BIAYA PEMBANGUNAN PABRIK KELAPA SAWIT

KAPASITAS 30 TON TBS PER JAM


I.PEKERJAAN CIVIL.
1. Civil Structure Work.
2. Main Factory Building Foundation
3. Machinery Foundation
4. Concrete Flooring
5. Roofing
6. Drain & Sump
7. Painting The Steel Structure
8. Office and Laboratory
9. Water Intake Pump House
10.Work Shop & General Store
11.Incenerator 1 Unit
12.Ash Store
13.Cocrete Road
14.Perimeter Fencing
15.Pump House & Water Basin
16.Slude Pit
17.Rail Track System
18.Retaining Wall Loading Ramp
19.Cable Trenches
20.Guard House
21.Musholla
22.Toilet Block
23.Leveling Lokasi Pabrik
Jumlah

Rp 1.850.000.000.Rp
400.000.000.Rp
400.000.000,Rp
350.000.000.Rp
600.000.000.Rp
450.000.000.Rp
250.000.000,Rp
300.000.000,Rp
100.000.000,Rp
200.000.000,Rp
450.000.000,Rp
150.000.000,Rp
620.000.000,Rp
400.000.000,Rp
650.000.000,Rp
300.000.000,Rp
350.000.000,Rp
500.000.000,Rp
200.000.000,Rp
70.000.000,Rp
90.000.000,Rp
70.000.000,Rp
600.000.000,Rp 9.350.000.000,-

II.PEKERJAAN MECHANICAL
1.Row Material Pabrik 1.000.000 Kg
2.Boiler Plate 18 mm utk Sterilizer
dan BPV
3.Rail Track 1 Lot
4.Pabrikasi Peralatan Pabrik
5.Transport Pengangkutan Alat
6.Alat Lain-Lain
7.Pengecatan Mesin
Jumlah

Rp 7.500.000.000,Rp
650. 000.000,Rp
400.000.000,Rp 3.500.000.000,Rp
800.000.000,Rp
100.000.000,
Rp
600.000.000,Rp 13.550.000.000,-

BIAYA PEMBANGUNAN PABRIK KELAPA SAWIT


KAPASITAS 30 TON TBS PER JAM
III.PEMBELIAN BARANG IMPORT ( PROPRIEATY EQUIPMENT)
N
O
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
.
11
.
12
.
13
.
14
.
15
.
16
.
17
.
18
.
19
.
20
.
21
.
22
.
23
.
24
.
25
.
26

DESKRIPSI

JUMLA
H

Weight bridge 40 Ton


Power Pack and Sparepart
Transfer Carriage
SterilizerDoor
Hosting Crane 8T
Srew Press 15T & Digester
3500 L
Capstand
Guide Bollard
Ripple Mill
Fan Complate Set

1
1
1
4
1
3

bh
bh
bh
bh
bh
bh

HARGA
PER
UNIT
(US $)
18.000,13.500,15.500,8.750,38.500,48.000,-

TOTAL
HARGA
(US $)

TOTAL
RUPIAH

18.000,13.500,15.500,35.000,38.500,48.000,-

3
6
2
1

bh
bh
bh
lot

6.500,750,2.500,29.000,-

19.500,4.500,5.000,29.000,-

165.000.000,124.200.000,142.600.000,322.000.000,354.200.000,1.324.800.00
0,179.400.000,41.400.000,46.000.000,266.800.000,-

Pump Complate

1 lot

25.200,-

25.200,-

231.840.000,-

Water Treatment Plant

1 lot

90.000,-

90.000,-

828.000.000,-

Kernel Silo Heater

1 lot

5.000,-

5.000,-

46.000.000,-

Parifier

1 bh

43.700,-

43.700,-

402.040.000,-

Sludge Centrifuge

3 bh

13.750,-

41.250,-

379.500.000,-

Gear Motor Complete Set

1 lot

35.000,-

35.000,-

322.000.000,-

Vibrating Screen

2 bh

8.300,-

16.600,-

152.720.000,-

Permanent Magnet

2 bh

560,-

1.120,-

10.304.000,-

Vacum Dryer & Pump

1 lot

18.500,-

18.500,-

170.200.000,-

BP Controll Valve

1 lot

6.500,-

6.500,-

59.800.000,-

Vibrating Feeder

2 bh

2.460,-

4.920,-

45.264.000,-

Surface Aerator

3 bh

6.500,-

19.500,-

179.400.000,

Genset 400 KVA

2 bh

48.200,-

96.400,-

886.880.000,-

Turbine 900 KW

1 bh

100.000,- 100.000,- 920.000.000,-

Chain PC

1 lot

36.000,-

36.000,-

331.299.000,-

Sand Cyclone

1 bh

8.600,-

8.600,-

79.120.000,-

BIAYA PEMBANGUNAN PABRIK KELAPA SAWIT


KAPASITAS 30 TON TBS PER JAM
.
27
.
28
.
29
.
30
.
31
.
32
.
33
.

Vibrating Single Deck

1 bh

7.900,-

7.900,-

72.680.000,-

Sterilizer Controll

1 bh

21.500,-

21.500,-

197.800.000,-

Water Tube Boiler

1 bh

Alat Work Shop

1 lot

340.000,- 340.000,- 3.128.000.00


0,35.340,35.340,325.128.000,-

Valves & Piping

1 lot

95.000,-

95.000,-

874.000.000,-

Bearing

1 lot

16.500,-

16.500,-

151.800.000,-

Peralatan Laboratorium

1 lot

17.400,-

17.400

160.080.000,-

1.404.4
30,-

12.920.756.
000,-

Jumlah
Catatan: Kurs US $ 1,- = Rp 9.200,-

IV.PEKERJAAN ELECTRICAL.
1. Pembuatan panel-panel dan pemasangan kabel listrik
Rp 1.400.000.000,2. Lain-Lain
Rp 100.000.000,Jumlah
Rp 1.500.000.000,V.FASILITAS PERUMAHAN KARYAWAN.
1. Perumahan Karyawan Type G-2 40 Unit
RP 7.674.000.000,VI.STASIUN PENGOLAHAN LIMBAH.
1. Kolam Pembiakan S/D Kolam Fakultatif.
Rp 1.280.000.000,VII.BIAYA OVERHEAD.
1. Biaya Overhead
Rp 950.000.000,VIII.BIAYA CONSULTANT.

BIAYA PEMBANGUNAN PABRIK KELAPA SAWIT


KAPASITAS 30 TON TBS PER JAM

1.Design and Preparing Drawing.


Rp 255.200.000,2.Supervisor during Construction
Rp 514.800.000,Rp

3.Trial and Conmessioning


44.000.000,-

Jumlah

Rp

814.000.000,-

IX. REKAPITULASI BIAYA:

Pekerjaan Civil
Rp 9.350.000.000,Pekerjaan Mechanical
Rp 13.550.000.000,Pembelian Barang-Barang Import
Rp 12.920.756.000,Pekerjaan Electrical
Rp 1.500.000.000,Perumahan Karyawan
Rp 7.764.000.000,Stasiun Pengolahan Limbah
Rp 1.280.000.000,Biaya Overhead
Rp
950.000.000,Biaya Consltant
Rp
814.000.000,Jumlah

Rp 48.128.756.000,Profit

pemborong
Jumlah

Rp 4.000.000.000,Rp 52.128.756.000,-

Dibulatkan
Rp 53.000.000.000,Terbilang: Limapuluh Tiga Milyar Rupiah