THULENDI PHULPUR PIPELINE PROJECT

18 OD X 71.2 KMS

JAIHIND PROJECTS LTD.

WORK PROCEDURE
FOR
FALSE CEILING

CLIENT

: GAIL (INDIA) LIMITED

CONSULTANT

: TRACTEBEL ENGINEERING

CONTRACTOR

: JAIHIND PROJECTS LTD

JAIHIND PROJECTS LTD


PREPARED
BY

CHECKED BY

GAIL / TRACTEBEL
REVIEWED
BY

APPROVED
BY

NAME
DESIGNATION
SIGN
DATE

DOCUMENT NO.

REV

FALSE CEILING

Page 1 of 4
JPL/GAIL/TPPL/QC/WP/CIVIL/03

00

THULENDI PHULPUR PIPELINE PROJECT


18 OD X 71.2 KMS

JAIHIND PROJECTS LTD.

CONTENT

SR.

DESCRIPTION

PAGE NO.

Purpose

Scope

Controlling Specification

False Ceiling Grid System

False Ceiling Tiles

Documentation

ITP

Inspection Report

DOCUMENT NO.

REV

FALSE CEILING

Page 2 of 4
JPL/GAIL/TPPL/QC/WP/CIVIL/03

00

THULENDI PHULPUR PIPELINE PROJECT


18 OD X 71.2 KMS

1.

JAIHIND PROJECTS LTD.

PURPOSE
The purpose covers supervision and method of record keeping for false floor and false ceiling.

2.

SCOPE
This procedure covers material, supervision and method of executing the false floor and false
ceiling

3.

CONTROLLING SPECIFICATION
TE Specification

4.

GTS Z / 02 /0017

FALSE CEILING GRID SYSTEMS


Galvanized Iron (GI) system shall be erected for the purpose of supporting Mineral Fibre false
ceiling tiles.
MATERIAL
A)

Main Runner
Main runner shall be of hot dipped galvanized steel and T shaped of 24 mm x 38 mm
size, 0.33 mm thickness with double rotary stitching.

B)

Cross Runner
Cross runner shall be of hot dipped galvanized steel and T shaped of 24 mm x 30 mm
size, 0.25 mm thickness, 1200 mm long and 24 mm x 25 mm size, 0.25 mm thickness,
600 mm long with double rotary stitching.

C)

Perimeter Section
Material shall same as runners. Sections shall be 22 mm x 22 mm size of 0.45 mm
thickness. Exposed areas of all the metallic members shall be power coated. (25 Micron).

ERECTION
Main runner shall be placed at the spacing of maximum 1200 mm c/c. Cross runners shall be
fixed @ maximum 600 mm to obtain a grid of 600 mm x 600 mm.
The grid shall be suspended by means of 4 mm dia MS wire, 6 mm thick MS cleat of 25 mm
section, dash fasteners and level adjustors.
The overall grid system shall be rigid by self-locking joints, in accordance with false ceiling
patterns perfectly leveled and aligned at desirable height as per drawings.

DOCUMENT NO.

REV

FALSE CEILING

Page 3 of 4
JPL/GAIL/TPPL/QC/WP/CIVIL/03

00

THULENDI PHULPUR PIPELINE PROJECT


18 OD X 71.2 KMS

5.

JAIHIND PROJECTS LTD.

FALSE CEILING TILES


The tiles shall be placed over the supporting grid system by means of hold down clips at four
corners of each tiles and one in canter of each side. The finished false ceiling shall be perfectly
leveled and aligned at desired height as per drawings. Necessary Electrical and AC and other
fixture shall be provided as per drawing and in coordination with relevant construction activities.
MINERAL FIBRE TILES

Mineral fiber false ceiling tiles shall be with durable regular edging having NRC value of
minimum 0.50, Light reflectance value of minimum 80%, K value of 0.052 to 0.057
w/m deg C and fire performance conforming to class I as per BS:476. The tiles shall be
of 600 mm x 600mm x 15 mm size. The tiles shall have fissured or granulated texture
on the front side as specified. Backside shall be provided with protective coating.
6.

DOCUMENTATION
Inspection Report
Inspection & Test Plan

:
:

As per attached format


As per attached format

NOTE: In case of any conflict between this procedures and contract specification the
latter supercede this procedure.