category
Risk
cod
e
Risk Factor
Construction
1
Shortage of equipment
Shortage of material
Late deliveries of
material
Poor quality of
workmanship
Risk Treatment
a) Hire the security officer to make sure
about the safety of the equipment
b) Conduct the frequent jobsite inspection
c) Establish safety equipment and material
storage system
Material price fluctuation
a) Always have a review of construction
material at the current situation
b) Develop a good, clear and appropriate
plan and control on schedule.
c) Maintain good relationship with the
suppliers to avoid any chance for the
suppliers to take an advantage of their
material prices
Material is necessarily imported from other
country
a) Avoid any late order to the supplier
b) Review the background and history of
each supplier before sign any contract.
c) Ensure standby cash flow in advance
d) Avoid any miscommunication with the
supplier from other country to prevent
any major losses
a) Avoid any late order to the supplier
b) Choose the capable suppliers that have
a good communication and linkage
c) Review the background and history of
each supplier before sign any contract.
d) Make sure the payment to the supplier is
following the schedule to avoid any
problem in delivering the materials to the
construction site.
e) Develop a good, clear and appropriate
plan and control on schedule.
a) Proper communication among parties
involved
b) Strict supervision by the supervisor
c) Provide training and education to the
workers
d) Proper construction management
a) Proper construction management and
manpower management
b) Proper work planning by the supervisors
c) Monitoring the workers to make sure
Construction
Accidents
Damage to persons or
property
10
Inadequate planning
11
Insolvency of suppliers
12
Insolvency
of subcontractors
Construction
13
Bad Weather
19
Poor supervision
20
Bureaucratic system
and long procedure for
approval
22
23
24
Price inflation of
construction materials
Politics and
Contracts
Provision
Finance
28
Lack of financial
resources
scope of work
d) Select subcontractor which already have
experience in similar project
Take protective measures, for example site
manager might therefore consider installing
protective sheeting around scaffolding, which
can also mitigate against wind, or temporary
roofing structures.
Provide training and seminar to the site
supervisor to improve their supervision skilled
task, requiring the highest levels of social work
skills and knowledge of research on what works.
a) Maintain good relationship and
connection with higher local government
agencies
b) Ensure the project is complying with
local authority procedure
c) Prepare and submit all the necessary
documents in a timely manner to the
government agencies
d) Always maintain a good reputation
without any blacklisted title.
a) Prepare the entire claim document early
before the submission date to the clients.
b) Have a discussion with the client to
approve the claim early and release the
money as soon as possible to make sure
all the site activities can be run as usual
without any delay.
a) Be sure to start of your year by
deploying an accounting system that you
can use to put all your invoices as well
as capture all expenses.
b) Always generate and deliver your
invoices immediately a service has been
completed.
a) Always have a review of construction
material at the current situation
b) Develop a good, clear and appropriate
plan and control on schedule
c) Maintain good relationship with the
suppliers to avoid any chance for the
suppliers to take an advantage of their
material prices
a) Ensure standby cash flow in advance
b) Examine the company's financial viability
30
Method of construction
defined in drawing and
specification is
inappropriate and
inapplicable to
construct
31
33
Design
35
Environmental
39
Lack of consistency
between bill of
quantities, drawing and
specification
Pollution
40
Ecological damage
41
Adverse weather
conditions
42
43
Environmental factors
(floods, droughts, etc.)
Environmental
44
Logistics
45
47
Lack of manpower on
site
49
Undefined scope of
working
50
51
Inexperienced
staff assigned
52