VERVE RESIDENCES TOWER 1

Inspection and Test Plan

PLUMBING WORKS
(Plumbing & Sanitary Works)

A
Rev.

Date

ANGELO P. SALAZAR

RINALYN T. MARTINEZ

Project-in-charge

QA Engineer

Prepared

Checked

First issue
Description

Document Review
Activity

Company

Name

Title

Reviewed by

MDC

Alfeo Levi Gamueda

TSD Officer

Reviewed by

MDC

Rodel S. Castillo

Project In-Charge

Reviewed by

MDC

Ma. Lourdes C. Cagampang

QA Opcen Supervisor

Approved by

MDC

Yunkim P. Tee

Area Manager

Signature

Date

Makati Development Corporation


Plumbing & Sanitary Works

ITP
Page 1 of 3

Number

Rev

VERVE RESIDENCES TOWER 1

Inspection and Test Plan


Item

Description

Inspection or Testing

By Whom
(/QC)

Frequencies
(QC)

TSD

3 set of shop drawings


prior to fabrication and
installation

Acceptance Criteria

Test Methods

QA

Records

Work Activity Submittal


Pre-Construction
Pre-Construction Shop Drawings
1

Shop Drawings for


reinforcing steel (ACI 315)

Review Shop drawings

ACI 315

Check if shop
drawings are
approved

Shop Drawings

Pre-Construction Method Statement


1

Method Statement
(Methodology)

Prepare Method Statement

Field Engineer

Per type of work

Review

Method Statement

Pre-Construction Materials

Item

Description

By Whom
(/QC)

Inspection or Testing

Frequencies
(QC)

Acceptance
Criteria

Test Methods

QA

Records

Per Activity

N/A

N/A

Work Request

Work Inspection Request

Each type
Each source

As per
specification

N/A

Check

Sanitary and Rainn water


piping checklist

Per Activity

As per
specification

N/A

Check

Work Inspection Request

N/A

Drainage pipe
shall be test by
filling water
higher than
testing point, 3
meters waiting
15 min.

Check

MDC Form
FQM MET-010
FQM MET-014

Work In-Progress
Construction General Storm Drainage pipe installation
1
2

Work Request

Visual

Storm Drainage pipe


installation

Visual

Work inspection Request

Inspection

Flow test and gravity test

Testing

QA/QC
Engineer/Field
Engineer
QA/QC
Engineer/Field
Engineer
QA/QC
Engineer/Field
Engineer
QA/QC
Engineer/Field
Engineer

Per Zone
Per Floor

Makati Development Corporation


Plumbing & Sanitary Works

ITP
Page 2 of 3

Number

Rev

VERVE RESIDENCES TOWER 1

Inspection and Test Plan


Construction General Sanitary Waste and vent pipe installation
1

Work Request

Work Request

Sanitary waste and vent


pipe installation

Visual

Work Inspection Request

Inspection

Gravity test (Waste, soil and


stack) (parking drain stack)
(lateral sewer)

Testing

Work Request
QA/QC
Engineer/Field
Engineer
QA/QC
Engineer/Field
Engineer
QA/QC
Engineer/Field
Engineer

Per Activity

N/A

Work Request

Work Request

Work Requests

Each Type
Each source

As per
specification

N/A

Check

Sanitary and rainb water


piping checklist

Per activity

N/A

N/A

Check

Work Inspection Request

Per zone
Per floor

As per
specification

The system
shall hold the
water for a full 1
hour, with no
drop of water.

Check

MDC FORM
FQM MET-014

Post-Construction
1

Work Inspection Request

Visual

Field Engineer

Inspection

Field Engineer

3
4

General Inspection
Quality Check
NCR
As-Built Survey

Documentation

Filing of Records

Visual/Physical
Survey Report

Survey Team
Document
Controller

Makati Development Corporation


Plumbing & Sanitary Works

ITP
Page 3 of 3