ID
C Rough Plumbing
ES Duration: LS
EF 3 days LF
ID ID
Total Float: I Install Cabinets K Final Plumbing
ES Duration: LS ES Duration: LS
EF 5 days LF EF 4 days LF
ID ID
J Paint L Final Electric
Total Float:
ES Duration: LS ES Duration: LS
EF 5 days LF EF 2 days LF
ID ID
D Frame F Install HVAC
ES Duration: LS ES Duration: LS Total Float: Total Float:
EF 10days LF EF 4 days LF
Activities Information
Duration Total Float: Total Float:
Activity Description Predecessor
(days)
A Excavation 3 --
B Lay Foundation 4 A ID
G Rough Electric
C Rough Plumbing 3 B
D Frame 10 B ES Duration: LS
Note: Note:
The earliest start (ES) for the initial activity in a project is “time zero”; The latest finish (LF) for the final activity in a project is equal to its EF as determined by the forward pass;
The ES of an activity is equal to the latest (or maximum) early finish of the activities directly preceding it; The LF for any other activity is equal to the earliest (or minimum) LS of the activities directly following (or succeeding) it;
The EF of an activity is equal to its ES plus the duration required to perform the activity. The LS of an activity is equal to its LF minus the time required to perform the activity.
Total Float = Late Finish (LF) - Early Finish (EF) Critical Path is the path of activities with TF = 0
DEVELOPMENT OF THE NETWORK DIAGRAM AND CRITICAL PATH
(Building a Small Shop)
ID
C Rough Plumbing
ES Duration: LS
7
EF 3 days LF
10
ID ID
Total Float: I Install Cabinets K Final Plumbing
ES Duration: LS ES Duration: LS
33 38
EF 5 days LF EF 4 days LF
38 42
Total Float: Total Float:
ES ID ID
0 A Excavation B Lay Foundation ID EF
ID M Install Flooring
ES Duration: LS ES Duration: LS H Drywall
ES Duration: LS
0 3 ES Duration: LS
Start 42 Finis
EF 3 days LF EF 4days LF ID 25
E Finish Exterior EF 4 days LF h
3 7 EF 8 days LF
LS
ES Duration: LS 46
Total Float: Total Float: 33
17 Total Float: LF
25 ID ID
J Paint L Final Electric
Total Float:
ES Duration: LS ES Duration: LS
33 38
EF 5 days LF EF 2 days LF
ID ID 38 40
D Frame F Install HVAC
ES Duration: LS ES Duration: LS Total Float: Total Float:
7 17
EF 10days LF EF 4 days LF
Activities Information 17 21
Duration Total Float: Total Float:
Activity Description Predecessor
(days)
A Excavation 3 --
B Lay Foundation 4 A ID
G Rough Electric
C Rough Plumbing 3 B
D Frame 10 B ES Duration: LS
Note: Note:
The earliest start (ES) for the initial activity in a project is “time zero”; The latest finish (LF) for the final activity in a project is equal to its EF as determined by the forward pass;
The ES of an activity is equal to the latest (or maximum) early finish of the activities directly preceding it; The LF for any other activity is equal to the earliest (or minimum) LS of the activities directly following (or succeeding) it;
The EF of an activity is equal to its ES plus the duration required to perform the activity. The LS of an activity is equal to its LF minus the time required to perform the activity.
Total Float = Late Finish (LF) - Early Finish (EF) Critical Path is the path of activities with TF = 0
DEVELOPMENT OF THE NETWORK DIAGRAM AND CRITICAL PATH
(Building a Small Shop)
ID
C Rough Plumbing
ES Duration: LS
7 22
EF 3 days LF
10 25
ID ID
Total Float: 15 I Install Cabinets K Final Plumbing
ES Duration: LS ES Duration: LS
33 33 38 38
EF 5 days LF EF 4 days LF
38 38 42 42
Total Float: 0 Total Float: 0
ES ID ID
0 A Excavation B Lay Foundation ID EF
ID M Install Flooring 46
ES Duration: LS ES Duration: LS H Drywall
ES Duration: LS
0 0 3 3 ES Duration: LS
Start 42 42 Finis
EF 3 days LF EF 4days LF ID 25 25
E Finish Exterior EF 4 days LF h
3 3 7 7 EF 8 days LF
LS
ES Duration: LS 46 46
0 Total Float: 0 Total Float: 0 33 33
17 17 Total Float: 0 LF
Total Float: 0 46
EF 8 days LF
25 25 ID ID
J Paint L Final Electric
Total Float: 0
ES Duration: LS ES Duration: LS
33 35 38 40
EF 5 days LF EF 2 days LF
ID ID 38 40 40 42
D Frame F Install HVAC
ES Duration: LS ES Duration: LS Total Float: 2 Total Float: 2
7 7 17 21
EF 10days LF EF 4 days LF
Activities Information 17 17 21 25
Duration Total Float: 0 Total Float: 4
Activity Description Predecessor
(days)
A Excavation 3 --
B Lay Foundation 4 A ID
G Rough Electric
C Rough Plumbing 3 B
D Frame 10 B ES Duration: LS
Note: Note:
The earliest start (ES) for the initial activity in a project is “time zero”; The latest finish (LF) for the final activity in a project is equal to its EF as determined by the forward pass;
The ES of an activity is equal to the latest (or maximum) early finish of the activities directly preceding it; The LF for any other activity is equal to the earliest (or minimum) LS of the activities directly following (or succeeding) it;
The EF of an activity is equal to its ES plus the duration required to perform the activity. The LS of an activity is equal to its LF minus the time required to perform the activity.
Total Float = Late Finish (LF) - Early Finish (EF) Critical Path is the path of activities with TF = 0
ID
Test 1 2
ES
EF
ID
1 Task 1
ES Duration: LS Total Float:
EF 32 days LF
Total Float:
Predecessors
Task 1
Task 2 1 ID
Task 3 1 3
Task 4 2,3 ES
Task 5 3
Task 6 3 EF
Task 7 4,5,6
Total Float:
2 Task 2
Duration: LS
15 days LF
ID
4 Task 4
Total Float: ES Duration: LS
EF 10 days LF
Total Float:
ID
3 Task 3 3 Task 5
Duration: LS ES Duration: LS
5 days LF EF 8 days LF
ID
3 Task 6
ES Duration: LS
EF 6 days LF
Total Float:
ID
5 Task 7
ES Duration: LS
EF 4 days LF
Total Float: