ScopeofWork&deliverables:

Consultant scope of work fo rproviding detailed engineering services for Installation of


Surge Relief System at SPM facilities at Mundra under thi sproposa lis as under:

p
P
p
P
p
Project
PP
PP
PP
PP
PP
CV
cv
cv
cv
PP/Cv
IN
IN
IN
IN
IN/EL
IN
IN
EL
EL

PreparationofPFD's
PreparationofP&ID's(UpdatedbasedonHAZOP)
PreparationofProcessdatasheets
PreparationofEquipmentlist
PreparationofLineList
PreparationofDCI
PreparationofPlotplan
PreparationofEquipmentlayout
PreparationofPipingGAD's/Isometrics
PreparationofMTOforPipe,fittings,flangesandvalves

PreparationofPipingsupportsGAD's
PreparationofStructuralfoundationdrawingsforpumps&t
ank.
. Preparation of Drawing fo rshed & gate
Preparation
of Drawing for Internal roads trenches, drainage & sanitation
PreparationofPilingdrawingforTankfoundation(if
required)
PreparationofU/GDrawing
PreparationofInstrumentdatasheetsand
specification
Sizingofcontrolvalveandspecificationanddata
sheet
PreparationofJobSpecificationsforinstruments
PreparationofInstrumentlocationlayoutand
Instrumentindex
PreparationofCablelayoutdrawing,
PreparationofInstrumentationhookupdetail
PreparationofCable&JBscheduleandcabletray
sizing
PreparationofSLD
Electricalloadcalculation

PreparationofElectricalcableroutinglayout
PreparationofPowerandEarthinglayout
EL
PreparationofCableschedule
EL
PreparationofProtectionrelayschedule
EL
PreparationofDatasheetforMotor
EL
PreparationofInterconnectiondiagramformotor
switchgearetc.
EL
PreparationofLightningprotectionlayout
EL
PreparationofHazardousareaclassificationlayout
andAreaLightinglayout
EL
PreparationofMaterialrequisitionforSRV
IN
PreparationofSeparateMaterialrequisitionfor
FlowTee,Pipe,Fittings,FlangesandValves
PP
PreparationofMaterialrequisitionforPumps
PP/PC
PreparationofMaterialrequisitionforBulkitemsfor
electrical,Instrumentation
EL
PreparationofMechanicaldatasheet(MDS)for
Tank
ME
PreparationofDrawingforfirfightingnetworkfor
ME/PC thenewfacilities
PreparationofTenderforTankageandcivilworks
CV
ME/PP PreparationofTenderforMechanicalworks
PreparationofCompositeTenderforElectrical&
Preparenecessarystatutorydrawingsrequiredfor
Instrumentwork
EL/IN
submissiontoAuthorities.(Approvalswillbeobtainedby
EL?IN?PPAPSEZ)
Technicalevaluationandrecommendationofthebids
EL?IN?PPandoffersreceivedfromcontractorsandVendors..
EL?IN?PPReviewofvendordrawings&datasheets.
EL

ELECTRICAL AND INSTRUMENT MAN HOURS


.

Exclusions:
FollowingarespecificallyexcludedfromconsultantProposal

Site survey and geotechnical investigation

Floating of bids, receipts of bids, commercial comparison, negotiations with


suppliers/ bidders

Ordering of machine/equipment/contracts

Negotiations with suppliers/bidders

Stores Management

Contract Management Commercial part of RFQ's shall be prepared and included by


PMC

Inspection/expediting services, Supervision during erection, Installation and


Construction activities and Assistance during Pre-Commissioning and commissioning
are
not included NECESSARY
under this proposal.
PREPARATION
STATUTORY DRAWINGS REQUIRED FOR
SUBMISSION TO AUTHORITIES.
PREPARATION OF PIPING MATERIAL SPECIFICATION.

Inputs Required:
EXISTING OVERALL PLOT PLAN.
EXISTING PIPING GA FOR TIE-IN POINT
DESIGN BASIS
SUPPORT STANDARD.

MAN
HOURS

22
25
20
10
10
40
50
50
80
25
80
60
NA
NA
60
NA
10
15
15
15
15
15
15
15
10

<
Y
,

15
15
10
NA
10
10
10
15
10
40 mech
40 mech
15
10 mech
NA
NA
NA
40
25
20
30

972