PL3 Recovery Working programme 11 April 2016

Activity ID

Classic WBS Layout

Activity Name

Original Start
Duration

PL3 Recovery Working programme 11 April 2016


Building Control (TOP/CSC) Submission, RI / TOP Submission
A1360
A1370
A1380
A1390
A1400
A1410

[PH2-TOP]
[PH2-TOP]
[PH2-TOP]
[PH2-TOP]
[PH2-TOP]
[PH2-TOP]

Request & Pre-inspection (TFP/FSC) Works


Inspection by RI (M&E)
Insurance of TFP/FSC
Inspection by RI (ARCH)
CBPU Compliance Certificate Insurance (TOP) if any
BCA Submission/ Inspection/ Procession & Insurance of TOP

Construction

A1340

[PH2-PLF3] Testing Commissioning by C8017 & SWC

Others(Demolition & Reconstruction)


A1350
A1440

Linkway at Near MRT(GL LB12) Existing Structure Demolition works


Roller Shutter Existing Removal/New Roller Shutter Erection

Actual Work

Critical Remaining Work

Remaining Work

Milestone

Summary

25

02

May 2016
09
16

23

30

06

June 2016
13
20

27

04

July 2016
11
18

25

01

August 2016
08
15

22

29

September 2016
05
12
19

26

03

October 2016
10
17

24

31

November 2016
07
14
21

ecember 2016
28
05
02-Dec-16

02-Dec-16

25d 08-Nov-16

02-Dec-16

-34d

02-Dec-16

17-Nov-16
27-Nov-16
27-Nov-16
27-Nov-16
27-Nov-16
02-Dec-16
24-Sep-16

-34d
-34d
-34d
-34d
-34d
-34d
35d

[PH2-TOP] Request & Pre


[PH2-TOP] Ins
[PH2-TOP] Ins
[PH2-TOP] Ins
[PH2-TOP] CB
[PH2-TOP

10d
10d
10d
10d
10d
15d
149d

08-Nov-16
18-Nov-16
18-Nov-16
18-Nov-16
18-Nov-16
18-Nov-16
29-Apr-16

70d 29-Apr-16
A1460
Upstanding beams Erection
3d 30-May-16*
A1470
Form work and RC works on Upstandd beams GL12 to GL10 @linkway Ramp area
5d 02-Jun-16
A1480
Roller Shutter Erection Works
10d 07-Jun-16
35d 29-Apr-16
SE-Platform GL5 to GL1
A1060
[PH2-PLF3] Erection of Steel Columns at Platform Level (GL LB1 to LB5)
3d 29-Apr-16*
A1070
[PH2-PLF3] Erection of Steel Beams at Platform Level (GL LB1 to LB5)
8d 02-May-16
A1080
[PH2-PLF3] Erection of Steel Columns at Roof Level (GL LB1 to LB5)
2d 10-May-16
A1090
[PH2-PLF3] Erection of Roof Beams, Purlins, Raftors at Roof Level (GL LB1 to LB5)
8d 12-May-16
A1100
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection,Roof Gutter (GL LB1 to LB5)
14d 20-May-16
42d 29-Apr-16
SE-Linkway Bridge , Escalator & Staircase 2 GL10 to GL5
A1110
[PH2-PLF3] Erection of Steel Beams, Steel Roof Truss, at Roof Level (GL LB5 to LB10)
4d 29-Apr-16*
A1130
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over Staircase 2 &Escalator (GL LB7
7d to
29-Apr-16
LB10)
A1120
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over Linkway bridge (GL LB7 to LB10)
7d 03-May-16
A1420
[PH2-PLF3]Escalator Package Erection by SWC
10d 31-May-16*
30d 18-May-16
SE- EXIT Staircase GL LB2 to to S2
A1140
[PH2-PLF3] Erection of Steel Beams, Steel Supports, Truss, Roof panels at E-STC (GL LB5 to LB10)
30d 18-May-16
20d 18-Jun-16
SE- @Ave4 Link way GL LB1 to to S3
A1200
[PH2-PLF3] Erection of Lower linkway Columns @Ave4 (GL LB1 to S2)
5d 18-Jun-16*
A1210
[PH2-PLF3] Installation of Roof beams, Supports, Rafters,purlins, Roofing @ Linkway Ave 4
15d 23-Jun-16
139d 09-May-16
RC Works
10d 09-May-16
RC-Linkway Bridge , Escalator & Staircase 2 GL10 to GL5
A1180
[PH2-PLF3] RC Works at Linkway Level (GL LB5 to LB10)
3d 09-May-16*
A1170
[PH2-PLF3] Erection of Bondek at Linkway Level (GL LB5 to LB10)
4d 10-May-16*
A1450
[PH2-PLF3] RC Works at Staircase 2 Level (GL LB5 to LB10)
7d 12-May-16
12d 18-May-16
RC-Platform GL5 to GL1
A1150
[PH2-PLF3] Erection of Bondek at Platform Level (GL LB1 to LB5)
7d 18-May-16*
A1160
[PH2-PLF3] RC Works at Platform Level (GL LB1 to LB5)
5d 25-May-16
18d 17-Jun-16
RC- EXIT Staircase GL LB2 to to S2
A1190
[PH2-PLF3] RC Works at E-STC Level (GL LB2 to S2)
18d 17-Jun-16
5d 20-Sep-16
RC- @Ave4 Link way GL LB1 to to S3
A1220
[PH2-PLF3] RC Works at linkway @Ave4 (GL LB1 to S2)
5d 20-Sep-16*
123d 08-Jul-16
Installation

T&C

Total Float April 2016


11
18
-34d

218d 29-Apr-16

07-Jul-16
01-Jun-16
06-Jun-16
16-Jun-16
02-Jun-16
01-May-16
09-May-16
11-May-16
19-May-16
02-Jun-16
09-Jun-16
02-May-16
05-May-16
09-May-16
09-Jun-16
16-Jun-16
16-Jun-16
07-Jul-16
22-Jun-16
07-Jul-16
24-Sep-16
18-May-16
11-May-16
13-May-16
18-May-16
29-May-16
24-May-16
29-May-16
04-Jul-16
04-Jul-16
24-Sep-16
24-Sep-16
07-Nov-16

114d
135d
135d
135d
-1d
-36d
-36d
-36d
-36d
-1d
138d
-15d
-2d
169d
0d
-36d
-36d
84d
84d
84d
35d
164d
-8d
169d
-8d
-14d
-14d
-14d
-36d
-36d
10d
10d
-9d

123d 08-Jul-16
90d 08-Jul-16
20d 06-Oct-16

07-Nov-16
05-Oct-16
25-Oct-16

-9d
24d
-11d

20d 06-Oct-16
10d 03-May-16

25-Oct-16
12-May-16

-11d
170d

5d 03-May-16
5d 08-May-16

07-May-16
12-May-16

170d
170d

Erection of Steel Structure Work (Incl. Night Work)

Architectural Finishes
E&M

Finish

29-Apr-16 15:00

24-Sep-16, Construction
07-Jul-16, Erection of Steel Structure Work (Incl. Night Work)
Upstanding beams Erection
Form work and RC works on Upstandd beams GL12 to GL10 @linkway Ramp area
Roller Shutter Erection Works
02-Jun-16, SE-Platform GL5 to GL1
[PH2-PLF3] Erection of Steel Columns at Platform Level (GL LB1 to LB5)
[PH2-PLF3] Erection of Steel Beams at Platform Level (GL LB1 to LB5)
[PH2-PLF3] Erection of Steel Columns at Roof Level (GL LB1 to LB5)
[PH2-PLF3] Erection of Roof Beams, Purlins, Raftors at Roof Level (GL LB1 to LB5)
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection,Roof Gutter (GL LB1 to LB5)
09-Jun-16, SE-Linkway Bridge , Escalator & Staircase 2 GL10 to GL5
[PH2-PLF3] Erection of Steel Beams, Steel Roof Truss, at Roof Level (GL LB5 to LB10)
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over Staircase 2 &Escalator (GL LB7 to LB10)
[PH2-PLF3] Erection of New Metal Roofing System with Lighting Protection over Linkway bridge (GL LB7 to LB10)
[PH2-PLF3]Escalator Package Erection by SWC
16-Jun-16, SE- EXIT Staircase GL LB2 to to S2
[PH2-PLF3] Erection of Steel Beams, Steel Supports, Truss, Roof panels at E-STC (GL LB5 to LB10)
07-Jul-16, SE- @Ave4 Link way GL LB1 to to S3
[PH2-PLF3] Erection of Lower linkway Columns @Ave4 (GL LB1 to S2)
[PH2-PLF3] Installation of Roof beams, Supports, Rafters,purlins, Roofing @ Linkway Ave 4
24-Sep-16, RC Works
18-May-16, RC-Linkway Bridge , Escalator & Staircase 2 GL10 to GL5
[PH2-PLF3] RC Works at Linkway Level (GL LB5 to LB10)
[PH2-PLF3] Erection of Bondek at Linkway Level (GL LB5 to LB10)
[PH2-PLF3] RC Works at Staircase 2 Level (GL LB5 to LB10)
29-May-16, RC-Platform GL5 to GL1
[PH2-PLF3] Erection of Bondek at Platform Level (GL LB1 to LB5)
[PH2-PLF3] RC Works at Platform Level (GL LB1 to LB5)
04-Jul-16, RC- EXIT Staircase GL LB2 to to S2
[PH2-PLF3] RC Works at E-STC Level (GL LB2 to S2)
24-Sep-16, RC- @Ave4 Link way GL LB1 to to S3
[PH2-PLF3] RC Works at linkway @Ave4 (GL LB1 to S2)
07-Nov-16, Installation
07-Nov-16, Architectural Finishes
05-Oct-16, E&M
25-Oct-16, T&C
[PH2-PLF3] Testing Commissioning by C8017 & SW
12-May-16, Others(Demolition & Reconstruction)
Linkway at Near MRT(GL LB12) Existing Structure Demolition works
Roller Shutter Existing Removal/New Roller Shutter Erection

Page 1 of 1