150 mm
=
=
3.75 kN/m2
4.39 kN/m2
8.14 kN/m2
{[(W * h) + W3] / h}
15.64 kN/m2
1500 mm
Loading diagram
1400mm
Weight of bottom slab will be directly counteracted by the corresponding ground reaction.
At any depth (h) from top slab, lateral pressure intensity (p)
p
=
=
0m
#REF! kN/m2
=
=
1.9 m
#REF! kN/m2
Considering one metre run of the culvert and each member as a separate fixed member, Fixed end moments are:
ANALYSIS AND DESIGN METHODOLOGY:
The RCC box culvert will be designed as per the guidance provided in the civil technical specification. Earth pressure for
all under ground water storage structure shall be taken as at rest. In addition to earth pressure the vehicular traffic load
as per the IRC specification of Class "A" shall be taken into account. Manual load calculations are made and analysed
using the software STAAD pro for the loadings, bending moments and shear forces and design/detail shall be made as pe
the manual calculation
Bending Moments
Considering maximum misspan section of slab for bending moment (M) = 7.532kNm
For top slab;
Assuming the depth of slab as 150mm with effective cover of 25mm.,
Depth available = 150-25
=
125 mm
Mu = 7.532 x 1.5
=
11.298 kNm
Mu,lim = b x d^2 x Q
=
1000 x 125^2 x 3.45
=
53.9063 kNm
<
Percentage reinforcement (Pt) = Mu/bd^2
=
11.3 x 10^6/1000 x 125^2
=
0.589248
Percentage tension reinforcement (pt) from SP16
Pt = 0.17%
Considering Minimum area of reinforcement 0.12%
Therefore area of reinforcement =
(Gross area of slab x 0.12)/100
= (1000 x 150 x 0.12)/100
=
180 mm2
Area of reinforcement with Pt = 0.17% = (1000 x 125 x 0.17)/100
11.3 kNm
=
Providing 12mm bars, Spacing
212.5
=
=
mm2
(113.04 X 1000)/212.5
531.953 mm
=(78.5 X 1000)/180
436.111
12.32 kNm
=
=
(113.04 X 1000)/300
376.8 mm
=(78.5 X 1000)/300
= 261.667 mm
=
=
386.02 kN/m2
470.86 kN/m2
c,
32.168 kN
1.5 x V
=
48.252 kN
Hence depth is OK
Hence depth is OK