Вы находитесь на странице: 1из 21

MINISTERIO DE VIVIENDA

CONSTRUCCION Y SANEAMIENTO

RESUMEN DE VALORIZACION FINAL


ADP N:

: N 013-2013-VIVIENDA

O B R A
CONTRATISTA
SUPERVISOR
FECHA

:
:
:
:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL


CENTRO DE SERVICIOS DE APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA AYACUCHO
CONSORCIO MACRO
CONSORCIO PAJONKY
MAYO DEL 2014
MONTO

DESCRIPCION

(s/IGV)

A:

VALORIZACION

CONTRATO
ANTERIOR

ACTUAL

ACUMULADO

182,038.48 182,038.48

0.00

182,038.48

100.00%

0.00

ESTRUCTURAS

148,897.58 148,897.58

0.00

148,897.58

100.00%

0.00

15,649.48

0.00

15,649.48

100.00%

0.00

51,994.10 51,994.10
45,725.52 45,725.52
444,305.16 444,305.16

0.00
0.00
0.00

51,994.10
45,725.52
444,305.16

100.00%
100.00%
100.00%

0.00
0.00
0.00

444,305.16 444,305.16

0.00

444,305.16

329.91
496.07
-20.31
262.52
319.45

0.00
0.00
0.00
0.00
0.00

329.91
496.07
-20.31
262.52
319.45

1,387.64

0.00

1,387.64

445,692.80

0.00

445,692.80

EQUIPAMIENTO E IMPLEMENTACION

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

TOTAL (C)

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

445,692.80

0.00

445,692.80

0.00
44,430.52
0.00
0.00
44,430.52

0.00
0.00
0.00
0.00
0.00

0.00
44,430.52
0.00
0.00
44,430.52

444,305.16 401,262.29
79,974.93 72,227.21

0.00
0.00

401,262.29
72,227.21

EQUIPAMIENTO

15,649.48

AVANCE FISICO DE OBRA


SUB TOTAL
REAJUSTES
ARQUITECTURA
ESTRUCTURAS
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS
EQUIPAMIENTO E IMPLEMENTACION

TOTAL (B)
VALORIZACION BRUTA (VB=A+B)
DEDUCCIONES
ARQUITECTURA
ESTRUCTURAS
INSTALACIONES ELECTRICAS
INSTALACIONES SANITARIAS

D:

AMORTIZACIONES
AMORTIZACION DEL ADELANTO EN EFEC.
AMORTIZACION DEL ADELANTO DE MAT.
ESTRUCTURAS
ARQUITECTURA
INST. ELECTRICA
INST. SANITARIAS
EQUIPAMIENTO
TOTAL (D)
VALORIZACION NETA (VN=VB-D-C)

D:

E:

VALORIZAR

ARQUITECTURA

INSTALACIONES SANITARIAS

C:

POR

ACUMULADO

VALORIZACION CONTRACTUAL

INSTALACIONES ELECTRICAS

B:

SALDO

AVANCE

RETENCIONES
FONDO DE GARANTIA (5%*VB)
POR FIEL CUMPLIMIENTO (10% CONTRATO DE OBRA)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL (D)
MONTO A PAGAR AL CONTRATISTA
EN EFECTIVO (VN-D)
EN I.G.V. (18%*VN)

TOTAL (E)
TOTAL COMPROMISO A SOLICITAR

524,280.09 473,489.50
473,489.50

0.00
0.00

473,489.50
473,489.50

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE APOYO AL
HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ESTRUCTURAS
PRESUPUESTO

PARTIDA

TEM

01
01.01
01.01.01

UND

MET

COSTO
COSTO
UNITARIO PARCIAL
(S/.)
(S/.)

ANTERIOR ACUMULADO
MET

MONTO (S/.)

SALDOS

ACTUAL
MET

MONTO (S/.)

ACTUAL ACUMULADO
%

MET

MONTO (S/.)

MET

MONTO (S/.)

ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE
3.60 X 2.40 m

2,988.58
u

1.00

1,000.08

01.01.02 ALMACEN, OFICINA Y GUARDIANIA

m2

10.00

132.87

01.01.03 SERVICIOS HIGIENICOS

m2

4.00

164.95

01.02

VALORIZACIONES

TRABAJOS PRELIMINARES

1,000.08
1,328.70
659.80

2,988.58
1.00
10.00
4.00

21,502.83

01.02.01 TRAZO Y REPLANTEO PRELIMINAR

m2

01.02.02 TRANSPORTE DE EQUIPO Y MATERIALES

0.00

100.00

0.00

0.00

100.00

0.00

0.00

659.80

100.00

0.00

21,502.83

100.00

1,328.70

2,988.58

100.00

0.00

0.00

1.00

1,000.08

100.00

0.00

0.00

0.00

0.00

10.00

1,328.70

100.00

0.00

0.00

0.00

0.00

0.00

4.00

659.80

100.00

0.00

0.00

0.00

0.00

0.00

21,502.83

100.00

0.00

0.00

1.55

867.89

559.93

867.89

100.00

0.00

0.00

0.00

559.93

867.89

100.00

0.00

0.00

0.00

1.00 20,634.94

20,634.94

1.00

20,634.94

100.00

0.05

0.00

0.00

1.00

20,634.94

100.00

0.00

0.00

0.00

720.53

100.00

720.53

100.00

0.00

0.00

01.03.01 SEALIZACION TEMPORAL DE SEGURIDAD

1.00

113.38

01.03.02 CAPACITACION EN SEGURIDAD Y SALUD

1.00

300.00

1.00

307.15

m3

131.02

18.33

m3

4.75

13.38

m3

110.45

12.22

1,349.70

110.45

m2

320.19

19.63

6,285.33

320.19

01.03

01.03.03

01.04

559.93

0.00
0.00

1,000.08

100.00

SEGURIDAD Y SALUD

RECURSOS PARA RESPUESTAS ANTE


EMERGENCIAS EN SEGURIDAD

720.53

MOVIMIENTO DE TIERRAS

01.04.01 EXCAVACION DE ZANJAS Y ZAPATAS H=1.20m


RELLENO CON MATERIAL PROPIO Y
COMPACTADO
ELIMINACION DE MATERIAL EXEDENTE HASTA
01.04.03
EL BOTADERO
01.04.02

01.04.04 AFIRMADO DE e = 0.10 m

113.38
300.00
307.15

1.00
1.00
1.00

10,100.19
2,401.60
63.56

131.02
4.75

0.00

0.00

100.00

0.00

0.00

0.00

1.00

113.38

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

1.00

300.00

100.00

0.00

0.00

0.00

307.15

100.00

0.00

0.00

0.00

1.00

307.15

100.00

0.00

0.00

0.00

10,100.19

100.00

10,100.19

100.00

0.00

0.00

113.38
300.00

0.00

0.00

100.00

0.00

0.00

0.00

131.02

2,401.60

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

4.75

63.56

100.00

0.00

0.00

0.00

1,349.70

100.00

0.00

0.00

0.00

110.45

1,349.70

100.00

0.00

0.00

0.00

6,285.33

100.00

0.00

0.00

0.00

320.19

6,285.33

100.00

0.00

0.00

0.00

2,401.60
63.56

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE APOYO AL
HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ESTRUCTURAS
PRESUPUESTO

PARTIDA

TEM

01.05

MET

COSTO
COSTO
UNITARIO PARCIAL
(S/.)
(S/.)

OBRAS DE CONCRETO SIMPLE

01.05.01 SOLADO C:H 1:12 e = 0.05m


CIMIENTOS CORRIDOS MEZCLA 1:10
CEMENTO-HORMIGON 30% PIEDRA
CONCRETO 1:8+25% PM PARA
01.05.03
SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO PARA
01.05.04
SOBRECIMIENTOS
FALSO PISO DE 4" DE CONCRETO 1:8
01.05.05
CEMENTO-HORMIGON
01.05.02

01.06

UND

VALORIZACIONES
ANTERIOR ACUMULADO
MET

22,444.67
m2

13.32

53.97

m3

79.45

120.48

m3

15.16

223.46

m2

131.77

31.66

m2

261.18

17.59

718.88
9,572.14
3,387.65
4,171.84
4,594.16

MONTO (S/.)

22,444.67
13.32
79.45
15.16
131.77
261.18

SALDOS

ACTUAL
MET

0.00

0.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

100.00

0.00

4,594.16

100.00

0.00

3,717.09

100.00

718.88
9,572.14
3,387.65
4,171.84

100.00

MONTO (S/.)

ACTUAL ACUMULADO
MET

MONTO (S/.)

22,444.67

100.00

13.32

718.88

100.00

0.00

79.45

9,572.14

0.00

0.00

15.16

0.00

0.00

0.00

0.00

0.00

0.00

MET

MONTO (S/.)

0.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

3,387.65

100.00

0.00

0.00

0.00

131.77

4,171.84

100.00

0.00

0.00

0.00

261.18

4,594.16

100.00

0.00

0.00

0.00

3,717.09

100.00

0.00

0.00

OBRAS DE CONCRETO ARMADO

01.06.01 ZAPATAS
01.06.01.0
CONCRETO f'c=210 kg/cm2 PARA ZAPATAS
1
01.06.01.0
ACERO DE REFUERZO Fy=4200 Kg/cm2
2

01.06.02
01.06.02.0
1
01.06.02.0
2
01.06.02.0
3

SOBRECIMIENTO ARMADO

01.06.03
01.06.03.0
1
01.06.03.0
2
01.06.03.0
3

COLUMNAS

3,717.09
m3
kg

7.99

322.62

2,577.73

7.99

2,577.73

100.00

0.00

0.00

0.00

7.99

2,577.73

100.00

0.00

0.00

0.00

263.74

4.32

1,139.36

263.74

1,139.36

100.00

0.00

0.00

0.00

263.74

1,139.36

100.00

0.00

0.00

0.00

5,240.98

100.00

5,240.98

100.00

0.00

0.00

5,240.98

0.00

0.00

100.00

0.00

0.00

0.00

8.31

2,790.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

32.42

1,306.53

100.00

0.00

0.00

0.00

1,144.45

100.00

0.00

0.00

0.00

264.92

1,144.45

100.00

0.00

0.00

0.00

15,761.57

100.00

15,761.57

100.00

0.00

0.00

CONCRETO f'c = 210 Kg/cm2 VIGUETAS DE


CONECCIN

m3

8.31

335.74

ENCOFRADO EN VIGUETAS DE CONECCION

m2

32.42

40.30

ACERO FY=4200Kg/cm2 GRADO 60 EN


VIGUETAS DE CONECCION

kg

264.92

4.32

CONCRETO f'c=210 kg/cm2 PARA COLUMNAS

m3

10.90

354.65

3,865.69

10.90

3,865.69

ENCOFRADO Y DESENCOFRADO NORMAL EN


COLUMNAS

m2

157.19

34.08

5,357.04

157.19

5,357.04

ACERO DE REFUERZO Fy=4200 Kg/cm2

kg

1,513.62

4.32

6,538.84 1,513.62

6,538.84

2,790.00
1,306.53
1,144.45

8.31
32.42
264.92

15,761.57

2,790.00
1,306.53

0.00

0.00

100.00

0.00

0.00

0.00

10.90

3,865.69

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

157.19

5,357.04

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

1,513.62

6,538.84

100.00

0.00

0.00

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE APOYO AL
HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ESTRUCTURAS
PRESUPUESTO

PARTIDA

TEM

01.06.04
01.06.04.0
1
01.06.04.0
2
01.06.04.0
3

VIGAS

01.06.05
01.06.05.0
1
01.06.05.0
2
01.06.05.0
3

LOSA MACIZA

UND

MET

COSTO
COSTO
UNITARIO PARCIAL
(S/.)
(S/.)

ANTERIOR ACUMULADO
MET

10,904.42

CONCRETO F'C=210KG/CM2 EN VIGAS

m3

9.77

335.74

ENCOFRADO Y DESENCOFRADO NORMAL EN


VIGAS

m2

94.21

37.12

ACERO DE REFUERZO Fy=4200 Kg/cm2

kg

955.36

4.32

CONCRETO F'C=210KG/CM2 EN LOSAS


MACIZAS
ENCOFRADO Y DESENCOFRADO DE LOSAS
MACIZAS

VALORIZACIONES

3,280.18
3,497.08
4,127.16

MONTO (S/.)

10,904.42
9.77
94.21
955.36

416.04

SALDOS

ACTUAL
MET

0.00

0.00

100.00

0.00

0.00

0.00

100.00

0.00

0.00

4,127.16

100.00

0.00

416.04

100.00

3,280.18
3,497.08

100.00

MONTO (S/.)

ACTUAL ACUMULADO
MET

MONTO (S/.)

10,904.42

100.00

9.77

3,280.18

100.00

0.00

94.21

3,497.08

0.00

0.00

955.36

0.00

0.00

MET

MONTO (S/.)

0.00

0.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

4,127.16

100.00

0.00

0.00

0.00

416.04

100.00

0.00

0.00

m3

0.34

332.48

113.04

0.34

113.04

100.00

0.00

0.00

0.00

0.34

113.04

100.00

0.00

0.00

0.00

m2

2.85

40.30

114.86

2.85

114.86

100.00

0.00

0.00

0.00

2.85

114.86

100.00

0.00

0.00

0.00

kg

43.55

4.32

188.14

43.55

188.14

100.00

0.00

0.00

0.00

43.55

188.14

100.00

0.00

0.00

0.00

01.07.01 TIJERAL T-1


01.07.01.0
BRIDAS DE ACERO 2L2 1/2" X 2 1/2" X 1/4"
1
01.07.01.0
BRIDAS DE ACERO 2L 2" X 2" X 3/16"
2

5,844.96

100.00

5,844.96

100.00

0.00

0.00

65.60

36.51

96.88

35.61

01.07.02 VIGUETAS
01.07.02.0
BRIDAS DE ACERO 2L1 1/2" X 1/2" X 1/8"
1
01.07.02.0
ACERO LISO D= 1/2"
2

1,011.10

22.46

957.66

7.44

01.07

ACERO DE REFUERZO Fy=4200 Kg/cm2

ESTRUCTURAS METLICAS
5,844.96
2,395.06
3,449.90

65.60
96.88

29,834.30
22,709.31
7,124.99

1,011.10
957.66

0.00

0.00

100.00

0.00

0.00

0.00

65.60

2,395.06

100.00

0.00

0.00

0.00

3,449.90

100.00

0.00

0.00

0.00

96.88

3,449.90

100.00

0.00

0.00

0.00

29,834.30

100.00

29,834.30

100.00

0.00

0.00

2,395.06

22,709.31
7,124.99

0.00

0.00

100.00

0.00

0.00

0.00

1,011.10

22,709.31

100.00

0.00

0.00

0.00

100.00

0.00

0.00

0.00

957.66

7,124.99

100.00

0.00

0.00

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE APOYO AL
HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ESTRUCTURAS
PRESUPUESTO

PARTIDA

TEM

TOTAL COSTO DIRECTO


GASTOS GENERALES Y YTILIDAD

UND

MET

COSTO
COSTO
UNITARIO PARCIAL
(S/.)
(S/.)

15.00%

SUB TOTAL
TOTAL
MONTO CONTRACTUAL=SUB-TOTAL*FR
IGV 18%
MONTO TOTAL DE LA OBRA
PORCENTAJE DE AVANCE DE OBRA

VALORIZACIONES

1.00

ANTERIOR ACUMULADO
MET

MONTO (S/.)

SALDOS

ACTUAL
MET

MONTO (S/.)

ACTUAL ACUMULADO
%

MET

MONTO (S/.)

MET

MONTO (S/.)

129,476.16
19,421.42

129,476.16
19,421.42

0.00
0.00

129,476.16
19,421.42

0.00
0.00

148,897.58

148,897.58

0.00

148,897.58

0.00

148,897.58

148,897.58

0.00

148,897.58

0.00

148,897.58

148,897.58

0.00

148,897.58

0.00

26,801.56

26,801.56

0.00

26,801.56

0.00

175,699.14

175,699.14
100.00%

0.00
0.00%

175,699.14
100.00%

0.00
0.00%

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ARQUITECTURA
PRESUPUESTO

TEM

01
01.01
01.01.01
01.01.02

01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.03

PARTIDA

UND

MET

COSTO
UNITARIO
(S/.)

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET

MONTO (S/.)

ACTUAL
MET

SALDOS

ACTUAL ACUMULADO

MONTO (S/.)

MET

MONTO (S/.)

MET

MONTO (S/.)

ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MUROS DE LADRILLO KK DE ARCILLA DE SOGA CON
MEZCLA 1:4 X 1.5 cm
MURO DE LADRILLO KK DE ARCILLA CANTO M=1:4
e=1.5CM

22,210.01

100.00

0.00

0.00

22,210.01

100.00

0.00

0.00

m2

434.03

51.10

22,210.01
22,178.93

434.03

22,178.93

100.00

0.00

0.00

0.00

434.03

22,178.93

100.00

0.00

0.00

0.00

m2

0.65

47.82

31.08

0.65

31.08

100.00

0.00

0.00

0.00

0.65

31.08

100.00

0.00

0.00

0.00

20,426.14

100.00

0.00

0.00

20,426.14

100.00

0.00

0.00

REVOQUES Y ENLUCIDOS
TERRAJEO DE MUROS EXTERIORES Y INTERIORES
MEZCLA C:A 1:5 e= 1.5 cm
TARRAJEO EN COLUMNAS CON CEMENTO-ARENA
MEZCLA 1:5 e=1.5CM
TARRAJEO EN VIGAS CON CEMENTO - ARENA
MEZCLA 1:5 e=1.5CM
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS
Y VANOS

20,426.14
m2

826.71

17.70

14,632.77

826.71

14,632.77

100.00

0.00

0.00

0.00

826.71

14,632.77

100.00

0.00

0.00

0.00

m2

73.72

26.87

1,980.86

73.72

1,980.86

100.00

0.00

0.00

0.00

73.72

1,980.86

100.00

0.00

0.00

0.00

m2

85.47

26.87

2,296.58

85.47

2,296.58

100.00

0.00

0.00

0.00

85.47

2,296.58

100.00

0.00

0.00

0.00

194.35

7.80

1,515.93

194.35

1,515.93

100.00

0.00

0.00

0.00

194.35

1,515.93

100.00

0.00

0.00

0.00

15,868.51

100.00

0.00

0.00

15,868.51

100.00

0.00

0.00

CIELORRASOS

15,868.51

01.03.01

CIELORRASOS CON MEZCLA DE CEMENTO-ARENA

m2

2.00

24.42

48.84

2.00

48.84

100.00

0.00

0.00

0.00

2.00

48.84

100.00

0.00

0.00

0.00

01.03.02

FALSO CIELO RASO CON FIBROCEMENTO 0.60.0.60


e=6MM

m2

261.18

60.57

15,819.67

261.18

15,819.67

100.00

0.00

0.00

0.00

261.18

15,819.67

100.00

0.00

0.00

0.00

20,749.50

100.00

0.00

0.00

20,749.50

100.00

0.00

0.00

01.04

PISOS Y PAVIMENTOS

20,749.50

01.04.01

CONTRAPISO DE 50MM, CEMENTO ARENA 1:5

m2

261.18

20.79

5,429.93

261.18

5,429.93

100.00

0.00

0.00

0.00

261.18

5,429.93

100.00

0.00

0.00

0.00

01.04.02

PISO CERAMICO DE DE 0.30X0.30m ALTO TRANSITO


ANTIDESLIZANTE

m2

165.35

45.09

7,455.63

165.35

7,455.63

100.00

0.00

0.00

0.00

165.35

7,455.63

100.00

0.00

0.00

0.00

01.04.03

PISO DE MADERA MACHIHEMBRADA TORNILLO 1"x4"

m2

80.35

82.35

6,616.82

80.35

6,616.82

100.00

0.00

0.00

0.00

80.35

6,616.82

100.00

0.00

0.00

0.00

01.04.04

PISO DE CONCRETO E=2" f'c 140 kg/cm2 X 4 cm


PULIDO 1:2 X 1 cm

m2

15.08

82.70

1,247.12

15.08

1,247.12

100.00

0.00

0.00

0.00

15.08

1,247.12

100.00

0.00

0.00

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ARQUITECTURA
PRESUPUESTO

TEM

01.04.05

PARTIDA

UND

MET

COSTO
UNITARIO
(S/.)

VEREDAS EXTERIORES

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET

5,550.30

MONTO (S/.)

5,550.30

100.00

ACTUAL
MET

SALDOS

ACTUAL ACUMULADO

MONTO (S/.)

0.00

0.00

MET

MONTO (S/.)

5,550.30

100.00

MET

MONTO (S/.)

0.00

0.00

01.04.05.01 PERFILADO Y COMPACTADO DE SUB RASANTE

m2

95.08

12.04

1,144.76

95.08

1,144.76

100.00

0.00

0.00

0.00

95.08

1,144.76

100.00

0.00

0.00

0.00

01.04.05.02 VEREDAS EXTERIORES DE F'c=175Kg/cm2 E=15cm

m2

95.08

30.20

2,871.42

95.08

2,871.42

100.00

0.00

0.00

0.00

95.08

2,871.42

100.00

0.00

0.00

0.00

01.04.05.03 ENCOFRADO Y DESENCOFRADO

m2

18.52

34.83

645.05

18.52

645.05

100.00

0.00

0.00

0.00

18.52

645.05

100.00

0.00

0.00

0.00

01.04.05.04 BRUADO EN PISO DE 1cm

92.60

5.48

507.45

92.60

507.45

100.00

0.00

0.00

0.00

92.60

507.45

100.00

0.00

0.00

0.00

01.04.05.05 JUNTAS ASFALTICAS

73.50

3.97

291.80

73.50

291.80

100.00

0.00

0.00

0.00

73.50

291.80

100.00

0.00

0.00

0.00

01.04.05.06 CURADO DE CONCRETO

m2

92.60

0.97

89.82

92.60

89.82

100.00

0.00

0.00

0.00

92.60

89.82

100.00

0.00

0.00

0.00

6,640.93

100.00

0.00

0.00

6,640.93

100.00

0.00

0.00

01.04.06

PATIO EXTERIOR

6,640.93

01.04.06.01 PERFILADO Y COMPACTADO DE SUB RASANTE

m2

123.12

12.04

1,482.36

123.12

1,482.36

100.00

0.00

0.00

0.00

123.12

1,482.36

100.00

0.00

0.00

0.00

01.04.06.02 PATIO EXTERIOR DE F'c=175 Kg/cm2 E=15cm

m2

123.12

30.20

3,718.22

123.12

3,718.22

100.00

0.00

0.00

0.00

123.12

3,718.22

100.00

0.00

0.00

0.00

01.04.06.03 ENCOFRADO Y DESENCOFRADO

m2

9.40

34.83

327.40

9.40

327.40

100.00

0.00

0.00

0.00

9.40

327.40

100.00

0.00

0.00

0.00

01.04.06.04 BRUADO EN PISO DE 1cm

150.80

5.48

826.38

150.80

826.38

100.00

0.00

0.00

0.00

150.80

826.38

100.00

0.00

0.00

0.00

01.04.06.05 JUNTAS ASFALTICAS

42.10

3.97

167.14

42.10

167.14

100.00

0.00

0.00

0.00

42.10

167.14

100.00

0.00

0.00

0.00

01.04.06.06 CURADO DE CONCRETO

m2

123.12

0.97

119.43

123.12

119.43

100.00

0.00

0.00

0.00

123.12

119.43

100.00

0.00

0.00

0.00

5,635.50

100.00

0.00

0.00

5,635.50

100.00

0.00

0.00

130.00

11.19

1,454.70

130.00

1,454.70

100.00

0.00

0.00

0.00

130.00

1,454.70

100.00

0.00

0.00

0.00

01.05.02

CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO ACABADO
FROTACHADO ACABADO PINTURA ESMALTE H = 40
CM
CONTRAZOCALO CERAMICO 0.10X0.30M

109.92

20.89

2,296.23

109.92

2,296.23

100.00

0.00

0.00

0.00

109.92

2,296.23

100.00

0.00

0.00

0.00

01.05.03

CONTRAZOCALO DE MADERA H=10CM

77.65

24.27

1,884.57

77.65

1,884.57

100.00

0.00

0.00

0.00

77.65

1,884.57

100.00

0.00

0.00

0.00

1,856.66

100.00

0.00

0.00

1,856.66

100.00

0.00

0.00

1,856.66

100.00

0.00

0.00

1,856.66

100.00

0.00

0.00

01.05
01.05.01

01.06
01.06.01

5,635.50

ZOCALOS
ZOCALO CERAMICO 0.30X0.30 M

1,856.66
m2

74.00

25.09

1,856.66

74.00

0.00

74.00

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ARQUITECTURA
PRESUPUESTO

TEM

01.07

PARTIDA

UND

MET

COSTO
UNITARIO
(S/.)

COBERTURA

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET

19,433.73

MONTO (S/.)

19,433.73

100.00

ACTUAL
MET

SALDOS

ACTUAL ACUMULADO

MONTO (S/.)

0.00

0.00

MET

MONTO (S/.)

19,433.73

100.00

MET

MONTO (S/.)

0.00

0.00

01.07.01

COBERTURA TIPO CALAMINON TI DE 0.5mm

m2

412.17

39.65

16,342.54

412.17

16,342.54

100.00

0.00

0.00

0.00

412.17

16,342.54

100.00

0.00

0.00

0.00

01.07.02

CUMBRERA TIPO CALAMINON TI DE 0.5MM

32.00

22.85

731.20

32.00

731.20

100.00

0.00

0.00

0.00

32.00

731.20

100.00

0.00

0.00

0.00

01.07.03

FLASCHING DE 0.40 X 30 CM

92.84

25.42

2,359.99

92.84

2,359.99

100.00

0.00

0.00

0.00

92.84

2,359.99

100.00

0.00

0.00

0.00

27,369.27

100.00

0.00

0.00

27,369.27

100.00

0.00

0.00

01.08.01

PTA. DE MADERA PANELADA DEBLE HOJA (1.60X2.35)

m2

11.28

329.26

3,714.05

11.28

3,714.05

100.00

0.00

0.00

0.00

11.28

3,714.05

100.00

0.00

0.00

0.00

01.08.02

PTA. DE MADERA APANELADA DOBLE HOJA


(1.20X2.35)

m2

5.64

284.71

1,605.76

5.64

1,605.76

100.00

0.00

0.00

0.00

5.64

1,605.76

100.00

0.00

0.00

0.00

01.08.03

PTA. DE MADERA APANELADA (0.80X2.35)

m2

1.88

208.40

391.79

1.88

391.79

100.00

0.00

0.00

0.00

1.88

391.79

100.00

0.00

0.00

0.00

01.08.04

PTA. DE MADERA CONTRAPLACADA


(1.20X2.10)CORREDIZA

m2

2.52

213.25

537.39

2.52

537.39

100.00

0.00

0.00

0.00

2.52

537.39

100.00

0.00

0.00

0.00

01.08.05

PTA. DE MADERA CONTRAPALCADA (0.80X2.10)

m2

10.08

194.35

1,959.05

10.08

1,959.05

100.00

0.00

0.00

0.00

10.08

1,959.05

100.00

0.00

0.00

0.00

01.08.06

PTA. DE MADERA CONTRAPLACADA (0.70X2.10)

m2

4.41

184.90

815.41

4.41

815.41

100.00

0.00

0.00

0.00

4.41

815.41

100.00

0.00

0.00

0.00

01.08.07

PTA. DE MADERA CONTRAPLACADA (1.25X2.10)


CORREDIZA

m2

2.83

216.85

613.69

2.83

613.69

100.00

0.00

0.00

0.00

2.83

613.69

100.00

0.00

0.00

0.00

01.08.08

PTA. DE MADERA CONTRAPALCADA (1.20X2.10)

m2

2.52

213.70

538.52

2.52

538.52

100.00

0.00

0.00

0.00

2.52

538.52

100.00

0.00

0.00

0.00

01.08.09

PTA. DE MADERA CONTRAPALCADA (0.60X1.65)

m2

3.96

167.35

662.71

3.96

662.71

100.00

0.00

0.00

0.00

3.96

662.71

100.00

0.00

0.00

0.00

01.08.10

PTA. DE MADERA CONTRAPLACADA (1.00X2.10)

m2

2.10

167.35

351.44

2.10

351.44

100.00

0.00

0.00

0.00

2.10

351.44

100.00

0.00

0.00

0.00

01.08.11

VENTANA DE MADERA (1.00X1.35)

m2

21.60

133.31

2,879.50

21.60

2,879.50

100.00

0.00

0.00

0.00

21.60

2,879.50

100.00

0.00

0.00

0.00

01.08.12

VENTANA DE MADERA (1.00X0.45)

m2

2.70

110.28

297.76

2.70

297.76

100.00

0.00

0.00

0.00

2.70

297.76

100.00

0.00

0.00

0.00

16.00

84.02

1,344.32

16.00

1,344.32

100.00

0.00

0.00

0.00

16.00

1,344.32

100.00

0.00

0.00

0.00

10.88

250.22

2,722.39

10.88

2,722.39

100.00

0.00

0.00

0.00

10.88

2,722.39

100.00

0.00

0.00

0.00

m2

27.00

132.28

3,571.56

27.00

3,571.56

100.00

0.00

0.00

0.00

27.00

3,571.56

100.00

0.00

0.00

0.00

01.08

01.08.13
01.08.14
01.08.15
01.08.16

CARPINTERIA DE MADERA Y MELAMINE

PTAS. DE MELAMINE 18MM PARA MUEBLE DE


COCINA 60X45 CM
TABIQUE EN MELAMINE 20MM INC. ACCESORIOS DE
ALUMINIO H=1.90M
BIOMBO DE MADERA TORNILLO MACHIHEMBRADO
H=2.55M
CERCO PERIMETRICO

27,369.27

201.50

26.62

5,363.93

201.50

5,363.93 100.00

0.00

0.00

0.00

201.50

5,363.93

100.00

0.00

0.00

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ARQUITECTURA
PRESUPUESTO

TEM

PARTIDA

UND

MET

COSTO
UNITARIO
(S/.)

ANTERIOR ACUMULADO
MET

MET

SALDOS

ACTUAL ACUMULADO

MONTO (S/.)

MET

MONTO (S/.)

MET

MONTO (S/.)

1,086.80

100.00

0.00

0.00

1,086.80

100.00

0.00

0.00

VIDRIO CRUDO DE 8mm CON LAMINA DE SEGURIDAD

m2

26.20

16.19

424.18

26.20

424.18

100.00

0.00

0.00

0.00

26.20

424.18

100.00

0.00

0.00

0.00

01.09.02

ESPEJOS DE CRISTAL 50X80CM e=4MM


(SOBREPONER)

m2

2.40

276.09

662.62

2.40

662.62

100.00

0.00

0.00

0.00

2.40

662.62

100.00

0.00

0.00

0.00

3,601.21

100.00

0.00

0.00

3,601.21

100.00

0.00

0.00

01.10

1,086.80

MONTO (S/.)

ACTUAL

01.09.01

01.09

VIDRIOS, CRISTALES Y SIMILARES

VALORIZACIONES

COSTO
PARCIAL
(S/.)

CERRAJERIA

3,601.21

01.10.01

BISAGRA CAPUCHINO ALUMINIZADAS 3.1/2"X3.1/2"

pza

90.00

10.34

930.60

90.00

930.60

100.00

0.00

0.00

0.00

90.00

930.60

100.00

0.00

0.00

0.00

01.10.02

BISAGRA CAPUCHINO ALUMINIZADAS 2"X2"

pza

88.00

10.34

909.92

88.00

909.92

100.00

0.00

0.00

0.00

88.00

909.92

100.00

0.00

0.00

0.00

01.10.03

CERRADURA TIPO PESADA DE 2 GOLPES

pza

8.00

65.56

524.48

8.00

524.48

100.00

0.00

0.00

0.00

8.00

524.48

100.00

0.00

0.00

0.00

01.10.04

CERRADURA DE POMO INTERIOR C/BOTON


EXTERIOR C/LLAVE

pza

16.00

53.31

852.96

16.00

852.96

100.00

0.00

0.00

0.00

16.00

852.96

100.00

0.00

0.00

0.00

01.10.05

CERROJO DE 3"

pza

12.00

7.41

88.92

12.00

88.92

100.00

0.00

0.00

0.00

12.00

88.92

100.00

0.00

0.00

0.00

01.10.06

TIRADOR DE BRONCE DE 4"

pza

8.00

6.56

52.48

8.00

52.48

100.00

0.00

0.00

0.00

8.00

52.48

100.00

0.00

0.00

0.00

01.10.07

CERROJO DE 2"

pza

35.00

6.91

241.85

35.00

241.85

100.00

0.00

0.00

0.00

35.00

241.85

100.00

0.00

0.00

0.00

7,615.77

100.00

0.00

0.00

7,615.77

100.00

0.00

0.00

01.11
01.11.01
01.11.02

PINTURA
PINTURA LATEX 2 MANOS EN MURO Y COLUMNAS
INTERIOR
PINTURA LATEX 2 MANOS EN CIELORASO Y VIGAS
INTERIOR

7,615.77
m2

929.58

5.74

5,335.79

929.58

5,335.79

100.00

0.00

0.00

0.00

929.58

5,335.79

100.00

0.00

0.00

0.00

m2

87.47

8.03

702.38

87.47

702.38

100.00

0.00

0.00

0.00

87.47

702.38

100.00

0.00

0.00

0.00

01.11.03

PINTURA BARNIZ EN CARP. DE MADERA

m2

147.43

8.99

1,325.40

147.43

1,325.40

100.00

0.00

0.00

0.00

147.43

1,325.40

100.00

0.00

0.00

0.00

01.11.04

PINTUTRA ESMALTE EN CONTRAZOCALO H=0.40M

130.00

1.94

252.20

130.00

252.20

100.00

0.00

0.00

0.00

130.00

252.20

100.00

0.00

0.00

0.00

250.00

100.00

0.00

0.00

250.00

100.00

0.00

0.00

250.00

100.00

0.00

0.00

250.00

100.00

0.00

0.00

01.12
01.12.01

VARIOS
LIMPIEZA DURANTE LA EJECUCION DE OBRA

01.12.01.01 LIMPIEZA DURANTE LA EJECUCIN DE OBRA

250.00
mes

2.50

100.00

250.00

2.50

0.00

2.50

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

ARQUITECTURA
PRESUPUESTO

TEM

PARTIDA
TOTAL COSTO DIRECTO
GASTOS GENERALES Y UTILIDAD

UND

MET

COSTO
UNITARIO
(S/.)

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET

MONTO (S/.)

ACTUAL
MET

MONTO (S/.)

SALDOS

ACTUAL ACUMULADO
%

MET

MONTO (S/.)

MET

MONTO (S/.)

158,294.33
23,744.15

158,294.33
23,744.15

0.00
0.00

158,294.33
23,744.15

0.00
0.00

SUB TOTAL

182,038.48

182,038.48

0.00

182,038.48

0.00

TOTAL

182,038.48

182,038.48

0.00

182,038.48

0.00

182,038.48

182,038.48

0.00

182,038.48

0.00

IGV 18%

32,766.93

32,766.93

0.00

32,766.93

0.00

MONTO TOTAL DE LA OBRA


PORCENTAJE DE AVANCE DE OBRA

214,805.41

214,805.41

0.00

214,805.41

0.00

100.00%

0.00%

100.00%

0.00%

MONTO CONTRACTUAL=SUB-TOTAL*FR

15.00%

1.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE APOYO
AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

INSTALACIONES SANITARIAS
PRESUPUESTO

PARTIDA

TEM

01
01.01

UND

MET

COSTO
UNITARIO
(S/.)

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET.

MONTO
(S/.)

12,228.79

100.00

ACTUAL
MET.

SALDOS

ACTUAL ACUMULADO

MONTO (S/.)

0.00

0.00

MET.

MONTO (S/.)

12,228.79

100.00

MET.

MONTO (S/.)

0.00

0.00

INSTALACIONES SANITARIAS
OBRAS PROVISIONALES

12,228.79

01.01.01

EXCAVACION MANUAL DE ZANJA T.N. H=0.40m, A=0.40

227.47

17.98

4,089.91

227.47

4,089.91

100.00

0.00

0.00

0.00

227.47

4,089.91

100.00

0.00

0.00

0.00

01.01.02

REFINE Y NIVELACION DE FONDO DE ZANJA

227.47

16.14

3,671.37

227.47

3,671.37

100.00

0.00

0.00

0.00

227.47

3,671.37

100.00

0.00

0.00

0.00

01.01.03

CAMA DE ARENA e=0.10M

227.47

4.63

1,053.19

227.47

1,053.19

100.00

0.00

0.00

0.00

227.47

1,053.19

100.00

0.00

0.00

0.00

01.01.04

RELLENO Y COMPACTACION MANUAL DE ZANJA

227.47

15.01

3,414.32

227.47

3,414.32

100.00

0.00

0.00

0.00

227.47

3,414.32

100.00

0.00

0.00

0.00

14.50

28.92

419.34

01.02
01.02.01

RED EXTERIOR DE AGUA POTABLE


TUBERIAS PVC CLASE 10

1,710.30

01.02.01.01

TUBERIA DE PVC CL-10 DE D=1"

01.02.01.02

TUBERIA DE PVC CL-10 DE D= 1 1/4"

11.94

29.78

01.02.01.03

TUBERIA DE PVC CL-10 DE D=3/4"

27.50

21.61

01.02.01.04

TUBERIA DE PVC CL-10 DE 1/2"

20.22

16.87

12.00

8.24

01.02.02

ACCESORIOS

1,710.30

100.00

0.00

0.00

14.50

419.34

100.00

0.00

0.00

0.00

355.57

11.94

355.57

100.00

0.00

0.00

594.28

27.50

594.28

100.00

0.00

0.00

341.11

20.22

341.11

100.00

0.00

475.32

100.00

98.88

100.00

0.00

475.32
98.88

12.00

1,710.30

100.00

0.00

0.00

14.50

419.34

100.00

0.00

0.00

0.00

0.00

11.94

355.57

100.00

0.00

0.00

0.00

0.00

27.50

594.28

100.00

0.00

0.00

0.00

0.00

0.00

20.22

341.11

100.00

0.00

0.00

0.00

0.00

0.00

475.32

100.00

0.00

0.00

0.00

0.00

98.88

100.00

0.00

0.00

0.00

01.02.02.01

CODO DE PVC CL-10 DE 3/4" X 90

12.00

01.02.02.02

CODO DE PVC CL-10 DE 1"X 90

1.00

8.24

8.24

1.00

8.24

100.00

0.00

0.00

0.00

1.00

8.24

100.00

0.00

0.00

0.00

01.02.02.03

CODO DE PVC CL-10 DE 1/2" X 90

29.00

6.14

178.06

29.00

178.06

100.00

0.00

0.00

0.00

29.00

178.06

100.00

0.00

0.00

0.00

01.02.02.04

CODO DE PVC CL-10 DE 1 1/4" X 90

3.00

12.44

37.32

3.00

37.32

100.00

0.00

0.00

0.00

3.00

37.32

100.00

0.00

0.00

0.00

01.02.02.05

TEE DE PVC CL-10 DE 1"

2.00

6.61

13.22

2.00

13.22

100.00

0.00

0.00

0.00

2.00

13.22

100.00

0.00

0.00

0.00

01.02.02.06

TEE DE PVC CL-10 DE 3/4"

5.00

9.82

49.10

5.00

49.10

100.00

0.00

0.00

0.00

5.00

49.10

100.00

0.00

0.00

0.00

01.02.02.07

TEE DE PVC CL-10 DE 1 1/4"

1.00

11.92

11.92

1.00

11.92

100.00

0.00

0.00

0.00

1.00

11.92

100.00

0.00

0.00

0.00

01.02.02.08

REDUCCION DE PVC CL-10 DE 1" X 3/4"

3.00

6.61

19.83

3.00

19.83

100.00

0.00

0.00

0.00

3.00

19.83

100.00

0.00

0.00

0.00

01.02.02.09

REDUCCION DE PVC CL-10 DE 1" X 1/2"

1.00

6.61

6.61

1.00

6.61

100.00

0.00

0.00

0.00

1.00

6.61

100.00

0.00

0.00

0.00

01.02.02.10

REDUCCION DE PVC CL-10 DE 3/4" X 1/2"

7.00

5.56

38.92

7.00

38.92

100.00

0.00

0.00

0.00

7.00

38.92

100.00

0.00

0.00

0.00

01.02.02.11

REDUCCION DE PVC CL-10 DE 1 1/4" X 1"

2.00

6.61

13.22

2.00

13.22

100.00

0.00

0.00

0.00

2.00

13.22

100.00

0.00

0.00

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE APOYO
AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

INSTALACIONES SANITARIAS
PRESUPUESTO

PARTIDA

TEM

01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.01.04
01.03.02

UND

MET

COSTO
UNITARIO
(S/.)

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET.

MONTO
(S/.)

317.06

100.00

ACTUAL
MET.

SALDOS

ACTUAL ACUMULADO

MONTO (S/.)

0.00

0.00

MET.

MONTO (S/.)

317.06

100.00

MET.

MONTO (S/.)

0.00

0.00

RED INTERIOR DE AGUA POTABLE


VLVULAS DE INTERRUPCIN
VALVULA ESFRICA ENTRE DOS UNIONES UNIVERSAL
D = 1 1/4"
VALVULA ESFRICA ENTRE DOS UNIONES UNIVERSAL
D = 1"
VALVULA ESFRICA ENTRE DOS UNIONES UNIVERSAL
D = 3/4"
VALVULA ESFRICA ENTRE DOS UNIONES UNIVERSAL
D= 1/2"

317.06
u

1.00

45.77

45.77

1.00

45.77

100.00

0.00

0.00

0.00

1.00

45.77

100.00

0.00

0.00

0.00

1.00

40.72

40.72

1.00

40.72

100.00

0.00

0.00

0.00

1.00

40.72

100.00

0.00

0.00

0.00

3.00

61.42

184.26

3.00

184.26

100.00

0.00

0.00

0.00

3.00

184.26

100.00

0.00

0.00

0.00

1.00

46.31

46.31

1.00

46.31

100.00

0.00

0.00

0.00

1.00

46.31

100.00

0.00

0.00

0.00

1,041.70

100.00

0.00

0.00

1,041.70

100.00

0.00

0.00

18.00

700.74

100.00

0.00

0.00

0.00

18.00

700.74

100.00

0.00

0.00

0.00

4.00

340.96

100.00

0.00

0.00

0.00

4.00

340.96

100.00

0.00

0.00

0.00

SALIDA PARA PUNTOS DE AGUA FRIA

1,041.70

01.03.02.01

SALIDA DE AGUA FRIA CON TUBERIA PVC SAP DE 1/2"

pto

18.00

38.93

01.03.02.02

SALIDA DE AGUA CALIENTE CON TUBERIA CPVC 1/2"

pto

4.00

85.24

5,641.56

100.00

0.00

0.00

5,641.56

100.00

0.00

0.00

217.00

24.18

5,247.06

217.00

5,247.06

100.00

0.00

0.00

0.00

217.00

5,247.06

100.00

0.00

0.00

0.00

10.47

16.87

176.63

10.47

176.63

100.00

0.00

0.00

0.00

10.47

176.63

100.00

0.00

0.00

0.00

14.40

15.13

217.87

14.40

217.87

100.00

0.00

0.00

0.00

14.40

217.87

100.00

0.00

0.00

0.00

825.30

100.00

0.00

0.00

825.30

100.00

0.00

0.00

6.00

137.55

825.30

100.00

0.00

0.00

825.30

100.00

0.00

0.00

01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.01.03
01.04.02
01.04.02.01

700.74
340.96

RED EXTERIOR DE DESAGE Y VENTILACIN


RED DE DISTRIBUCIN
SUMINISTRO E INSTALACIN DE TUBERA DE PVC SAP
4"
SUMINISTRO E INSTALACIN DE TUBERA DE PVC SAP
2"
SUMINISTRO E INSTALACIN DE TUBERA DE PVC SAP
2" (Ventilacin)

5,641.56

CAJA DE REGISTRO
CAJA DE REGISTRO 30 X 60m

825.30
6.00

339.09

0.00

6.00

0.00

339.09

100.00

0.00

0.00

339.09

100.00

0.00

0.00

01.04.03.01

CODO DE PVC SAP 4" X 90

4.00

8.71

34.84

4.00

34.84

100.00

0.00

0.00

0.00

4.00

34.84

100.00

0.00

0.00

0.00

01.04.03.02

CODO DE PVC SAP 4" X 45

9.00

8.63

77.67

9.00

77.67

100.00

0.00

0.00

0.00

9.00

77.67

100.00

0.00

0.00

0.00

01.04.03.03

CODO DE PVC SAP 2" X 90

2.00

5.48

10.96

2.00

10.96

100.00

0.00

0.00

0.00

2.00

10.96

100.00

0.00

0.00

0.00

01.04.03.04

CODO DE PVC SAP 2" X 45

9.00

5.48

49.32

9.00

49.32

100.00

0.00

0.00

0.00

9.00

49.32

100.00

0.00

0.00

0.00

01.04.03.05

YEE PVC SAP 4" X 4"

6.00

11.40

68.40

6.00

68.40

100.00

0.00

0.00

0.00

6.00

68.40

100.00

0.00

0.00

0.00

01.04.03.06

YEE PVC SAP 4" X 2"

11.00

8.90

97.90

11.00

97.90

100.00

0.00

0.00

0.00

11.00

97.90

100.00

0.00

0.00

0.00

01.04.03

ACCESORIOS

825.30

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE APOYO
AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

INSTALACIONES SANITARIAS
PRESUPUESTO

TEM

01.05
01.05.01

PARTIDA

UND

MET

COSTO
UNITARIO
(S/.)

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET.

MONTO
(S/.)

1,724.03

100.00

ACTUAL
MET.

SALDOS

ACTUAL ACUMULADO

MONTO (S/.)

0.00

0.00

MET.

MONTO (S/.)

1,724.03

100.00

MET.

MONTO (S/.)

0.00

0.00

RED INTERIOR DE DESAGE Y VENTILACIN


SALIDA P/PUNTOS DE DESAGE

1,724.03

01.05.01.01

SALIDAS DE DESAGUE CON TUBERIA PVC DE 4"

pto

4.00

49.21

196.84

4.00

196.84

100.00

0.00

0.00

0.00

4.00

196.84

100.00

0.00

0.00

0.00

01.05.01.02

SALIDAS DE DESAGUE CON TUBERIA PVC DE 2"

pto

16.00

51.61

825.76

16.00

825.76

100.00

0.00

0.00

0.00

16.00

825.76

100.00

0.00

0.00

0.00

01.05.01.03

SALIDA DE VENTILACIN CON TUBERA PVC 2"

pto

10.00

35.68

356.80

10.00

356.80

100.00

0.00

0.00

0.00

10.00

356.80

100.00

0.00

0.00

0.00

01.05.01.04

REGISTRO ROSCADO DE BRONCE CROMADO 2"

pto

5.00

15.02

75.10

5.00

75.10

100.00

0.00

0.00

0.00

5.00

75.10

100.00

0.00

0.00

0.00

01.05.01.05

SUMIDERO CON REGILLA DE BRONCE DE 2"

pto

3.00

13.35

40.05

3.00

40.05

100.00

0.00

0.00

0.00

3.00

40.05

100.00

0.00

0.00

0.00

01.05.01.06

REGISTRO DE BRONCE DE 4"

pza

2.00

21.68

43.36

2.00

43.36

100.00

0.00

0.00

0.00

2.00

43.36

100.00

0.00

0.00

0.00

01.05.01.07

SOMBRERO DE VENTILACION PVC DE 2"

pza

9.00

20.68

186.12

9.00

186.12

100.00

0.00

0.00

0.00

9.00

186.12

100.00

0.00

0.00

0.00

01.06

APARATOS Y ACCESORIOS SANITARIOS

3,743.71

100.00

0.00

0.00

3,743.71

100.00

0.00

0.00

01.06.01

INODORO TANQUE BAJO BLANCO RAPID JET

pza

4.00

361.24

1,444.96

4.00

1,444.96

100.00

0.00

0.00

0.00

4.00

1,444.96

100.00

0.00

0.00

0.00

01.06.02

LAVATORIO MANANTIAL BLANCO

pza

7.00

129.86

909.02

7.00

909.02

100.00

0.00

0.00

0.00

7.00

909.02

100.00

0.00

0.00

0.00

01.06.03

LAVADERO DE ACERO INOXIDABLE 1 POZA

pza

1.00

222.13

222.13

1.00

222.13

100.00

0.00

0.00

0.00

1.00

222.13

100.00

0.00

0.00

0.00

01.06.04

URINARIO CADET BLANCO O SIMILAR

pza

2.00

145.05

290.10

2.00

290.10

100.00

0.00

0.00

0.00

2.00

290.10

100.00

0.00

0.00

0.00

01.06.05

DUCHA CON LLAVE MEXCLADORA CROMADA

pza

3.00

77.53

232.59

3.00

232.59

100.00

0.00

0.00

0.00

3.00

232.59

100.00

0.00

0.00

0.00

01.06.06

PAPELERA DE LOSA BLANCA

pza

4.00

20.46

81.84

4.00

81.84

100.00

0.00

0.00

0.00

4.00

81.84

100.00

0.00

0.00

0.00

01.06.07

GANCHO SIMPLE DE LOSA BLANCO P/ADOSAR

pza

3.00

32.46

97.38

3.00

97.38

100.00

0.00

0.00

0.00

3.00

97.38

100.00

0.00

0.00

0.00

01.06.08

TUBO DE ALUMINIO DE 1" PARA CORTINA DE DUCHA

3.00

16.00

48.00

3.00

48.00

100.00

0.00

0.00

0.00

3.00

48.00

100.00

0.00

0.00

0.00

01.06.09

COLOCACION DE APARATOS SANITARIOS

pza

17.00

15.47

262.99

17.00

262.99

100.00

0.00

0.00

0.00

17.00

262.99

100.00

0.00

0.00

0.00

01.06.10

COLOCACION DE ACCESORIOS SANITARIOS

pza

10.00

15.47

154.70

10.00

154.70

100.00

0.00

0.00

0.00

10.00

154.70

100.00

0.00

0.00

0.00

4,758.89

100.00

0.00

0.00

4,758.89

100.00

0.00

0.00

24.18

611.27

25.28

611.27

100.00

0.00

0.00

0.00

25.28

611.27

100.00

0.00

0.00

0.00

01.07

3,743.71

EVACUACION PLUVIAL

4,758.89

01.07.01

SUMINISTRO E INSTALACIN DE TUBERA DE PVC SAP


4" (Lluvias)

25.28

01.07.02

ACCESORIOS EN TUB BAJADA DE EVAC. PLUVIAL

pto

6.00

81.93

491.58

6.00

491.58

100.00

0.00

0.00

0.00

6.00

491.58

100.00

0.00

0.00

0.00

01.07.03

COLUMNETAS PARA EVACUACION PLUVIAL

6.00

102.34

614.04

6.00

614.04

100.00

6.00

0.00

0.00

6.00

614.04

100.00

0.00

0.00

0.00

01.07.04

CANALETA GALVANIZADA P/AGUA PLUVIAL DE 8"

72.00

42.25

3,042.00

72.00

3,042.00

100.00

0.00

0.00

0.00

72.00

3,042.00

100.00

0.00

0.00

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE APOYO
AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

INSTALACIONES SANITARIAS
PRESUPUESTO

PARTIDA

TEM

01.08
01.08.01
01.08.02
01.08.03

UND

MET

COSTO
UNITARIO
(S/.)

VARIOS
PRUEBA HIDRAULICA DE DESGE
PRUEBAS HIDRAULICAS Y DESINFECCION DE
TUBERIAS DE AGUA
NICHO INC. MARCO Y TAPA EN MURO PARA ALOJAR
VALVULA ESFRICA

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET.

12,406.51

MONTO
(S/.)

ACTUAL
MET.

SALDOS

ACTUAL ACUMULADO

MONTO (S/.)

MET.

MONTO (S/.)

MET.

MONTO (S/.)

12,406.51

100.00

0.00

0.00

12,406.51

100.00

0.00

0.00

238.87

17.13

4,091.84

238.87

4,091.84

100.00

0.00

0.00

0.00

238.87

4,091.84

100.00

0.00

0.00

0.00

82.00

40.35

3,308.70

82.00

3,308.70

100.00

0.00

0.00

0.00

82.00

3,308.70

100.00

0.00

0.00

0.00

6.00

98.03

588.18

6.00

588.18

100.00

0.00

0.00

0.00

6.00

588.18

100.00

0.00

0.00

0.00

01.08.04

TANQUE ELEVADO SEGUN PLANO 1100 Lts

1.00

1,108.90

1,108.90

1.00

1,108.90

100.00

0.00

0.00

0.00

1.00

1,108.90

100.00

0.00

0.00

0.00

01.08.05

SUMINISTRO E INSTALACIN DE TERMA ELCTRICA 80


Lts.

1.00

1,199.99

1,199.99

1.00

1,199.99

100.00

0.00

0.00

0.00

1.00

1,199.99

100.00

0.00

0.00

0.00

01.08.06

CISTERNA PREFABRICADA (2800 Lts) INC. ACCESORIOS

1.00

2,108.90

2,108.90

1.00

2,108.90

100.00

0.00

0.00

0.00

1.00

2,108.90

100.00

0.00

0.00

0.00

TOTAL COSTO DIRECTO


GASTOS GENERALES Y UTILIDAD

45,212.26
6,781.84

45,212.26
6,781.84

0.00
0.00

45,212.26
6,781.84

0.00
0.00

SUB TOTAL

51,994.10

51,994.10

0.00

51,994.10

0.00

TOTAL

51,994.10

51,994.10

0.00

51,994.10

0.00

51,994.10

51,994.10

0.00

51,994.10

0.00

9,358.94

9,358.94

0.00

9,358.94

0.00

61,353.04

61,353.04
100.00%

0.00
0.00%

61,353.04
100.00%

0.00
0.00%

MONTO CONTRACTUAL=SUB-TOTAL*FR
IGV 18%
MONTO TOTAL DE LA OBRA
PORCENTAJE DE AVANCE DE OBRA

15.00%

1.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

INSTALACIONES ELECTRICAS
PRESUPUESTO

PARTIDA

TEM

01
01.01

UND

MET

COSTO
UNITARIO
(S/.)

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET

MONTO (S/.)

4,281.66

100.00

ACTUAL
MET

SALDOS

ACTUAL ACUMULADO

MONTO
(S/.)

0.00

0.00

MET

MONTO
(S/.)

4,281.66

100.00

MET

MONTO
(S/.)

0.00

0.00

INSTALACIONES ELECTRICAS
SALIDAS

4,281.66

01.01.01

SALIDA DE TECHO PARA CENTRO DE LUZ

pto

18.00

20.60

370.80

18.00

370.80

100.00

0.00

0.00

0.00

18.00

370.80

100.00

0.00

0.00

0.00

01.01.02

SALIDA EN PARED

pto

14.00

8.90

124.60

14.00

124.60

100.00

0.00

0.00

0.00

14.00

124.60

100.00

0.00

0.00

0.00

01.01.03

SALIDA PARA TOMACORRIENTE DOBLE CON LINEA


DE TIERRA

pto

20.00

44.89

897.80

20.00

897.80

100.00

0.00

0.00

0.00

20.00

897.80

100.00

0.00

0.00

0.00

pto

4.00

96.19

384.76

4.00

384.76

100.00

0.00

0.00

0.00

4.00

384.76

100.00

0.00

0.00

0.00

01.01.04
01.01.05

SALIDA PARA TOMACORRIENTE DOBLE CON PUESTA


A TIERRA A PRUEBA DE AGUA
SALIDA PARA TOMACORRIENTE DOBLE
ESTANDARIZADA CON PUESTA A TIERRA

pto

4.00

45.19

180.76

4.00

180.76

100.00

0.00

0.00

0.00

4.00

180.76

100.00

0.00

0.00

0.00

01.01.06

SALIDA PARA INTERRUPTORES DOBLES

pto

12.00

67.95

815.40

12.00

815.40

100.00

0.00

0.00

0.00

12.00

815.40

100.00

0.00

0.00

0.00

01.01.07

SALIDAS PARA DATA Y TELEFONO

pto

8.00

166.15

1,329.20

8.00

1,329.20

100.00

0.00

0.00

0.00

8.00

1,329.20

100.00

0.00

0.00

0.00

01.01.08

SALIDA PARA UPS

pto

1.00

38.54

38.54

1.00

38.54

100.00

0.00

0.00

0.00

1.00

38.54

100.00

0.00

0.00

0.00

01.01.09

SALIDA PARA THERMA CON PVC

pto

2.00

69.90

139.80

2.00

139.80

100.00

0.00

0.00

0.00

2.00

139.80

100.00

0.00

0.00

0.00

467.04

100.00

0.00

0.00

467.04

100.00

0.00

0.00

01.02.01

CAJA DE PASE CUADRADA 150 X 75

8.00

29.69

237.52

8.00

237.52

100.00

0.00

0.00

0.00

8.00

237.52

100.00

0.00

0.00

0.00

01.02.02

CAJA DE PASE ACTOGONAL 100 X 50

8.00

28.69

229.52

8.00

229.52

100.00

0.00

0.00

0.00

8.00

229.52

100.00

0.00

0.00

0.00

792.46

100.00

0.00

0.00

792.46

100.00

0.00

0.00

01.02

01.03
01.03.01
01.03.02
01.03.03

CAJAS DE PASE

467.04

TUBERIAS, CABLES
CONDUCTOR 2-1X10MM2 N2XH+1X10MM2 N2XH(T)25MM PVC-P
CONDUCTOR 2-1X6MM2 N2XH+1X6MM2 N2XH(T)20MM PVC-P
CONDUCTOR 10MM2 CU(T)-20MM PVC-P

792.46
m

13.00

17.93

233.09

13.00

233.09

100.00

0.00

0.00

0.00

13.00

233.09

100.00

0.00

0.00

0.00

39.00

11.99

467.61

39.00

467.61

100.00

0.00

0.00

0.00

39.00

467.61

100.00

0.00

0.00

0.00

8.00

11.47

91.76

8.00

91.76

100.00

0.00

0.00

0.00

8.00

91.76

100.00

0.00

0.00

0.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

INSTALACIONES ELECTRICAS
PRESUPUESTO

PARTIDA

TEM

UND

MET

COSTO
UNITARIO
(S/.)

COSTO
PARCIAL
(S/.)

MET

MET

SALDOS

ACTUAL ACUMULADO

MONTO
(S/.)

MET

MONTO
(S/.)

MET

MONTO
(S/.)

1,910.03

100.00

0.00

0.00

1,910.03

100.00

0.00

0.00

TABLERO GENERAL

1.00

542.23

542.23

1.00

542.23

100.00

0.00

0.00

0.00

1.00

542.23

100.00

0.00

0.00

0.00

01.04.02

TABLERO DE DISTRIBUCION TD1

1.00

341.95

341.95

1.00

341.95

100.00

0.00

0.00

0.00

1.00

341.95

100.00

0.00

0.00

0.00

01.04.03

TABLERO DE DISTRIBUCION TD2

1.00

341.95

341.95

1.00

341.95

100.00

0.00

0.00

0.00

1.00

341.95

100.00

0.00

0.00

0.00

01.04.04

TABLERO DE DISTRIBUCION TD3

1.00

341.95

341.95

1.00

341.95

100.00

0.00

0.00

0.00

1.00

341.95

100.00

0.00

0.00

0.00

01.04.05

TABLERO DE DISTRIBUCION TD4

1.00

341.95

341.95

1.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

01.05

1,910.03

MONTO (S/.)

ACTUAL

01.04.01

01.04

TABLEROS DE DISTRIBUCION

VALORIZACIONES
ANTERIOR ACUMULADO

ARTEFACTOS

4,861.80

341.95

100.00

4,861.80

100.00

341.95

100.00

4,861.80

100.00

01.05.01

ARTEFACTO DE ALUMBRADO C/2LAMP FLUOREC. DE


36W

15.00

170.97

2,564.55

15.00

2,564.55

100.00

0.00

0.00

0.00

15.00

2,564.55

100.00

0.00

0.00

0.00

01.05.02

LAMPARA AORRADORA DE DE 24, CON SOCKET DE


PORCELANA

3.00

82.69

248.07

3.00

248.07

100.00

0.00

0.00

0.00

3.00

248.07

100.00

0.00

0.00

0.00

01.05.03

LUMINARIA EXTERIOR, TIPO TORTUGA ORNAMENTAL

14.00

146.37

2,049.18

14.00

2,049.18

100.00

0.00

0.00

0.00

14.00

2,049.18

100.00

0.00

0.00

0.00

1,295.25

100.00

0.00

0.00

1,295.25

100.00

0.00

0.00

1,295.25

100.00

0.00

0.00

1,295.25

100.00

0.00

0.00

01.06
01.06.01

VARIOS
POZO PUESTA A TIERRA P-1

TOTAL COSTO DIRECTO


GASTOS GENERALES Y UTILIDAD

1,295.25
u

1.00

1,295.25

15.00%

SUB TOTAL
TOTAL
MONTO CONTRACTUAL=SUB-TOTAL*FR
IGV 18%
MONTO TOTAL DE LA OBRA
PORCENTAJE DE AVANCE DE OBRA

1.00

1,295.25

1.00

0.00

1.00

0.00

13,608.24
2,041.24

13,608.24
2,041.24

0.00
0.00

13,608.24
2,041.24

0.00
0.00

15,649.48

15,649.48

0.00

15,649.48

0.00

15,649.48

15,649.48

0.00

15,649.48

0.00

15,649.48

15,649.48

0.00

15,649.48

0.00

2,816.91

2,816.91

0.00

2,816.91

0.00

18,466.39

18,466.39
100.00%

0.00
0.00%

18,466.39
100.00%

0.00
0.00%

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

EQUIPAMIENTO
PRESUPUESTO

PARTIDA

TEM

01

EQUIPAMIENTO INFORMATIVO

1.01

EQUIPO DE INTERNET

01.02

EQUIPAMIENTO CON MOVILIARIO

01.03
01.03.01

MET

VALORIZACIONES

COSTO
PARCIAL
(S/.)

ANTERIOR ACUMULADO
MET

MONTO (S/.)

11,968.05

100.00

11,968.05

100.00

22,827.40

100.00

22,827.40

100.00

1,212.09

100.00

1,212.09

100.00

ACTUAL
MET

SALDOS

ACTUAL ACUMULADO

MONTO
(S/.)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

MET

MONTO
(S/.)

11,968.05

100.00

11,968.05

100.00

22,827.40

100.00

22,827.40

100.00

1,212.09

100.00

1,212.09

100.00

MET

MONTO (S/.)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

EQUIPAMIENTO

01.01

01.02.01

UND

COSTO
UNITARIO
(S/.)

MOVILIARIO PARA EL CENTRO DE APOYO AL


HABITAT RURAL

11,968.05
glb

1.00

11,968.05

1.00

22,827.40
glb

1.00

22,827.40

EQUIPAMIENTO CON COCINA MEJORADA


COCINA MEJORADA

11,968.05

22,827.40

1.00

1,212.09
glb

1.00

1,212.09

1.00

0.00

1.00

1.00

0.00

0.00

0.00

3,753.78

100.00

0.00

0.00

3,753.78

100.00

0.00

0.00

PANEL SOLAR Y ACCESORIOS

1.00

1,200.00

1,200.00

1.00

1,200.00

100.00

0.00

0.00

0.00

1.00

1,200.00

100.00

0.00

0.00

0.00

01.04.02

PARARRAYOS TIPO PDC

1.00

1,468.00

1,468.00

1.00

1,468.00

100.00

0.00

0.00

0.00

1.00

1,468.00

100.00

0.00

0.00

0.00

01.04.03

SALIDA PARA DETECTOR DE HUMO

pto

2.00

391.42

782.84

2.00

782.84

100.00

0.00

0.00

0.00

2.00

782.84

100.00

0.00

0.00

0.00

01.04.04

SUMINISTRO E INSTALACION DE POSTES PARA


ILUMINAR

2.00

151.47

302.94

2.00

302.94

100.00

0.00

0.00

0.00

2.00

302.94

100.00

0.00

0.00

TOTAL COSTO DIRECTO


GASTOS GENERALES Y UTILIDAD

3,753.78

0.00

1.00

01.04.01

01.04

EQUIPAMIENTO ELECTRICO

1,212.09

0.00

0.00

39,761.32
5,964.20

39,761.32
5,964.20

0.00
0.00

39,761.32
5,964.20

0.00
0.00

SUB TOTAL

45,725.52

45,725.52

0.00

45,725.52

0.00

TOTAL

45,725.52

45,725.52

0.00

45,725.52

0.00

45,725.52

45,725.52

0.00

45,725.52

0.00

8,230.59

8,230.59

0.00

8,230.59

0.00

MONTO CONTRACTUAL=SUB-TOTAL*FR
IGV 18%

15.00%

1.00

VALORIZACION FINAL
ADP N:

N 013-2013-VIVIENDA

OBRA:

"ELABORACION DE EXPEDIENTE TECNICO EJECUCION DE OBRA Y EQUIPAMIENTACION DEL CENTRO DE SERVICIOS DE


APOYO AL HABITAT RURAL EN EL C.P. SAN ISIDRO DE TOTORA - AYACUCHO

CONTRATISTA:

CONSORCIO MACRO

SUPERVISOR:

CONSORCIO PAJONKY

FECHA:

AL 27 DE FEBRERO DEL 2014

FORMULA

EQUIPAMIENTO
PRESUPUESTO

TEM

PARTIDA

MONTO TOTAL DE LA OBRA


PORCENTAJE DE AVANCE DE OBRA

UND

MET

COSTO
UNITARIO
(S/.)

VALORIZACIONES

COSTO
PARCIAL
(S/.)

53,956.11

ANTERIOR ACUMULADO
MET

MONTO (S/.)

53,956.11
100.00%

ACTUAL
MET

MONTO
(S/.)

0.00
0.00%

SALDOS

ACTUAL ACUMULADO
%

MET

MONTO
(S/.)

53,956.11
100.00%

MET

MONTO (S/.)

0.00
0.00%

K =0.340*(Mr/Mo)+0.136*(Ar/Ao)+0.135*(Br/Bo)+0.133*(Cr/Co)+0.132*(Pr/Po)+0.124*(Mr/Mo)
SIMBOLO
MO

ELEMENTO REPRESENTATIVO
MANO DE OBRA (INC. LEYES SOC.)

ACERO DE CONSTRUCCION LISO

BLOQUE Y LADRILLO

CEMENTO PORTLAND I

PLANCHA GALVANIZADA

MADERA IMPORTADA

COEFICIENTE DE REAJUSTE:

K=

Io
COEF.
%
IND.BASE
CODIGO
INCIDENCIA INCIDENCIA
FEB'08
47

17

21

61

42

0.340

0.136

0.135

0.133

0.132

0.124

1.000

100.000%

100.00%

100.000%

100.000%

100.000%

100.000%

1 vlr
NOV'2013
Ir
K

DIC'2013
Ir
K

2VRL
ENE'2014
Ir
K

3VRL

4LR
FEB'2014
Ir
K

MAR'2014
Ir

497.55
497.55

497.55
497.55

0.340

497.55
497.55

0.340

497.55
497.55

0.340

498.10
498.10

0.340

0.00
0.00

0.000

475.65
475.65

475.65
475.65

0.136

480.08
480.08

0.137

478.63
478.63

0.137

479.33
479.33

0.137

0.00
0.00

0.000

745.10
745.10

745.10
745.10

0.135

751.30
751.30

0.136

753.48
753.48

0.137

749.60
749.60

0.136

0.00
0.00

0.000

354.74
354.74

354.74
354.74

0.133

354.74
354.74

0.133

354.74
354.74

0.133

354.74
354.74

0.133

0.00
0.00

0.000

246.92
246.92

246.92
246.92

0.132

244.86
244.86

0.131

243.72
243.72

0.130

245.82
245.82

0.131

0.00
0.00

0.000

223.32
223.32

223.32
223.32

0.124

224.40
224.40

0.125

223.94
223.94

0.124

224.86
224.86

0.125

0.00
0.00

0.000

1.000

1.002

1.001

1.003

0.000

VIVIENDA

REINTEGRO POR REAJUSTE


(CONTROL DE VALORIZACIONES Y REAJUSTES)

CONTRATO PRINCIPAL
PROCESO
O B R A
CONTRATISTA
SUPERVISOR
RESIDENTE
FECHA

:
:
:
:
:
:

ADP N 013-2013-VIVIENDA
CREACION DEL CENTRODE SERVICIOS DE APOYO AL HABITAT RURAL
CONSORCIO MACRO
CONSORCIO PAJONKI
ING.SILVIO CRISANTE PARIONA
AL 27 DE FEBRERO DEL 2014
VALORIZACION

No.

MES

PROGRAMADO EJECUTADO
FORMULA 01: ESTRUCTURA
1
Nov-13
26,818.05
65,099.59
2
Dec-13
106,878.42
63,270.21
3
Jan-14
15,201.11
15,255.27
4
Feb-14
0.00
5,272.51
5
Mar-14
0.00
0.00
SUB-TOTAL
148,897.58
148,897.58
EN VALORIZ. ANTERIOR
REINTEGRO ACTUAL
FORMULA 02: ARQUITECTURA
1
Nov-13
28.75
0.00
2
Dec-13
39,712.66
34,179.87
3
Jan-14
113,627.71
85,002.13
4
Feb-14
28,669.36
62,856.48
5
Mar-14
0.00
0.00
SUB-TOTAL
182,038.48
182,038.48
EN VALORIZ. ANTERIOR
REINTEGRO ACTUAL
FORMULA 03: INSTALACIONES SANITARIAS
1
Nov-13
0.00
4,703.40
2
Dec-13
14,268.27
0.00
3
Jan-14
21,305.71
32,301.06
4
Feb-14
16,420.12
14,989.64
5
Mar-14
0.00
0.00
SUB-TOTAL
51,994.10
51,994.10
EN VALORIZ. ANTERIOR
REINTEGRO ACTUAL
FORMULA 04: INSTALACIONES ELECTRICAS
1
Nov-13
0.00
0.00
2
Dec-13
2,151.83
0.00
3
Jan-14
7,906.58
6,524.13
4
Feb-14
5,591.07
9,125.35
5
Mar-14
0.00
0.00
SUB-TOTAL
15,649.48
15,649.48
EN VALORIZ. ANTERIOR
REINTEGRO ACTUAL
FORMULA 05: EQUIPAMIENTO
1
Nov-13
0.00
0.00
2
Dec-13
0.00
0.00
3
Jan-14
0.00
0.00
4
Feb-14
45,725.52
45,725.52
5
Mar-14
0.00
0.00
SUB-TOTAL
45,725.52
45,725.52
EN VALORIZ. ANTERIOR
REINTEGRO ACTUAL

REINTEGRO
K-1
PROGRAMADO

EJECUTADO

REINTEGRO
BRUTO
AUTORIZADO

DEDUCCION
A.D
EFECTIVO MATERIALES

REINTEGRO
NETO
AUTORIZADO

0.003
0.006
0.006
0.008
0.000

89.52
640.10
94.52
0.00
0.00
824.13

217.29
378.93
94.86
39.85
0.00
730.92

217.29
378.93
94.86
39.85
0.00
730.92

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

217.29
378.93
94.86
39.85
0.00
730.92
396.53
334.39

0.003
0.002
0.001
0.003
0.000

0.10
74.99
114.08
0.00
0.00
189.17

0.00
64.55
85.34
157.80
0.00
307.68

0.00
64.55
85.34
157.80
0.00
307.68

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
64.55
85.34
157.80
0.00
307.68
127.65
180.03

0.003
0.000
0.002
0.009
0.000

0.00
0.00
53.17
151.95
0.00
205.12

15.70
0.00
80.61
138.71
0.00
235.02

15.70
0.00
80.61
138.71
0.00
235.02

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

15.70
0.00
80.61
138.71
0.00
235.02
37.41
197.61

0.000
0.000
-0.006
0.000
0.000

0.00
0.00
-48.99
0.00
0.00
-48.99

0.00
0.00
-40.42
3.89
0.00
-36.53

0.00
0.00
-40.42
3.89
0.00
-36.53

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
-40.42
3.89
0.00
-36.53
-56.64
20.11

0.000
0.000
0.001
0.007
0.000

0.00
0.00
0.00
319.45
0.00
319.45

0.00
0.00
0.00
319.45
0.00
319.45

0.00
0.00
0.00
319.45
0.00
319.45

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
319.45
0.00
319.45
0.00
319.45