IN-15-0065-EE-26
Doc. No.
Date: 01.28.16
Location
: Inverter Block : 1 to 4
Equipment
Relay Make
Setting Range
CT Ratio
: 40
Load Current
: 38.49
Fault Current
: 0.59
kA
: 110%
Relay Characteristics
: Normal Inverse
/1
A00
Rev.
38.49
0.065
= 592.17 Amps
(Considering Z = 6.5% percentage impedance for Inverter Duty Transformer)
IDMT Over Current Relay Setting
=
Relay Operation Time
13.46
Fault Current
CT Primary x Current Setting
592.17
40 x 110%
13.46 PS
Plug Setting and 1.0 TMS
=
18MW-RTR1 SPV Plant at Virudhunaar, TN.
(PSM) - 1
0.14
0.05337
2.62
Sec
Page 1 of 23
A00
Doc. No.
Date: 01.28.16
Sec
=
Actual Operation time
Rev.
0.25
Sec
0.25
2.62
0.095
2.62
0.250 Sec
0.095
= 110%
= 13.46
= 0.095
=
Relay Operation Time
14.80
Fault Current
CT Primary x Current Setting
592.17
40 x 100%
14.80 PS
Plug Setting and 1.0 TMS
=
18MW-RTR1 SPV Plant at Virudhunaar, TN.
(PSM) - 1
0.14
0.05538
2.53
Sec
Page 2 of 23
A00
Doc. No.
Date: 01.28.16
Sec
=
Actual Operation time
Rev.
0.25
Sec
0.25
2.53
0.099
2.53
0.253
0.10
= 100%
= 14.80
= 0.10
Page 3 of 23
Doc. No.
Date: 01.28.16
A00
Rev.
OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of 0.59
kA at 33kV Side.
710.606 Amps
Fault Current
CT Primary x Current Setting
710.61
40 x 100%
17.77 PS
= 17.77
Time Delay
= 0.1
= 0.05 - 4
0.1
Time delay
0.1
The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer
Page 4 of 23
Doc. No.
Date: 01.28.16
Location
: Inverter Block : 3
Equipment
Relay Make
Setting Range
CT Ratio
: 30
Load Current
: 19.25
Fault Current
: 0.296
kA
: 110%
Relay Characteristics
: Normal Inverse
/1
A00
Rev.
19.25
0.065
= 296.09 Amps
(Considering Z = 6.5% percentage impedance for Inverter Duty Transformer)
IDMT Over Current Relay Setting
=
Relay Operation Time
8.97
Fault Current
CT Primary x Current Setting
296.09
30 x 110%
8.97
PS
=
18MW-RTR1 SPV Plant at Virudhunaar, TN.
(PSM) - 1
0.14
0.04486
3.12
Sec
Page 5 of 23
A00
Doc. No.
Date: 01.28.16
Sec
=
Actual Operation time
Rev.
0.25
Sec
0.25
3.12
0.080
3.12
0.250
0.080
= 110%
= 8.97
= 0.08
=
Relay Operation Time
9.87
Fault Current
CT Primary x Current Setting
296.09
30 x 100%
9.87
PS
=
18MW-RTR1 SPV Plant at Virudhunaar, TN.
(PSM) - 1
0.14
0.04685
2.99
Sec
Page 6 of 23
A00
Doc. No.
Date: 01.28.16
Sec
=
Actual Operation time
Rev.
0.25
Sec
0.25
2.99
0.084
2.99
0.269
0.090
= 100%
= 9.87
= 0.084
Page 7 of 23
Doc. No.
Date: 01.28.16
A00
Rev.
OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of
0.296 kA at 33kV Side.
355.303 Amps
Fault Current
CT Primary x Current Setting
355.30
30 x 100%
11.84 PS
= 11.84
Time Delay
= 0.1
= 0.05 - 4
0.1
Time delay
0.1
The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer
Page 8 of 23
Doc. No.
Date: 01.28.16
Location
: Inverter Block : 4 to 7
Equipment
Relay Make
Setting Range
CT Ratio
: 60
Load Current
: 48.99
Fault Current
: 0.75
kA
: 110%
Relay Characteristics
: Normal Inverse
/1
A00
Rev.
48.99
0.065
= 753.67 Amps
(Considering Z = 6.5% percentage impedance for Inverter Duty Transformer)
IDMT Over Current Relay Setting
=
Relay Operation Time
11.42
Fault Current
CT Primary x Current Setting
753.67
60 x 110%
11.42 PS
Plug Setting and 1.0 TMS
=
18MW-RTR1 SPV Plant at Virudhunaar, TN.
(PSM) - 1
0.14
0.04991
2.80
Sec
Page 9 of 23
A00
Doc. No.
Date: 01.28.16
Sec
=
Actual Operation time
Rev.
0.25
Sec
0.25
2.80
0.089
2.80
0.250
0.09
= 110%
= 11.42
= 0.09
=
Relay Operation Time
12.56
Fault Current
CT Primary x Current Setting
753.67
60 x 100%
12.56 PS
Plug Setting and 1.0 TMS
=
18MW-RTR1 SPV Plant at Virudhunaar, TN.
(PSM) - 1
0.14
0.05191
2.70
Sec
Page 10 of 23
A00
Doc. No.
Date: 01.28.16
Sec
=
Actual Operation time
Rev.
0.25
Sec
0.25
2.70
0.093
2.70
0.250
0.093
= 100%
= 12.56
= 0.093
Page 11 of 23
Doc. No.
Date: 01.28.16
A00
Rev.
OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of
0.754 kA at 33kV Side.
904.41 Amps
Fault Current
CT Primary x Current Setting
904.41
60 x 100%
15.07 PS
= 15.07
Time Delay
= 0.1
= 0.05 - 4
0.1
Time delay
0.1
The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer
Page 12 of 23
A00
Doc. No.
Date: 01.28.16
Location
: MCR Room
Equipment
Relay Make
Setting Range
CT Ratio
: 175 /1
Load Current
: 155.72
Fault Current
: 2.396
kA
: 120%
Relay Characteristics
: Normal Inverse
Rev.
Fault Current
175 x 120%
11.41 PS
=
Relay Operation Time
11.41
(PSM) - 1
0.14
0.04989
2.81
=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,
0.25
Sec
Sec
0.5
Sec
Page 13 of 23
A00
Doc. No.
Date: 01.28.16
0.5
2.81
0.18
=
Actual Operation time
Rev.
2.81
0.500
0.18
= 120%
= 11.41
= 0.18
Fault Current
175 x 100%
13.69 PS
=
Relay Operation Time
13.69
(PSM) - 1
0.14
0.05373
2.61
=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,
18MW-RTR1 SPV Plant at Virudhunaar, TN.
0.25
Sec
Sec
0.5
Sec
Page 14 of 23
Doc. No.
Date: 01.28.16
=
Actual Operation time
A00
Rev.
0.5
2.61
0.192
= 0.23
2.61
0.60
0.230
= 100%
= 13.69
= 0.230
Page 15 of 23
Doc. No.
Date: 01.28.16
A00
Rev.
OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of
2.396 kA at 33kV Side.
2.8752 Amps
Fault Current
CT Primary x Current Setting
2.88
175 x 100%
0.02
PS
= 0.02
Time Delay
= 0.1
= 0.05 - 4
0.1
Time delay
0.1
The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer
Page 16 of 23
A00
Doc. No.
Date: 01.28.16
Location
Equipment
: 33kV MV Panel
Relay Make
Setting Range
CT Ratio
: 175 /1
Load Current
: 136.46
Fault Current
: 2.1
kA
: 110%
Relay Characteristics
: Normal Inverse
Rev.
Fault Current
175 x 100%
12.00 PS
=
Relay Operation Time
12.00
(PSM) - 1
0.14
0.05095
2.75
=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,
0.25
Sec
Sec
0.5
Sec
Page 17 of 23
A00
Doc. No.
Date: 01.28.16
0.5
2.75
0.18
=
Actual Operation time
Rev.
2.75
0.500
0.18
= 100%
= 12.00
= 0.18
Fault Current
175 x
15.00 PS
=
Relay Operation Time
15.00
80%
(PSM) - 1
0.14
0.05565
2.52
=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,
0.25
Sec
Sec
0.5
Sec
Page 18 of 23
Doc. No.
Date: 01.28.16
=
Actual Operation time
A00
Rev.
0.5
2.52
0.199
0.2
2.52
0.503
0.200
= 80%
= 15.00
= 0.200
Page 19 of 23
Doc. No.
Date: 01.28.16
A00
Rev.
OverCurrent Setting(Highset)(50)
Relay Setting
= 0.1 -range
35A
The relay shall be set such that it does not operate for the reflected down stream fault of 2.1
kA at 33kV Side.
2.52
Amps
Fault Current
CT Primary x Current Setting
2.52
175 x 100%
0.01
PS
= 0.01
Time Delay
= 0.1
= 0.05 - 4
0.1
Time delay
0.1
The relay has to operate with minimum time delay for ground fault in the primary side of
Transformer
Page 20 of 23
A00
Doc. No.
Date: 01.28.16
Location
Equipment
: 33kV MV Panel
Relay Make
Setting Range
CT Ratio
: 350 /1
Load Current
: 292.17
Fault Current
: 4.5
kA
: 110%
Relay Characteristics
: Normal Inverse
Rev.
Fault Current
350 x 100%
12.86 PS
=
Relay Operation Time
12.86
(PSM) - 1
0.14
0.0524
2.67
=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,
0.5
Sec
Sec
0.75
Sec
Page 21 of 23
A00
Doc. No.
Date: 01.28.16
0.75
2.67
0.28
=
Actual Operation time
Rev.
2.67
0.750
0.28
= 100%
= 12.86
= 0.28
Fault Current
350 x
16.07 PS
=
Relay Operation Time
16.07
80%
(PSM) - 1
0.14
0.05711
2.45
=
Operating time of downstream O/C relay
Allowing a grade margin of 250 msec,
18MW-RTR1 SPV Plant at Virudhunaar, TN.
0.5
Sec
Sec
0.75
Sec
Page 22 of 23
Doc. No.
Date: 01.28.16
=
Actual Operation time
A00
Rev.
0.75
2.45
0.306
= 0.34
2.45
0.833
0.340
= 80%
= 16.07
= 0.340
Page 23 of 23