Вы находитесь на странице: 1из 202

LTE Single Site Ve

1).How to define the file name of "Single Site Verification Report"


For each region ,we should define like this:
E.g SSV Report Lagos-HT001-LTE

2).How to fill the sheet of "1. Parameters Checklist"


1.Antenna High:Fill the approximate antenna high bound,allow the error of +-2.5m.( Such

2.Antenna Direction:Fill the approximate antenna direction bound,allow the error of +-5 de
value is 120 degree, 115~125 degree can pass);

3.Antenna Downtilt:Fill the approximate antenna downtilt bound,allow the error of +-1 deg
4.LTE Antenna Main beam blocked checking: Refer to the sheets of "Antenna View Photo"

3).How to define the Legend of DT?


SINR

>= -80

Excellent

>= 20 <50

Excellent

>= -90 < -80

Very Good

>= 10 <20

Very Good

>= -100 < -90

Good

>= 5 <10

Good

>= -110 < -100

Fair

>=0 <5

Fair

>= -125 < -110

Poor

>= -5 < 0

Poor

>= -150 < -125

Very Poor

>= -20 < -5

Very Poor

SINR

RSRP

RSRP

Single Site Verification Report

Single Site Verification Report

le Site Verification Report

ror of +-2.5m.( Such as 40m~45m);

ow the error of +-5 degree.( Such as if the design

w the error of +-1 degree.

Antenna View Photo" and "Sector Panoramic Photo";

UL Throughput (Mbps)

>= 20 <40

Excellent

>= 10 <20

Very Good

>= 5 <10

Good

>=1 <5

Fair

>= 0.5< 1

Poor

>= 0 < 0.5

Very Poor

UL Throughput (Mbps)

DL Throughput (Mbps)

DL Throughput (Mbps)

Single Site Verification Report

>= 7 <10

Excellent

>= 5 <7

Very Good

>= 3 <5

Good

>=1 <3

Fair

>= 0.25 < 1

Poor

>= 0 < 0.25

Very Poor

Single Site Verification Report

LTE S
Report Prepared By:

Chika

Site Name:

LLG2845

Region

Sing
Serial No.

Check I

1.Parameters Chec

2.Latency Test

3.Throughput Test

4.Drive Test

Single Site Verification Report

QC by(sub):
Signature:
Date:

Single Site Verification Report

LTE Single Site Verification Report


Chika

Site Visited By:

Chika

General Information
Lagos

Site Config:

Long.:

Single Site Verification Items List


Result
Check Items

Pass

1.Parameters Checklist

2.Latency Test

3.Throughput Test

4.Drive Test

Fail

Inspection Result
Pass

Single Site Verification Report

Fail

Approved by:
Signature:
Date:

Single Site Verification Report

cation Report

ka

Visited Date:

15-Jul-16

n
3.25000

Lat.:

ems List
Remark

Single Site Verification Report

6.47217

Single Site Verification Report

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A
Single Site Verification Report

Planned

Actual

6175

6175

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

LTE Single Site Verification Rep


1. Parameters Checklist
Report Prepared By:

Chika

Site Verification Visited By:

eNodeB Parameter Checklist


eNodeB ID
eNodeB Name
MCC
eNodeB

MNC
EARFCN
Frequency Spectrum
Frequency Bandwidth
Alarm

Cell Parameter Checklist


EARFCN
Cell ID
Basic Information

Cell Name
LLG2845A

Planned

Actual

6175

6175

6175

6175

Single Site Verification Report

LLG2845B

Reference SignalTransm
Power (dBm)
Planned

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

gle Site Verification Report

1. Parameters Checklist

Site Verification Visited By:

Chika

Visit Date:

15-Jul-16

deB Parameter Checklist


LLG2845
LLG2845
621
30
6175 / 24175
800MHz
5 MHz
CLEAR

ell Parameter Checklist


Reference SignalTransmit
Power (dBm)
Actual

PCI

Result
Remark

Planned
395

Actual

Pass

395

Single Site Verification Report

394

394

Fail

Lantency test conditions:


1) Radio Environment Condition: RSRP -80dBmSINR 25dB;
2) Static measurement;
3) Abnormal latency caused by non-Huawei equipment should be excluded;
Sector 1_Round Trip Time(Ping 32Bytes) = 42ms

Sector 2_Round Trip Time(Ping 32Bytes) = 39ms

Sector 3_Round Trip Time(Ping 32Bytes) = 38ms

Cell 1: PCI=395,BW=5MHZ
Download:

Cell 2: PCI=394 ,BW=5MHZ


Download:

Cell 3: PCI=393,BW=5MHZ
Download:

Upload:

Upload:

Upload:

LTE Single Site Verificat


4. Drive Test
Report Prepared By:

Chika

Site Verification Visited By:

SINR

Single Site Verification Report

LTE Single Site Verificat


4. Drive Test
Report Prepared By:

Chika

Single Site Verification Report

Site Verification Visited By:

LTE Single Site Verificat


4. Drive Test
Report Prepared By:

Chika

Site Verification Visited By:

RSRP

Single Site Verification Report

LTE Single Site Verificat


4. Drive Test
Report Prepared By:

Chika

Single Site Verification Report

Site Verification Visited By:

e Site Verification Report


4. Drive Test
Chika

Visit Date:

SINR

Single Site Verification Report

15-Jul-16

e Site Verification Report


4. Drive Test
Chika

Visit Date:

Single Site Verification Report

15-Jul-16

e Site Verification Report


4. Drive Test
Chika

Visit Date:

RSRP

Single Site Verification Report

15-Jul-16

e Site Verification Report


4. Drive Test
Chika

Visit Date:

Single Site Verification Report

15-Jul-16

Cell 1: CSFB

Cell 2: CSFB

Cell 3: CSFB