Вы находитесь на странице: 1из 9

FLSmidth RAHCO Technology Center

FLSmidth Spokane, Inc.

SECTION A

605 E. Holland Ave., Suite 300 Spokane, WA 99218 USA

FPR No:

Contract No:

Site: Tutupan (MOB)

To:

110026
From: Sri Seva Ganes /

Problem Identified by:

Frank Mason

Dwi Hargito

Customer

Description / Title:
Power Cable 20 kV from MSC Switch-Gear to MSC JB track-5 failed

CSD-F

Contractor

FLSmidth

Mechanical failure
Electrical failure
Incomplete supply
Transport damage

Field Problem Report


Form No. CSD-F-001

Revision: 0, Date: 06/19/10

Equipment / Part reference:

Late delivery
Assembly problem
Design problem
Service problem
Other .

Prysmian Cable 20 kV 3c 25 mm2


Reference drawing/s:

Details of problems:
At 15 July 2014, JPI found problem Incoming Switch-gear 20 kV at CV260 E-House tripped with
Message Over-Voltage at SEPAM protection relay. It Happened when Energize feeder Spreader
from MSC Switch-gear.
After troubleshoot and isolate problem, found that Power Cable 20 kV from MSC Switchgear to
MSC JB Track-5 bad. There was noisy (cracking sound ) on the cable before SEPAM tripped when
energize power to cable.
Alarm histories at SEPAM Protection relay show that phase 3 to neutral have short indication. It
also proven from HI-pot tested that show L3 failed. Because of that reason, we change the cable.

SECTION B

Raised by: Sri Seva Ganes / Dwi Hargito

Date: 07/08/2014

Response/Action proposed:

1.
2.

Contact to Cable Supplier to analyze what the cause

Cost allocation:
Project

Sales Order

Warranty

Customer

Project / Order Ref:

Task Ref:

RFC required:

Project Manager approval:

No

SECTION C

Estimated cost (USD):

FSI Ref:

ITP Ref:
Date:

Yes RFC No:

Action taken/Cause:

Customer notified:
In writing

Close out:

PSD-F-004

Non-conformance raised:
By phone

Verbally at site

No

Yes NCR No:

Actual cost (USD):

Page 2 of 9

Field Problem Report


Form No. CSD-F-001

FPR Register updated


Copy sent to QA Manager

Revision: 0, Date: 06/19/10

Management - sign off:

Date:

* Attach relevant supporting documentation as required

SEPAM Protection Relay Alarm History

PSD-F-004

Page 3 of 9

Field Problem Report


Form No. CSD-F-001

Revision: 0, Date: 06/19/10

Phase 3 Phase to Neutral voltage shows there are leakage on the cable core.

HI-pot Tested
PSD-F-004

Page 4 of 9

Field Problem Report


Form No. CSD-F-001

Revision: 0, Date: 06/19/10

Cable Condition at end side


PSD-F-004

Page 5 of 9

Field Problem Report


Form No. CSD-F-001

PSD-F-004

Revision: 0, Date: 06/19/10

Page 6 of 9

Field Problem Report


Form No. CSD-F-001

Revision: 0, Date: 06/19/10

Cable splicing at the 20 meter from the end termination.

PSD-F-004

Page 7 of 9

Field Problem Report


Form No. CSD-F-001

Revision: 0, Date: 06/19/10

The cable splicing point has been wrapped with some kind of the which look abnormal.

PSD-F-004

Page 8 of 9

Field Problem Report


Form No. CSD-F-001

Revision: 0, Date: 06/19/10

Cracking sound point marked with cable ties. ( It was around 10 meter from cable splicing area )

PSD-F-004

Page 9 of 9