Академический Документы
Профессиональный Документы
Культура Документы
30,2001
Rev:
CDP L 3009 E R0
Page:
1 of 26
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
2 of 26
CONTENTS
Page
1. PURPOSE ........................................................................................................................................................4
2.BASIC PROCEDURE.........................................................................................................................................4
2.1 CONTENTS OF LOADING DATA IN EACH STEP ...............................................................................................4
2.2 PREPARATION SCHEDULE OF LOADING DATA AT EACH STEP ..........................................................................5
2.3 REQUIRED UPSTREAM DATA FOR PREPARATION OF LOADING DATA ..................................................................5
3.ITEMS TO BE CONSIDERED IN BASIC PLANNING OF PIPE RACK ......................................................6
3.1 ECONOMICAL WIDTH, LONGITUDINAL SPAN AND STRUCTURAL SYSTEM ............................................................6
3.2 DIFFERENCE IN ELEVATION BETWEEN TRANSVERSE AND LONGITUDINAL DIRECTIONS ......................................8
3.3 STRUCTURAL MATERIAL (CONCRETE/STEEL) .................................................................................................9
3.4 PLANNING IN PIPING LAYOUT.....................................................................................................................9
3.5 HEADER SUPPORT AND MAINTENANCE STAGE FOR AIR COOLED HEAT EXCHANGES(AFC) ..............................10
3.6 VALVE OPERATING STAGE .........................................................................................................................11
3.7
3.8
3.9
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
3 of 26
REVISION CONTROL AND FINAL LOADING DATA (DESIGN COMPLETION STAGE) .......................24
APPENDICES ..............................................................................................................................................26
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
4 of 26
1. PURPOSE
This procedure supplements CES L 4011 EA PIPING LOAD DATA REQUIRED FOR
CIVIL AND STRUCTURAL ENGINEERING, and describes the procedure for the
preparation of pipe rack loading data, which is consistent from both piping
and civil engineering point of view, for the purpose of early start and
completion of pipe rack construction. It describes the items which must
be taken into consideration by the piping group (a party to issue the loading
data) and the civil group (a party to receive the loading data.)
2. BASIC PROCEDURE
In order to minimize revision and prepare the economical and accurate pipe
rack loading data, the usage of loading data shall be made clear for each
item and the loading data shall be prepared in 3 steps for such usage. For
actual items, refer to Table 1-1 ISSUE STEPS FOR PIPING LOAD DATA.
2.1 Contents of Loading Data in Each Step
(1) 1st-STEP
The loading data shall cover the basic dimensions including width, length,
height, number of layers, column spacing in longitudinal direction,
requirement and location for intermediate beams, brace arrangement and
location, and location of stairs. It shall be sufficient for Civil Group
to design the foundation (including piles).
Based on this loading data, Civil Group shall prepare structural planning,
determine approximate sizing of major framing members, develop the
initial model and order piling materials.
(2) 2ND-STEP
The loading data shall be sufficient for Civil Group to perform the detail
design of all elements in the pipe rack. (However, minor stages, pipe
supports and insert plates which do not affect the design of major
structural members are excluded.)
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
5 of 26
Based on this loading data, Civil Group shall perform the detail design
(for purchase of steel materials and preparation of steel fabrication
drawings) and size the members and foundations. The 1st issue of drawings
to the client (IFA or IFR) shall be prepared.
(3) 3RD-STEP
The loading data shall cover minor stages, insert plate, floor openings,
trolley beams, and loads for miscellaneous equipment. The loading data
shall be "Final". It should be noted that major framing members cannot
be revised without cost/schedule effect at this stage, since materials
have been ordered already.
2.2 Preparation Schedule of Loading Data at Each Step
Issue schedule of the loading data at each step shall, in general, be as
shown below; however, it shall be finalized for each project by Piping and
Civil Groups(Refer to Table-1.1):
1ST STEP
ND
STEP
RD
STEP
2
3
PLOT PLAN
FIREFIGHTING P&ID
EXTENT OF FIREPROOFING
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
6 of 26
(2) 2ND-STEP
(3) 3RD-STEP
PIPING STUDY DRAWING / PDS 3D MODEL (FOR INSERT PLATE LOCATION AND
MINOR STAGE INFORMATION)
ELEC/INST.
DESIGN
(FOR
INSERT
PLATE
LOCATION
AND
MINOR
STAGE
INFORMATION)
used.
However,
specifications,
if
fireproofing
selection
of
material
is
specified
(concrete
or
in
Client's
steel
with
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
7 of 26
[Note]
- When requirement for fireproofing on intermediate beams is not clearly
defined, the judgment criteria shall be based on the following:
Use the same pattern. (It is desirable to make the shape uniform and
repetitious to simplify the design/fabrication/construction)
The maximum width of pipe racks with AFC should be limited to 10m.
When the width becomes wider than 10m, additional columns or
cantilevered girders should be considered.
girders
are
provided.
Sockets
are
provided
for
column/footing connections.
- For steel pipe racks, about 100mm space from the column face is required
for plates and bolts in column/girder connections.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
8 of 26
Longitudinal Span
Longitudinal Girder
Width
Girder
Intermediate Beam
Width
Long.
Girder
at diff.
level
Long.
Girder
at
same
level
No. of Pipe
Layer (3 for this
case)
For concrete pipe rack, the transverse girders and longitudinal girders
shall be located at different level for ease of construction.
For steel pipe rack where pipes run straight and few branches are
provided, the transverse girders and longitudinal girders shall be
located at the same elevation.
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
9 of 26
Ends
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
10 of 26
When cantilevers are provided outside the pipe rack framing, small
pipes shall not be placed on cantilevers. (It is difficult to provide
intermediate beams).
3.5 Header Support and Maintenance Stage for Air Cooled Heat Exchanges(AFC)
Header pipe for AFC tends to make the support structure complicated.
The steel weight of header support is substantial. Furthermore, since
the data is not finalized in a short period, the design period is
extended and it is often the cause for engineering re-work and
construction re-work.
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
11 of 26
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
12 of 26
When supports for large diameter piping are required, Civil Group
should be consulted even for
a case where pipe supports are designed and fabricated by Piping Group.
Piping with thermal load shall be located at the same level. (Steam
line etc.)
3.10
Supports for piping loops shall be provided in regular spans and should
not be located at locations such as road crossings.
When it is necessary to provide piping loops at large span location such
as road crossings, it is possible to have the truss in a longitudinal
direction, which may cause clashes between piping and truss members when
thermal expansion/contraction occurs. Civil Group and Piping Group shall
consult at the start of design.
4. PIPING LOAD CALCULATION PROCEDURE
Definition of piping load and computation shall be according to " CES L
4011". The following shall be considered in preparation of loading data:
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
13 of 26
(However,
---
Specific Gravity = 0
(d) Flare
()
GasAirNitrogen
(f)
Others
Specific Gravity=
To be determined individually
1
0
[Note]
- For large diameter piping for gas/vapor (flare header, column
overhead piping etc.) where test loads greatly affect the design of
pipe racks, pneumatic test should be considered. When pneumatic test
is selected as basis of design and construction, Client's approval
is required.
design.
- Hydrostatic test loads of large diameter pipes shall be computed
based on actual test method used at site.
- The above shall be reflected in pipe test plan.
For preparation of piping loading data for piping empty load, fluid
load and test fluid load shall be performed using Appendix-2 & 3 "Load
Table for Pipe Rack". Actual piping data shall be used.
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
14 of 26
Piping Group and Civil Group shall have a meeting before detail
When sliding plate is used under the pipe, it shall be noted in the remarks
column in the table.
When there is a requirement for future piping, space, size, and number
of pipes shall be indicated and the loading data shall include the
load for future piping. However, when size and number of pipes are
not clear, the load of average pipe size on pipe rack piping shall
be applied on the future space. When there is no requirement, space
and load for future piping need not be considered.
If there is a
To account for valves, branch line, support, saddle, and shoe of piping,
the following additional load shall be considered:
Additional Load = { Piping Empty Weight Fluid Weight
Insulation Weight}5%
* This equation is listed as standard load in the Load Table.
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
15 of 26
Load Table
(3) Loads on Longitudinal Girder
same.
1t
3m
3m
1t
1t
1.5
1.5
1t
1.5
0.25 t
2.5
TOTAL = 2 ton
1.5
1t
TOTAL = 1ton
TOTAL = 2 ton
1.5
0 .33t/m(6m= 2t)
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
16 of 26
When wind and seismic loads are required, locations and loads shall
be indicated.
[Note]
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
17 of 26
Piping load shall be calculated from data in " Load Table for Pipe
Rack".
Concentrated Load and Uniform Load: Uniform load shall be grouped into
3 groups based on the location and magnitude. For large loads which
are not treated as uniform loads shall be treated as concentrated loads.
weight
of
pipes needs
to
be
accounted
for.
Future Load
Future piping is also included in the Piping Loading Table. - Such
piping load shall be indicated in the table.
For hydrostatic loads, only one pipe which is critical for the
design of the particular beam need to be considered and other pipes
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
18 of 26
hydrostatic load is not critical for the design of the pipe rack,
it may be omitted.
(2) Load on Longitudinal Girders
At 1st Step Issue, the piping load on the longitudinal girders covers
the large diameter piping only. Therefore, in addition to those loads
indicated on the loading data from Piping Group, a concentrated load
of 1 ton shall be applied at midpoint of each longitudinal girder.
These concentrated loads shall be included in the foundation design.
However, for longitudinal girders such as those for yard pipe racks
and over the access, where it is clear that no pipes are supported,
such additional concentrated loads need not be considered.
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
19 of 26
Page:
Girder
Intermediate Beam
l1
l2
l2
l2
l2
l2
h
PI
PE
RA W
CK
WI
DT
H
l4
l3
l4
W2
W1
W3
l2 + l4
+h)/W =
2
l2 + l2
W2 = ( + +
)/W =
X1.05X(
2
l4 + l4
W3 = ( + +
)/W =
X1.05X(
2
W1 = ( + +
X1.05X(
Kg/m
Kg/m
Kg/m
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
20 of 26
ID
T
l1
PI
PE
RA W
CK
W
Girder
Intermediate Beam
X1.05X(
W = ( + +
l1
+ l2
2
)/W =
Kg/m
(UNIFORM LOAD)
l3
l2
l4
l4
W2
W3
PI
PE
RA W
CK
W
Girder
ID
TH
W1
Intermediate Beam
W = ( + +
X1.05X(l3 OR l 4) / W =
Kg/m
(UNIFORM LOAD)
l3
l4
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
21 of 26
The piping loading data shall be followed. The direction of the force
and short/long term load shall be made clear and shall be reflected
in the design.
For a large force, modifying the detail of pipe guide/anchor such that
some sliding is allowed instead of completely fixity may reduce the
magnitude of the force.
especially when the loading data is revised so that member sizes will
not be revised.
However, attention
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
22 of 26
weight given in "Load Table for Pipe Rack" and pipe sizes. However,
when the Client's specification requires to compute the wind load and
seismic load of individual piping at the fix point of pipes, such loads
shall be included in the loading data. (e. g. When seismic loads for
each pipe is to be computed according to the High Pressure Gas
Regulation in the domestic projects, and wind load on large diameter
piping at high elevation.)
In computing the wind load on the pipe rack along the longitudinal
direction, wind loads on pipes need not be considered.
It shall be consulted and confirmed with the Group who prepared the
loading data whether such loads are to be considered as long term loads
or short term loads. The result shall be incorporated in the design.
For vertical loads, only the design contingency indicated on the piping
loading data shall be considered.
For anchor force, a possibility that the force may vary up to 20% when
sizing members based on the loading data at 1st Step.
branches and ends of pipe racks and when conduits are used, where
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
23 of 26
The
Normally, the AFC loading data includes the wind and seismic loads
acting on AFC. However, when the issue of such data is late, Civil
Group shall compute such loads.
The self weight of pipes and the weight of their contents in operation
and test in the direction of longitudinal span shall be prepared using
Load Table for Pipe Rack. Preliminary data at 1st-Step and the final
data in 2nd-Step shall be prepared and issued to Civil Group.
1ST-STEP
2ND-STEP
1ST-STEP
2ND-STEP
1ST-STEP
2ND-STEP
d) Stairway / ladder
1ST-STEP
2ND-STEP
e) Bracing locations
1ST-STEP
2ND-STEP
1ST-STEP
2ND-STEP
1ST-STEP
2ND-STEP
1ST-STEP
2ND-STEP
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
24 of 26
2ND-STEP
2ND-STEP
3RD-STEP
2ND-STEP
3RD-STEP
3RD-STEP
3RD-STEP
1ST-STEP
2ND-STEP
b) Bracing locations
1ST-STEP
2ND-STEP
1ST-STEP
2ND-STEP
d) Center walkway
1ST-STEP
2ND-STEP
e) Stairway / ladder
1ST-STEP
2ND-STEP
1ST-STEP
2ND-STEP
2ND-STEP
3RD-STEP
(1) Civil Group shall feed back the design load used by them to Piping Group.
Piping Group shall confirm how the net loading data is used in the civil
design.
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
25 of 26
(2) When the piping loading data is changed, Piping Group need not issue
the revised loading data to Civil Group when the revised loading data
is within the actual loading data used by Civil Group or within the value
of design development.
However, Piping Group shall show the record of revised loading data
clearly on the drawings.
[See Note-1]
(3) Piping Group shall ensure that information on all the anchor/guide forces
are given.
However, during design revised information need not be issued provided
that the changes in anchor/guide forces are within the limit described
below:
(*) For anchor point of each line, within 20% of the load and
within 500 kgf
However, Piping Group shall show the record of revised loading data
clearly on the drawings and shall inform Civil Group if the above limit
is exceeded. [See Note-1]
(4) To check the consistency of the final loading data at the time of
completion of PDS model, Piping Group shall check the loading data whether
it is within the design load used by Civil Group and inform them. [See
Note- 1]
[Note -1]
- Changes in load and location shall be indicated by crossing out the previous values
and adding the new data next to them so that the revision history can be identified
easily on the drawings.
CHECK LIST
APPENDIX-6 Check List highlights the items, which are to be considered
in preparation of the loading data. Piping Group shall improve the quality
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Date: Apr.30,2001
Rev:
CDP L 3009 E R0
Page:
26 of 26
APPENDICES
APPENDIX-1
APPENDIX-2
APPENDIX-3
APPENDIX-4
APPENDIX-5
APPENDIX-6
: Check List
APPENDIX-7
APPENDIX-8
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF CHIYODA CORPORATION
(CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION SHALL BE DISCLOSED TO OTHERS OR REPRODUCED
IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR WRITTEN PERMISSION OF CHIYODA.
Table-1
ISSUE STEP
STATUS
INFORMATION DRAWING
10
11
12
13
14
15
CONTRACT AWARD
1ST-STEP
( REV.0 )
FIXED
PLOT/P&ID
PIPING STUDY
PRELIMINARY
PRELIMINARY
PRELIMINARY
PRELIMINARY
L/D PREPARATION
2ND-STEP
( REV.1 )
1ST STEP
3RD STEP
PRELIMINARY
PRELIMINARY
PRELIMINARY
FIXED
FIXED
FIXED
FIXED
FIXED
FIXED
FIXED
FDN START
ERECTION
HANDOVER TO PIPING
PRELIMINARY
PRELIMINARY
RC PRECAST/ERECTION
3RD-STEP
1)INFORMATION ON DELETION OF
LONGITUDINAL GIRDERS(NOT REQUIRED
STRUCTURALLY)
FIXED
ADDITION/REVI
SION
(PRIOR TO
FIXED
MATERIAL
( REV.2 )
PLAN, ELEVATION
FIXED
FIXED
FIXED
*1: OVERALL PROJECT SCHEDULE IS 26-28 MONTHS AFTER CONTRACT AWARD. PIPING GENERAL ROUTING IS TO START AT 1-2 MONTHS AFTER CONTRACT AWARD.
DETAILED SCHEDULE SHALL BE SET FOR EACH PROJECT.
*2: ONLY THOSE LOADS GREATER THAN 1 TON (FOR LONGITUDINAL SPAN OF 6 M) SHALL BE INDICATED IN LOADING DATA.
*3: OPENINGS GREATER THAN OR EQUAL TO 150 DIA SHALL BE FIXED IN STEP 3. OPENINGS SMALLER THAN 150 DIA SHALL BE PROVIDED AT SITE. (PIPING GROUP AND CIVIL GROUP SHALL DISCUSS AND CONFIRM ON PROJECT BY PROJECT BASIS).
*4: FOR LOADS LESS THAN 1 TON, INSERT PLATE SHALL BE PROVIDED AT SITE BY USING CHEMICAL ANCHOR ETC.(PIPING GROUP AND CIVIL GROUP SHALL DISCUSS AND CONFIRM ON PROJECT BY PROJECT BASIS).
APPENDIX-1
CDP L 3009 E
Page 1 of 1
DETAIL-X
CONCEPTUAL SKETCHES OF
PIPE RACKS
DETAIL-X
ALL RIGHTS RESERVED. THIS DOCUMENT AND ANY DATA AND INFORMATION CONTAINED THEREIN ARE CONFIDENTIAL AND THE PROPERTY OF
CHIYODA CORPORATION (CHIYODA) AND THE COPYRIGHT THEREIN IS VESTED IN CHIYODA. NO PART OF THIS DOCUMENT, DATA, OR INFORMATION
SHALL BE DISCLOSED TO OTHERS OR REPRODUCED IN ANY MANNER OR USED FOR ANY PURPOSE WHATSOEVER, EXCEPT WITH THE PRIOR
WRITTEN PERMISSION OF CHIYODA.
APPENDIX-2A
CDP L 3009 ER0
Page 1 of 1
PROJECT :
JOB No. :
PIPE RACK
DOC NO.
COLUMN No.
REV NO.
DATE
SERVICE
CLASS
INFORMATION DATA
PIPE
WALL
INS.
SIZE
THK
THK
PIPE
SPECIFIC
FLUID
WEIGHT
kg/m
GRAVITY
WEIGHT
kg/m
+ +
ADDITIONAL
kg/m
(NOTE-4)
kg
WEIGHT
kg/m
WEIGHT
INDICATE
OTHERS
REMARKS
PIPE TO
INDICATE
PIPE
WHEN PIPE
WHEN ON
(NOTE-3) DISTANCE
SIZE IS
ONLY WHEN INTERMEDIATE
mm
NOT FIXED
BEAM
ON GIRDER
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL
(kg/m2)
NOTES :
- 1 WEIGHTS OF STEAM TRACER AND STEAM JACKET PIPE ARE TO BE INCLUDED IN PIPE WEIGHTS SHOWN ABOVE.
- 2 " GIRDER " MEANS A BEAM LOCATED AT A COLUMN, " INTERMEDIATE BEAM " MEANS A BEAM LOCATED BETWEEN COLUMNS
- 3 WHEN SPECIAL CONSIDERATION IS NEEDED, INDICATE IN THIS COLUMN AND SHOW THE SUPPORT POINTS ON THE
LOADING DATA INFORMATION DRAWINGS.
(1) LOADS OTHER THAN PIPE SUCH AS VALVES, FITTINGS AND BRANCH PIPE WEIGHTS : ( 5 %
(2) DESIGN DEVELOPMENT LOADS ( DESIGN CONTINGENCY )
: ( ) %
- 4 WHEN NOT APPROPRIATE TO APPLY AVERAGE WEIGHT, SUCH AS AT ENDS OF PIPE RACK, CORNERS, AT LOCATIONS WHERE VALVES ARE
CONCENTRATED, AND AT SADDLE FOR LARGE DIAMETER PIPING, ADDITIONAL WEIGHTS SHALL BE INDICATED IN THIS COLUMN.
APPENDIX-2B
CDP L 3009 ER0
Page 1 of 1
JOB No. :
COLUMN No.
PIPE RACK
DOC NO.
REV NO.
DATE
SERVICE
CLASS
INFORMATION DATA
PIPE
WALL
INS.
SIZE
THK
THK
PIPE
SPECIFIC
FLUID
WEIGHT
kg/m
GRAVITY
WEIGHT
kg/m
+ + ADDITIONAL
WEIGHT
kg/m
WEIGHT
(NOTE-4)
kg
kg/m
REMARKS
INDICATE
OTHERS
PIPE TO
INDICATE
PIPE
WHEN PIPE
WHEN ON
(NOTE-3) DISTANCE
SIZE IS
ONLY WHEN INTERMEDIATE
mm
NOT FIXED
BEAM
ON GIRDER
0
0
0
0
0
0
0
0
TOTAL
(kg/m2)
APPENDIX-2C
CDP L 3009 ER0
Page 1 of 1
JOB No. :
COLUMN No.
PIPE RACK
DOC NO.
REV NO.
DATE
SERVICE
CLASS
INFORMATION DATA
PIPE
WALL
INS.
SIZE
THK
THK
PIPE
SPECIFIC
FLUID
WEIGHT
kg/m
GRAVITY
WEIGHT
kg/m
+ + ADDITIONAL
TEST FLUIDINSULATION
WEIGHT
kg/m
WEIGHT
kg/m
WEIGHT
(NOTE-4)
kg
kg/m
REMARKS
PIPE TO
INDICATE
PIPE
WHEN PIPE
WHEN ON
(NOTE-3) DISTANCE
SIZE IS
ONLY WHEN INTERMEDIAT
mm
NOT FIXED
E BEAM
ON GIRDER
0
0
0
0
0
0
TOTAL
Automatically input
continuously piping from
north or east side by 3D
PDS MODEL
(kg/m2)
A
C
Appendix-3
SAMPLE
PROJECT : XXXXXXXXX
JOB No. :
BBBBB
COLUMN No.
SERVICE
CLASS
PIPE
DOC NO.
-3
8.0
6.5
LINE DATA
LINE NUMBERS
INS.
SIZE
THK
THK
(NPS)
(Sch No)
mm
PIPE
SPECIFIC
FLUID
WEIGHT
kg/m
GRAVITY
WEIGHT
kg/m
+ + ADDITIONAL
WEIGHT
kg/m
WEIGHT
(NOTE-4)
kg
kg/m
INDICATE
REV NO.
m
DATE
INFORMATION DATA
WALL
********
OTHERS
REMARKS
PIPE TO
INDICATE
PIPE
WHEN PIPE
WHEN ON
ONLY WHEN
ON GIRDER
(NOTE-3) DISTANCE
SIZE IS
INTERMEDIATE
mm
NOT FIXED
BEAM
COLUMN "F"
P-1001
A1
10
40
59.19
0.86
41.81
48.62
109.00
P-1020
B1
1-1/2
80
5.41
1.00
1.14
1.14
6.55
FUTURE PIPE
A1
40
16.02
1.00
8.22
8.22
24.24
150
FUTURE PIPE
40
16.02
1.00
8.22
8.22
24.24
150
FUTURE PIPE
40
16.02
1.00
8.22
8.22
24.24
150
40
16.02
1.00
8.22
8.22
24.24
150
space.
FUTURE PIPE
CABLE DUCT
W-5001
60
500
1000W
AI
16
330
100
30
1.00
92.98
117.87
92.98
200
COLUMN "E"
450
600
0
0
0
0
0
0
TOTAL
305.49
200
8000
150.0 (kg/m2)
NOTES :
- 1 WEIGHTS OF STEAM TRACER AND STEAM JACKET PIPE ARE TO BE INCLUDED IN PIPE WEIGHTS SHOWN ABOVE.
- 2 " GIRDER " MEANS A BEAM LOCATED AT A COLUMN, " INTERMEDIATE BEAM " MEANS A BEAM LOCATED BETWEEN COLUMNS
- 3 WHEN SPECIAL CONSIDERATION IS NEEDED, INDICATE IN THIS COLUMN AND SHOW THE SUPPORT POINTS ON THE
LOADING DATA INFORMATION DRAWINGS.
(1) LOADS OTHER THAN PIPE SUCH AS VALVES, FITTINGS AND BRANCH PIPE WEIGHTS : ( 5 %
(2) DESIGN DEVELOPMENT LOADS ( DESIGN CONTINGENCY )
: ( ) %
- 4 WHEN NOT APPROPRIATE TO APPLY AVERAGE WEIGHT, SUCH AS AT ENDS OF PIPE RACK, CORNERS, AT LOCATIONS WHERE VALVES ARE
CONCENTRATED, AND AT SADDLE FOR LARGE DIAMETER PIPING, ADDITIONAL WEIGHTS SHALL BE INDICATED IN THIS COLUMN.
Appendix-6
CDP L 3009 ER0
Page 1 of 1
DWG No. :
CHECK LIST
PIPE RACK LOADING DATA
PROJECT :
JOB No. :
LE
DESIGNER
( REVIEW )
CHECK
No.
LE
SIGN
CHECK ITEM
LAYOUT
PIPING
aSUPPORT LOCATIONS AND LOADS
bECONOMICAL DESIGN FOR PIPE SUPPORTS ( ESPECIALLY FOR AFC HEADER SUPPORTS )
cSPACE AND LOADS FOR FUTURE PIPING AND INSTRUMENT & ELECTRICAL CABLE
LOCATION OF VERTICAL BRACE AND CONFIRMATION OF VIBRATION FORCE, IF ANY, WITH CIVIL GROUP
bINTERFERENCE BETWEEN PIPING AND EQUIPMENT, AUXILIARY EQUIPMENT, INSTRUMENT, CABLE DUCT ETC.
SWITCHES
STRUCTURAL
INTERFERENCE
INTERFERENCE BETWEEN PIPING AND COLUMN*, DIRDER*, BEAM*, VERTICAL & HORIZONTAL BRACE, ETC.
( * EXPECTED SIZE )
DESIGNER
DATE
REMARKS
SIGN
DATE
Appendix-7.1
CDP L 3009 ER
Page 1 of 1
Variation in equivalent load to 1 ton load acting at mid-span of 6m long longitudinal girders
is shown in this APPENDIX.
INDEX
PIPE MATERIAL
( Note 1 )
INSULATION
( Note 2 )
CASE : 1
C.S
NON
CASE : 2
C.S
50mm
CASE : 3
C.S
100mm
Notes :
1 PIPE
: ASME standard
2 INSULATION : Heat insulator made of calcium silicate
Page 1 of 2
Appendix-7.2
CDP L 3009 ER
REV NO.0
CASE : 1
DATE4/30'99
NON INSULATION
MADE BYY,SHITAYA
SPECIFIC GRAVITY
0
PIPE
WALL
INS.
SIZE
THK
THK
PIPE
10
12
14
(kg/m)
++
FLUID INSULATION
WEIGHT WEIGHT
(mm)
(kg/m)
0.5
MIN. LINE
QUANT.
WEIGHT
(kg/m)
(kg/m)
++
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
1.0
MIN. LINE
QUANT.
(kg/m)
++
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
MIN. LINE
QUANT.
(kg/m)
160
11.1
0.0
11.1 14
( 0.93 TON)
0.7
11.8 14
( 0.99 TON)
1.5
12.6 13
( 0.98 TON)
80
7.5
0.0
7.5 21
( 0.94 TON)
1.0
8.4 19
( 0.96 TON)
1.9
9.4 17
( 0.96 TON)
40
5.4
0.0
5.4 29
( 0.95 TON)
1.1
6.5 25
( 0.98 TON)
2.2
7.6 21
160
21.4
0.0
21.4
( 0.90 TON)
1.8
23.1
( 0.97 TON)
3.5
24.9
( 0.90 TON)
80
15.3
0.0
15.3
( 0.82 TON)
2.1
17.4
( 0.94 TON)
4.3
19.6
( 0.94 TON)
( 0.96 TON)
40
11.3
0.0
11.3 14
( 0.95 TON)
2.4
13.7 12
( 0.99 TON)
4.8
16.1 10
( 0.97 TON)
160
33.6
0.0
33.6
( 0.81 TON)
3.0
36.6
( 0.88 TON)
6.0
39.5
( 0.95 TON)
80
22.4
0.0
22.4
( 0.94 TON)
3.7
26.1
( 0.94 TON)
7.4
29.8
( 0.89 TON)
40
16.0
0.0
16.0 10
( 0.96 TON)
4.1
20.1
( 0.97 TON)
8.2
24.2
( 0.87 TON)
160
66.0
0.0
66.0
( 0.79 TON)
6.5
72.5
( 0.87 TON)
13.0
79.0
( 0.95 TON)
80
41.8
0.0
41.8
( 0.75 TON)
8.1
49.9
( 0.90 TON)
16.1
57.9
( 0.70 TON)
40
27.7
0.0
27.7
( 0.83 TON)
9.0
36.6
( 0.88 TON)
17.9
45.6
( 0.82 TON)
160
109.6
0.0
109.6
( 0.66 TON)
11.4
121.0
( 0.73 TON)
22.8
132.4
( 0.79 TON)
80
63.8
0.0
63.8
( 0.77 TON)
14.3
78.1
( 0.94 TON)
28.6
92.4
( 0.55 TON)
40
42.1
0.0
42.1
( 0.76 TON)
15.7
57.8
( 0.69 TON)
31.4
73.5
( 0.88 TON)
80
94.0
0.0
94.0
( 0.56 TON)
22.1
116.0
( 0.70 TON)
44.2
138.1
( 0.83 TON)
40
59.2
0.0
59.2
( 0.71 TON)
24.3
83.5
( 0.50 TON)
48.6
107.8
( 0.65 TON)
20
41.2
0.0
41.2
( 0.99 TON)
25.5
66.6
( 0.80 TON)
50.9
92.1
( 0.55 TON)
80
129.2
0.0
129.2
( 0.78 TON)
31.6
160.8
( 0.96 TON)
63.2
192.4
( 0.00 TON)
40
78.3
0.0
78.3
( 0.94 TON)
34.8
113.1
( 0.68 TON)
69.7
148.0
( 0.89 TON)
20
49.3
0.0
49.3
( 0.89 TON)
36.7
86.0
( 0.52 TON)
73.4
122.7
( 0.74 TON)
80
157.7
0.0
157.7
( 0.95 TON)
39.6
197.3
( 0.00 TON)
79.2
236.9
( 0.00 TON)
( 0.00 TON)
40
94.3
0.0
94.3
( 0.57 TON)
43.7
138.0
( 0.83 TON)
87.3
181.6
20
67.7
0.0
67.7
( 0.81 TON)
45.3
113.1
( 0.68 TON)
90.7
158.4
( 0.95 TON)
80
203.2
0.0
203.2
( 0.00 TON)
51.9
255.1
( 0.00 TON)
103.8
307.0
( 0.00 TON)
REMARKS
Page 2 of 2
Appendix-7.2
CDP L 3009 ER
REV NO.0
CASE : 1
DATE4/30'99
NON INSULATION
MADE BYY,SHITAYA
SPECIFIC GRAVITY
0
16
18
20
24
26
0.5
1.0
40
123.3
0.0
123.3
( 0.74 TON)
57.0
180.3
( 0.00 TON)
114.0
237.3
( 0.00 TON)
20
77.6
0.0
77.6
( 0.93 TON)
59.9
137.6
( 0.83 TON)
119.8
197.5
( 0.00 TON)
80
254.4
0.0
254.4
( 0.00 TON)
65.9
320.3
( 0.00 TON)
131.8
386.1
( 0.00 TON)
40
156.2
0.0
156.2
( 0.94 TON)
72.1
228.3
( 0.00 TON)
144.3
300.5
( 0.00 TON)
20
87.5
0.0
87.5
( 0.53 TON)
76.5
164.0
( 0.98 TON)
153.0
240.6
( 0.00 TON)
80
311.3
0.0
311.3
( 0.00 TON)
81.5
392.8
( 0.00 TON)
163.0
474.3
( 0.00 TON)
40
183.6
0.0
183.6
( 0.00 TON)
89.7
273.2
( 0.00 TON)
179.3
362.9
( 0.00 TON)
20
116.8
0.0
116.8
( 0.70 TON)
93.9
210.7
( 0.00 TON)
187.8
304.6
( 0.00 TON)
80
442.3
0.0
442.3
( 0.00 TON)
117.8
560.1
( 0.00 TON)
235.5
677.9
( 0.00 TON)
40
255.5
0.0
255.5
( 0.00 TON)
129.7
385.2
( 0.00 TON)
259.3
514.8
( 0.00 TON)
20
140.6
0.0
140.6
( 0.84 TON)
137.0
277.6
( 0.00 TON)
274.0
414.5
( 0.00 TON)
80
525.2
0.0
525.2
( 0.00 TON)
137.8
663.0
( 0.00 TON)
275.6
800.9
( 0.00 TON)
40
299.0
0.0
299.0
( 0.00 TON)
152.2
451.2
( 0.00 TON)
304.4
603.4
( 0.00 TON)
20
202.9
0.0
202.9
( 0.00 TON)
158.3
361.2
( 0.00 TON)
316.7
519.6
( 0.00 TON)
Page 1 of 2
Appendix-7.3
CDP L 3009 ER
REV NO.0
CASE : 2
DATE4/30'99
INSULATION:50mm
MADE BYY,SHITAYA
SPECIFIC GRAVITY
0
PIPE
WALL
INS.
SIZE
THK
THK
80
(kg/m)
(kg/m)
QUANT.
(kg/m)
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
MIN. LINE
QUANT.
(kg/m)
( 0.99 TON)
0.7
3.9
15.7 10
( 0.94 TON)
1.5
3.9
16.4 10
( 0.99 TON)
11.3 14
( 0.95 TON)
1.0
3.9
12.3 13
( 0.96 TON)
1.9
3.9
13.3 12
( 0.95 TON)
9.3 17
( 0.95 TON)
1.1
3.9
10.4 15
( 0.94 TON)
2.2
3.9
11.5 14
( 0.97 TON)
160
21.4
0.0
4.7
26.1
( 0.94 TON)
1.8
4.7
27.9
( 0.84 TON)
3.5
4.7
29.6
( 0.89 TON)
15.3
0.0
4.7
20.0
( 0.96 TON)
2.1
4.7
22.2
( 0.93 TON)
4.3
4.7
24.3
( 0.88 TON)
11.3
0.0
4.7
16.1 10
( 0.96 TON)
2.4
4.7
18.5
( 0.89 TON)
4.8
4.7
20.9
( 0.88 TON)
33.6
0.0
5.5
39.1
( 0.94 TON)
3.0
5.5
42.1
( 0.76 TON)
6.0
5.5
45.1
( 0.81 TON)
22.4
0.0
5.5
27.9
( 0.84 TON)
3.7
5.5
31.6
( 0.95 TON)
7.4
5.5
35.3
( 0.85 TON)
16.0
0.0
5.5
21.5
( 0.90 TON)
4.1
5.5
25.6
( 0.92 TON)
8.2
5.5
29.8
( 0.89 TON)
50
80
50
80
50
66.0
0.0
7.1
73.0
( 0.88 TON)
6.5
7.1
79.6
( 0.95 TON)
13.0
7.1
86.1
( 0.52 TON)
41.8
0.0
7.1
48.9
( 0.88 TON)
8.1
7.1
56.9
( 0.68 TON)
16.1
7.1
65.0
( 0.78 TON)
40
27.7
0.0
7.1
34.7
( 0.83 TON)
9.0
7.1
43.7
( 0.79 TON)
17.9
7.1
52.7
( 0.95 TON)
160
109.6
0.0
8.6
118.3
( 0.71 TON)
11.4
8.6
129.6
( 0.78 TON)
22.8
8.6
141.0
( 0.85 TON)
63.8
0.0
8.6
72.4
( 0.87 TON)
14.3
8.6
86.7
( 0.52 TON)
28.6
8.6
101.0
( 0.61 TON)
42.1
0.0
8.6
50.7
( 0.91 TON)
15.7
8.6
66.4
( 0.80 TON)
31.4
8.6
82.1
( 0.99 TON)
94.0
0.0
10.2
104.1
( 0.62 TON)
22.1
10.2
126.2
( 0.76 TON)
44.2
10.2
148.3
( 0.89 TON)
59.2
0.0
10.2
69.4
( 0.83 TON)
24.3
10.2
93.7
( 0.56 TON)
48.6
10.2
118.0
( 0.71 TON)
41.2
0.0
10.2
51.4
( 0.92 TON)
25.5
10.2
76.8
( 0.92 TON)
50.9
10.2
102.3
( 0.61 TON)
129.2
0.0
11.7
140.9
( 0.85 TON)
31.6
11.7
172.5
( 0.00 TON)
63.2
11.7
204.2
( 0.00 TON)
78.3
0.0
11.7
90.0
( 0.54 TON)
34.8
11.7
124.9
( 0.75 TON)
69.7
11.7
159.7
( 0.96 TON)
49.3
0.0
11.7
61.0
( 0.73 TON)
36.7
11.7
97.7
( 0.59 TON)
73.4
11.7
134.4
( 0.81 TON)
157.7
0.0
12.9
170.6
( 0.00 TON)
39.6
12.9
210.2
( 0.00 TON)
79.2
12.9
249.8
( 0.00 TON)
94.3
0.0
12.9
107.2
( 0.64 TON)
43.7
12.9
150.8
( 0.90 TON)
87.3
12.9
194.5
( 0.00 TON)
20
67.7
0.0
12.9
80.6
( 0.97 TON)
45.3
12.9
125.9
( 0.76 TON)
90.7
12.9
171.3
( 0.00 TON)
80
203.2
0.0
14.4
217.6
( 0.00 TON)
51.9
14.4
269.5
( 0.00 TON)
103.8
14.4
321.4
( 0.00 TON)
123.3
0.0
14.4
137.7
( 0.83 TON)
57.0
14.4
194.7
( 0.00 TON)
114.0
14.4
251.7
( 0.00 TON)
77.6
0.0
14.4
92.0
( 0.55 TON)
59.9
14.4
152.0
( 0.91 TON)
119.8
14.4
211.9
( 0.00 TON)
80
50
40
50
20
80
40
50
20
80
16
15.0 11
++
3.9
80
14
(kg/m)
3.9
WEIGHT
3.9
40
12
(kg/m)
FLUID INSULATION
WEIGHT
MIN. LINE
0.0
160
10
QUANT.
1.0
++
0.0
40
0.0
WEIGHT
7.5
160
(kg/m)
11.1
MIN. LINE
5.4
40
(kg/m)
0.5
++
40
80
50
FLUID INSULATION
WEIGHT WEIGHT
160
2
PIPE
40
40
20
50
50
REMARKS
Page 2 of 2
Appendix-7.3
CDP L 3009 ER
REV NO.0
CASE : 2
DATE4/30'99
INSULATION:50mm
MADE BYY,SHITAYA
SPECIFIC GRAVITY
0
PIPE
WALL
INS.
SIZE
THK
THK
40
50
26
(kg/m)
254.4
0.0
MIN. LINE
QUANT.
WEIGHT
(kg/m)
16.0
(kg/m)
1.0
++
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
MIN. LINE
QUANT.
(kg/m)
++
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
MIN. LINE
QUANT.
(kg/m)
270.3
( 0.00 TON)
65.9
16.0
336.2
( 0.00 TON)
131.8
16.0
402.1
( 0.00 TON)
0.0
16.0
172.2
( 0.00 TON)
72.1
16.0
244.3
( 0.00 TON)
144.3
16.0
316.4
( 0.00 TON)
87.5
0.0
16.0
103.5
( 0.62 TON)
76.5
16.0
180.0
( 0.00 TON)
153.0
16.0
256.5
( 0.00 TON)
311.3
0.0
17.5
328.8
( 0.00 TON)
81.5
17.5
410.3
( 0.00 TON)
163.0
17.5
491.8
( 0.00 TON)
183.6
0.0
17.5
201.1
( 0.00 TON)
89.7
17.5
290.7
( 0.00 TON)
179.3
17.5
380.4
( 0.00 TON)
20
116.8
0.0
17.5
134.3
( 0.81 TON)
93.9
17.5
228.2
( 0.00 TON)
187.8
17.5
322.1
( 0.00 TON)
80
442.3
0.0
20.6
462.9
( 0.00 TON)
117.8
20.6
580.7
( 0.00 TON)
235.5
20.6
698.5
( 0.00 TON)
255.5
0.0
20.6
276.1
( 0.00 TON)
129.7
20.6
405.8
( 0.00 TON)
259.3
20.6
535.5
( 0.00 TON)
80
24
(kg/m)
0.5
++
156.2
20
20
FLUID INSULATION
WEIGHT WEIGHT
80
18
PIPE
40
40
50
50
20
140.6
0.0
20.6
161.2
( 0.97 TON)
137.0
20.6
298.2
( 0.00 TON)
274.0
20.6
435.2
( 0.00 TON)
80
525.2
0.0
22.2
547.4
( 0.00 TON)
137.8
22.2
685.2
( 0.00 TON)
275.6
22.2
823.0
( 0.00 TON)
299.0
0.0
22.2
321.2
( 0.00 TON)
152.2
22.2
473.4
( 0.00 TON)
304.4
22.2
625.6
( 0.00 TON)
202.9
0.0
22.2
225.0
( 0.00 TON)
158.3
22.2
383.4
( 0.00 TON)
316.7
22.2
541.7
( 0.00 TON)
40
20
50
REMARKS
Page 1 of 2
Appendix-7.4
CDP L 3009 ER
REV NO.0
CASE : 3
DATE4/30'99
INSULATION:100mm
MADE BYY,SHITAYA
SPECIFIC GRAVITY
0
PIPE
WALL
INS.
SIZE
THK
THK
PIPE
160
10
12
(kg/m)
MIN. LINE
QUANT.
WEIGHT
(kg/m)
(kg/m)
++
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
MIN. LINE
QUANT.
(kg/m)
++
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
MIN. LINE
QUANT.
(kg/m)
0.0
9.2
20.3
( 0.97 TON)
0.7
9.2
21.0
( 0.88 TON)
1.5
9.2
21.7
( 0.91 TON)
7.5
0.0
9.2
16.6
( 0.90 TON)
1.0
9.2
17.6
( 0.95 TON)
1.9
9.2
18.6
( 0.89 TON)
40
5.4
0.0
9.2
14.6 11
( 0.96 TON)
1.1
9.2
15.7 10
( 0.94 TON)
2.2
9.2
16.8
( 0.91 TON)
160
21.4
0.0
10.6
32.0
( 0.96 TON)
1.8
10.6
33.7
( 0.81 TON)
3.5
10.6
35.5
( 0.85 TON)
15.3
0.0
10.6
25.9
( 0.93 TON)
2.1
10.6
28.0
( 0.84 TON)
4.3
10.6
30.2
( 0.91 TON)
( 0.96 TON)
80
100
100
40
11.3
0.0
10.6
22.0
( 0.92 TON)
2.4
10.6
24.4
( 0.88 TON)
4.8
10.6
26.8
160
33.6
0.0
11.9
45.5
( 0.82 TON)
3.0
11.9
48.5
( 0.87 TON)
6.0
11.9
51.5
( 0.93 TON)
22.4
0.0
11.9
34.3
( 0.82 TON)
3.7
11.9
38.0
( 0.91 TON)
7.4
11.9
41.7
( 0.75 TON)
80
100
40
16.0
0.0
11.9
27.9
( 0.84 TON)
4.1
11.9
32.0
( 0.96 TON)
8.2
11.9
36.2
( 0.87 TON)
160
66.0
0.0
14.5
80.5
( 0.97 TON)
6.5
14.5
87.0
( 0.52 TON)
13.0
14.5
93.5
( 0.56 TON)
( 0.87 TON)
41.8
0.0
14.5
56.3
( 0.68 TON)
8.1
14.5
64.4
( 0.77 TON)
16.1
14.5
72.4
40
80
27.7
0.0
14.5
42.2
( 0.76 TON)
9.0
14.5
51.1
( 0.92 TON)
17.9
14.5
60.1
( 0.72 TON)
160
109.6
0.0
17.1
126.7
( 0.76 TON)
11.4
17.1
138.1
( 0.83 TON)
22.8
17.1
149.5
( 0.90 TON)
80
100
63.8
0.0
17.1
80.9
( 0.97 TON)
14.3
17.1
95.2
( 0.57 TON)
28.6
17.1
109.5
( 0.66 TON)
40
42.1
0.0
17.1
59.2
( 0.71 TON)
15.7
17.1
74.9
( 0.90 TON)
31.4
17.1
90.6
( 0.54 TON)
80
94.0
0.0
19.7
113.7
( 0.68 TON)
22.1
19.7
135.8
( 0.81 TON)
44.2
19.7
157.8
( 0.95 TON)
( 0.77 TON)
40
100
59.2
0.0
19.7
78.9
( 0.95 TON)
24.3
19.7
103.2
( 0.62 TON)
48.6
19.7
127.5
20
41.2
0.0
19.7
60.9
( 0.73 TON)
25.5
19.7
86.4
( 0.52 TON)
50.9
19.7
111.8
( 0.67 TON)
80
129.2
0.0
22.3
151.5
( 0.91 TON)
31.6
22.3
183.1
( 0.00 TON)
63.2
22.3
214.7
( 0.00 TON)
40
100
100
80
16
++
1.0
11.1
80
20
14
(kg/m)
FLUID INSULATION
WEIGHT WEIGHT
(mm)
0.5
40
100
78.3
0.0
22.3
100.6
( 0.60 TON)
34.8
22.3
135.4
( 0.81 TON)
69.7
22.3
170.3
( 0.00 TON)
49.3
0.0
22.3
71.6
( 0.86 TON)
36.7
22.3
108.3
( 0.65 TON)
73.4
22.3
145.0
( 0.87 TON)
157.7
0.0
24.2
181.9
( 0.00 TON)
39.6
24.2
221.5
( 0.00 TON)
79.2
24.2
261.1
( 0.00 TON)
94.3
0.0
24.2
118.5
( 0.71 TON)
43.7
24.2
162.1
( 0.97 TON)
87.3
24.2
205.8
( 0.00 TON)
20
67.7
0.0
24.2
91.9
( 0.55 TON)
45.3
24.2
137.3
( 0.82 TON)
90.7
24.2
182.6
( 0.00 TON)
80
203.2
0.0
26.8
230.0
( 0.00 TON)
51.9
26.8
281.9
( 0.00 TON)
103.8
26.8
333.8
( 0.00 TON)
123.3
0.0
26.8
150.1
( 0.90 TON)
57.0
26.8
207.1
( 0.00 TON)
114.0
26.8
264.1
( 0.00 TON)
77.6
0.0
26.8
104.4
( 0.63 TON)
59.9
26.8
164.3
( 0.99 TON)
119.8
26.8
224.2
( 0.00 TON)
40
20
100
REMARKS
Page 2 of 2
Appendix-7.4
CDP L 3009 ER
REV NO.0
CASE : 3
DATE4/30'99
INSULATION:100mm
MADE BYY,SHITAYA
SPECIFIC GRAVITY
0
PIPE
WALL
INS.
SIZE
THK
THK
PIPE
80
20
24
26
40
100
++
FLUID INSULATION
WEIGHT WEIGHT
(mm)
18
0.5
MIN. LINE
QUANT.
WEIGHT
(kg/m)
(kg/m)
1.0
++
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
MIN. LINE
QUANT.
(kg/m)
++
FLUID INSULATION
WEIGHT
WEIGHT
(kg/m)
(kg/m)
MIN. LINE
QUANT.
(kg/m)
(kg/m)
(kg/m)
254.4
0.0
29.4
283.7
( 0.00 TON)
65.9
29.4
349.6
( 0.00 TON)
131.8
29.4
415.5
( 0.00 TON)
156.2
0.0
29.4
185.6
( 0.00 TON)
72.1
29.4
257.7
( 0.00 TON)
144.3
29.4
329.8
( 0.00 TON)
20
87.5
0.0
29.4
116.9
( 0.70 TON)
76.5
29.4
193.4
( 0.00 TON)
153.0
29.4
269.9
( 0.00 TON)
80
311.3
0.0
31.9
343.3
( 0.00 TON)
81.5
31.9
424.8
( 0.00 TON)
163.0
31.9
506.3
( 0.00 TON)
183.6
0.0
31.9
215.5
( 0.00 TON)
89.7
31.9
305.1
( 0.00 TON)
179.3
31.9
394.8
( 0.00 TON)
20
116.8
0.0
31.9
148.7
( 0.89 TON)
93.9
31.9
242.6
( 0.00 TON)
187.8
31.9
336.5
( 0.00 TON)
80
442.3
0.0
37.1
479.5
( 0.00 TON)
117.8
37.1
597.2
( 0.00 TON)
235.5
37.1
715.0
( 0.00 TON)
255.5
0.0
37.1
292.7
( 0.00 TON)
129.7
37.1
422.3
( 0.00 TON)
259.3
37.1
552.0
( 0.00 TON)
40
40
100
100
20
140.6
0.0
37.1
177.7
( 0.00 TON)
137.0
37.1
314.7
( 0.00 TON)
274.0
37.1
451.7
( 0.00 TON)
80
525.2
0.0
39.7
564.9
( 0.00 TON)
137.8
39.7
702.7
( 0.00 TON)
275.6
39.7
840.6
( 0.00 TON)
299.0
0.0
39.7
338.7
( 0.00 TON)
152.2
39.7
490.9
( 0.00 TON)
304.4
39.7
643.2
( 0.00 TON)
202.9
0.0
39.7
242.6
( 0.00 TON)
158.3
39.7
400.9
( 0.00 TON)
316.7
39.7
559.3
( 0.00 TON)
40
20
100
REMARKS
Appendix-8.1
CDP L 3009 ER0
Page 1 of 1
INDEX
PROJECT NAME
JOB NO.
ATTACHMENT NO.
51067
71003
51073
62445
BZP :
62477
Page 1 of 2
Appendix-8.2
CDP L 3009 ER0
PROJECT: TCP
JOB NO : 51067
9,000
EL +7,000
EL +5,000
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
LONGITUDINAL SPAN
(m)
MAX. SIZE
(B)
7000
135
21
12 (MP STEAM)
5000
200
16
16 (PROCESS)
7000
130
18
12 (MP STEAM)
5000
135
16
16 (PROCESS)
REMARKS
Page 2 of 2
Appendix-8.2
CDP L 3009 ER0
PROJECT: TCP
JOB NO : 51067
9,000
EL +7,000
EL +5,000
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
LONGITUDINAL SPAN
(m)
MAX. SIZE
(B)
7000
100
16
12 (MP STEAM)
5000
150
22
16 (PROCESS)
7000
115
13
12 (MP STEAM)
5000
145
25
16 (PROCESS)
7000
120
14
12 (C. WATER)
5000
140
23
16 (PROCESS)
7000
120
16
12 (C. WATER)
5000
150
23
14 (PROCESS)
7000
125
15
12 (C. WATER)
5000
130
22
12 (PROCESS)
7000
130
17
14 (C. WATER)
5000
130
23
12 (PROCESS)
7000
130
17
14 (C. WATER)
5000
140
14
8 (PROCESS)
7000
135
14
14 (C. WATER)
5000
140
13
8 (PROCESS)
REMARKS
Appendix-8.3
CDP L 3009 ER0
Page 1 of 1
PROJECT: SSP
JOB NO : 71003
9,500
GL +10,300
GL +8,800
GL +6,700
A D
E I
J M
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
LONGITUDINAL SPAN
(m)
MAX. SIZE
(B)
10,300
150
20
28 (FLARE)
8,800
200
7.2
22
24 (PSD)
6,700
150
3.5
35
8 (SCP)
10,300
150
20
28 (FLARE)
8,800
200
7.6
18
EF : 11
FH : 6
HI : 7
6,700
150
3.5
33
10,300
150
20
8,800
150
6.0
11
6,700
150
5.0
26
REMARKS
24 (PSD)
8 (MEG)
JK : 7
KL : 11.5
LM : 5.5
MN : 3.5
28 (FLARE)
12 (SCP)
16 (CLR)
N U
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
LONGITUDINAL SPAN
(m)
10,300
120
28
8,800
120
6.9
12
6,700
100
4.0
20
NP : 6
PS : 7
ST : 6
TU : 7
MAX. SIZE
(B)
28 (FLARE)
16 (NSB)
8 (MEG)
REMARKS
Page 1 of 3
Appendix-8.4
CDP L 3009 ER0
PROJECT: QMM
JOB NO : 51073
10,000
GL +7,000
GL +5,000
A
PROCESS MAIN RACK ( RC-P/R )
SECTION ELEVATION
21
22 25
26
27
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
LONGITUDINAL SPAN
MAX. SIZE
(B)
REMARKS
(m)
*1
7000
195
5.6
27
22 (SWR)
5000
155
3.4
27
6 (PL)
7000
210
7.2
25
24 (LS)
*1
5000
190
3.3
22
6 (PL)
*1
7000
200
7.6
19
24 (LS)
*1
5000
190
3.3
15
6 (PG)
*1
7000
200
7.6
18
24 (LS)
*1
5000
210
4.9
15
26 (PG)
*1
7000
200
7.0
21
24 (LS)
*1
5000
200
4.0
18
26 (PG)
*1
7000
180
7.0
21
24 (LS)
5000
150
4.0
17
26 (PG)
7000
175
7.2
20
18 (LS)
5000
140
4.4
18
26 (PG)
7000
150
7.8
18
18 (LS)
5000
125
3.6
19
8 (LS)
7000
120
6.3
19
16 (LS)
5000
125
3.3
18
8 (LS)
*1: Piping load is big due to large diameter and heavy wall thickness piping. ( However impact of the piping loads on
structural design was not so big, since pipe rack was RC type and AFC`s were on it. )
Page 2 of 3
Appendix-8.4
CDP L 3009 ER0
PROJECT: QMM
JOB NO : 51073
10,000
GL +7,000
GL +5,000
A
PROCESS MAIN RACK ( RC-P/R )
SECTION ELEVATION
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
LONGITUDINAL SPAN
(m)
MAX. SIZE
(B)
7000
175
7.5
14
36 (FL)
5000
175
4.4
16
10 (PL)
7000
175
7.5
13
36 (FL)
5000
180
8.3
10
10 (PL)
7000
175
7.5
13
36 (FL)
5000
210
11.5
20 (PL)
7000
180
8.5
15
36 (FL)
5000
220
11.5
20 (PL)
7000
160
8.5
15
36 (FL)
5000
250
11.4
24 (FG)
7000
175
8.5
15
36 (FL)
5000
220
12.0
24 (FG)
7000
175
7.5
15
36 (FL)
5000
225
13.5
24 (FG)
7000
175
8.5
17
36 (FL)
5000
235
13.2
10
24 (FG)
7000
175
8.5
17
36 (FL)
5000
185
12.2
11
24 (FG)
REMARKS
*1
*1
*1
*1
*1
*1
*1: Piping load is big due to large diameter and heavy wall thickness piping. ( However impact of the piping loads on
structural design was not so big, since pipe rack was RC type and AFC`s were on it. )
Page 3 of 3
Appendix-8.4
CDP L 3009 ER0
PROJECT: QMM
JOB NO : 51073
10,000
GL +7,000
GL +5,000
A
PROCESS MAIN RACK ( RC-P/R )
SECTION ELEVATION
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
LONGITUDINAL SPAN
MAX. SIZE
(B)
REMARKS
(m)
*1
7000
200
9.5
17
36 (FL)
5000
185
11.3
11
30 (PG)
7000
200
8.2
16
36 (FL)
*1
5000
250
12.8
11
30 (PG)
*1
7000
215
8.9
18
36 (FL)
*1
5000
270
14.0
30 (PG)
*1
7000
155
6.3
12 (LS)
5000
205
16.5
20 (FG)
*1
*1: Piping load is big due to large diameter and heavy wall thickness piping. ( However impact of the piping loads on
structural design was not so big, since pipe rack was RC type and AFC`s were on it. )
Appendix-8.5
CDP L 3009 ER0
Page 1 of 2
PROJECT: GKD
JOB NO : 62445
8,000
EL +9,250
EL +7,250
EL +5,750
Ab
Aa
A1 A16
ELEVATION
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
LONGITUDINAL SPAN
A1A5 : 8
A5A12 : 6
A12A16 : 8
9,250
190
8.2
17
7,250
170
9.1
15
5,750
170
5.0
26
(m)
MAX. SIZE
(B)
34 (FLARE)
28 (M.STEAM)
26 (NITROGEN)
REMARKS
Appendix-8.5
CDP L 3009 ER0
Page 2 of 2
PROJECT: GKD
JOB NO : 62445
6,000
EL +8,000
EL +6,500
B2
B1
Ba Bd
Bd Bh
ELEVATION
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
LONGITUDINAL SPAN
(m)
MAX. SIZE
(B)
8,000
160
7.9
13
26 (MP N2)
6,500
175
6.3
18
16 (HP OXYGEN)
8,000
175
8.3
12
26 (MP N2)
6,500
175
6.9
13
16 (HP OXYGEN)
REMARKS
Appendix-8.6
CDP L 3009 ER0
Page 1 of 1
PROJECT: BZP
JOB NO : 62477
9,000
EL +6,200
EL +4,700
W
(kg/m2)
AVE. SIZE
(B)
LINE QTY
(MAX.)
6,200
110
5.1
15
4,700
85
3.3
33
LONGITUDINAL SPAN
(m)
:
:
:
:
6
4
8
6
MAX. SIZE
(B)
14 (WCR)
6 (RMT)
REMARKS