ARCHITECTURAL NOTES.

)
5
7
2
1
(
Z
N
L
A
R
O
H

%uARCHITEULNOS.

05
/04
/16
1.

All

dimensions

shown

on

drawings

are

imperial

dimensions

i.e.in

feet

and

14.
All

inches.

block

shall

be

work
of

below

solid

ground

block

or

level,at

cill

and

jump

to

door

and

window

1
77
28
09
90
-22

71
OWNER 2:

opening

concrete.

F
B
N
I
Z
Y
&
E
M
A
H
S

S
L
U
A
N
I
B
D
H
O
M

Drawings

shall

not

be

scaled,only

written

dimensions

shall

be

followed.

15.
All

concrete

approved

In

case

that

of

any

shall

taken

on

be

descrepency

brought

site

till

to

on

drawings

consultants

consultant

has

in

dimensions

attention

resolved

the

at

or

once

above

in

and

any

no

other

work

by

details,

shall

the

Contractor

drainage,and
shall

shall

be

The

main

the

work

All

A/C

and

contractor
at

site

junctions

ensure
on

be

as

prior

work
by

R.C.members
mesh

for

shall
the

and

site

to

operations.

execution

block

demolished

and

work

before

All

balcony,verandah,toilet

general

finished

kitchen

and

floor

toilet

and

level

kitchen

and

entrance

finished

provide

without

shall

be

covering

door

(Full

floor

1/2"thick
width

of

throughly

protected

by

1000gauge

polythene

sheet

All

block

unless

dimensions-

quality

of

re-built

any

level

marble

shall

shall

otherwise

comply

be

to

B.S.2028.All

8"or4"thick(as

per

internal

drawing)

All

levels

with

shall

be

as

per

As

block

per

6"wide-

17.
Unless

above

Dubai

the

ground

Muncipality

otherwise

specified

3/4"thick

sand/cemend

minimum

1/2"thick

higher

indicated

than

on

level

the

drawings

outside

level

of

the

or

are

related

the

road,whichever

centre

of

the

to

+0'-0"level
is

finished

of

instructed

of

walls

above

concrete

the

blocks

level

shall

Ragulation)

as

be

10"thick

shown

in

insulated

typical

A.C

concrete

section

sheets

CONSULTA

all

external

plaster

smooth

and

walls

all

shall

internal

sand/cemend

be

rendered

walls

plaster

shall

using

with

be

minimum

plastered

expamet

FAKHRY ENGINEERING

CONSULTANCY

with

profiles

and

P.OBX:412DUAI

x
a
F
5
2
)
4
1
7
9
+
(
;
l
e
T

1/2"below

to

bath

room

consultant's

refering

higher.This

level

block

hollow

lath.

o
N
.
v
e
R

18.
Contractor

ground

as

indicated.

shall

supply

shop

drawings

showing

windows,kitchen,cupboards,entrance,gate,etc.for

highest

coats

cost.

plaster.

treshold

openings)

work

level

Externel

block(

to

additional

covered

with

(b)
All

all-

instruction.

consultant.

ground

metal
7

be

and

work.

the

consultant

expamet

of

maintaining

be

shall

paint

be-

architectural,structural,electrical,-

smooth

site

required

expanded

with

responsible

Sub-standard

between

steel

to

verified

shall

standards

galvanised

co-ordinate

drawings

checked

acceptable

throughly

underground
bituminous

descrepency.

All
16.(a)

work

quality

to

the

level

the

commencement

shall

nearest

for

be

consultant's

that

main-

of

work

contractor

approval

shall

minimum

also

2weeks

details

and

consultants
submit

prior

to

sizes

schedule

the

of

approval
of

n
o
t
p
i
r
c
s
e
D

e
t
a
D

doors,

prior

to

ironmongery

commencement

of

work.

road.

finished

ground

described

above

floor
or

level

as

shall

be

otherwise

minimum

2'-0"

above

+0'-0"level

19.
Contractor shall submit samples of
of work minimum 2weeks before.

as

meterials

standards

used

and

as

in

construction

approved

by

for

approval

prior

to

execution

indicated.

20.

10
All

materials

shall

be

consultant

of

the

prior

best

to

quality

to

commencement

attain
of

BRITTISH

work.

These

drawings

DWG.shall

not

drawings

shall

be

are

copied

be

copy

or

rights

of

re-produced

returned

back

to

the

M/s Fakhry

without

Engineering

consultant's

consultant

on

Consultancy
.These

permission.All

completion

of

the

the

N
F
S
G
I
R
Y
P
O
C
E
H
T
L

O
T
F
C
P
S
,
G
N
W
A
R
D
.
E
I

job.

D
V
R
A
B
J
S
I
H
F
O
.
C
T
E

L
F
T
I
C
U
P
E
R
Y
D
B
O
N

N
M
E
U
O
H
I
W
S
T
R
A
P

:
E
H
T
F
O

11
contractor
consultant

shall
@

no

fecilitate
extra

testing

of

any

material

on

site

when

required

by

the

cost.

T
L
U
S
O
C
I
G
N
E
Y
R
H
K
A
F

21.
Contractor

shall

submit

the

shop

fighting/alarm,drainage,water
commencement
12.
All

kitchen,bathrooms

with

dense

light

welded

polyster

quality

and

and

weight
fibre

applied

toilets

concrete

reinforced

as

per

shall

have

screed

laid

bituminous

consultant's

minimum
over

8"sunken

minimum

waterproofing

portion

4mm.thick

membrance

24

hours

and

shall

be

kitchen

approved

by

the

shall

consultant

be

of

prior

to

for

laying

installation.Details

prior

to

5
2
)
4
1
7
9
+
(
:
.
l
e
T

the

5
2
)
4
1
7
9
+
(
:
x
a
F

work.

DRAWING TITLE :

approved

22.
Slopping

tested

I
A
U
D
2
1
4
:
X
B
O
.
P

layout(electrical,fire-

S
O
N
L
U
E
T
I
H
C
R
A

instructions.

waterproofing

etc.)with

service

filled-

and
and

supply

of

torch

roof

slab

waterproofing

13.
Roof,bathroom,toilet

of

drawings

roof

covered

membrane

tiles

over

with

of

roofing

approved

tiles

shall

quality,prior

be
to

protected
fixing

of

with

timber

liquid

SCALE:

1:0

battens

it.

STAMP

DRAWN BY:

minimum

screed

over

it.

M.KHALI

DESIGNED BY:

A.SHRF

23.
All

doors,windows

subframe
of

all

paint

of

frames

full

and
width

touching

approved

by

the

arch
of

openings

the

wall

wall

shall

shall

in

be

have

case

coated

no

min.1/2"thick

subframe

with

coats

in
of

marine

plywood

specified.Inside
the

DATE :

face

CHECKED BY:

6
1
0
2

anti-termite

consultant.

A-701

6
3
/
1
0
g
w
d
.
H
R
A
l
i
m
T
O
L
P
p
o
t
k
D
2
h
c
a
r
e
s
U
\
:
C

E.HLMY