Metrados

Polishing Pond - Elev. 4120 to 4135 - Proyectos Complementarios/ 103-13081-MTE2915-MTO-464-G-0001 / Ampliacin del Sidehill Etapa 2 - Fase I
Compaa Minera Antamina S.A
Proyecto 159-415-8108
Doc. N 103-13081-MTE2915-MTO-464-G-0001
Rev. A

TEM

1.0.0.0.0
1.1.0.0.0
1.1.1.0.0
1.1.2.0.0
1.2.0.0.0
1.2.1.0.0
1.2.2.0.0
2.0.0.0.0
2.1.0.0.0
2.1.1.0.0
2.1.1.1.0
2.1.1.2.0
2.1.2.0.0
2.1.2.1.0
2.1.2.2.0
2.1.2.3.0
2.1.2.4.0
2.1.2.5.0
2.1.2.6.0
2.1.2.7.0
2.1.2.8.0
2.1.2.9.0
2.1.2.10.0
2.1.2.11.0
2.1.3.0.0
2.1.3.1.0
2.1.3.1.1
2.1.3.1.2
2.1.3.1.3
2.1.3.1.4
2.1.3.1.5
2.1.3.1.6
2.1.3.1.7
2.1.3.1.8
2.1.3.1.9
2.1.3.1.10
2.1.3.2.0
2.1.3.2.1
2.1.3.2.2
2.1.3.2.3
2.1.3.2.4
2.1.3.2.5
2.1.3.2.6
2.1.3.2.7
2.1.3.2.8
2.1.3.2.9
2.1.3.2.10
2.1.3.3.0
2.1.3.3.1
2.1.3.3.2
2.1.3.3.3
2.1.3.3.4
2.1.3.3.5
2.1.3.3.6
2.1.3.3.7
2.1.3.3.8
2.1.3.4.0
2.1.3.4.1
2.1.3.4.2
2.1.3.4.3
2.1.3.4.4
2.1.3.4.5
2.1.3.4.6
2.1.3.4.7
2.1.3.4.8
2.1.3.5.0
2.1.3.5.1
2.1.3.5.2
2.1.3.5.3
2.1.3.5.4
2.1.3.5.5
2.1.3.5.6
2.1.3.5.7
2.1.3.6.0
2.1.3.6.1
2.1.3.6.2
2.1.3.6.3
2.1.3.6.4
2.1.3.6.5
2.1.3.6.6
2.1.3.6.7
2.1.3.7.0
2.1.3.7.1
2.1.3.7.2
2.1.3.7.3
2.1.3.7.4
2.1.3.8.0
2.1.3.8.1
2.1.3.8.2
2.1.3.8.3
2.1.3.8.4
2.1.3.9.0
2.1.3.9.1
2.1.3.9.2
2.1.3.9.3

DESCRIPCIN

UNIDAD

ELIMINACION DE ESTRUCTURA DE ENTRADA EXISTENTE


Demolicin y Eliminacin de Estructura de Derivacin Exist. MCDC
Excavacin masiva de material suelo (Inc. Elim. Dp=1 km)
Demolicin y eliminacin de estructura de concreto armado
Demolicin y Eliminacin de Tramo Sidehill Existente (L = 8.5 m)
Excavacin masiva de material suelo (Inc. Elim. Dp=1 km)
Demolicin y eliminacin de estructura de concreto armado
RECRECIMIENTO SIDEHILL (ETAPA I)
Estructura Sidehill (L = 15.2 m)
Movimiento de tierra
Excavacin masiva de material suelo (Inc. Elim. Dp=1 km)
Relleno Estructural
Civil
Solado de concreto f'c=10 Mpa
Acero de Refuerzo fy=420 Mpa
Encofrado y Desencofrado de Madera
Concreto Armado f'c=30 MPa
Tapas de acero para cierre permanente de aberturas
Soportes metlicos para tuberas HDPE 20"
Pernos M10
Rieles metlicos
Suministro e Colocacin de Dowels 1"
Aberturas (0.75 x 0.55 m) sobre tuberas existentes HDPE 42" SDR21
Aberturas (0.75 x 0.55 m) sobre tuberas nuevas HDPE 42" SDR21
Mecnico
Tubera Spool 01
42" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR21, To be supplied in Spool.
42" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR21, To be supplied in Spool. Anillo Aereador
42" - Flange Adaptor, Polyethylene, PE 4710, Plain End, Standard Dimension Ratio 21.
42" - Flange - Backing, Ductile Iron per ASTM A536 Gr.65-45-12, 75 psi Operating Pressure for HDPE, Convoluted Design, Bolt Circle and
Bolt Holes to match with AWWA C207 Class D bolting parameters, Marked per MSS SP 25.
Tapa de Orificio para tuberia 42" - HDPE - CS, To be supplied in Spool.
6" Branch Fittings, Polyethylene, PE 4710, To be supplied in Spool. (See detail on drawing 464-M-10003T).
42" - Electrofusion Couple, Friatec or similar
42" - Flexible Coupling, Victaulic Style 230 or similar (alternative)
6" - Flexible Coupling, Victaulic Style 230 or similar
42" - Aerator Ring (See detail on drawing 464-M-10002T).
Tubera Spool 02
42" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR21, To be supplied in Spool.
42" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR21, To be supplied in Spool. Anillo Aereador
42" - Flange Adaptor, Polyethylene, PE 4710, Plain End, Standard Dimension Ratio 21.
42" - Flange - Backing, Ductile Iron per ASTM A536 Gr.65-45-12, 75 psi Operating Pressure for HDPE, Convoluted Design, Bolt Circle and
Bolt Holes to match with AWWA C207 Class D bolting parameters, Marked per MSS SP 25.
Tapa de Orificio para tuberia 42" - HDPE - CS, To be supplied in Spool.
6" Branch Fittings, Polyethylene, PE 4710, To be supplied in Spool. (See detail on drawing 464-M-10003T).
42" - Electrofusion Couple, Friatec or similar
42" - Flexible Coupling, Victaulic Style 230 or similar (alternative)
6" - Flexible Coupling, Victaulic Style 230 or similar
42" - Aerator Ring (See detail on drawing 464-M-10002T).
Tubera Spool 03
20" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR21, To be supplied in Spool.
20" - Flange Adaptor, Polyethylene, PE 4710, Plain End, Standard Dimension Ratio 21.
20" - Flange - Backing, Ductile Iron per ASTM A536 Gr.65-45-12, 75 psi Operating Pressure for HDPE, Convoluted Design, Bolt Circle and
Bolt Holes to match with AWWA C207 Class D bolting parameters, Marked per MSS SP 25.
20" - Ellbow 90 deg, R=1.5D, Fab HDPE to SDR 21, PE 4710, Plain End,
20" - Ellbow 70.7 deg, R=1D, Fab HDPE to SDR 21, PE 4710, Plain End,
6" Branch Fittings, Polyethylene, PE 4710, To be supplied in Spool. (See detail on drawing 464-M-10003T).
20" Flexible Coupling, Victaulic Style 230 or similar
6" Flexible Coupling, Victaulic Style 230 or similar
Tubera Spool 04
20" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR21, To be supplied in Spool.
20" - Flange Adaptor, Polyethylene, PE 4710, Plain End, Standard Dimension Ratio 21.
20" - Flange - Backing, Ductile Iron per ASTM A536 Gr.65-45-12, 75 psi Operating Pressure for HDPE, Convoluted Design, Bolt Circle and
Bolt Holes to match with AWWA C207 Class D bolting parameters, Marked per MSS SP 25.
20" - Ellbow 90 deg, R=1.5D, Fab HDPE to SDR 21, PE 4710, Plain End,
20" - Ellbow 70.7 deg, R=1D, Fab HDPE to SDR 21, PE 4710, Plain End,
6" Branch Fittings, Polyethylene, PE 4710, To be supplied in Spool. (See detail on drawing 464-M-10003T).
20" Flexible Coupling, Victaulic Style 230 or similar
6" Flexible Coupling, Victaulic Style 230 or similar
Tubera Spool 05
20" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR21, To be supplied in Spool.
20" - Flange Adaptor, Polyethylene, PE 4710, Plain End, Standard Dimension Ratio 21.
20" - Flange - Backing, Ductile Iron per ASTM A536 Gr.65-45-12, 75 psi Operating Pressure for HDPE, Convoluted Design, Bolt Circle and
Bolt Holes to match with AWWA C207 Class D bolting parameters, Marked per MSS SP 25.
20" - Ellbow 90 deg, R=1.5D, Fab HDPE to SDR 21, PE 4710, Plain End,
20" - Ellbow 70.7 deg, R=1D, Fab HDPE to SDR 21, PE 4710, Plain End,
20" Flexible Coupling, Victaulic Style 230 or similar
6" Flexible Coupling, Victaulic Style 230 or similar
Tubera Spool 06
20" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR21, To be supplied in Spool.
20" - Flange Adaptor, Polyethylene, PE 4710, Plain End, Standard Dimension Ratio 21.
20" - Flange - Backing, Ductile Iron per ASTM A536 Gr.65-45-12, 75 psi Operating Pressure for HDPE, Convoluted Design, Bolt Circle and
Bolt Holes to match with AWWA C207 Class D bolting parameters, Marked per MSS SP 25.
20" - Ellbow 90 deg, R=1.5D, Fab HDPE to SDR 21, PE 4710, Plain End,
20" - Ellbow 70.7 deg, R=1D, Fab HDPE to SDR 21, PE 4710, Plain End,
20" Flexible Coupling, Victaulic Style 230 or similar
6" Flexible Coupling, Victaulic Style 230 or similar
Tubera Spool 07
6" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR17, To be supplied in Spool.
6" - Ellbow 90 deg, R=1.5D, SDR 21, PE 4710, Plain End,
6"x6" - Tee HDPE to SDR 21, PE 4710, Plain End,
6" Flexible Coupling, Victaulic Style 230 or similar
Tubera Spool 08
6" - Pipe, Polyethylene ASTM F714, PE 4710, Plain End, SDR17, To be supplied in Spool.
6" - Ellbow 90 deg, R=1.5D, SDR 21, PE 4710, Plain End,
6"x6" - Tee HDPE to SDR 21, PE 4710, Plain End,
6" Flexible Coupling, Victaulic Style 230 or similar
Soporte de Tubera
20" - Piping Support Type GS1 - 20"
20" - Piping Support Type GS2 - 20"
6" - Piping Support Type GS3 - 6"

Golder Associates

CANTIDAD
ESTIMADA
(A)

MATERIAL
(B)

m3
m3

520
120

m3
m3

520
130

m3
m3

660
170

m3
kg
m2
m3
und
und
und
m
und
und
und

10
20,000
180
260
14
11
92
70
17
4
10

m
m
und

15
1
3

und

und
und
und
und
und
und

5
2
1
1
4
1

m
m
und

15
1
3

und

und
und
und
und
und
und

5
2
1
1
4
1

m
und

23
6

und

und
ea
und
und
und

2
1
2
1
2

m
und

23
6

und

und
und
und
und
und

2
1
2
1
2

m
und

24
6

und

und
und
und
und

2
1
1
2

m
und

24
6

und

und
und
und
und

2
1
1
2

m
und
und
und

9
2
1
4

m
und
und
und

9
2
1
4

und
und
und

4
12
8

COSTOS UNITARIOS (US$/UNID.)


INSTALACIN
EQUIPO
(C)
(D)

TOTAL
(E)=(B+C+D)

SUB TOTAL
(US$)
(A*E)

Metrados
Polishing Pond - Elev. 4120 to 4135 - Proyectos Complementarios/ 103-13081-MTE2915-MTO-464-G-0001 / Ampliacin del Sidehill Etapa 2 - Fase I
Compaa Minera Antamina S.A
Proyecto 159-415-8108
Doc. N 103-13081-MTE2915-MTO-464-G-0001
Rev. A

TEM

DESCRIPCIN

2.1.3.9.4
2.1.3.10.0
2.1.3.10.1
2.1.3.10.2
2.2.0.0.0
2.2.1.0.0
2.2.2.0.0
3.0.0.0.0
3.1.0.0.0
3.1.1.0.0
3.1.1.1.0
3.1.1.2.0
3.1.2.0.0
3.1.2.1.0
3.1.2.2.0
3.1.2.3.0
3.1.3.0.0
3.1.3.1.0
3.2.0.0.0
3.2.1.0.0
3.2.1.1.0
3.2.1.2.0
3.2.2.0.0
3.2.2.1.0
3.2.2.2.0
3.2.2.3.0
3.2.2.4.0
3.2.3.0.0
3.2.3.1.0
3.2.3.2.0
3.2.3.3.0
4.0
5.0
6.0
7.0
8.0
9.0

UNIDAD

20" - Piping Support Type GS4 - 20"


Sello de Ventana
Rubber Packing Support C.S. ASTM A36
Rubber Cover 1/2" thickness (MOR 130B)
Nuevo Sistema de Aeracin
Anillo Aerador
Suministro y Colocacin de Tubera HDPE 2" SDR17 PE 4710
SISTEMA DE DERIVACION TEMPORAL MCDC
Extensin Canal MCDC (L = 9.0 m)
Movimiento de tierra
Excavacin masiva de material suelo (Inc. Elim. Dp=1 km)
Relleno Estructural
Civil
Solado de concreto f'c=10 MPa
Acero de Refuerzo fy=420 MPa
Concreto Estructural f'c=28 Mpa
Otros
Neopreno
Caja de Derivacin CD-01
Movimiento de tierra
Excavacin masiva de material suelo (Inc. Elim. Dp=1 km)
Relleno Estructural
Civil
Solado de concreto f'c=10 MPa
Acero de Refuerzo fy=420 MPa
Encofrado y Desencofrado de Madera
Concreto Estructural f'c=28 MPa
Otros
Suministro y Colocacin de Tubera HDPE 36" SDR21 PE 4710
Junta Water Stop
Parrilla Metlica
Costo Directo Total (US$) (tems 1.0 + 2.0 + 3.0)
Gastos Generales Fijos ..% (US$) (% de tem 4.0)
Gastos Generales Variables ..% (US$) (% de tem 4.0)
Gastos de Alimentacin y Hospedaje (US$)
Utilidades .% (US$) (% de tem 4.0)
Costo Total General (US$) (tems 4.0 + 5.0 + 6.0 + 7.0 + 8.0)

CANTIDAD
ESTIMADA
(A)

MATERIAL
(B)

und

und
m2

2
16

und
m

2
25

m3
m3

80
120

m3
kg
m3

2
2,200
30

m2

m3
m3

1,350
350

m3
kg
m2
m3

6
5,300
250
70

m
m
m2

8
50
50

COSTOS UNITARIOS (US$/UNID.)


INSTALACIN
EQUIPO
(C)
(D)

TOTAL
(E)=(B+C+D)

SUB TOTAL
(US$)
(A*E)

0.00
0.00
0.00
0.00
0.00
0.00

NOTAS
1.0
2.0
3.0
4.0
5.0
6.0
7.0

El Contratista presentar sus metrados, anlisis de costos unitarios por partida, as como el desagregado de GG, en caso contrario la propuesta ser RECHAZADA.
No se considerarn como tems de pago el tiempo perdido o stand by por alertas.
El contratista deber desagregar como un tem aparte, todo el combustible requerido para este proyecto (petrleo, gasolina).
Las tarifas horarias de alquiler de equipos debern ser sin combustible.
Debido a disposiciones legales, el combustible ser proporcionado por Antamina a travs de su concesionario en mina (Repsol), hasta por el volumen indicado en su propuesta. Cantidades mayores debern ser debidamente justificadas por el contratista.
El contratista deber verificar e identificar en los planos y documentos del proyecto, todas las partidas que se requieran para la culminacin correcta de la presente obra. En caso que haya una diferencia en actividades no incluidas en este cuadro, deber ser presentado en hoja aparte pero en este mismo formato,
Antamina no proporcionar ningn material, instalaciones temporales, suministro, servicio, mano de obra, o equipo que no haya sido expresamente indicado en el tem 3.3. de los Alcances de Obra.

Golder Associates