Вы находитесь на странице: 1из 3

Sl.

No.

DESCRIPTION

xiii
xiv

Pump House and Water


Conductor Systems
Pump house at Ramappa
Miscellaneous
Approach Channel At Ramappa
Site Development works
Out fall Structure
Crossing works
At Nala / River
At Roads
Pipe line Along With Supproting
Arrangements
Electro - mechanical including
control systems
Pumps & Motars at Ramappa
Auxilary Mechnical Equipments
Auxilary Electrical Equipments
Auxilary Miscelleanous
Equipments
Hydro Mechanical
Surge Protection against transient

B)

Distributory System

A
i
ii
iii
iv
v
vi
vii
viii

ix
x
xi
xii

Canal and Allied works

ii

Development of distributory
system for 32,500 Ac @Rs.150000
per AC

iii

Development of water Course for


32500 Ac @Rs. 1500 Per Ac

C)

Strengthening of both
reservoirs for 1 TMC
(Construction of Tanks)

Pump House and Water Conductor


Systems
Pump house at Ramappa
Miscellaneous
Approach Channel At Ramappa
Site Development works
Out fall Structure
Crossing works
At Nala / River
At Roads
Pipe line Along With Supproting
Arrangements
Electro - mechanical including control
systems
Pumps & Motars at Ramappa
Auxilary Mechnical Equipments
Auxilary Electrical Equipments
Auxilary Miscelleanous Equipments
Hydro Mechanical
Surge Protection against transient

pressure Main-Construction of Pipeline


with MS pipes including manufacture,
supply, delivery,of M.S Pipes & Specials
transportation ,lowering,laying ,jointing
and field Hydro testing (
Distrybutory System -Construction of
Pipeline with HDPE pipes including
manufacture, supply, delivery,of HDPE
Pipes & Specials transportation
,lowering,laying ,jointing and field Hydro
testing (
Development of water Course for 32500
Ac @Rs. 1500 Per Ac

Delivery Cistern at 11.500 Km @ +310M


(250x100x6) - all Civil Works
ADDITIONAL LENGTH OF GRAVITY
MAIN OF 11.00 KM FROM DELIVERY
CISTERN TO PAKAL LAKE Laying of
1800mm dia 10 mm thk about 11.00 km
length of gravity main pipe line ( new
proposal)

As per IBM

As per Alternative Proposal


COST
IN
LAKHS

Sl.
No.

DESCRIPTION

Pump House and


Water Conductor
Systems

Pump House and


Water Conductor
Systems

Sub Total -Pump


House and Water
Conductor
Systems :
Distributory
System

Sub Total -Pump


House and Water
Conductor
Systems :

B)

10779.
78

Canal and Allied


works

1931.05

ii

Development of
distributory system
for 32,500 Ac
@Rs.150000 per AC

4875.00
iii

C)

Development of
water Course for
32500 Ac @Rs.
1500 Per Ac
Sub Total Distributory
System :
Strengthening of
both reservoirs
for 1 TMC
(Construction of
Tanks)

COST IN
LAKHS

pressure MainConstruction of
Pipeline with MS pipes
including
manufacture, supply,
delivery,of M.S Pipes
& Specials
transportation
,lowering,laying
,jointing and field
Hydro testing (
Distrybutory System
-Construction of
Pipeline with HDPE
pipes including
manufacture, supply,
delivery,of HDPE
Pipes & Specials
transportation
,lowering,laying
,jointing and field
Hydro testing (

10779.78

22460.23

4100.55

487.50

487.50

7293.5
5

27048.28

8101.0
0

Delivery Cistern at
11.500 Km @ +310M
(250x100x6) - all Civil
Works

4102.19

ADDITIONAL
LENGTH OF
GRAVITY MAIN OF
11.00 KM FROM
DELIVERY CISTERN
TO PAKAL LAKE
Laying of 1800mm dia
10 mm thk about
11.00 km length of
gravity main pipe line
( new proposal)
ECV

Total

26174.
33

ECV

Total

3652.92

45583.17