Finding : Steam tracing not touching the 35LV002 & 1st isolation valve body
Action : To rectify and ensure steam trace properly install
35 & 36
Finding : The 3way valve handwheel operation is restricted by the near LWH
flushing line. (restricted by LWH cladding for insulation). Potential injury to operator
Action : To rectify & ensure smooth handwheel operation
35 & 36
Finding : The LWH line piping to V-35-02 bottom is slightly lifted from the support
Action : To rectify
35 & 36
35 & 36
35 & 36
35 & 36
Finding : RO 3502 downstream flange bolt loose & restricted by the steam
trace.
Action : To tighten the bolt & rectify the steam tracing
35 & 36
35 & 36
35 & 36
35 & 36
Finding : LWH isolation valve handle opening is restricted by steam trap at valve
Action : To rectify
35 & 36
35 & 36
35 & 36
35 & 36
35 & 36
35 & 36
35 & 36
35 & 36
Finding : Poor housekeeping inside the P-3601A&B 7& F-39-01A&B drain pan
35 & 36
Finding : The isolation valves for SLS to E-36-03 & E-36-04 is at higher elevation and
far from the platform. No access to bring the movable step to the isolation valves,
restricted by piping.
Action : To provide dedicated movable step or platform to access the isolation valves
35 & 36
Finding : isolation valve handle cannot be open for flushing (LWH to 3-US36013)
Action : To install steam trace
35 & 36
35 & 36
Finding : All nozzle on T-36-01 top extended until the platform. Potential clogging
Action : To install steam trace
35 & 36
35 & 36
Finding : Steam trace not touching N1 nozzle T36-01 and no insulation provided
Action : To rectify
35 & 36
35 & 36
Finding : F-39-02A/B vent valve and linenot insulate but steam trap install
Action : To confirm the availability of insulation for the vent valves & line. To
install insulation if not available