Вы находитесь на странице: 1из 50

Pre Levels - Bund

Name of the TankKomati kuntaVillage


Chainage (m)

B.S
2.510

I.S

F.S

Mastipur
H.O.I
327.510

3.300
1.585
1.550
1.580
3.500

327.510
327.510
327.510
327.510
327.510

25

3.120
1.585
1.550
1.580
3.320

327.510
327.510
327.510
327.510
327.510

50

2.510
1.565
1.530
1.560
2.710

327.510
327.510
327.510
327.510
327.510

75

3.430
1.690
1.655
1.685
3.630

327.510
327.510
327.510
327.510
327.510

100

3.560
1.755
1.720
1.750
3.765

327.510
327.510
327.510
327.510
327.510

125

3.850
2.015
1.980
2.010
4.100

327.510
327.510
327.510
327.510
327.510

150

3.950
1.995
1.960
1.990
4.270

327.510
327.510
327.510
327.510
327.510

175

3.220
1.915
1.880
1.910
3.430

327.510
327.510
327.510
327.510
327.510

200

2.650
1.815
1.780
1.810
2.870

225

3.600
2.345
2.310
2.340
3.900

327.510
327.510
327.510
327.510
327.510
327.900
327.900
327.900
327.900
327.900
327.900

250

3.350
2.185
2.150
2.180
3.815

327.900
327.900
327.900
327.900
327.900

275

3.310
2.020
1.985
2.015
3.535

327.900
327.900
327.900
327.900
327.900

300

3.320
2.155
2.120
2.150
3.580

327.900
327.900
327.900
327.900
327.900

325

2.980
1.940
2.340
2.370
3.280

327.900
327.900
327.900
327.900
327.900

350

2.330
2.265
2.230
2.260
2.550

327.900
327.900
327.900
327.900
327.900

375

2.320

327.900

1.840

1.450

400

1.845
1.810
1.840
2.580

327.900
327.900
327.900
327.900

2.000
1.725
1.690
1.720
2.050

327.900
327.900
327.900
327.900
327.900

1.210
1.200

1.150
1.240
1.870

327.96
327.92

Arithmetic Check : B.S =

6.760

F.S =

B.S - F.S =

1.050

R.L n - R.L 1 =

1.050

5.710

Since B.S - F.S = R.L Last - R.L First


Arithemetic Check is Satisfied.

Mandal Atmakur
R.L
Remarks
325.000 B.M (Weir)
324.210
325.925
325.960
325.930
324.010
324.390
325.925
325.960
325.930
324.190
325.000
325.945
325.980
325.950
324.800
324.080
325.820
325.855
325.825
323.880
323.950
325.755
325.790
325.760
323.745
323.660
325.495
325.530
325.500
323.410

U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S

323.560
325.515
325.550
325.520
323.240
324.290
325.595
325.630
325.600
324.080

U/S
Centre
D/S
U/S
Centre
D/S

324.860
325.695
325.730
325.700
324.640
326.060
323.910
325.555
325.590
325.560
324.000
324.550
325.715
325.750
325.720
324.085
324.590
325.880
325.915
325.885
324.365
324.580
325.745
325.780
325.750
324.320
324.920
325.960
325.560
325.530
324.620

U/S
Centre
D/S
C.P
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S

325.570
325.635
325.670
325.640
325.350

U/S
Centre

325.580

U/S

D/S

326.055
326.090
326.060
325.320
325.900
326.175
326.210
326.180
325.850
326.75
326.72
326.05

Centre
D/S
U/S
Centre
D/S
C.P
C.P

Work Done Levels - Bund


Name of the Tank
Komati kuntaVillage
Chainage (m)

B.S
2.510

I.S

F.S

Mastipur
H.O.I
327.510

3.300
1.285
1.250
1.280
3.500

327.510
327.510
327.510
327.510
327.510

25

3.120
1.165
1.130
1.160
3.320

327.510
327.510
327.510
327.510
327.510

50

2.510
1.245
1.210
1.240
2.710

327.510
327.510
327.510
327.510
327.510

75

3.430
1.360
1.325
1.355
3.630

327.510
327.510
327.510
327.510
327.510

100

3.560
1.485
1.450
1.480
3.765

327.510
327.510
327.510
327.510
327.510

125

3.850
1.665
1.630
1.660
4.100

327.510
327.510
327.510
327.510
327.510

150

3.950
1.645
1.610
1.640
4.270

327.510
327.510
327.510
327.510
327.510

175

3.220
1.515
1.480
1.510
3.430

327.510
327.510
327.510
327.510
327.510

200

2.650
1.415
1.380
1.410
2.870

225

3.600
1.935
1.900
1.930
3.900

327.510
327.510
327.510
327.510
327.510
327.900
327.900
327.900
327.900
327.900
327.900

250

3.350
1.685
1.650
1.680
3.815

327.900
327.900
327.900
327.900
327.900

275

3.310
1.520
1.485
1.515
3.535

327.900
327.900
327.900
327.900
327.900

300

3.320
1.705
1.670
1.700
3.580

327.900
327.900
327.900
327.900
327.900

325

2.980
1.940
1.920
1.950
3.280

327.900
327.900
327.900
327.900
327.900

350

2.330
1.865
1.830
1.860
2.550

327.900
327.900
327.900
327.900
327.900

375

2.320

327.900

1.840

1.450

400

1.495
1.460
1.490
2.580

327.900
327.900
327.900
327.900

2.000
1.225
1.190
1.220
2.050

327.900
327.900
327.900
327.900
327.900

1.360
1.410

1.520
1.340
1.650

327.740
327.810

Arithmetic Check : B.S =

7.120

F.S =

B.S - F.S =

1.160

R.L n - R.L 1 =

1.160

5.960

Since B.S - F.S = R.L Last - R.L First


Arithemetic Check is Satisfied.

Mandal Atmakur
R.L
###

Remarks
B.M (Weir)

324.210
326.225
326.260
326.230
324.010

U/S

324.390
326.345
326.380
326.350
324.190
325.000
326.265
326.300
326.270
324.800
324.080
326.150
326.185
326.155
323.880
323.950
326.025
326.060
326.030
323.745
323.660
325.845
325.880
325.850
323.410

Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S

323.560
325.865
325.900
325.870
323.240
324.290
325.995
326.030
326.000
324.080

U/S
Centre
D/S
U/S
Centre
D/S

324.860
326.095
326.130
326.100
324.640
326.060
324.300
325.965
326.000
325.970
324.000
324.550
326.215
326.250
326.220
324.085
324.590
326.380
326.415
326.385
324.365
324.580
326.195
326.230
326.200
324.320
324.920
325.960
325.980
325.950
324.620

U/S
Centre
D/S
C.P
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S
U/S
Centre
D/S

325.570
326.035
326.070
326.040
325.350

U/S
Centre

325.580

U/S

D/S

326.405
326.440
326.410
325.320
325.900
326.675
326.710
326.680
325.850
326.380
326.400
326.160

Centre
D/S
U/S
Centre
D/S
C.P
C.P

Name of the Work


Mission
: Kakatiya, Phase - II : Restoration of Komati kunta, Mastipur Village, Atm

Longitudinal Profile of the Bund

326.600
326.400
326.200
326.000

Elevation (m)

325.800
325.600
325.400
325.200
Pre
325.000
Lev 0
el

Chainage (mts)

25

50

75

100

125

150

175

200

225

250

Chainage (mts)

25

50

75

100

125

150

175

200

225

Top Bund Level (T.B.L) 326.500 326.500 326.500 326.500 326.500 326.500 326.500 326.500 326.500 326.500

Assitant Engineer
I-CADD., I.B. Section, Manganoor.

Dy. Executive Engineer


I-CADD., I.B. Sub Division, Makthal

27

Pre Level

325.960 325.960 325.980 325.855 325.790 325.530 325.550 325.630 325.730 325.590

Worked Level

326.260 326.380 326.300 326.185 326.060 325.880 325.900 326.030 326.130 326.000

Height of Bund (H.O.B) 0.300


TBL - WORK DONE

0.240

0.420

0.320

0.330

0.270

0.350

0.350

0.400

0.400

0.410

0.120

0.200

0.315

0.440

0.620

0.600

0.470

0.370

0.500

Assitant Engineer
I-CADD., I.B. Section, Manganoor.

Dy. Executive Engineer


I-CADD., I.B. Sub Division, Makthal

ur Village, Atmakur Mandal, Mahboobnagar District.

250

275

250

275

300

300

325

325

350

350

375

400

375

326.500 326.500 326.500 326.500 326.500 326.500

Assitant Engineer
I-CADD., I.B. Section, Manganoor.

Dy. Executive Engineer


I-CADD., I.B. Sub Division, Makthal

325.750 325.915 325.780 325.560 325.670 326.090


326.250 326.415 326.230 325.980 326.070 326.440
0.500

0.500

0.450

0.420

0.400

0.350

0.250

0.085

0.270

0.520

0.430

0.060

Assitant Engineer
I-CADD., I.B. Section, Manganoor.

Dy. Executive Engineer


I-CADD., I.B. Sub Division, Makthal

375

400

400
326.500

Assitant Engineer
I-CADD., I.B. Section, Manganoor.

Dy. Executive Engineer


I-CADD., I.B. Sub Division, Makthal

326.210
326.500
0.290
0.000

Assitant Engineer
I-CADD., I.B. Section, Manganoor.

Dy. Executive Engineer


I-CADD., I.B. Sub Division, Makthal

Cross-Section Details of Komati kunta, Mastipur Village, Atmakur M


Crossection Details @ 0 mts
Chainage

0 mts

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

327.250

Pre Level Worked Level


324.210
324.210
325.218
325.218
325.925
326.225
325.960
326.260
325.930
326.230
325.120
325.120
324.010
324.010

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
0.378
0.300
=
0.750
0.600
=
0.750
0.600
=
0.744
0.300
Area @ 0 mts Section =

Area
0.113
0.450
0.450
0.223
1.237

25 mts

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
0.378
0.420
=
0.750
0.840
=
0.750
0.840
=
0.744
0.420
rea @ 25 mts Section =

Area
0.159
0.630
0.630
0.313
1.731

-1.50
0.00
Interval

-2.26

-1.50
0.00
Interval

325.500

Elevation
323.750

322.000
-3.01

Area of Embankment :-

-2.26

327.250

Pre Level Worked Level


324.390
324.390
325.368
325.368
325.925
326.345
325.960
326.380
325.930
326.350
325.270
325.270
324.190
324.190

Average WidthAverage Depth

323.750

Sq.m

Crossection Details @ 25 mts


Chainage

Elevation

322.000
-3.01

Area of Embankment :Average WidthAverage Depth

325.500

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

Crossection Details @ 50 mts


Chainage

50 mts

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

Pre Level Worked Level


325.000
325.000
325.633
325.633
325.945
326.265
325.980
326.300
325.950
326.270
325.535
325.535
324.800
324.800

Average WidthAverage Depth

=
0.378
0.320
=
0.750
0.640
=
0.750
0.640
=
0.744
0.320
rea @ 50 mts Section =

Elevation
325.500

323.750
-3.01

Area of Embankment :Left Triangle


Left Trapezoid
ght Trapezoid
Right Triangle

327.250

Area
0.121
0.480
0.480
0.238
1.319

-2.26

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

-1.50
0.00
Interval

Crossection Details @ 75 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

75 mts

327.250

Pre Level Worked Level


324.080
324.080
325.115
325.115
325.820
326.150
325.855
326.185
325.825
326.155
325.018
325.018
323.880
323.880

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
0.378
0.330
=
0.750
0.660
=
0.750
0.660
=
0.744
0.330
rea @ 75 mts Section =

Area
0.125
0.495
0.495
0.246
1.360

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

100 mts

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.270
0.750
0.540
0.750
0.540
0.744
0.270
@ 100 mts Section =

Area
0.102
0.405
0.405
0.201
1.113

-1.50
0.00
Interval

-2.26

-1.50
0.00
Interval

325.500

Elevation
323.750

322.000
-3.01

Area of Embankment :-

-2.26

327.250

Pre Level Worked Level


323.950
323.950
324.988
324.988
325.755
326.025
325.790
326.060
325.760
326.030
324.888
324.888
323.745
323.745

Average WidthAverage Depth

323.750

Sq.m

Crossection Details @ 100 mts


Chainage

Elevation

322.000
-3.01

Area of Embankment :Average WidthAverage Depth

325.500

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

Crossection Details @ 125 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

125 mts

Pre Level Worked Level


323.660
323.660
324.753
324.753
325.495
325.845
325.530
325.880
325.500
325.850
324.630
324.630
323.410
323.410

Average WidthAverage Depth

=
=
=
=
ea

0.378
0.350
0.750
0.700
0.750
0.700
0.744
0.350
@ 125 mts Section =

325.500

Elevation
323.750

322.000
-3.01

Area of Embankment :Left Triangle


Left Trapezoid
ght Trapezoid
Right Triangle

327.250

Area
0.132
0.525
0.525
0.261
1.443

-2.26

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

-1.50
0.00
Interval

Crossection Details @ 150 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

150 mts

327.250

Pre Level Worked Level


323.560
323.560
324.713
324.713
325.515
325.865
325.550
325.900
325.520
325.870
324.555
324.555
323.240
323.240

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.350
0.750
0.700
0.750
0.700
0.744
0.350
@ 150 mts Section =

Area
0.132
0.525
0.525
0.261
1.443

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

175 mts

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.400
0.750
0.800
0.750
0.800
0.744
0.400
@ 175 mts Section =

Area
0.151
0.600
0.600
0.298
1.649

-1.50
0.00
Interval

-2.26

-1.50
0.00
Interval

325.500

Elevation
323.750

322.000
-3.01

Area of Embankment :-

-2.26

327.250

Pre Level Worked Level


324.290
324.290
325.143
325.143
325.595
325.995
325.630
326.030
325.600
326.000
325.040
325.040
324.080
324.080

Average WidthAverage Depth

322.000

Sq.m

Crossection Details @ 175 mts


Chainage

Elevation
323.750

320.250
-3.01

Area of Embankment :Average WidthAverage Depth

325.500

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

Crossection Details @ 200 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

200 mts

Pre Level Worked Level


324.860
324.860
325.478
325.478
325.695
326.095
325.730
326.130
325.700
326.100
325.370
325.370
324.640
324.640

Average WidthAverage Depth

=
=
=
=
ea

0.378
0.400
0.750
0.800
0.750
0.800
0.744
0.400
@ 200 mts Section =

Elevation
325.500

323.750
-3.01

Area of Embankment :Left Triangle


Left Trapezoid
ght Trapezoid
Right Triangle

327.250

Area
0.151
0.600
0.600
0.298
1.649

-2.26

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

-1.50
0.00
Interval

Crossection Details @ 225 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

225 mts

327.250

Pre Level Worked Level


323.910
323.910
324.938
324.938
325.555
325.965
325.590
326.000
325.560
325.970
324.985
324.985
324.000
324.000

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.410
0.750
0.820
0.750
0.820
0.744
0.410
@ 225 mts Section =

Area
0.155
0.615
0.615
0.305
1.690

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

250 mts

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.500
0.750
1.000
0.750
1.000
0.744
0.500
@ 250 mts Section =

Area
0.189
0.750
0.750
0.372
2.061

-1.50
0.00
Interval

-2.26

-1.50
0.00
Interval

325.500

Elevation
323.750

322.000
-3.01

Area of Embankment :-

-2.26

327.250

Pre Level Worked Level


324.550
324.550
325.383
325.383
325.715
326.215
325.750
326.250
325.720
326.220
325.153
325.153
324.085
324.085

Average WidthAverage Depth

323.750

Sq.m

Crossection Details @ 250 mts


Chainage

Elevation

322.000
-3.01

Area of Embankment :Average WidthAverage Depth

325.500

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

Crossection Details @ 275 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

275 mts

Pre Level Worked Level


324.590
324.590
325.485
325.485
325.880
326.380
325.915
326.415
325.885
326.385
325.375
325.375
324.365
324.365

Average WidthAverage Depth

=
=
=
=
ea

0.378
0.500
0.750
1.000
0.750
1.000
0.744
0.500
@ 275 mts Section =

325.500

Elevation
323.750

322.000
-3.01

Area of Embankment :Left Triangle


Left Trapezoid
ght Trapezoid
Right Triangle

327.250

Area
0.189
0.750
0.750
0.372
2.061

-2.26

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

-1.50
0.00
Interval

Crossection Details @ 300 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

300 mts

327.250

Pre Level Worked Level


324.580
324.580
325.388
325.388
325.745
326.195
325.780
326.230
325.750
326.200
325.260
325.260
324.320
324.320

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.450
0.750
0.900
0.750
0.900
0.744
0.450
@ 300 mts Section =

Area
0.170
0.675
0.675
0.335
1.855

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

325 mts

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.430
0.750
0.850
0.750
0.840
0.744
0.420
@ 325 mts Section =

Area
0.163
0.637
0.630
0.313
1.743

-1.50
0.00
Interval

-2.26

-1.50
0.00
Interval

Elevation
325.500

323.750
-3.01

Area of Embankment :-

-2.26

327.250

Pre Level Worked Level


324.920
324.920
325.440
325.440
325.530
325.960
325.560
325.980
325.530
325.950
325.285
325.285
324.620
324.620

Average WidthAverage Depth

323.750

Sq.m

Crossection Details @ 325 mts


Chainage

Elevation

322.000
-3.01

Area of Embankment :Average WidthAverage Depth

325.500

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

Crossection Details @ 350 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

350 mts

Pre Level Worked Level


325.570
325.570
325.803
325.803
325.635
326.035
325.670
326.070
325.640
326.040
325.695
325.695
325.350
325.350

Average WidthAverage Depth

=
=
=
=
ea

0.378
0.400
0.750
0.800
0.750
0.800
0.744
0.400
@ 350 mts Section =

Elevation
325.500

323.750
-3.01

Area of Embankment :Left Triangle


Left Trapezoid
ght Trapezoid
Right Triangle

327.250

Area
0.151
0.600
0.600
0.298
1.649

-2.26

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

-1.50
0.00
Interval

Crossection Details @ 375 mts


Chainage

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

375 mts

327.250

Pre Level Worked Level


325.580
325.580
325.993
325.993
326.055
326.405
326.090
326.440
326.060
326.410
325.865
325.865
325.320
325.320

323.750
-3.01

Area of Embankment :Average WidthAverage Depth

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.350
0.750
0.700
0.750
0.700
0.744
0.350
@ 375 mts Section =

Area
0.132
0.525
0.525
0.261
1.443

Interval
-3.01
-2.26
-1.50
0.00
1.50
2.99
4.48

400 mts

Average WidthAverage Depth

Left Triangle
Left Trapezoid
ght Trapezoid
Right Triangle

=
=
=
=
ea

0.378
0.325
0.750
0.615
0.750
0.610
0.744
0.320
@ 400 mts Section =

-2.26

-1.50
0.00
Interval

Elevation

325.500
-3.01

Area
0.123
0.461
0.458
0.238
1.280

-1.50
0.00
Interval

327.250

Pre Level Worked Level


325.900
325.900
326.200
326.200
326.175
326.500
326.210
326.500
326.180
326.500
326.175
326.175
325.850
325.850

Area of Embankment :-

-2.26

Sq.m

Crossection Details @ 400 mts


Chainage

Elevation
325.500

Sq.m

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

tipur Village, Atmakur Mandal, MBNR

327.250

325.500

Elevation

323.750
Worked
Level

322.000
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

327.250

325.500

levation
323.750
Worked
Level
322.000
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

Elevation
325.500

Worked
Level

323.750
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

325.500

levation
323.750
Worked
Level
322.000
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

327.250

325.500

Elevation

323.750
Worked
Level

322.000
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

325.500

levation
323.750
Worked
Level
322.000
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

325.500

Elevation
323.750

322.000

Worked
Level

320.250
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

327.250

325.500

levation
323.750

322.000
-3.01

Worked
Level
-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

Elevation
325.500

Worked
Level

323.750
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

325.500

levation
323.750
Worked
Level
322.000
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

327.250

325.500

Elevation

323.750
Worked
Level

322.000
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

325.500

levation
323.750
Worked
Level
322.000
-3.01

Pre Level
-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

325.500

Elevation

323.750
Worked
Level

322.000
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

327.250

levation
325.500

Worked
Level
323.750
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

Elevation
325.500

Worked
Level

323.750
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

327.250

levation
325.500

Worked
Level
323.750
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

327.250

Elevation

Worked
Level

325.500
-3.01

-2.26

-1.50
0.00
Interval

1.50

2.99

4.48

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

BUND EMBANKMENT QUANTITY


Mission Kakatiya : Restoration of Komati kunta, Mastipur Village,
Atmakur Mandal, Mahboobnagar.
Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Chainage Distance
(m)
(m)
0
25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400

0
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25

Area
( m2 )

Mean Area
( m2 )

Quantity
( m3 )

1.237
1.731
1.319
1.360
1.113
1.443
1.443
1.649
1.649
1.690
2.061
2.061
1.855
1.743
1.649
1.443
1.280

1.484
1.525
1.340
1.237
1.278
1.443
1.546
1.649
1.670
1.876
2.061
1.958
1.799
1.696
1.546
1.361

37.10
38.13
33.49
30.92
31.95
36.07
38.65
41.22
41.74
46.89
51.53
48.95
44.97
42.40
38.65
34.03

Total Quantity =

636.70

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

MBANKMENT QUANTITY

ration of Komati kunta, Mastipur Village,


r Mandal, Mahboobnagar.

m3

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

BENCHING QUANTITY
Mission Kakatiya : Restoration of Komati kunta, Mastipur Village,
Atmakur Mandal, Mahboobnagar.
Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Chainage Distance
(m)
(m)
0
25
50
75
100
125
150
175
200
225
250
275
300
325
350
375
400

0
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25

Area
( m2 )

Mean Area
( m2 )

Quantity
( m3 )

4.000
4.000
4.000
4.000
4.000
5.000
4.000
3.000
4.000
4.000
4.000
3.000
4.000
4.000
4.000
4.000
4.000

4.000
4.000
4.000
4.000
4.500
4.500
3.500
3.500
4.000
4.000
3.500
3.500
4.000
4.000
4.000
4.000

100.00
100.00
100.00
100.00
112.50
112.50
87.50
87.50
100.00
100.00
87.50
87.50
100.00
100.00
100.00
100.00

Total Quantity = 1575.00

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

NCHING QUANTITY

ration of Komati kunta, Mastipur Village,


r Mandal, Mahboobnagar.

m3

Assitant Engineer
Dy. Executive Engineer
I-CADD., I.B. Section, Manganoor.
I-CADD., I.B. Sub Division, Makthal

Вам также может понравиться