THE TASK
Determine if all tasks involved are needed.
Review the sequence of the tasks, is there a safer order?
Decide whether critical tasks can be performed in a different manner.
Review whether amended timing would be safer (e.g. during a partial or total shutdown
5 Substituting hazardous methods with less hazardous methods (cold cutting versus flame cutti
6 Containing the hazardous effects (e.g. water curtain, isolating).
THE PEOPLE INVOLVED
7 What are the requirements for rules, job instruction, competencies and training?
8 What are the requirements for specific supervision?
9 Are the people at risk and do they require specific protection?
10 Reduction of the number of persons exposed.
11 Reduction of the exposure period.
12 Ensuring personnel involved in the job are properly protected.
THE TOOLS AND EQUIPMENT USED
13 What are the potential hazards?
14 Can the potential hazards be eliminated or reduced?
THE MATERIAL USED
15 Is elimination or substitution possible?
16 Can the hazard potential arising from the material itself be reduced? (reduce,quantity,confinem
etc..)
1
2
3
4
ures Checklist
al shutdown
ng versus flame cutting
ning?
USED
ce,quantity,confinement,
opriate measurement of a
nel involved ?
yes
No
Work Permit Audit & Monitoring / Audit & Pemantauan Izin Ker
Name / Dept of person carrying out audit / Nama / Dept pelaku audit : ________________________ / ___
Type / Number of Work Permit / Jenis / Nomer Izin Kerja : _________________________________ / ________
Name of Performing Authority at site / Nama Wewenang Pelaksana di lokasi kerja : ________________
Name of Operating Authority at site / Nama Wewenang Operasi di lokasi kerja : ___________________
Name of Contractor's Company working at site / Nama Perusahaan Kontraktor yang bekerja di loka
If Complimentary Permit(s) is/are implemented, relevant ques
Jika ijin pelengkap diberlakukan, pertanyaan-pertanyaan yang sesuai berlak
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
16
17
18
19
20
21
22
23
Apakah jalan menuju Tempat Berkumpul telah tersedia dan tidak terhalang?
Do the workers know about alert system and action plan in case of Emergency?
Apakah para pekerja memahami tentang sistem alarm dan tindakan yang harus ditempuh pada saat terjadi keadaan dar
If gas test is required, is it done properly and recorded in work permit?
Apabila pengetesan gas diwajibkan pada pekerjaan tsb, apakah pengetesan dilakukan dengan benar dan di catat pada iji
Have all 'electrical' tools/equipments been checked?
Apakah peralatan bantu listrik sudah diperiksa?
Has the isolation procedure been properly implemented and marked (lock-out/tag-out)?
Apakah prosedur isolasi sudah dilakukan sesuai prosedur dan diberi tanda?
Has Operating Authority reported to Control Room about the starting of work at site?
Apakah Wewenang Operasi telah melaporkan ke Ruang Kontrol tentang dimulainya pekerjaan yang dilakukan dilapangan
Is there any other work at the same work place?
Apakah dilokasi kerja yang sama ada pekerjaan lain?
If your answer of item 22 above is YES, is there any conflict of work among them?
Apabila jawaban anda pada item no.16 adalah YA, apakah terjadi konflik kepentingan kerja antara masing-masing pekerja
SUGGESTION / USULAN :
PLEASE SUBMIT THE AUDIT REPORT TO SITE S&E FOR REGISTRATION HASIL
AUDIT HARAP DISERAHKAN KEPADA SITE S&E DI
No WPA :...........
_________________ / _____________________________
____________ / _____________________________
_________________________________________
______________________________________
erja : ____________________________________________
a : _______________________________________________
angsung?
Apabila tidak sesuai, harap
dikosongkan
masing2 pihak?
di tempat kerja?
ng?
an?
VISA AUDITOR:
PARAF PENGAUDIT:
VISA AUDITTEE
PARAF TERAUDIT: