SAN FRANCISCO PUBLIC UTILITIES COMMISSION

INFRASTRUCTURE DIVISION
PROCEDURES MANUAL
VOLUME 2, PROJECT DESIGN
SECTION 2: PLANNING

APPROVED:

PROCEDURE: PD 2.05

DATE: 7/14/08

TITLE: BASIC ENGINEERING DESIGN


DATA (BEDD) SHEETS

REVISION: 0

1.

POLICY

The purpose of the Basic Engineering Design Data (BEDD) Sheets procedure is to
document specific site requirements as the basis for design and construction. The
Project Manager, together with the Project Engineer, shall determine during Project
Planning whether preparation of the BEDD Sheets will be undertaken for the project. If
BEDD Sheets will be prepared as a project task, associated funding shall be provided.
Not every section description is required for each facility. This document shall be
updated as additional or new requirements are established as site requirements.
2.

DEFINITIONS

The BEDD Sheets are a compilation of existing site conditions, facility operating basis,
design basis and listing of existing reference documents. They supplement the
reference materials of regulations, manuals, handbooks, standards, and codes, refer to
PD 1.06 Engineering Design Standards and PD 5.05 Project Design Review.
Ideally, the BEDD Sheets development should start during Alternatives Analysis tasks,
and draft completed before the start of CER as indicated in PM 2.01 Project
Development Process.
3.

RESPONSIBILITIES

See PD 1.01 Project Personnel Roles and Other Definitions and PD 1.02 PE
Responsibilities.
Refer to PD 1.01 Project Personnel Roles and Other Definitions and PD 1.02 PE
Responsibilities for roles of the PE, Resident Engineer (RE), Engineer of Record (EOR),
Design Engineer (DE), Design Lead Engineer (DLE), Drafting Group Leader, and
Operations Representative (OR).

Project Design: Procedure PD 2.05, Rev. 0, Page 1 of 2

4.

IMPLEMENTATION

The BEDD Sheets shall be utilized as part of the initial design processes to assure that
all of the basic design considerations for each project are considered. Not all of the
design considerations listed in the BEDD Sheets are necessarily applicable for every
project.
The BEDD Sheets shall be the basis or beginning of the Design Criteria and may be
incorporated in the Design Criteria as appropriate (refer to PD 2.04 Design Criteria).
Where applicable the BEDD sheets provide standardized data that is consistent
throughout the Projects. The remainder of the BEDD Sheets provides a listing of the
data that must be determined, calculated or otherwise provided as part of the Design
Package. All sections of the BEDD Sheets should be reviewed. In cases where a
particular section and/or sections are not applicable it should be noted, and a brief
explanation as to why they are not applicable provided.
The BEDD Sheets shall be retained as part of the design material documentation for
Quality Assurance/Quality Control validation.
5.

ATTACHMENTS
(1) Basic Engineering Design Data (BEDD) Sheets

Project Design: Procedure PD 2.05, Rev. 0, Page 2 of 2

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

BASIC ENGINEERING DESIGN DATA


(BEDD) SHEETS

FACILITY:

DATE:

ORIGINATOR:
SITE OPERATIONS MANAGER APPROVAL:

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 1 of 2

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

SECTION

SECTION MANAGER APPROVAL

GENERAL SITE

PROCESS

PRESSURE VESSELS

TANKS & DRUMS

HEAT EXCHANGERS

FURNACES & HEATERS

PUMPS

HYDRAULICS

INSTRUMENTS &
CONTROLS

COMPRESSORS,
BLOWERS

PIPING & VALVES

M STRUCTURES
N

INSULATION &
FIREPROFING

POWER & LIGHTING

FOUNDATIONS

ARCHITECTURE &

BUILDINGS
SITE IMPROVEMENTS

MATERIALS HANDLING

EXPENDABLES

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 1 of 56

1 OF 56

DATE

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

PACKAGE UNITS

LANDSCAPING

ENVIRONMENTAL &
POLLUTION CONTROL

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 2 of 56

2 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

3 OF 56

BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS


CONTENTS

SECTION
PART I

SHEET #
SITE DESCRIPTION

I-1

Area Description

I-2

Facility Description

I-3

Process Description

I-4

Utility Services

1-5

Underground Services

PART II

SITE DESIGN DATA


SECTION A GENERAL DATA

A-1

Cost and Utility Data

A-2

Payout Period

A-3

Design Life

A-4

General Site Data

A-5

Meteorological Data

SECTION B DESIGN DATA FOR PROCESS


B-1

Process Requirements

SECTION C DESIGN DATA FOR PRESSURE VESSELS


C-1

Codes

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 3 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

4 OF 56

SHEET #

SECTION

SECTION D DESIGN DATA FOR TANKS AND DRUMS


D-1

Codes

D-2

Materials to be Stored

D-3

Local Preferences, Appurtenances

D-4

Special Provisions for Tanks

SECTION E DESIGN DATA FOR HEAT EXCHANGERS, ETC.


E-1

Design Temperature to Which Stocks Must Be Cooled

E-2

Heat Exchangers

E-3

Air Coolers

SECTION F DESIGN DATA FOR FURNACES AND HEATERS


F-1

Codes

F-2

Heater and Furnace Performance

F-3

Fuel Information

SECTION G-DESIGN DATA FOR PUMPS


G-1

Chemical Injection Pumps and Drivers

G-2

Centrifugal Pumps and Drivers

G-3

Sump Pumps and Drivers

SECTION H-DESIGN DATA FOR HYDRAULICS


H-1

Codes

H-2

Flow Requirements

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 4 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

5 OF 56

SHEET #

SECTION

SECTION J DESIGN DATA FOR INSTRUMENTS AND CONTROLS


J-1

Instrument Requirements

J-2

Instrument Wiring & Electrical Requirements

J-3

Controls

SECTION K-DESIGN DATA FOR COMPRESSORS, BLOWERS AND FANS


K-1

Compressors

K-2

Blowers

K-3

Fans

K-4

Lube Oil and Seal Oil Systems

SECTION L DESIGN DATA FOR DESIGN DATA FOR PIPING & VALVES
L-1

Preferred Basis for Design

L-2

Selection of Materials for Piping Systems

L-3

Special Considerations

L-4

Underground Lines and Road Crossings

L-5

Large and Specialty Valves

SECTION M DESIGN DATA FOR STRUCTURES AND BUILDINGS


M-1

Design Criteria

M-2

Foundations

M-3

Structural Loads

M-4

Preferred Materials for Construction

M-5

Underground Vaults

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 5 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

SHEET #

SECTION
M-6

6 OF 56

Pipe Supports and Pipe Racks

SECTION N DESIGN DATA ON INSULATION AND FIREPROOFING


N-1

Pipe Insulation

N-2

Fireproofing

SECTION P DESIGN DATA FOR POWER AND LIGHTING


P-1

Codes

P-2

Power Supply

P-3

Switchgear Assemblies, Circuit Breakers and Fuses

P-4

Transformers

P-5

Motors

P-6

Motor Starters

P-7

Lighting

P-8

Receptacles and Plugs

P-9

Panel Boards

P-10

Wire, Conduit and Conduit Fittings

P-11

Special Considerations

P-12

Pole Line Material

P-13

Metering

P-14

Adjustable Speed Drives

P-15

Heat Tracing

P-16

Process Control Telemetry-SCADA

P-17

Cathodic Protection

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 6 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

7 OF 56

SHEET #

SECTION
SECTION Q DESIGN DATA FOR FOUNDATIONS
Q1

Design Criteria

Q-2

Types of Foundations

Q-3

Foundation Capacities

Q-4

Foundation Piles

Q-5

Spill Containment

SECTION R-DESIGN DATA FOR ACHITECTURE & BUILDINGS


R-1

Codes

R-2

Type of Building Design

R-3

Office Requirements

R-4

Change Room and Lockers

R-5

Toilets and Waste Disposal Systems

R-6

Laboratory Requirements

R-7

Walls, Partitions and Windows

R-8

Roof Requirements

R-9

Fire Protection; sprinkler System, Fire Extinguishers

R-10

HVAC

SECTION S DESIGN DATA FOR SITE IMPROVEMENTS AND SERVICES


S-1

Grading

S-2

Paving

S-3

Drainage

S-4

Hydrostatic Testing

S-5

Fire Protection

S-6

Security and Safety

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 7 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

SHEET #

SECTION
S-7

Painting and Coatings

SECTION T-DESIGN DATA FOR MATERIALS HANDLING


T-1

Load Requirements

T-2

OSHA and Safety Requirements

T-3

Noise Requirements

SECTION U-DESIGN DATA FOR EXPENDABLES


U-1

Catalyst

U-2

Chemicals

U-3

Lubricating Oils and Greases

U-4

Seal and Flushing Oil

U-5

Refrigerants

SECTION V-DESIGN DATA FOR PACKAGE UNITS


V-1

8 OF 56

Specific Requirement

SECTION X-DESIGN DATA FOR LANDSCAPING


X-1

Site Specific Structural and Ornamental Features

X-2

Site Specific Natural Features

X-3

Special Visual Requirements

X-4

Mitigation Requirements

X-5

Gates and Fencing

X-6

Irrigation

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 8 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

9 OF 56

SHEET #

SECTION
SECTION Z-DESIGN DATA FOR ENVIRONMENTAL AND POLLUTION CONTROL
Z-1

Regulatory Issues

Z-2

Regulatory Requirements

Z-3

Regulatory Agencies

Z-4

Monitoring and Reporting

Z-5

Soils

Z-6

Water

Z-7

Air Quality and Emissions Control

Z-8

Noise

Z-9

Odor

PART III

REFERENCES

III-1

TECHNICAL CONTRACTS AND REPORTS

III-2

MAJOR OR CRITICAL SPECIFICATIONS REFERENCED IN BEDD SHEETS

III-3

MAJOR OR CRITICAL DRAWINGS

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 9 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

PART I

SITE DESCRIPTION

I-1 AREA DESCRIPTION

Site Plan, see Drawing


County:
Major Access Roads nearby
Area:

I-2

FACILITY DESCRIPTION

Bench Mark:

ft., Datum of Reference

Established Grade

ft.

Plot Plan, see Drawing

Objective:

I-3

PROCESS DESCRIPTION

P&ID, see Drawing


Chemical Storage:

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 10 of 56

10 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

PART II

11 OF 56

SITE DESIGN DATA

SECTION A GENERAL DATA


A 1 COST AND UTILITY DATA Information from Site Operations
1.1

Steam available in Main Headers at Plot Limit

1.1.1

(SECTION NOT APPLICABLE)

Nominal

Nominal

{Pressure} PSIG

{Temperature} F

{Source}

Incremental Cost of Steam


General credit for steam generated in process plants from 250F BFW to level below.
1.1.1.1 Short Steam Balance (demand for Low Pressure Steam) Steam used for heat
and specified emergency drives.

Supply

Operating Credit

Condensate

{ }$ / 1000 lbs.

{ } $ / 1000 gal.

1.1.1.2 Long Steam Balance (excess supply of Low Pressure Steam) Steam used for
power.

1.2

1.1.2

Value of Condensate and Boiler Feedwater

1.1.3

Boiler Feedwater Pressure at Process Plant Plot limit for Process Steam Generators.

Electric Power
Cost of Purchased Power
Demand and approximate Energy Charge:

1.3

$________/KWH

Water

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 11 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

1.3.1

12 OF 56

Cooling Water
1.3.1.1 Design Inlet and Outlet Temperature at Plant Plot Limit.
Inlet

________F

Outlet

________F
Velocity in Tubes

Source

Max

Min.

Design Supply Press

ft/sec

ft/sec

at Plot Limit Grade

1.3.1.2 Fresh Water

psig

1.3.1.3 Drinking Water

PSIG

1.3.1.4Cost of Purchased Fresh Water:

/ 1000 gallons.

1.3.1.5 Incremental Cooling Water Cost


Operating Cost

Investment

$ / GPM / Year $ / MM Btu / Yr.

$ / GPM

Cooling Water: $_______

1.3.2

Fresh Water for Drinking and Boiler Feed


1.3.2.1 Source ___________________________
1.3.2.2 Average Analysis of Water see ________
1.3.2.3 Suitable for Drinking? YES X NO ___
1.3.2.4 Cost of Cold, Fresh Water, Untreated: $________ per 1000 gal.
Operating

Investment

$ / 1000 gal.

$ / GPM

1.3.2.5 Cost of Treated Water 60F (Softened) $_________

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 12 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

1.3.3

13 OF 56

Fire Water Supply:


1.3.3.1 Flow required at Plant Plot Limits

__________ GPM @ ___ psig


psig

1.3.3.2 Maximum Pressure


See Section S-3.

AVERAGE WATER ANALYSIS

Source of Water:
Date of Sample:

Design Average
As Element

Analysis

As Element

Ca
Mg
Na
K
Fe + Fe
NH4
Total Cations, Mg/l.
Cl
S04
C03
HC03
NO3
NO2
PO4

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 13 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

OH
Total Anions, Mg/l.
Total Hardness, PPM
pH
SIO2, Mg/l.
H2S
P Alkalinity, PPM
M Alkalinity, PPM
Conductivity, Mhos/cm3
Color
Turbidity, Mg/l.
Temperature Min./ Max.
TDS, PPM
1.4

Fuel Gas
Fuel Gas Characteristics:

Typical Example Values Only


Min.

Avg.

Max.

Heating Value (LHV, Btu/scf)

900

1050

1400

Specific Gravity (air = 1.0)

0.56

0.71

0.93

Molecular Weight

16.1

20.6

26.8

Composition (Mole %)

TYPICAL ONLY

H2

29.1

13.8

15.1

CH4

50.3

49.8

36.1

C2H6

6.2

11.2

10.2

C2H4

4.2

9.9

8.4

C3H8

1.3

1.2

4.3

C3H6

1.9

4.4

6.5

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 14 of 56

14 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

C4H10

2.7

1.1

11.1

C4H8

0.0

0.8

1.4

C5H14

0.2

0.3

0.4

CO

0.0

0.0

0.0

CO2

0.5

0.3

0.2

O2

0.0

0.0

0.0

N2

3.1

4.9

3.2

TOTAL
1.5

100.0 100.0 100.0

Compressed Air
1.5.1

1.5.2

Cost

Operating:

$_____________ / 1000 Cu. Ft.

Investment;

$_____________ / 1000 Cu. Ft./hr.

Air Characteristics
Pressure at Plant Plot Limit
Normal

Maximum Dew Point

Design

1.5.2.1

Instrument

100

50

PSIG

1.5.2.2

Service

100

150

PSIG

1.5.2.3

Instrument

PSIG

1.5.3

1.6

15 OF 56

Is emergency instrument air supply required?

Yes

No

Chemicals and Other utilities


1.6.1

Nitrogen

1.6.2

Anhydrous Ammonia

1.6.3

Natural Gas

1.6.4

Carbon Dioxide

1.6.5

Sodium Bisulfite

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 15 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

A 2

PAYOUT PERIOD

2.1

Process Equipment

2.2

2.1.1

Before Taxes

2.1.2

Before Taxes

Years
Years

Utility Equipment
2.2.1

Before Taxes

2.2.2

Before Taxes

Years
Years

A 3 DESIGN LIFE
3.1

3.2

Column / Vessels

Years

Tanks / Exchanger Shells

Years

Utility Systems

Years

High Pressure / Alloy Pipe

Years

Removable Internals
Furnace Tubes
Low Pressure & CS Pipe

3.3

20

10

Years

20

Years

Years

Removable Internals
Pump Internals

A 4 GENERAL SITE DATA


4.1

Nature of Terrain

4.2

Soil Characteristics

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 16 of 56

16 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

4.2.1

Ease of Excavation

4.2.2

Corrosivity

17 OF 56

Recommended treatment, buried lines (Refer to Section L 3.1)

4.3

4.2.3

Borers, Termites, etc. are present

4.2.4

Ground Water Level Table Elevation + __ ft. approximately *

Tidal Data
4.3.1

Maximum Hight Tide

feet

4.3.2

Normal Hight Tide

feet

4.3.3

Normal Low Tide

feet

4.3.4

Maximum Low Tide

feet

A 5 METEOROLOGICAL DATA
5.1

Wind
5.1.1

Direction: % of time blowing from each quadrant each quarter.

5.1.2

Mean Velocity: See attached Wind Rose and Wind Direction / Velocity Data.

5.1.3

Maximum Velocity: 78 mph.*

5.2

5.3

Maximum Velocity (faster mile) at 30 ft. height on a 50-year recurrence period.

Air Temperatures
5.2.1

Annual Mean Daily Maximum

5.2.2

Annual Mean Daily Minimum

5.2.3

Annual Mean Temperature

5.2.4

Maximum Recorded

5.2.5

Minimum Recorded

5.2.6

Design (exceeded 90 hrs. / yr.)

Design temperature for cold weather protection

Precipitation
5.3.1

Rainfall

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 17 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

5.3.1.1 Average Annual Record (Period 1977 1990)

in.

5.3.1.2 Maximum Recorded Annual

in.

5.3.1.3 Minimum Recorded Annual

in.

5.3.1.4 Annual Average Number of Rainy Days

in.

5.3.1.5 Rainy Season

in.

5.3.1.6 Maximum intensity, single storm

in.

5.3.1.7 Duration of individual storm average days

in.

5.3.2

Snowfall
Annual Average

5.4

18 OF 56

None

Other Meteorological Data


5.4.1

Depth of Frostline

5.4.2

Thunderstorm Frequency

5.4.3

Barometric Pressure

None

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 18 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

5.5

19 OF 56

Earthquake (See Section M 3.22)


Typical Shown-NOT ACTUAL SITE

Ground-Level Monitor
October 1978 to September 1985
VELOCITY (M.P.H)

DIRECTION
MONTH

NE

SE

SW

NW

CAL 4 - 10 10 - 20 ABOVE
M
20

June

6.2%

0.2%

0.3%

8.9%

45.2%

27.2%

8.5%

3.5%

2.4%

67.7%

26.7%

3.9%

July

0.0

0.2

0.1

17.7

48.8

11.2

15.0

1.0

1.1

71.1

27.1

0.7

August

1.2

0.3

0.3

4.5

45.9

41.4

6.1

0.3

0.7

76.3

21.1

1.9

September

2.5

1.8

1.7

17.1

50.2

21.3

5.4

0.0

0.0

81.3

18.7

0.0

October

9.0

4.9

4.0

12.1

30.8

30.9

5.1

3.2

4.5

67.8

23.0

3.8

November

34.9

15.6

5.0

10.6

11.3

11.1

6.1

5.6

12.1

67.9

17.6

2.4

December

28.0

24.5

3.6

11.0

17.9

7.5

4.4

3.1

1.0

82.2

15.7

1.1

January

44.0

18.4

6.5

8.1

13.5

8.1

1.0

0.4

4.5

85.2

8.3

2.0

February

16.8

15.3

5.3

11.8

17.9

15.3

12.0

5.8

13.7

58.8

24.6

2.9

March

8.8

12.2

1.7

4.6

17.9

30.5

19.0

5.3

11.1

52.7

32.5

3.7

April

3.1

2.2

1.8

5.3

23.2

39.7

20.0

4.7

8.5

48.0

37.4

6.1

May

4.1

1.1

0.9

3.6

29.3

30.9

26.5

3.8

6.2

53.9

38.4

1.5

AVERAGE

13.3%

8.2%

2.6%

9.6%

29.2%

23.3%

10.8%

3.0%

5.7%

67.2%

24.5%

2.6%

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 19 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

SECTION B DESIGN DATA FOR PROCESS


B 1 PROCESS REQUIREMENTS

1.1

1.2

1.3

Water Flow Rate basis for chemical treatment rates


1.1.1

Minimum, mgd

1.1.2

Average, mgd

1.1.3

Maximum, mgd

Chemical Treatment or Injection Rate


1.2.1

Name , gph

1.2.2

Name , gph

Specific Pipe Branch Flow Rate Typical Example Only


Sodium
Hypochlorite

Aqua
Ammonia

Caustic
Soda

1.3.1

Alameda Creek Siphon #1

39

12

40

1.3.2

Alameda Creek Siphon #2

84

26

87

1.3.3

Alameda Creek Siphon #3

84

26

87

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 20 of 56

20 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

21 OF 56

SECTION C DESIGN DATA FOR PRESSURE VESSELS


C 1 CODES

1.1

Pressure Vessel / Columns

1.1.1

Above 15 psig or operation under


vacuum

1.1.2

Below 15 psig (See Section D)

1.1.3

Minimum Pressurizing
Temperature for vessels

1.2

Non-Metallic Tanks and Fiberglass


Tanks

ASME Code Section

California
State Safety
Orders

Notes

VIII Div. 1 or 2

Title 8

12
3

VIII, Div. 1, Figure UCS


66

Minimum Design Temperature for vessel Skirts

40

NOTES:
1)

The applicable specifications shall be selected from standard specifications or developed


using the standard specifications as a basis.

2)

Selected vessels may be in accordance with Section VIII, Division 2, subject to


Companys approval.

3)

Process vessels normally are not designed for pressure below 15 psig.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 21 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

22 OF 56

SECTION D - DESIGN DATA FOR STORAGE TANKS AND DRUMS


D 1 CODES
1.1

Storage Tanks

Code Section

1.2

1.1.1

Atmospheric

API 650

1.1.2

Low Pressure (below 15 psig)

API 620

1.1.3

Non-Metallic

Calif. State
Safety Orders Notes
Title 8

Pressure Vessels (Above 15 psig or operation under vacuum, see Section C-1.1)

D 2 MATERIALS TO BE STORED Typical Examples Only


2.1

2.2

2.3

Material;

Sodium Hypochlorite

2.1.1

Total Storage Capacity, gallons__________________________________

2.1.2

Number of Tanks of Standard Capacity, Each @ gallons______________

2.1.3

Standard Tank Dimensions, Diameter, Ft. X Length, Ft._______________

Material;

Aqua Ammonia

2.2.1

Total Storage Capacity, gallons__________________________________

2.2.2

Number of Tanks of Standard Capacity, Each @ gallons______________

2.2.3

Standard Tank Dimensions, Diameter, Ft. X Length, Ft._______________

Material;

Caustic Soda

2.3.1

Total Storage Capacity, gallons__________________________________

2.3.2

Number of Tanks of Standard Capacity, Each @ gallons______________

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 22 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

2.3.3

23 OF 56

Standard Tank Dimensions, Diameter, Ft. X Length, Ft._______________

D 3 LOCAL PREFERENCES, APPURTENANCES


See Tank Specification____________________

D 4 SPECIAL PROVISION FOR TANKS


4.1

Location and spacing:

4.2

Drainage:

4.3

Maximum Tank Heights:

4.4

Slope of Tank Bottoms:

NOTES:
1.

Emissions shall be in accordance with the BAAQ Ds Regulations 8, Rule 5.

2.

Applicable specifications shall be based on Company Standard Specifications.

3.

Design metal temperature (Section 2, Paragraph 2.2.9 of API Std. 650) -45F.

4.

Design Wind Velocity (Section 3, Paragraph 3.9.7 of API Standard 650) 100 mph.

5.

When Appendix F is applied, API Std. 650 tanks may be constructed for internal pressure
nor exceeding 2 psig. With specific Company approval.

6.

Rainfall intensity for sizing floating roof drains 2.4 / 1 Hr.

7.

Seismic design shall be in accordance with API 650 Appendix E.

8.

The details of any API Standard 620 tanks shall be subject to specific Company
approval.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 23 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

24 OF 56

SECTION E DESIGN DATA FOR HEAT EXCHANGERS, ETC.


(ENTIRE SECTION NOT APPLICABLE FOR MOST FACILITIES)
E 1 DESIGN TEMPERATURES TO WHICH STOCKS MUST BE COOLED
See Process Design and review for most economic design consistent with safe tankage
temperature and pressure. Also, see Note No. 1, Section D I.

E 2 HEAT EXCHANGERS
2.1

Codes
ASME Code
Section

Notes

Calif. State
Safety
Orders
Title 8,
Chapter4

2.1.1

Shell and Tube

VIII, Div 1

2.1.2

Steam or Water heating or Hot Water


Supply Boiler

IV

1,2

Subch.2

2.1.3

Steam Generators in Process Furnaces

1,2,3

Subch

2.1.4

Exchanger Type Unfired

VIII, Div. 1

1,2,3

Subch. 2

2.1.5

Fired Process Tubular Heaters

2.15.1 Nominal Size 6 and Less

None

Subch. 2

2.15.2 Nominal Size Larger than 6

VIII, Div. 1

Subch. 2

NOTES:
1)

Within the limits established in Sections I or (IV), all piping, valves, fittings, gauges, etc. shall
comply with the requirements of Section I (or IV) and include stamping and data reports.
Also see California Safety Orders, Article 761 concerning reaction forces from relief
devices.

2)

Check individual piping standards for conformance to Section I (or IV) before using.

3)

For Section VII, Division 1, Construction, see requirements of Code Paragraph UW-2 .
Within the limits established in Section I, all piping valves, fittings, gauges, etc. shall comply
with the requirements of Section I, Make provisions to obtain a Master Data Report where
required by Code Par. PG-104.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 24 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

25 OF 56

E 3 AIR COOLERS
3.1

Codes ASME Section VIII, API 661

3.2

Design Air Temperature Forced Draft*

3.3

Design Air Temperature Induced Draft*

3.4

Maximum Outlet Air Temperature

82F

*Design air temperature includes the effect of hot air re-circulation and inplant heating of the
ambient air.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 25 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

26 OF 56

SECTION F DESIGN DATA FOR FURNACES AND HEATERS


(ENTIRE SECTION NOT APPLICABLE FOR MOST FACILITIES)
F 1

CODES

F-2

HEATERS AND FURNACE PERFORMANCE

F-3

FUEL INFORMATION

SECTION G DESIGN DATA FOR PUMPS AND DRIVERS


G 1

CHEMICAL INJECTION PUMPS AND DRIVERS Typical Example Only

1.1

Service:___________________Sodium Hypochlorite Feed Injection

1.2

Quantity:____________four (4) __________including______One (1)___spare.

1.3

Fluid:____________________ Sodium Hypochlorite

1.4

Flow Rate, gph: Normal_______78____;Min.________1___; Max.______208___

1.5

Pressure, psig: Normal______________________; Max_____________________

1.6

Pump Controls

1.7

1.6.1

Stroke Frequency Adjustment

____________________Yes____

1.6.2

Stroke Length Adjustment

____________________No_ ___

1.6.3

Diaphragm-failure Detector:

____________________Yes____

1.6.4

Power:

___________________________

PUMP ACCESSORIES
1.7.1

Pressure Relief Valve: Internal__Yes_______; External________Yes____

1.7.2

Pulsation Dampener:____________________________________Yes____

1.7.3

Calibration Column:____________________________10,000 mil capacity

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 26 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

27 OF 56

G 2

CENTRIFUGAL PUMPS AND DRIVERS

2.1

Service:____________________________________________________________

2.2

Quantity:_________________________________including______________spare.

2.3

Fluid:______________________________________________________________

2.4

Flow Rate, gpm: Normal_____________;Min.____________;Max._____________

2.5

Pressure, Psig: Normal______________________;Max______________________

2.6

Pump Controls:

G 3

SUMP PUMPS AND DRIVERS

3.1

Service:____________________________________________________________

3.2

Quantity:_________________________________including______________spare.

3.3

Fluid:______________________________________________________________

3.4

Flow Rate, gpm: Normal_____________;Min.____________;Max._____________

3.5

Pressure, Psig: Normal______________________;Max______________________

3.6

Pump Controls:

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 27 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

28 OF 56

SECTION J DESIGN DATA FOR INSTRUMENTS AND CONTROLS


J1

INSTRUMENT REQUIREMENTS

1.1

Utility Instruments

Typical Examples Only

Consult Water Department for utility instrument requirements (field and central control
system) when new utilities are added to a process plant.

1.2

Central Control Systems


1.2.1

Distributed Control System (DCS): None

1.2.2.

Safety Shutdown System (SSD): None

1.2.3

Rotating Equipment Monitoring System: None

1.3

Instrument Numbering: Tags for new and existing instruments to conform to tagging
requirements.

1.4

Engineering Units: Engineering units will be abbreviated

1.5

Transmitters: Transmitters to be smart type.

1.6

Field Digital Indicators: Field digital indicators to be smart type.

1.7

RTDs: 3-wire, 100ohm platinum with an alpha of 0.00385.

1.8

Thermocouples: Type k and grounded at the tip.

1.9

Analyzers: Analyzers having multiple output signals to be interfaced to the DCS through
a PLC serial interface.

1.10

Control Valves: Minimum pressure rating to be ANSI Class 300. Valve packing to meet
VOC requirements. Control valves to have smart electro-pneumatic positioners.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 28 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

29 OF 56

J2

INSTRUMENT WIRING AND INSTRUMENT ELECTRICAL REQUIREMENTS

2.1

Analog Signal and Alarm Wiring: Cables will be black and white twisted pair with
individual and overall shield. Black will be the positive wire.

2.2

Digital Output Wiring: Digital output signals are not to be included in cables having other
types of signals.

2.3

Thermocouple Wiring: Thermocouple extension wiring will follow ANSI color code.

2.4

I/O Voltage Levels: All I/Q to be 24 VDC.

2.5

Field Junction Boxes: NEMA 4X, stainless steel.

J3

CONTROLS

LATER Information based on facility requirements and control strategy.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 29 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

SECTION K DESIGN DATA FOR COMPRESSORS, BLOWERS AND FANS


K 1 COMPRESSORS

K 2 BLOWERS

K 3 FANS

K 4 LUBE OIL AND SEAL OIL SYSTEMS

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 30 of 56

30 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

31 OF 56

SECTION L DESIGN DATA FOR PIPING AND VALVES

L 1 PREFERRED BASIS FOR DESIGN


(code, Instructions, etc.)

1.1

1.2

Within Process Areas

Outside Process Areas

General

Special

Piping Manual

ASME Section I

ANSI B-31.3

(See Section E-2)

Piping Manual

ASME Section I

ANSI B-31.3

(See Section E-2)

L 2

SELECTION OF MATERIALS FOR PIPING SYSTEMS

2.1

Steel

2.2

PVC Double Contained

2.3

High Density Polyethylene (HDPE)

2.4

Cement

L3

SPECIAL CONSIDERATIONS - Typical

3.1

Underground steel lines shall be externally coated with Polypropylene X-Tru-Coat with
following thicknesses:
Lines 6 through 16 nominal size:

60 mil thickness

Line 3 to 4 size:

35 mile thickness

Lines 2 and under:

30 mil thickness

Pipe joints shall be:

Protected with Thermofit pipe sleeves.

The above coatings are limited to 160F maximum.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 31 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

L4

UNDERGROUND LINES AND ROAD CROSSINGS

4.1

Underground Lines

4.2

4.1.1

All underground chemical lines shall be constructed of double wall pipe and have
intermittent leak inspection holes.

4.1.2

All underground utility lines shall be coated and wrapped to prevent corrosion unless
otherwise noted.

4.1.3

Sewer lines shall be constructed per Specification _______________________

Road Crossings
4.2.1

The maximum estimated chemical tanker load at underground pipeline crossing is


_________________lbs.

4.2.2

All underground lines with less than 3 feet of native soil cover shall be reviewed by Civil
Engineer. Additional protective cover for underground lines can provided by reinforced
concrete slab.

L5

LARGE AND SPECIALTY VALVES

5.1

Large Valves

5.2

32 OF 56

5.1.1

Valve Model Numbers and description

5.1.2

Actuator Model Numbers and description

Specialty Valves
5.2.1

Valve Model Numbers and description

5.2.2

Actuator Model Numbers and description

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 32 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

33 OF 56

SECTION M DESIGN DATA FOR STRUCTURES AND BUILDINGS


M 1 DESIGN CRITERIA
1.1

Buildings and Structures: CALIFORNIA BUILDING CODE, SAN FRANCISCO


BUILDING CODE, or other Building Code required by governing jurisdiction.

M 2 FOUNDATIONS (See Section Q)

M 3 STRUCTURAL LOADS
3.1

3.2

Vertical Live Loads


3.11

Roofs: Unit load (See UBC).

3.12

Platforms and walkways, uniform load of 75 psf or concentrated load of 2000 lbs.,
whichever is more severe, except areas subject to heavier loading shall be designed for
the loading to which they will be subjected.

3.13

Stairs Uniform load of 100 psf or concentrated load of 1000 pounds.

Lateral Loads
3.2.1

International Building Code

3.2.2

Earthquake Zone: 4

3.2.3

Seismic Importance Factors


I=
Ip=

3.3

Wind Zone:

M 4 PREFERRED MATERIALS FOR CONSTRUCTION


4.1

Elevated Walks, Platforms Use galvanized steel serrated grating or flat steel plate to
match existing structures, subject to Water Department approval.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 33 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

34 OF 56

4.2

Stanchions Fireproofed structural steel where fireproofing is required. Consult Section


N-1 for fireproofing requirements. In non-fireproofed areas, use structural steel.

4.3

Stairs Serrated grating with cast abrasive nosing and galvanized.

4.4

Underground Vaults-Cast in Place Concrete.

M-5

UNDERGROUND VAULTS

M-6

PIPE SUPPORTS AND PIPE RACKS

6.1

Pipe Supports

6.2

Pipe Racks

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 34 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

SECTION N DESIGN DATA ON INSULATION AND FIREPROOFING


N 1 VESSELS, DRUMS AND TANKS
1.1

Vessels and Drums

1.2

Tanks

N 2 PIPES
2.1

Pipes

N 3 FIREPROOFING
3.1

Vessel Supports, Column Skirts

3.2

Elevated Support Structures

3.3

Overhead Stanchions

3.4

Valves and critical Instruments

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 35 of 56

35 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

SECTION P DESIGN DATA FOR POWER AND LIGHTING

36 OF 56

Typical Examples Only

P 1 CODES
1.1

General: California Administrative Code Title 24, latest Revision

1.2

Pole Line: California General Order (G.O.) 95

1.3

NFPA 70 (NEC)

1.4

Other: California Title 8 Electrical Safety Orders

P 2 POWER SUPPLY
Location

Typical Example Only


Nominal
Voltage

Phase

Frequency

Type

2.1

PG&E Service

12.47 KV

60

Low Resistance Substation

2.2

Emergency Power

2.4 KV

60

High Resistance, Low,


Resistance Grounding

2.3

Distribution

12.47 KV

60

Low Resistance Substation

2.4

FeedersMotors 250
HP& Larger

2400 V

60

High Resistance
Substation, Low,
Resistance Grounding

2.5

Feeders-Motors 250
HP& Under

480 V

60

High Resistance Substation

2.6

Lighting

120/208 V

60

Solid Lighting TX

2.7

Feeders Motors HP &


Less

120/208 V

60

Solid

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 36 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

37 OF 56

P 3 SWITCHGEAR ASSEMBLIES, CIRCUIT BREAKERS AND FUSES


Nominal
Voltage

Location

Rated
Voltage

Type

Enclosure &
Mounting

3.1

Main

12.47 KV

15 KV

Metal Clad

NEMA1

3.2

Feeders

2.4 KV

5 KV

Metal Clad

NEMA1

3.3

Low Voltage Main & Feeder

480 V

600 V

Metal Encl.

NEMA1

P 4 TRANSFORMERS

Typical Examples Only


Voltage

KVA Range

4.1

2000 10,000

Primary Secondary

12KV

2.4 KV

Class
OA 55C\
OA 65C\
FFA

Phase

Taps

Construction

2-2-1/2 up
2-2-1/2 dn

Enclosed
Bushings
DELTA-WYE
(Note 1)

OA\FA

2-2-1/2 up
2-2-1/2 dn

Enclosed
Bushings
DELTA-WYE
(Note 1)

480 V 208/120 V

AA

2-2-1/2 up
2-2-1/2 dn

Enclosed
DELTA-WYE

480 V 240/120 V

AA

2 5% dn

Enclosed

4.2

500 1500

12 KV 480 V

4.3

9 50

4.4

Below 9

*OA

Oil immersed self-cooled.

OA 55C\OA 65C\FFA -

Oil immersed self-cooled @ 55C rise \ Oil immersed self-cooled @ 65C


rise \ Future forced air @ 65C rise.

AA -

Dry type self-cooled.

Note 1: -Y preferred; however, in existing plants with - transformers, the desire to parallel
transformers may require buying a - .

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 37 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

38 OF 56

P 5 MOTORS
HP Range

Location & Area


Classification

1-250 HP

250-400 HP

4000 HP & UP

(Note 3)

(Note 3)

(Notes 1, 3)

Less than 1 HP
(Notes 1, 3)

Class 1
Division 2 or
Outdoors
Unclassified
or Indoors

Class 1 Div.
2 or

Process
Equipment

Aux. Equipment
Indoor
Unclassified

Wet/Dusty

Unclassified

All Areas

Clean and Dry

2.3 KV
4.0 KV
(Note 1)

5.1

Voltage

460

5.2

Phase

5.3

Enclosure*

TEFC

5.4

Insulation/Temp Rise

(Note 2)

(Note 2)

(Note 2)

5.5

Service Factor

1.0

1.0

1.0

3
TEFC (note
4)

12 KV
3
TEFC

*DP -

Drip Proof

ESV - Enclosed Self-Ventilated

SP -

Splash Proof

TEAC - Totally Enclosed Air Cooled

XP -

Explosion Proof

TEFC - total Enclosed Fan Cooled

WP -

Weather-protected

TEWAC Totally Enclosed Water Cooled

EFV -

Enclosed Forced Ventilated

Notes: 1. 4 KV motor is acceptable when with captive transformer.


2. Class F insulation with Class B insulation temperature rise.
3. The horsepower breakdown is typical. However, higher voltage levels maybe used if
available for economic reasons.
4. TEFC enclosures shall be used for motors up to 800 HP and WP-II enclosures shall
be used for motors over 800 HP. TEAC enclosure may be used to meet
environmental requirements.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 38 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

39 OF 56

P 6 MOTOR STARTERS
HP Range

Voltage

Type & Size*

Control Voltage

NEMA Enclosure
Unclassified
Indoor Outdoor

6.1

4000 & Above


(Notes 1 & 3, sht. 26)

12 KV

15 KV MCB

48 V or
120 V DC Trip
120 or 240 VAC
Close

6.2

250 -- 4000
(Notes 1 & 3, sht. 26)

2.4 KV

5 KV CLF
5 KV Starter

6.3

1500 -- 4000
(Notes 1 & 3, sht. 26)

2.4 KV

5 KV CLF
5 KV Starter

6.4

1 -- 150
(Notes 1 & 3, sht. 26)
200 -- 250
(Note 3, sht. 26)
Below 1

480 V

480 V

CB Combin. In
MCC
MEB

48 V or
120 V DC Trip
120 or 240 VAC
Close
48 V or
120 V DC Trip
120 or 240 VAC
Close
120 VAC
120 VAC

120/240V

W/ O/L

120 VAC

6.5
6.6

* MCB -

Metal Clad Draw-out Air Circuit Breakers

CLF -

Metal Clad Enclosed Contractor with Current Limiting Fuses

MEB -

Metal Enclosed Draw-out Low Voltage Power Circuit Breaker

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 39 of 56

3 or 4
3
3 or 4

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

40 OF 56

P 7 LIGHTING
Enclosure or Model *
Type (Watts)
7.1

Incandescent
(100-300W)

7.2

Fluorescent
(20-40W)

7.3

High Pressure
Sodium
(70-150W)

Remarks:

Voltage

Location

Unclassified

Class 1
Div 1 Div 2

Class 2
Div 1 Div 2

120 V
120 V
120 V
120 V

Indoor
Outdoor
Indoor
Outdoor

Open
EG
Open
EG

XP
XP
-XP

EG

--

--

EG

--

--

120 V,
277 V,
or 480 V

Indoor

Open

--

EG

--

--

Outdoor

WP

--

EG

--

--

All outdoor lights shall be High Pressure Sodium except incandescent for
emergency lights (25 to 33% max.). All indoor lights shall be fluorescent type.
Incandescent lights may be used for emergency lights.

* XP - Explosion Proof
DT - Dust Tight
WP - Weatherproof
EG - Enclosed and Gasketed
WT - Watertight

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 40 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

P 8

RECEPTACLES & PLUGS


Voltage /
Amperes

8.1

41 OF 56

Poles

Catalog. No

Mfg.

Outdoor Convenience
Receptacle

120V / 20A

2W / 3P

CPSE 2375

Appleton

Indoor Convenience
Receptacle

120V / 5A

2W / 3P

5262

_____

8.2

Welding Receptacle

480V / 30A

3W / 3P

EPC 43042

Crouse Hinds

8.3

Outdoor Convenience
Plug

120V / 15A

2W / 3P

CPP (Form 1)

Appleton

8.4

Indoor Convenience
Plug

8.5

Welding Plugs

8.6

__

__

480V / 30A

3W / 4P

__
API 3483

__
Cutler Hammer

Special Purpose
(Such as power source for classifier)

8.7

Receptacles and Plugs NEC 210-F applies

P 9 PANEL BOARDS
Enclosure or Catalog No.
Type
9.1

9.2

Power

Lighting

Voltage

Unclassified

Classified

Indoor

480 V

NEMA 1 (gasket)

XP (NEMA 7)

Outdoor

480 V

NEMA 4

XP (NEMA 7)

Indoor

(See P 4.4)

--

XP (NEMA 7)

Outdoor

(See P 4.4)

NEMA 4

XP (NEMA 7)

Ground fault protection required per P 8.7.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 41 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

42 OF 56

P 10 WIRE, CONDUIT AND CONDUTT FITTINGS


10.1

10.2

Wire and Cable


Nom. Voltage

Location

Insulation and Jacket

Voltage Rating

10.1.1

600 V & below

In Conduit

XHHW or RHW or
THW

600 V

10.1.2

2.4 KV

In Conduit

EPR

5 KV

10.1.3

12 KV

In Conduit

133% EPR

15 KV

10.1.4

Inst. Alarm &


Low Voltage
Control

Single & Multi-Pairs

300 V

10.1.5

Thermocouple
Ext. Cable

Single & Multi-Pairs

Conduit

Type
Location

Metallic

Non-metallic

Above Ground

Rs. S. Galv. Or Cu-Free AL 4 & Up

N/A

Below Ground

R. S. Galv

PVC Sch. 40 all sizes

R. s. Galv. Or EMT

N/A

Building

10.3

Conduit Protection
Buried Conduits in
Banks

Red Concrete Envelope 3 Main.

Red Concrete Envelope 3 Main.

Single Buried Conduits

RGS. 3 Red Concrete Envelop if


area is at risk of future excavation

Red Concrete Envelope 3 Main.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 42 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

10.4 Conduit Fittings

Location

Unclassified

Class1
Div 1
Div 2

43 OF 56

Class2
Div 1
Div 2

Indoor

XP

Obround

Outdoor

XP

Form 8

Over 1

P 11 SPECIAL CONSIDERATIONS
11.1

For location of Classified Areas._____________________________________________


Type

11.2

11.2

Classifications Required

Location

Class I, Div. 1

TBD

Class I, Div. 2

TBD

Class II, Div. 1

TBD

Class II, Div. 2

TBD

Lighting Protection Electrical Required for:


11.2.1 Equipment Motors rated 4000 HP and large (See Section A .52) Structures
11.2.2 Any motor connected to overhead exposed conductors

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 43 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

44 OF 56

P 12 POLE LINE MATERIAL


Voltage

Construction

Pole Class

Insulator

Crossarms

12.1

P 13 METERING
13.1

Type
Nominal Voltage

Location

13.1.1

12 KV

Main

Multi-function Digital Metering

13.1.2

2.4 KV

Feeder

Multi-function Digital Metering

13.1.3

480 V

Unit Sub- Main

Multi-function Digital Metering

13.1.4

480 V

Feeder

Multi-function Digital Metering

P 14 ADJUSTABLE SPEED DRIVES


14.2

Voltage, Phase & Frequency


Nominal
Voltage

Phase

Frequency

Type

Location

Grounding

14.2.1

12.47 KV

15 KV

As Reqd

Metal Clad

--

--

14.2.2

2.4 KV

5 KV

As Reqd

Metal Clad

--

--

14.2.3

480 V

600 V

As Reqd

Metal Clad

--

--

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 44 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

14.2

45 OF 56

Technology
14.2.1 Pulse Width Modulation (PWM) 12 pulse
14.2.2 Load Commutated Inverter (LCI) 6 pulse

P 15 HEAT TRACING

P 16 PROCESS CONTROL TELEMETRY SCADA

P 17 CATHODIC PROTECTION
17.1

Furnish and install galvanic anode cathodic protection system of underground per
Specification 11800.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 45 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

46 OF 56

SECTION Q DESIGN DATA FOR FOUNDATIONS


Q 1 DESIGN CRITERIA
See Section M-1

Q2

TYPES OF FOUNDATIONS

Selection of foundation type (i.e., piles or shallow footings) shall be made on a case-bycase basis, considering the soil strength and stiffness, and the requirements of the
equipment to be supported.

Q 3 FOUNDATION CAPACITIES
Refer to the geotechnical reports for each site.

Q 4 FOUNDATION PILES Typical Example Only


All piles shall be 14 x 14 pre-cast pre-stressed concrete or 12. steel pipe.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 46 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

SECTION R DESIGN DATA FOR ARCHITECTURE AND BUILDINGS

R 1 CODES

R 2 DESIGN CRITERIA FOR TYPE OF BUILDING

R 3 OFFICE REQUIREMENTS

R 4 CHANGE ROOM AND LOCKERS REQUIREMENTS

R5

TOILETS AND WASTE DISPOSAL SYSTEMS

R 6 LABORATORY REQUIREMENTS

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 47 of 56

47 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

R 7 WALLS, PARTITIONS AND WINDOWS REQUIREMENTS

R8

ROOF REQUIREMENTS

R 9 FIRE PROTECTION, SPRINKLER AND FIRE EXTINGUISHERS

R 10

HVAC REQUIREMENTS

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 48 of 56

48 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

49 OF 56

SECTION S DESIGN DATA FOR MISCELLANEOUS SERVICES


S 1 GRADING
Fill area and grade as required per Specification____________________________.

S 2 PAVING
Refer to Specification________________________________________________.

2.1

Roads
Main Plant

Asphaltic Concrete

Maintenance Area

Asphaltic Concrete

2.2

Walks

Concrete

2.3

Plant Areas

Asphaltic concrete except under equipment where pile supported


concrete pads are installed.

S 3 DRAINAGE
Refer to Specification___________________________________________________.

3.1

Storm drains and ditches shall be designed for 10-year frequency storms. Use 25 year
return period for very sensitive areas or if required by outside agency.

3.2

On-plot use runoff coefficient of 1.0.

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 49 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

3.3

50 OF 56

Each area catch basin serving an area of approximately 3750 sq. ft. and its lateral shall
be designed to carry 0.2 gpm per ft2 of contributing surface area. Mains should be
designed to carry 3000 to 5000 gpm of fire water.

S 4 HYDROSTATIC TESTING
4.1

Hydrostatic testing of underground piping shall be done in accordance with


Specification__________________________.

S 5 FIRE PROTECTION
5.1

Fire Codes:

NFPA

YES

Other: Local Ordinances

5.2

Safety Orders: CAL-OSHA, State and Local Ordinances

5.3

Public Fire Protection:Available:

5.4

Control House Design:

Purged No

5.5

Plant Fire Alarm System:

Type _________________________________________

5.6

Spacing Between Plants: _________________________________________________

5.7

Location of Fired Equipment: ______________________________________________

5.8

Type of Hose Threads Required:

Yes On call basis By Whom:______________

American National Standard: 1-1/2 and 2-1/2 __________________


Other: _________________________
5.9

Type of Hydrants Required: Standard Drawing


Type B-3

5.10

Model _______

Threads NSHFT

Type of First Aid Hose Stations Required:


Standard Drawing 1-1/2 hose reels W / 100 hose

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 50 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:

BEDD NO.:
REVISION
NO.:

LOCATION:

SHEET

5.11

51 OF 56

Special Extinguishing Systems Required: ____________________________________


Water Spray: _______________________________________________
Foam: ___________ Other: _____________

5.12

Monitors __________________________________ ;___________ gpm at ______ psig

5.13

Make and Model of all Extinguishers, Nozzles, Hose, will be specified by:
______________________________________________________________

5.14

Special Provisions required in Tank fields: Firewater will be installed to deluge LPG
drums or spheres, or treating vessels which, if not cooled immediately in case of fire
could fail and add to the propagation of the fire. Spray will also be provided over
hydrocarbon pumps operating over auto ignition temperature. Critical area and location
of water supply will be determined by Company.

S 6 SECURITY AND SAFETY


6.1

Codes and Instructions


6.1.1

California Occupational Health and Safety Act. Safety Order Title 8

6.1.2

Safety in Design Standards

6.1.3

Fire Protection Standards

6.2

Insulation or barricades are required for accessible surfaces that exceed 140F unless
otherwise approved.

6.3

Security
6.3.1

Internal Security

6.3.2

External Security

S 7 PAINTING

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 51 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

7.1

52 OF 56

Buildings
7.1.1

Internal Painting per Specification ____________________________________

7.1.2

External Painting per Specification ___________________________________

7.2

Equipment per Specifications _____________________________________________

7.3

External Items per Specification ___________________________________________

SECTION T DESIGN DATA FOR MATERIALS HANDLING


T-1 LOAD REQUIREMENTS

T-2 OSHA AND SAFETY REQUIREMENTS

T-3

NOISE CONTROL REQUIREMENTS

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 52 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

SECTION U DESIGN DATA FOR EXPENDABLES


U-1 CATALYST

U-2

CHEMICALS

U-3

LUBRICATING OILS AND GREASE

U-4

SEAL AND FLUSHING OILS

U-5

REFRIGERANTS

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 53 of 56

53 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

SECTION V DESIGN DATA FOR PACKAGE UNITS


V-1 SPECIFIC DESIGN CRITERIA
These package units are Off-the Shelf. No custom design.

SECTION X DESIGN DATA FOR LANDSCAPING


X-1 SITE SPECIFIC STRUCTURAL AND ORNAMENTAL FREATURES

X-2

SITE SPECIFIC NATURAL FREATURES

X-3

SPECIAL VISUAL REQUIREMENTS

X-4

MITIGATION REQUIREMENTS

X-5

GATES AND FENCING

X-6

IRRIGATION REQUIREMENTS

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 54 of 56

54 OF 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

55 OF 56

SECTION Z DESIGN DATA FOR ENVIRONMENTAL AND POLLUTION CONTROL


Consult Planning & Environmental Group for assistance.
Z-1

REGULATORY ISSUES

Z-2

REGULATORY REQUIREMENTS

Z-3

REGULATORY AGENCIES

Z-4

MONITORING AND REPORTING

Z-5

SOILS

Z-6

GROUND WATER AND SURFACE WATER

Z-7

AIR QUALITY AND EMISSIONS CONTROL

Z-8

NOISE

Z-9

ODOR

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 55 of 56

ATTACHMENT 1: BASIC ENGINEERING DESIGN DATA (BEDD) SHEETS

FACILITY/PROJECT
TITLE:
LOCATION:

BEDD NO.:
REVISION
NO.:
SHEET

PART III

56 OF 56

REFERENCES

I-1

TECHNICAL CONTRACTS AND REPORTS

III-2

MAJOR OR CRITICAL SPECIFICATIONS REFERENCED IN BEDD SHEETS

III-3

MAJOR OR CRITICAL SITE DRAWINGS

Project Design: Procedure PD 2.05, Rev. 0, Attachment 1, Page 56 of 56