Академический Документы
Профессиональный Документы
Культура Документы
Height
No
Breadth
Length
1 Clearing site
Unit
( 4 Nos x 6
LS
13.56
0.30
0.50
4.068
M3
2
2
2
2
2
2
2
13.56
3.60
2.40
13.56
13.56
3.60
2.40
0.30
0.30
0.30
0.20
0.20
0.20
0.20
0.50
0.50
0.50
0.60
0.60
0.60
0.60
4.07
1.08
0.72
3.25
3.25
0.86
0.58
13.82
M3
4.91
1.68
7.51
1.54
4.49
20.12
M3
Total
4 Filling in basement
1
1
1
1
1
2.80
2.80
3.04
2.56
2.56
2.92
1.00
4.12
1.00
2.92
0.60
0.60
0.60
0.60
0.60
Total
Stage 1- Up tp Plinth
Total
Deduct Door
Window W2
Window W3
Window W2k
Parapet portion
Wall above Lintel level
Total Deduction
Net
6 RCC for lintel & s/shade
2
2
2
2
2
2
2
13.56
3.60
2.40
13.56
13.56
3.60
2.40
4
0.90
2
0.90
2
1.40
1
0.90
1
2.80
1 105.36
7
2
1
2
0.90
1.40
3.00
13.56
Beam at sitout
Sun shade
Total
Stage 2 Plinth to Lintel Level
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.60
3.00
3.00
3.00
3.00
3.00
3.00
3.00
2.00
1.35
1.35
1.00
2.40
1.00
0.10
0.10
0.15
0.08
12.204
3.240
2.160
12.204
12.204
3.240
2.160
47.412
1.080
0.365
0.567
0.135
1.008
15.804
18.959
28.454
0.095
0.042
0.068
1.302
1.506
M3
M3
M3
M3
1 105.36
0.15
9.6
5.3
1
1
1.506
5.088
60
70
5.3
1
1
1
1
1
2.88
2.88
3.12
2.64
2.64
to
1.00
1
2
2
1
1
1
1
9.60
9.12
4.44
11.76
11.28
14.64
7.44
M3
50.88
M2
90.36
356.16
446.52 Kg
0.1
5.088
M3
3.00
1.08
4.20
1.08
3.00
8.64
3.11
13.10
2.85
7.92
35.63
Total
9 Plastering
Over roof slab
Walls - Out side
Walls - Out side
Walls - In side
Walls - In side
Walls - In side
Walls - In side
Total
15.804
5.30
3.60
3.60
3.00
3.00
3.00
3.00
M2
50.88
65.66
31.97
35.28
33.84
43.92
22.32
283.87
LS
4300
RTS
M3
M3
Kg
3.6
3.6
M3
M3
Cement
B/s20mm
M3
2.1
4.5
0.7
2.5
1.8
4.5
16.1
B/s40mm
No
1500
2800
M.Sand
CC Block
30x20x15
Materials required
Bag
10
22
1.5
120
9
5
370
30
7
18
6.5 12mm- 490
96
20
250cft
M3
8mm
-450
6mm - 20
Kg
100
Bag
Cement
RTS
B/s20mm
B/s40mm
M.Sand
CC
Block
30x20x
15
P. Days
required for
the item as
per PWD Data.
Pday/ Unit
( 4 Nos x 6 days )
Man
Boy
Woman
Total
2.00
2.54
0.625
0.4
0.35
11.74
0.85
12.58
28.86
0.625
0.3
0.625
0.5
0.85
0.85
0.625
Person Days
0.35
0.035
0.385
0.5
0.050
0.55
0.85
0.085
0.935
105.36
26.60
0.935
0.935
1
6.78
33.38
4.50
3.5
4.5
10 Person Days
14.78
0.935
12.72
0.25
6.61
22.90
57.00
0.0148
0.25
0.0148
4.50
d to 28 P. Days
8.55
0.24
0.165
46.84
0.165
Qty
CC Block
30x20x10
1
56.39
No
300
14 M3
29.5 M3
1.5 M3
5 M3
36 M2
300 M2
14
29.5 3121.693
29.5
4.425
1.5
1.425
5
4.75
30
2.1
10.5
22.125
0.675
2.25
9
30
4.5
18
300
300
No
16.1
6.5
M3
569.94
230.1
Cft
CC
Block
30x20x
10
Akty
Km
7
0
0
0
0
0
4
10
21
C.Pam
Km
12
12
4
0
0
0
0
20
48
Pnly
Km
7
5
0
0
0
0
2
20
34
M2
100
0.0411
M
100
300
40
400
400
0.0021
0.62
0.41
Estimate
Name of Work: A - DP - Planting Fodder grass along road side & other public land
Name of Work: B - DP - Planting Fodder grass in land of Vulnerable Section House Holds
For Road Side 1 Km at one side
For Road Side 1 Km at both sides
Add Cost of Seedlings & Conveyance
d
Pblm
Km
0
0
0
0
4
3
0
5
12
Tsy
Km
3
9
4
4
0
0
0
10
30
M2)
P. Days
0.0411
0.084
2.480
0.547
3.15
668.17
public land
Fdr
Works under Mahatma Gandhi NREGA - Proposal for AAP for 2015-16
Due to recent amendments of thhe Schedules 1 & 2 of the Act,
The works taken up are generally categorised in to 4
A
Public Works related to Natural Resources Management
B
Individual Assets for Vulnerable Sections ( Only for House Holds in Para 5 )
C
Common Infra structure for NRLM compliant Self Help Groups
D
Rural Infra structure.
1
2
a. Providing not less than 100 days of unskilled manual work in an year to ever
house hold as per Demand, resulting in creation of PRODUCTIVE ASSETS of
prescibed Quality & Durability. (Measurable, Tangible & Non-repeatitive
b. Strengthening Lively hood resource base of poor
c. Pro-actively ensuring Social Inclusion and
d. Strengthening Panchayath Raj Institutions.
Note: The Usual works being done may be mainly categorised as 2. One is work requ
comparatively no materials, and the other is work which require material for executio
Cost
L C %ge M C %ge
100
0.95
0.05 With out Material
300
0.20
0.80 Material-Work
400
Total
LC by 0.6 in to 0.4
Permissible MC
Shortage in MC
Shortage by Total in to 100
Shortage % ge
This shows
LC
95.00
60.00
155.00
MC
5.00
240.00
245.00
103.33
141.67
35.42
Total
100.00
300.00
400.00
Some of the Possible & allowable works suitable for our locality are enlisted separate
Para 5 )
0 to be kept
mponent are to be
ge
,
25 % of the
and
e is work require
al for execution
sted separate.
LB15