DAILY PROGRESS REPORT

CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

7/12/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia

Elec

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

9:00 AM Meeting with NC, DT, RM, KA


Grand opening rescheduled
Redwood will be onsite tomorrow to begin prep for antigraffiti
10:30 AM
2:00 PM

Laid out bike racks with JS - she will provide a sketch and hardware
Manny and crew working at 16th - pulled conductors but missing splice chamber
Missing PPB - check with Guy if he has salvaged PPB to install
Potential turn on at 1 pm tomorrow

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

7/11/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia

Elec

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

Porta potty.

REMARKS (State in full progress of work)


Manny onsite installing push buttons at 16th/Telegraph
Will prioritize 16th/Broadway tomorrow
Hunt was onsite Saturday to fill in gaps at poles/nose
Hunt installed granite nose cap - still need to fill in a few poles and stain whitish grout

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

7/8/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia

Elec

1 2 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
installing
luminaire
heads/street
signs
2:00 PM
Continue wiring at 15th
Hardware at island tip extends into Broadway - check with TSD

Antenna at 16th and Broadway?


Check on additional rebar cage

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

7/7/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 2
1 1 3

1 1
3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Bell
for
decorative
poles
conflicts
with
PPB
8:30 AM
Will modify to match others
Need ~ 300 LF of 12 conductor - James will let us borrow if we restore it
Cut 16th on same time as 15th
Columbia wiring heads at 16th

M&H excavated for bollards - plan to pour later today


M&H begin yard cleanup

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Elec

Foremen

CONTRACTOR & SUB


M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

7/6/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia

Elec

1 1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

1:00 PM Pole at 16th stood on T&M


Armando pulling wire at controller will put 16th on flash
Next week activate 16th/Telegraph
Hunt not onsite
Waiting on 12 conductors
Install push buttons tomorrow
14:00

Installing head at 16th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

7/5/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Meeting
with
NC,
DT,
KA,
RM
leave
fence up to 7/15
9:00 AM
Columbia installing luminaire heads
BID cleaned up graffitti
Armando plans to install pole by end of the week - may turn on 16th/Telegraph by Thursday
Armando on vacation next week - string lights likely wont be installed
AT&T onsite
Columbia continue to wire at 16th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Paver
Elec

Foremen

CONTRACTOR & SUB


European
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

7/1/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


European
onsite
to
fix
drainage
at
16th
8:00 AM
Removing pavers/scraping bedding
Asked them to brush out dirty water
11:30 AM

Met with PG&E at 16th


PG&E plans to remove the poles tomorrow - Oscar will contact me
Go ahead on front rail for bench

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Paver
Elec

Foremen

CONTRACTOR & SUB


European
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/30/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia

Elec

1 1 2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
attempting
to
install
arm
at
15th
1:00 PM
All other poles stood including TS15
Arm did not fit - requested RFI

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/29/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia

Elec

1 1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

9:00 AM Meeting with NC, KA, RM


Columbia continue to stand light poles
Installing heads at 15th
Met with Christian/Eric/Ann? At 1500 Broadway - asked them to pt in SCF ticket for leaks
Electrical box is low point on sidewalk

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/28/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia

Elec

1 1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
planing
in
median
expect
to
finish
today
12:00 PM
Columbia working at 15th/Broadway - pulling wire, standing poles
Type 15TS was shipped with wrong bolt pattern
Pole H potential conflict with tree

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/27/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
planing
in
median
expect
to
finish
today
12:00 PM
Columbia working at 15th/Broadway - pulling wire, standing poles
Type 15TS was shipped with wrong bolt pattern
Pole H potential conflict with tree

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Elec

Foremen

CONTRACTOR & SUB


M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/24/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Fountain

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


Now ork onsite - Columbia offsite due to parade planning

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


Fountain

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/23/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

3
1

2
2

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


RGB onsite - pole needs to be drilled for power
M&H installing plants in median
RGB plans to program this trip
AT&T onsite at MH20
Columbia drilling poles

NOSC - electrical punchlist - fiber

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Plant
Elec

Foremen

CONTRACTOR & SUB


M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION

6/22/2016

PROJECT NO. :

C464560

Latham Square
Shower

Rain

SHIFT Su M T

Foggy

W Th F

Crane

WEATHER: Clear Cloudy Sunny

Sweeper

PROJECT NAME:

DATE:

Sa

Fountain

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

RESIDENT ENGINEER NAME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


Fountain

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/21/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Fountain

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


Now ork onsite - Columbia offsite due to parade planning

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


Fountain

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/20/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


Now ork onsite - Columbia offsite due to parade planning

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/17/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 2
1
2

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


M&H offhauling dirt from yard
Columbia building poles at yard - will be back Wednesday or Thursday
M&H moving fence

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Elec

Foremen

CONTRACTOR & SUB


M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/16/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia

Elec

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

2:#0 pm M&H will move fence tomorrow


Columbia working at conex

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/15/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Columbia
Hunt

Elec
Stone

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

2:30 PM Columbia stood 1B poles


Hunt grouted stone

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/14/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1

2
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
working
on
poles
at
Telegraph/16th
1:00 PM
Sidewalk poured at 16th - will remove barriers tomorrow
Hunt installing skate stops - will be back to grout
Ctrench drains at 16th cleaned out

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Elec
Stone

Foremen

CONTRACTOR & SUB


M&H
Columbia
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/13/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1

2
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
working
on
poles
at
Telegraph/16th
1:00 PM
Sidewalk poured at 16th - will remove barriers tomorrow
Hunt installing skate stops - will be back to grout
Ctrench drains at 16th cleaned out

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Elec
Stone

Foremen

CONTRACTOR & SUB


M&H
Columbia
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/10/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
Elec

1 1 3
1 1 3

1 1

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


Frank preparing area at yard for conex
Pouring sidewalk at Williams - sign at 16'
1097 total feet - pull rope beiong checked
Setting up signal pole at 17th - pulling wire
M&H installing soil at median

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

SuperInt

CONTRACTOR & SUB


M&H
Columbia

Foremen

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/9/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3

1
2
1 1 6
1
3

1 1
1 1
3
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

10:30 AM M&H installing soil in median]


Striping Graphics on Telegraph
Columbia installing box at 17th/Telegraph
3 from Foundry installing plates at fountain
1:30 PM

M&H grading SW at 16th


Columbia installing box at 16th
M&H ran out of soil
Armando plans to wire TSP tomorrow
M&H/Columbia pouring back specialty sidewalk on Telegraph at Williams
Foundry fitting up panels

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Stripe
Elec
Foundry

Foremen

CONTRACTOR & SUB


M&H
Striping Graphics
Columbia
Foundry

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/8/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
Elec
Irr
Stone
Striping

1 3
1 1 4
1
1
1
2

1 1
2
1
1
1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:00 AM VPI onsite to replace steel plate


M&H filling in median planter
Columbia setting box at 16th/ Signal pole foundation poured
1 working on irrigfation in the planter
Columbia disassembling poles at 16th
Notify Broadway about PG&E
11:00

Striping Graphics began on Telegraphj


Hunt continue to install skate stops
Columbia continue to dismantle pole at 16th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
Columbia
M&H
Hunt
Striping Graphics

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/7/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1 3
1 1 4

1 1
1
1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:00 AM M&H digging out planters


M&H pouring nose and curb
2 from Columbia working at 16th
Columbia standing signal pole at 17th - formed foundation at 16th - pour at 1:30 pm
Columbia plans to deliver 3 controllers

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Conc
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/6/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
2
1 1 4
1 1 5

1
1 1
1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:00 AM Dino cattracking on Telegraph


Belleci locating monuments - buried on Telgraph/17th
Columbia patching at Telegraph - OPD shutdown Telegraph for Clinton
1310 LF of conduit - need to wheel
2 backfilling structures/2 laying out domes at 15th & Broadway
Zef will break nose today
12:00

2 workers breaking nose


Columbia begin to dig out at 16th
Surveyors planning to set monument - appears to be a conflict
M&H installing garbage cans

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Survey
Stripe
Elec
GC

Foremen

CONTRACTOR & SUB


Bellecci
Striping Graphics
Columbia
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/3/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 3
1
3

1 1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Zef
installing
benches/will
install
cans
on Monday
7:30 AM
M&H breaking out structures on Broadway
AT&T sign company working at 15th
M&H cleaning up site
2:00 PM

Met with Christian at 1500 Broadway - concrete from light pole


Island coned off with triangle

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Conc

Foremen

CONTRACTOR & SUB


M&H
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

6/2/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Pave
2
3
Conc
1
Fountain
1
Elec
1 1
1
Saw

11
2
2
3

2 1

3
1
1
1 1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:00 AM M&H paving southbound broadway


Tacking at Telegraph/2 rollers
Concrete crew installing benches at Latham - TB on site ok with skate stops and bench color/grout stain
Foundry on site with Christina to install anchors/backing plate
11:00 AM

Ccolumbia installed crossing at 20th/plating over fresh AC


Plan to fill potholes tomorrow/drill base next week
MCE paving on Telegraph
1 flagging at 15th

12:00 PM Paving northbound broadway


Asked Bruce to tape limit lines
2:00 PM Northbound complete
3:30 PM Traffic restore

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
M&H
Foundry
Columbia
Bayline

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/31/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
Conc
Stone
Elec

1 2
1
1
1 1

1
3

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Telegraph
ground
out
sweeper/backhoe/dump
on-site
7:30 AM
Tree being trimmed at Mens Warehouse
Hunt installin gucrved granite
1 flagging at 15th for grinding
Buried MH at 17th - east side of street
Grinder making 7' pass
Box in road dead - Armando pulled out wires
1 pass left on southbound - 2 flagging at 15th

12:00 PM
2:00 PM Grinding done- TC in place

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

SuperInt

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia

Foremen

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/27.

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:30 AM Mockup for granite sealer


Tuesday for skate stops
Hunt drilling for curved granite stops
Call James for a box
10:30 AM

M&H setting rock at island


Quantities with Keith

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone

Foremen

CONTRACTOR & SUB


M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/26/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 3

1 1
1 2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Armando
plugging
18th
plans
to
dig/plate
crossing but will not work tomorrow
8:30 AM
CoO box damaged at 18th
M&H plugging island on Broadway - need to measure with Keith
Project Sign hung back up

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec

Foremen

CONTRACTOR & SUB


M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/25/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 4

1 2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:30 AM M&H pouring curb


Bruce setting up CMS signs
2 setting boxes at Williams
Columbia begin crossing Telegraph - chipping out slurry cap
Columbia planning to pave back 18th
2:00 PM

Armando planning to start early for paving on Telegraph tomorrow


PCMS boards installed

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec

Foremen

CONTRACTOR & SUB


M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/24/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

3
1

1 1 4
5
1

1 1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
compacting
rock
at
Telegraph
trench
10:30 AM
M&H plugging (E) side of C&G on Broadway
Spoke to Zef about cleaning at Viscera
Columbia removed SL conduit at 16th but PG&E feed to cabinet is still in the way
1 from M&H working on irrigation onsite

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec
Conc
plant

Foremen

CONTRACTOR & SUB


M&H
Columbia
M&H
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/23/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1

1 1 3
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


First
truck
poured
C&G
M&H
continue
to form other C&G
8:30 AM
Finishing C&G at 15th - 23' C-C on W side of curb
Armando continue digging at Telegraph
9:25 AM

2nd truck arrives - Zef says they will pour West curb from northbound traffic due to space
Frank Foster for trash can
Paving on Broadway/Telegraph - ask for CMS boards

2:30 PM

OSA noise in summertime


Columbia installing sand - conduit installed on Telegraph - shallow ~24" at duct crossing
M&H working on irrigation onsite
M&H will plug median tomorrow

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec
Plant

Foremen

CONTRACTOR & SUB


M&H
Columbia
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/20/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1
4
1 1 3

1 1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
cleaning
up
midblock
and
fixing
fence to back of planter
8:00 AM
Cutback placed at PG&E boxes
Grade ring on SS MH in curb line
9:15 AM

Columbia compacting at 16th


Expect 3 more days for wotk at Telegraph
Ezelle onsite - compaction numbers appear good

3:30 PM

AT&T Rob Dawson needs to access MH on Broadway - 510-303-9982


EBMUD raising hydrant

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/19/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1

1 1
1 1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
trenching
at
Telegraph
for
IC
8:00am
Damaged uplight at fountain
PG&E did install meter but did not disconnect old service - Columbia will move temp power to permanent power
M&H rolling median on Broadway - installing agg base
Mailbox removed at 16th
M&H pouring at 16th and Broadway - spoke to Chris about deliveries

1:00 PM

M&H to tack weld every 6th frame


Columbia laying conduit ~32" down - conflict with duct bank
Columbia will switch temp signal power tomorrow
M&H forming median C&G - plan to pour Monday - curb heights appear low - check with Keith
Spoke to Champagne about access, laid out plywood
Fabric located on Broadway about 2" down

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

1 3
1 1 3
1
10

Worker

Operator

TRADE

GC
Elec
conc

Foremen

CONTRACTOR & SUB


M&H
Columbia
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/18/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1 1 3
1 3

1 1
1 2
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
forming
at
15th
will
pour
7'
width
tomorrow
8:00am
Bud working with 2 workers to relocate TSP at 16th
Bruce will span SPUR entrance with steel plate/cut back
M&H sawing off lodgepoles onsite
2 workers from Columbia setting boxes at 16th
Columbia compacting at 17th/Telegraph
14:30

Columbia plating and installing cutback on Telegraph from 16th to 17th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec
Dig

Foremen

CONTRACTOR & SUB


M&H
Columbia
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/17/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1 1 3
1 3

1 1
1 2
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
potholed
at
20th
to
install
HDPE
conduit - will trench across 20th
1:30 PM
Plating connection at 20th, will revisit later
Cwill begin trenching at 17th tomorrow
M&H partially dug up island - almost completed
Concrete pour on Thursday

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec
Dig

Foremen

CONTRACTOR & SUB


M&H
Columbia
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/16/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
1
1 3
Fountain
1
3
Elec
1 2 5
Saw
1
1
Stone

1 1
2
1 2
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

11:00 AM M&H breaking at bulbout


Pierro and crew on site fitting up bronze panels
Bruce will break median AC tomorrow
Columbia hit irrigation line near Williams St - asked for additional crosswalk closed signs
11:30 AM

3 from Columbia locating irrigation line


Columbia plating at damaged air line
AT&T onsite
1 worker from Hunt washing curbs - prepare for sealing
Seat wall pieces are ready/Barry to be onsite tomorrow
Bruce has called for pickup of relay box

3:00 PM Pierro still onsite - M&H cleaning up at bulbout - plant o pour sidewalk Wednesday

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
Iron
Columbia
Baylin
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/13/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 5
1
1
2

2 4
1
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

7:30 AM M&H pouring concrete for ramps


Columbia breaking/potholing - will bore south from Williams to 19th
Columbia appears to have hit AT&T air line - conduit was installed
12:00 PM
2:30 PM
4:30 PM

AT&T onsite investigating hit - allowed Columbia to dig


Columbia attempting to hand dig to locate line
Columbia removing extra pavement, could not find line but could hear air injection

RESIDENT ENGINEER NAME

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec
Conc
Utl

Foremen

CONTRACTOR & SUB


M&H
Columbia
Central
AT&T

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

SIGNATURE

DATE

DAYS REMAINING

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/12/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 1 4
1 1
9
1 3

1 1
1 5
1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:30 AM M&H breaking ramps/setting plywood


Columbia onsite boring conduit
3 on vacuum truck continue to pothole
1 crew digging at Williams for open cut
Bore from 17th through 18th successful
Concrete at 730 tomorrow for ramps
10:40

Set up at 18th for next bore


1 from MH watering plants

3:!5 pm Columbia vacuumin dirt/removing TC


Allowed early work tomorrow due to school complaint
Spoke to Tina - will deliver letters

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec
Dig

Foremen

CONTRACTOR & SUB


M&H
Columbia
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/11/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1 1 1 4

1
1

1 1
1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
installing
irrigation
sleeeve
galv
pipe t hreaded
11:30 AM
Bruce sawcut domes today/will break tomorrow
12:30 PM

M&H rolling asphalt at crosswalk


Telegraph sawcut on east side - PG&E intends to pave back trench
Columbia to set early TC tomorrow
Columbia setting plates on Telegraph
Approved 90^ 5' sweeps on case by case basis
M&H sawcut domes today - plan to demo tomorrow

2:30 PM Pits plated and barriers up

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Elec

Foremen

CONTRACTOR & SUB


M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/10/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1
3
1 1 1 7
1
1

1 1
1

1 1
1 3
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Allen
Law,
Jamie,
Keith
onsite
to
review
meters - shutdown the ones on Telegraph - send drawings to Allen
10:00 AM
Al Canestro on-site to review raising pole - is ok with new foundation and relocating existing pole
M&H breaking on Broadway/offhauling
10:30 AM

12.5" bolt circle/1.25" bolt


Al recommended 6' deep foundation/rod coupling not allowed
Columbia sawcutting at Williams St
Plan to bore Thursday at 8 am 17th - 19th - check on 5' radius sweeps
Have existing cage - 32" / 8' deep
Columbia begin pothole on 17th

12:30 PM M&H installing AC on 16th - spoke to Bruce about requested times

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Conc
Elec
Plant

Foremen

CONTRACTOR & SUB


M&H
Columbia
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/9/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Conc
Elec
Plant

1 1 1 7
2

1
1

2 3
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
forming
at
16th/
revised
curb
height
to 8" from 12"
8:00 AM
FH and TSP need to be raised ~6"
Columbia pulling wire at 17th
3 potholing at 20th
PG&E utility marker onsite
Columbia plans to dig pits tomorrow- Brian onsite and suggested alternate route of bulbint between bulbouts

2:30 AM

M&H planting at Rotunda building


Spoke to Ari & Anna - worked moved to Monday
Spoke to Si and James - standard would be to upgrade the pole

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

SuperInt

CONTRACTOR & SUB


M&H
Columbia
M&H

Foremen

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/5/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1

1
1

1
2

1
1

1 2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
forming
at
16th
St
bulbout
intend
to pour Monday morning
9:00 AM
2 workers washing onsite
Columbia potholing at 18th/19th - digging out route for boxes
Water filling in at the excavation
Tentative pave date 6/7
2:00 PM

Columbia pulled offsite


Guillermo continue working

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Conc
GC
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/6/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
1
Fountain
1
Elec
1

2
1

1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

9:30 AM Paul onsite/CA waterscapes onsite


2 valves in control box - 1 for each lion head
CA waterscapes to provide editable manual
Cast iron frame for filter cannot be secured
Columbia potholing at 19th/ demoed concrete in sidewalk for boxes
AT&T locating around 19th
10:30

Ask GD about mix design in front of Fox


Columbia plans to move conduit inside bike lane
Latham (Jose) planning to move material off street by Monday

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

1
3

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
CA Waterscape
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/4/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


See HC Report

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/3/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1
1

1
1

1
9

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

9:00 AM Meeting with KA, BG, GD, DT


Fountain cleaning/moisture in uplights
Superior onsite caulking at seat walls
EBMUD working on leak at Broadway
Quest USAING at 19th
MCE working at Telegraph - both sides of street - damaged a city box
Columbia potholing on Telegraph - ask about 5' sweeps?
1 worker setting valves

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Vacuum

Grinder

Worker

Operator

TRADE

GC
Elec
Caulk
Util

Foremen

CONTRACTOR & SUB


M&H
Columbia
Superior
EBMUD

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

5/2/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1
1

1 2
1 1
1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

10:00 AM M&H onsite planting


EBMUD working at 16th to fix leak
Walked SIC with Armando - pipe adjacent to pothole location so will move alignment
Continue to investigate around 20th
Waiting for mark from 18th north
12:00 PM

EBMUD shut off water/ attempting to fix leak


Will cut out old tee and cut in new one
M& H continue planting - tying in irrigation controller

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Plant
GC
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/29/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
continue
to
plant/
accepted
different
plant after discussion with TB
9:00 AM
Armando on-site - located damaged wire that tripped breaker
10:30 AM

Scaffold company onsite to remove scaffolding


Spoke to Casey - he will have crew clean up

1:#0 pm

Walked with Jason , Shirley, Si, Randy


Will investigate boxes around 20th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Plant
Scaf
Elec

Foremen

CONTRACTOR & SUB


M&H
Scaffold
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/28/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

6
1

1 1
2

1
1 1
1 2

1 1 5

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


RLA
working
on
fountain
/
Molly
has
not
been onsite
9:30 AM
1 from Columbia working on string lights on Telegraph
M&H plugging 15th today - can pull barriers today
Columbia set new box - preparing to pave on Telegraph
Dan connecting irrigation meter
2:00 PM

Columbia paving at Telegraph


RLA wcontinue to work on fountain - Molly was not onsite

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Conc
Cons
GC
Elec

Foremen

CONTRACTOR & SUB


M&H
RLA
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/27/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Conc
1
2
Elec
1 1 5
plant
1
4
Saw
1
1
2
Cons

1
1

1 3
1 2
1
1

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

7:30 AM

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


Hunt also onsite with 3 workers and 1 pickp
M&H pouring concrete at 15th/Columbia adjusting boxes
PG&E at Telegraph - last day
2 from Columbia setting uplights - others working at 17th
M&H planting/setting trees
Bayline sawing at 16th/ Bruce to break tomorrow
RLA onsite for fountain work
Hunt grouting bricks

11:00 AM Plants delivered


1:30 PM TB onsite - check on Salvia - dogwood in wrong place
Columbia planning to pave tomorrow

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
Columbia
M&H
Bayline
RLA

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/26/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 5
2
1
2
1

1 2
1 3
1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
encountered
vault
edge
at
17th
10:00 AM
M&H poured at 17th both corners and finished 16th St bulbout - continue finishing
CA waterscape onsite to fix pipe
Have M&H check seat wall elevations
Spoke to Thomas - Latham building should be done by Monday
Columbia setting uplights around trees
DG at existing trees - Rock/sealer ok
Hunt installing last basalat inscription
M&H continue to set trees - plant delivery tomorrow
12:00 PM Columbia exposed old streel rails - willc hip around
1:30 PM Existing conduit run across 17th appears to be fine
Columbia to explore setting a larger box

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Plant
1
Elec
Stone
Cons
Fount

Foremen

CONTRACTOR & SUB


M&H
Columbia
Hunt
RLA
CA waterscape

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/25/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 2 7
2

1 2
1 3
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


2
Columbia
workers
at
16th
breaking
out
additional concrete/bollards discovered in sidewalk
9:00 AM
Armando and crew digging/paving on Telegraph
2 from Columbia setting uplights/ 1 setting string light on Telegraph
Casey onsite moving trees/watering/soil
Seat cap has wax on it - "Barry set a skate stop
12:00 PM

Columbia paving trench at 17th / may save work across Telegraph until tomorrow
M&H moving fence on Broadway - plan to pour 17th tomorrow and 15th on Wednesday

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Plant
Elec
Stone

Foremen

CONTRACTOR & SUB


M&H
Columbia
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/22/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1
1 3
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

10:00 AM Columbia trenching across Telegraph


Bruce crew breaking at 17th additional sidewalk - agg base prepared for concrete pour
M&H moving trees onsite
M&H digging for small tree at Cath building
11:00 AM

Trench drains are set in brackets - no bolts


Unknown large diameter pipe at 17th exposed at joint - could not undermine - concrete over top for cover

13:00

M&H cleaning up at 15th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

1 3
1 1 3
1
2

Worker

Operator

TRADE

GC
Elec
Cons
Plant

Foremen

CONTRACTOR & SUB


M&H
Columbia
RLA
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/21/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1
2
1 1 3
1
3
1
2

2
1

2 4

3
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:00 AM Conservator onsite cleaning


Concrete crew at 15th - poured ramps and concrete in roadway
Trees were spootted wrong - identified 3 trees to be moved
Plaza concrete poured - Tyler requested pictures
Columbia tunneling conduit at 17th - concrete broken out
Columbia to temp lights on at 16th - direct burial line in curb was damaged and will need to be resolved
10:00

M&H finishing ramps at 15th


Molly onsite - will send email about treatment of concrete

11:30 AM
2:30 PM 4 puling wire at 15th and broadway

Still setting uplights - will be back Monday


Molly still onsite with chemicals
3:15 PM Cutback placed at 17th and plates being put into place
Armando wll be back with a small crew for Telegraph tomorrow - Frank operator for IC work

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Conc
plant
Elec
Elec
Cons

Foremen

CONTRACTOR & SUB


M&H
M&H
Columbia
Columbia
Fountain

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/20/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 3 4
1
2
1 1 1 3

1 4
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
digging
for
button
at
17th
ready
to pour at 17th
9:00 AM
M&H setting trees in plaza - TB has concerns and wants a second opinion
10:00 AM

M&H forming at 15th ADA ramp


Jerry onsite - says trees are fine and to pay attention for growth
EBMUD onsite to fix leak at 16th
Appears to be a leak at 17th

14:00

EBMUD onsite at 17th - expect to send a crew in for leak


Columbia poured foundations - preparing to set boxes-conduit

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Elec
Cons
plant

Foremen

CONTRACTOR & SUB


M&H
Columbia
Fountain
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/19/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1

1 1
1 4
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Meeting
with
KA,
NS,
RM,
NC,
DT,
SL,
SK regarding FO work
9:00 AM
Columbia set foundation at 17th - approved by Scott
M&H offhauling at 16th - cleaning west side of Broadway
12:30 PM

Columbia to chip out slurry at 17th to locate conduit


Foundation poured - controller not poured
Conservator continue to clean fountain

13:30

Measure with Keith for pavement, stripings, markings

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

2 2
1 1 4
1
2

Worker

Operator

TRADE

GC
Elec
Cons

Foremen

CONTRACTOR & SUB


M&H
Columbia
Fountain

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/18/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1

1 1
1 4
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
trenching
across
Telegraph
/ potholing at NW corner
9:00 AM
Streetlight conduit in conflict - direct Columbia to move
M&H preparing AB at 15th with 2 workers - 1 compacting
1 worker from columbia pulling out old cabinet
11:00 AM

M&H breaking at 16th / offhauling at 15th


Armando plans to set 2 boxes at 17th to intercept fiber and traffic signal

12:00 PM

Columbia sawing across Telegraph to pothole


Rebar cage on site - hairpins missing
2 from Columbia restoring lights at 15th

2:00 PM Met with Shirley/Si onsite - ok with caltrans 1-B 2009 standard at corner
Push button pole at 17th crossing
Ask Al if we can run the streetlight wire in new conduit - Al oked it

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

1 2
1 1 4
1
2

Worker

Operator

TRADE

GC
Elec
Cons

Foremen

CONTRACTOR & SUB


M&H
Columbia
Fountain

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/15/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
1
Elec
1 2
Stripe
1
3
Util
1
1
1
1
Stone

1
1

2
2
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:30 AM Striping graphics on-site - Dino


PG&E onsite to energize 15th
Columbia pour at 15th at 1 pm - potholing at 17th
9:00 AM

Hunt onsit eto set basalt with inscription - 1 piece damaged and rejected
M&H take down signs around fence
Jaw has to be relocated to left side
Jennifer approved of striping - questions for Pete
Concrete discovered on top of fountain - RFI
Columbia continue to pothole along 17th
90^ into box at 15th due to conflict

2:00 AM Met with Bid regarding 5/5 celebration


Foundations poured

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
Columbia
Striping Graphics
PG&E
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/14/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1 1 3
3

2
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Columbia
encountered
concrete
duct
bank
at 15th
8:30 AM
Ed on site - explore duct bank pothole for alternate location
Columbia potholing at 17th trench - vacuum truck saw cut and TC in place
1:00 PM

Met with Noah at Spur - has concerns about 1230 pm to 130 pm


Meet with Shan and RK - concerns about communication
Add RK to email blast list - question about medians - BID can promote businesses

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Elec
Elec

Foremen

CONTRACTOR & SUB


M&H
Columbia
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/13/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 2
1 9
2
1
1

1 3
1

1 1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Sweeper/blower
on
site
prepping
street
for paving
8:00 AM
2 building scaffolding at fountain
M&H forming sign foundations in planter
M&H broke additional concrete at 15th
1 flagman on 16th - mechanic on site for paving machine
9:15 AM
10:00

AC onsite - Exelle onsite for compaction testing - 1/2" from G&B


First lane paved
Meeting grand opening

11:00 AM 2nd pass complete


AC road opened at 16th - 2 compacting AC plug at 15th
12:30pm Continue rolling - Ezelle leaves with sample
Talked to thomas - will be complete well before 6/30 in his schedule

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

Worker

Operator

TRADE

GC
Pave
Scaff
conc

Foremen

CONTRACTOR & SUB


M&H
M&H
Scaffold
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/12/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1

1
3
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
complete
first
pass
on
16th
Grinder/Sweeper
on site with Bruce's crew doing work around vaults
8:00 AM
Columbia onsite installing uplights - plan to install string lights
1 flagman at 16th to direct traffic
M&H pouring curb at 15th
10:00 AM

Second concrete truck


Columbia plans to begin install of string lights
Columbia plans to begin pothole at 17th on Thursday and augur at 15th same day
M&H will begin concrete demo on Monday

2:00 PM Handwork and sweeper onsite - Bruce to set path through alley
Columbia installed one string light

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Grinder

Welder

1 3
1 2
1
2
1
3

Worker

TRADE

GC
Pave
Elec
conc

Operator

Foremen

CONTRACTOR & SUB


M&H
M&H
Columbia
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/11/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 2
1
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


AJW
working
at
17th/Telegraph
PG&E
installing transformer on 17th
10:00 AM
Columbia onsite - installed jaws at 16th - waiting for other 1 for 15th
1 from Columbia working on tree lighting
11"00 am

Guillermo forming at 15th - noted discrepancy between cut sheet and design - told Guillermo to use design
1 worker breaking out old ramp
Check with Ray on brass disk

1:30 PM

Guillermo continue to form


M&H will have to break back to trench to make slope work
Trench does not appear necessary

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Conc
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/8/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

8:30 AM AJW onsite at 16th


M&H offhauling debris along Broadway fence with TC
Guillermo forming at 15th - setting C&G elevation
15th St compacted and graded

1:00 PM

Guillermo continue to form


Holidng FL And varying TC to create cross slopes

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Conc

Foremen

CONTRACTOR & SUB


M&H
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/7/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1
1

2
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Ed
onsite
to
locate
TSP
for
15th/
Guillermo
onsite to layout ramps
9:00 AM
Irrigation needs to move for sign foundation
M&H continue to break/plug along 16th
11:00am

Carla onsiote to review manhole - confirmed abandoned


Asked Nick to c heck on boxes -s poke to Anna at Flightdeck - concerned about access
Columbia potholed for Type 23 at 15th - only bricks appear in the road

13:00

TB moved sign foundation locations - will revise post height - agreed top of foundation should match top of brick
Guillermo onsite forming foundation for signs
Columbia moving tree lights on T&M

2:00 PM

Bruce to continue to plug AC at 16th


Will grade for C&G at 15th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

1 1

2
2

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Land
Elec
conc

Foremen

CONTRACTOR & SUB


M&H
M&H
Columbia
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/6/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
1
1 3
Land
1 1
2
Stone
1
3
Elec
1 1 3
1
Fount

1 1
2

2
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

9:00 AM M&H breaking cobbles along 16th


Potholing for depth - may plug today
M&H planting crew onsite - tree delivery tomorrow cancelled - did jet water into plant holes
Hunt onsite sealing -will chisel face of stone and asked about whitish grout
Inlet/pipe installed at bioswale
M&H setting valves/boxes in landscape area
10:30

CA waterscape onsite working on fountain/installing sleeves


Columbia found damage dconduit at 15th and lead cable - appears to be old fire alarm system - leave in place
16th appears to be 4" AC?6" AB

3:15 PM 16th partially plugged at San Pablo


Spoke to Thomas at Lathm building - expects crane to be onsite 4 weeks
Columbia to drill TSP at 15th tomorrow

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia
Waterscape

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/5/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
Land
Stone
Elec
Util
SITE INSPECTION CHECKLIST (Check applicable items)

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


Check HC report

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia
PG&E

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/4/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
Land
Stone
Elec
Util
SITE INSPECTION CHECKLIST (Check applicable items)

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


Check HC report

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia
PG&E

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

4/1/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 3
1 1 1 2
8
1
3
1

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Land
Stone
Elec
Util

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia
PG&E

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

1 1
1 1
1
2
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


TB
onsite
approved
trees
/
ok
with
largest
tree that can fit by Cath Building/guardrail for seats
8:30 AM
M&H breaking rest of asphalt at 15th
PG&E inscribing MHs onsite
Columbia onsite moving both conduits - need to repull wire
M&H digging out planters on west side of cath building for trees - KEith expects rest of plantings to be onsite Thursday
1:30 PM

2:00 PM

Columbia offsite/Hunt offsite


M&H plugging AC at 15th
Spoke to Ari - check with Nick on grand opening

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/31/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 2
1 1
1

4
10
2

1 1
1 1
1
2

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Conflict
with
tree
at
SW
corner
of
Telegraph
9:30 AM
RM onsite for visit
M&H breaking out AC plug at Broadway - will pour today
Columbia onsite pulling wire along Broadway
11:00 AM

Brooke onsite with NC/DT


Want to hand out brick pavers as commemorative piece from Latham ; asked Bruce to set aside scrap brick
Spoke to Casey about low point in the bioswale - can install landscape drain and pipe
Manny plans to pull out existing wire this Saturday after PG&E energizes - M&H will plug afterwards on Monday

3:00 PM Other tree well has a conflict with existing conduit - direct M&H to relocate
Provided RFI for 16th street lighting to Manny

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Land
Stone
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/30/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 2
1
1

1 1

1 1 4

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
moving
fence
at
16th/
breaking
at
15th on east side of Broadway
9:00 AM
1 worker cleaning out joints at Cathbuilding
Columbia tacking pit - base installed - waiting on aggregate
Guillermo onsite with 2 laborers to form concrete pad
Rebar formed - waiting on concrete
10:00 AM

10:20 AM

Concrete truck arrives - 20 minute pour


Barry washing brick on esat side
AC arrives for trench
Plug conduit Monday morning
Walkway at Cath buildingopened
Columbia setting the FO box at 16th
Manny attempting to fix damaged head
Frank from columbia onsite to compact trench

3:00 PM

3 from Columbia onsite to pul wire


Diane/Patrcik/Nick on site to review skate stops

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Paver
Conc
Elec

Foremen

CONTRACTOR & SUB


M&H
Hunt
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/29/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1
1
1 3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Meeting
with
DT,
NC,
RM,
GD,
BG,
KA
- Brooke site visit on Thursday at 11 am
9:00 AM
10:30 AM

Columbia installing crossing at 16th with 30" of cover - utility conflict with duct bank
Confirmed conduit is the one that is leaking in the Cath building
M&H breaking/digging at 15th
Hunt onsite continue grouting
Measured bricks and conc pavers

15:00

Columbia installed conduit and sand


Will be back tomorrow to AC
Confirmed Columbia will be onsite Saturday

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

1 2
11
1
5

Worker

Operator

TRADE

GC
Paver
Elec

Foremen

CONTRACTOR & SUB


M&H
Hunt
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/28/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

2
1
1

1 1

4
1 1 1 4

1
4

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Euro
onsite
to
finish
last
of
conc
pavers
8:30 AM
Spoke to owner at Jimmys delis - said the basement leak and wanted to know the plan for bulbout
Columbia onsite for signal move - Jason onsite as well
M&H with flaggers at 15th for Columbia
Columbia sawcutting on 16th with 1 on vacuum
Barry onsite grouting at fountain
9:30

1 pole moved - need to move other side


Mailbox at 16th / PG&E boxes / VPI frame and grate

1:00 PM Barry sealing entrance at Cath building


Began measuring stone pavers
2:30 PM Columbia begin trenching at 16th
Curbs painted red

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Stone
Conc
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Euro
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/25/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 2
1
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
grading
at
16th/compacting/digging
out and breaking out foundation
9:)0 am
Met with Jason - needs to be onsite Saturday
Guy/Edmond on-site - 16th has new style b uttons - Guy has salvaged buttons to install
10:30 AM

Timing changed by Guy


European working towards finishing on Monday
Hunt said American Sand machine for radius pieces broke - 4 weeks out
Hunt grouting bricks - fixing stone curbs - asked for curb near ramp to be fixed
M&H will provide flagging on Monday
Asked Bruce to paint curbs

2:00 PM Barry crew washing west side of Cath building - will seal Monday
Thomas says crane will be onsite 4-5 more weeks

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/24/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Meeting
with
MN,
DL,
LS,
DT,
NC
regarding
outreach
11:00 AM
Nick to look into economic development outreach - list of speakers

2:00 PM

European vibrating sand - working towards 15th St


2 from Hunt fixing curb at Cath planter - need to raise up entire row
1 from European cutting - 3 raking sand in - others laying out
Amost complete at the corner
Spoke to Keith - Columbia will need to power the traffic controller temporarily anyways

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/23/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1
1

11
6

1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Hunt
grouting
at
west
side
of
Cath
building
10:00 AM
2 working towards center of fountain
Pointed out lip at ADA ramps to Luis - will fix tomorrow
Luis ran out of mastic - expect deloivery by tomorrow and will be onsite until Monday
Reschedule temp pole move to Monday - Luis will concentrate on filling in corner
Spoke to Keith/Bruce about pouring 16th and blocking out box - they will work on it the next few days

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/22/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


European
continue
to
install
pavers/sand
12:00 PM
1 fulltime on saw preparing corner/edge pieces
M&H sawed off domes at tip
Hunt has straight pieces of granite - will begin installation
Question about skate stops - can be installed later but would need to widen joints
Hunt continue to work towards center fountain
13:00

Rain burst - all work stopped

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/21/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


European
continue
to
install
pavers/sand
12:00 PM
1 fulltime on saw preparing corner/edge pieces
M&H sawed off domes at tip
Hunt has straight pieces of granite - will begin installation
Question about skate stops - can be installed later but would need to widen joints
Hunt continue to work towards center fountain
13:00

Rain burst - all work stopped

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/18/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1
1
1

3
12
7

1 1
1
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


European
continuing
past
bulbout
1
tacking
concrete - Luis laying centerline
9:30 AM
M&H plugging concrete at crosswalk - forms stripped
3 workers laying out basalt around fountain
Euro infilling around edges - received pallet delivery
M&H continue to plug band
Bruce/ yohann on site - pointed out curb that needed to be patched
13:30

European blowing sand into joints


2 laborers moved fence out

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/17/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

2
1
1
1

1 1

12
7
2

1
1

1 1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Guillermo
forming
at
15th/
No.
5
at
12"
OC - asked for deep joint and dowels
8:30 AM
European continue with conc pavers - received additional pallets
10:00 AM

Meeting with DT, NC, RB, BF


Requested CPR records and additional information on days
Hunt grouting at Broadway Cath entrance - Barry confirmed can do Option B

2:00 PM

European rolling asphalt at 15th - completed install


Hunt continue grouting - fountain layout begins
Conc crosswalk poured with early high strength Conc pavers stacked at 2.5' x 4' x 2.5' H to a stack

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/16/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 2 2
1
13
1
7

1 1
1
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Met
with
Enrique
with
RM
enrique
pointed
out a conduit labeled "STREET LIGHT" that appeared to be leaking
9:00 AM
Conduit appeared to be wet at the coupling - assume it is a SL conduit that will eventually be abandoned
10:00 AM

SD uncovered at 17th - is 4'-9" from basement wall and about 5'-8" from proposed sidewalk
33" from pipe to pipe for conduit - asked James to mark out city lightes
European onsite continuing to install conc pavers - 1 worker tacking with mastic
VPI NO PARKING signs on Broadway - check with Ben
M&H broke out AC at 15th and offhauling - plan to rebar and pour tomorrow
Directed Keith to install additional baricades
European setting centerline of bricks and continue to tack (mastic)
Hunt delivering material from across 15th
Asked Barry to fix various curbs - one curb appears very low
Jason from Columbia to review 17th St

12:30 PM

Ari asking about NO PARKING


Serv Pro appears to be working at 1635 Telegraph

3:00 PM

DL/RM/AC Spoke to Tim Low and informed him of communications with Vernoica - he will schedule inspection

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/15/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1
1
1

2
12
7

1
1
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

9:00 AM Meeting with NC, RM, KA, BD


Meet at 17th - M&H exploring for basement and located it at 3' back
3 from hunt Grouting - the rest laying bricks toward nose
European continue to layout concrete pavers and install asphalt
3:30 PM

Spoke to KH about redesign for the TSP - they will look at ways to keep it short of the SD

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/14/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1

1
1

1
8

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

10:00 AM Hnt working towards nose of plaza


European installing concrete pavers - 1 tacking AC
Move fence on Tuesday - water barrier pathway - break on Wednesday
Ran into Cort - informed him of break
Asked M&H to speak to Columbia about mobilizing for foundation at 17th
European runniung out of bricks, delivery tomorrow

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone
Conc

Foremen

CONTRACTOR & SUB


M&H
Hunt
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/11/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Informed
Keith/Oscar
about
plugged
drain
12:30 PM
Spoke to Veronica - informed me a structural engineer looked at her basement and was concerned about collapse
ServPro cost of 3500, she wants us to pump basement
Informed Keith to have a few people available to pump out the basement
3:30 PM

Spoke to Tim - intends to send someone on Monday


Vernoica : 510-984-8130

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC

Foremen

CONTRACTOR & SUB


M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/10/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

3
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Hunt
onsite
installing
basalt
brick
towards
fountain
8:30 AM
Calsense controller was set
Asked M&H to have Oscar onsite tomorrow for maintenance

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Stone

Foremen

CONTRACTOR & SUB


M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/9/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


AT&T splicing at MH19
M&H covered planters at Rotunda building
M&H wet vaccing out water and dumping

3:00 PM

Completed vacuuming and set up additional bags/plastic

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC

Foremen

CONTRACTOR & SUB


M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/8/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

GC
Conc Paver
Stone
Irr

3
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

10:00 AM Meeting with NC, RM, DT, KA, GD


11:00 AM

M&H plugging AC at 17th/Telegraph


European onsite with sand asphalt - Luis is the foreman
Hunt onsite continue to isntall basalt/brick

12:30 PM

Barry laying out basalt around ADA ramps


M&H continue to plug at 17th

13:00

TB, NC onsite - layout bricks 45^ to centerline


1 from MH prepping irrigation controller
Barry spoke to TB about fountain pattern - TB will provide sketch
Spoke to NC, TB, GD about nose of median - potentially install curb

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

SuperInt

CONTRACTOR & SUB


M&H
European
Hunt
M&H

Foremen

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/7/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Conc Paver

Foremen

CONTRACTOR & SUB


M&H
European

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

1 1

SITE INSPECTION CHECKLIST (Check applicable items)

TIME

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)


Water in Cathedral building - dripping from above - can see a splash
European onsite delivering equipment and paver
Ben plugging asphalt of VPI - maybe 2 weeks out to be done
Spoke to Veronica at 1635 Telegraph - claims there has never been leaks but hatch and wall were not waterproofed
Indicated that we would help with the water situation but that she would have to file a claim for lost time/productivity/etc
Asked about backfill program - informed prvious owner did not elect to take part - informed Veronica that the spalled
concrete and corroded rebar looked like pre existing conditions
M&H pumped out water and removed formwork at inlet

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/4/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

3
1

1 1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

TIME

Temporary asphalt paving.


Porta potty.

REMARKS (State in full progress of work)

7:30 AM M&H pouring C&G at 17th


Directed KEith to bag and plastic around excavation before end of the day
9:30 AM

NC, DT, RB, RM, AC meeting - additional questions about direct costs
Nick to provide updated summary sheet

10:30 AM

Hunt laying stone around fountain and moving to nose


Bricks laid out to trapezoidal planter
Telegraph entrance restored
Guillermo continue to finish concrete

12:00 PM Spoke to Keith - noted that basement was leaking from hatch and pipe - plugged pipe and will try to clean on Monday
Had to run water on unfinished concrete and put hole in the DI
3:00 PM Tony/Jose to pump water out on both Saturday and Sunday on extra costs

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
Conc
Stone

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/3/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 1 3
1
9
1
8
1
1
1

1 1
1
1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Hunt
working
on
basalt
at
Telegraph
entrance
of Cath building
9:00 AM
1 from M&H working on irrigation at 15th
Armando onsite with 1 laborer to sleeve under curb for traffic and IC conduit
10:00 AM

Met with Keitjh about billing and PR for 15th


Met with Jim McIlvane - meet later to mark out fence moving
PG&E working at 17th and on Telegraph
Band poured at 15th
Asked Keith to put cutback at ramps
M&H compacting at 17th

2:30 PM M&H forming C&G at 17th


Asked Jose for more plastic around basement
Cutback put at ramp at 15th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Stonr
Irr
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/2/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 1 3
1
9
1
8
1
1
1

1 1
1
1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Hunt
working
on
basalt
at
Telegraph
entrance
of Cath building
9:00 AM
1 from M&H working on irrigation at 15th
Armando onsite with 1 laborer to sleeve under curb for traffic and IC conduit
10:00 AM

Met with Keitjh about billing and PR for 15th


Met with Jim McIlvane - meet later to mark out fence moving
PG&E working at 17th and on Telegraph
Band poured at 15th
Asked Keith to put cutback at ramps
M&H compacting at 17th

2:30 PM M&H forming C&G at 17th


Asked Jose for more plastic around basement
Cutback put at ramp at 15th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Stonr
Irr
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
M&H
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

3/1/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 1 2
1
1
1
8
1

1 1
1
1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


Meeting
with
NC,
DT,
RM,
KA,
BG,
GD
9:00 AM
10:00 AM

M&H pouring concrete at DI At 17th


PG&E at 17th to trench gas service to Dogwood - set up saw cut
HDPE liner cut at basement
Hunt laid out and installed basalt around poles
Hunt continue to install bricks around Cath building - plan to begin Telegraph tomorrow at 7 am
Directed Bruce to install cutback at ramps
M&H forming band - instructed them to increase size to 16" to capture christy block

12:00 PM Met with 1635 Telgraph - appears to be debric in their basement


Quantum Market Research - Kim Powers - 510-238-9010

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Stonr
Irr

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
M&H

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/29/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

1 1 1 3
1
8
1
8
1
2

1 2
1
1
3

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Storm drain protection.

12

Temporary asphalt paving.


Porta potty.

TIME

REMARKS (State in full progress of work)


M&H
pouring
slab
for
pavers
weephole
set at conccrete band
8:30 AM
M&H hand digging inlet at 17th - will pothole inlet and water/sewer at signal poles
M&H continue to lay brcks/stone towards fountain
Columbia onsite pulling wire at 16th - installing splice chambers
PG&E posted NO PARKING south of 17th
PG&E runningservice to 1736 Telegraph - possibly 3-4 weeks out
10:30

Provided additional cylinders for M&H to break - 3 cylinders for CoO lab
Ryan from KH in field to review for spread footing

12:15 PM
2:30 PM Last truck - 1 on TC at ramp

Hunt continue to install basalt in pockets on Telegraph

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Stonr
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT

DAILY PROGRESS REPORT


CITY OF OAKLAND
PUBLIC WORKS DEPARTMENT
PROJECT DELIVERY DIVISION
PROJECT NAME:

DATE:

2/26/2016

PROJECT NO. :

C464560

Latham Square
WEATHER: Clear Cloudy Sunny

Shower

Rain

SHIFT Su M T

Foggy

W Th F

Sa

2 4
1
1

1
1

SITE INSPECTION CHECKLIST (Check applicable items)


1

Traffic control and pedestrian access.

Sampling and materials Testing coordination.

On site material & equipment storage.

Review work plan and schedule with Contractor.

Site cleanliness.

Dust control and noise.

Verify conformance of new materials on site.

10

Site safety.

Trench protection w/ steel plate & shoring.

11

Temporary asphalt paving.

Storm drain protection.

12

TIME

Porta potty.

REMARKS (State in full progress of work)

8:30 AM M&H offhauling at 17th and breaking


Hunt set bricks at Broadway entrance and grouting
Columbia broke out flag for 1B at nose and hand dug foundation
M&H preparing TC at 17th
65'x16' for AC quantity - check on concrete paving bid item - 126 SF on sidewalk
Stone paving: 681', 14. 984 SF, 18. 2822 SF, 19. 2392 SF, 9400 for materials

2:30 PM

Columbia pulling wire at 15th while waiting for concrete


Hunt ran out of mortar
Cath entrance restored with plywood
M&H breaking out fountain equipment that moved during pour
Told Keith to provide more protection at 17th

RESIDENT ENGINEER NAME

SIGNATURE

DATE

DAYS REMAINING

Mixer

Cleaner

CCTV Truck

Crane

Sweeper

Jackhammer

Scraper

Loader-Crawler

Truck (Water )

1 2

9
1

Truck Trailer

Truck (Pickup)

Truck (Dump)

Paver

Roller

Excavator

Compressor

Compactor

Bobcat

Backhoe

Winch

Lift

Pump

Vacuum

Welder

Worker

Operator

TRADE

GC
conc
Stonr
Elec

Foremen

CONTRACTOR & SUB


M&H
M&H
Hunt
Columbia

SuperInt

NUMBER OF PERSONNEL AND MAJOR EQUIPMENT