A -06
PLUMBING PERMIT
BUILDING PERMIT NO.
PP NO
APPLICATION NO.
LAST NAME
FIRST NAME
M.I.
FORM OF OWNERSHIP
STREET,
LOCATION OF CONSTRUCTION:
BARANGAY,
TIN
CITY/MUNICIPALITY
ZIP CODE
TELEPHONE NO
LOT NO. _______________ BLK NO. ________________ TCT NO. ______________________ TAX DEC. NO. _____________________
SCOPE OF WORK
NEW CONSTRUCTION
RENOVATION ________________________
ERECTION
ADDITION
ALTERATION
CONVERSION ________________________
REPAIR _____________________________
MOVING _____________________________
RAISING________________________________________
DEMOLITION ____________________________________
ACCESSORY BUILDING/STRUCTURE ________________
OTHERS (Specify)_________________________________
NEW
FIXTURES
EXISTING
FIXTURES
KIND OF
FIXTURES
QTY.
NEW
FIXTURES
EXISTING
FIXTURES
KIND OF
FIXTURES
BIDETTE
LAUNDRY TRAYS
DENTAL CUSPIDOR
DRINKING FOUNTAIN
BAR SINK
SODA FOUNTAIN SINK
LABORATORY SINK
STERILIZER
OTHERS (Specify)
__________________________
__________________________
__________________________
__________________________
WATER CLOSET
FLOOR DRAIN
LAVATORY
KITCHEN SINK
FAUCET
SHOWER HEAD
WATER METER
GREASE TRAP
BATH TUB
SLOP SINK
URINAL
AIR CONDITIONING UNIT
WATER TANK/RESERVOIR
TOTAL
TOTAL
SEPTIC TANK
SEWAGE SYSTEM
BOX 3
BOX 4
Date_______________
MASTER PLUMBER
(Signed and Sealed Over Printed Name)
Date_______________
MASTER PLUMBER
(Signed and Sealed Over Printed Name)
Address
Address
PRC. No
Validity
PRC. No
Validity
PTR. No
Issued at
Date Issued
PTR. No
Issued at
Date Issued
TIN
TIN
BOX 5
BOX 6
BUILDING OWNER
Date Issued
Place Issued
C.T.C. No.
Date Issued
Place Issued
DATE:
COST ESTIMATES
BILL OF MATERIALS
BOX 8
PROGRESS FLOW
IN
DATE
OUT
TIME
DATE
PROCESSED BY
TIME
BOX 9
ACTION TAKEN:
That the proposed plumbing works shall be in accordance with the plumbing plans filed
with this Office and in conformity with the Revised Plumbing Code of the Philippines, the
National Building Code and its IRR.
2.
3.
That upon completion of the plumbing works, the licensed supervisor/in-charge shall
submit the entry to the logbook duly signed and sealed to the building official including asbuilt plans and other documents and shall also accomplish the Certificate of Completion
stating that the plumbing works of the building conform to the provision of the Revised
Plumbing Code, the National Building Code and its IRR.
4.
That this permit is null and void unless accompanied by the building permit.
BUILDING OFFICIAL
(Signature Over Printed Name)
Date ____________________