During
25th, 26th April, 2014
Submitted by
S. Mahalakshmi Sowjanya (12B01A0277)
U. Naga Satya Devi (12B01A0284)
II B.Tech EEE
Control Room:
There is generator of 11 KV which are connected to bus bars and there are 220V stuck off transformer connected
In this synchronizing takes place i.e., voltage, frequency, phases are same. This can be tested by 2 lamp method. If
an ON machine is tripped it takes half an hour time to start synchroscope method.
In this control panel:
1.
2.
3.
4.
5.
6.
7.
8.
189
A
189
B
B
52
189
C
52 is used to interrupt the gas in the breakers. If the machine is not working then we will take the power from the
grid.
We can change the reactive power supply by under excitation and higher excitation.
Daily APGENCO Hyderabad manages the loads. Have to maintain constant frequency 50 Hz.
If the load frequency changed suddenly then it will be tripped. Grid restoration starts from Nagarjuna sagar and
Srisailam.
Transformer tank contains 3000 liters of insulating oil.
In unit 2-8 8000 liters oil is used.
In unit 1 12000liters oil is used.
Insulators are kept for support used for insulation. Insulators are placed at every transformer.
Hence, we have observed and learnt the basics of the generation of power in hydro power station.