2016/4/7
FOR Approve
wang
xuehui
zhangxiaoping
0A
2015/11/27
FOR Approve
wang
xuehui
zhangxiaoping
CRN.
DATE
PURPOSE OF REVISION
PERF..
VERIF.
APPROV.
CONTRACT NUMBER:
PROJECT:
TYPE OF DOCUMENT:
01
Wang peilei
VERIFIED BY:
APPROVED BY:
Xue hui
Zhang xiaoping
NUMBER DOCUMENT CLIENT:
REVISION CLIENT:
PA5-PI-SB-01-A00-001
NUMBER DOCUMENT PROJECT/MANUFACTURE
DATE OF ISSUE
00
SHEET:
COMPANY:
2016-04-07
1/4
1/1
LUDIAN Project No
ITP No./ Revision
PA5-PI-SB-01-A00-001/0A
Manufacturer location
Equipment Quantity
Equipment Name
Structural Steel
Equipment No
SN
Inspection
Reference
Acceptance criteria
Technical
agreement
Quantity of inspection
Supervision method
Remark
Manufacture
LUDIAN/ S
Manufacture
LUDIAN/ S
Owner
Technical agreement
100%
100%
AWS D1.1
AWS D1.1
100%
100%
AWS D1.1
AWS D1.1
100%
100%
Technical
agreement
Technical agreement
100%
100%
AWS D1.1
AWS D1.1
100%
100%
NDE: ASNT-TC-A1
NDE: ASNT-TC-A1
100%
100%
2.1
MTR(Material
Test Record)
GB/T 700-2006
GB/T 1591-2008
Technical
agreement
GB/T 700-2006
GB/T 1591-2008
Technical agreement
100%
100%
2.2
GB/T 700-2006
GB/T 1591-2008
Technical
GB/T 700-2006
GB/T 1591-2008
Technical agreement
100%
Random
1.1
1.2
1.3
1.4
1.5
1.6
2
Specification, certificate
and qualification review
Welder qualification
certificate
NDE
NDE qualification
certificate
agreement
GB/T 700-2006
GB/T 1591-2008
Technical agreement
100%
Random
Drawings technical
agreement
AWS D1.1
100%
Random
AWS D1.1
100%
Random
AWS D1.1
Table 6.1
Drawing
AWS D1.1
Table 6.1
Drawing
100%
Random
AWS D1.1
AWS D1.1
100%
Random
-
NDE Inspection - UT
AWSD1.1
Drawing
AWSD1.1
Drawing
100%
Random
mark transfer
final dimension
inspection
AWSD1.1
Drawing
AWSD1.1
Drawing
100%
Random
AISC360
Drawing
AISC360
Drawing
100%
Random
Sa2.5
Technical agreement
100%
Random
Technical agreement
100%
Random
ASTM D 3359
ASTM D 4541
Technical
agreement
Technical agreement
100%
Random
Drawing
Technical
agreement
Drawing
Technical agreement
Random
Random
2.3
process inspection
3.1
weld fit-up
3.2
3.3
Welding
inspection
3.4
NDT
3.4.1
3.5
3.7
welding
visual
Blasting
5.1
,
paint primer and
intermediate coat
5.2
6.1
GB/T 700-2006
GB/T 1591-2008
Technical
agreement
color
code, film thickness,
adhensive
Fasten inspection
Appearance, dimension,
surface treatment
Drawings
technical
agreement
AWS D1.1
WPS
AWS D1.1
Drawing
Blasting
procedure
Technical
agreement
ASTM D 3359
ASTM D 4541
Technical
agreement
inspection
6.2
High strength
bolt connection and anti
slip coefficient test
Completion inspection
packing
delivery
ASTM A325M or
ASTM A490M
Technical
agreement
Packing Procedure
Technical
agreement
Technical
agreement
Random
Random
Technical agreement
100%
100%
Technical agreement
100%
Random
Technical agreement
100%
100%
Remarks:
1. The clause Supervision method refers to R/W/H (Review/ Witness/ Hold);
2. S Refer to supervision sub-contractor (Bureauveritas Quality service (shanghai) Co., Ltd. ) of LUDIAN.
3. On the Remarks column the Manufacturer shall add the drawings, bill of materials, Standards, Procedures WPS, PQR and WQ.
H: /
Holding Point: Customer and Organization will witness the inspection/test beyond which this work can not proceed without the Customer/Organization approval in written.
W:
Witness Point: Organization (may also including Customer) shall witness the inspection/test beyond which the work can proceed.
R: /
Review Point: The inspection/test shall be implemented, witnessed and recorded by Suppliers, but these Records may be checked by Customer or Organization.