No.
DESCRIPTION
xiii
xiv
B)
Distributory System
A
i
ii
iii
iv
v
vi
vii
viii
ix
x
xi
xii
ii
Development of distributory
system for 32,500 Ac @Rs.150000
per AC
iii
C)
Strengthening of both
reservoirs for 1 TMC
(Construction of Tanks)
As per IBM
Sl.
No.
DESCRIPTION
B)
10779.
78
1931.05
ii
Development of
distributory system
for 32,500 Ac
@Rs.150000 per AC
4875.00
iii
C)
Development of
water Course for
32500 Ac @Rs.
1500 Per Ac
Sub Total Distributory
System :
Strengthening of
both reservoirs
for 1 TMC
(Construction of
Tanks)
COST IN
LAKHS
pressure MainConstruction of
Pipeline with MS pipes
including
manufacture, supply,
delivery,of M.S Pipes
& Specials
transportation
,lowering,laying
,jointing and field
Hydro testing (
Distrybutory System
-Construction of
Pipeline with HDPE
pipes including
manufacture, supply,
delivery,of HDPE
Pipes & Specials
transportation
,lowering,laying
,jointing and field
Hydro testing (
10779.78
22460.23
4100.55
487.50
487.50
7293.5
5
27048.28
8101.0
0
Delivery Cistern at
11.500 Km @ +310M
(250x100x6) - all Civil
Works
4102.19
ADDITIONAL
LENGTH OF
GRAVITY MAIN OF
11.00 KM FROM
DELIVERY CISTERN
TO PAKAL LAKE
Laying of 1800mm dia
10 mm thk about
11.00 km length of
gravity main pipe line
( new proposal)
ECV
Total
26174.
33
ECV
Total
3652.92
45583.17