ACKNOW

WLEDGEMENT
T

W
With
the objective
o
to provide a summary of ov
verall
perform
mance of the Proviince undeer PIPIP, the Prog
gram
Management Uniit, PIPIP has been preparing
g the An
nnual
Monitorring Reportt at the end
d of each fiinancial yeear as one of
o its
monitorring functio
ons. The cu
urrent repo
ort containss an accoun
nt of
physicall and finan
ncial achiev
vements, made
m
under PIPIP du
uring
thefirstquarterof201516(en
ndingSepteember2015)).

T
Thisreportp
providesreegionwise detailofth
heexecuted
dcivilwork
ksandfinancial

utilizatio
onfortheffirstquarterrof2015166.Itisexpeectedthattthisreportw
willbeaso
ource
of autheentic inform
mation for all those who are directly
d
or indirectly related to this
project.

C
Collection
of
o informattion and an
nalysis of data
d
for a program spread
s
overr the

entireprrovince,do
oesinvolvededicatedeeffortsonth
hepartofP
PMUteam.Iamespeccially
appreciaative of Mrr. Riaz Ah
hmed, Depu
uty Project Director and
a
Mr. Taariq Mahm
mood,
Assistan
nt Director (M&E) forr their pro
ofessional contribution
c
ns. I hope that the whole
w
PMU team will keep up the same profeessional app
proach witth the samee zeal & zeest in
future.

(DR.A
AYESHAS
SAEED)
(DMG/PAS
S)
PrrojectDirecctor

CONTENTS

Description

Acknowledgements

Contents

PunjabSummary

1 BahawalpurRegion

2 DeraGhaziKhanRegion

3 FaisalabadRegion

4 GujranwalaRegion

5 LahoreRegion

6 MultanRegion

7 SargodhaRegion

8 RawalpindiRegion

Page
No.
i

ii

12

34

56

78

910

1112

1314

1516

17

ii

PUNJABSUMMARY
A.

RegularWatercourses

i.

PhysicalProgress
RegionwisephysicalprogressofPunjabIrrigatedAgricultureProductivityImprovement

ProjectunderthecomponentofRegularWatercoursesforthequarterendingSeptember,2015is
tabulatedasunder:
ICRI
ICRII
Nameof
Target
TBAP(15%) Achieved TBAP(1%) Achieved
Region
23
2
Bahawalpur
150
45
3
29
2
D.GKhan
191
57
12
11
1
Faisalabad
73
20
4
17
1
Gujranwala
112
44
14
33
2
Lahore
218
69
7
46
3
Multan
308
77
6
22
1
Sargodha
148
27
3
0
0
Rawalpindi
0
0
0
1200
180
339
12
49
Total:

FCR
TBAP(0%) Achieved
0

0
0

AbovetablerevealsthatasperTimeBoundActionPlan(TBAP)
180 (15% of the target) ICRI were required to be verified against which 339 ICRI
havebeenverified.
12(1%ofthetarget)ICRIIwererequiredtobeverifiedagainstwhich49ICRIIhave
beenverified.
AsperTBAPduringfirstquarternoFCRisrequiredtobeverified.

ii.

FinancialUtilization
Financial utilization for the quarter ending September, 2015 is given in the following

table:whichshowsthatRs.129.240million(96%ofexpectedutilization)havebeenutilizedat
theendoffirstquarter.InregionsBahawalpur,D.GKhanandFaisalabadutilizationremained
lowbutthesamewasexcellentinGujranwala,Lahor,MultanandSargodharegions.
(Rs.inmillion)
Nameof
Region
Bahawalpur
D.GKhan
Faisalabad
Gujranwala
Lahore
Multan
Sargodha
Rawalpindi
Total:

FundsUtilizedupto30092915
ExpectedUtilization
st
upto30092015
1 Release 2nd Release 3rd Release
Total

15.389
14.770
9.000
12.120
21.644
44.054
17.276

134.253

3.472
0.514

24.380
28.323
34.399
12.018

103.106

1.946
2.601
0.561
6.357
1.623
2.125
0.650

15.863

2.730

7.541

10.271

5.418
3.115
3.291
30.737
29.946
44.065
12.668

129.240

%age

35
21
37
254
138
100
73

96

Page1

B.

HighEfficiencyIrrigationSystem(HEIS)

i.

PhysicalProgress
Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:
Achievementupto30092015(Acres)
Nameof
District

Target
(Acres)

AsperTBAP
upto30092015

Bahawalpur

1150

D.GKhan

WorkOrders
Issued

Material
Verified

Commissioning
Verified

288

230

192

67

1050

263

250

75

Faisalabad

900

225

130

36

Gujranwala

1200

300

109

39

Lahore

1000

250

189

48

Multan

1200

300

68

15

Sargodha

1400

350

104

Rawalpindi

2100

525

244

37

Total:

10000

2500

1324

442

73

Above table shows that situation under component HEIS does not reflect a rosy picture.
Commissioning at only 73 acres has been verified at the end of first quarter, while as per TBAP it should
be 2500 acres upto 30-09-2015. Work orders on 1324 acres have been issued and material on 442 acres has
been verified.

ii.

FinancialUtilization
Financial utilization for the quarter ending September, 2015 is given in the following

tablewhichrevealsthatonlyRs.3.573million(2%oftheexpectedutilization)havebeenutilized
attheendoffirstquarter.

(Rs.inmillion)
Nameof
Region

ExpectedUtilization
upto30092015

FundsUtilizedupto30092915
1stRelease 2ndRelease 3rdRelease

%age
Total

Bahawalpur

22.856

0.824

1.930

2.754

12

D.GKhan

20.869

0.165

0.165

Faisalabad

17.888

0.280

0.280

Gujranwala

23.850

0.160

0.160

Lahore

19.875

0.030

0.030

Multan

23.850

0.162

0.162

Sargodha

27.825

0.000

0.000

Rawalpindi

41.738

0.022

0.022

Total:

198.750

1.643

1.930

3.573

Page2

Bahawalpur
A.

RegularWatercourses

i.

PhysicalProgress
In Bahawalpur region districtwise physical progress of Punjab Irrigated Agriculture

ProductivityImprovementProjectunderthecomponentofRegularWatercoursesforthequarter
endingSeptember,2015istabulatedasunder:
ICRI

NameofDistrict Target

ICRII

FCR

TBAP(15%) Achieved TBAP(1%) Achieved TBAP(0%) Achieved

Bahawalpur

50

14

RahimYarKhan

75

11

16

Bahawalnagar

25

15

150

23

45

Total:

AbovetablerevealsthatasperTimeBoundActionPlan(TBAP)
23(15%ofthetarget)ICRIwererequiredtobeverifiedagainstwhich45ICRIhave
beenverified.
2 (1% of the target) ICRII were required to be verified against which 3 ICRII have
beenverified.
During first quarter the region showed excellent performance to achieve the targets as
perTimeBoundActionPlan(TBAP).

ii.

FinancialUtilization
Financial utilization for the quarter ending September, 2015 is given in the following

table,whichrevealsthatRs.5.418millions(35%oftheexpectedutilization)havebeenutilizedin
theregionattheendoffirstquarter.IndistrictBahawalnagaralltheverifiedICRIarecarried
overfrompreviousyearthereforeutilizationremainednil.
(Rs.inmillion)
Nameof
District

ExpectedUtilization
upto30092015

FundsUtilizedupto30092915
First
Release

Second
Release

Third
Release

Total

%age

Bahawalpur

7.272

0.760

1.393

2.153

30

RahimYarKhan

8.117

2.712

0.553

3.265

40

15.389

3.472

1.946

5.418

35

Bahawalnagar
Total:

Page3

B.

HighEfficiencyIrrigationSystem(HEIS)

i.

PhysicalProgress

Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:

Target
(Acres)

AsperTBAP
upto30092015

Bahawalpur

350

RahimYarKhan
Bahawalnagar

NameofDistrict

Total:

Achievementupto30092015(Acres)
WorkOrders
Issued

Material
Verified

Commissioning
Verified

88

110

95

30

400

100

77

77

37

400

100

43

20

1150

288

230

192

67

Above table shows that situation in the region under component HEIS is very poor. As per
TBAP against the target of 1150 acres, commissioning on 288 acres was required to be verified
upto 30-09-2015, while commissioning on only 67 acres has been verified at the end of first
quarter. Work orders on 230 acres have been issued and material on 75 acres has been verified.
ii.

FinancialUtilization

Financial utilization for the quarter ending September, 2015 is given in the following

table which reveals that only Rs. 2.754 million (12% of the expected utilization) have been
utilizedattheendoffirstquarter.IndistrictBahawalnagarRs.7.950wereexpectedtobeutilized
bututilizationremainednil.

(Rs.inmillion)

NameofDistrict

FundsUtilizedupto30092915

ExpectedUtilization
upto30092015

First
Release

Second
Release

Third
Release

Total

%age

Bahawalpur

6.956

0.459

1.362

1.821

26

RahimYarKhan

7.950

0.365

0.568

0.933

12

Bahawalnagar

7.950

22.856

0.824

1.930

2.754

12

Total:

Page4

DeraGhaziKhan
A.

RegularWatercourses

i.

PhysicalProgress
PhysicalprogressundercomponentRegularWatercoursesforthequarterending

September,2015istabulatedasunder:
Nameof
District

Target

ICRI

ICRII

FCR

TBAP(15%) Achieved TBAP(1%) Achieved TBAP(0%) Achieved

D.GKhan

60

24

MuzaffarGarrh

75

11

16

Rajanpur

15

52
191

29

57

12

Layyah
Total:

AbovetablerevealsthatasperTimeBoundActionPlan(TBAP)

29(15%ofthetarget)ICRIwererequiredtobeverifiedagainstwhich,57ICRI
have been verified. All the districts except Layyah performed well in case of
ICRIverification.
3(1%ofthetarget)ICRIIwererequiredtobeverifiedagainstwhich12,ICRII
have been verified. All the districts showed excellent performance in this
regard.
AsperTBAPattheendoffirstquarternoFCRisrequiredtobeverified.
ii.

FinancialUtilization
Financial utilization for the quarter ending September, 2015 is given in the

following table which reveals that Rs. 3.115 million (21% of expected utilization) have
been utilized in the region at the end of first quarter. In district Rajanpur utilization
duringthreemonthsoffirstquarterisnilwhichcausedslowutilizationintheregion.
(Rs.inmillion)
Nameof
District

Expected
Utilizationupto
30092015

FundsUtilizedupto30092915
%age

First
Release

Second
Release

Third
Release

Total

0.514

40

2.101

53

D.GKhan

1.280

0.514

MuzaffarGarrh

3.942

2.101

Rajanpur

8.098

Layyah

1.450

0.500

0.500

34

14.770

0.514

2.601

3.115

21

Total:

Page5

B.

HighEfficiencyIrrigationSystem(HEIS)

i.

PhysicalProgress
Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:
Nameof
District

Target
(Acres)

AsperTBAP
upto30092015

D.GKhan

250

MuzaffarGarrh

Achievementupto30092015(Acres)
WorkOrders
Issued

Material
Verified

Commissioning
Verified

63

250

63

206

60

Rajanpur

200

50

Layyah

350
1050

88
264

38

250

75

Total:

Above table shows that situation in the region under component HEIS is very pathetic. As
per TBAP against the target of 1050 acres, commissioning on 264 acres was required to be
verified upto 30-09-2015, while commissioning on only 6 acres has been verified at the end of
first quarter. Work orders on 250 acres have been issued and material on 75 acres has been
verified.
ii.

FinancialUtilization

FinancialutilizationforthequarterendingSeptember,2015isgiveninthefollowingtable

whichrevealsthatonlyRs.0.165million(1%oftheexpectedutilization)havebeenutilizedatthe
endoffirstquarter. IndistrictsD.GKhan,MuzaffargarrhandRajanpur, Rs.13.913million
wereexpectedtobeutilizedbututilizationremainednilduringfirstquarter.

(Rs.inmillion)
FundsUtilizedupto30092915

Expected
Utilizationupto30
092015

First
Release

Second
Release

Third
Release

Total

D.GKhan

4.969

MuzaffarGarrh

4.969

Rajanpur

3.975

Layyah

6.965

0.165

0.165

20.878

0.165

0.165

NameofDistrict

Total:

%age

Page6

Faisalabad
A.

RegularWatercourses

i.

PhysicalProgress
PhysicalprogressundercomponentRegularWatercoursesforthequarterending

September,2015istabulatedasunder:
Nameof
District

Target

ICRI

ICRII

FCR

TBAP(15%) Achieved TBAP(1%) Achieved TBAP(0%) Achieved

Faisalabad

10

Jhang

45

T.TSingh

Chiniot

17
73

12

20

Total:

AbovetablerevealsthatasperTimeBoundActionPlan(TBAP)

12(15%ofthetarget)ICRIwererequiredtobeverifiedagainstwhich20,ICRI
havebeenverified.AllthedistrictsachievedtheirtargetasperTBAP.
1(1%ofthetarget)ICRIIwasrequiredtobeverifiedagainstwhich4,ICRII
havebeenverified.
AsperTBAPattheendoffirstquarternoFCRisrequiredtobeverified.
ii.

FinancialUtilization
FinancialutilizationforthequarterendingSeptember,2015isgiveninthe

followingtablewhichrevealsthatRs.3.291million(37%ofexpectedutilization)have
beenutilizedintheregionattheendoffirstquarter.
(Rs.inmillion)
Nameof
District

Expected
Utilizationupto
30092015

FundsUtilizedupto30092915
%age

First
Release

Second
Release

Third
Release

Total

Faisalabad

5.000

1.410

1.410

28

Jhang

1.300

0.561

0.561

43

T.TSingh

1.700

0.967

0.967

57

Chiniot

1.000

0.353

0.353

35

9.000

0.561

2.730

3.291

37

Total:

Page7

B.

HighEfficiencyIrrigationSystem(HEIS)

i.

PhysicalProgress
Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:
Nameof
District

Target
(Acres)

AsperTBAP
upto30092015

Faisalabad

250

Jhang

Achievementupto30092015(Acres)
WorkOrders
Issued

Material
Verified

Commissioning
Verified

63

30

16

250

63

39

T.TSingh

250

63

45

20

Chiniot

150
900

38
227

16

130

36

Total:

Above table shows that situation in the region under component HEIS is very pathetic. As
per TBAP against the target of 900 acres, commissioning on 227 acres was required to be verified
upto 30-09-2015, while commissioning is nil at the end of first quarter. Work orders on 250 acres
have been issued and material on 75 acres has been verified.
ii.

FinancialUtilization

FinancialutilizationforthequarterendingSeptember,2015isgiveninthefollowingtable

whichrevealsthatonlyRs.0.280million(2%oftheexpectedutilization)havebeenutilizedatthe
endoffirstquarter. IndistrictsJhangandT.TSingh, utilizationremainednilwhileRs.9.938
millionwereexpectedtobeutilizedbythesedistrictsduringfirstquarter.

(Rs.inmillion)
NameofDistrict

FundsUtilizedupto30092915

ExpectedUtilization
upto30092015

First
Release

Second
Release

Third
Release

Total

%age

Faisalabad

4.969

0.207

0.207

Jhang

4.969

T.TSingh

4.969

2.981

0.073

0.073

17.888

0.280

0.280

Chiniot
Total:

Page8

Gujranwala
A.

RegularWatercourses

i.

PhysicalProgress
PhysicalprogressundercomponentRegularWatercoursesforthequarterending

September,2015istabulatedasunder:
Nameof
District

Target

ICRI

ICRII

FCR

TBAP(15%) Achieved TBAP(1%) Achieved TBAP(0%) Achieved

Gujranwala

50

20

Hafizabad

25

Narowal

Sialkot

15

M.BDin

20

11

1
112

17

44

14

Gujrat
Total:

AbovetablerevealsthatasperTimeBoundActionPlan(TBAP)

17(15%ofthetarget)ICRIwererequiredtobeverifiedagainstwhich44,ICRI
havebeenverifiedwhichisevidentofexcellentperformancebyalldistrictsto
achievetheirtargetasperTBAP.
1(1%ofthetarget)ICRIIwasrequiredtobeverifiedagainstwhich14,ICRII
havebeenverified.
AsperTBAPattheendoffirstquarternoFCRisrequiredtobeverified.
ii.

FinancialUtilization
FinancialutilizationforthequarterendingSeptember,2015isgiveninthe

followingtablewhichrevealsthatRs.30.737million(254%ofexpectedutilization)have
beenutilizedintheregionattheendoffirstquarter.
(Rs.inmillion)
First
Release

Second
Release

Third
Release

Total

Gujranwala

4.800

8.929

1.465

10.394

217

Hafizabad

4.080

3.370

3.370

83

Sialkot

0.650

1.237

0.489

1.726

266

M.BDin

2.590

9.497

4.075

13.572

524

1.347

0.328

1.675

12.120

24.380

6.357

30.737

254

Narowal

Gujrat
Total:

FundsUtilizedupto30092915

Expected
Utilizationupto
30092015

Nameof
District

%age

Page9

B.

HighEfficiencyIrrigationSystem(HEIS)

i.

PhysicalProgress
Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:
Nameof
District

Target
(Acres)

AsperTBAP
upto30092015

Gujranwala

175

Hafizabad

Achievementupto30092015(Acres)
WorkOrders
Issued

Material
Verified

Commissioning
Verified

44

12

150

38

Narowal

175

44

Sialkot

200

50

15

15

M.BDin

250

63

26

12

Gujrat

250
1200

63
300

56

12

109

39

Total:

Above table shows that situation in the region under component HEIS is very pathetic. As
per TBAP against the target of 1200 acres, commissioning on 300 acres was required to be
verified upto 30-09-2015, while commissioning is nil at the end of first quarter. Work orders on
109 acres have been issued and material on 39 acres has been verified.
ii.

FinancialUtilization

FinancialutilizationforthequarterendingSeptember,2015isgiveninthefollowingtable

whichrevealsthatonlyRs.0.160million(1%oftheexpectedutilization)havebeenutilizedatthe
endoffirstquarter.Onlyonedistrict,M.BDinutilizedthisamountwhileinallotherdistrictsof
theregion,utilizationremainednilwhileRs.18.881millionwereexpectedtobeutilizedbythese
districtsduringfirstquarter.

(Rs.inmillion)
NameofDistrict

FundsUtilizedupto30092915

ExpectedUtilization
upto30092015

First
Release

Second
Release

Third
Release

Total

%age

Gujranwala

3.478

Hafizabad

2.981

Narowal

3.478

Sialkot

3.975

M.BDin

4.969

0.160

0.160

Gujrat

4.969

23.850

0.160

0.160

Total:

Page10

Lahore
A.

RegularWatercourses

i.

PhysicalProgress
PhysicalprogressundercomponentRegularWatercoursesforthequarterending

September,2015istabulatedasunder:
Nameof
District

Target

ICRI

ICRII

FCR

TBAP(15%) Achieved TBAP(1%) Achieved TBAP(0%) Achieved

Lahore

10

Sheikhupura

48

14

NankanaSahib

10

Kasur

75

11

16

Okara

75
218

11

34

33

69

Total:

AbovetablerevealsthatasperTimeBoundActionPlan(TBAP)

33(15%ofthetarget)ICRIwererequiredtobeverifiedagainstwhich69,ICRI
havebeenverifiedwhichisevidentofexcellentperformancebyalldistrictsto
achievetheirtargetasperTBAP.
3(1%ofthetarget)ICRIIwasrequiredtobeverifiedagainstwhich7,ICRII
havebeenverified.
AsperTBAPattheendoffirstquarternoFCRisrequiredtobeverified.
ii.

FinancialUtilization
Financial utilization for the quarter ending September, 2015 is given in the

followingtablewhichrevealsthatRs.29.946million(138%ofexpectedutilization)have
beenutilizedintheregionattheendoffirstquarter.
(Rs.inmillion)
FundsUtilizedupto30092915

Expected
Utilizationupto
30092015

First
Release

Second
Release

Third
Release

Total

Lahore

1.400

Sheikhupura

4.000

7.765

7.765

194

NankanaSahib

1.103

1.955

1.955

177

Kasur

6.354

9.242

9.242

145

Okara

8.787

9.361

1,623

10.984

125

21.644

28.323

1.623

29.946

138

Nameof
District

Total:

%age

Page11

B.

HighEfficiencyIrrigationSystem(HEIS)

i.

PhysicalProgress
Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:
Nameof
District

Target
(Acres)

AsperTBAP
upto30092015

Lahore

150

Sheikhupura

Achievementupto30092015(Acres)
WorkOrders
Issued

Material
Verified

Commissioning
Verified

38

21

200

50

45

NankanaSahib

150

38

Kasur

250

63

38

Okara

250
1000

63
250

85

48

189

48

Total:

Above table shows that situation in the region under component HEIS is very pathetic. As
per TBAP against the target of 1000 acres, commissioning on 250 acres was required to be
verified upto 30-09-2015, while commissioning is nil at the end of first quarter. Work orders on
189 acres have been issued and material on 48 acres has been verified. It is pertinent to mention
here that in district Nankana Sahib, where commissioning on 38 acres was required to be verified,
even work order has not been issued on a single acre.
ii.

FinancialUtilization

FinancialutilizationforthequarterendingSeptember,2015isgiveninthefollowingtable

whichrevealsthatanegligibleamountofRs.0.030millionhasbeenutilizedagainstRs.19.875
million.InLahore,Sheikhupura,NankanaSahibandKasurdistricts,utilizationisnil.

(Rs.inmillion)
NameofDistrict

FundsUtilizedupto30092915

ExpectedUtilization
upto30092015

First
Release

Second
Release

Third
Release

Total

%age

Lahore

2.981

Sheikhupura

3.975

NankanaSahib

2.981

Kasur

4.969

4.969

0.030

0.030

19.875

0.030

0.030

Okara
Total:

Page12

Multan
A.

RegularWatercourses

i.

PhysicalProgress
PhysicalprogressundercomponentRegularWatercoursesforthequarterending

September,2015istabulatedasunder:
Nameof
District

Target

ICRI

ICRII

FCR

TBAP(15%) Achieved TBAP(1%) Achieved TBAP(0%) Achieved

Multan

75

11

17

Khanewal

65

10

Vehari

65

10

20

Lodhran

48

13

Sahiwal

25

10

30
308

46

77

Pakpattan
Total:

AbovetablerevealsthatasperTimeBoundActionPlan(TBAP)

46(15%ofthetarget)ICRIwererequiredtobeverifiedagainstwhich77,ICRI
havebeenverifiedwhichshowsexcellentperformancetoachievetheirtarget
asperTBAP.
3(1%ofthetarget)ICRIIwasrequiredtobeverifiedagainstwhich6,ICRII
havebeenverified.
AsperTBAPattheendoffirstquarternoFCRisrequiredtobeverified.
ii.

FinancialUtilization
FinancialutilizationforthequarterendingSeptember,2015isgiveninthe

followingtablewhichrevealsthatRs.44.065million(100%ofexpectedutilization)have
beenutilizedintheregionattheendoffirstquarter.
(Rs.inmillion)
First
Release

Second
Release

Third
Release

Total

Multan

2.980

2.980

2.980

100

Khanewal

2.770

2.770

2.770

100

Vehari

14.724

14.324

0.400

14.724

100

Lodhran

7.370

7.315

0.055

7.370

100

Sahiwal

9.200

1.670

7.541

9.211

100

Pakpattan

7.010

7.010

7.010

100

44.054

34.399

2.125

7.541

44.065

100

Total:

FundsUtilizedupto30092915

Expected
Utilizationupto
30092015

Nameof
District

%age

Page13


B.

HighEfficiencyIrrigationSystem(HEIS)

i.

PhysicalProgress
Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:
Nameof
District

Target
(Acres)

AsperTBAP
upto30092015

Multan

200

Khanewal

Achievementupto30092015(Acres)
WorkOrders
Issued

Material
Verified

Commissioning
Verified

50

200

50

21

Vehari

200

50

10

Lodhran

200

50

10

Sahiwal

250

63

17

10

Pakpattan

150
1200

38
300

10

68

15

Total:

Above table shows that situation in the region under component HEIS is very pathetic. As
per TBAP against the target of 1200 acres, commissioning on 300 acres was required to be
verified upto 30-09-2015, while commissioning is nil at the end of first quarter. Work orders on
68 acres have been issued and material on 15 acres has been verified.
ii.

FinancialUtilization

FinancialutilizationforthequarterendingSeptember,2015isgiveninthefollowingtable

whichrevealsthatanegligibleamountofRs.0.162millionhasbeenutilizedagainstRs.23.850
million.InMultan,Vehari,Lodhran,SahiwalandPakpattandistricts,utilizationis0%againstan
amountofRs.20.869million.

(Rs.inmillion)
NameofDistrict

ExpectedUtilization
upto30092015

FundsUtilizedupto30092915
First
Release

Second
Release

Third
Release

Total

%age

Multan

3.975

Khanewal

3.975

0.149

0.149

Vehari

3.975

Lodhran

3.975

Sahiwal

4.969

2.981

0.013

0.013

23.850

0.162

0.162

Pakpattan
Total:

Page14

Sargodha
A.

RegularWatercourses

i.

PhysicalProgress
PhysicalprogressundercomponentRegularWatercoursesforthequarterending

September,2015istabulatedasunder:
Nameof
District

Target

ICRI

ICRII

FCR

TBAP(15%) Achieved TBAP(1%) Achieved TBAP(0%) Achieved

Sargodha

55

13

Khushab

27

Bhakkar

46

Mianwali

20
148

22

27

Total:

AbovetablerevealsthatasperTimeBoundActionPlan(TBAP)

22(15%ofthetarget)ICRIwererequiredtobeverifiedagainstwhich27,ICRI
havebeenverified.
1(1%ofthetarget)ICRIIwasrequiredtobeverifiedagainstwhich3,ICRII
havebeenverified.
AsperTBAPattheendoffirstquarternoFCRisrequiredtobeverified.
ii.

FinancialUtilization
Financial utilization for the quarter ending September, 2015 is given in the

followingtablewhichrevealsthatRs.12.668million(73%ofexpectedutilization)have
been utilized in the region at the end of first quarter. In Bhakkar district against an
amountofRs.5.014milliononly0.383million(8%)havebeenutilized.
(Rs.inmillion)
FundsUtilizedupto30092915

Expected
Utilizationupto
30092015

First
Release

Second
Release

Sargodha

7.760

8.888

0.650

Khushab

2.005

Bhakkar
Mianwali

Nameof
District

Total:

Third
Release

Total

%age

9.538

123

0.698

0.698

35

5.014

0.383

0.383

2.497

2.049

2.049

82

17.276

12.018

12.668

73

0.650

Page15

B.

HighEfficiencyIrrigationSystem(HEIS)

i.

PhysicalProgress
Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:
Nameof
District

Target
(Acres)

AsperTBAP
upto30092015

Sargodha

350

Khushab

Achievementupto30092015(Acres)
WorkOrders
Issued

Material
Verified

Commissioning
Verified

88

45

300

75

18

Bhakkar

500

125

12

Mianwali

250
1400

63
350

29

104

Total:

Above table shows that situation in the region under component HEIS is very pathetic. As
per TBAP against the target of 1400 acres, commissioning on 350 acres was required to be
verified upto 30-09-2015, but verifications of commissioning and material are nil at the end of
first quarter. Only work orders on 104 acres have been issued.
ii.

FinancialUtilization

FinancialutilizationforthequarterendingSeptember,2015isgiveninthefollowingtable

whichrevealsthatunderthecomponentofHEISnotasinglepennyhasbeenutilizedagainstan
amountofRs.27.825million.

(Rs.inmillion)
NameofDistrict

FundsUtilizedupto30092915

ExpectedUtilization
upto30092015

First
Release

Second
Release

Third
Release

Total

%age

Sargodha

6.956

Khushab

5.963

Bhakkar

9.938

4.969

27.825

Mianwali
Total:

Page16

Rawalpindi

HighEfficiencyIrrigationSystem(HEIS)
i.

PhysicalProgress
Physical progress under component High Efficiency Irrigation System (HEIS) for the

quarterendingSeptember,2015istabulatedasunder:
Nameof
District

Target
(Acres)

AsperTBAP
upto30092015

Rawalpindi

450

Attock

Achievementupto30092015(Acres)
WorkOrders
Issued

Material
Verified

Commissioning
Verified

113

69

37

700

175

80

Chakwal

550

138

59

Jhelum

400
2100

100
525

36

244

37

Total:

Above table shows that situation in the region under component HEIS is very pathetic. As
per TBAP against the target of 2100 acres, commissioning on 525 acres was required to be
verified upto 30-09-2015, while commissioning is nil at the end of first quarter. Work orders on
189 acres have been issued and material at only 37 acres has been verified. In districts Attock,
Chakwal and Jhelum neither material nor commissioning have been verified only work orders on
80, 59 and 36 acres respectively have been issued.
ii.

FinancialUtilization

FinancialutilizationforthequarterendingSeptember,2015isgiveninthefollowingtable

whichrevealsthatanegligibleamountofRs.0.022millionhasbeenutilizedagainstRs.41.738
million. In Attock, Chakwal, and Jhelum districts, not a single penny has been utilized during
firstquarter.

(Rs.inmillion)
NameofDistrict

ExpectedUtilization
upto30092015

FundsUtilizedupto30092915
First
Release

Second
Release

Third
Release

Total

%age

Rawalpindi

8.944

0.022

0.022

Attock

13.913

Chakwal

10.931

Jhelum

7.950

41.738

0.022

0.022

Total:

Page17