Plumber
Helper
Sl
No.
Date
working
hours
1
2
3
4
12/13/2014
12/15/2014
12/17/2014
12/18/2014
8
8
8
8
1
1
1
1
3
3
3
12/19/2014
12/20/2014
12/22/2014
12/23/2014
12/24/2014
10
12/25/2014
11
12/26/2014
12
12/27/2014
13
12/29/2014
14
12/30/2014
15
12/31/2014
16
1/2/2015
17
1/3/2015
18
1/5/2015
19
20
21
1/6/2015
1/7/2015
1/8/2015
22
1/9/2015
23
1/10/2015
24
25
1/15/2015
1/20/2015
26
1/21/2015
27
1/22/2015
28
29
1/23/2015
1/24/2015
30
1/27/2015
31
32
33
34
35
36
37
38
39
40
41
1/28/2015
1/29/2015
1/30/2015
1/31/2015
2/2/2015
2/3/2015
2/4/2015
2/5/2015
2/6/2015
2/7/2015
2/9/2015
42
2/10/2015
43
2/11/2015
44
2/12/2015
45
2/13/2015
46
2/14/2015
47
57
131
2/17/2015
48
49
50
51
52
53
2/18/2015
2/19/2015
2/19/2015
3/4/2015
3/6/2015
3/10/2015
54
3/16/2015
55
56
57
4/17/2015
4/21/2015
4/29/2015
TOTAL
desription
for plumbing material receiving at site
Toilet-1, W/C fixing and PVC pipe fixing
Toilet-1, W/C fixing and outlet pipe fixing
Toilet-2, W/C fixing and outlet pipe fixing
Toilet-1, outlet disposal pipe fixing and flushing
tank pipe line fixing on W/C
Toilet-2, outlet disposal pipe fixing and flushing
tank pipeline fixing on W/C
Toilet-1&2, Chamber bricwork and pipe
connection on chamber.
Toilet-1&2, Chamber plastering inner and outer
and chipping for pipeline on toilet-1
Chamber curing and toilet-1 flushing tank fixing
and pipeline fixing on outer side
Toilet-1, chipping for pipeline and pipe fixing on
inner side
toilet-1 pipeline fixing on inner side and flushing
tank cheking.
Toilet-1 pipeline fixing on inner side and Toilet-2
pipe fixing on outter side.
Toilet-2 chipping on outter wall for pipe line
connection.
Toilet-2 chipping on inner side and pipe fixing.
Toilet-2 pipeline fixing and w/c packing with
gunny bags.
Toilet-2 flushing tank fixing and checking,socket
fixing on toilet-1 and toilet-2.
pipeline connection for outlet joining on septic
tank .
septick tank chipping for outlet connection and
pipe line fixing on septick tank.
R.c.c chipping on bathroom for nani trop fixing.
R.c.c chipping on bathroom for nani trop fixing
and excavation for nani-trop fixing.
Nani-trop and pipeline fixing on batroom.
Nani-trop pipeline fixed on bathroom and
covered with gunny bags top of the nani-trop.
Nani-trop fixing and packing with cement
mortor.