JOINT VENTURE
TECHNICAL CAPABILITIES
Introduction
The Introduction to the Individual Companies (UNISON
Engineering & Constructions Pvt. Ltd. and TEMPUS Infra Projects
Pvt. Ltd) along with the nature, aim and domain of the joint
venture has been given in an independent presentation which is
submitted.
This presentation, describes the combined technical
capabilities of the Joint Venture formulated between UNISON and
TEMPUS. The Various resources, personnel and equipment to be
utilized for the projects are elaborated on, along with a brief about
the executed projects as a glimpse of the capabilities of the JV.
JVS ORGANISATION
STRUCTURE
Organization Chart
The JV has taken utmost care in formulation of the team for the execution of the
projects as follows:
Project Director
Project Manager
Construction
Manager
Contracts
Manager
Procurement
manager
NSC
Manager
Architecture
Coordinator
Planning
Manager
QA/QC
Manager
EHS
Officer
S. MUTHU
Experience:
Township (Russia), 56 storey bay gate Project (Dubai), Tidel park (Chennai),
CTS (Chennai), 30 storey Deyaar Office Tower (Dubai), Infosys Building
(Chennai), TCS Building (Chennai), 29 storey water tower (Dubai)
Project
Manager
JAYABALAN
Experience:
ITBP (Bangalore), Tidel Park (Chennai), Tnernational Tech park (Chennai), CTS
(Siruseri), ETA techno Park, RMZ Ecospace 4AB, Globe phase 1
GNANASIVAM
Experience:
Contracts
Manager
RAJESHKUMAR
Experience:
Procurement
Manager
SUBRAMANIAN
Experience:
KARTIC
BE (EEE), 17 years of experience
Experience:
International Tech park phase III, MCD Civic Centre, Park7 Condominium,
KLCC Luxury Condominium, 21st Century Tower, DICC
Architecture
Coordinator
SAPNA
Experience:
Planning
Manager
RAJEEV
Experience:
DEEPAK
Experience:
CTS (Siruseri), ETA Technopark, Saint Gobain Glass factory, Tech City, Verde
building, Anand City Tower
EHS Officer
SRINIVASAN
IN-HOUSE RESOURCES
Tower
Cranes
X 11 nos.
Batching
Plants
X 13 nos.
Concrete
Pumps
X 05 nos.
Excavator
Loader
X 05 nos.
Transit
Mixture
X 10 nos.
Bar Bender
/ Cutter
X 51 nos.
SRP 80
Platform
X 08 nos.
Power
Tools
X 50 nos.
Block
Casting
Machine
X 08 nos.
Dewatering
Pump
X 24 nos.
Vibrator
X 52 nos.
COMPLETED PROJECTS
Completed Projects
Leveraging its vast resources, the JV has accomplished the execution of the following
projects successfully:
Residential
PROJECT
VALUE
INR 238 CR
INR 82 CR
INR 91.5 CR
Botanika, Hyderabad
INR 41 CR
INR 50 CR
INR 22 CR
INR 50 CR
INR 22 CR
Completed Projects
Leveraging its vast resources, the JV has accomplished the execution of the following
projects successfully:
Commercial
PROJECT
VALUE
INR 120 CR
INR 30 CR
INR 33 CR
INR 24 CR
INR 12.15 CR
PROJECT EXECUTION
PHILOSOPHY
Preliminaries
- Site offices
- Worker facilities
- Storage facilities
- Hoisting facilities
- Water / Electricity
- Temporary access/tracks
- Site security
- External & Internal scaffolding
- Temporary hoardings
- Survey and setting out
- Co-ordination
Site Work
-Structural works
-Blockworks
-Plastering
-Screeding
-Tiling / Granite works
-Wheel stopper / column
Guard
-Handrails
Subcontracts
Toilet partition
Flooring / skirting
Faade works
Waterproofing works
Conventional Formwork
Based Construction
Formwork Type
Catering Area
(Approx.)
Cycle Time
(Approx.)
Retaining Wall
05 Days
Columns
25% of Column
area
03 Days
100% ( 1 Complete
floor)
07 Days
Table Formwork
100% (1 Complete
floor)
18 Days / floor
cycle
Slab (non-Tower
Area)
Cup-lock System
100% (1 Complete
floor)
18 Days / floor
cycle
Retaining Wall
Column
Lift Wall
Table Formwork
23
For a generic Slab constructed by conventional methods, a total setting / curing time of 18 days
is required as described:
Days
Activity
10
11
12
13
14
15
16
17
24
18
Precast Structure
Based Construction
PRECAST COLUMN
The
columns
are
installed and grouting is
performed
before
installation.
SLAB FOR
FLOOR 0
Installation of Precast
Columns
as
done
previously.
SLAB FOR
FLOOR 1
Repeating
the
procedure from the
floor 0 construction of
slab to install slab for
floor 1.
TOPPING FOR
FLOOR SLAB 0
Repeating
the
procedure from Floor
slab 1 topping.
Optimization:
Lesser tolerances and
more
dimensional
control as compared
to in-situ casting.
Faster Completion:
Use of Precast members
allows for faster and
easier
process
of
construction.
Versatile:
Molding ability allows
wide range of designs
and configurations.
Ecological:
Irrespective of level of
reinforcement, Precast
members can be 100%
recycled / reused.
PAST PROJECTS
COMPLETED BY US
32
RESIDENTIAL PROJECTS
The Botanika
Residential development Project at Kondapur,
Hyderabad.
Built-up Area: 9.4 Lakh sq. Ft
6 buildings spread over 7.5 acres
3 basements and 23 floors each
Contract value INR 41 Cr
Iris Court
Residential development at Mahindra World
City (near Paranur Village, Chengelput),
Chennai.
Built-up Area: 4.0 Lakh sq. Ft
244 units spread over 18 acres.
Project value INR 50 Cr.
Project value:
INR 22 Cr.
Swan Lake
Residential development by
Emami group at Kukatpally,
Hyderabad.
Built-up Area: 10.65 Lakh sq. Ft
2 buildings spread over 4 acres
Contract value INR 22 Cr
COMMERCIAL PROJECTS
Ascendas MTB2
Construction of Ascendas MTB2
Building in the Information Technology
Park Ltd(ITPL) at Whitefield, Bangalore
Located in SEZ.
Scope: Design, development and build
including testing, commissioning and
remedying defects of the proposed
development (MTB2) comprising of
6,02,000 sq ft. of business floor spaces,
facilities and external works.
1 Building consisting 2 basements,
ground floor and 13 floors.
EED Platinum certified building
Built up area : 8,10,000 Sq. Ft.
Project value: INR 120 Cr.
INR 33 Cr.
86,000 Sq.
RRC Headquarters
Construction of Office Complex at Jubilee Hills,
Hyderabad
Building consists of
3 basements and 4 floors
Built-up Area: 40,000 Sq. Ft.
Project Value: INR 12.15 Cr.
JVs Advantages
Extensive International Experience.
Highly qualified and experienced Project Team.
Reputed Clientele serving as a testimony to high work standards.
Multiple bases of Operations enabling dynamic control over the project.
High Engineering and Construction capabilities across infrastructure sector.
Strong network of vendors and subcontractors.
Adoption of modern construction methods enabling faster, better, and
economical quality of work.
- Thank You -