Вы находитесь на странице: 1из 4
‘The inpeston ln saline montane inet of he npr rep tni pemanetrepin ecm 81542 Flltwelded Patches 15:24 Filewele aces may be wd 1 mae tory epi to nage, corde a ede of rsire ‘eel componens, rs sl nt be pie imate to eget teins at ac wl ote epee {o rope fm under the atch In sae xn egier ra ned wpm finesse ‘epi ig lel uct shal be aproed by ning and eng, The we ile weed pases may eh Jette spose govring coon 81.51.22 Fie ele paces que spec sin comida. epi ltd wells fieny. Filet welded ey esp ae areca tes hl en a eo pv a pe eer 1. The fille. ptches rove sin sty equal minced openings ined caring the aplible ow: ston cote 1 The ilt-weled patches are eine abe mene si ftps hn ast with ae of pliable convection code, th flowing rat 1. Teatlonable membrane ses ist exceeded in te vesel pa ort paces 2. The sin inte aches oct elt i ile nl oe hat xen alla estes fe ih als septs oi equine sal ied wh on oppo Hes forsee aa a 5123 Aiba pach shat eileen tp of meng fet nl psch, When ling ile wld pacha oan exiting e-waste betes hoes fh ile wed hall we a —_—_——~—~—~_——v=v_ a= 4 — hee 1 mini dance between es of lt els fast lt wel aan inn = heise rains he ves, nin.) 15 each often ee wal nine) ‘8184.28 Fite weld pa pnts al ve and OS wth minus ais PS om ima rai, 81543 Lap Band Repairs fl excelent ip bd es my be cee i te lowing eqns a met 1. Thedasgn approve nd came yh eins nd pect. 1. There isot covering rack inthe ese sl, €, Thetnd is esired cont the il vest dia pes. 4. Alling ean nthe pub lero ut wel with he deionised inpestion ose tet with be apr code The cern lt welds tacig te nd othe vessel ae ge afr th ila oa in te ‘ese! shel sing jot ficeey of C4. Whe sigan, he cents fe fh td reve he rial Sl al bonded ning the an aftchent wel { Appopit sre NDE al becondted al stiches Faia ofthe sachet wel, ach a ig resting om dif exgnson tba eae othe vse! sl Should be conde, opps 1 Toh materia weld tl ae sul cont withthe nine i he sien conor dan prope ‘aan allowanes poised th bad 1 Tedamage mechan ding th ned oe epee sal be conser in demining the nds onl mio Inga fur ipeeon of he pi. OFFICIAL COPY - PDF Generated on 15-May-2006 8:57AM so17ao0 | sP| m | 64 | 010 | C1 [-ce 15 temperature shall be maintained during the Interruption, or the jt sha be wrapped in {iy thermal insulating blaets to enero show cling. Before eeommencing walsng, the ‘ued pre-hat shal be e-eppled [Al pipe welds shal be fl pnetation welds ‘The use of backing sip or rings shal not be permit ‘Ne sires ouside the wold beve shall be avoised. Are kes outeife he ted weld Jott shal be removed by eatei ginding. The ground aea shall be examined for any {elects using magnetc partite examinaton ode penetant lasing i ne case of nen- ‘magnate materiale Anj defects shall be rernoved by grncing andthe sea (examined ‘Any geing shal be blended in smootiy fo the surounding area and shal nok oduce the wal tices locay by more tan 125% of the nominal speci wal theses. 1211 ATTACHMENT WELDS. Permanent stachments oplpewark such as pipe suppors and relnorhg pads shall be connecting using continous al ound lt weiss. ‘Te tlt welds shal be made by qualified wolsrs using approved weldng consumables ‘and pro-hest. ae epeced on the PURCHASER approved welding proesaue ‘Sitch welaing i not atone, [A minimum of two runs of weld metal shall be used fr all permanen:stachments to pressure contaning pipe, Flot welds shat fuse gradual into the pipe and bo fee from marked regularities and Undrcu. “Temporary attachments, suchas cess, brie paces, tacking tips or oer attachments wold temporary to pipework to fala febretion, shal be of th same qually oF ‘equivalent materal ac the ppowork to which thy wil be. atached.”" Temporary ‘alachmont for suppring staies soe by woling a not period “Temporary attchrants shal be completely and caretuly removed pier» any postweld heat treatment. Where removals by thermal cutng, te cut shal be made oar of he pipework such that atleast mm ofthe temporary atchment i ef fr fal removal by {inding. “Any sutace Impertectons remaining afer ber reroval shal be rectfed by ‘welding, n accordance with an approved repair weking procedure. Ths shal be folowed by ariaing toa smaath Mish, flush wah the surface of the adjacent pipe erin, plerly before th oint cole and the welder Inve tha location, The rected areas) Shallbe subjecte to MPE or DPE examnaton Hammering shall not be used under any circumstances to remove temporary stschments ‘fom pipework WELD SPACING CCrourfeential butt wolds shal be seperated by the maimum possible cstance Howover, between piping ftings, hor pipe lengths may be requted. The proxy of Welds Is defined in Figure 2 athe end ofthis Sector. Crcumferental buttelds coset OFFICIAL COPY - PDF Generated on 15-May-2006 ] ‘CALM BUOY PIPING FABRICATION SBM SPECIFICATION so17a00 | SP] M | 64] 010 | Ct [race 16 ra4 ‘han these lms shal be notified to the PURCHASER and may raquce post weld heat ‘watment ‘ranehingzee and other pressure attachment welds shal not be generay closer than “Gorm fom adacent pressure welcs. Lesser soparaon t08 minim of Somm may Be considered a postwola Meat Weatment i appeg, and such cases shall be elerred to the PURCHASER for approval Non-pessure conting atachment welds, such as pipe support welds shall be "minimum of Sonm fom any pressure containg wel. WELD CLEANING ‘After each welding pas, the weld shall be cleaned of all ux and slay by power wire brush, gining or Rand tol Onl stainless see wie brushes hal be ueod for etanoes| ‘Stel of nonfetrous mata, Wire rushes for stainies stele or non‘arrous msterls tay only be subsoquenty used exclusvely for he sare mates and shal be ented early for tat use Each welding pas shall be visualy inspected to ensue freedom from slag, cracks, and oro before the start of he next pass. Ary defects shall be romoved or Fepared prot forthe start of the nxt poss, (on completion ofthe weld, the aslacent surfaces shall be cleaned ofall spate, slap, fx and carbonacecus mater Noweld peenng of any sor shal be permite IDENTIFICATION & TRACEABILITY The CONTRACTOR shall encure that doniietion and waceabilly of materi, weiss and welders is maintained throughout the manufacturing process, ‘foal documented sysiom shal ensure tet the tently ofthe ofrators and the ‘raceabity of materials are recorded OFFICIAL COPY - PDP Generated on 15-May-2006 8:57AM ‘CALM BUOY PIPING FABRICATION ‘SPECIFICATION PAGE 18 FIGURE2 PROXIMITY OF WELOS 1 p= Seperation betvoon wo prestur cortaning ful cess was shal be-emiimumof 180mm ‘Spa. = Separation between 2 pressure contsining ful hickness weld and 2 permanent attactment weld shal be 8 miriam of 100mm ‘a. = Separation between any attachment welds sha be @ minimumot Soman

Вам также может понравиться