SANITATION
Supported by Facilitated by
Community Based
Disaster Preparedness Project
Back ground of the programme
To familiarize the participants with innovative models on Team members on the way to field
sanitation under different site conditions
Activities: (1) Making of filtering system (2) Fixing of filter system inside the ferro cement tanks,
(3) Construction of Ferro cement super structure
1 2 3
Clearing ground for the construction of Construction of support wall in progress Construction of support wall in progress
support wall to the ferro cement tanks
4 5 6
Drilling PVC pipe for making the filter system Filling the perforated PVC pipe (110mm) fitted Filter system installed in the tank
to be placed inside the tank inside the tank with filter media
7 8 9
Covering the ferro cement tanks after fixing the Covering slab placed over the tanks Fixing the slab over the tank and support wall
filter system
10 11 12
Fixing two layers of chicken net for the Smearing cement over the chicken net fixed Finishing of the smearing
superstructure of the latrine after binding the two layers together
Activities: (1) Construction of platform for the toilet (2) Construction of obloid superstructure for
the toliet using ferro cement technology (3) Making of junction box for the latrine
1 2 3
Constructing support wall for the ferro cement support wall construction before filling Platform of the latrine with support wall
tanks completed
4 5 6
Covering the top of the platform and the ferro Shaping the iron rod to a circle for making Preparing chicken net for making the obloid
cement tanks with cover slab obloid superstructure for the latrine room
7 8 9
Fixing weld mesh for constructing the obloid Smearing cement over chicken mesh bound Director-KSSF observing the toilet
superstructure with welded mesh construction
10 11 12
Making of junction box Making of junction box Making of junction box
Activities: (1) Construction of platform for the toilet (2) Making of cover slabs for the latrine (3)
Making of junction box for the latrine
1
Taking measurment for building the
basement of the toilet 2 3
Constructing the foundation with Basement construction in progress
cement bricks
4 5 6
Foundation work and the tanks Making slab for covering the foundation Placing iron rods for reinforcement
finished
7 8 9
Filling red soil in the foundation Mr.Rajesh.PD explaining the making of Team members in front of the completed
junction box foundation of the latrine
After the field work the team were gatheres in village Directors' Visit to
development rehabilitation training centre, Thalavady.
Mr. O.J Deepak, State Programme Officer - KSSF Manalel Colony
welcomed the group to the gathering. He invited each
participant for sharing their feed back on the three day
training programme.
Glimpses!
Water quality
tested!
Village food!
The finishing
touch!
Active
involvement!
p-present, a-absent
Documentation team:
Deepak.OJ, State Program Officer-KSSF,
Lakshmi Shankar, Documentation Officer-KSSF
Estimate of Twin Pit Latrine with internal filtration for WatSan Programme in Kerala
Model 11. With Ferrocement Ring and ferrocement Obloid Toilet Room above latrine
Sl.
No Description No L B H Qty Unit Rate Amount
Super Structure - Toilet Room
Clearing the grass and other growth of
vegitation and removal of rubbish upto a
distance of 150m outside the periphery of the
1 area cleared. 1 2.5 2.5 6.25 100m2 175.00 10.94
Ferrocement CM 1:3 for Basement and super
structure for a height of 1.5m including all cost
2 of material, labour, conveyance etc complete 1 3.1 1.3 4.03 1m2 761.72 3069.72
Ferrocement CM 1:3 for superstructure above
1.5 including all cost of material, labour,
3 conveyance etc complete 1 3.1 1.05 3.26 1m2 1056.47 3444.08
Filling good earth inside the room for fixing
4 closet 1 1.02 0.2 0.2 1m3 245.00 49
PCC in 1:4:8 for floor using 20mm Broken stone
including all cost of material, labour,
5 conveyance etc complete 1 1.02 0.05 0.05 1m3 4101.09 205.05
RR Masonry in CM 1:8 for steps including all
cost of material, labour, conveyance etc
6 complete 3 0.7 0.25 0.2 0.11 1m3 2620.29 288.23
Plastering in CM 1:6 for super structure
including all cost of material, labour,
7 conveyance etc complete
Steps 1 0.7 0.9 0.63
Floor 1 1.02 1.02
Subtotal 1.65 10m2 1553.99 256.41
8 Toilet Settings 1 1 Nos 500
9 GI Sheet and red oxide 1 1 Unit 500
10 PVC Door and fittings with PVC door frame 1 1 Nos 1250
Sub Total 9573.43
Pits
Clearing the grass and other growth of vegitation and removal
of rubbish upto a distance of 150m outside the periphery of the
1 area cleared. 1 2.5 2 5 100m2 175.00 8.75
Earth work excavation in Hard soil with initial lead of 50m and
2 lift up to 1.5m
For pits 2 3.14x0.96x0.96/4 0.7 1.01
For Soak Pit 1 3.14x0.4x0.4/4 1 0.13
Sub Total 1.14 10m3 2187.50 249.38
Ferrocement pit of 3 feet wide for latrine with CM 1:3 and 14
guage weld mesh and 22 guage chicken net including all cost of
3 material, labour and conveyance etc complete. 2 3.14x0.93 0.9 5.26 m2 761.72 4006.63
Ferrocement slab for top and bottom of pit of latrine with CM
1:3, 6mm Iron bars and 22 guage chicken net including all cost
4 of material, labour and conveyance etc complete. 3 3.14x0.96x0.96/4 2.17 m2 754.81 1637.93
RCC 1:2:4 cover slab using 20mm Broken stone including all
5 cost of material, labour, conveyance etc complete 1 1.3 1.3 0.08 0.14 m3 5855.00 819.7
G 0.26 L
0.36
0.90
Model 4: Sectional Elveation of Twin Pit latrine with Hollow Brick Masonry for pit and room above pit
Twin pit latrine with Brick Masonry pit in CM 1:6 and masonry super structure above pit
Children at Manalel colony, Thalavady