Вы находитесь на странице: 1из 2

Steam Turbine

Description

Technical Data
Steam & Casing Temperatures

Steam Temperatures
Rated Value,
Annual
Average

Long-Term
Value, Subject
to Annual
Average

400 hrs.
Per Year

80 hrs. Per Year


Max. 15 min in
Individual Case

Unit

Main Steam at
HP Stop Valve in
Let

537.0

545.3

551.0

565.0

HRH Steam at
IP Stop Valve in
Let

537.0

545.3

551.0

565.0

Steam Temperatures
Rated Value

Long Term
Operation

80 hrs. Per Year,


Max. 15 min. in
Individual Case

In Special
Cases at
No Load

HP Turbine Exhaust

337.9

339.9

429.9

500.0

Extraction 6

337.9

339.9

429.9

500.0

Extraction 5

410.0

415.0

450.0

Extraction 4

297.2

307.2

347.2

Extraction 3

183.8

196.8

243.8

Extraction 2

99.3

119.3

164.3

Extraction 1

75.4

95.4

145.4

LP Turbine Exhaust

46.1

70.0

70.0

Unit

Long-Term Operation: Upper Limit Value Permissible Without Time Limit.


These Values Correspond To 600 MW Load With 3% Makeup and 0.1013 bar Back Pressure
With all Heaters in Service and Rated Steam Conditions.
Only Valid For The No Load Period With High Reheat Pressure After Trip-Out From Full Load
Operation. For Individual Case Approx. 15 Minutes.
The Turbine Is Immediately Re-Loaded Or The Boiler Immediately Reduced To Minimum Load
If No Load Operation Is Maintained.
Casing Metal Temperatures
Wall Temperatures

Alarm At

Machine Must Be Shut Down At

Unit

HP Turbine Casing Exhaust

485

500

Outer Casing of LP Cylinder

90

110

Spray Water To LP Turbine Must Be Switched On At 900C

BHEL, Hardwar

6.1-0101-97/1

Casing Metal Temperature Differences


Temperature Difference

Alarm At

Machine Must Be Tripped At

Unit

Between Upper & Lower Casing


Halves of HP Turbine, Middle

90

100

Between Upper & Lower Casing


Halves of IP Turbine, Front

30

45

Between Upper & Lower Casing


Halves of IP Turbine, Rear

30

45

Permissible Differential Temperature between Parallel Steam Supply Lines


No Time Limitation

17

Short Time Period (15 min)

28

In the Hottest Line the Limitations Indicated for Main and Reheat Steam Temperature must not be Exceeded

Feed Water Heater out of Service


Operation With Feed Water Heaters Out of Service

Main Steam Flow, Kg/s


(Indicative)

Load,
MW

454.95

600

Extraction A6, A5 (Both Strings Out)


Output Limit during Testing with Automatic Turbine Tester
Testing of Main Steam Stop and Control Valves

< 300

MW

Testing of HRH Steam Stop and Control Valves

300

MW

Motoring
Motoring is the condition in which the turbine is driven by the generator at rated speed with the
stop and control valves closed. In this operating mode, certain turbine components are heated up
by wind age power of the blading.
To prevent heat-up beyond permissible temperatures, motoring must not be allowed to continue
for longer than one minute. If the condenser low vacuum limit of 0.3 bars is exceeded, motoring
must not be allowed to continue for more than 4 seconds.

BHEL, Hardwar

6.1-0101-97/2

Вам также может понравиться