174.29 m
Ground Lvl =
172.00 m
Bed Lvl =
169.50 m
Top Lvl =
175.20 m
Road Lvl =
174.60 m
4.79 m
5.70 m
2.50 m
2.50 m
Width of Tank =
Road
174.60
20.00 m
7000000.00 L
140.00 m
provided Length =
141.20 m
141.2x2.5x20x1000
Volume of Ramp =
=53.17x4.5x0.2 =
Columns
=(6x0.35x0.35x5 )+
(18x0.35x0.35x2.5) =
Total
7060000
47.85 m3
9.1875
57.04 m3
7002959.5
be designed as cantilever while the top portion designed as slab supported by long walls.
Design Constants.
Concrete
M20
cbc =
m=
7 N/mm2
13
Since the face of the wall will be in contact with water for each condition ,
st =
150 N/mm2
175 N/mm2
k=
0.38
j=
0.87
R=
Angle of repose =
1.157
30o
21.00
kN/m3
Pa=
Ka'H + wH
here,
Ka =
' =
Pa=
1-sin300 /1+sin300 =
21.00
0.33x11.19x5.7+(9.81x5.7) =
9.81
76.97 kN/m2
0.33
2.5 say
76.97x5.7/2x5.7/3 =
req. d=
416.79 kN-m
600.19
750 mm
d=
715.00 mm
Ast=
416.79*10^6/150/.874/715 =
4446.40
1000*491/4446.4=
110.43
0.33x11.19x3+(9.81*3)
Ast
40.51x3/2x3/3 =
60.765 kN-m
d req =
229.17 mm
provided D=
300.00 mm
d=
265.00 mm
60.765*10^6/150/.874/265 =
provide 16 mm @
=201/1749*1000 =
1749.1 mm2
114.9162426391
40.51
for
100
for
450
Distribution steel =
Astd =
0.2x750*1000/100 =
1500
750
Spacing of 12 mm bars =
150.67 mm c/c
.33*11.19(5.79-1.5)+9.8(5.79-1.5) =
57.88 kN/m2
Yw.H
9.81x3.21
M=
p.H/2.H/3 =
Ast =
31.49x3.21/2x3.21/3=
54.08 x10^6/150/.874/715
P. B/2
PL=
41.202x20*.5
As reqd =
where p=9.81x4.2 =
412
2746.67 mm2
1) Top portion:
The bottom portion 1.5m (>H/4) acts as cantilever, while the remaining 4.2m acts as slab su
on Long walls
At h=
1.50 m (>H/4)
=1/3x 11.19x4.2+9.81x4.2=
56.868x4^2/12
M (at Center)
=PAL2/8-Mf=
75.824
37.912 kN-m
=PAL2/24
d=
350-(25+16+8)=
At supports,
Ast =
301 mm
1921.49 mm2
Using 16 mm bars s=
1000x201/1921 =
at Mid span =
104.606321
0.5x1921
960.5 mm2
Min Ast =
805 mm2
(76.97
Ast =
77.18x1000/150/.874/305 =
Min. steel =
76.97
x1.425x.5)x1/3
18.33
821.13
805
245 mm
=9810*3.2 =
Mf at support = PB2/12 =
31.392 kN/m2
=31.392x5^2/12
65.4
=31.392x5^2/24
32.7
Direct Tension in short wall, due to water pressure on the end one meter width of long walls is
PB =
w(H-h)x1
=
effective depth d for horizontal steel =
31.392
715 mm
Distance x =
d-T/2 =
=715-375=
Hence Net BM =
M-Pb.x =
Astx1 =
65.4x10^6-31392x340/150/.874/715
340
583.84 mm2
Pb/sh =
Astt2 =
Total
Ast1+Ast2 =
379.12 mm2
=715+379 =
using 12 mm bars, s=
1094.12 mm2
103.37 c/c
=(32.7x10^6 - 31392x340)/150x0.874x715
234.99 mm2
Ast2 =
379.12 mm2
Total =
614.11 mm2
Min. Ast =
805.00 mm2
140.37 mm2
provide 12 mm @ 125c/c
4 Design of Long wall with surcharge of Traffic Load (20kN/m3)
As found earlier
=w/Y =
0.95
1-sin300 /1+sin300 =
0.33
here,
Ka =
' =
Pa=
21.00
kN/m3
0.33x11.19x5.7+(9.81x (5.7+0.95)
86.28 kN/m2
2.50 say
86.28x5.7/2x5.7/3 =
d=
467.21 kN-m
635.46
750 mm
d=
Ast=
9.81
715.00 mm
467.21*10^6/150/.874/715 =
4984.29
1000*491/4984.29=
100
for
100
0.00 for
450
.3-.1(350-100)/(450-100)=
0.23x350*1000/100 =
805
403 mm2
Spacing of 10 mm bars =
194.79 mm c/c
1000.00 mm
wH1 =
=9.81(2.5+.5) =
29.43 kN/m2
=PuxBxL =
29.43x 20x142 =
=(.3+.75)*(142+142+20+20)*5.79
=1x20x142x25 =
1969.758 kN
71000 kN
72969.758 kN
The difference =
10611.442 kN
83581.2
((.75*142)+(.75*20))*1*25 =
3037.5 kN
85200
=(.3+.75)*(142+142+20+20)*5.79
=1x20x142x25 =
1969.758 kN
85200 kN
90207.258 kN
The difference =
6626.058 kN
Hence the weight of the tank is more than the floatation force.
Hence the tank is safe in buoyancy
The Total weight of the tank =
Wt of the water =
=4.79*20*142*9.81 =
Total weight is =
The area of the tank
90207.258 kN
133451.316
223658.574
= 20x 142 =
2840 m2
78.75 kN/m2
95 kN/m2
Hence base slab is safe in bearing
Wt of slab =
=1x1x1.2x25 =
29.43 kN/m2
30 Kn/m2
0
.2x1200x1000/100
2400 mm2
Both sides @
1200 mm2
provide 16 @
167.50 c/c
provide 16 @
175.20 m
0.6
174.29 m
169.50 m
20.00 m
11.19 kN/m3
3m
kN/m2
mm thick and
.3-.1(350-100)/(450-100)=
mm2
mm2
522 kN
3.21
31.49 kN/m2
49x3.21/2x3.21/3=
54.08 kN-m
576.9364122 mm2
153.4901835 mm2
4.2
56.868 kN/m2
kN-m
kN/m2
kN-m with Tension outside face
mm2
mm2
490.63
803.84
magnitude is given by
kN-m
kN-m
kN
mm
11.19 kN/m3
3m
mm
mm thick and
0.23
mm2
kN
Deisgn of Ramp
Design of Slab
Here the aspect ratio Ly/Lx is greater than 2 hence the slab is designed as a one way slab.
Effective depth required
125 mm
OneShortEdgeDisContinuous:
Basic dimensions of slab
=
Hence designed as an one way slab
d'
Effective depth
Diameter of bar
fck
fy
Load calculation :
DL
FF
Live load
LL
Total load
TL
Mu
Mu/bd
Pt
kN.m
N/mm2
mm
mm
103.46
2.20
73.24%
1589.32
260.4
0.12%
=.12*1000x250/100
300
mm2
spacing of
10 mm
261.6666666667
mm
provide
10mm
@ 250c/c
mm mm
16
125
Edge Beams
Beam =
230x 500
d=
Load on Beam B1
465.00 mm
=wlx/3 =
=27.25*4.5/3
40.875 kN/m
40.88 kN/m
Moment =
Mu/bd2
wl2/8 =
40.875x4.5x4.5/8 =
103.46 kN-m
Mu =
1.5x103.46=
155.19 kN-m
155.19x10^6/1000/21 0.7177246
Pt =
0.24 %
Ast =
=.24*1000*465/100
provide
1112.5 mm2
Shear Design
shear to be designed =
= wl/2 =
shear Stress =
61312.5/230*465 =
percentage at supports =
61.3125 kN
0.5732819074 N/mm2
=402/230/465x100 =
0.38
0.26
0.12x230x465 =
33.5055 kN
=2x50x.87x415x465/34
=
501.07669 mm
Middle Beams
Beam =
230x 700
d=
Load on Beam B1
665.00 mm
=2xwlx/3 =
=2x27.25*4.5/3
81.75 kN/m
81.75 kN/m
Moment =
Mu/bd2
wl2/8 =
81.75x4.5x4.5/8 =
Mu =
1.5x206.93=
310.4x10^6/1000/217
Pt =
=.23*1000*465/100 =
provide
310.4 kN-m
0.23 %
Ast =
1570.00 mm2
206.93 kN-m
1551.7 mm2
0.7
shear to be designed =
= wl/2 =
shear Stress =
122625/230*465 =
percentage at supports =
122.625 kN
0.8 N/mm2
=402/230/665x100 =
0.26
0.22
shear to be resisted =
62.031 kN
=2x50x.87x415x665/62
=
387.06171 mm
1.5*.5*2.5*4.5*27.
229.9 kN
1.5*5*4.5*27.25*.5
459.8 kN
=.45*20*(300x300-6*113)+.67x113 = 804 kN
0.9 m
Loads:
Live load =
2 kN/m2
Assume Thickness
0.1 m
Self wt =
2.5 kN/m2
FF =
Total =
5.5 kN/m2
factored =
8.25 kN/m2
Moment = wl2/2 =
3.34125 kN-m
Ast =
238.8720912182 mm2
Spacing of 8mm =
210.0840336134 mm
0.5
3
0.5
460
460
460
2.25
2.25
460
460
460
0.50
5.00
0
0
0
0
0.00
1.08
11.00
0.50
0.5
460
4.5
460
0
0
0
0
0.5
2760 kN
2024.00 kN
95.00 kN/m2
area of footing
21.31 m2
55.00 m2
Ixx
114.58333 m4
Iyy
554.58333 m4
Y bar
2.5 m
X bar
5.5 m
5.5 m
5.00
area C.G
loading cg
x bar
###
y bar
1.8333333 m
ex =
0.00 m
ey =
0.67 m
Mx =
Mx = P*ey
1226.67 kN-m
My =
My = P*ex
0 kN-m
60.2181818182
6.6909090909
60.2181818182
<
95.00 kN/m2
safe
w l2/2
7.53
wl 2/8
228
228
20 N/mm2
415 N/mm2
351.78 mm
665.86 mm
20 N/mm2
1.12 N/mm2
At edge(Node No.2131)
Perimeter, bo
(d/2+1100)+(d+200)+(d/2+1100)
2d+2400 m
1.25
357
mm
1140 mm
1200 mm
559.17898 mm2
1008 mm2
Dia of Bar
201.0624 mm2
359.6 mm
150 mm
16 mm
Lx
Ly
4.5
10
2.222 >2
ne way slab
25 mm
250.00 mm
217.00 mm
16 mm
20 N/mm
415 N/mm
6.250 kN/m
1 kN/m
20 kN/m
27.250 kN/m
Ast pro
mm
1608.50
safe
>
459.8
4.2
0.50
460
460
kN-m
kN-m
kN-m
d/2+1100
d+200
d/2+1100)