Академический Документы
Профессиональный Документы
Культура Документы
2 VILLA
ARCHITECTURAL NOTES.
)
5
7
2
1
(
Z
N
L
A
R
O
H
%uARCHITEULNOS.
05
/04
/16
1.
All
dimensions
shown
on
drawings
are
imperial
dimensions
i.e.in
feet
and
14.
All
inches.
block
shall
be
work
of
below
solid
ground
block
or
level,at
cill
and
jump
to
door
and
window
1
77
28
09
90
-22
71
OWNER 2:
opening
concrete.
F
B
N
I
Z
Y
&
E
M
A
H
S
S
L
U
A
N
I
B
D
H
O
M
Drawings
shall
not
be
scaled,only
written
dimensions
shall
be
followed.
15.
All
concrete
approved
In
case
that
of
any
shall
taken
on
be
descrepency
brought
site
till
to
on
drawings
consultants
consultant
has
in
dimensions
attention
resolved
the
at
or
once
above
in
and
any
no
other
work
by
details,
shall
the
Contractor
drainage,and
shall
shall
be
The
main
the
work
All
A/C
and
contractor
at
site
junctions
ensure
on
be
as
prior
work
by
R.C.members
mesh
for
shall
the
and
site
to
operations.
execution
block
demolished
and
work
before
All
balcony,verandah,toilet
general
finished
kitchen
and
floor
toilet
and
level
kitchen
and
entrance
finished
provide
without
shall
be
covering
door
(Full
floor
1/2"thick
width
of
throughly
protected
by
1000gauge
polythene
sheet
All
block
unless
dimensions-
quality
of
re-built
any
level
marble
shall
shall
otherwise
comply
be
to
B.S.2028.All
8"or4"thick(as
per
internal
drawing)
All
levels
with
shall
be
as
per
As
block
per
6"wide-
17.
Unless
above
Dubai
the
ground
Muncipality
otherwise
specified
3/4"thick
sand/cemend
minimum
1/2"thick
higher
indicated
than
on
level
the
drawings
outside
level
of
the
or
are
related
the
road,whichever
centre
of
the
to
+0'-0"level
is
finished
of
instructed
of
walls
above
concrete
the
blocks
level
shall
Ragulation)
as
be
10"thick
shown
in
insulated
typical
A.C
concrete
section
sheets
CONSULTA
all
external
plaster
smooth
and
walls
all
shall
internal
sand/cemend
be
rendered
walls
plaster
shall
using
with
be
minimum
plastered
expamet
FAKHRY ENGINEERING
CONSULTANCY
with
profiles
and
P.OBX:412DUAI
x
a
F
5
2
)
4
1
7
9
+
(
;
l
e
T
1/2"below
to
bath
room
consultant's
refering
higher.This
level
block
hollow
lath.
o
N
.
v
e
R
18.
Contractor
ground
as
indicated.
shall
supply
shop
drawings
showing
windows,kitchen,cupboards,entrance,gate,etc.for
highest
coats
cost.
plaster.
treshold
openings)
work
level
Externel
block(
to
additional
covered
with
(b)
All
all-
instruction.
consultant.
ground
metal
7
be
and
work.
the
consultant
expamet
of
maintaining
be
shall
paint
be-
architectural,structural,electrical,-
smooth
site
required
expanded
with
responsible
Sub-standard
between
steel
to
verified
shall
standards
galvanised
co-ordinate
drawings
checked
acceptable
throughly
underground
bituminous
descrepency.
All
16.(a)
work
quality
to
the
level
the
commencement
shall
nearest
for
be
consultant's
that
main-
of
work
contractor
approval
shall
minimum
also
2weeks
details
and
consultants
submit
prior
to
sizes
schedule
the
of
approval
of
n
o
t
p
i
r
c
s
e
D
e
t
a
D
doors,
prior
to
ironmongery
commencement
of
work.
road.
finished
ground
described
above
floor
or
level
as
shall
be
otherwise
minimum
2'-0"
above
+0'-0"level
19.
Contractor shall submit samples of
of work minimum 2weeks before.
as
meterials
standards
used
and
as
in
construction
approved
by
for
approval
prior
to
execution
indicated.
20.
10
All
materials
shall
be
consultant
of
the
prior
best
to
quality
to
commencement
attain
of
BRITTISH
work.
These
drawings
DWG.shall
not
drawings
shall
be
are
copied
be
copy
or
rights
of
re-produced
returned
back
to
the
M/s Fakhry
without
Engineering
consultant's
consultant
on
Consultancy
.These
permission.All
completion
of
the
the
N
F
S
G
I
R
Y
P
O
C
E
H
T
L
O
T
F
C
P
S
,
G
N
W
A
R
D
.
E
I
job.
D
V
R
A
B
J
S
I
H
F
O
.
C
T
E
L
F
T
I
C
U
P
E
R
Y
D
B
O
N
N
M
E
U
O
H
I
W
S
T
R
A
P
:
E
H
T
F
O
11
contractor
consultant
shall
@
no
fecilitate
extra
testing
of
any
material
on
site
when
required
by
the
cost.
T
L
U
S
O
C
I
G
N
E
Y
R
H
K
A
F
21.
Contractor
shall
submit
the
shop
fighting/alarm,drainage,water
commencement
12.
All
kitchen,bathrooms
with
dense
light
welded
polyster
quality
and
and
weight
fibre
applied
toilets
concrete
reinforced
as
per
shall
have
screed
laid
bituminous
consultant's
minimum
over
8"sunken
minimum
waterproofing
portion
4mm.thick
membrance
24
hours
and
shall
be
kitchen
approved
by
the
shall
consultant
be
of
prior
to
for
laying
installation.Details
prior
to
5
2
)
4
1
7
9
+
(
:
.
l
e
T
the
5
2
)
4
1
7
9
+
(
:
x
a
F
work.
DRAWING TITLE :
approved
22.
Slopping
tested
I
A
U
D
2
1
4
:
X
B
O
.
P
layout(electrical,fire-
S
O
N
L
U
E
T
I
H
C
R
A
instructions.
waterproofing
etc.)with
service
filled-
and
and
supply
of
torch
roof
slab
waterproofing
13.
Roof,bathroom,toilet
of
drawings
roof
covered
membrane
tiles
over
with
of
roofing
approved
tiles
shall
quality,prior
be
to
protected
fixing
of
with
timber
liquid
SCALE:
1:0
battens
it.
STAMP
DRAWN BY:
minimum
screed
over
it.
M.KHALI
DESIGNED BY:
A.SHRF
23.
All
doors,windows
subframe
of
all
paint
of
frames
full
and
width
touching
approved
by
the
arch
of
openings
the
wall
wall
shall
shall
in
be
have
case
coated
no
min.1/2"thick
subframe
with
coats
in
of
marine
plywood
specified.Inside
the
DATE :
face
CHECKED BY:
6
1
0
2
anti-termite
consultant.
A-701
6
3
/
1
0
g
w
d
.
H
R
A
l
i
m
T
O
L
P
p
o
t
k
D
2
h
c
a
r
e
s
U
\
:
C
E.HLMY