Вы находитесь на странице: 1из 13

Statement of Work

RAW BANK DRC


And

TORRY HARRIS BUSINESS SOLUTIONS LIMITED


OBIEE Dashboard Reporting

SECTION 1 - GENERAL PROVISIONS..............................................................................3


1.1 Document Revision.................................................................................................... 3
1.2 Order Management.................................................................................................... 3
1.3 Notices.......................................................................................................................... 3
SECTION 2 - OVERVIEW..................................................................................................... 5
2.1
2.2
2.3
2.4

Document Purpose..................................................................................................... 5
Intended Audience..................................................................................................... 5
Introduction................................................................................................................. 5
Project Overview......................................................................................................... 5

SECTION 3 - PROJECT SCOPE...........................................................................................6


3.1 Technical & Functional Requirements.....................................................................6
3.2 In Scope....................................................................................................................... 8
3.3 Out of Scope................................................................................................................ 8
SECTION 4 - EFFORT ESTIMATION, DELIVERABLE & SCHEDULE.........................9
4.1
4.2
4.3
4.4

Solution Description................................................................................................... 9
Effort Estimations and estimated project plan......................................................9
Project Schedule......................................................................................................... 9
Hardware/Software Requirements...........................................................................9

SECTION 5 - ACCEPTANCE CRITERIA...........................................................................10


5.1 Key Success factors................................................................................................. 10
5.2 KPIs............................................................................................................................. 10
SECTION 6 - GENERAL ASSUMPTIONS & DEPENDENCIES...................................11
6.1 Assumptions.............................................................................................................. 11
6.2 Dependencies............................................................................................................ 11
SECTION 7 - FINANCIAL PROVISIONS.........................................................................12
7.1 Fees Payable.............................................................................................................. 12

SOW RAW Bank


Page 2 of 13

Section 1 - General Provisions


The person with overall responsibility for completing this Statement of Work
is the individual with responsibility for delivery of the project within RAW
Bank DRC. This responsibility extends to raising the Statement of Work in
conjunction with Procurement, Finance, Legal and the Vendor.
This Statement of Work together with its accompanying RAW Bank.
Purchase Order will together comprise an Order.
Note that all changes to this Statement of Work will be governed by the
Frame Service Agreement.
1.1

Document Revision
Versi
on
1.0

1.2

Change

Author

Date

Initial version All the reporting


requirements shared by RAW Bank
team has been considered.

THBS

12-July2016

Order Management
Project Managers (authorised to manage and implement the services to be
provided under this Statement of Work)
Supplier Project Manager
Authorised Representatives (authorised to enter into this Statement of
Work and make amendments to it)
Raw Bank DRC Authorised
Representative
Supplier Authorised
Representative

1.3

Notices
For RAW Bank DRC:
Address:
For Supplier:
Address:
Torry Harris Business Solutions,
# 71, Ground Floor, Sona Towers,
Millers Road, Bangalore 560052
Tel: + 91 - 80 - 41827200
Fax: +91 - 80 41235695

SOW RAW Bank


Page 3 of 13

Definitions & Acronyms


Acronyms
THBS
PO
SOW
IST
GRN
BI
DWH
KPI

Definitions
Torry Harris Business Solutions
Purchase Order
Statement of Work
Indian Standard Time
Goods Received Note
Business Intelligence
Data Ware House
Key Performance Indicators

SOW RAW Bank


Page 4 of 13

Section 2 - Overview
2.1

Document Purpose
This document describes High level scope, deliverables, schedule and
financial considerations for delivering the OBIEE based dashboards.
It provides the baseline for the project and, once approved forms part of
the contract between Raw Bank DRC and THBS

2.2

Intended Audience
The intended audience is contract authorities and project managers from
both parties, THBS designers, developers and testers, and Raw Bank DRC
teams

2.3

Introduction
Raw Bank DRC plans to implement a one stop dashboard to report critical
KPIs which are essential in reporting the banks overall performance and
other Key performance metrics
Raw Bank DRC has indicated their willingness to partner with THBS team to
realize this Business requirement.

2.4

Project Overview
Project Brief
The project aims to achieve the below objectives:
Project Scope:
Leverage the existing OBIEE reporting infrastructure to develop
critical business dashboards.
The dashboards to reflect business critical KPIs in form of tables,
graphs, maps, etc.,
As no Data models are available to build the required dashboards, it
is expected that TBHS team liaise with the RAW Bank business team
to understand the reporting requirements and build the data model
accordingly.
THBS team to build the Dashboards on top of the newly designed
Data model post model sign off from the RAW Bank business team.
Post report development, reports to be integrated in to the existing
SharePoint portal. SharePoint will be the single point of initialization
of the dashboard reports.
All dashboard reports can be accessed by all users. However, the
data viewed in the dashboard will be secured as per the user scope.

SOW RAW Bank


Page 5 of 13

Section 3 - Project Scope


3.1

Technical & Functional Requirements

Initiation, Stage Deployment, ETL Dimensions deployment

Initiation:
Sl
No
1

i.

OBIEE tools to design and develop Data models, answers


and dashboards has to configured and installed
appropriately.

ii.

Developer to be provided with necessary privileges to


develop and deploy data models. This includes creating
and deploying repository and restarting the BI services
when required.

iii.

Developer to be provided the necessary access to query


and connect to the underlying RDBMS database.

iv.

Development Environment to be provided with all the


necessary privileges explained in point I,ii and iii

v.

As the requirement is to leverage Widows Authentication


to authenticate the end user, Active Directory needs to
be configured in the WebLogic Server to allow the domain
users to access the application

Description

Requirement Gathering:
Sl
No
1

Description
At this stage it is expected that the developer has to
formal meeting with the business team to gather the
requirement for the dashboard development.
This will include the below items.

1) Outline the list of Dimension required for reporting.


2) Outline the Facts required for reporting.
3) Agree on the Dimension and attribute naming
conventions
4) Agree on the Measure naming conventions.
5) Agree on the schema and format of the Dashboards.
6) Business team to share the key KPI calculation with
the THBS Development team.
7) Agree on the UAT (User acceptance Test) time lines.
8) Communicate upfront to Development team on any
dependencies which could affect the project timelines.

SOW RAW Bank


Page 6 of 13

Design.
Sl
No
1

Description
This below tasks will be included as part of this phase.

1) Create Data model to include all the fact and


dimensions used for reporting the KPIs
2) Map Fact to the Dimensions to build the logical model.
3) Configure the measure and calculated measure to be
used in reporting the KPIs
4) Validate the data model for consistency and deploy
the model to the BI server

Develop:
Sl
No
1

Description
This below tasks will be included as part of this phase.

1) Create reusable Dimension Prompt filters.


2) Create a session variable to login the user details.
3) Build dynamic reports with business KPIs embedded
in the reports leveraging the rich reporting features of
OBIEE
4) Report the data to the targeted audience by filtering
the data reported on the session variable.
5) Integrate the OBIEE dashboards into the Sharepoint
point portal using the URL based integration
methodology.
Note: The base data has to be mapped to its
corresponding user to ensure the session variable
filters the data correctly before reporting the data to
the targeted users.

SOW RAW Bank


Page 7 of 13

UAT and Production Deployment.


Sl
No
1

Description
This below tasks will be included as part of this phase.

1) The reports to be deployed to UAT environment for


User Acceptance test
2) Any bugs identified will be fixed in this phase.
3) UAT sign off to be provided by the UAT team, post
UAT.
4) Post UAT sign off, the reports to be deployed to the
production environment.

3.2

In Scope
Development of data models, answers, dashboards.
Deploying data models and dashboards to the DEV,UAT and PROD
environments
Integrating OBIEE reports into Sharepoint portal.

3.3

Out of Scope
Database backups
Infrastructure maintenance (storage, access,
network etc.)
Setting up any meeting with third party vendors.
Any issues found after the UAT sign off.
Delays in providing the business requirements.

hardware

failure,

SOW RAW Bank


Page 8 of 13

Section 4 - Effort Estimation, Deliverable


& Schedule
4.1

Solution Description
Solution design is based on the Data model developed post requirement
gathering from the respective business stakeholders.

4.2

Effort Estimations and estimated project plan


Effort estimates are as specified in the project plan.
Resource Location

Effort (man days)

Onshore

4.3

22

Project Schedule
Below is the high level estimate of the project schedule.

Week1
Requirement Gathering and
Design

Week
2

Week3

Week4

Development
UAT and Production
Deployment

4.4

Hardware/Software Requirements
OBIEE 11 g Enterprise Edition
Sharepoint portal

SOW RAW Bank


Page 9 of 13

Section 5 - Acceptance Criteria


This section defines the minimum requirements for accepting deliverables.
It also describes the criteria used for acceptance and/or KPIs.
5.1

Key Success factors


Timely Data Validation and closure
Timely delivery of the deliverables mapped against business
requirement.
Customer satisfaction on the deliverables

5.2

KPIs

Dashboards to be delivered with high quality and minimal bugs.

SOW RAW Bank


Page 10 of 13

Section 6 - General Assumptions &


Dependencies
6.1

Assumptions
It is assumed that:
English will be the language of communication during this work. All
information required for the THBS consultants during this assignment
including the documents, meetings/discussions etc. will be in English
only.
Offshore working hours will be normal business hours as per IST (9
AM to 6 PM).
All dependencies will be addressed by RAW BANK DRC in a timely
manner.
Upon completion of UAT, Signoff is required from RAW Bank DRC
team to deploy the solution to Production environment.
If there are any delays in completing the validation activity by RAW
Bank DRC as per schedule, then THBS will discuss with RAW Bank
DRC PM and re-baseline the schedule and the cost.
If RAW Bank DRC or any other person(s)/team(s) change the relevant
requirements, project plans, schedule, specifications, scope or
system environment or architecture which would require additional
services or re-performance of services, those change(s) shall be
considered a change in the scope of services and will require
renegotiation of schedules and costs.
Any new changes during the development and implementation apart
of the activities mentioned in Section 3.1 will be taken/considered as
a Change Request and will be delivered separately as part of a new
PO and SOW.
Cost mentioned is with assumption of working days only. Any work
done out of office hours, weekends and holidays will be invoiced.
Development and production servers provided at the start of the
project will not change for entire project

6.2

Dependencies
RAW Bank DRC has the following MIC dependencies:
Requirement to be freezed prior to start the development phase.
SOW RAW Bank
Page 11 of 13

UAT should be performed within in the duration agreed in the project


plan by RAW Bank DRC team and a complete report has to be shared
with THBS for fixing
The required personnel & local support teams from each country will
be available for all the discussions and meetings.
Timely responses to clarification requests.
Relevant technical and business documentation will be provided to
the consultants.
RAW Bank DRC to have the required resources available for data
validation as per the agreed schedule.

SOW RAW Bank


Page 12 of 13

Section 7 - Financial
Provisions
7.1

Fees Payable
Resource
Type

Locati
on

Senior
Consultant
DWH/ BI
Expert
(5-10 years of
experience)

Onsite

Effort

Hourly
Rate

Billing
Rate

(in Man
Days)

(as per
FSA)

(8Hr/d
ay)

22

$ 52.5

Accommodation including weekends (30 days)


Travel and Visa (Approx)
Total

$ 420

Total Cost
Per
Resource

$
9,240.00

$3300.00
$2000.00
$ 14,540

RAW Bank DRC to issue a PO for $ 14,540


Note:
1: More number of onsite days will be decided during the course of project
execution if required and for that RAW Bank DRC would be providing the
additional PO upon submitting the revised effort estimate.
2: Travel and Visa cost $2000 provided is for single onward and return
journey, if any additional travel to DRC is required then actual Ticket cost
would be invoiced.
4: Local transport between office and hotel is expected to be provided by

RAW Bank DRC.

SOW RAW Bank


Page 13 of 13

Вам также может понравиться