Вы находитесь на странице: 1из 347

WalkerDriveProperties

Warrenton,Virginia
April6,2016

TrafficImpactAnalysis

Preparedfor:
WalkerDriveInvestmentGroup,LLC
andMr.MikeForsten
(540)2709971
redsun33@comcast.net

TABLEOFCONTENTS

INTRODUCTIONandSUMMARYOFFINDINGS......................................................1

EXISTINGTRAFFICCONDITIONS.............................................................................5
1
LocationMapofStudyIntersections..................................................................8
2
ConceptPlan.......................................................................................................9
3
ExistingLaneUse..............................................................................................10
4
ExistingPeakHourTrafficVolumes..................................................................11
5
LevelofServiceforStudyIntersections(ExistingTraffic).................................12

BACKGROUNDTRAFFICCONDITIONS...................................................................13

6A RegionalTrafficGrowth(1%for3Years)..........................................................16
6B RegionalTrafficGrowth(1%for4Years)..........................................................17
6C RegionalTrafficGrowth(1%for10Years)........................................................18
7A 2018BasePeakHourTrafficVolumes..............................................................19
7B 2019BasePeakHourTrafficVolumes..............................................................20
7C 2025BasePeakHourTrafficVolumes..............................................................21
8
TripGenerationRatesandTotalforBackgroundDevelopments.....................22
9A TripAssignmentforWalkerDriveByRight...................................................23
9B TripAssignmentforWarrentonCrossing.........................................................24
9C ProposedWilliamsWaytoConnectOliverCityRoad......................................25
10A 2018BackgroundPeakHourTrafficVolumes..................................................26
10B 2018TrafficAdjustmentDuetoConstructionofWilliamsWay......................27
10C Adjusted2018BackgroundPeakHourTrafficVolumes...................................28
10D LevelofServiceforStudyIntersections(2018BackgroundTraffic).................29
11A 2019BackgroundPeakHourTrafficVolumes..................................................30
11B 2019TrafficAdjustmentDuetoConstructionofWilliamsWay......................31
11C Adjusted2019BackgroundPeakHourTrafficVolumes...................................32
11D LevelofServiceforStudyIntersections(2019BackgroundTraffic).................33
12A 2025BackgroundPeakHourTrafficVolumes..................................................34
12B 2025TrafficAdjustmentDuetoConstructionofWilliamsWay......................35
12C Adjusted2025BackgroundPeakHourTrafficVolumes...................................36
12D LevelofServiceforStudyIntersections(2025BackgroundTraffic).................37

TABLEOFCONTENTS(contd.)

TOTALTRAFFICCONDITIONS...............................................................................38
13A
13B
13C
13D
14A
14B
14C
15A
15B
16A
16B
17A
17B
18A
18B
19A
19B
20A
20B
21A

21B

22A
22B
22C

TripsGenerationRatesandTotalforSubjectSite............................................43
TripGenerationforSubjectSitebyPhases......................................................44
SiteDevelopmentPMPeakHourMultiUseTripGenerationWorksheet.......45
SiteDevelopmentSatPeakHourMultiUseTripGenerationWorksheet........46
TripAssignmentforPodsA&B........................................................................47
TripAssignmentforPodsA,B,C,&D...............................................................48
TripAssignmentforPodE.................................................................................49
PassByTripAssignmentforPhase1................................................................50
PassByTripAssignmentforPhase1+Phase2................................................51
2018TotalPeakHourTrafficVolumes.............................................................52
LevelofServiceforStudyintersections(2018TotalTraffic)............................53
2019TotalPeakHourTrafficVolumes.............................................................54
LevelofServiceforStudyIntersections(2019TotalTraffic)............................55
2025TotalPeakHourTrafficVolumes.............................................................56
LevelofServiceforStudyIntersections(2025TotalTraffic)............................57
ResultsofIntersectionCapacityAnalyses(PMPeakHour)..............................58
ResultsofIntersectionCapacityAnalyses(Sat.peakHour).............................59
ResultsofintersectionQueueAnalyses(PMPeakHour).................................60
ResultsofIntersectionQueueAnalyses(SatPeakHour).................................61
ADTSignalWarrantforWalkerDr./E.LeeSt.&US29NBBypassRamp/.......62
MeetzeRd.
ADTSignalWarrantforUS29SBBypassRamp/MeetzeRd.&WalkerDr./....63
SiteEnt.A
RecommendedImprovementsfor2018Phase1.............................................64
RecommendedImprovementsfor2019Phase2.............................................65
RecommendedImprovementsforYear2025..................................................66

RESULTS,RECOMMENDATIONS,ANDCONCLUSIONS...........................................67

APPENDICES

APPENDIXAScopingLetter,IntersectionTurningMovementCounts,andPhotos

APPENDIXBIntersectionCapacityAnalysisWorksheets

APPENDIXCTurningLaneWarrantWorksheets

Preparedby: MickeyA.Cornelius,P.E.,PTOE

FuhsiungHuang,P.E.,PTOE

MAC:rek
(F:\2016\20160202_WarrentonWalkerDrive\DOCS\REPORTS\TIS.docx)

TheTrafficGroup,Inc.
TrafficEngineers&TransportationPlanners

MergingInnovationandExcellence

CORPORATEOFFICE
9900FranklinSquareDrive,SuiteH
Baltimore,Maryland21236
4109316600Fax:4109316601
18005838411
www.trafficgroup.com

INTRODUCTIONANDSUMMARYOFFINDINGS
StudyPurpose

This Traffic Impact Analysis has been prepared to identify the impact of the
proposedrezoningandsubsequentdevelopmentoftheWalkerDriveProperties
onsurroundingareatrafficconditions.TheWalkerDrivesiteislocatedalongthe
east side of Walker Drive between E. Lee Street and Academy Hill Road in the
Town of Warrenton, Virginia. The site is currently zoned Industrial and is
proposedtoberezonedforamultiuseresidential/commercialcommunity.The
siteisproposedtobedevelopedintwophaseswiththefirstphasecompletedin
Year2018andthesecondphasecompletedinYear2019.Atthistime,thefull
sitedevelopmentisplannedtoincludethefollowing:

21,000squarefootbowlingalley

35,000squarefootmultiplexmovietheatre

37,356squarefeetofofficespace

55,967squarefeetofretailspace

33,550squarefeetofrestaurantspace

116apartmentunits

AccesstothesubjectpropertyisproposedatthreeaccesspointsalongWalker
DriveandoneaccessalongAcademyHillRoad.

StudyCriteria/Methodology

ThisTrafficImpactAnalysiswasconductedinaccordancewithVDOTregulations.
A scoping meeting was held with representatives of VDOT and the Town of
WarrentonandacopyoftheapprovedscopingformisincludedinAppendixAof
this report. The parameters of the Traffic Impact Analysis as detailed in the
improvedscopingformareasfollows:

Study Periods Existing, Phase 1 (2018), Phase 2 (2019), and six years
aftercompletion(2025)

StudyHoursWeekdayeveningandSaturdaymiddaypeakhours

Intersectionstobeincludedintheanalysis:

WalkerDriveandAcademyHillRoad

Walker Drive and Breezewood Drive/Existing Office Building


Access

WalkerDriveandHiddenCreek/SiteAccessB

E.LeeStreetandFalmouthStreet

E.LeeStreetandWalkerDrive

E.LeeStreet/MeetzeRoadandUS29bypasssouthboundramp

MeetzeRoadandUS29bypassnorthboundramp

WalkerDriveandSiteAccessA

WalkerDriveandSiteAccessC

AcademyHillRoadandSiteAccessD

OtherTransportationImprovementsTheconstructionofWilliamsWay
throughtheWarrentonCrossingSubdivision

AnnualTrafficGrowth1%peryearcompounded

TripGenerationUseofITETripGenerationManual(9thEdition)withtrip
rates for office and retail uses based upon the full development of the
site

TripDistribution

NorthalongWalkerDrive20%

NorthalongUS29Bypass40%

SouthalongUS29Bypass20%

WestalongE.Lee15%

EastalongMeetzeRoad5%


TripAdjustmentFactorsInternaltripreductionusingthesmallerof15%
of residential trips or 15% nonresidential trips, and reduction of the
smaller of 5% office trips or 5% retail trips; passby allowance for retail
andrestaurantusesof20%

Software Methodology Synchro with queuing analyses based upon


SimTraffic95%percentilequeues

OtherbackgrounddevelopmentstobeconsideredWarrentonCrossing
andWalkerDrivematterofrightdevelopment

Additional issues to be considered Provide statement regarding


pedestrian/bicycle facilities; provide queueing analyses; evaluate turn
lane warrants, and evaluate potential traffic signal warrants using the
ADTestimatedmethodforthefollowinglocations:

E.LeeStreet/WalkerDrive

US29bypasssouthboundrampandMeetzeRoad

US29bypassnorthboundrampandMeetzeRoad

AllofthisinformationisdetailedintheScopeofWorkMeetingFormcontained
inAppendixAofthisreport.

SummaryofFindingsandRecommendations

TheresultsofIntersectionCapacityAnalysesconductedaspartofthisstudyfor
existing, 2018, 2019, and 2025 total projected traffic volumes are shown in
Exhibits19Aand19BfortheweekdayPMandSaturdaypeakhours,respectively.
SimTraffic95thpercentilequeueresultsareprovidedinExhibits20Aand20Bfor
the weekday PM and Saturday peak hours, respectively. Exhibits 21A and 21B
provide the results of the traffic signal warrant evaluations using estimated
ADTs.

Based upon the results of the analyses, the following recommendations have
beendevelopedaspartofthisstudy.

Phase12018DesignYear

InstallTrafficSignalizationattheintersectionofE.LeeStreetand
Walker Drive. It is recommended that split phasing be used for
this signal with the threelane southbound approach of Walker
Driveconsistingofanexclusiverightturnlane,asharedthrough/
left turn lane, and an exclusive left turn lane. It is also
recommended that the exclusive left turn lane be extended to
provideaminimumstoragecapacityof200feet.

A traffic signal is also recommended for the intersection of the


US29bypassnorthboundrampsandMeetzeRoad.

The two site access points for the Walker Drive Properties are
recommendedtohaveleftturnlanesprovidedofatleast100feet
in length along Walker Drive and right turn lanes of at least 100
feet in length. Both approaches from the subject property are
recommendedtobedesignedastwolaneapproaches.

Phase22019DesignYear

In addition to the Phase 1 improvements, the intersection of


WalkerDrivewithSiteAccessAisrecommendedtobesignalized.

With the improvements recommended, all intersections are projected to


maintain acceptable levels of service and all turn lanes can accommodate
projected95%Percentilequeuesforalldesignyearsincludedinthisstudy.

The data and methodology used to undertake this study is detailed in the
sectionsthatfollow.

EXISTINGTRAFFICCONDITIONS

SiteInformation

The Walker Drive property is located in the Town of Warrenton bounded by


WalkerDrive,theUS29bypass,E.LeeStreet,andAcademyHillRoadasshown
in Exhibit 1. A Concept Plan for the proposed development showing the
proposedaccesslocationsisprovidedinExhibit2ofthisreport.

StudyArea

To evaluate the effect of the proposed development of the WalkerDrive


Properties on surrounding area traffic conditions, this study addresses
intersection operations and queuing conditions at nearby intersections during
the weekday evening and Saturday midday peak hours. The study area as
outlinedinthescopingmeetingformincludesintersectionsalongWalkerDrive
andE.LeeStreet/MeetzeRoad(Route643).Descriptionsoftheseroadsfollow:

Walker Drive Walker Drive is a north/south fourlane divided Major


Collector roadway extending northerly from E. Lee Street, through the
study area, connecting to Blackwell Road (Business 15) to the north.
Within the study area, Walker Drive has 12foot travel lanes and a
combination of curb/gutter and 6foot shoulders. Based upon the
existing traffic counts and an assumed peak hour factor of 10%, the
estimatedADTisapproximately4,500vehiclesperday.

E.LeeStreet/MeetzeRoad(Route643)Route643isaneast/westfour
lanedividedroadwayinthestudyareabetweenFalmouthStreettothe
west and the US 29 bypass to the east. This roadway presently serves
localresidentialusesandcontains12footwidetravellaneswithanopen
section east of Walker Drive and curb and gutter west of Walker Drive.
Route643hasapostedspeedlimitof45mileperhoureastofUS29and
35mileperhourwestofUS29.Thecurrentaveragedailytraffic(ADT)
volumeaccordingtothelatest2015VDOTpublisheddatainthevicinity
ofthesiteis10,000vehiclesperdaywestoftheUS29bypassand8,000
vehiclesperdayeastoftheUS29bypass.

Theintersectionsincludedwithinthestudyareaareasfollows:

WalkerDriveandAcademyHillRoad

WalkerDriveandBreezewoodDrive/existingofficeaccess


WalkerDriveandHiddenCreek/SiteAccessB

E.LeeStreetandFalmouthStreet

E.LeeStreetandWalkerDrive

E.LeeStreetandUS29bypasssouthboundramp

MeetzeRoadandUS29bypassnorthboundramp

WalkerDriveandSiteAccessA

WalkerDriveandSiteAccessC

AcademyHillRoadandSiteAccessD

All of these intersections are currently unsignalized. Exhibit 3 provides a


schematicdrawingofthesurroundingroadsystemshowingtheexistinglaneuse
andtrafficcontrolatthestudyintersections.

TrafficVolumes

Intersection Turning Movement Counts were collected between the hours of


47PM on a weekday and 10 AM2 PM on a Saturday at all of the existing
intersections in the study area. These counts were collected between
September and November of 2014 by VETTRA Company. Copies of the
intersection turning movement counts and aerial photographs of the
intersectionsareincludedinAppendixAofthisreport.Theexistingpeakhour
turningmovementswereidentifiedateachlocationandthattrafficwasgrown
by one percent to reflect estimated existing traffic volumes at the time of this
study.Theresultingexistingpeakhourtrafficvolumesatthestudyintersections
areshowninExhibit4.

AnalysisofExistingTrafficConditions

IntersectionCapacityAnalyseswereconductedforthestudyintersectionsusing
Synchro, and the results of the Intersection Capacity Analyses are detailed in
Exhibits 19A and 19B for the weekday evening and Saturday peak hours,
respectively. The results show acceptable Level of Service D or better
conditionsthroughoutthestudyareaduringtheweekdayeveningpeakhourand

acceptable Level of Service C or better conditions throughout the study area


during the Saturday peak hour. Exhibit 5 of this report provides a schematic
drawingshowingthelevelsofserviceforthevariouslanegroupsateachofthe
studyintersectionsunderexistingtrafficconditions.

EXHIBIT 2
CONCEPT PLAN

10

11

12

BACKGROUNDTRAFFICCONDITIONS

DesignYear(s)

InaccordancewiththeproposeddevelopmentandtheScopeofWorkMeeting
Form, this study addresses future Design Years of 2018 for Phase 1, 2019 for
Phase2(fullbuild)andYear2025toreflectsixyearsaftercompletion.

BackgroundTraffic

Future traffic growth is considered from regional traffic increases as well as


other approved developments in the surrounding area. Given historical traffic
data, a one percent annual traffic growth was requested to reflect regional
trafficincreases.Theexistingtrafficvolumesweregrownfrom2015 toreflect
threeyearsadditionaltrafficgrowthforYear2018,fouryearsadditionaltraffic
growth for Year 2019, and 10 years additional traffic growth for Year 2025.
Exhibits 6A, 6B, and 6C show the additional traffic assumed in the study area
accountingforregionaltrafficincreases.Combiningthattrafficwiththeexisting
traffic volumes results in the 2018, 2019, and 2025 base peak hour traffic
volumesshowninExhibits7A,7B,and7C.

Inadditionaltoregionaltrafficgrowth,informationwasalsoobtainedregarding
otherapproveddevelopmentinthesurroundingvicinity.Twospecificprojects
wereidentifiedtobeincludedasfollows:

Walker Drive by right development This is property within the


boundariesofthesubjectsitewhichisproposedtobedevelopedunder
existing zoning. The proposed additional development includes 18,202
square feet of a health/fitness club and 14,900 square feet of medical
officespace.

Warrenton Crossing 135 single family dwelling units located south of


E.LeeStreetoppositeWalkerDrive

UsingtripgenerationratesfromtheITETripGenerationReport(9thEdition),the
totalprojectedweekdayeveningandSaturdaypeakhourtripstobegenerated
by the background developments are shown in Exhibit 8. These trips were
assigned to the surrounding area road system in accordance with the
distribution agreed to in the scoping meeting. Exhibit 9A shows the trip
assignmentfortheWalkerDrivebyrightdevelopment,andExhibit9Bshowsthe
tripassignmentforWarrentonCrossing.

13

AspartoftheWarrentonCrossingProject,aconnectorroadwillbeconstructed
which will provide a northsouth travelway between E. Lee Street, opposite
WalkerDrive,southerlytoFalmouthStreet.Exhibit9CprovidesaConceptPlan
for Warrenton Crossing which shows that connector road identified as
WilliamsWay. With the construction of Williams Way, traffic which currently
proceeds westbound on E. Lee Street from Walker Drive then turns left on
Falmouth Street would have the potential to be diverted to the newly
constructed Williams Way which provides a more direct connection further
southonFalmouthStreet.

AnalysisofBackgroundTrafficConditions

Combining the trips generated by the approved developments with the 2018
basetrafficvolumesprovidesthe2018backgroundpeakhourtrafficvolumesat
the study intersections shown in Exhibit 10A. Traffic diversions were then
accountedforduetotheconstructionofWilliamsWaybydiverting50%ofthe
westbound left turn movements on E. Lee Street on Falmouth Street to the
proposedWilliamsWayconnectorroad.Exhibit10Bshowstheimpactofthose
traffic diversions. The resulting adjusted 2018 background peak hour traffic
volumesareshowninExhibit10C.

IntersectionCapacityAnalyseswereconductedforthestudyintersectionsusing
the2018adjustedbackgroundtrafficvolumesusingSynchro,andtheresultsare
displayed in Exhibits 19A and 19B for the weekday evening and Saturday peak
hours,respectively.TheseresultsshowaLevelofServiceFconditionforthe
northboundUS29bypassofframpatMeetzeRoadduringtheweekdayevening
peakhourandaLevelofServiceFconditionforthesouthboundleftturnsfrom
WalkerDrivetoE.LeeStreetduringtheweekdayeveningpeakhour.Allother
locations continue to provide acceptable Level of Service D or better
conditions during the both the weekday evening and Saturday peak hours.
Exhibit 10D provides the level of service results by lane group at the study
intersections.

Forthe2019DesignYear,theapproveddevelopmentswerecombinedwiththe
2019 base traffic volumes resulting in the 2019 background peak hour traffic
volumes shown in Exhibit 11A. Fifty percent of the left turn movements from
E.Lee Street to southbound Falmouth Street were diverted to the proposed
Williams Way connector road and Exhibit 11B provides the impact of those
trafficadjustments.Exhibit11Cshowstheresulting2019adjustedbackground
peakhourtrafficvolumes.

Intersection Capacity Analyses were conducted for the adjusted 2019


backgroundtrafficvolumes,andtheresultsaredisplayedinExhibits19Aand19B

14

for the weekday evening and Saturday peak hours, respectively. Exhibit 11D
provides the results of the Intersection Capacity Analyses showing levels of
service by lane group. This exhibit shows continued Level of Service F
conditions for the northbound US 29 bypass offramp at Meetze Road and the
southbound left turns Walker Drive movement to E. Lee Street during the
weekday evening peak hour. All other locations show acceptable Level of
ServiceDorbetterconditionsthroughoutthestudyareaduringtheweekday
eveningandSaturdaypeakhours.

For Year 2025 evaluations, Exhibit 12A shows the 2025 background peak hour
trafficvolumeswhichcombinesthe2025basepeakhourtrafficvolumesandthe
tripsgeneratedbytheidentified,nearbyapproveddevelopments.Adjustments
weremadetoaccountfortheconstructionofWilliamsWayasshowninExhibit
12B,andtheresultingadjusted2025backgroundpeakhourtrafficvolumesare
showninExhibit12C.IntersectionCapacityAnalyseswereconductedusingthe
Synchromethodology,andtheresultsareshowninExhibits19Aand19Bforthe
weekday evening and Saturday peak hours, respectively. Exhibit 12D provides
the level of service results by lane group for the 2025 background traffic
conditions. Once again, Level of Service F movements are projected for the
southboundleftturnsfromWalkerDrivetoE.LeeStreetandthenorthboundUS
29 bypass offramp approach at Meetze Road. All other locations continue to
show acceptable Level of Service D or better conditions during both the
weekdayeveningandSaturdaypeakhours.

QueuingAnalyseswerealsoconductedforthe2018,2019,and2025background
traffic conditions using the SimTraffic 95th percentile queues, and those results
are displayed in Exhibits 20A and 20B for the weekday evening and Saturday
peakhours,respectively.

15

16

17

18

19

20

21

Trip Generation Rates


Directional Distribution
Formula/Rate
Health/Fitness Club (ksf, ITE-492)
Evening Trips = 3.53 x ksf
Midday Sat. Trips = 2.78 x ksf
Medical-Dental Office (ksf, ITE-720)
Ln(Evening Trips) = 0.90 x Ln(ksf) + 1.53
Midday Sat. Trips =3.63 x ksf
Single-Family Detached (ITE-210, Units)
Ln(Evening Trips) = 0.90 x Ln(Units) + 0.51
Midday Sat. Trips = 0.89 x Units + 8.77

PM Peak Hour

Sat Peak Hour

IN

OUT

IN

OUT

57%

43%

45%

55%

28%

72%

57%

43%

63%

37%

54%

46%

Note:Trip generation formula and rates obtained from ITE Trip Generation Manual, 9th Edition, 2012.

Trip Generation for Walker Dr. Site


No. Land Use

Size

In

PM Peak Hour
Out
Total

Midday Sat. Peak Hour


In
Out
Total

Walker Drive "By-Right"


Health/Fitness Club

18,202

sq.ft.

36

28

64

23

28

51

Medical-Dental Office

14,900

sq.ft.

15

38

53

31

23

54

51

66

117

54

51

105

87

51

138

70

59

129

Total Trips for Walker Drive "By-Right"


Warrenton Crossing
Single Family Detached

135

F:\2016\2016-0202_Warrenton-Walker Drive\ENG\INITIAL\Trips

Units

EXHIBIT 8
TRIP GENERATION RATES AND TOTAL
FOR BACKGROUND DEVELOPMENTS
22

23

24

EXHIBIT259C
PROPOSED WILLIAMS WAY
TO CONNECT OLIVER CITY RD

26

27

28

29

30

31

32

33

34

35

36

37

TOTALTRAFFICCONDITIONS

SiteInformation

The Walker Drive Property is proposed to be developed with a multiuse


communitywithmultipleaccesspointsalongWalkerDriveandoneaccessalong
Academy Hill Road. At this time, the site is proposed to be developed in two
phasesasfollows:

Phase12018DesignYear:

21,000squarefootbowlingalley

35,000squarefootmultiplexmovietheatre

20,550squarefeetofofficespace

20,550squarefeetretailspace

20,550squarefeetofhighturnoverrestaurantspace

Phase22019DesignYear:

MiddleParcel(PodsCandD)

o 76apartmentunits

o 16,806squarefeetofofficespace

o 23,417squarefeetofretailspace

o 5,000ofhighturnoverrestaurantspace

NorthParcel(PodE)

o 40apartmentunits

o 12,000squarefeetofretailspace

o 8,000squarefeetofhighturnoverrestaurantspace

ThePhase1DevelopmentwouldbeservedbySiteAccessPointsAandBalong
Walker Drive. The middle parcel for Phase 2 would be served by the Phase 1

38

access points while the north parcel (Pod E) would be served by a rightin/
rightout access along Walker Drive at Site Entrance C, and a full movement
accessatSiteEntranceDalongAcademyHillRoad.

For pedestrian/bicycle facilities, the proposed site development will provide


typicalpedestrianpathwaysand/orsidewalksthroughoutthesite.Theseshared
usepathways/sidewalkswillpermitbicyclistsandpedestrianstheabilitytotravel
within the site and to adjacent developments. The pedestrian pathways/
sidewalkswillsupportpedestrianconnectivitywithintheseareas.Bikerackswill
beprovidedatcertainareaswithinthedevelopment.Therackswillbeplacedat
locationsdeemedappropriatebythedeveloperinconsultationwiththeTownof
Warrenton. TDM strategies will be encouraged and enacted as available,
includingabusstopwithsign,bench,andlandscaping.

TripGeneration/Distribution

TripgenerationratesfortheproposeddevelopmentwereobtainedfromtheITE
TripGenerationManual(9thEdition).Thetripgenerationratesfortheretailand
officeportionsofthesitewerebasedupontheITEregressionequationsandthe
ultimatebuildoutofthesiteinaccordancewiththeTrafficStudyScopingForm.
The trip generation rates and projected peak hour trips for the overall site
development are shown in Exhibit 13A. Trip reductions were taken in
accordance with VDOT regulations for both internal trips and passby trips.
Internaltripswereaccountedforbytakingthesmallerof15%oftheresidential
generatedtripsversus15%ofthecommercialgeneratedtripsandbytakingthe
smallerof5%oftheofficegeneratedtripsversus5%oftheretailandrestaurant
generatedtrips.Theeffectofpassbytripswasagreedtointhescopingmeeting
as 20% of the retail and restaurant generated trips. Exhibit 13A provides the
totalsitegeneratedtripsaswellasthenetnewtripsaddedtotheroadsystem
forthefulldevelopmentofthesite.

Thetripgenerationforthepropertywasthenbrokendownintovariousphases
andsitedevelopmentpodsasshowninExhibit13B.Exhibits13Cand13Dshow
theinternaltripcalculationsinaccordancewithVDOTguidelines.

The trips projected to be generated by Phase 1 were assigned to Site Access


Points A and B and then distributed to surrounding area road system in
accordance with the traffic distribution approved in the scoping agreement.
Exhibit14AshowstheresultingassignmentofpeakhourtripsforPhase1aswell
as the Phase 1 ADTs at the access points and along the adjacent roads.
Exhibit14BshowsthetripassignmentforPhases1and2forPodsA,B,C,andD
with those trips using Site Access Points A and B. Once again, this exhibit
provides the ADTs for the access points and the ADTs added to the adjacent

39

roads. Exhibit 14C provides the trips assignment for the Phase 2 development
locatedinPodEutilizingSiteAccessPointsCandD.Thisexhibitalsoshowsthe
ADTsalongthoseaccesspointsandtheADTsaddedtotheadjacentroads.

TheimpactofpassbytripsforPhase1andfullsitedevelopmentareshownin
Exhibits15Aand15B,respectively.

AnalysisofTotalTrafficConditions

The site generated trips were combined with the background traffic volumes
resultinginthe2018(Phase1)totalpeakhourtrafficvolumesshowninExhibit
16A.IntersectionCapacityAnalyseswereconductedforthestudyintersections
usingSynchrosoftware,andtheresultsaredisplayedinExhibits19Aand19Bfor
the weekday evening and Saturday peak hours, respectively. A review of the
IntersectionCapacityAnalysisresultsshowsthatLevelofServiceFmovements
are projected for the southbound left turns from Walker Drive to E. Lee Street
andforthenorthboundUS29bypassofframpatMeetzeRoadduringboththe
weekday evening and Saturday peak hours. At all other locations, acceptable
Level of Service D or better movements are projected to be maintained.
Exhibit16BprovidestheresultsoftheSynchroanalysesbylanegroupateachof
thestudyintersectionsforthePhase1totaltrafficvolumes.Baseduponthese
results,itwasidentifiedthattrafficsignalizationmaybewarrantedatboththe
WalkerDrive/E.LeeStreetintersectionandtheMeetzeRoad/US29northbound
ramp intersection. Additional analyses were conducted assuming traffic
signalization, and those results show acceptable Level of Service D or better
conditionsforallapproachesduringtheboththeweekdayeveningandSaturday
peakhourswithtrafficsignalizationatthoseintersections.

ThePhase2(2019)totalprojectedtrafficvolumesweredevelopedusingthesite
generated trips and the 2019 background traffic volumes resulting in the total
2019 peak hour traffic volumes displayed in Exhibit 17A. Intersection Capacity
Analyses were conducted for the study intersections based upon the Phase 2
totaltrafficvolumesfor2019,andtheresultsareshowninExhibits19Aand19B
for the weekday evening and Saturday peak hours, respectively. Exhibit 17B
providestheresultsoftheSynchrocapacityanalysesbylanegroupforthePhase
2totaltrafficvolumes.AreviewofthisexhibitshowsthatLevelofServiceF
movements would remain for the southbound Walker Drive left turn to E.Lee
Street and the northbound US 29 bypass offramp approach at Meetze Road
under existing stop controlled conditions. In addition, the left turn movement
exiting Site Access A is projected to have Level of Service F conditions under
the proposed Phase 2 stop control condition. As previously identified under
Phase 1, with traffic signalization both the Walker Drive/E. Lee Street and
MeetzeRoad/US29northboundbypassrampintersectionswouldoperatewith

40

acceptablelevelsofserviceforallapproacheswithtrafficsignalization.Forthe
Site Access A intersection with Walker Drive, traffic signalization may also be
warranted. With signalization, Intersection Capacity Analyses using Synchro
show good Level of Service B or better conditions for both the weekday
eveningandSaturdaypeakhoursunderPhase2totaltrafficvolumes.

The Synchro results show a Level of Service E condition with a delay of 43.8
seconds for the southbound left turn movement from the US 29 bypass
southboundofframptoE.LeeStreet/MeetzeRoadduringtheweekdayevening
peak hour. However, with potential traffic signalization at the Walker
Drive/E.Lee Street and Meetze Road/US 29 bypass northbound ramp
intersections, additional gaps would be created, and the SimTraffic evaluation
shows the southbound left turn movement from the US 29 bypass to E. Lee
Street/MeetzeRoadwouldimprovetoanacceptableLevelofServiceDwitha
delayof25.5secondsunderthatscenario.

Year 2025 total traffic volumes were developed using the background traffic
volumesandsitegeneratedtripsasshowninExhibit18A.IntersectionCapacity
Analyses were conducted for the study intersections using Synchro, and the
results show similar conditions as Phase 2 traffic volumes. With the
improvements recommended in Phase 2, acceptable traffic conditions would
remain for all movements/approaches based upon the Synchro Analyses.
Exhibit18Bprovidesthelevelsofserviceforthelanegroups/approachesunder
2025totaltrafficconditions.

Once again, the southbound left turn movement from the US 29 bypass to
MeetzeRoadshowsaLevelofServiceFconditionwithadelayof56.1seconds
during the weekday evening peak hour. However, with assumed traffic
signalization at both the Walker Drive/E. Lee Street and US 29 bypass
northboundramps/MeetzeRoadintersections,theSimTrafficevaluationsshows
theUS29southboundofframpleftturnwouldimprovetoanacceptableLevel
ofServiceDwithadelayof31.5seconds.

In addition to the Synchro capacity analyses, queuing analyses were also


conducted using the SimTraffic 95th percentile output. The results of those
analyses are shown in Exhibits 20A and 20B for the weekday evening and
Saturday peak hours, respectively. These results show that with the
recommendedextensionofthesouthboundleftturnlanealongWalkerDriveat
E.LeeStreettoaminimumof200feet,allqueuescanbeaccommodatedinthe
availablelanes.

Turnlanewarrantevaluationswerealsoconductedforallsiteaccesslocationsin
accordancewithVDOTguidelines.Copiesofthecapacityworksheetsforthese

41

evaluations are included in Appendix C of this report. The results of those


evaluationsshowthatleftandrightturnlanesarewarrantedalongWalkerDrive
atSiteAccessPointsAandB.

To further evaluate operating conditions and make recommendations for the


intersectionsofE.LeeStreetwithWalkerDrive,E.Lee/MeetzeRoadwiththeUS
29bypasssouthboundrampandnorthboundrampintersections,andtheWalker
Drive/Access A intersection, traffic signal warrant evaluations were conducted
using VDOT ADT methodology. The results of those analyses are displayed in
Exhibits21Aand21B.TheseresultsshowthatunderPhase1trafficconditions,
trafficsignalizationmaybewarrantedfortheintersectionsofE.LeeStreetwith
Walker Drive and the US 29 northbound ramp intersection with Meetze Road.
UnderPhase2totaltrafficconditions,trafficsignalizationmaybewarrantedat
theintersectionsofWalkerDrivewithSiteAccessAandtheUS29southbound
ramp intersection with Meetze Road. It is important to note that the Signal
WarrantAnalysisforthesouthboundUS29rampintersectionwithMeetzeRoad
assumes the total approach volumes along the US 29 bypass ramp. However,
given that most of this traffic turns right and an exclusive right turn lane is
available,withrightturnsexcludedfromthatanalysis,trafficsignalizationwould
notbewarranted.

Exhibits 22A, 22B, and 22C show the recommended improvements to the
surroundingarearoadsystemforPhase1,Phase2,andYear2025,respectively.

42

43

Trip Generation By Phaseing for Walker Dr.


PM Peak Hour
No. Land Use

Midday Sat. Peak Hour

Size

ADT
In

Out

Total

In

Out

Total

Phase 1 - 2018
South Parcel (Pods A & B)
Bowling Alley

21,000

sq.ft.

26

48

74

37

37

74

700

Multiplex Movie Theater

35,000

sq.ft.

107

65

172

124

41

165

2732

General Office

20,550

sq.ft.

10

51

61

308

Shopping Center

20,550

sq.ft.

69

75

144

113

104

217

1668

-14

-15

-29

-23

-21

-44

-334

Pass-by Trips
Net Shopping Center Trips

55

60

115

90

83

173

1334

122

81

203

154

136

290

2613

Pass-by Trips

-25

-16

-41

-31

-27

-58

-522

Net High Turnover Restaurant Trips

97

65

162

123

109

232

2091

Phase 1 Total Trips

295

289

584

379

274

653

7165

29

16

45

21

18

39

467

High Turnover Restaurant

20,550

sq.ft.

Phase 2 (Pods C & D)- 2019


Middle Parcel (Pods C & D)
Apartment

76

Units

General Office

16,806

sq.ft.

41

49

251

Shopping Center

23,417

sq.ft.

78

86

164

129

119

248

1900

-15

-17

-32

-26

-24

-50

-380

63

69

132

103

95

198

1520

30

20

50

37

34

71

636

Pass-by Trips

-6

-4

-10

-7

-7

-14

-127

Net High Turnover Restaurant Trips

24

16

40

30

27

57

509

Total Middle Parcel Trips

124

142

266

158

143

301

2747

24

11

10

21

246

Pass-by Trips
Net Shopping Center Trips
High Turnover Restaurant

5,000

sq.ft.

North Parcel (Pod E)


Apartment
Shopping Center

40

Units

16

12,000

sq.ft.

40

44

84

66

61

127

975

Pass-by Trips

-8

-9

-17

-13

-12

-25

-195

Net Shopping Center Trips

32

35

67

53

49

102

780

46

31

77

59

52

111

1017

High Turnover Restaurant

8,000

sq.ft.

Pass-by Trips

-9

-6

-15

-12

-10

-22

-204

Net High Turnover Restaurant Trips

37

25

62

47

42

89

813

Total North Parcel Trips

85

68

153

111

101

212

1839

Phase 2 Total Trips

209

210

419

269

244

513

4586

F:\2016\2016-0202_Warrenton-Walker Drive\ENG\INITIAL\Trips

EXHIBIT 13B
TRIP GENERATION FOR
SUBJECT SITE BY 44
PHASES

LAND USE A Retail


55,967

s.f.

Total

Internal

External

Enter

195

187

Exit

211

205

xxx

Peak Hour Trips

Total

406

14

392

xxx

ADT

ADT

4657

114

4543

100%

3%

97%

Size:

Exit to External

205

187
Enter from External

5%

11

233

5%

Demand
1

31

5%

Demand

10%

Demand

31

Balanced
5%

10

21

10%

Demand

20

466

Demand

Balanced

Balanced

Balanced

10%

Demand

83

10%

Demand

LAND USE B Office

LAND USE C Residential

37,356 sf GLA
Size:
Total
Internal

Exit to External

92
Enter

20

83

Demand

Demand
External

5%

Balanced
1

Demand
5%

Size: 116 units


Total
Internal

18

Enter

Exit

100

92

18

Total

120

10

110

Enter from External

ADT

621

62

100%

8%

559

31

31

92%

Demand

5%

5%

Balanced

53

Enter from External

External

45
24

Exit

28

Total

81

12

69

41

ADT

827

114

713

100%

15%

85%

Demand

45

24
Exit to External

Net External Trips for Multi-Use Development


LAND USE A

LAND USE B

LAND USE C

TOTAL

Enter

187

18

45

250

Exit

205

92

24

321

Total

392

110

69

571

INTERNAL CAPTURE

Single-Use Trip Gen. Est.

406

120

81

607

6%

Note: Internal trip capture rate obtained from ITE Trip Generation Hanbook 3rd Edition, 2014.

EXHIBIT 13C
SITE DEVELOPMENT PM PEAK HOUR
MULTI-USE TRIP GENERATION WORKSHEET
rh, 160202\initial\trips.xls-inter pm, f04/06/16

45

LAND USE A Retail


Size:

Exit to External

284

Total

308

External

311

308

Exit

288

284

Total

599

592

100%

1%

99%

14

5%

Demand

5%

s.f.

Internal

Enter

Enter from External

5%

55,967

16

10%

Demand

29

10%

Demand

31

Demand

Balanced

Balanced

Balanced

Balanced

5%

Demand

10%

Demand

10%

Demand

Demand

LAND USE B Office


Size:

Exit to External

Total
Enter

LAND USE C Residential

37,356 sf GLA
Internal

Demand
External

5%

Balanced
0

Demand
5%

Exit

Total

16

16

Enter from External

100%

0%

100%

5%

Demand

5%

Balanced

Size: 116 units


Total

Demand

Enter from External

Internal

External

Enter

36

32
28

Exit

31

Total

67

60

100%

10%

90%

32

28
Exit to External

Net External Trips for Multi-Use Development


LAND USE A

LAND USE B

LAND USE C

TOTAL

Enter

308

32

349

Exit

284

28

319

Total

592

16

60

668

INTERNAL CAPTURE

Single-Use Trip Gen. Est.

599

16

67

682

2%

Note: Internal trip capture rate obtained from ITE Trip Generation Hanbook 3rd Edition, 2014.

EXHIBIT 13D
SITE DEVELOPMENT SAT PEAK HOUR
MULTI-USE TRIP GENERATION WORKSHEET
rh, 160202\initial\trips.xls-inter sat, f03/25/16

46

47

48

49

50

51

52

53

54

55

56

57

Synchro HCM 2010 Output


Intersection

Control Type

1. Wlaker Dr. & Academy Hill Rd


EB/LTR
WB/LTR
NB/LT
SB/LT
2. Walker Dr & Breezewood Dr/Office Bldg Ent
EB/LTR
WB/LTR
NB/L
SB/LT
3. Walker Dr & Hidden Creek/Site Ent B
EB/LR or LTR
WB/LT
WB/R
NB/L
SB/L
4. E Lee St. & Falmouth St.
EB/LTR
WB/LT
WB/R
NB/LTR
SB/LTR
5. E Leet St. & Walker Dr.
EB/L
WB/L
NB/LTR
SB/L
SB/T
SB/R
w/Signal Improvement
EB
WB
NB
SB
6. E Lee St. & US 29 SB Ramp
WB/L
SB/LT
SB/R
w/Adjacent Intersection Signals Improvements
SB/LT (Simtraffic Output)
7. Meetze Rd & US 29 NB Ramp
EB/L
NB/LTR
w/Signal
EB
WB
NB
8. Walker Dr & Site Ent A
WB/L
WB/R
SB/L
w/Signal
WB
NB
SB
9. Walker Dr & Site Ent C.
WB/R
10. Academy Hill Rd & Site Ent D
NB/LR

Two Way
Stop

Two Way
Stop

Two Way
Stop

All Way
Stop

Two Way
Stop

Signal

Two Way
Stop

2015
Existing
Traffic

2018
Background
Traffic

2018
Total
Traffic

2019
Background
Traffic

2019
Total
Traffic

2025
Background
Traffic

2025
Total
Traffic

LOS / Delay

LOS / Delay

LOS / Delay

LOS / Delay

LOS / Delay

LOS / Delay

LOS / Delay

B
B
A
A

/
/
/
/

11.3
11.1
7.9
7.6

B / 11.9
B / 11.9
A / 8.1
A / 7.7

B / 12.7
B / 12.7
A / 8.3
A / 7.8

B / 11.9
B / 12.0
A / 8.1
A / 7.7

B / 14.1
C / 16.1
A / 8.4
A / 8.0

B
B
A
A

/
/
/
/

12.2
12.2
8.1
7.7

B / 14.6
C / 16.6
A / 8.5
A / 8.0

A
B
A
A

/
/
/
/

9.2
11.3
7.9
8.0

A / 9.3
B / 12.7
A / 8.0
A / 8.1

A / 9.5
B / 13.5
A / 8.2
A / 8.3

A / 9.3
B / 12.7
A / 8.0
A / 8.1

A / 9.8
C / 15.2
A / 8.4
A / 8.6

A
B
A
A

/
/
/
/

9.4
12.9
8.0
8.2

A / 9.9
C / 15.5
A / 8.5
A / 8.7

A / 9.2
----A / 7.9
--C / 20.9
C / 17.4
D / 29.0
B / 11.7
C / 17.9
C / 21.3

A / 9.5
----A / 8.1
--B / 15.0
B / 14.5
C / 17.0
B / 10.7
B / 13.0
C / 17.0

A / 9.6
C / 19.0
A / 9.5
A / 8.2
A / 8.0
C / 17.5
C / 17.5
C / 21.2
B / 11.1
B / 14.1
C / 18.9

A / 9.5
----A / 8.1
--C / 15.2
B / 14.7
C / 17.2
B / 10.7
B / 13.2
C / 17.3

A / 9.8
D / 25.3
A / 9.9
A / 8.4
A / 8.4
C / 20.8
C / 21.4
D / 27.0
B / 11.5
C / 15.4
C / 21.0

A / 9.6
----A / 8.2
--C / 16.9
C / 16.3
C / 19.4
B / 11.4
B / 14.3
C / 19.7

A / 9.9
D / 26.6
A / 10.0
A / 8.5
A / 8.4
D / 25.4
D / 26.2
D / 34.6
B / 12.5
C / 17.2
D / 25.4

A
A
B
C
C
B

/ 8.4
/ 8.1
/ 10.6
/ 24.1
/ 16.3
/ 10.3
-----------

A / 8.3
A / 8.4
B / 14.2
F / 91.7
C / 23.8
A / 9.9
-----------

A / 8.4
A / 8.4
C / 15.4
F / 599.8
D / 27.7
B / 10.2
B / 19.4
B / 15.8
B / 17.3
C / 31.0
C / 22.5

A / 8.3
A / 8.4
B / 14.3
F / 96.6
C / 24.2
A / 9.9
-----------

A / 8.5
A / 8.4
C / 17.0
F / >999
D / 32.6
B / 10.5
C / 21.7
B / 18.0
B / 19.3
D / 35.3
C / 24.8

A
A
B
F
D
B

A / 8.6
A / 8.5
C / 18.4
F / >999
E / 36.3
B / 10.7
C / 24.0
B / 18.0
C / 22.9
D / 37.7
C / 27.5

A / 8.2
C / 18.0
B / 11.7

A / 8.4
C / 21.4
B / 13.1

A / 8.8
D / 30.4
C / 17.7

A / 8.4
C / 21.9
B / 13.2

A / 9.2
E / 43.8
D / 25.6

A / 8.5
C / 24.7
B / 13.9

--Two Way
Stop

A / 8.2
D / 28.0

--A / 8.4
F / 60.6

-------

-------

A / 8.9
F / 496.4
A / 9.1
A / 5.5
B / 12.6
B / 18.6

-------

-------

D / 27.7
A / 9.7
A / 8.2

-------

-------

Signal

Two Way
Stop

---

--A / 8.4
F / 63.6
-------------

Signal

Two Way
Stop
Two Way
Stop

-----

A / 9.6
---

------A / 9.8
---

------A / 9.6
---

D / 25.5
A / 9.4
F / >999
B / 10.6
A / 6.6
B / 15.3
C / 20.1
F / 95.5
B / 10.5
A / 8.8
A / 8.5
B / 16.9
A / 9.0
A / 4.8
B / 10.5
A / 8.8

/ 8.4
/ 8.5
/ 15.0
/ 139.9
/ 26.3
/ 10.1
-----------

--A / 8.5
F / 87.7
------------------A / 9.6
---

A / 9.3
F / 56.1
D / 29.5
D / 31.5
A / 9.6
F / >999
B / 11.0
A / 6.9
B / 16.0
C / 20.2
F / 108.0
B / 10.6
A / 8.9
A / 8.5
B / 17.8
A / 8.8
A / 4.6
B / 10.6
A / 8.8

EXHIBIT 19A
RESULTS OF INTERSECTION
CAPACITY ANALYSES (PM PEAK HOUR)
rh, 160202\initial\los.xls-pm, f03/29/16

58

Synchro HCM 2010 Output


Intersection
1. Wlaker Dr. & Academy Hill Rd
EB/LTR
WB/LTR
NB/LT
SB/LT
2. Walker Dr & Breezewood Dr/Office Bldg Ent
EB/LTR
WB/LTR
NB/L
SB/LT
3. Walker Dr & Hidden Creek/Site Ent B
EB/LR or LTR
WB/LT
WB/R
NB/L
SB/L
4. E Lee St. & Falmouth St.
EB/LTR
WB/LT
WB/R
NB/LTR
SB/LTR
5. E Leet St. & Walker Dr.
EB/L
WB/L
NB/LTR
SB/L
SB/T
SB/R
w/Signal Improvement
EB
WB
NB
SB
6. E Lee St. & US 29 SB Ramp
WB/L
SB/LT
SB/R
7. Meetze Rd & US 29 NB Ramp
EB/L
NB/LTR
w/Signal
EB
WB
NB
8. Walker Dr & Site Ent A
WB/L
WB/R
SB/L
w/Signal
WB
NB
SB
9. Walker Dr & Site Ent C.
WB/R
10. Academy Hill Rd & Site Ent D
NB/LR

Control Type
Two Way
Stop

Two Way
Stop

Two Way
Stop

All Way
Stop

Two Way
Stop

Signal

Two Way
Stop

Two Way
Stop

2015
Existing
Traffic

2018
Background
Traffic

2018
Total
Traffic

2019
Background
Traffic

2019
Total
Traffic

2025
Background
Traffic

2025
Total
Traffic

LOS / Delay

LOS / Delay

LOS / Delay

LOS / Delay

LOS / Delay

LOS / Delay

LOS / Delay

A / 9.8
A / 8.6
A / 7.5
---

B / 10.4
A / 8.7
A / 7.7
---

B / 11.0
A / 8.8
A / 7.9
---

B / 10.4
A / 8.7
A / 7.7
---

B / 12.4
B / 14.5
A / 8.0
A / 7.8

B / 10.5
A / 8.7
A / 7.7
---

B / 12.5
B / 14.8
A / 7.8
A / 8.0

A
A
A
A

A / 9.1
B / 10.7
A / 7.7
A / 7.7

A / 9.4
B / 11.4
A / 7.8
A / 7.8

A / 9.1
B / 10.8
A / 7.7
A / 7.7

A / 9.9
B / 12.8
A / 8.2
A / 8.1

A
B
A
A

9.1
10.8
7.7
7.7

A / 9.9
B / 12.9
A / 8.2
A / 8.2

A / 9.3
----A / 7.6
--B / 11.6
B / 10.7
B / 12.6
B / 10.5
B / 11.8
B / 12.1

A / 9.6
----A / 7.7
--B / 10.8
B / 10.4
B / 11.1
B / 10.1
B / 10.6
B / 11.8

B / 10.3
B / 14.0
A / 9.0
A / 7.8
A / 7.7
B / 11.8
B / 11.9
B / 12.4
B / 10.5
B / 11.3
B / 12.6

A / 9.6
----A / 7.8
--B / 10.9
B / 10.4
B / 11.2
B / 10.2
B / 10.7
B / 11.8

B / 10.8
C / 20.1
A / 9.4
A / 8.1
A / 8.1
B / 12.8
B / 13.4
B / 14.0
B / 10.9
B / 11.9
B / 13.4

A / 9.7
----A / 7.8
--B / 11.3
B / 10.8
B / 11.6
B / 10.6
B / 11.1
B / 12.4

B / 11.0
C / 20.4
A / 9.5
A / 8.1
A / 8.1
B / 13.7
B / 14.4
B / 14.9
B / 11.5
B / 12.7
B / 14.3

A
A
B
B
B
A

/ 8.1
/ 7.8
/ 10.5
/ 14.9
/ 13.5
/ 9.7
-----------

A / 8.0
A / 7.9
B / 11.7
C / 21.9
C / 16.2
A / 9.5
-----------

A / 8.2
A / 7.9
B / 12.5
F / 138.9
C / 18.2
A / 9.8
B / 12.7
A / 9.9
A / 9.8
C / 24.9
B / 16.1

A / 8.0
A / 7.9
B / 11.7
C / 22.3
C / 16.3
A / 9.5
-----------

A / 8.3
A / 7.9
B / 13.4
F / 536.8
C / 20.4
B / 10.1
C / 20.1
B / 14.7
B / 18.1
C / 34.2
C / 23.5

A
A
B
C
C
A

A / 8.4
A / 8.0
B / 13.7
F / 603.9
C / 21.4
B / 10.2
C / 20.4
B / 15.0
B / 18.2
C / 34.4
C / 23.8

A / 7.9
B / 13.1
A / 10.0

A / 8.0
B / 14.2
B / 10.6

A / 8.4
C / 17.9
B / 13.7

A / 8.0
B / 14.3
B / 10.6

A / 8.8
C / 22.3
C / 18.9

A / 8.1
B / 15.0
B / 10.8

A / 8.9
C / 24.0
C / 20.0

A / 8.0
C / 16.5

A / 8.2
C / 23.8

A / 8.2
C / 24.1

A / 9.2
F / 756.3
B / 11.6
A / 7.2
B / 15.7
B / 18.4

A / 8.3
D / 27.3

A / 9.3
F / 893.3
B / 11.8
A / 7.4
B / 16.1
B / 18.8

/
/
/
/

8.9
9.8
7.5
7.5

-------

-------

A / 8.6
F / 169.7
A / 9.7
A / 5.8
B / 12.5
B / 16.9

-------

-------

C / 18.8
A / 9.2
A / 7.9

-------

-------

Signal

Two Way
Stop

-------------

Signal

Two Way
Stop
Two Way
Stop

-----

A / 9.1
---

------A / 9.3
---

------A / 9.1
---

F / 59.6
B / 10.2
A / 8.6
A / 8.4
B / 15.0
A / 8.6
A / 4.7
B / 10.1
A / 8.9

/
/
/
/

/ 8.1
/ 8.0
/ 11.9
/ 24.5
/ 16.9
/ 9.6
-----------

------------------A / 9.1
---

F / 63.6
B / 10.2
A / 8.6
A / 8.6
B / 16.1
A / 9.2
A / 4.7
B / 10.1
A / 8.9

EXHIBIT 19B
RESULTS OF INTERSECTION
CAPACITY ANALYSES (SAT PEAK HOUR)
rh, 160202\initial\los.xls-sat, f03/26/16

59

Simtraffic 95th Queue Output


Intersection & Movements

Storage
Length (ft)

1. Wlaker Dr. & Academy Hill Rd


EB/LTR
--WB/LTR
--NB/LT
--SB/LT
--2. Walker Dr & Breezewood Dr/Office Bldg Ent
EB/LTR
--WB/LTR
--NB/L
150'
SB/LT
--3. Walker Dr & Hidden Creek/Site Ent B
EB/LR or LTR
--WB/LT
--WB/R
--NB/L
115'
SB/L
--4. E Lee St. & Falmouth St.
EB/LTR
--WB/LT
--WB/R
--NB/LTR
--SB/LTR
--5. E Leet St. & Walker Dr.
EB/L
250'
WB/L
225'
NB/LTR
--SB/L
115'
SB/T
--SB/R
--w/Signal Improvement
EB/L
250'
WB/L
225'
NB/LTR
--SB/L
200'
SB/LT
--SB/R
--6. E Lee St. & US 29 SB Ramp
WB/L
200'
SB/LT
--SB/R
315'
7. Meetze Rd & US 29 NB Ramp
EB/L
200'
NB/LTR
w/Signal
EB/L
--NB/LTR
--8. Walker Dr & Site Ent A
WB/L
--WB/R
--SB/L
--w/Signal
WB/L
--WB/R
--SB/L
--9. Walker Dr & Site Ent C.
WB/R
--10. Academy Hill Rd & Site Ent D
NB/LR
---

2015
Existing
Traffic

2018
Background
Traffic

2018
Total
Traffic

2019
2018
Total Traffic Background
w/Improve
Traffic

95th Queue
(ft)

95th Queue
(ft)

95th Queue
(ft)

95th Queue
(ft)

95th Queue
(ft)

95th Queue
(ft)

95th Queue
(ft)

52
<25
30
<25

53
<25
44
<25

208
<25
46
209

54
<25
46
<25

50
<25
42
<25

590
476
66
700

<25
55
<25
28

<25
61
<25
28

33
209
<25
243

<25
65
<25
34

<25
62
<25
32

32
----<25
---

32
----28
---

184
324
193
29
177

32
52
35
26
39

71
121
50
95
111

66
90
50
76
104

94
110
52
84
120

44
<25
<25
117
33
45

42
41
94
196
433
110

-------------

2019
Total
Traffic

2025
2019
Total Traffic Background
w/Improve
Traffic

2025
Total
Traffic

2025
Total Traffic
w/Improve

95th Queue
(ft)

95th Queue
(ft)

95th Queue
(ft)

54
54
53
36

57
<25
42
<25

605
453
47
701

57
58
57
34

39
280
<25
318

<25
69
<25
47

<25
65
<25
35

42
269
<25
308

<25
70
<25
45

32
----27
---

217
315
362
29
222

32
128
37
31
48

34
----28
---

244
307
325
<25
210

32
132
35
32
47

86
166
64
81
113

70
93
50
79
102

102
103
47
79
116

104
179
63
89
124

70
103
52
86
132

100
104
48
80
129

112
184
66
88
126

71
45
117
166
539
434

-------------

48
44
90
198
484
112

104
42
268
167
530
313

-------------

44
43
109
201
754
354

121
50
325
168
533
393

-------------

-------------

-------------

87
79
93
122
154
56

-------------

-------------

111
82
98
176
196
64

-------------

-------------

126
92
102
180
205
67

33
111
94

36
124
121

36
130
210

37
123
227

37
119
117

37
313
462

42
224
405

39
131
134

39
333
476

45
378
518

63
76

67
106

76
220

-----

70
102

83
322

-----

77
123

82
512

-----

-----

-----

-----

150
126

-----

-----

184
156

-----

-----

195
161

-------

-------

320
407
233

124
46
38

-------

300
377
236

-------

-------

305
318
224

-------

-------

-------

-------

-------

-------

-------

118
49
56

-------

-------

124
53
55

---

47

46

46

48

53

54

46

56

56

---

---

---

---

---

209

48

---

54

48

EXHIBIT 20A
RESULTS OF INTERSECTION
QUEUE ANALYSES (PM PEAK HOUR)
rh, 160202\initial\los.xls-pq, f04/05/16

60

2015
Existing
Traffic

Simtraffic 95th Queue Output


Intersection & Movements

Storage
Length (ft)

2018
Background
Traffic

2018
Total
Traffic

2018
Total Traffic
w/Improve

2019
Background
Traffic

2019
Total
Traffic

2019
Total Traffic
w/Improve

2025
Background
Traffic

2025
Total
Traffic

2025
Total Traffic
w/Improve

95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft)

1. Wlaker Dr. & Academy Hill Rd


EB/LTR

---

45

49

50

49

52

128

55

49

168

55

WB/LTR

---

<25

<25

<25

<25

<25

195

56

<25

225

55

NB/LT

---

<25

30

36

33

32

39

43

32

46

47

SB/LT

---

---

<25

---

<25

<25

221

32

<25

293

30
30

2. Walker Dr & Breezewood Dr/Office Bldg Ent


EB/LTR

---

30

30

30

30

29

44

29

29

68

WB/LTR

---

47

52

57

54

50

216

56

52

244

57

NB/L

150'

<25

<25

<25

<25

<25

<25

<25

<25

<25

<25

SB/LT

---

<25

<25

<25

<25

<25

273

26

<25

310

32

EB/LR or LTR

---

34

34

36

33

35

184

36

36

173

35

WB/LT

---

---

---

45

45

---

354

117

---

351

108

3. Walker Dr & Hidden Creek/Site Ent B

WB/R

---

---

---

34

33

---

341

32

---

342

39

NB/L

115'

<25

<25

<25

<25

<25

<25

<25

<25

<25

<25

SB/L

---

---

---

35

32

---

253

55

---

237

54

EB/LTR

---

34

34

52

53

37

61

59

39

64

71

WB/LT

---

66

60

69

83

64

73

102

62

75

111

4. E Lee St. & Falmouth St.

WB/R

---

58

58

58

70

56

52

75

58

55

82

NB/LTR

---

72

66

71

71

65

67

70

71

75

70

SB/LTR

---

74

72

83

85

74

78

82

75

83

87
---

5. E Leet St. & Walker Dr.


EB/L

250'

30

35

51

---

31

98

---

31

101

WB/L

225'

<25

<25

36

---

37

32

---

40

36

---

---

<25

58

80

---

56

121

---

61

139

---

NB/LTR
SB/L

115'

60

95

194

---

84

167

---

104

166

---

SB/T

---

<25

44

608

---

46

532

---

51

539

---

SB/R

---

36

37

83

---

37

292

---

37

309

---

w/Signal Improvement
EB/L

250'

---

---

---

80

---

---

103

---

---

92

WB/L

225'

---

---

---

67

---

---

60

---

---

66

---

---

---

---

72

---

---

84

---

---

85

200'

---

---

---

92

---

---

148

---

---

158

NB/LTR
SB/L
SB/LT

---

---

---

---

108

---

---

158

---

---

160

SB/R

---

---

---

---

44

---

---

60

---

---

57

WB/L

200'

<25

26

27

<25

<25

25

29

26

27

31

SB/LT

---

58

65

67

71

63

71

77

63

75

72

SB/R

315'

59

73

122

125

69

202

199

71

203

234

6. E Lee St. & US 29 SB Ramp

7. Meetze Rd & US 29 NB Ramp


EB/L
NB/LTR

200'

59

62

80

---

63

82

---

66

87

---

---

64

73

181

---

83

338

---

83

297

---

w/Signal
EB/L
NB/LTR

200'

---

---

---

127

---

---

188

---

---

195

---

---

---

---

121

---

---

153

---

---

165
---

8. Walker Dr & Site Ent A


WB/L

---

---

---

197

99

---

323

---

---

312

WB/R

---

---

---

132

47

---

414

---

---

419

---

SB/L

---

---

---

61

35

---

284

---

---

279

--122

w/Signal
WB/L

---

---

---

---

---

---

---

115

---

---

WB/R

---

---

---

---

---

---

---

51

---

---

54

SB/L

---

---

---

---

---

---

---

60

---

---

59

---

---

45

47

47

49

53

51

50

53

50

---

---

---

---

---

---

106

49

---

124

47

9. Walker Dr & Site Ent C.


WB/R
10. Academy Hill Rd & Site Ent D
NB/LR

EXHIBIT 20B
RESULTS OF INTERSECTION
QUEUE ANALYSES (SAT PEAK HOUR)
rh, 160202\initial\los.xls-sq, f04/05/16

61

Intersection: E. Lee St & Walker Dr.


Major - 2 Lanes

85% Speed is < 40 mph

Speed Factor = 1.0

Minor - 2 Lanes

Traffic Volumes

Major

Condition A

Condition B

Combination of

Minimum Vehicle Volume

Interruption of Continuous Traffic

Condition A and B

Major

Minor

Major

Minor

80% of Condition A

80% of Condition B

Minor

(9,600)

(3,200)

(14,400)

(1,600)

(7,680) & (2,560)

(11,520) & (1,280)

4,080

No

Yes

No

No

Yes

No

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Existing Traffic
9,230

No

Satisfied?
2018 Total Traffic
15,100

10,300

Yes

Satisfied?

Yes

2019 Total Traffic


18,230

14,080

Yes

Satisfied?

Yes

2025 Total Traffic


18,820

14,340

Yes

Satisfied?

Yes

Intersection: Meetze Rd & US 29 Bypass NB Ramp


Major - 2 Lanes

85% Speed is < 40 mph

Speed Factor = 1.0

Minor - 1 Lane

Traffic Volumes

Major

Combination of

Condition A

Condition B

Minimum Vehicle Volume

Interruption of Continuous Traffic

Condition A and B

Major

Minor

Major

Minor

80% of Condition A

80% of Condition B

Minor

(9,600)

(2,400)

(14,400)

(1,200)

(7,680) & (1,920)

(11,520) & (960)

920

No

No

No

No

No

No

No

No

Yes

No

No

No

No

Yes

Yes

Yes

Yes

No

Yes

Yes

Yes

Existing Traffic
7,470
Satisfied?

No

2018 Total Traffic


10,650

1,890

Yes

Satisfied?

No

2019 Total Traffic


12,340

2,370

Yes

Satisfied?

Yes

2025 Total Traffic


12,830

2,430
Satisfied?

Yes
Yes

EXHIBIT 21A
ADT SIGNAL WARRANT FOR
WALKER DR/ E. LEE ST & US29 NB BYPASS RAMP/MEETZE RD
rh, 160202\initial\los.xls-w5&7, f03/26/16

62

Intersection: Meetze Rd & US 29 Bypass SB Ramp


Major - 2 Lanes

85% Speed is < 40 mph

Speed Factor = 1.0

Minor - 2 Lanes

Traffic Volumes

Major

Condition A

Condition B

Combination of

Minimum Vehicle Volume

Interruption of Continuous Traffic

Condition A and B

Major

Minor

Major

Minor

80% of Condition A

80% of Condition B

Minor

(9,600)

(3,200)

(14,400)

(1,600)

(7,680) & (2,560)

(11,520) & (1,280)

4,160

No

Yes

No

Yes

Yes

No

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Existing Traffic
9,090
Satisfied?

No

2018 Total Traffic


14,970

6,150

Yes

Satisfied?

Yes

2019 Total Traffic


18,100

7,150

Yes

Satisfied?

Yes

2025 Total Traffic


18,670

7,410

Yes

Satisfied?

Yes

Intersection: Walker Drive & Site Access A


Major - 2 Lanes

85% Speed is < 40 mph

Speed Factor = 1.0

Minor - 2 Lanes

Traffic Volumes

Major

Condition A

Condition B

Combination of

Minimum Vehicle Volume

Interruption of Continuous Traffic

Condition A and B

Major

Minor

Major

Minor

80% of Condition A

80% of Condition B

Minor

(9,600)

(2,400)

(14,400)

(1,200)

(7,680) & (1,920)

(11,520) & (960)

5,016

Yes

Yes

No

Yes

Yes

No

Yes

No

Yes

Yes

Yes

Yes

No

Yes

Yes

Yes

2018 Total Traffic


10,300
Satisfied?

Yes

2019 Total Traffic


14,080

5,352

Yes

Satisfied?

Yes

2025 Total Traffic


14,340

5,352
Satisfied?

Yes
Yes

EXHIBIT 21B
ADT SIGNAL WARRANT FOR
US29 SB BYPASS RAMP/MEETZE RD & WALKER DR/SITE ENT A
rh, 160202\initial\los.xls-w6&8, f04/06/16

63

64

65

66

RESULTS,RECOMMENDATIONS,ANDCONCLUSIONS

StudyPurpose

AdetailedTrafficImpactAnalysishasbeenpreparedfortheproposedrezoning
and multiuse development of the Walker Drive Properties. As a result of the
analyses and findings of the study, it has been shown that the proposed
developmentcanbeaccommodatedbythesurroundingarearoadsystemwith
recommendedmitigatingtrafficimprovements.Thespecificroadimprovements
recommendedaspartofthisstudyforthePhase1andPhase2(buildout)ofthe
sitearedetailedbelow.

Phase1(2018DesignYear)

Provide traffic signalization at the intersection of Walker Drive


with E. Lee Street with split phasing for Walker Drive. The lane
use along southbound Walker Drive is recommended to be
changedtoanexclusiverightturnlane,asharedthroughleftturn
lane,andanexclusiveleftturnlane.Theexclusiveleftturnlane
shouldbeextendedtoaminimumlengthof200feet.

ProvidetrafficsignalizationattheintersectionoftheUS29bypass
northboundrampswithMeetzeRoad.

Provide100feetleftturnandrightturnlanesalongWalkerDrive
at both Site Access Points A and B and provide twolane
approachesfortheexitingsitemovements.

Phase2(2019DesignYear)

In addition to the Phase 1 improvements, provide traffic


signalizationattheSiteAccessAintersectionwithWalkerDrive.

No further improvements were identified to be needed for Year 2025 traffic


volumesbeyondthoseidentifiedforPhase2Development.

Withtheimplementationoftherecommendedimprovements,acceptabletraffic
conditionscanbemaintainedonthesurroundingarearoadsystemwiththefull
developmentoftheWalkerDriveProperties.

67

APPENDIX A
Scoping Letter
Intersection Turning Movement Counts,
and Photos

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

Virginia Department of Transportation


Traffic Engineering Division
2015
Preliminary Unofficial Annual Average Daily Traffic Volume Estimates By Section of Route, for Review Only
Fauquier Maintenance Area
Route

Length AADT

QA

4Tire

Bus

98%

1%

---------------Truck--------------2Axle 3+Axle 1Trail 2Trail

QC

K
Dir
QK
Factor
Factor

AAWDT QW

Year

Town of Warrenton
From:

Fletcher Dr

2200

Bus US 29

To:

1600

99%

1%

1%

97%

1%

0%

0%

1%

0%

0%

0%

0.562

2200

2015

0%

NA

1600

2015

1%

0%

NA

4100

2015

NA

10000

2015

Falmouth St

G
To:

0.101

4th St

From:

10000

3rd St

G
To:

Meetze Rd

0%

Fauquier Rd

From:

4100

0%

Bear Wallow Dr

G
To:

Lee St

0%

Oak Springs Dr

From:

Foxcroft Rd

1%

98%

1%

1%

0%
East St

45
2/23/2016

81

Virginia Department of Transportation


Traffic Engineering Division
2015
Preliminary Unofficial Annual Average Daily Traffic Volume Estimates By Section of Route, for Review Only
Fauquier Maintenance Area
Route

Length AADT

QA

4Tire

Bus

96%

0%

96%

0%

96%

0%

---------------Truck--------------2Axle 3+Axle 1Trail 2Trail

QC

K
Dir
QK
Factor
Factor

AAWDT QW

Year

Fauquier County
From:

643 Meetze Rd

3.33

2600

SR 28 S, Catlett Rd

To:
From:

643 Meetze Rd

4.61

4200

643 Meetze Rd

0.59

8000

644 Ritchie Rd

1.40

1200

220

110

1.38
4.46

810

98%

0%

0.30

720
1700
2700

30

0%

98%

0%

0.36

1%

98%

0%

1%

0.59

230

1900

0.60

1%

0.094

0.612

8200

2015

380

430
600

320

0%

0%

1500

95%

0%

1%

99%

0%

0%

1.80

1300

651 Sumerduck Rd

2.10

1700

NA

NA

08/12/2015

NA

NA

09/02/2015

NA

NA

08/12/2015

0.098

0.667

830

2015

0%

0%

0%

0.095

0.804

740

2015

0%

0%

0%

0.100

0.75

1700

2015

0%

0%

0%

0.097

0.747

2800

2015

NA

NA

08/12/2015

NA

NA

08/12/2015

1%

2%

0%

0.099

0.556

2000

2015

0%

0%

0%

0.101

0.732

390

2015

0%

0%

0.11

0.532

440

2015

0%

0%

0.114

0.63

610

2015

30-602 W; Rogues Rd
30-602 W, Rogues Rd

99%

0%

99%

0%

0%

0%

30-650 Messick Rd

0%

0%

30-663 Balls Mill Rd


SR 28 Catlett Rd

NA

NA

11/02/2015

30-649 Germantown Rd
US 17 Marsh Rd, Warrenton Rd

97%

0%

97%

0%

97%

0%

97%

0%

1%

1%

2%

0%

0.100

0.752

1200

2015

0%

0.103

0.531

1500

2015

0%

0.105

0.507

1400

2015

0%

0.113

0.594

1700

2015

30-632 E, Rogers Ford Rd

1%

1%

2%

30-632 W, Union Church Rd

To:
From:

To:

08/12/2015

SR 28 Catlett Rd

To:
From:

651 Sumerduck Rd

NA

0%

1200

NA

30-610 Midland Rd

To:
From:

651 Sumerduck Rd

0%

30-610 Midland Rd

From:

3.82

1%

30-646 Blackwelltown Rd

To:

651 Sumerduck Rd

1%

From:

1.20

2015

30-602 Rogues Rd

To:

650 Messick Rd

To:
From:

649 Germantown Rd

4300

30-719; 30-721 Free State Rd

From:

1.13

0.585

30-635 Hume Rd

To:

649 Germantown Rd

30-733 Wilson Rd

To:
From:

649 Germantown Rd

1%

98%

From:

0.54

1%

To:

649 Germantown Rd

0.096

30-688 Leeds Manor Rd

To:
From:

648 Ebenezer Church Rd

Rappahannock County Line

From:

1.50

0%

30-648 Ebenezer Church Rd

To:

648 Ebenezer Church Rd

1%

30-602 Old Mill Rd

To:
From:

647 Crest Hill Rd

1%

To:
From:

647 Crest Hill Rd

1%

30-647 Crest Hill Rd

To:
From:

3.23

2015

Rappahannock County Line

From:

647 Crest Hill Rd

To:

2.89

2700

30-806 Elk Run Rd

From:

647 Crest Hill Rd

0.622

30-602 Old Mill Rd

To:

2.10

From:

646 Blackwelltown Rd

0.106

US 17 Marsh Rd

To:

3.25

To:
From:

645 Tapps Ford Rd

0%

ECL Warrenton

From:

1300

1%

30-672 Duhollow Rd

To:

1.90

1%

30-616 S, Casanova Rd

To:
From:

644 Ritchie Rd

1%

1%

1%

2%

30-637 Courtneys Rd

1%

1%

2%

30-620 Kelly Ford Rd

46
2/23/2016

25

APPENDIX B
Intersection Capacity
Analysis Worksheets

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


36
0
27
36
0
27
0
0
0
Stop Stop Stop
- None
1
0
86
86
86
2
2
2
42
0
31
Minor2
458
273
185
7.54
6.54
6.54
3.52
486
710
799

563
273
290
6.54
5.54
5.54
4.02
434
683
671

471
543
684
768

418
493
682
646

Approach
HCM Control Delay, s
HCM LOS

EB
11.3
B

RH
3/24/2016

Existing PM

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1268
0.032
7.9
A
0.1

WBL WBT WBR


4
0
1
4
0
1
0
0
0
Stop Stop Stop
- None
1
0
86
86
86
2
2
2
5
0
1

NBL NBT NBR


35 179
0
35 179
0
0
0
0
Free Free Free
- None
0
0
86
86
86
2
2
2
41 208
0

145
6.94
3.32
876
-

Minor1
417
290
127
7.54
6.54
6.54
3.52
520
694
863

583
290
293
6.54
5.54
5.54
4.02
423
671
669

104
6.94
3.32
931
-

Major1
291
4.14
2.22
1268
-

876
-

487
548
668
831

407
476
646
668

931
-

1268
-

WB
11.1
B
NBT NBR EBLn1WBLn1 SBL
- 649 597 1360
- 0.113 0.01 0.001
0.1
- 11.3 11.1
7.6
A
B
B
A
0.4
0
0

NB
1.4

0
-

0
-

SBL SBT SBR


1 215
35
1 215
35
0
0
0
Free Free Free
- None
0
0
86
86
86
2
2
2
1 250
41
Major2
208
4.14
2.22
1360
1360
-

0
-

0
-

SB
0

SBT SBR
0
A
-

Synchro 9 Report
Page 1
1

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
87
87
87
2
2
2
0
0
5
Minor2
496
354
142
7.54
6.54
6.54
3.52
457
636
846

683
354
329
6.54
5.54
5.54
4.02
370
629
645

428
509
632
808

358
443
612
641

Approach
HCM Control Delay, s
HCM LOS

EB
9.2
A

RH
3/24/2016

Existing PM

1.7

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1259
0.005
7.9
A
0

WBL WBT WBR


34
0
30
34
0
30
0
0
0
Stop Stop Stop
- None
1
0
87
87
87
2
2
2
39
0
34

NBL NBT NBR


6 223
51
6 223
51
0
0
0
Free Free Free
- None
150
0
0
87
87
87
2
2
2
7 256
59

149
6.94
3.32
871
-

Minor1
504
299
205
7.54
6.54
6.54
3.52
451
685
778

653
299
354
6.54
5.54
5.54
4.02
385
665
629

157
6.94
3.32
861
-

Major1
299
4.14
2.22
1259
-

871
-

438
524
681
753

373
458
661
612

861
-

1259
-

WB
11.3
B
NBT NBR EBLn1WBLn1 SBL
- 871 642 1242
- 0.005 0.115 0.022
9.2 11.3
8
A
B
A
0
0.4
0.1

NB
0.2

0
-

0
-

SBL SBT SBR


24 260
0
24 260
0
0
0
0
Free Free Free
- None
0
0
87
87
87
2
2
2
28 299
0
Major2
315
4.14
2.22
1242
1242
-

0
-

0
-

SB
0.8

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
2

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La.

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


Existing PM

0.6
EBL
0
0
0
Stop
0
1
0
91
2
0

EBR
19
19
0
Stop
None
91
2
21

NBL NBT
22 232
22 232
0
0
Free Free
- None
115
0
0
91
91
2
2
24 255

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
473
297
176
6.84
5.84
5.84
3.52
520
728
837

150
6.94
3.32
870
-

Major1
300
4.14
2.22
1258
-

510
510
728
821

870
-

1258
-

Approach
HCM Control Delay, s
HCM LOS

EB
9.2
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBL
1258
0.019
7.9
A
0.1

NB
0.7

NBT EBLn1
- 870
- 0.024
9.2
A
0.1

0
-

SBT SBR
267
6
267
6
0
0
Free Free
- None
0
0
91
91
2
2
293
7
Major2
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 3
3

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

20.9
C

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/24/2016

2016-0202 Walker Drive


Existing PM

EBL
1
1
0.85
2
1
0
EB
WB
2
SB
1
NB
1
17.4
C

EBT
178
178
0.85
2
209
1

EBR
29
29
0.85
2
34
0

WBU
0
0
0.92
2
0
0

WBL
176
176
0.90
2
196
0
WB
EB
1
NB
1
SB
1
23.9
C

WBT
146
146
0.90
2
162
1

WBR
134
134
0.90
2
149
1

NBU
0
0
0.92
2
0
0

NBL
19
19
0.87
2
22
0

NBT
92
92
0.87
2
106
1

NBR
131
131
0.87
2
151
0

NB
SB
1
EB
1
WB
2
17.9
C

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


8%
0%
55%
0%
65%
38%
86%
45%
0%
34%
54%
14%
0% 100%
0%
Stop
Stop
Stop
Stop
Stop
242
208
322
134
268
19
1
176
0
175
92
178
146
0
92
131
29
0
134
1
278
245
358
149
308
2
5
7
7
2
0.54 0.498 0.742 0.267 0.615
6.984 7.327
7.58 6.581 7.316
Yes
Yes
Yes
Yes
Yes
517
494
479
549
496
5.001 5.346
5.28 4.281 5.316
0.538 0.496 0.747 0.271 0.621
17.9
17.4
29
11.7
21.3
C
C
D
B
C
3.2
2.7
6.2
1.1
4.1

Synchro 9 Report
Page 4
4

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


Existing PM

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
175
175
0.87
2
201
0

SBT
92
92
0.87
2
106
1

SBR
1
1
0.87
2
1
0

SB
NB
1
WB
2
EB
1
21.3
C

Lane

RH
3/24/2016

Synchro 9 Report
Page 5
5

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


95 375
8
95 375
8
0
0
0
Free Free Free
- None
250
- 135
0
0
94
94
94
2
2
2
101 399
9
Major1
402
4.14
2.22
1153
-

Approach
HCM Control Delay, s
HCM LOS

EB
1.7

RH
3/24/2016

Existing PM

4.5

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

1153
-

0
-

NBLn1 EBL
664 1153
0.024 0.088
10.6
8.4
B
A
0.1
0.3

0
-

WBL WBT WBR


9 378 174
9 378 174
0
0
0
Free Free Free
- None
225
- 375
0
0
94
94
94
2
2
2
10 402 185
Major2
399
4.14
2.22
1156
1156
WB
0.1

0
-

0
-

NBL NBT NBR


2
0
13
2
0
13
0
0
0
Stop Stop Stop
- None
1
0
94
94
94
2
2
2
2
0
14
Minor1
822 1022
601 601
221 421
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
266 235
454 488
761 587
209
306
414
639

213
308
445
582

NB
10.6
B

199
6.94
3.32
809
809
-

SBL SBT SBR


156
1 115
156
1 115
0
0
0
Stop Stop Stop
- None
115
0
1
0
94
94
94
2
2
2
166
1 122
Minor2
823 1022
421 421
402 601
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
266 235
581 587
596 488
242
351
530
534

201
6.94
3.32
806
-

213
321
582
445

806
-

SB
18.2
C

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1156
- 351 321 806
- 0.008
- 0.473 0.003 0.152
8.1
- 24.1 16.3 10.3
A
C
C
B
0
2.4
0
0.5

Synchro 9 Report
Page 6
6

HCM 2010 TWSC


2016-0202 Walker Drive
Existing PM
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

6
EBL EBT EBR
0 393 119
0 393 119
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 401 121

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
247
4.14
2.22
1316
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1316
-

EBL
1316
0
A
0

0
-

0
-

WBL WBT WBR


29 242
0
29 242
0
0
0
0
Free Free Free
- None
200
0
0
98
98
98
2
2
2
30 247
0
Major2
401
4.14
2.22
1154
1154
-

0
-

0
-

WB
0.9

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
98
98
98
2
2
2
0
0
0

SBL SBT SBR


204
0 360
204
0 360
0
0
0
Stop Stop Stop
- None
0
1
0
98
98
98
2
2
2
208
0 367
Minor2
507
306
201
6.84
5.84
5.84
3.52
495
720
813

707
306
401
6.54
5.54
5.54
4.02
359
660
599

123
6.94
3.32
905
-

482
482
701
813

0
0
0
0

905
-

SB
14
B

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1154
- 482 905
- 0.026
- 0.432 0.406
8.2
18 11.7
A
C
B
0.1
2.1
2

Synchro 9 Report
Page 7
7

HCM 2010 TWSC


2016-0202 Walker Drive
Existing PM
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

4.4
EBL EBT EBR
202 397
0
202 397
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
217 427
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
215
4.14
2.22
1352
-

Approach
HCM Control Delay, s
HCM LOS

EB
2.8

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1352
-

0
-

NBLn1 EBL
260 1352
0.405 0.161
28
8.2
D
A
1.9
0.6

0
-

WBL WBT WBR


0 200 106
0 200 106
0
0
0
Free Free Free
- None
- 115
0
0
93
93
93
2
2
2
0 215 114
Major2
427
4.14
2.22
1129
1129
-

0
-

0
-

WB
0

NBL NBT NBR


73
0
25
73
0
25
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
78
0
27
Minor1
969 1076
861 861
108 215
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
251 218
374 371
904 724
211
211
314
904

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
93
93
93
2
2
2
0
0
0

213
6.94
3.32
792
792
-

NB
28
D

EBT EBR WBL WBT WBR


- 1129
0
A
0
-

Synchro 9 Report
Page 8
8

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


31
0
24
31
0
24
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
33
0
26
Minor2
234
126
108
7.54
6.54
6.54
3.52
701
865
886

288
126
162
6.54
5.54
5.54
4.02
621
791
763

690
706
848
867

609
628
791
748

Approach
HCM Control Delay, s
HCM LOS

EB
9.8
A

RH
3/24/2016

Existing Sat

2.4

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1443
0.019
7.5
A
0.1

WBL WBT WBR


0
0
1
0
0
1
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
0
0
1

NBL NBT NBR


25 101
0
25 101
0
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
27 109
0

69
6.94
3.32
980
-

Minor1
219
162
57
7.54
6.54
6.54
3.52
718
824
948

300
54
162
138
6.54 6.94
5.54
5.54
4.02 3.32
611 1002
763
781
-

Major1
138
4.14
2.22
1443
-

980
-

688
697
808
923

599 1002
616
748
781
-

1443
-

WB
8.6
A
NBT NBR EBLn1WBLn1 SBL
- 804 1002 1479
- 0.074 0.001
0.1
9.8
8.6
0
A
A
A
A
0.2
0
0

NB
1.6

0
-

0
-

SBL SBT SBR


0 106
22
0 106
22
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
0 114
24
Major2
109
4.14
2.22
1479
1479
-

0
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 1
9

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


1
0
10
1
0
10
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
1
0
11
Minor2
245
173
72
7.54
6.54
6.54
3.52
688
812
929

324
173
151
6.54
5.54
5.54
4.02
592
755
771

671
692
810
909

587
613
750
769

Approach
HCM Control Delay, s
HCM LOS

EB
8.9
A

RH
3/24/2016

Existing Sat

1.7

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1417
0.003
7.5
A
0

WBL WBT WBR


26
0
17
26
0
17
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
28
0
18

NBL NBT NBR


4 117
15
4 117
15
0
0
0
Free Free Free
- None
150
0
0
93
93
93
2
2
2
4 126
16

80
6.94
3.32
964
-

Minor1
235
142
93
7.54
6.54
6.54
3.52
700
846
904

317
142
175
6.54
5.54
5.54
4.02
598
778
753

71
6.94
3.32
977
-

Major1
160
4.14
2.22
1417
-

964
-

688
707
844
889

593
617
776
748

977
-

1417
-

WB
9.8
A
NBT NBR EBLn1WBLn1 SBL
- 931 794 1438
- 0.013 0.058 0.005
8.9
9.8
7.5
A
A
A
0
0.2
0

NB
0.2

0
-

0
-

SBL SBT SBR


7 145
4
7 145
4
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
8 156
4
Major2
142
4.14
2.22
1438
1438
-

0
-

0
-

SB
0.3

SBT SBR
0
A
-

Synchro 9 Report
Page 2
10

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La.

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


Existing Sat

1.1
EBL
6
6
0
Stop
0
1
0
90
2
7

EBR
18
18
0
Stop
None
90
2
20

NBL NBT
13 102
13 102
0
0
Free Free
- None
115
0
0
90
90
2
2
14 113

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
262
176
86
6.84
5.84
5.84
3.52
705
837
927

89
6.94
3.32
951
-

Major1
179
4.14
2.22
1394
-

698
698
837
918

951
-

1394
-

Approach
HCM Control Delay, s
HCM LOS

EB
9.3
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBL
1394
0.01
7.6
A
0

NB
0.9

NBT EBLn1
- 872
- 0.031
9.3
A
0.1

0
-

SBT SBR
156
5
156
5
0
0
Free Free
- None
0
0
90
90
2
2
173
6
Major2
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 3
11

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

11.6
B

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/24/2016

2016-0202 Walker Drive


Existing Sat

EBL
2
2
0.89
2
2
0
EB
WB
2
SB
1
NB
1
10.7
B

EBT
91
91
0.89
2
102
1

EBR
33
33
0.89
2
37
0

WBU
0
0
0.92
2
0
0

WBL
95
95
0.90
2
106
0
WB
EB
1
NB
1
SB
1
11.5
B

WBT
89
89
0.90
2
99
1

WBR
185
185
0.90
2
206
1

NBU
0
0
0.92
2
0
0

NBL
10
10
0.84
2
12
0

NBT
104
104
0.84
2
124
1

NBR
87
87
0.84
2
104
0

NB
SB
1
EB
1
WB
2
11.8
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


5%
2%
52%
0%
54%
52%
72%
48%
0%
44%
43%
26%
0% 100%
2%
Stop
Stop
Stop
Stop
Stop
201
126
184
185
200
10
2
95
0
108
104
91
89
0
88
87
33
0
185
4
239
142
204
206
215
2
5
7
7
2
0.367
0.23 0.359 0.306 0.352
5.523 5.848 6.324 5.352 5.893
Yes
Yes
Yes
Yes
Yes
648
612
568
670
609
3.579 3.912 4.074 3.102 3.951
0.369 0.232 0.359 0.307 0.353
11.8
10.7
12.6
10.5
12.1
B
B
B
B
B
1.7
0.9
1.6
1.3
1.6

Synchro 9 Report
Page 4
12

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


Existing Sat

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
108
108
0.93
2
116
0

SBT
88
88
0.93
2
95
1

SBR
4
4
0.93
2
4
0

SB
NB
1
WB
2
EB
1
12.1
B

Lane

RH
3/24/2016

Synchro 9 Report
Page 5
13

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


44 243
3
44 243
3
0
0
0
Free Free Free
- None
250
- 135
0
0
91
91
91
2
2
2
48 267
3
Major1
348
4.14
2.22
1208
-

Approach
HCM Control Delay, s
HCM LOS

EB
1.2

RH
3/24/2016

Existing Sat

2.9

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

1208
-

0
-

NBLn1 EBL
662 1208
0.018 0.04
10.5
8.1
B
A
0.1
0.1

0
-

WBL WBT WBR


6 317
77
6 317
77
0
0
0
Free Free Free
- None
225
- 375
0
0
91
91
91
2
2
2
7 348
85
Major2
267
4.14
2.22
1294
1294
WB
0.1

0
-

0
-

NBL NBT NBR


4
0
7
4
0
7
0
0
0
Stop Stop Stop
- None
1
0
91
91
91
2
2
2
4
0
8
Minor1
553
364
189
7.54
6.54
6.54
3.52
416
627
795

726
364
362
6.54
5.54
5.54
4.02
350
622
624

368
457
602
725

334
419
597
621

NB
10.5
B

SBL SBT SBR


91
3
60
91
3
60
0
0
0
Stop Stop Stop
- None
115
0
1
0
91
91
91
2
2
2
100
3
66

134
6.94
3.32
890
-

Minor2
592
362
230
7.54
6.54
6.54
3.52
390
629
752

726
362
364
6.54
5.54
5.54
4.02
350
624
622

174
6.94
3.32
839
-

890
-

373
465
604
716

334
428
621
597

839
-

SB
12.8
B

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1294
- 465 428 839
- 0.005
- 0.215 0.008 0.079
7.8
- 14.9 13.5
9.7
A
B
B
A
0
0.8
0
0.3

Synchro 9 Report
Page 6
14

HCM 2010 TWSC


2016-0202 Walker Drive
Existing Sat
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

3.8
EBL EBT EBR
0 265
55
0 265
55
0
0
0
Free Free Free
- None
- 200
0
0
91
91
91
2
2
2
0 291
60

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
235
4.14
2.22
1329
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1329
-

EBL
1329
0
A
0

0
-

0
-

WBL WBT WBR


18 214
0
18 214
0
0
0
0
Free Free Free
- None
200
0
0
91
91
91
2
2
2
20 235
0
Major2
291
4.14
2.22
1268
1268
-

0
-

0
-

WB
0.6

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
91
91
91
2
2
2
0
0
0

SBL SBT SBR


96
1 171
96
1 171
0
0
0
Stop Stop Stop
- None
0
1
0
91
91
91
2
2
2
105
1 188
Minor2
421
275
146
6.84
5.84
5.84
3.52
561
747
866

566
275
291
6.54
5.54
5.54
4.02
432
681
670

118
6.94
3.32
912
-

552
552
735
866

0
0
0
0

912
-

SB
11.1
B

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1268
- 552 912
- 0.016
- 0.193 0.206
7.9
- 13.1
10
A
B
B
0
0.7
0.8

Synchro 9 Report
Page 7
15

HCM 2010 TWSC


2016-0202 Walker Drive
Existing Sat
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

3.5
EBL EBT EBR
163 220
0
163 220
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
177 239
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
196
4.14
2.22
1374
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.4

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1374
-

0
-

NBLn1 EBL
408 1374
0.232 0.129
16.5
8
C
A
0.9
0.4

0
-

WBL WBT WBR


0 180 127
0 180 127
0
0
0
Free Free Free
- None
- 115
0
0
92
92
92
2
2
2
0 196 138
Major2
239
4.14
2.22
1325
1325
-

0
-

0
-

WB
0

NBL NBT NBR


60
1
26
60
1
26
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
65
1
28
Minor1
691
593
98
6.84
5.84
5.84
3.52
378
515
915

789
593
196
6.54
5.54
5.54
4.02
321
492
737

120
6.94
3.32
909
-

329
329
449
915

0
0
0
0

909
-

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

NB
16.5
C

EBT EBR WBL WBT WBR


- 1325
0
A
0
-

Synchro 9 Report
Page 8
16

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2018 Background PM

2.3
EBL EBT EBR
37
0
28
37
0
28
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
40
0
30

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
555
292
263
7.54
6.54
6.54
3.52
414
692
719

667
292
375
6.54
5.54
5.54
4.02
378
670
615

391
478
644
669

352
440
669
573

Approach
HCM Control Delay, s
HCM LOS

EB
11.9
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NBL
1247
0.06
8.1
A
0.2

RH
3/24/2016

2016-0202 Walker Drive

WBL WBT WBR


4
0
1
4
0
1
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
4
0
1

NBL NBT NBR


69 207
0
69 207
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
75 225
0

155
6.94
3.32
863
-

Minor1
512
375
137
7.54
6.54
6.54
3.52
445
618
852

687
375
312
6.54
5.54
5.54
4.02
368
615
656

113
6.94
3.32
918
-

Major1
310
4.14
2.22
1247
-

863
-

406
474
575
821

342
419
573
655

918
-

1247
-

WB
11.9
B
NBT NBR EBLn1WBLn1 SBL
- 592 525 1341
- 0.119 0.01 0.001
0.2
- 11.9 11.9
7.7
A
B
B
A
0.4
0
0

NB
2.2

0
-

0
-

SBL SBT SBR


1 249
36
1 249
36
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
1 271
39
Major2
225
4.14
2.22
1341
1341
-

0
-

0
-

SB
0

SBT SBR
0
A
-

Synchro 9 Report
Page 1
17

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
4
Minor2
586
420
166
7.54
6.54
6.54
3.52
394
581
820

794
420
374
6.54
5.54
5.54
4.02
319
588
616

366
458
578
783

305
400
566
612

Approach
HCM Control Delay, s
HCM LOS

EB
9.3
A

RH
3/24/2016

2018 Background PM

1.9

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1210
0.005
8
A
0

WBL WBT WBR


54
0
30
54
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
59
0
33

NBL NBT NBR


6 281
51
6 281
51
0
0
0
Free Free Free
- None
150
0
0
92
92
92
2
2
2
7 305
55

173
6.94
3.32
840
-

Minor1
593
346
247
7.54
6.54
6.54
3.52
389
643
735

766
346
420
6.54
5.54
5.54
4.02
331
634
588

180
6.94
3.32
832
-

Major1
346
4.14
2.22
1210
-

840
-

374
474
639
703

317
414
630
566

832
-

1210
-

WB
12.7
B
NBT NBR EBLn1WBLn1 SBL
- 840 560 1194
- 0.005 0.163 0.031
9.3 12.7
8.1
A
B
A
0
0.6
0.1

NB
0.1

0
-

0
-

SBL SBT SBR


34 318
0
34 318
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
37 346
0
Major2
361
4.14
2.22
1194
1194
-

0
-

0
-

SB
0.9

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
18

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La.

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2018 Background PM

0.6
EBL
0
0
0
Stop
0
1
0
92
2
0

EBR
20
20
0
Stop
None
92
2
22

NBL NBT
23 290
23 290
0
0
Free Free
- None
115
0
0
92
92
2
2
25 315

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
586
378
208
6.84
5.84
5.84
3.52
441
663
807

191
6.94
3.32
818
-

Major1
382
4.14
2.22
1173
-

432
432
663
790

818
-

1173
-

Approach
HCM Control Delay, s
HCM LOS

EB
9.5
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBL
1173
0.021
8.1
A
0.1

NB
0.6

NBT EBLn1
- 818
- 0.027
9.5
A
0.1

0
-

SBT SBR
345
6
345
6
0
0
Free Free
- None
0
0
92
92
2
2
375
7
Major2
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 3
19

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/24/2016

2016-0202 Walker Drive


2018 Background PM

15
B
EBU
0
0
0.92
2
0
0

EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
14.5
B

EBT
195
195
0.92
2
212
1

EBR
30
30
0.92
2
33
0

WBU
0
0
0.92
2
0
0

WBL
91
91
0.92
2
99
0
WB
EB
1
NB
1
SB
1
14.8
B

WBT
163
163
0.92
2
177
1

WBR
138
138
0.92
2
150
1

NBU
0
0
0.92
2
0
0

NBL
20
20
0.92
2
22
0

NBT
95
95
0.92
2
103
1

NBR
67
67
0.92
2
73
0

NB
SB
1
EB
1
WB
2
13
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


11%
0%
36%
0%
65%
52%
86%
64%
0%
34%
37%
13%
0% 100%
0%
Stop
Stop
Stop
Stop
Stop
182
226
254
138
276
20
1
91
0
180
95
195
163
0
95
67
30
0
138
1
198
246
276
150
300
2
5
7
7
2
0.355
0.44 0.525 0.248 0.542
6.455 6.446 6.846 5.949 6.498
Yes
Yes
Yes
Yes
Yes
556
558
527
603
555
4.507 4.498 4.594 3.696 4.544
0.356 0.441 0.524 0.249 0.541
13
14.5
17
10.7
17
B
B
C
B
C
1.6
2.2
3
1
3.2

Synchro 9 Report
Page 4
20

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2018 Background PM

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
180
180
0.92
2
196
0

SBT
95
95
0.92
2
103
1

SBR
1
1
0.92
2
1
0

SB
NB
1
WB
2
EB
1
17
C

Lane

RH
3/24/2016

Synchro 9 Report
Page 5
21

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2018 Background PM

15.5

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


91 333
12
91 333
12
0
0
0
Free Free Free
- None
250
- 135
0
0
94
94
94
2
2
2
97 354
13

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
353
4.14
2.22
1202
-

Approach
HCM Control Delay, s
HCM LOS

EB
1.7

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/24/2016

2016-0202 Walker Drive

1202
-

0
-

NBLn1 EBL
529 1202
0.259 0.081
14.2
8.3
B
A
1
0.3

0
-

WBL WBT WBR


122 332 212
122 332 212
0
0
0
Free Free Free
- None
225
- 375
0
0
94
94
94
2
2
2
130 353 226
Major2
354
4.14
2.22
1201
1201
-

0
-

0
-

WB
1.5

NBL NBT NBR


5
25
99
5
25
99
0
0
0
Stop Stop Stop
- None
1
0
94
94
94
2
2
2
5
27 105
Minor1
1011 1161
548 548
463 613
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
194 194
488 515
548 481
123
208
449
375

159
247
473
429

177
6.94
3.32
835
835
-

SBL SBT SBR


204
51
95
204
51
95
0
0
0
Stop Stop Stop
- None
115
0
1
0
94
94
94
2
2
2
217
54 101
Minor2
997 1161
613 613
384 548
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
~ 198 194
446 481
611 515
~ 137
229
410
463

NB
14.2
B

159
245
429
473

177
6.94
3.32
835
835
-

SB
59.6
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1201
- 229 245 835
- 0.108
- 0.948 0.221 0.121
8.4
- 91.7 23.8
9.9
A
F
C
A
0.4
8.3
0.8
0.4

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
22

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze 2018
Rd Background PM

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

6.6
EBL EBT EBR
0 458 146
0 458 146
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 467 149

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
289
4.14
2.22
1270
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1270
-

EBL
1270
0
A
0

0
-

0
-

WBL WBT WBR


30 283
0
30 283
0
0
0
0
Free Free Free
- None
200
0
0
98
98
98
2
2
2
31 289
0
Major2
467
4.14
2.22
1091
1091
-

0
-

0
-

WB
0.8

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
98
98
98
2
2
2
0
0
0

SBL SBT SBR


210
0 426
210
0 426
0
0
0
Stop Stop Stop
- None
0
1
0
98
98
98
2
2
2
214
0 435
Minor2
584
350
234
6.84
5.84
5.84
3.52
443
684
783

817
350
467
6.54
5.54
5.54
4.02
309
631
560

144
6.94
3.32
877
-

430
430
665
783

0
0
0
0

877
-

SB
15.8
C

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1091
- 430 877
- 0.028
- 0.498 0.496
8.4
- 21.4 13.1
A
C
B
0.1
2.7
2.8

Synchro 9 Report
Page 7
23

HCM 2010 TWSC


2016-0202 Walker Drive
2018 Background PM
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

8.8
EBL EBT EBR
255 415
0
255 415
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
274 446
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
229
4.14
2.22
1336
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1336
-

0
-

NBLn1 EBL
192 1336
0.717 0.205
60.6
8.4
F
A
4.5
0.8

0
-

WBL WBT WBR


0 213 109
0 213 109
0
0
0
Free Free Free
- None
- 115
0
0
93
93
93
2
2
2
0 229 117
Major2
446
4.14
2.22
1111
1111
-

0
-

0
-

WB
0

NBL NBT NBR


102
0
26
102
0
26
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
110
0
28
Minor1
1110 1224
995 995
115 229
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
203 178
318 321
897 713
161
161
253
897

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
93
93
93
2
2
2
0
0
0

223
6.94
3.32
780
780
-

NB
60.6
F

EBT EBR WBL WBT WBR


- 1111
0
A
0
-

Synchro 9 Report
Page 8
24

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2018 Background PM

0.6
WBL
0
0
0
Stop
1
0
92
2
0

WBR
46
46
0
Stop
None
0
92
2
50

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
512
321
191
6.84
5.84
5.84
3.52
491
708
822

174
6.94
3.32
839
-

491
491
708
822

839
-

Approach
HCM Control Delay, s
HCM LOS

WB
9.6
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBT NBRWBLn1 SBL


- 839 1207
- 0.06
9.6
0
A
A
0.2
0

NBT NBR
270
51
270
51
0
0
Free Free
- None
0
0
92
92
2
2
293
55
Major1
0
NB
0

0
-

SBL SBT
0 352
0 352
0
0
Free Free
- None
0
0
92
92
2
2
0 383
Major2
349
4.14
2.22
1207
1207
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 9
25

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2019 Background PM

2.3
EBL EBT EBR
37
0
28
37
0
28
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
40
0
30

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
559
295
264
7.54
6.54
6.54
3.52
412
689
718

672
295
377
6.54
5.54
5.54
4.02
376
668
614

390
476
641
668

350
438
667
572

Approach
HCM Control Delay, s
HCM LOS

EB
11.9
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NBL
1245
0.06
8.1
A
0.2

RH
3/24/2016

2016-0202 Walker Drive

WBL WBT WBR


4
0
1
4
0
1
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
4
0
1

NBL NBT NBR


69 209
0
69 209
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
75 227
0

156
6.94
3.32
862
-

Minor1
516
377
139
7.54
6.54
6.54
3.52
442
616
850

691
377
314
6.54
5.54
5.54
4.02
366
614
655

114
6.94
3.32
917
-

Major1
312
4.14
2.22
1245
-

862
-

404
472
573
819

340
418
572
654

917
-

1245
-

WB
12
B
NBT NBR EBLn1WBLn1 SBL
- 590 523 1339
- 0.12 0.01 0.001
0.2
- 11.9
12
7.7
A
B
B
A
0.4
0
0

NB
2.2

0
-

0
-

SBL SBT SBR


1 251
36
1 251
36
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
1 273
39
Major2
227
4.14
2.22
1339
1339
-

0
-

0
-

SB
0

SBT SBR
0
A
-

Synchro 9 Report
Page 1
26

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
4
Minor2
590
423
167
7.54
6.54
6.54
3.52
391
579
818

799
423
376
6.54
5.54
5.54
4.02
317
586
615

363
456
576
781

303
398
563
611

Approach
HCM Control Delay, s
HCM LOS

EB
9.3
A

RH
3/24/2016

2019 Background PM

1.9

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1207
0.005
8
A
0

WBL WBT WBR


54
0
30
54
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
59
0
33

NBL NBT NBR


6 283
51
6 283
51
0
0
0
Free Free Free
- None
150
0
0
92
92
92
2
2
2
7 308
55

174
6.94
3.32
839
-

Minor1
596
348
248
7.54
6.54
6.54
3.52
387
641
734

771
348
423
6.54
5.54
5.54
4.02
329
633
586

182
6.94
3.32
829
-

Major1
349
4.14
2.22
1207
-

839
-

372
472
637
702

314
412
629
563

829
-

1207
-

WB
12.7
B
NBT NBR EBLn1WBLn1 SBL
- 839 558 1192
- 0.005 0.164 0.031
9.3 12.7
8.1
A
B
A
0
0.6
0.1

NB
0.1

0
-

0
-

SBL SBT SBR


34 321
0
34 321
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
37 349
0
Major2
363
4.14
2.22
1192
1192
-

0
-

0
-

SB
0.9

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
27

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La.

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2019 Background PM

0.6
EBL
0
0
0
Stop
0
1
0
92
2
0

EBR
20
20
0
Stop
None
92
2
22

NBL NBT
23 292
23 292
0
0
Free Free
- None
115
0
0
92
92
2
2
25 317

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
591
382
209
6.84
5.84
5.84
3.52
438
660
806

192
6.94
3.32
817
-

Major1
385
4.14
2.22
1170
-

429
429
660
789

817
-

1170
-

Approach
HCM Control Delay, s
HCM LOS

EB
9.5
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBL
1170
0.021
8.1
A
0.1

NB
0.6

NBT EBLn1
- 817
- 0.027
9.5
A
0.1

0
-

SBT SBR
348
6
348
6
0
0
Free Free
- None
0
0
92
92
2
2
378
7
Major2
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 3
28

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

15.2
C

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/24/2016

2016-0202 Walker Drive


2019 Background PM

EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
14.7
B

EBT
197
197
0.92
2
214
1

EBR
30
30
0.92
2
33
0

WBU
0
0
0.92
2
0
0

WBL
91
91
0.92
2
99
0
WB
EB
1
NB
1
SB
1
14.9
B

WBT
165
165
0.92
2
179
1

WBR
139
139
0.92
2
151
1

NBU
0
0
0.92
2
0
0

NBL
20
20
0.92
2
22
0

NBT
96
96
0.92
2
104
1

NBR
68
68
0.92
2
74
0

NB
SB
1
EB
1
WB
2
13.2
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


11%
0%
36%
0%
65%
52%
86%
64%
0%
34%
37%
13%
0% 100%
0%
Stop
Stop
Stop
Stop
Stop
184
228
256
139
279
20
1
91
0
182
96
197
165
0
96
68
30
0
139
1
200
248
278
151
303
2
5
7
7
2
0.361 0.446 0.532 0.251
0.55
6.491 6.486
6.88 5.984 6.531
Yes
Yes
Yes
Yes
Yes
554
555
523
600
552
4.545 4.539 4.628 3.731 4.578
0.361 0.447 0.532 0.252 0.549
13.2
14.7
17.2
10.7
17.3
B
B
C
B
C
1.6
2.3
3.1
1
3.3

Synchro 9 Report
Page 4
29

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2019 Background PM

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
182
182
0.92
2
198
0

SBT
96
96
0.92
2
104
1

SBR
1
1
0.92
2
1
0

SB
NB
1
WB
2
EB
1
17.3
C

Lane

RH
3/24/2016

Synchro 9 Report
Page 5
30

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2019 Background PM

16.1

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


92 337
12
92 337
12
0
0
0
Free Free Free
- None
250
- 135
0
0
94
94
94
2
2
2
98 359
13

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
356
4.14
2.22
1199
-

Approach
HCM Control Delay, s
HCM LOS

EB
1.7

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/24/2016

2016-0202 Walker Drive

1199
-

0
-

NBLn1 EBL
526 1199
0.263 0.082
14.3
8.3
B
A
1
0.3

0
-

WBL WBT WBR


123 335 214
123 335 214
0
0
0
Free Free Free
- None
225
- 375
0
0
94
94
94
2
2
2
131 356 228
Major2
359
4.14
2.22
1196
1196
-

0
-

0
-

WB
1.5

NBL NBT NBR


5
25 100
5
25 100
0
0
0
Stop Stop Stop
- None
1
0
94
94
94
2
2
2
5
27 106
Minor1
1022 1172
554 554
468 618
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
190 191
484 512
545 479
119
204
444
371

156
244
470
427

179
6.94
3.32
833
833
-

SBL SBT SBR


205
52
96
205
52
96
0
0
0
Stop Stop Stop
- None
115
0
1
0
94
94
94
2
2
2
218
55 102
Minor2
1006 1172
618 618
388 554
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
~ 195 191
443 479
607 512
~ 134
226
407
459

NB
14.3
B

156
242
427
470

178
6.94
3.32
834
834
-

SB
62.4
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1196
- 226 242 834
- 0.109
- 0.965 0.229 0.122
8.4
- 96.6 24.2
9.9
A
F
C
A
0.4
8.6
0.9
0.4

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
31

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze 2019
Rd Background PM

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

6.8
EBL EBT EBR
0 462 147
0 462 147
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 471 150

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
292
4.14
2.22
1267
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1267
-

EBL
1267
0
A
0

0
-

0
-

WBL WBT WBR


30 286
0
30 286
0
0
0
0
Free Free Free
- None
200
0
0
98
98
98
2
2
2
31 292
0
Major2
471
4.14
2.22
1087
1087
-

0
-

0
-

WB
0.8

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
98
98
98
2
2
2
0
0
0

SBL SBT SBR


212
0 430
212
0 430
0
0
0
Stop Stop Stop
- None
0
1
0
98
98
98
2
2
2
216
0 439
Minor2
589
353
236
6.84
5.84
5.84
3.52
439
682
781

824
353
471
6.54
5.54
5.54
4.02
307
629
558

146
6.94
3.32
875
-

426
426
663
781

0
0
0
0

875
-

SB
16.1
C

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1087
- 426 875
- 0.028
- 0.508 0.501
8.4
- 21.9 13.2
A
C
B
0.1
2.8
2.9

Synchro 9 Report
Page 7
32

HCM 2010 TWSC


2016-0202 Walker Drive
2019 Background PM
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

9.2
EBL EBT EBR
257 419
0
257 419
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
276 451
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
231
4.14
2.22
1334
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1334
-

0
-

NBLn1 EBL
189 1334
0.734 0.207
63.6
8.4
F
A
4.7
0.8

0
-

WBL WBT WBR


0 215 110
0 215 110
0
0
0
Free Free Free
- None
- 115
0
0
93
93
93
2
2
2
0 231 118
Major2
451
4.14
2.22
1106
1106
-

0
-

0
-

WB
0

NBL NBT NBR


103
0
26
103
0
26
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
111
0
28
Minor1
1119 1234
1003 1003
116 231
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
201 175
315 318
896 712
159
159
250
896

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
93
93
93
2
2
2
0
0
0

225
6.94
3.32
778
778
-

NB
63.6
F

EBT EBR WBL WBT WBR


- 1106
0
A
0
-

Synchro 9 Report
Page 8
33

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2019 Background PM

0.6
WBL
0
0
0
Stop
1
0
92
2
0

WBR
46
46
0
Stop
None
0
92
2
50

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
516
323
193
6.84
5.84
5.84
3.52
489
706
821

176
6.94
3.32
837
-

489
489
706
821

837
-

Approach
HCM Control Delay, s
HCM LOS

WB
9.6
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBT NBRWBLn1 SBL


- 837 1204
- 0.06
9.6
0
A
A
0.2
0

NBT NBR
272
51
272
51
0
0
Free Free
- None
0
0
92
92
2
2
296
55
Major1
0
NB
0

0
-

SBL SBT
0 355
0 355
0
0
Free Free
- None
0
0
92
92
2
2
0 386
Major2
351
4.14
2.22
1204
1204
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 9
34

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


40
0
30
40
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
43
0
33
Minor2
587
310
277
7.54
6.54
6.54
3.52
393
675
706

707
310
397
6.54
5.54
5.54
4.02
359
658
602

370
460
626
654

332
424
657
558

Approach
HCM Control Delay, s
HCM LOS

EB
12.2
B

RH
3/24/2016

2025 Background PM

2.3

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1227
0.064
8.1
A
0.2

WBL WBT WBR


4
0
1
4
0
1
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
4
0
1

NBL NBT NBR


72 221
0
72 221
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
78 240
0

165
6.94
3.32
850
-

Minor1
543
397
146
7.54
6.54
6.54
3.52
423
600
842

729
397
332
6.54
5.54
5.54
4.02
348
602
643

120
6.94
3.32
909
-

Major1
329
4.14
2.22
1227
-

850
-

384
455
556
809

322
403
558
642

909
-

1227
-

WB
12.2
B
NBT NBR EBLn1WBLn1 SBL
- 573 505 1324
- 0.133 0.011 0.001
0.2
- 12.2 12.2
7.7
A
B
B
A
0.5
0
0

NB
2.1

0
-

0
-

SBL SBT SBR


1 264
39
1 264
39
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
1 287
42
Major2
240
4.14
2.22
1324
1324
-

0
-

0
-

SB
0

SBT SBR
0
A
-

Synchro 9 Report
Page 1
35

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
4
Minor2
617
440
177
7.54
6.54
6.54
3.52
374
566
808

833
440
393
6.54
5.54
5.54
4.02
303
576
604

347
443
562
771

289
387
554
600

Approach
HCM Control Delay, s
HCM LOS

EB
9.4
A

RH
3/24/2016

2025 Background PM

1.8

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1189
0.006
8
A
0

WBL WBT WBR


54
0
30
54
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
59
0
33

NBL NBT NBR


7 297
51
7 297
51
0
0
0
Free Free Free
- None
150
0
0
92
92
92
2
2
2
8 323
55

183
6.94
3.32
828
-

Minor1
623
366
257
7.54
6.54
6.54
3.52
370
626
725

806
366
440
6.54
5.54
5.54
4.02
314
621
576

189
6.94
3.32
821
-

Major1
366
4.14
2.22
1189
-

828
-

355
459
622
693

300
400
617
554

821
-

1189
-

WB
12.9
B
NBT NBR EBLn1WBLn1 SBL
- 828 545 1177
- 0.005 0.168 0.031
9.4 12.9
8.2
A
B
A
0
0.6
0.1

NB
0.2

0
-

0
-

SBL SBT SBR


34 337
0
34 337
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
37 366
0
Major2
378
4.14
2.22
1177
1177
-

0
-

0
-

SB
0.8

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
36

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La.

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2025 Background PM

0.6
EBL
0
0
0
Stop
0
1
0
92
2
0

EBR
21
21
0
Stop
None
92
2
23

NBL NBT
24 307
24 307
0
0
Free Free
- None
115
0
0
92
92
2
2
26 334

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
620
401
219
6.84
5.84
5.84
3.52
420
645
796

202
6.94
3.32
805
-

Major1
404
4.14
2.22
1151
-

411
411
645
778

805
-

1151
-

Approach
HCM Control Delay, s
HCM LOS

EB
9.6
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBL
1151
0.023
8.2
A
0.1

NB
0.6

NBT EBLn1
- 805
- 0.028
9.6
A
0.1

0
-

SBT SBR
365
7
365
7
0
0
Free Free
- None
0
0
92
92
2
2
397
8
Major2
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 3
37

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

16.9
C

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/24/2016

2016-0202 Walker Drive


2025 Background PM

EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
16.3
C

EBT
209
209
0.92
2
227
1

EBR
32
32
0.92
2
35
0

WBU
0
0
0.92
2
0
0

WBL
97
97
0.92
2
105
0
WB
EB
1
NB
1
SB
1
16.6
C

WBT
174
174
0.92
2
189
1

WBR
148
148
0.92
2
161
1

NBU
0
0
0.92
2
0
0

NBL
21
21
0.92
2
23
0

NBT
102
102
0.92
2
111
1

NBR
72
72
0.92
2
78
0

NB
SB
1
EB
1
WB
2
14.3
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


11%
0%
36%
0%
65%
52%
86%
64%
0%
34%
37%
13%
0% 100%
0%
Stop
Stop
Stop
Stop
Stop
195
242
271
148
296
21
1
97
0
193
102
209
174
0
102
72
32
0
148
1
212
263
295
161
322
2
5
7
7
2
0.398 0.493 0.582 0.278 0.604
6.766 6.746 7.112 6.213 6.763
Yes
Yes
Yes
Yes
Yes
530
531
507
576
531
4.839 4.815 4.875 3.975 4.826
0.4 0.495 0.582
0.28 0.606
14.3
16.3
19.4
11.4
19.7
B
C
C
B
C
1.9
2.7
3.7
1.1
4

Synchro 9 Report
Page 4
38

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2025 Background PM

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
193
193
0.92
2
210
0

SBT
102
102
0.92
2
111
1

SBR
1
1
0.92
2
1
0

SB
NB
1
WB
2
EB
1
19.7
C

Lane

RH
3/24/2016

Synchro 9 Report
Page 5
39

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2025 Background PM

21.7

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


97 357
13
97 357
13
0
0
0
Free Free Free
- None
250
- 135
0
0
94
94
94
2
2
2
103 380
14

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
380
4.14
2.22
1175
-

Approach
HCM Control Delay, s
HCM LOS

EB
1.7

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/24/2016

2016-0202 Walker Drive

1175
-

0
-

NBLn1 EBL
503 1175
0.286 0.088
15
8.4
C
A
1.2
0.3

0
-

WBL WBT WBR


127 357 225
127 357 225
0
0
0
Free Free Free
- None
225
- 375
0
0
94
94
94
2
2
2
135 380 239
Major2
380
4.14
2.22
1175
1175
-

0
-

0
-

WB
1.5

NBL NBT NBR


5
26 104
5
26 104
0
0
0
Stop Stop Stop
- None
1
0
94
94
94
2
2
2
5
28 111
Minor1
1075 1236
586 586
489 650
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
174 175
463 495
529 463
104
185
422
350

141
227
452
410

190
6.94
3.32
820
820
-

SBL SBT SBR


215
54 101
215
54 101
0
0
0
Stop Stop Stop
- None
115
0
1
0
94
94
94
2
2
2
229
57 107
Minor2
1060 1236
650 650
410 586
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
~ 178 175
424 463
589 495
~ 119
~ 208
387
436

NB
15
C

141
226
410
452

190
6.94
3.32
820
820
-

SB
87.9
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1175
- 208 226 820
- 0.115
1.1 0.254 0.131
8.5
- 139.9 26.3 10.1
A
F
D
B
0.4
- 10.6
1
0.5

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
40

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze 2025
Rd Background PM

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

7.3
EBL EBT EBR
0 487 154
0 487 154
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 497 157

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
307
4.14
2.22
1250
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1250
-

EBL
1250
0
A
0

0
-

0
-

WBL WBT WBR


32 301
0
32 301
0
0
0
0
Free Free Free
- None
200
0
0
98
98
98
2
2
2
33 307
0
Major2
497
4.14
2.22
1063
1063
-

0
-

0
-

WB
0.8

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
98
98
98
2
2
2
0
0
0

SBL SBT SBR


225
0 453
225
0 453
0
0
0
Stop Stop Stop
- None
0
1
0
98
98
98
2
2
2
230
0 462
Minor2
620
372
248
6.84
5.84
5.84
3.52
420
667
770

869
372
497
6.54
5.54
5.54
4.02
289
617
543

154
6.94
3.32
864
-

407
407
646
770

0
0
0
0

864
-

SB
17.5
C

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1063
- 407 864
- 0.031
- 0.564 0.535
8.5
- 24.7 13.9
A
C
B
0.1
3.4
3.2

Synchro 9 Report
Page 7
41

HCM 2010 TWSC


2016-0202 Walker Drive
2025 Background PM
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh

11.9

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


270 445
0
270 445
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
290 478
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
245
4.14
2.22
1318
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1318
-

0
-

NBLn1 EBL
172 1318
0.85 0.22
87.9
8.5
F
A
6
0.8

0
-

WBL WBT WBR


0 228 117
0 228 117
0
0
0
Free Free Free
- None
- 115
0
0
93
93
93
2
2
2
0 245 126
Major2
478
4.14
2.22
1081
1081
-

0
-

0
-

WB
0

NBL NBT NBR


108
0
28
108
0
28
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
116
0
30
Minor1
1182 1304
1059 1059
123 245
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
183 159
295 299
889 702
143
143
230
889

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
93
93
93
2
2
2
0
0
0

239
6.94
3.32
762
762
-

NB
87.9
F

EBT EBR WBL WBT WBR


- 1081
0
A
0
-

Synchro 9 Report
Page 8
42

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2025 Background PM

0.6
WBL
0
0
0
Stop
1
0
92
2
0

WBR
46
46
0
Stop
None
0
92
2
50

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
541
339
202
6.84
5.84
5.84
3.52
471
693
812

183
6.94
3.32
828
-

471
471
693
812

828
-

Approach
HCM Control Delay, s
HCM LOS

WB
9.6
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBT NBRWBLn1 SBL


- 828 1189
- 0.06
9.6
0
A
A
0.2
0

NBT NBR
286
51
286
51
0
0
Free Free
- None
0
0
92
92
2
2
311
55
Major1
0
NB
0

0
-

SBL SBT
0 371
0 371
0
0
Free Free
- None
0
0
92
92
2
2
0 403
Major2
366
4.14
2.22
1189
1189
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 9
43

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2018 Background Sat

2.6
EBL EBT EBR
32
0
25
32
0
25
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
34
0
27

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
336
156
180
7.54
6.54
6.54
3.52
594
831
804

403
156
247
6.54
5.54
5.54
4.02
535
768
701

574
619
795
769

512
557
768
671

Approach
HCM Control Delay, s
HCM LOS

EB
10.4
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NBL
1406
0.04
7.7
A
0.1

RH
3/24/2016

2016-0202 Walker Drive

WBL WBT WBR


0
0
1
0
0
1
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
0
0
1

NBL NBT NBR


52 126
0
52 126
0
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
56 135
0

84
6.94
3.32
958
-

Minor1
319
247
72
7.54
6.54
6.54
3.52
610
735
929

416
247
169
6.54
5.54
5.54
4.02
526
701
758

68
6.94
3.32
981
-

Major1
169
4.14
2.22
1406
-

958
-

573
604
703
903

503
542
671
758

981
-

1406
-

WB
8.7
A
NBT NBR EBLn1WBLn1 SBL
- 733 981 1447
- 0.084 0.001
0.1
- 10.4
8.7
0
A
B
A
A
0.3
0
0

NB
2.3

0
-

0
-

SBL SBT SBR


0 134
23
0 134
23
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
0 144
25
Major2
135
4.14
2.22
1447
1447
-

0
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 1
44

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


1
0
10
1
0
10
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
1
0
11
Minor2
347
244
103
7.54
6.54
6.54
3.52
583
738
892

458
244
214
6.54
5.54
5.54
4.02
498
703
724

563
613
736
872

489
541
692
722

Approach
HCM Control Delay, s
HCM LOS

EB
9.1
A

RH
3/24/2016

2018 Background Sat

1.9

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1360
0.003
7.7
A
0

WBL WBT WBR


41
0
17
41
0
17
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
44
0
18

NBL NBT NBR


4 176
15
4 176
15
0
0
0
Free Free Free
- None
150
0
0
93
93
93
2
2
2
4 189
16

104
6.94
3.32
931
-

Minor1
346
206
140
7.54
6.54
6.54
3.52
584
777
849

452
206
246
6.54
5.54
5.54
4.02
502
730
701

103
6.94
3.32
932
-

Major1
208
4.14
2.22
1360
-

931
-

569
623
775
826

493
547
728
690

932
-

1360
-

WB
10.7
B
NBT NBR EBLn1WBLn1 SBL
- 889 690 1364
- 0.013 0.09 0.014
9.1 10.7
7.7
A
B
A
0
0.3
0

NB
0.2

0
-

0
-

SBL SBT SBR


18 189
4
18 189
4
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
19 203
4
Major2
205
4.14
2.22
1364
1364
-

0
-

0
-

SB
0.7

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
45

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La.

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2018 Background Sat

0.8
EBL
6
6
0
Stop
0
1
0
92
2
7

EBR
19
19
0
Stop
None
92
2
21

NBL NBT
13 160
13 160
0
0
Free Free
- None
115
0
0
92
92
2
2
14 174

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
352
237
115
6.84
5.84
5.84
3.52
619
780
897

120
6.94
3.32
909
-

Major1
240
4.14
2.22
1324
-

612
612
780
888

909
-

1324
-

Approach
HCM Control Delay, s
HCM LOS

EB
9.6
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBL
1324
0.011
7.7
A
0

NB
0.6

NBT EBLn1
- 814
- 0.033
9.6
A
0.1

0
-

SBT SBR
216
5
216
5
0
0
Free Free
- None
0
0
92
92
2
2
235
5
Major2
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 3
46

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

10.8
B

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/24/2016

2016-0202 Walker Drive


2018 Background Sat

EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
10.4
B

EBT
105
105
0.92
2
114
1

EBR
34
34
0.92
2
37
0

WBU
0
0
0.92
2
0
0

WBL
49
49
0.92
2
53
0
WB
EB
1
NB
1
SB
1
10.5
B

WBT
103
103
0.92
2
112
1

WBR
191
191
0.92
2
208
1

NBU
0
0
0.92
2
0
0

NBL
10
10
0.92
2
11
0

NBT
107
107
0.92
2
116
1

NBR
45
45
0.92
2
49
0

NB
SB
1
EB
1
WB
2
10.6
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


6%
1%
32%
0%
54%
66%
74%
68%
0%
44%
28%
24%
0% 100%
2%
Stop
Stop
Stop
Stop
Stop
162
141
152
191
206
10
2
49
0
111
107
105
103
0
91
45
34
0
191
4
176
153
165
208
222
2
5
7
7
2
0.27 0.238 0.278 0.299 0.349
5.52 5.591 6.056 5.184 5.676
Yes
Yes
Yes
Yes
Yes
650
641
593
693
634
3.564 3.635 3.793
2.92 3.718
0.271 0.239 0.278
0.3
0.35
10.6
10.4
11.1
10.1
11.8
B
B
B
B
B
1.1
0.9
1.1
1.3
1.6

Synchro 9 Report
Page 4
47

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2018 Background Sat

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
111
111
0.93
2
119
0

SBT
91
91
0.93
2
98
1

SBR
4
4
0.93
2
4
0

SB
NB
1
WB
2
EB
1
11.8
B

Lane

RH
3/24/2016

Synchro 9 Report
Page 5
48

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


45 213
6
45 213
6
0
0
0
Free Free Free
- None
250
- 135
0
0
92
92
92
2
2
2
49 232
7
Major1
321
4.14
2.22
1236
-

Approach
HCM Control Delay, s
HCM LOS

EB
1.4

RH
3/24/2016

2018 Background Sat

5.7

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

1236
-

0
-

NBLn1 EBL
659 1236
0.18 0.04
11.7
8
B
A
0.7
0.1

0
-

WBL WBT WBR


84 295 114
84 295 114
0
0
0
Free Free Free
- None
225
- 375
0
0
92
92
92
2
2
2
91 321 124
Major2
232
4.14
2.22
1333
1333
WB
1.3

0
-

0
-

NBL NBT NBR


7
20
82
7
20
82
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
8
22
89
Minor1
690
329
361
7.54
6.54
6.54
3.52
331
658
630

832
329
503
6.54
5.54
5.54
4.02
303
645
540

262
356
632
507

271
357
619
503

NB
11.7
B

SBL SBT SBR


127
34
53
127
34
53
0
0
0
Stop Stop Stop
- None
115
0
1
0
92
92
92
2
2
2
138
37
58

116
6.94
3.32
914
-

Minor2
727
503
224
7.54
6.54
6.54
3.52
312
519
758

832
503
329
6.54
5.54
5.54
4.02
303
540
645

160
6.94
3.32
857
-

914
-

247
349
498
634

271
359
503
619

857
-

SB
17.9
C

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1333
- 349 359 857
- 0.068
- 0.396 0.103 0.067
7.9
- 21.9 16.2
9.5
A
C
C
A
0.2
1.8
0.3
0.2

Synchro 9 Report
Page 6
49

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze 2018
Rd Background Sat

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

4
EBL EBT EBR
0 322
79
0 322
79
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 350
86

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
274
4.14
2.22
1286
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1286
-

EBL
1286
0
A
0

0
-

0
-

WBL WBT WBR


19 252
0
19 252
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
21 274
0
Major2
350
4.14
2.22
1206
1206
-

0
-

0
-

WB
0.6

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

SBL SBT SBR


99
1 225
99
1 225
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
108
1 245
Minor2
490
315
175
6.84
5.84
5.84
3.52
507
713
838

665
315
350
6.54
5.54
5.54
4.02
379
654
631

137
6.94
3.32
886
-

498
498
701
838

0
0
0
0

886
-

SB
11.7
B

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1206
- 498 886
- 0.017
- 0.218 0.276
8
- 14.2 10.6
A
B
B
0.1
0.8
1.1

Synchro 9 Report
Page 7
50

HCM 2010 TWSC


2016-0202 Walker Drive
2018 Background Sat
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

5.1
EBL EBT EBR
211 233
0
211 233
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
229 253
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
209
4.14
2.22
1359
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.9

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1359
-

0
-

NBLn1 EBL
315 1359
0.397 0.169
23.8
8.2
C
A
1.8
0.6

0
-

WBL WBT WBR


0 192 131
0 192 131
0
0
0
Free Free Free
- None
- 115
0
0
92
92
92
2
2
2
0 209 142
Major2
253
4.14
2.22
1309
1309
-

0
-

0
-

WB
0

NBL NBT NBR


87
1
27
87
1
27
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
95
1
29
Minor1
816
712
104
6.84
5.84
5.84
3.52
315
447
909

921
712
209
6.54
5.54
5.54
4.02
269
434
728

127
6.94
3.32
900
-

262
262
372
909

0
0
0
0

900
-

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

NB
23.8
C

EBT EBR WBL WBT WBR


- 1309
0
A
0
-

Synchro 9 Report
Page 8
51

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2018 Background Sat

0.7
WBL
0
0
0
Stop
1
0
92
2
0

WBR
36
36
0
Stop
None
0
92
2
39

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
308
193
115
6.84
5.84
5.84
3.52
660
821
897

111
6.94
3.32
921
-

660
660
821
897

921
-

Approach
HCM Control Delay, s
HCM LOS

WB
9.1
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBT NBRWBLn1 SBL


- 921 1343
- 0.042
9.1
0
A
A
0.1
0

NBT NBR
151
54
151
54
0
0
Free Free
- None
0
0
92
92
2
2
164
59
Major1
0
NB
0

0
-

SBL SBT
0 211
0 211
0
0
Free Free
- None
0
0
92
92
2
2
0 229
Major2
223
4.14
2.22
1343
1343
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 9
52

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2019 Background Sat

2.6
EBL EBT EBR
32
0
25
32
0
25
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
34
0
27

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
338
158
180
7.54
6.54
6.54
3.52
592
828
804

406
158
248
6.54
5.54
5.54
4.02
533
766
700

572
617
792
769

510
555
766
670

Approach
HCM Control Delay, s
HCM LOS

EB
10.4
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NBL
1405
0.04
7.7
A
0.1

RH
3/24/2016

2016-0202 Walker Drive

WBL WBT WBR


0
0
1
0
0
1
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
0
0
1

NBL NBT NBR


52 127
0
52 127
0
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
56 137
0

85
6.94
3.32
957
-

Minor1
321
248
73
7.54
6.54
6.54
3.52
608
734
928

418
248
170
6.54
5.54
5.54
4.02
524
700
757

68
6.94
3.32
981
-

Major1
170
4.14
2.22
1405
-

957
-

572
603
702
902

501
541
670
757

981
-

1405
-

WB
8.7
A
NBT NBR EBLn1WBLn1 SBL
- 731 981 1445
- 0.084 0.001
0.1
- 10.4
8.7
0
A
B
A
A
0.3
0
0

NB
2.3

0
-

0
-

SBL SBT SBR


0 135
23
0 135
23
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
0 145
25
Major2
137
4.14
2.22
1445
1445
-

0
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 1
53

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


1
0
10
1
0
10
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
1
0
11
Minor2
350
246
104
7.54
6.54
6.54
3.52
580
736
890

461
246
215
6.54
5.54
5.54
4.02
496
701
724

560
611
734
870

487
540
690
722

Approach
HCM Control Delay, s
HCM LOS

EB
9.1
A

RH
3/24/2016

2019 Background Sat

1.9

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1358
0.003
7.7
A
0

WBL WBT WBR


41
0
17
41
0
17
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
44
0
18

NBL NBT NBR


4 177
15
4 177
15
0
0
0
Free Free Free
- None
150
0
0
93
93
93
2
2
2
4 190
16

105
6.94
3.32
929
-

Minor1
348
207
141
7.54
6.54
6.54
3.52
582
776
847

455
207
248
6.54
5.54
5.54
4.02
500
729
700

103
6.94
3.32
932
-

Major1
210
4.14
2.22
1358
-

929
-

567
621
774
824

491
545
727
689

932
-

1358
-

WB
10.8
B
NBT NBR EBLn1WBLn1 SBL
- 887 688 1363
- 0.013 0.091 0.014
9.1 10.8
7.7
A
B
A
0
0.3
0

NB
0.2

0
-

0
-

SBL SBT SBR


18 191
4
18 191
4
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
19 205
4
Major2
206
4.14
2.22
1363
1363
-

0
-

0
-

SB
0.7

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
54

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La.

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2019 Background Sat

0.8
EBL
6
6
0
Stop
0
1
0
92
2
7

EBR
19
19
0
Stop
None
92
2
21

NBL NBT
14 161
14 161
0
0
Free Free
- None
115
0
0
92
92
2
2
15 175

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
357
239
118
6.84
5.84
5.84
3.52
615
778
894

121
6.94
3.32
908
-

Major1
241
4.14
2.22
1323
-

608
608
778
884

908
-

1323
-

Approach
HCM Control Delay, s
HCM LOS

EB
9.6
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBL
1323
0.012
7.8
A
0

NB
0.6

NBT EBLn1
- 812
- 0.033
9.6
A
0.1

0
-

SBT SBR
217
5
217
5
0
0
Free Free
- None
0
0
92
92
2
2
236
5
Major2
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 3
55

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

10.9
B

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/24/2016

2016-0202 Walker Drive


2019 Background Sat

EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
10.4
B

EBT
106
106
0.92
2
115
1

EBR
34
34
0.92
2
37
0

WBU
0
0
0.92
2
0
0

WBL
49
49
0.92
2
53
0
WB
EB
1
NB
1
SB
1
10.6
B

WBT
104
104
0.92
2
113
1

WBR
193
193
0.92
2
210
1

NBU
0
0
0.92
2
0
0

NBL
10
10
0.92
2
11
0

NBT
108
108
0.92
2
117
1

NBR
45
45
0.92
2
49
0

NB
SB
1
EB
1
WB
2
10.7
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


6%
1%
32%
0%
54%
66%
75%
68%
0%
44%
28%
24%
0% 100%
2%
Stop
Stop
Stop
Stop
Stop
163
142
153
193
208
10
2
49
0
112
108
106
104
0
92
45
34
0
193
4
177
154
166
210
224
2
5
7
7
2
0.273
0.24
0.28 0.303 0.354
5.538 5.608 6.067 5.196 5.691
Yes
Yes
Yes
Yes
Yes
647
639
592
690
631
3.584 3.658 3.809 2.937 3.734
0.274 0.241
0.28 0.304 0.355
10.7
10.4
11.2
10.2
11.8
B
B
B
B
B
1.1
0.9
1.1
1.3
1.6

Synchro 9 Report
Page 4
56

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2019 Background Sat

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
112
112
0.93
2
120
0

SBT
92
92
0.93
2
99
1

SBR
4
4
0.93
2
4
0

SB
NB
1
WB
2
EB
1
11.8
B

Lane

RH
3/24/2016

Synchro 9 Report
Page 5
57

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


46 215
6
46 215
6
0
0
0
Free Free Free
- None
250
- 135
0
0
92
92
92
2
2
2
50 234
7
Major1
323
4.14
2.22
1234
-

Approach
HCM Control Delay, s
HCM LOS

EB
1.4

RH
3/24/2016

2019 Background Sat

5.8

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

1234
-

0
-

NBLn1 EBL
657 1234
0.182 0.041
11.7
8
B
A
0.7
0.1

0
-

WBL WBT WBR


85 297 115
85 297 115
0
0
0
Free Free Free
- None
225
- 375
0
0
92
92
92
2
2
2
92 323 125
Major2
234
4.14
2.22
1331
1331
WB
1.4

0
-

0
-

NBL NBT NBR


7
20
83
7
20
83
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
8
22
90
Minor1
699
334
365
7.54
6.54
6.54
3.52
327
653
627

842
334
508
6.54
5.54
5.54
4.02
299
642
537

258
352
627
504

267
353
616
500

NB
11.7
B

SBL SBT SBR


128
34
53
128
34
53
0
0
0
Stop Stop Stop
- None
115
0
1
0
92
92
92
2
2
2
139
37
58

117
6.94
3.32
913
-

Minor2
736
508
228
7.54
6.54
6.54
3.52
307
516
754

842
508
334
6.54
5.54
5.54
4.02
299
537
642

161
6.94
3.32
855
-

913
-

242
345
495
629

267
355
500
616

855
-

SB
18.2
C

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1331
- 345 355 855
- 0.069
- 0.403 0.104 0.067
7.9
- 22.3 16.3
9.5
A
C
C
A
0.2
1.9
0.3
0.2

Synchro 9 Report
Page 6
58

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze 2019
Rd Background Sat

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

4
EBL EBT EBR
0 325
79
0 325
79
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 353
86

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
277
4.14
2.22
1283
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1283
-

EBL
1283
0
A
0

0
-

0
-

WBL WBT WBR


19 255
0
19 255
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
21 277
0
Major2
353
4.14
2.22
1202
1202
-

0
-

0
-

WB
0.6

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

SBL SBT SBR


100
1 227
100
1 227
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
109
1 247
Minor2
495
318
177
6.84
5.84
5.84
3.52
504
710
836

671
318
353
6.54
5.54
5.54
4.02
376
652
629

139
6.94
3.32
884
-

495
495
698
836

0
0
0
0

884
-

SB
11.7
B

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1202
- 495 884
- 0.017
- 0.222 0.279
8
- 14.3 10.6
A
B
B
0.1
0.8
1.1

Synchro 9 Report
Page 7
59

HCM 2010 TWSC


2016-0202 Walker Drive
2019 Background Sat
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

5.1
EBL EBT EBR
213 235
0
213 235
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
232 255
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
211
4.14
2.22
1357
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.9

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1357
-

0
-

NBLn1 EBL
311 1357
0.402 0.171
24.1
8.2
C
A
1.9
0.6

0
-

WBL WBT WBR


0 194 132
0 194 132
0
0
0
Free Free Free
- None
- 115
0
0
92
92
92
2
2
2
0 211 143
Major2
255
4.14
2.22
1307
1307
-

0
-

0
-

WB
0

NBL NBT NBR


87
1
27
87
1
27
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
95
1
29
Minor1
823
718
105
6.84
5.84
5.84
3.52
312
444
908

929
718
211
6.54
5.54
5.54
4.02
266
431
726

128
6.94
3.32
898
-

259
259
368
908

0
0
0
0

898
-

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

NB
24.1
C

EBT EBR WBL WBT WBR


- 1307
0
A
0
-

Synchro 9 Report
Page 8
60

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2019 Background Sat

0.7
WBL
0
0
0
Stop
1
0
92
2
0

WBR
36
36
0
Stop
None
0
92
2
39

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
311
195
116
6.84
5.84
5.84
3.52
657
819
896

112
6.94
3.32
920
-

657
657
819
896

920
-

Approach
HCM Control Delay, s
HCM LOS

WB
9.1
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBT NBRWBLn1 SBL


- 920 1342
- 0.043
9.1
0
A
A
0.1
0

NBT NBR
152
54
152
54
0
0
Free Free
- None
0
0
92
92
2
2
165
59
Major1
0
NB
0

0
-

SBL SBT
0 213
0 213
0
0
Free Free
- None
0
0
92
92
2
2
0 232
Major2
224
4.14
2.22
1342
1342
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 9
61

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


34
0
27
34
0
27
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
37
0
29
Minor2
354
166
188
7.54
6.54
6.54
3.52
576
820
796

426
166
260
6.54
5.54
5.54
4.02
519
760
692

556
605
783
759

496
545
760
661

Approach
HCM Control Delay, s
HCM LOS

EB
10.5
B

RH
3/24/2016

2025 Background Sat

2.6

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1395
0.042
7.7
A
0.1

WBL WBT WBR


0
0
1
0
0
1
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
0
0
1

NBL NBT NBR


54 134
0
54 134
0
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
58 144
0

89
6.94
3.32
951
-

Minor1
336
260
76
7.54
6.54
6.54
3.52
594
722
924

438
260
178
6.54
5.54
5.54
4.02
511
692
751

72
6.94
3.32
975
-

Major1
178
4.14
2.22
1395
-

951
-

556
590
690
896

488
531
661
751

975
-

1395
-

WB
8.7
A
NBT NBR EBLn1WBLn1 SBL
- 721 975 1436
- 0.091 0.001
0.1
- 10.5
8.7
0
A
B
A
A
0.3
0
0

NB
2.3

0
-

0
-

SBL SBT SBR


0 142
24
0 142
24
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
0 153
26
Major2
144
4.14
2.22
1436
1436
-

0
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 1
62

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


1
0
11
1
0
11
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
1
0
12
Minor2
364
256
108
7.54
6.54
6.54
3.52
567
726
886

479
256
223
6.54
5.54
5.54
4.02
484
694
718

548
601
724
866

475
532
683
716

Approach
HCM Control Delay, s
HCM LOS

EB
9.1
A

RH
3/24/2016

2025 Background Sat

1.9

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1348
0.003
7.7
A
0

WBL WBT WBR


41
0
17
41
0
17
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
44
0
18

NBL NBT NBR


4 184
15
4 184
15
0
0
0
Free Free Free
- None
150
0
0
93
93
93
2
2
2
4 198
16

110
6.94
3.32
922
-

Minor1
361
215
146
7.54
6.54
6.54
3.52
570
767
842

473
215
258
6.54
5.54
5.54
4.02
488
724
693

107
6.94
3.32
926
-

Major1
219
4.14
2.22
1348
-

922
-

555
612
765
818

479
537
722
682

926
-

1348
-

WB
10.8
B
NBT NBR EBLn1WBLn1 SBL
- 883 680 1353
- 0.015 0.092 0.014
9.1 10.8
7.7
A
B
A
0
0.3
0

NB
0.2

0
-

0
-

SBL SBT SBR


18 200
4
18 200
4
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
19 215
4
Major2
214
4.14
2.22
1353
1353
-

0
-

0
-

SB
0.7

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
63

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La.

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2025 Background Sat

0.8
EBL
7
7
0
Stop
0
1
0
92
2
8

EBR
20
20
0
Stop
None
92
2
22

NBL NBT
14 168
14 168
0
0
Free Free
- None
115
0
0
92
92
2
2
15 183

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
372
250
122
6.84
5.84
5.84
3.52
602
768
890

127
6.94
3.32
900
-

Major1
253
4.14
2.22
1309
-

595
595
768
880

900
-

1309
-

Approach
HCM Control Delay, s
HCM LOS

EB
9.7
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBL
1309
0.012
7.8
A
0

NB
0.6

NBT EBLn1
- 794
- 0.037
9.7
A
0.1

0
-

SBT SBR
227
6
227
6
0
0
Free Free
- None
0
0
92
92
2
2
247
7
Major2
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 3
64

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

11.3
B

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/24/2016

2016-0202 Walker Drive


2025 Background Sat

EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
10.8
B

EBT
112
112
0.92
2
122
1

EBR
36
36
0.92
2
39
0

WBU
0
0
0.92
2
0
0

WBL
52
52
0.92
2
57
0
WB
EB
1
NB
1
SB
1
11
B

WBT
109
109
0.92
2
118
1

WBR
204
204
0.92
2
222
1

NBU
0
0
0.92
2
0
0

NBL
11
11
0.92
2
12
0

NBT
115
115
0.92
2
125
1

NBR
48
48
0.92
2
52
0

NB
SB
1
EB
1
WB
2
11.1
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


6%
1%
32%
0%
54%
66%
75%
68%
0%
44%
28%
24%
0% 100%
2%
Stop
Stop
Stop
Stop
Stop
174
150
161
204
220
11
2
52
0
119
115
112
109
0
97
48
36
0
204
4
189
163
175
222
237
2
5
7
7
2
0.298
0.26 0.301 0.327 0.382
5.668 5.749 6.185 5.311 5.814
Yes
Yes
Yes
Yes
Yes
632
623
579
674
617
3.724 3.809 3.935
3.06 3.867
0.299 0.262 0.302 0.329 0.384
11.1
10.8
11.6
10.6
12.4
B
B
B
B
B
1.2
1
1.3
1.4
1.8

Synchro 9 Report
Page 4
65

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2025 Background Sat

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
119
119
0.93
2
128
0

SBT
97
97
0.93
2
104
1

SBR
4
4
0.93
2
4
0

SB
NB
1
WB
2
EB
1
12.4
B

Lane

RH
3/24/2016

Synchro 9 Report
Page 5
66

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


49 228
6
49 228
6
0
0
0
Free Free Free
- None
250
- 135
0
0
92
92
92
2
2
2
53 248
7
Major1
342
4.14
2.22
1214
-

Approach
HCM Control Delay, s
HCM LOS

EB
1.4

RH
3/24/2016

2025 Background Sat

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

1214
-

0
-

NBLn1 EBL
644 1214
0.191 0.044
11.9
8.1
B
A
0.7
0.1

0
-

WBL WBT WBR


88 315 120
88 315 120
0
0
0
Free Free Free
- None
225
- 375
0
0
92
92
92
2
2
2
96 342 130
Major2
248
4.14
2.22
1315
1315
WB
1.3

0
-

0
-

NBL NBT NBR


7
20
86
7
20
86
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
8
22
93
Minor1
736
354
382
7.54
6.54
6.54
3.52
307
636
612

888
354
534
6.54
5.54
5.54
4.02
281
629
523

238
333
608
485

249
337
602
485

NB
11.9
B

SBL SBT SBR


134
35
56
134
35
56
0
0
0
Stop Stop Stop
- None
115
0
1
0
92
92
92
2
2
2
146
38
61

124
6.94
3.32
904
-

Minor2
775
534
241
7.54
6.54
6.54
3.52
288
498
741

888
534
354
6.54
5.54
5.54
4.02
281
523
629

171
6.94
3.32
843
-

904
-

224
328
476
612

249
340
485
602

843
-

SB
19.6
C

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1315
- 328 340 843
- 0.073
- 0.444 0.112 0.072
8
- 24.5 16.9
9.6
A
C
C
A
0.2
2.2
0.4
0.2

Synchro 9 Report
Page 6
67

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze 2025
Rd Background Sat

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

4.1
EBL EBT EBR
0 342
83
0 342
83
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 372
90

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
291
4.14
2.22
1268
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1268
-

EBL
1268
0
A
0

0
-

0
-

WBL WBT WBR


20 268
0
20 268
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
22 291
0
Major2
372
4.14
2.22
1183
1183
-

0
-

0
-

WB
0.6

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

SBL SBT SBR


106
1 238
106
1 238
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
115
1 259
Minor2
521
335
186
6.84
5.84
5.84
3.52
485
697
827

707
335
372
6.54
5.54
5.54
4.02
359
641
617

146
6.94
3.32
875
-

476
476
684
827

0
0
0
0

875
-

SB
12.1
B

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1183
- 476 875
- 0.018
- 0.244 0.296
8.1
15 10.8
A
C
B
0.1
0.9
1.2

Synchro 9 Report
Page 7
68

HCM 2010 TWSC


2016-0202 Walker Drive
2025 Background Sat
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

5.5
EBL EBT EBR
223 249
0
223 249
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
242 271
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
224
4.14
2.22
1342
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.9

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

1342
-

0
-

NBLn1 EBL
290 1342
0.454 0.181
27.3
8.3
D
A
2.2
0.7

0
-

WBL WBT WBR


0 206 140
0 206 140
0
0
0
Free Free Free
- None
- 115
0
0
92
92
92
2
2
2
0 224 152
Major2
271
4.14
2.22
1289
1289
-

0
-

0
-

WB
0

NBL NBT NBR


91
1
29
91
1
29
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
99
1
32
Minor1
867
755
112
6.84
5.84
5.84
3.52
292
425
900

979
755
224
6.54
5.54
5.54
4.02
249
415
717

135
6.94
3.32
889
-

239
239
348
900

0
0
0
0

889
-

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

NB
27.3
D

EBT EBR WBL WBT WBR


- 1289
0
A
0
-

Synchro 9 Report
Page 8
69

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2025 Background Sat

0.7
WBL
0
0
0
Stop
1
0
92
2
0

WBR
36
36
0
Stop
None
0
92
2
39

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
323
202
121
6.84
5.84
5.84
3.52
646
812
891

116
6.94
3.32
914
-

646
646
812
891

914
-

Approach
HCM Control Delay, s
HCM LOS

WB
9.1
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/24/2016

NBT NBRWBLn1 SBL


- 914 1333
- 0.043
9.1
0
A
A
0.1
0

NBT NBR
159
54
159
54
0
0
Free Free
- None
0
0
92
92
2
2
173
59
Major1
0
NB
0

0
-

SBL SBT
0 222
0 222
0
0
Free Free
- None
0
0
92
92
2
2
0 241
Major2
232
4.14
2.22
1333
1333
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 9
70

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


37
0
28
37
0
28
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
40
0
30
Minor2
651
357
294
7.54
6.54
6.54
3.52
354
633
690

795
357
438
6.54
5.54
5.54
4.02
319
627
577

333
430
585
637

294
395
626
533

Approach
HCM Control Delay, s
HCM LOS

EB
12.7
B

RH
3/25/2016

2018 Total PM

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1181
0.064
8.3
A
0.2

WBL WBT WBR


4
0
1
4
0
1
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
4
0
1

NBL NBT NBR


69 265
0
69 265
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
75 288
0

187
6.94
3.32
823
-

Minor1
608
438
170
7.54
6.54
6.54
3.52
380
567
815

814
438
376
6.54
5.54
5.54
4.02
311
577
615

144
6.94
3.32
877
-

Major1
374
4.14
2.22
1181
-

823
-

344
424
524
784

287
376
533
614

877
-

1181
-

WB
12.7
B
NBT NBR EBLn1WBLn1 SBL
- 541 473 1271
- 0.131 0.011 0.001
0.2
- 12.7 12.7
7.8
A
B
B
A
0.4
0
0

NB
1.9

0
-

0
-

SBL SBT SBR


1 308
36
1 308
36
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
1 335
39
Major2
288
4.14
2.22
1271
1271
-

0
-

0
-

SB
0

SBT SBR
0
A
-

Synchro 9 Report
Page 1
71

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
4
Minor2
681
484
197
7.54
6.54
6.54
3.52
336
533
786

921
484
437
6.54
5.54
5.54
4.02
269
550
578

310
413
530
749

256
360
527
574

Approach
HCM Control Delay, s
HCM LOS

EB
9.5
A

RH
3/25/2016

2018 Total PM

1.7

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1145
0.006
8.2
A
0

WBL WBT WBR


54
0
30
54
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
59
0
33

NBL NBT NBR


6 339
51
6 339
51
0
0
0
Free Free Free
- None
150
0
0
92
92
92
2
2
2
7 368
55

205
6.94
3.32
802
-

Minor1
688
409
279
7.54
6.54
6.54
3.52
333
590
704

893
409
484
6.54
5.54
5.54
4.02
279
594
550

212
6.94
3.32
793
-

Major1
410
4.14
2.22
1145
-

802
-

319
429
586
671

266
373
590
527

793
-

1145
-

WB
13.5
B
NBT NBR EBLn1WBLn1 SBL
- 802 513 1132
- 0.005 0.178 0.033
9.5 13.5
8.3
A
B
A
0
0.6
0.1

NB
0.1

0
-

0
-

SBL SBT SBR


34 377
0
34 377
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
37 410
0
Major2
424
4.14
2.22
1132
1132
-

0
-

0
-

SB
0.8

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
72

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La./Site Access B

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


0
0
20
0
0
20
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
22
Minor2
697
479
218
7.54
6.54
6.54
3.52
328
537
764

865
479
386
6.54
5.54
5.54
4.02
290
553
609

300
300
525
712

275
275
536
596

Approach
HCM Control Delay, s
HCM LOS

EB
9.6
A

RH
3/25/2016

2018 Total PM

2.4

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1146
0.022
8.2
A
0.1

WBL WBT WBR


62
0
37
62
0
37
0
0
0
Stop Stop Stop
- None
0
0
0
92
92
92
2
2
2
67
0
40

NBL NBT NBR


23 309
69
23 309
69
0
0
0
Free Free Free
- None
115
- 100
0
0
92
92
92
2
2
2
25 336
75

204
6.94
3.32
803
-

Minor1
661
386
275
7.54
6.54
6.54
3.52
348
609
708

869
386
483
6.54
5.54
5.54
4.02
289
609
551

168
6.94
3.32
847
-

Major1
409
4.14
2.22
1146
-

803
-

325
325
596
668

274
274
596
534

847
-

1146
-

WB
15.4
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 803 325 847 1220
- 0.027 0.207 0.047 0.03
9.6
19
9.5
8
A
C
A
A
0.1
0.8
0.1
0.1

NB
0.5

0
-

0
-

SBL SBT SBR


34 370
6
34 370
6
0
0
0
Free Free Free
- None
100
0
0
92
92
92
2
2
2
37 402
7
Major2
336
4.14
2.22
1220
1220
-

0
-

0
-

SB
0.7

SBT SBR
-

Synchro 9 Report
Page 3
73

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

17.5
C

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/25/2016

2016-0202 Walker Drive


2018 Total PM

EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
17.5
C

EBT
239
239
0.92
2
260
1

EBR
30
30
0.92
2
33
0

WBU
0
0
0.92
2
0
0

WBL
91
91
0.92
2
99
0
WB
EB
1
NB
1
SB
1
18
C

WBT
206
206
0.92
2
224
1

WBR
138
138
0.92
2
150
1

NBU
0
0
0.92
2
0
0

NBL
20
20
0.92
2
22
0

NBT
95
95
0.92
2
103
1

NBR
67
67
0.92
2
73
0

NB
SB
1
EB
1
WB
2
14.1
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


11%
0%
31%
0%
65%
52%
89%
69%
0%
34%
37%
11%
0% 100%
0%
Stop
Stop
Stop
Stop
Stop
182
270
297
138
276
20
1
91
0
180
95
239
206
0
95
67
30
0
138
1
198
293
323
150
300
2
5
7
7
2
0.378 0.545 0.632 0.257 0.573
6.879 6.682 7.044 6.172 6.877
Yes
Yes
Yes
Yes
Yes
520
537
510
579
522
4.958 4.754
4.81 3.937 4.946
0.381 0.546 0.633 0.259 0.575
14.1
17.5
21.2
11.1
18.9
B
C
C
B
C
1.7
3.2
4.3
1
3.6

Synchro 9 Report
Page 4
74

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2018 Total PM

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
180
180
0.92
2
196
0

SBT
95
95
0.92
2
103
1

SBR
1
1
0.92
2
1
0

SB
NB
1
WB
2
EB
1
18.9
C

Lane

RH
3/25/2016

Synchro 9 Report
Page 5
75

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2018 Total PM

118.2

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


135 333
12
135 333
12
0
0
0
Free Free Free
- None
250
- 135
0
0
94
94
94
2
2
2
144 354
13

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
353
4.14
2.22
1202
-

Approach
HCM Control Delay, s
HCM LOS

EB
2.4

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

2016-0202 Walker Drive

1202
-

0
-

NBLn1 EBL
481 1202
0.285 0.119
15.4
8.4
C
A
1.2
0.4

0
-

WBL WBT WBR


122 332 404
122 332 404
0
0
0
Free Free Free
- None
225
- 375
0
0
94
94
94
2
2
2
130 353 430
Major2
354
4.14
2.22
1201
1201
-

0
-

0
-

WB
1.2

NBL NBT NBR


5
25
99
5
25
99
0
0
0
Stop Stop Stop
- None
1
0
94
94
94
2
2
2
5
27 105
Minor1
1104 1254
641 641
463 613
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
166 171
430 468
548 481
92
159
378
352

134
212
412
429

NB
15.4
C

177
6.94
3.32
835
835
-

SBL SBT SBR


392
51 138
392
51 138
0
0
0
Stop Stop Stop
- None
115
0
1
0
94
94
94
2
2
2
417
54 147
Minor2
1091 1254
613 613
478 641
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
~ 169 171
446 481
537 468
~ 112
~ 189
~ 393
~ 386

134
212
429
412

177
6.94
3.32
835
835
-

SB
$ 409.5
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1201
- 189 212 835
- 0.108
- 2.206 0.256 0.176
8.4
-$ 599.8 27.7 10.2
A
F
D
B
0.4
- 33.2
1
0.6

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
76

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd 2018 Total PM

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

8.4
EBL EBT EBR
0 588 204
0 588 204
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 600 208

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
364
4.14
2.22
1191
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

1191
-

EBL
1191
0
A
0

0
-

0
-

WBL WBT WBR


30 357
0
30 357
0
0
0
0
Free Free Free
- None
200
0
0
98
98
98
2
2
2
31 364
0
Major2
600
4.14
2.22
973
973
-

0
-

0
-

WB
0.7

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
98
98
98
2
2
2
0
0
0

SBL SBT SBR


210
0 544
210
0 544
0
0
0
Stop Stop Stop
- None
0
1
0
98
98
98
2
2
2
214
0 555
Minor2
726 1026
426 426
300 600
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
360 233
627 584
725 488
349
349
607
725

0
0
0
0

182
6.94
3.32
829
829
-

SB
21.2
C

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 973
- 349 829
- 0.031
- 0.614 0.67
8.8
- 30.4 17.7
A
D
C
0.1
3.9
5.3

Synchro 9 Report
Page 7
77

HCM 2010 TWSC


2016-0202 Walker Drive
2018 Total PM
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh

72.6

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


371 429
0
371 429
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
399 461
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
245
4.14
2.22
1318
-

Approach
HCM Control Delay, s
HCM LOS

EB
4.1

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

1318
-

0
-

NBLn1 EBL
107 1318
1.879 0.303
$ 496.4
8.9
F
A
16.4
1.3

0
-

WBL WBT WBR


0 228 109
0 228 109
0
0
0
Free Free Free
- None
- 115
0
0
93
93
93
2
2
2
0 245 117
Major2
461
4.14
2.22
1096
1096
-

0
-

0
-

WB
0

NBL NBT NBR


161
0
26
161
0
26
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
173
0
28
Minor1
1382 1504
1259 1259
123 245
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
~ 135 120
231 240
889 702
~ 94
~ 94
~ 161
889

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
93
93
93
2
2
2
0
0
0

231
6.94
3.32
771
771
-

NB
$ 496.4
F

EBT EBR WBL WBT WBR


- 1096
0
A
0
-

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 8
78

HCM 2010 TWSC


8: Walker Dr & Site Access A

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2018 Total PM

4.8
NWL
184
184
0
Stop
0
1
0
92
2
200

NWR
37
37
0
Stop
None
0
92
2
40

NET NER
362 187
362 187
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
393 203

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
710
393
317
6.84
5.84
5.84
3.52
368
651
711

197
6.94
3.32
811
-

353
353
651
682

811
-

Approach
HCM Control Delay, s
HCM LOS

NW
24.7
C

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NET NERNWLn1NWLn2 SWL SWT


- 353 811 1162
- 0.567 0.05 0.041
- 27.7
9.7
8.2
D
A
A
3.3
0.2
0.1
-

RH
3/25/2016

Major1
0
NE
0

0
-

SWL SWT
44 408
44 408
0
0
Free Free
- None
100
0
0
92
92
2
2
48 443
Major2
393
4.14
2.22
1162
1162
-

0
-

SW
0.8

Synchro 9 Report
Page 9
79

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2018 Total PM

0.5
WBL
0
0
0
Stop
1
0
92
2
0

WBR
46
46
0
Stop
None
0
92
2
50

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
607
384
223
6.84
5.84
5.84
3.52
428
658
793

206
6.94
3.32
800
-

428
428
658
793

800
-

Approach
HCM Control Delay, s
HCM LOS

WB
9.8
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

NBT NBRWBLn1 SBL


- 800 1143
- 0.063
9.8
0
A
A
0.2
0

NBT NBR
328
51
328
51
0
0
Free Free
- None
0
0
92
92
2
2
357
55
Major1
0
NB
0

0
-

SBL SBT
0 411
0 411
0
0
Free Free
- None
0
0
92
92
2
2
0 447
Major2
412
4.14
2.22
1143
1143
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 10
80

HCM 2010 Signalized Intersection Summary


5: Walker Dr & E Lee St

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

2016-0202 Walker Drive


2018 Total PM w/improve

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

135
135
5
0
1.00
1.00
1863
144
1
0.94
2
427
0.08
1774
144
1774
3.2
3.2
1.00
427
0.34
467
1.00
1.00
13.2
0.5
0.0
1.6
13.6
B

333
333
2
0

12
12
12
0
1.00
1.00
1863
13
1
0.94
2
436
0.28
1583
13
1583
0.3
0.3
1.00
436
0.03
756
1.00
1.00
15.0
0.0
0.0
0.2
15.0
B

122
122
1
0
1.00
1.00
1863
130
1
0.94
2
460
0.08
1774
130
1774
2.9
2.9
1.00
460
0.28
513
1.00
1.00
13.3
0.3
0.0
1.5
13.6
B

332
332
6
0

404
404
16
0
1.00
1.00
1863
258
1
0.94
2
425
0.27
1583
258
1583
8.1
8.1
1.00
425
0.61
756
1.00
1.00
18.1
1.4
0.0
3.7
19.5
B

5
5
3
0
1.00
1.00
1900
5
0
0.94
2
7
0.11
60
137
1638
4.6
4.6
0.04
180
0.76
464
1.00
1.00
24.5
6.5
0.0
2.4
31.0
C

25
25
8
0

99
99
18
0
1.00
1.00
1900
105
0
0.94
2
138
0.11
1256
0
0
0.0
0.0
0.77
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

392
392
7
0
1.00
1.00
1863
456
2
0.94
2
656
0.18
3548
456
1774
6.8
6.8
1.00
656
0.70
1318
1.00
1.00
21.6
1.3
0.0
3.4
22.9
C

51
51
4
0

138
138
14
0
1.00
1.00
1863
103
1
0.94
2
293
0.18
1583
103
1583
3.2
3.2
1.00
293
0.35
588
1.00
1.00
20.1
0.7
0.0
1.5
20.8
C

1
1
9.3
5.0
6.0
4.9
0.0

1.00
1863
354
2
0.94
2
975
0.28
3539
354
1770
4.6
4.6
975
0.36
1690
1.00
1.00
16.5
0.2
0.0
2.2
16.7
B
511
15.8
B
2
2
20.6
5.0
27.0
6.6
5.5

4
4
15.4
5.0
21.0
8.8
1.6

1.00
1863
353
2
0.94
2
950
0.27
3539
353
1770
4.6
4.6
950
0.37
1690
1.00
1.00
16.8
0.2
0.0
2.2
17.0
B
741
17.3
B
5
5
9.7
5.0
6.0
5.2
0.0

1.00
1863
27
1
0.94
2
35
0.11
323
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
137
31.0
C

6
6
20.2
5.0
27.0
10.1
5.1

1.00
1863
0
0
0.94
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
559
22.5
C

8
8
11.2
5.0
16.0
6.6
0.4

19.4
B

Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016

Synchro 9 Report
Page 1
81

HCM 2010 Signalized Intersection Summary


2016-0202 Walker Drive
2018 Total PM w/improve
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/26/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

371
371
5
0
1.00
1.00
1863
399
1
0.93
2
760
0.22
1774
399
1774
5.6
5.6
1.00
760
0.52
1731
1.00
1.00
6.6
0.6
0.0
2.8
7.1
A

429
429
2
0

0
0
12
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0
1
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

228
228
6
0

109
109
16
0
1.00
1.00
1863
82
1
0.93
2
361
0.23
1583
82
1583
1.6
1.6
1.00
361
0.23
936
1.00
1.00
12.2
0.3
0.0
0.7
12.5
B

161
161
3
0
1.00
1.00
1900
173
0
0.93
0
245
0.16
1502
201
1745
4.2
4.2
0.86
285
0.71
986
1.00
1.00
15.4
3.2
0.0
2.3
18.6
B

0
0
8
0

26
26
18
0
1.00
1.00
1900
28
0
0.93
0
40
0.16
243
0
0
0.0
0.0
0.14
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0

0
0

0
0

1.00
1863
461
2
0.93
2
2052
0.58
3632
461
1770
2.4
2.4
2052
0.22
5274
1.00
1.00
3.9
0.1
0.0
1.2
4.0
A
860
5.5
A
2
2
27.6
5.0
58.0
4.4
5.6

1.00
1863
245
2
0.93
2
807
0.23
3632
245
1770
2.2
2.2
807
0.30
2091
1.00
1.00
12.5
0.2
0.0
1.1
12.7
B
327
12.6
B
5
5
13.7
5.0
30.0
7.6
1.2

1.00
1863
0
1
0.93
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
201
18.6
B

6
6
13.9
5.0
23.0
4.2
4.6

8
8
11.4
5.0
22.0
6.2
0.9

9.1
A

Synchro 9 Report
Page 1
82

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


37
0
28
37
0
28
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
40
0
30
Minor2
790
432
358
7.54
6.54
6.54
3.52
281
572
633

954
432
522
6.54
5.54
5.54
4.02
257
581
529

251
354
514
563

224
327
564
475

Approach
HCM Control Delay, s
HCM LOS

EB
14.1
B

RH
3/25/2016

2019 Total PM

3.2

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1160
0.083
8.4
A
0.3

WBL WBT WBR


46
0
8
46
0
8
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
50
0
9

NBL NBT NBR


89 302
0
89 302
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
97 328
0

197
6.94
3.32
811
-

Minor1
756
522
234
7.54
6.54
6.54
3.52
297
506
748

973
522
451
6.54
5.54
5.54
4.02
251
529
569

164
6.94
3.32
852
-

Major1
395
4.14
2.22
1160
-

811
-

258
349
454
699

219
312
475
552

852
-

1160
-

WB
16.1
C
NBT NBR EBLn1WBLn1 SBL
- 467 382 1228
- 0.151 0.154 0.023
0.3
- 14.1 16.1
8
A
B
C
A
0.5
0.5
0.1

NB
2.1

0
-

0
-

SBL SBT SBR


26 327
36
26 327
36
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
28 355
39
Major2
328
4.14
2.22
1228
1228
-

0
-

0
-

SB
0.6

SBT SBR
0.1
A
-

Synchro 9 Report
Page 1
83

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

2016-0202 Walker Drive


2019 Total PM

1.6
EBL EBT EBR
0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
4
Minor2
824 1116
573 573
251 543
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
265 206
472 502
731 518
242
355
469
694
EB
9.8
A
NBL
1061
0.006
8.4
A
0

194
306
477
515

249
6.94
3.32
751
751
-

WBL WBT WBR


54
0
30
54
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
59
0
33
Minor1
839 1089
516 516
323 573
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
259 214
510 533
663 502
246
365
507
626

202
319
529
477

265
6.94
3.32
733
-

Major1
499
4.14
2.22
1061
-

733
-

1061
-

WB
15.2
C
NBT NBR EBLn1WBLn1 SBL
- 751 445 1033
- 0.006 0.205 0.036
9.8 15.2
8.6
A
C
A
0
0.8
0.1

NBL NBT NBR


6 437
51
6 437
51
0
0
0
Free Free Free
- None
150
0
0
92
92
92
2
2
2
7 475
55

NB
0.1

0
-

0
-

SBL SBT SBR


34 459
0
34 459
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
37 499
0
Major2
530
4.14
2.22
1033
1033
-

0
-

0
-

SB
0.8

SBT SBR
0.2
A
-

Synchro 9 Report
Page 2
84

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La./Site Access B

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

2016-0202 Walker Drive


2019 Total PM

4.3
EBL EBT EBR
0
0
20
0
0
20
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
22
Minor2
857 1070
593 593
264 477
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
251 220
459 492
718 554
219
329
448
651
EB
9.8
A
NBL
1085
0.023
8.4
A
0.1

203
308
465
541

236
6.94
3.32
766
766
-

WBL WBT WBR


168
0
52
168
0
52
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
183
0
57
Minor1
834 1074
477 477
357 597
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
261 218
538 554
633 490
239
356
526
581

201
311
541
463

NBL NBT NBR


23 393 160
23 393 160
0
0
0
Free Free Free
- None
115
0
0
0
92
92
92
2
2
2
25 427 174

214
6.94
3.32
791
-

Major1
473
4.14
2.22
1085
-

791
-

1085
-

WB
21.7
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 766 356 791 1129
- 0.028 0.513 0.071 0.055
9.8 25.3
9.9
8.4
A
D
A
A
0.1
2.8
0.2
0.2

NB
0.3

0
-

0
-

SBL SBT SBR


57 429
6
57 429
6
0
0
0
Free Free Free
- None
100
0
0
92
92
92
2
2
2
62 466
7
Major2
427
4.14
2.22
1129
1129
-

0
-

0
-

SB
1

SBT SBR
-

Synchro 9 Report
Page 3
85

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

20.8
C

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/25/2016

2016-0202 Walker Drive


2019 Total PM

EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
21.4
C

EBT
273
273
0.92
2
297
1

EBR
30
30
0.92
2
33
0

WBU
0
0
0.92
2
0
0

WBL
91
91
0.92
2
99
0
WB
EB
1
NB
1
SB
1
22.4
C

WBT
240
240
0.92
2
261
1

WBR
139
139
0.92
2
151
1

NBU
0
0
0.92
2
0
0

NBL
20
20
0.92
2
22
0

NBT
96
96
0.92
2
104
1

NBR
68
68
0.92
2
74
0

NB
SB
1
EB
1
WB
2
15.4
C

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


11%
0%
27%
0%
65%
52%
90%
73%
0%
34%
37%
10%
0% 100%
0%
Stop
Stop
Stop
Stop
Stop
184
304
331
139
279
20
1
91
0
182
96
273
240
0
96
68
30
0
139
1
200
330
360
151
303
2
5
7
7
2
0.409 0.634 0.724 0.268 0.607
7.363 7.019 7.249 6.391 7.314
Yes
Yes
Yes
Yes
Yes
492
519
496
558
497
5.363 5.019 5.048 4.189 5.314
0.407 0.636 0.726 0.271
0.61
15.4
21.4
27
11.5
21
C
C
D
B
C
2
4.4
5.8
1.1
4

Synchro 9 Report
Page 4
86

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2019 Total PM

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
182
182
0.92
2
198
0

SBT
96
96
0.92
2
104
1

SBR
1
1
0.92
2
1
0

SB
NB
1
WB
2
EB
1
21
C

Lane

RH
3/25/2016

Synchro 9 Report
Page 5
87

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2019 Total PM

270.7

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


168 337
12
168 337
12
0
0
0
Free Free Free
- None
250
- 135
0
0
94
94
94
2
2
2
179 359
13

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
356
4.14
2.22
1199
-

Approach
HCM Control Delay, s
HCM LOS

EB
2.8

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

2016-0202 Walker Drive

1199
-

0
-

NBLn1 EBL
438 1199
0.316 0.149
17
8.5
C
A
1.3
0.5

0
-

WBL WBT WBR


123 335 541
123 335 541
0
0
0
Free Free Free
- None
225
- 375
0
0
94
94
94
2
2
2
131 356 576
Major2
359
4.14
2.22
1196
1196
-

0
-

0
-

WB
1

NBL NBT NBR


5
25 100
5
25 100
0
0
0
Stop Stop Stop
- None
1
0
94
94
94
2
2
2
5
27 106
Minor1
1184 1334
716 716
468 618
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
145 153
387 432
545 479
72
121
329
330

116
185
368
427

NB
17
C

179
6.94
3.32
833
833
-

SBL SBT SBR


529
52 171
529
52 171
0
0
0
Stop Stop Stop
- None
115
0
1
0
94
94
94
2
2
2
563
55 182
Minor2
1168 1334
618 618
550 716
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
~ 149 153
~ 443 479
~ 487 432
~ 94
~ 158
~ 377
~ 335

116
185
427
368

178
6.94
3.32
834
834
-

SB
$ 856.9
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1196
- 158 185 834
- 0.109
- 3.562 0.299 0.218
8.4
$- 1211.5 32.6 10.5
A
F
D
B
0.4
- 54.5
1.2
0.8

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
88

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd 2019 Total PM

Intersection
Int Delay, s/veh

11.6

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


0 686 247
0 686 247
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 700 252

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
420
4.14
2.22
1136
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

1136
-

EBL
1136
0
A
0

0
-

0
-

WBL WBT WBR


30 412
0
30 412
0
0
0
0
Free Free Free
- None
200
0
0
98
98
98
2
2
2
31 420
0
Major2
700
4.14
2.22
893
893
-

0
-

0
-

WB
0.6

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
98
98
98
2
2
2
0
0
0

SBL SBT SBR


212
0 631
212
0 631
0
0
0
Stop Stop Stop
- None
0
1
0
98
98
98
2
2
2
216
0 644
Minor2
832 1182
482 482
350 700
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
308 188
587 552
684 440
297
297
567
684

0
0
0
0

210
6.94
3.32
796
796
-

SB
30.2
D

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 893
- 297 796
- 0.034
- 0.728 0.809
9.2
- 43.8 25.6
A
E
D
0.1
5.3
8.7

Synchro 9 Report
Page 7
89

HCM 2010 TWSC


2016-0202 Walker Drive
2019 Total PM
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh

203.1

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


456 444
0
456 444
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
490 477
0

WBL WBT WBR


0 240 110
0 240 110
0
0
0
Free Free Free
- None
- 115
0
0
93
93
93
2
2
2
0 258 118

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
258
4.14
2.22
1304
-

Approach
HCM Control Delay, s
HCM LOS

EB
4.8

WB
0

NBLn1 EBL
69 1304
3.584 0.376
$ 1288.4
9.4
F
A
25.9
1.8

EBT EBR WBL WBT WBR


- 1082
0
A
0
-

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

1304
-

Notes
~: Volume exceeds capacity

RH
3/25/2016

0
-

0
-

$: Delay exceeds 300s

Major2
477
4.14
2.22
1082
1082
-

0
-

NBL NBT NBR


204
0
26
204
0
26
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
219
0
28
Minor1
1587 1716
1458 1458
129 258
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
~ 99
89
~ 180 192
883 693

0
-

~ 62
~ 62
~ 112
883

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
93
93
93
2
2
2
0
0
0

239
6.94
3.32
762
762
-

NB
$ 1288.4
F

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 8
90

HCM 2010 TWSC


8: Walker Dr & Site Access A

Intersection
Int Delay, s/veh

2016-0202 Walker Drive


2019 Total PM

12.8

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

NWL
203
203
0
Stop
0
1
0
92
2
221

NWR
60
60
0
Stop
None
0
92
2
65

NET NER
513 205
513 205
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
558 223

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
987
558
429
6.84
5.84
5.84
3.52
244
537
624

279
6.94
3.32
718
-

229
229
537
586

718
-

Approach
HCM Control Delay, s
HCM LOS

NW
76.1
F

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NET NERNWLn1NWLn2 SWL SWT


- 229 718 1009
- 0.964 0.091 0.061
- 95.5 10.5
8.8
F
B
A
8.6
0.3
0.2
-

RH
3/25/2016

Major1
0
NE
0

0
-

SWL SWT
57 562
57 562
0
0
Free Free
- None
100
0
0
92
92
2
2
62 611
Major2
558
4.14
2.22
1009
1009
-

0
-

SW
0.8

Synchro 9 Report
Page 9
91

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2019 Total PM

0.8
WBL
0
0
0
Stop
1
0
92
2
0

WBR
82
82
0
Stop
None
0
92
2
89

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
717
449
268
6.84
5.84
5.84
3.52
364
610
753

259
6.94
3.32
740
-

364
364
610
753

740
-

Approach
HCM Control Delay, s
HCM LOS

WB
10.5
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NBT NBRWBLn1 SBL


- 740 1044
- 0.12
- 10.5
0
B
A
0.4
0

RH
3/25/2016

NBT NBR
349 128
349 128
0
0
Free Free
- None
0
0
92
92
2
2
379 139
Major1
0
NB
0

0
-

SBL SBT
0 493
0 493
0
0
Free Free
- None
0
0
92
92
2
2
0 536
Major2
518
4.14
2.22
1044
1044
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 10
92

HCM 2010 TWSC


10: Site Access D & Academy Hill Rd

Intersection
Int Delay, s/veh

EBT EBR
1
25
1
25
0
0
Free Free
- None
0
0
92
92
2
2
1
27

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
0
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

RH
3/25/2016

2019 Total PM

5.4

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBLn1
997
0.053
8.8
A
0.2

0
-

WBL WBT
0
5
0
5
0
0
Free Free
- None
0
0
92
92
2
2
0
5
Major2
28
4.12
2.218
1585
1585
WB
0

0
-

NBL
49
49
0
Stop
0
0
0
92
2
53

NBR
0
0
0
Stop
None
92
2
0

Minor1
20
15
5
6.42
5.42
5.42
3.518
997
1008
1018

15
6.22
3.318
1065
-

997
997
1008
1018

1065
-

NB
8.8
A

EBT EBR WBL WBT


- 1585
0
A
0
-

Synchro 9 Report
Page 11
93

HCM 2010 Signalized Intersection Summary


5: Walker Dr & E Lee St

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

2016-0202 Walker Drive


2019 Total PM w/improvements

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

168
168
5
0
1.00
1.00
1863
179
1
0.94
2
385
0.06
1774
179
1774
4.0
4.0
1.00
385
0.46
385
1.00
1.00
16.1
0.9
0.0
0.8
17.0
B

337
337
2
0

12
12
12
0
1.00
1.00
1863
13
1
0.94
2
457
0.29
1583
13
1583
0.4
0.4
1.00
457
0.03
632
1.00
1.00
16.6
0.0
0.0
0.2
16.6
B

123
123
1
0
1.00
1.00
1863
131
1
0.94
2
452
0.07
1774
131
1774
3.3
3.3
1.00
452
0.29
484
1.00
1.00
14.5
0.4
0.0
1.6
14.9
B

335
335
6
0

541
541
16
0
1.00
1.00
1863
346
1
0.94
2
477
0.30
1583
346
1583
12.7
12.7
1.00
477
0.72
680
1.00
1.00
20.3
2.2
0.0
5.9
22.6
C

5
5
3
0
1.00
1.00
1900
5
0
0.94
2
6
0.11
59
138
1638
5.3
5.3
0.04
178
0.78
377
1.00
1.00
28.3
7.1
0.0
2.8
35.3
D

25
25
8
0

100
100
18
0
1.00
1.00
1900
106
0
0.94
2
137
0.11
1258
0
0
0.0
0.0
0.77
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

529
529
7
0
1.00
1.00
1863
602
2
0.94
2
786
0.22
3548
602
1774
10.4
10.4
1.00
786
0.77
1253
1.00
1.00
23.8
1.6
0.0
5.2
25.4
C

52
52
4
0

171
171
14
0
1.00
1.00
1863
110
1
0.94
2
351
0.22
1583
110
1583
3.8
3.8
1.00
351
0.31
559
1.00
1.00
21.2
0.5
0.0
1.7
21.7
C

1
1
9.8
5.0
6.0
5.3
0.0

1.00
1863
359
2
0.94
2
1022
0.29
3539
359
1770
5.2
5.2
1022
0.35
1412
1.00
1.00
18.3
0.2
0.0
2.6
18.5
B
551
18.0
B
2
2
23.8
5.0
26.0
7.2
5.8

4
4
19.4
5.0
23.0
12.4
2.1

1.00
1863
356
2
0.94
2
1067
0.30
3539
356
1770
5.1
5.1
1067
0.33
1521
1.00
1.00
17.7
0.2
0.0
2.5
17.9
B
833
19.3
B
5
5
9.0
5.0
4.0
6.0
0.0

1.00
1863
27
1
0.94
2
35
0.11
320
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
138
35.3
D

6
6
24.6
5.0
28.0
14.7
4.9

1.00
1863
0
0
0.94
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
712
24.8
C

8
8
12.1
5.0
15.0
7.3
0.4

21.7
C

Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016

Synchro 9 Report
Page 1
94

HCM 2010 Signalized Intersection Summary


2016-0202 Walker Drive
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd2019 Total PM w/improvements

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

456
456
5
0
1.00
1.00
1863
490
1
0.93
2
781
0.26
1774
490
1774
8.2
8.2
1.00
781
0.63
1625
1.00
1.00
7.7
0.8
0.0
4.0
8.5
A

444
444
2
0

0
0
12
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0
1
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

240
240
6
0

110
110
16
0
1.00
1.00
1863
71
1
0.93
2
330
0.21
1583
71
1583
1.7
1.7
1.00
330
0.22
744
1.00
1.00
14.7
0.3
0.0
0.8
15.0
B

204
204
3
0
1.00
1.00
1900
219
0
0.93
0
299
0.19
1552
247
1750
5.9
5.9
0.89
337
0.73
823
1.00
1.00
17.0
3.1
0.0
3.1
20.1
C

0
0
8
0

26
26
18
0
1.00
1.00
1900
28
0
0.93
0
38
0.19
198
0
0
0.0
0.0
0.11
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0

0
0

0
0

1.00
1863
477
2
0.93
2
2066
0.58
3632
477
1770
2.9
2.9
2066
0.23
4675
1.00
1.00
4.5
0.1
0.0
1.4
4.5
A
967
6.6
A
2
2
31.1
5.0
59.0
4.9
5.8

1.00
1863
258
2
0.93
2
738
0.21
3632
258
1770
2.8
2.8
738
0.35
1664
1.00
1.00
15.1
0.3
0.0
1.4
15.4
B
329
15.3
B
5
5
16.8
5.0
33.0
10.2
1.5

1.00
1863
0
1
0.93
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
247
20.1
C

6
6
14.3
5.0
21.0
4.8
4.5

8
8
13.6
5.0
21.0
7.9
1.1

10.6
B

Synchro 9 Report
Page 2
95

HCM 2010 Signalized Intersection Summary


8: Walker Dr & Site Access A

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

2016-0202 Walker Drive


2019 Total PM w/improve + Sig

NWL

NWR

NET

NER

SWL

SWT

203
203
3
0
1.00
1.00
1863
221
1
0.92
2
328
0.18
1774
221
1774
4.6
4.6
1.00
328
0.67
1378
1.00
1.00
15.1
2.4
0.0
2.5
17.5
B
266
16.9
B

60
60
18
0
1.00
1.00
1863
45
1
0.92
2
293
0.18
1583
45
1583
1.0
1.0
1.00
293
0.15
1230
1.00
1.00
13.6
0.2
0.0
0.4
13.9
B

513
513
2
0

205
205
12
0
1.00
1.00
1863
0
1
0.92
2
617
0.00
1583
0
1583
0.0
0.0
1.00
617
0.00
1388
1.00
0.00
0.0
0.0
0.0
0.0
0.0

57
57
1
0
1.00
1.00
1863
62
1
0.92
2
502
0.05
1774
62
1774
0.7
0.7
1.00
502
0.12
814
1.00
1.00
6.0
0.1
0.0
0.4
6.1
A

562
562
6
0

1
1
7.0
5.0
9.0
2.7
0.0

2
2
20.5
5.0
35.0
6.6
9.0

1.00
1863
558
2
0.92
2
1378
0.39
3632
558
1770
4.6
4.6
1378
0.40
3103
1.00
1.00
8.8
0.2
0.0
2.2
9.0
A
558
9.0
A
3

1.00
1863
611
2
0.92
2
1998
0.56
3632
611
1770
3.6
3.6
1998
0.31
4345
1.00
1.00
4.6
0.1
0.0
1.7
4.7
A
673
4.8
A
6
6
27.5
5.0
49.0
5.6
9.9

8
8
12.4
5.0
31.0
6.6
0.8

8.5
A

Synchro 9 Report
Page 1
96

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2025 Total PM

3.2
EBL EBT EBR
40
0
30
40
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
43
0
33

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor2
818
447
371
7.54
6.54
6.54
3.52
268
560
622

988
447
541
6.54
5.54
5.54
4.02
246
572
519

206
6.94
3.32
800
-

238
341
500
549

213
317
555
463

800
-

Approach
HCM Control Delay, s
HCM LOS

EB
14.6
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

NBL
1143
0.087
8.5
A
0.3

WBL WBT WBR


46
0
8
46
0
8
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
50
0
9
Minor1
782 1009
541 541
241 468
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
284 239
493 519
741 560
244
337
440
689

207
301
463
543

171
6.94
3.32
843
-

Major1
412
4.14
2.22
1143
-

843
-

1143
-

WB
16.6
C
NBT NBR EBLn1WBLn1 SBL
- 452 370 1215
- 0.168 0.159 0.023
0.3
- 14.6 16.6
8
A
B
C
A
0.6
0.6
0.1

NBL NBT NBR


92 314
0
92 314
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
100 341
0

NB
2.1

0
-

0
-

SBL SBT SBR


26 340
39
26 340
39
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
28 370
42
Major2
341
4.14
2.22
1215
1215
-

0
-

0
-

SB
0.6

SBT SBR
0.1
A
-

Synchro 9 Report
Page 1
97

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

2016-0202 Walker Drive


2025 Total PM

1.6
EBL EBT EBR
0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
4
Minor2
850 1151
590 590
260 561
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
254 197
461 493
722 508
232
345
457
684
EB
9.9
A
NBL
1046
0.007
8.5
A
0

186
298
468
504

258
6.94
3.32
741
741
-

WBL WBT WBR


54
0
30
54
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
59
0
33
Minor1
865 1123
533 533
332 590
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
248 204
498 523
655 493
236
355
494
618

192
310
519
468

273
6.94
3.32
725
-

Major1
516
4.14
2.22
1046
-

725
-

1046
-

WB
15.5
C
NBT NBR EBLn1WBLn1 SBL
- 741 434 1019
- 0.006 0.21 0.036
9.9 15.5
8.7
A
C
A
0
0.8
0.1

NBL NBT NBR


7 451
51
7 451
51
0
0
0
Free Free Free
- None
150
0
0
92
92
92
2
2
2
8 490
55

NB
0.1

0
-

0
-

SBL SBT SBR


34 475
0
34 475
0
0
0
0
Free Free Free
- None
0
0
92
92
92
2
2
2
37 516
0
Major2
546
4.14
2.22
1019
1019
-

0
-

0
-

SB
0.8

SBT SBR
0.2
A
-

Synchro 9 Report
Page 2
98

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La./Site Access B

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

2016-0202 Walker Drive


2025 Total PM

4.3
EBL EBT EBR
0
0
21
0
0
21
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
23
Minor2
887 1109
613 613
274 496
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
239 208
446 481
709 544
208
319
435
642
EB
9.9
A
NBL
1068
0.024
8.5
A
0.1

192
298
454
531

246
6.94
3.32
754
754
-

WBL WBT WBR


168
0
52
168
0
52
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
183
0
57
Minor1
862 1112
496 496
366 616
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
249 207
524 544
626 480
227
345
511
573

191
301
531
453

NBL NBT NBR


24 408 160
24 408 160
0
0
0
Free Free Free
- None
115
- 100
0
0
92
92
92
2
2
2
26 443 174

222
6.94
3.32
782
-

Major1
492
4.14
2.22
1068
-

782
-

1068
-

WB
22.7
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 754 345 782 1113
- 0.03 0.529 0.072 0.056
9.9 26.6
10
8.4
A
D
B
A
0.1
2.9
0.2
0.2

NB
0.3

0
-

0
-

SBL SBT SBR


57 446
7
57 446
7
0
0
0
Free Free Free
- None
100
0
0
92
92
92
2
2
2
62 485
8
Major2
443
4.14
2.22
1113
1113
-

0
-

0
-

SB
0.9

SBT SBR
-

Synchro 9 Report
Page 3
99

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

25.4
D

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/25/2016

2016-0202 Walker Drive


2025 Total PM

EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
26.2
D

EBT
285
285
0.92
2
310
1

EBR
32
32
0.92
2
35
0

WBU
0
0
0.92
2
0
0

WBL
97
97
0.92
2
105
0
WB
EB
1
NB
1
SB
1
28
D

WBT
249
249
0.92
2
271
1

WBR
148
148
0.92
2
161
1

NBU
0
0
0.92
2
0
0

NBL
21
21
0.92
2
23
0

NBT
102
102
0.92
2
111
1

NBR
72
72
0.92
2
78
0

NB
SB
1
EB
1
WB
2
17.2
C

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


11%
0%
28%
0%
65%
52%
90%
72%
0%
34%
37%
10%
0% 100%
0%
Stop
Stop
Stop
Stop
Stop
195
318
346
148
296
21
1
97
0
193
102
285
249
0
102
72
32
0
148
1
212
346
376
161
322
2
5
7
7
2
0.455 0.705 0.799 0.303
0.68
7.728 7.338 7.646 6.782 7.605
Yes
Yes
Yes
Yes
Yes
464
491
474
529
473
5.803 5.401 5.406 4.542 5.667
0.457 0.705 0.793 0.304 0.681
17.2
26.2
34.6
12.5
25.4
C
D
D
B
D
2.3
5.5
7.3
1.3
5

Synchro 9 Report
Page 4
100

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2025 Total PM

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
193
193
0.92
2
210
0

SBT
102
102
0.92
2
111
1

SBR
1
1
0.92
2
1
0

SB
NB
1
WB
2
EB
1
25.4
D

Lane

RH
3/25/2016

Synchro 9 Report
Page 5
101

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2025 Total PM

314.1

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


173 357
13
173 357
13
0
0
0
Free Free Free
- None
250
- 135
0
0
94
94
94
2
2
2
184 380
14

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
380
4.14
2.22
1175
-

Approach
HCM Control Delay, s
HCM LOS

EB
2.8

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

2016-0202 Walker Drive

1175
-

0
-

NBLn1 EBL
411 1175
0.349 0.157
18.4
8.6
C
A
1.5
0.6

0
-

WBL WBT WBR


127 357 552
127 357 552
0
0
0
Free Free Free
- None
225
- 375
0
0
94
94
94
2
2
2
135 380 587
Major2
380
4.14
2.22
1175
1175
-

0
-

0
-

WB
1

NBL NBT NBR


5
26 104
5
26 104
0
0
0
Stop Stop Stop
- None
1
0
94
94
94
2
2
2
5
28 111
Minor1
1237 1398
748 748
489 650
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
132 140
371 418
529 463
61
103
313
311

105
170
353
410

NB
18.4
C

190
6.94
3.32
820
820
-

SBL SBT SBR


539
54 176
539
54 176
0
0
0
Stop Stop Stop
- None
115
0
1
0
94
94
94
2
2
2
573
57 187
Minor2
1222 1398
650 650
572 748
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
~ 136 140
~ 424 463
~ 472 418
~ 83
~ 142
~ 358
~ 317

105
171
410
353

190
6.94
3.32
820
820
-

SB
$ 1007.6
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1175
- 142 171 820
- 0.115
- 4.038 0.336 0.228
8.5
$- 1430.4 36.3 10.7
A
F
E
B
0.4
- 57.7
1.4
0.9

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
102

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd 2025 Total PM

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

14
EBL EBT EBR
0 711 254
0 711 254
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 726 259

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
436
4.14
2.22
1120
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

1120
-

EBL
1120
0
A
0

0
-

0
-

WBL WBT WBR


32 427
0
32 427
0
0
0
0
Free Free Free
- None
200
0
0
98
98
98
2
2
2
33 436
0
Major2
726
4.14
2.22
873
873
-

0
-

0
-

WB
0.6

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
98
98
98
2
2
2
0
0
0

SBL SBT SBR


225
0 654
225
0 654
0
0
0
Stop Stop Stop
- None
0
1
0
98
98
98
2
2
2
230
0 667
Minor2
864 1227
501 501
363 726
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
293 177
574 541
674 428
282
282
552
674

0
0
0
0

218
6.94
3.32
786
786
-

SB
36.3
E

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 873
- 282 786
- 0.037
- 0.814 0.849
9.3
- 56.1 29.5
A
F
D
0.1
6.6 10.1

Synchro 9 Report
Page 7
103

HCM 2010 TWSC


2016-0202 Walker Drive
2025 Total PM
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh

238.3

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


469 470
0
469 470
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
504 505
0

WBL WBT WBR


0 253 117
0 253 117
0
0
0
Free Free Free
- None
- 115
0
0
93
93
93
2
2
2
0 272 126

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
272
4.14
2.22
1288
-

Approach
HCM Control Delay, s
HCM LOS

EB
4.8

WB
0

NBLn1 EBL
62 1288
4.11 0.392
$ 1535.6
9.6
F
A
27.6
1.9

EBT EBR WBL WBT WBR


- 1056
0
A
0
-

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

1288
-

Notes
~: Volume exceeds capacity

RH
3/25/2016

0
-

0
-

$: Delay exceeds 300s

Major2
505
4.14
2.22
1056
1056
-

0
-

NBL NBT NBR


209
0
28
209
0
28
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
225
0
30
Minor1
1650 1786
1514 1514
136 272
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
~ 90
81
~ 168 181
876 683

0
-

~ 55
~ 55
~ 102
876

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
93
93
93
2
2
2
0
0
0

253
6.94
3.32
746
746
-

NB
$ 1535.6
F

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 8
104

HCM 2010 TWSC


8: Walker Dr & Site Access A

Intersection
Int Delay, s/veh

2016-0202 Walker Drive


2025 Total PM

14.1

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

NWL
203
203
0
Stop
0
1
0
92
2
221

NWR
60
60
0
Stop
None
0
92
2
65

NET NER
529 205
529 205
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
575 223

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
1014
575
439
6.84
5.84
5.84
3.52
235
526
617

288
6.94
3.32
709
-

~ 220
~ 220
526
579

709
-

Approach
HCM Control Delay, s
HCM LOS

NW
85.8
F

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NET NERNWLn1NWLn2 SWL SWT


- 220 709 994
- 1.003 0.092 0.062
- 108 10.6
8.9
F
B
A
9.1
0.3
0.2
-

Notes
~: Volume exceeds capacity

$: Delay exceeds 300s

RH
3/25/2016

Major1
0
-

0
-

NE
0

+: Computation Not Defined

SWL SWT
57 580
57 580
0
0
Free Free
- None
100
0
0
92
92
2
2
62 630
Major2
575
4.14
2.22
994
994
-

0
-

SW
0.8

*: All major volume in platoon

Synchro 9 Report
Page 9
105

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2025 Total PM

0.8
WBL
0
0
0
Stop
1
0
92
2
0

WBR
82
82
0
Stop
None
0
92
2
89

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
741
464
277
6.84
5.84
5.84
3.52
352
599
745

267
6.94
3.32
731
-

352
352
599
745

731
-

Approach
HCM Control Delay, s
HCM LOS

WB
10.6
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NBT NBRWBLn1 SBL


- 731 1030
- 0.122
- 10.6
0
B
A
0.4
0

RH
3/25/2016

NBT NBR
363 128
363 128
0
0
Free Free
- None
0
0
92
92
2
2
395 139
Major1
0
NB
0

0
-

SBL SBT
0 509
0 509
0
0
Free Free
- None
0
0
92
92
2
2
0 553
Major2
534
4.14
2.22
1030
1030
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 10
106

HCM 2010 TWSC


10: Site Access D & Academy Hill Rd

Intersection
Int Delay, s/veh

EBT EBR
1
25
1
25
0
0
Free Free
- None
0
0
92
92
2
2
1
27

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
0
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

RH
3/25/2016

2025 Total PM

5.4

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBLn1
997
0.053
8.8
A
0.2

0
-

WBL WBT
0
5
0
5
0
0
Free Free
- None
0
0
92
92
2
2
0
5
Major2
28
4.12
2.218
1585
1585
WB
0

0
-

NBL
49
49
0
Stop
0
0
0
92
2
53

NBR
0
0
0
Stop
None
92
2
0

Minor1
20
15
5
6.42
5.42
5.42
3.518
997
1008
1018

15
6.22
3.318
1065
-

997
997
1008
1018

1065
-

NB
8.8
A

EBT EBR WBL WBT


- 1585
0
A
0
-

Synchro 9 Report
Page 11
107

HCM 2010 Signalized Intersection Summary


5: Walker Dr & E Lee St

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

2016-0202 Walker Drive


2025 Total PM w/improve

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

173
173
5
0
1.00
1.00
1863
184
1
0.94
2
420
0.10
1774
184
1774
5.0
5.0
1.00
420
0.44
424
1.00
1.00
15.3
0.7
0.0
2.5
16.0
B

357
357
2
0

13
13
12
0
1.00
1.00
1863
14
1
0.94
2
491
0.31
1583
14
1583
0.4
0.4
1.00
491
0.03
583
1.00
1.00
17.0
0.0
0.0
0.2
17.0
B

127
127
1
0
1.00
1.00
1863
135
1
0.94
2
459
0.08
1774
135
1774
3.7
3.7
1.00
459
0.29
476
1.00
1.00
15.6
0.4
0.0
1.8
16.0
B

357
357
6
0

552
552
16
0
1.00
1.00
1863
352
1
0.94
2
457
0.29
1583
352
1583
14.4
14.4
1.00
457
0.77
560
1.00
1.00
23.0
5.3
0.0
6.9
28.3
C

5
5
3
0
1.00
1.00
1900
5
0
0.94
2
6
0.11
57
144
1637
6.1
6.1
0.03
183
0.79
348
1.00
1.00
30.5
7.2
0.0
3.1
37.7
D

26
26
8
0

104
104
18
0
1.00
1.00
1900
111
0
0.94
2
141
0.11
1262
0
0
0.0
0.0
0.77
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

539
539
7
0
1.00
1.00
1863
614
2
0.94
2
780
0.22
3548
614
1774
11.5
11.5
1.00
780
0.79
1155
1.00
1.00
26.0
2.2
0.0
5.9
28.2
C

54
54
4
0

176
176
14
0
1.00
1.00
1863
113
1
0.94
2
348
0.22
1583
113
1583
4.2
4.2
1.00
348
0.32
515
1.00
1.00
23.2
0.5
0.0
1.9
23.7
C

1
1
10.3
5.0
6.0
5.7
0.0

1.00
1863
380
2
0.94
2
1097
0.31
3539
380
1770
5.9
5.9
1097
0.35
1302
1.00
1.00
18.8
0.2
0.0
2.9
19.0
B
578
18.0
B
2
2
26.9
5.0
26.0
7.9
6.0

4
4
20.5
5.0
23.0
13.5
2.0

1.00
1863
380
2
0.94
2
1020
0.29
3539
380
1770
6.0
6.0
1020
0.37
1252
1.00
1.00
20.0
0.2
0.0
3.0
20.3
C
867
22.9
C
5
5
11.8
5.0
7.0
7.0
0.0

1.00
1863
28
1
0.94
2
36
0.11
318
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
144
37.7
D

6
6
25.4
5.0
25.0
16.4
4.0

1.00
1863
0
0
0.94
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
727
27.5
C

8
8
12.9
5.0
15.0
8.1
0.4

24.0
C

Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016

Synchro 9 Report
Page 1
108

HCM 2010 Signalized Intersection Summary


2016-0202 Walker Drive
2025 Total PM w/improve
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

469
469
5
0
1.00
1.00
1863
504
1
0.93
2
776
0.27
1774
504
1774
9.0
9.0
1.00
776
0.65
1473
1.00
1.00
8.1
0.9
0.0
4.4
9.0
A

470
470
2
0

0
0
12
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0
1
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

253
253
6
0

117
117
16
0
1.00
1.00
1863
75
1
0.93
2
336
0.21
1583
75
1583
1.8
1.8
1.00
336
0.22
740
1.00
1.00
15.3
0.3
0.0
0.8
15.7
B

209
209
3
0
1.00
1.00
1900
225
0
0.93
0
314
0.20
1543
255
1749
6.4
6.4
0.88
355
0.72
818
1.00
1.00
17.5
2.7
0.0
3.3
20.2
C

0
0
8
0

28
28
18
0
1.00
1.00
1900
30
0
0.93
0
42
0.20
206
0
0
0.0
0.0
0.12
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0

0
0

0
0

1.00
1863
505
2
0.93
2
2068
0.58
3632
505
1770
3.3
3.3
2068
0.24
4363
1.00
1.00
4.7
0.1
0.0
1.6
4.8
A
1009
6.9
A
2
2
32.5
5.0
58.0
5.3
6.2

1.00
1863
272
2
0.93
2
751
0.21
3632
272
1770
3.1
3.1
751
0.36
1655
1.00
1.00
15.8
0.3
0.0
1.5
16.1
B
347
16.0
B
5
5
17.5
5.0
31.0
11.0
1.6

1.00
1863
0
1
0.93
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
255
20.2
C

6
6
15.0
5.0
22.0
5.1
4.9

8
8
14.6
5.0
22.0
8.4
1.2

11.0
B

Synchro 9 Report
Page 2
109

HCM 2010 Signalized Intersection Summary


8: Walker Dr & Site Access A

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

2016-0202 Walker Drive


2025 Total PM w/improve+Sig

NWL

NWR

NET

NER

SWL

SWT

203
203
3
0
1.00
1.00
1863
221
1
0.92
2
312
0.18
1774
221
1774
4.7
4.7
1.00
312
0.71
1374
1.00
1.00
15.5
3.0
0.0
2.5
18.5
B
264
17.8
B

60
60
18
0
1.00
1.00
1863
43
1
0.92
2
279
0.18
1583
43
1583
0.9
0.9
1.00
279
0.15
1227
1.00
1.00
14.0
0.3
0.0
0.4
14.2
B

529
529
2
0

205
205
12
0
1.00
1.00
1863
0
1
0.92
2
632
0.00
1583
0
1583
0.0
0.0
1.00
632
0.00
1385
1.00
0.00
0.0
0.0
0.0
0.0
0.0

57
57
1
0
1.00
1.00
1863
62
1
0.92
2
504
0.05
1774
62
1774
0.7
0.7
1.00
504
0.12
815
1.00
1.00
5.8
0.1
0.0
0.3
5.9
A

580
580
6
0

1
1
7.0
5.0
9.0
2.7
0.0

2
2
21.0
5.0
35.0
6.7
9.3

1.00
1863
575
2
0.92
2
1413
0.40
3632
575
1770
4.7
4.7
1413
0.41
3096
1.00
1.00
8.6
0.2
0.0
2.3
8.8
A
575
8.8
A
3

1.00
1863
630
2
0.92
2
2032
0.57
3632
630
1770
3.7
3.7
2032
0.31
4334
1.00
1.00
4.4
0.1
0.0
1.8
4.5
A
692
4.6
A
6
6
28.0
5.0
49.0
5.7
10.3

8
8
12.0
5.0
31.0
6.7
0.7

8.5
A

Synchro 9 Report
Page 1
110

111

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


32
0
25
32
0
25
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
34
0
27
Minor2
447
238
209
7.54
6.54
6.54
3.52
495
744
774

544
238
306
6.54
5.54
5.54
4.02
445
707
660

476
546
708
736

424
495
707
628

Approach
HCM Control Delay, s
HCM LOS

EB
11
B

RH
3/25/2016

2018 Total Sat

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1311
0.043
7.9
A
0.1

WBL WBT WBR


0
0
1
0
0
1
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
0
0
1

NBL NBT NBR


52 181
0
52 181
0
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
56 195
0

125
6.94
3.32
902
-

Minor1
419
306
113
7.54
6.54
6.54
3.52
518
679
880

557
306
251
6.54
5.54
5.54
4.02
437
660
698

97
6.94
3.32
940
-

Major1
251
4.14
2.22
1311
-

902
-

484
539
646
854

416
480
628
698

940
-

1311
-

WB
8.8
A
NBT NBR EBLn1WBLn1 SBL
- 660 940 1375
- 0.093 0.001
0.1
11
8.8
0
A
B
A
A
0.3
0
0

NB
1.8

0
-

0
-

SBL SBT SBR


0 210
23
0 210
23
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
0 226
25
Major2
195
4.14
2.22
1375
1375
-

0
-

0
-

SB
0

SBT SBR
-

Synchro 9 Report
Page 1
112

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


1
0
10
1
0
10
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
1
0
11
Minor2
459
326
133
7.54
6.54
6.54
3.52
485
661
857

599
326
273
6.54
5.54
5.54
4.02
414
647
683

468
540
659
837

406
481
636
681

Approach
HCM Control Delay, s
HCM LOS

EB
9.4
A

RH
3/25/2016

2018 Total Sat

1.6

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1270
0.003
7.8
A
0

WBL WBT WBR


41
0
17
41
0
17
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
44
0
18

NBL NBT NBR


4 231
15
4 231
15
0
0
0
Free Free Free
- None
150
0
0
93
93
93
2
2
2
4 248
16

145
6.94
3.32
876
-

Minor1
446
265
181
7.54
6.54
6.54
3.52
496
717
803

593
265
328
6.54
5.54
5.54
4.02
417
688
646

132
6.94
3.32
893
-

Major1
289
4.14
2.22
1270
-

876
-

482
559
715
780

409
486
686
635

893
-

1270
-

WB
11.4
B
NBT NBR EBLn1WBLn1 SBL
- 829 628 1296
- 0.014 0.099 0.015
9.4 11.4
7.8
A
B
A
0
0.3
0

NB
0.1

0
-

0
-

SBL SBT SBR


18 265
4
18 265
4
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
19 285
4
Major2
265
4.14
2.22
1296
1296
-

0
-

0
-

SB
0.6

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
113

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La./Site Access B

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


6
0
19
6
0
19
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
7
0
21
Minor2
491
368
123
7.54
6.54
6.54
3.52
461
624
868

586
368
218
6.54
5.54
5.54
4.02
421
620
721

425
425
617
820

402
402
598
713

Approach
HCM Control Delay, s
HCM LOS

EB
10.3
B

RH
3/25/2016

2018 Total Sat

2.7

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1285
0.011
7.8
A
0

WBL WBT WBR


61
0
39
61
0
39
0
0
0
Stop Stop Stop
- None
0
0
0
92
92
92
2
2
2
66
0
42

NBL NBT NBR


13 175
89
13 175
89
0
0
0
Free Free Free
- None
115
- 100
0
0
92
92
92
2
2
2
14 190
97

137
6.94
3.32
886
-

Minor1
448
218
230
7.54
6.54
6.54
3.52
494
764
752

589
218
371
6.54
5.54
5.54
4.02
419
721
618

95
6.94
3.32
943
-

Major1
275
4.14
2.22
1285
-

886
-

466
466
756
709

400
400
713
597

943
-

1285
-

WB
12
B
NBT NBR EBLn1WBLn1WBLn2 SBL
- 703 466 943 1381
- 0.039 0.142 0.045 0.035
- 10.3
14
9
7.7
B
B
A
A
0.1
0.5
0.1
0.1

NB
0.4

0
-

0
-

SBL SBT SBR


44 248
5
44 248
5
0
0
0
Free Free Free
- None
100
0
0
92
92
92
2
2
2
48 270
5
Major2
190
4.14
2.22
1381
1381
-

0
-

0
-

SB
1.1

SBT SBR
-

Synchro 9 Report
Page 3
114

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

11.8
B

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/25/2016

2016-0202 Walker Drive


2018 Total Sat

EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
11.9
B

EBT
162
162
0.92
2
176
1

EBR
34
34
0.92
2
37
0

WBU
0
0
0.92
2
0
0

WBL
49
49
0.92
2
53
0
WB
EB
1
NB
1
SB
1
11.5
B

WBT
144
144
0.92
2
157
1

WBR
191
191
0.92
2
208
1

NBU
0
0
0.92
2
0
0

NBL
10
10
0.92
2
11
0

NBT
107
107
0.92
2
116
1

NBR
45
45
0.92
2
49
0

NB
SB
1
EB
1
WB
2
11.3
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


6%
1%
25%
0%
54%
66%
82%
75%
0%
44%
28%
17%
0% 100%
2%
Stop
Stop
Stop
Stop
Stop
162
198
193
191
206
10
2
49
0
111
107
162
144
0
91
45
34
0
191
4
176
215
210
208
222
2
5
7
7
2
0.287 0.345
0.36 0.308 0.369
5.858 5.768 6.184 5.345 6.001
Yes
Yes
Yes
Yes
Yes
611
620
579
669
598
3.925 3.832 3.941 3.102 4.063
0.288 0.347 0.363 0.311 0.371
11.3
11.9
12.4
10.5
12.6
B
B
B
B
B
1.2
1.5
1.6
1.3
1.7

Synchro 9 Report
Page 4
115

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2018 Total Sat

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
111
111
0.93
2
119
0

SBT
91
91
0.93
2
98
1

SBR
4
4
0.93
2
4
0

SB
NB
1
WB
2
EB
1
12.6
B

Lane

RH
3/25/2016

Synchro 9 Report
Page 5
116

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2018 Total Sat

29.2

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


102 213
6
102 213
6
0
0
0
Free Free Free
- None
250
- 135
0
0
92
92
92
2
2
2
111 232
7

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
321
4.14
2.22
1236
-

Approach
HCM Control Delay, s
HCM LOS

EB
2.6

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

2016-0202 Walker Drive

1236
-

0
-

NBLn1 EBL
600 1236
0.197 0.09
12.5
8.2
B
A
0.7
0.3

0
-

WBL WBT WBR


84 295 360
84 295 360
0
0
0
Free Free Free
- None
225
- 375
0
0
92
92
92
2
2
2
91 321 391
Major2
232
4.14
2.22
1333
1333
-

0
-

0
-

WB
0.9

NBL NBT NBR


7
20
82
7
20
82
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
8
22
89
Minor1
814
453
361
7.54
6.54
6.54
3.52
270
556
630

956
453
503
6.54
5.54
5.54
4.02
257
568
540

191
278
506
479

218
299
517
503

NB
12.5
B

SBL SBT SBR


305
34
94
305
34
94
0
0
0
Stop Stop Stop
- None
115
0
1
0
92
92
92
2
2
2
332
37 102

116
6.94
3.32
914
-

Minor2
851
503
348
7.54
6.54
6.54
3.52
~ 253
519
641

956
503
453
6.54
5.54
5.54
4.02
257
540
568

160
6.94
3.32
857
-

914
-

~ 191
~ 288
472
504

218
309
503
517

857
-

SB
101.4
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1333
- 288 309 857
- 0.068
- 1.151 0.12 0.119
7.9
- 138.9 18.2
9.8
A
F
C
A
0.2
- 14.2
0.4
0.4

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
117

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd 2018 Total Sat

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

5
EBL EBT EBR
0 445 134
0 445 134
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 484 146

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
377
4.14
2.22
1178
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

1178
-

EBL
1178
0
A
0

0
-

0
-

WBL WBT WBR


19 347
0
19 347
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
21 377
0
Major2
484
4.14
2.22
1075
1075
-

0
-

0
-

WB
0.4

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

SBL SBT SBR


99
1 376
99
1 376
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
108
1 409
Minor2
660
418
242
6.84
5.84
5.84
3.52
396
632
776

902
418
484
6.54
5.54
5.54
4.02
276
589
550

189
6.94
3.32
821
-

388
388
620
776

0
0
0
0

821
-

SB
14.6
B

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 1075
- 388 821
- 0.019
- 0.28 0.498
8.4
- 17.9 13.7
A
C
B
0.1
1.1
2.8

Synchro 9 Report
Page 7
118

HCM 2010 TWSC


2016-0202 Walker Drive
2018 Total Sat
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh

32

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


320 247
0
320 247
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
348 268
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
229
4.14
2.22
1336
-

Approach
HCM Control Delay, s
HCM LOS

EB
4.9

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

1336
-

0
-

NBLn1 EBL
179 1336
1.16 0.26
169.7
8.6
F
A
10.8
1

0
-

WBL WBT WBR


0 211 131
0 211 131
0
0
0
Free Free Free
- None
- 115
0
0
92
92
92
2
2
2
0 229 142
Major2
268
4.14
2.22
1293
1293
-

0
-

0
-

WB
0

NBL NBT NBR


163
1
27
163
1
27
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
177
1
29
Minor1
1079 1193
964 964
115 229
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
213 186
331 332
897 713
~ 158
~ 158
245
897

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

134
6.94
3.32
890
890
-

NB
169.7
F

EBT EBR WBL WBT WBR


- 1293
0
A
0
-

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 8
119

HCM 2010 TWSC


8: Walker Dr & Site Access A

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2018 Total Sat

4.1
NWL
182
182
0
Stop
0
1
0
92
2
198

NWR
40
40
0
Stop
None
0
92
2
43

NET NER
235 241
235 241
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
255 262

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
529
255
274
6.84
5.84
5.84
3.52
479
764
747

128
6.94
3.32
898
-

456
456
764
710

898
-

Approach
HCM Control Delay, s
HCM LOS

NW
17.1
C

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NET NERNWLn1NWLn2 SWL SWT


- 456 898 1307
- 0.434 0.048 0.049
- 18.8
9.2
7.9
C
A
A
2.2
0.2
0.2
-

RH
3/25/2016

Major1
0
NE
0

0
-

SWL SWT
59 269
59 269
0
0
Free Free
- None
100
0
0
92
92
2
2
64 292
Major2
255
4.14
2.22
1307
1307
-

0
-

SW
1.4

Synchro 9 Report
Page 9
120

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2018 Total Sat

0.6
WBL
0
0
0
Stop
0
0
92
2
0

WBR
36
36
0
Stop
None
0
92
2
39

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
409
253
156
6.84
5.84
5.84
3.52
570
766
856

141
6.94
3.32
881
-

570
570
766
856

881
-

Approach
HCM Control Delay, s
HCM LOS

WB
9.3
A

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

NBT NBRWBLn1 SBL


- 881 1276
- 0.044
9.3
0
A
A
0.1
0

NBT NBR
206
54
206
54
0
0
Free Free
- None
0
0
92
92
2
2
224
59
Major1
0
NB
0

0
-

SBL SBT
0 287
0 287
0
0
Free Free
- None
0
0
92
92
2
2
0 312
Major2
283
4.14
2.22
1276
1276
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 10
121

HCM 2010 Signalized Intersection Summary


5: Walker Dr & E Lee St

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

2016-0202 Walker Drive


2018 Total Sat w/improve

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

102
102
5
0
1.00
1.00
1863
111
1
0.92
2
430
0.36
850
111
850
4.3
6.9
1.00
430
0.26
854
1.00
1.00
11.6
0.3
0.0
1.0
11.9
B

213
213
2
0

6
6
12
0
1.00
1.00
1863
7
1
0.92
2
572
0.36
1583
7
1583
0.1
0.1
1.00
572
0.01
1362
1.00
1.00
8.3
0.0
0.0
0.1
8.4
A

84
84
1
0
1.00
1.00
1863
91
1
0.92
2
536
0.36
1136
91
1136
2.4
4.2
1.00
536
0.17
1103
1.00
1.00
10.3
0.1
0.0
0.8
10.5
B

295
295
6
0

360
360
16
0
1.00
1.00
1863
234
1
0.92
2
572
0.36
1583
234
1583
4.5
4.5
1.00
572
0.41
1362
1.00
1.00
9.7
0.5
0.0
2.0
10.2
B

7
7
3
0
1.00
1.00
1900
8
0
0.92
2
11
0.10
110
119
1641
2.9
2.9
0.07
158
0.75
726
1.00
1.00
17.9
7.0
0.0
1.6
24.9
C

20
20
8
0

82
82
18
0
1.00
1.00
1900
89
0
0.92
2
119
0.10
1227
0
0
0.0
0.0
0.75
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

305
305
7
0
1.00
1.00
1863
358
2
0.92
2
616
0.17
3548
358
1774
3.8
3.8
1.00
616
0.58
1918
1.00
1.00
15.5
0.9
0.0
1.9
16.3
B

34
34
4
0

94
94
14
0
1.00
1.00
1863
72
1
0.92
2
275
0.17
1583
72
1583
1.6
1.6
1.00
275
0.26
856
1.00
1.00
14.6
0.5
0.0
0.7
15.1
B

1.00
1863
232
2
0.92
2
1278
0.36
3539
232
1770
1.8
1.8
1278
0.18
3044
1.00
1.00
8.9
0.1
0.0
0.9
9.0
A
350
9.9
A
2
2
19.7
5.0
35.0
8.9
5.8

1.00
1863
321
2
0.92
2
1278
0.36
3539
321
1770
2.6
2.6
1278
0.25
3044
1.00
1.00
9.1
0.1
0.0
1.3
9.2
A
646
9.8
A

4
4
12.1
5.0
22.0
5.8
1.4

1.00
1863
22
1
0.92
2
29
0.10
303
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
119
24.9
C

6
6
19.7
5.0
35.0
6.5
5.9

1.00
1863
0
0
0.92
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
430
16.1
B

8
8
8.9
5.0
18.0
4.9
0.4

12.7
B

Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016

Synchro 9 Report
Page 1
122

HCM 2010 Signalized Intersection Summary


2016-0202 Walker Drive
2018 Total Sat w/improve
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

320
320
5
0
1.00
1.00
1863
348
1
0.92
2
724
0.21
1774
348
1774
4.7
4.7
1.00
724
0.48
1691
1.00
1.00
6.7
0.5
0.0
2.2
7.2
A

247
247
2
0

0
0
12
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0
1
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

211
211
6
0

131
131
16
0
1.00
1.00
1863
100
1
0.92
2
323
0.20
1583
100
1583
1.9
1.9
1.00
323
0.31
1059
1.00
1.00
12.1
0.5
0.0
0.9
12.7
B

163
163
3
0
1.00
1.00
1900
177
0
0.92
0
255
0.17
1492
207
1745
4.0
4.0
0.86
298
0.69
1167
1.00
1.00
14.0
2.9
0.0
2.1
16.9
B

1
1
8
0

27
27
18
0
1.00
1.00
1900
29
0
0.92
0
42
0.17
244
0
0
0.0
0.0
0.14
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0

0
0

0
0

1.00
1863
268
2
0.92
2
1948
0.55
3632
268
1770
1.3
1.3
1948
0.14
5523
1.00
1.00
3.9
0.0
0.0
0.6
4.0
A
616
5.8
A
2
2
24.8
5.0
56.0
3.3
3.8

1.00
1863
229
2
0.92
2
722
0.20
3632
229
1770
2.0
2.0
722
0.32
2367
1.00
1.00
12.2
0.2
0.0
1.0
12.4
B
329
12.5
B
5
5
12.4
5.0
27.0
6.7
1.0

1.00
1863
1
1
0.92
2
1
0.17
8
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
207
16.9
B

6
6
12.3
5.0
24.0
4.0
3.3

8
8
11.1
5.0
24.0
6.0
1.0

9.7
A

Synchro 9 Report
Page 2
123

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


32
0
25
32
0
25
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
34
0
27
Minor2
628
333
295
7.54
6.54
6.54
3.52
367
654
689

746
333
413
6.54
5.54
5.54
4.02
340
642
592

332
423
602
626

303
390
621
545

Approach
HCM Control Delay, s
HCM LOS

EB
12.4
B

RH
3/25/2016

2019 Total Sat

3.8

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1288
0.068
8
A
0.2

WBL WBT WBR


63
0
11
63
0
11
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
68
0
12

NBL NBT NBR


82 220
0
82 220
0
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
88 237
0

136
6.94
3.32
888
-

Minor1
610
413
197
7.54
6.54
6.54
3.52
378
587
786

758
413
345
6.54
5.54
5.54
4.02
335
592
635

118
6.94
3.32
912
-

Major1
272
4.14
2.22
1288
-

888
-

336
420
541
737

298
380
545
614

912
-

1288
-

WB
14.5
B
NBT NBR EBLn1WBLn1 SBL
- 549 457 1327
- 0.112 0.174 0.028
0.2
- 12.4 14.5
7.8
A
B
B
A
0.4
0.6
0.1

NB
2.3

0
-

0
-

SBL SBT SBR


34 230
23
34 230
23
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
37 247
25
Major2
237
4.14
2.22
1327
1327
-

0
-

0
-

SB
1

SBT SBR
0.1
A
-

Synchro 9 Report
Page 1
124

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


1
0
10
1
0
10
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
1
0
11
Minor2
644
448
196
7.54
6.54
6.54
3.52
358
560
787

848
448
400
6.54
5.54
5.54
4.02
297
571
600

343
441
558
767

290
392
559
598

Approach
HCM Control Delay, s
HCM LOS

EB
9.9
A

RH
3/25/2016

2019 Total Sat

1.3

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1143
0.004
8.2
A
0

WBL WBT WBR


41
0
17
41
0
17
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
44
0
18

NBL NBT NBR


4 349
15
4 349
15
0
0
0
Free Free Free
- None
150
0
0
93
93
93
2
2
2
4 375
16

206
6.94
3.32
800
-

Minor1
634
392
242
7.54
6.54
6.54
3.52
364
604
740

843
392
451
6.54
5.54
5.54
4.02
299
605
569

196
6.94
3.32
812
-

Major1
412
4.14
2.22
1143
-

800
-

352
456
602
715

292
396
603
557

812
-

1143
-

WB
12.8
B
NBT NBR EBLn1WBLn1 SBL
- 745 523 1164
- 0.016 0.119 0.017
9.9 12.8
8.1
A
B
A
0
0.4
0.1

NB
0.1

0
-

0
-

SBL SBT SBR


18 379
4
18 379
4
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
19 408
4
Major2
391
4.14
2.22
1164
1164
-

0
-

0
-

SB
0.5

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
125

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La./Site Access B

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


6
0
19
6
0
19
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
7
0
21
Minor2
704
524
180
7.54
6.54
6.54
3.52
324
504
804

854
524
330
6.54
5.54
5.54
4.02
294
528
644

284
383
498
738

271
361
494
636

Approach
HCM Control Delay, s
HCM LOS

EB
10.8
B

RH
3/25/2016

2019 Total Sat

4.2

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1191
0.013
8.1
A
0

WBL WBT WBR


169
0
56
169
0
56
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
184
0
61

NBL NBT NBR


14 276 208
14 276 208
0
0
0
Free Free Free
- None
115
- 100
0
0
92
92
92
2
2
2
15 300 226

182
6.94
3.32
829
-

Minor1
672
330
342
7.54
6.54
6.54
3.52
342
657
646

857
330
527
6.54
5.54
5.54
4.02
293
644
527

150
6.94
3.32
870
-

Major1
364
4.14
2.22
1191
-

829
-

314
420
649
589

270
368
636
493

870
-

1191
-

WB
17.4
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 648 420 870 1258
- 0.042 0.437 0.07 0.065
- 10.8 20.1
9.4
8.1
B
C
A
A
0.1
2.2
0.2
0.2

NB
0.2

0
-

0
-

SBL SBT SBR


75 330
5
75 330
5
0
0
0
Free Free Free
- None
100
0
0
92
92
92
2
2
2
82 359
5
Major2
300
4.14
2.22
1258
1258
-

0
-

0
-

SB
1.5

SBT SBR
-

Synchro 9 Report
Page 3
126

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

12.8
B

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/25/2016

2016-0202 Walker Drive


2019 Total Sat

EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
13.4
B

EBT
204
204
0.92
2
222
1

EBR
34
34
0.92
2
37
0

WBU
0
0
0.92
2
0
0

WBL
49
49
0.92
2
53
0
WB
EB
1
NB
1
SB
1
12.6
B

WBT
182
182
0.92
2
198
1

WBR
193
193
0.92
2
210
1

NBU
0
0
0.92
2
0
0

NBL
10
10
0.92
2
11
0

NBT
108
108
0.92
2
117
1

NBR
45
45
0.92
2
49
0

NB
SB
1
EB
1
WB
2
11.9
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


6%
1%
21%
0%
54%
66%
85%
79%
0%
44%
28%
14%
0% 100%
2%
Stop
Stop
Stop
Stop
Stop
163
240
231
193
208
10
2
49
0
112
108
204
182
0
92
45
34
0
193
4
177
261
251
210
224
2
5
7
7
2
0.303 0.429
0.44
0.32
0.39
6.153 5.924 6.309 5.489 6.278
Yes
Yes
Yes
Yes
Yes
579
603
567
650
568
4.244 4.008 4.085 3.265 4.363
0.306 0.433 0.443 0.323 0.394
11.9
13.4
14
10.9
13.4
B
B
B
B
B
1.3
2.1
2.2
1.4
1.8

Synchro 9 Report
Page 4
127

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2019 Total Sat

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
112
112
0.93
2
120
0

SBT
92
92
0.93
2
99
1

SBR
4
4
0.93
2
4
0

SB
NB
1
WB
2
EB
1
13.4
B

Lane

RH
3/25/2016

Synchro 9 Report
Page 5
128

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2019 Total Sat

126

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


144 215
6
144 215
6
0
0
0
Free Free Free
- None
250
- 135
0
0
92
92
92
2
2
2
157 234
7

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
323
4.14
2.22
1234
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.3

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

2016-0202 Walker Drive

1234
-

0
-

NBLn1 EBL
550 1234
0.217 0.127
13.4
8.3
B
A
0.8
0.4

0
-

WBL WBT WBR


85 297 536
85 297 536
0
0
0
Free Free Free
- None
225
- 375
0
0
92
92
92
2
2
2
92 323 583
Major2
234
4.14
2.22
1331
1331
-

0
-

0
-

WB
0.7

NBL NBT NBR


7
20
83
7
20
83
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
8
22
90
Minor1
912 1055
547 547
365 508
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
229 224
489 516
627 537
147
222
427
451

182
258
450
500

NB
13.4
B

117
6.94
3.32
913
913
-

SBL SBT SBR


465
34 131
465
34 131
0
0
0
Stop Stop Stop
- None
115
0
1
0
92
92
92
2
2
2
505
37 142
Minor2
949 1055
508 508
441 547
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
~ 215 224
516 537
565 516
~ 155
~ 242
~ 450
~ 423

182
270
500
450

161
6.94
3.32
855
855
-

SB
$ 399.4
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1331
- 242 270 855
- 0.069
- 2.089 0.137 0.167
7.9
-$ 536.8 20.4 10.1
A
F
C
B
0.2
- 37.9
0.5
0.6

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
129

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd 2019 Total Sat

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

6.6
EBL EBT EBR
0 559 182
0 559 182
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 608 198

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
453
4.14
2.22
1104
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

1104
-

EBL
1104
0
A
0

0
-

0
-

WBL WBT WBR


19 417
0
19 417
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
21 453
0
Major2
608
4.14
2.22
966
966
-

0
-

0
-

WB
0.4

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

SBL SBT SBR


100
1 486
100
1 486
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
109
1 528
Minor2
799 1103
495 495
304 608
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
323 210
578 544
722 484
316
316
565
722

0
0
0
0

227
6.94
3.32
776
776
-

SB
19.5
C

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 966
- 316 776
- 0.021
- 0.347 0.681
8.8
- 22.3 18.9
A
C
C
0.1
1.5
5.4

Synchro 9 Report
Page 7
130

HCM 2010 TWSC


2016-0202 Walker Drive
2019 Total Sat
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh

146.6

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


421 261
0
421 261
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
458 284
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
247
4.14
2.22
1316
-

Approach
HCM Control Delay, s
HCM LOS

EB
5.7

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

1316
-

0
-

NBLn1 EBL
107 1316
2.479 0.348
$ 756.3
9.2
F
A
23.9
1.6

0
-

WBL WBT WBR


0 227 132
0 227 132
0
0
0
Free Free Free
- None
- 115
0
0
92
92
92
2
2
2
0 247 143
Major2
284
4.14
2.22
1275
1275
-

0
-

0
-

WB
0

NBL NBT NBR


216
1
27
216
1
27
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
235
1
29
Minor1
1322 1446
1199 1199
123 247
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
~ 148 131
248 257
889 701
~ 96
~ 96
~ 162
889

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

142
6.94
3.32
880
880
-

NB
$ 756.3
F

EBT EBR WBL WBT WBR


- 1275
0
A
0
-

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 8
131

HCM 2010 TWSC


8: Walker Dr & Site Access A

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2019 Total Sat

9.1
NWL
204
204
0
Stop
0
1
0
92
2
222

NWR
67
67
0
Stop
None
0
92
2
73

NET NER
428 266
428 266
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
465 289

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
870
465
405
6.84
5.84
5.84
3.52
291
599
642

233
6.94
3.32
769
-

269
269
599
594

769
-

Approach
HCM Control Delay, s
HCM LOS

NW
47.4
E

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NET NERNWLn1NWLn2 SWL SWT


- 269 769 1093
- 0.824 0.095 0.075
- 59.6 10.2
8.6
F
B
A
6.6
0.3
0.2
-

RH
3/25/2016

Major1
0
NE
0

0
-

SWL SWT
75 445
75 445
0
0
Free Free
- None
100
0
0
92
92
2
2
82 484
Major2
465
4.14
2.22
1093
1093
-

0
-

SW
1.2

Synchro 9 Report
Page 9
132

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2019 Total Sat

1
WBL
0
0
0
Stop
1
0
92
2
0

WBR
89
89
0
Stop
None
0
92
2
97

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
544
326
218
6.84
5.84
5.84
3.52
469
704
797

205
6.94
3.32
802
-

469
469
704
797

802
-

Approach
HCM Control Delay, s
HCM LOS

WB
10.1
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NBT NBRWBLn1 SBL


- 802 1144
- 0.121
- 10.1
0
B
A
0.4
0

RH
3/25/2016

NBT NBR
222 156
222 156
0
0
Free Free
- None
0
0
92
92
2
2
241 170
Major1
0
NB
0

0
-

SBL SBT
0 401
0 401
0
0
Free Free
- None
0
0
92
92
2
2
0 436
Major2
411
4.14
2.22
1144
1144
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 10
133

HCM 2010 TWSC


10: Site Access D & Academy Hill Rd

Intersection
Int Delay, s/veh

EBT EBR
0
34
0
34
0
0
Free Free
- None
0
0
92
92
2
2
0
37

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
0
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

RH
3/25/2016

2019 Total Sat

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBLn1
998
0.08
8.9
A
0.3

0
-

WBL WBT
0
1
0
1
0
0
Free Free
- None
0
0
92
92
2
2
0
1
Major2
37
4.12
2.218
1574
1574
WB
0

0
-

NBL
73
73
0
Stop
0
0
0
92
2
79

NBR
0
0
0
Stop
None
92
2
0

Minor1
19
18
1
6.42
5.42
5.42
3.518
998
1005
1022

18
6.22
3.318
1061
-

998
998
1005
1022

1061
-

NB
8.9
A

EBT EBR WBL WBT


- 1574
0
A
0
-

Synchro 9 Report
Page 11
134

HCM 2010 Signalized Intersection Summary


5: Walker Dr & E Lee St

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

2016-0202 Walker Drive


2019 Total Sat w/improve

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

144
144
5
0
1.00
1.00
1863
157
1
0.92
2
415
0.07
1774
157
1774
3.7
3.7
1.00
415
0.38
415
1.00
1.00
13.3
0.6
0.0
1.8
13.9
B

215
215
2
0

6
6
12
0
1.00
1.00
1863
7
1
0.92
2
499
0.31
1583
7
1583
0.2
0.2
1.00
499
0.01
736
1.00
1.00
14.2
0.0
0.0
0.1
14.2
B

85
85
1
0
1.00
1.00
1863
92
1
0.92
2
518
0.05
1774
92
1774
2.1
2.1
1.00
518
0.18
569
1.00
1.00
13.2
0.2
0.0
1.0
13.4
B

297
297
6
0

536
536
16
0
1.00
1.00
1863
350
1
0.92
2
479
0.30
1583
350
1583
11.9
11.9
1.00
479
0.73
763
1.00
1.00
18.8
2.2
0.0
5.4
21.0
C

7
7
3
0
1.00
1.00
1900
8
0
0.92
2
10
0.10
109
120
1640
4.3
4.3
0.07
156
0.77
409
1.00
1.00
26.6
7.6
0.0
2.3
34.2
C

20
20
8
0

83
83
18
0
1.00
1.00
1900
90
0
0.92
2
117
0.10
1230
0
0
0.0
0.0
0.75
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

465
465
7
0
1.00
1.00
1863
531
2
0.92
2
722
0.20
3548
531
1774
8.4
8.4
1.00
722
0.74
1297
1.00
1.00
22.5
1.5
0.0
4.3
23.9
C

34
34
4
0

131
131
14
0
1.00
1.00
1863
85
1
0.92
2
322
0.20
1583
85
1583
2.7
2.7
1.00
322
0.26
579
1.00
1.00
20.2
0.4
0.0
1.2
20.6
C

1
1
8.2
5.0
5.0
4.1
0.0

1.00
1863
234
2
0.92
2
1115
0.31
3539
234
1770
2.9
2.9
1115
0.21
1646
1.00
1.00
15.1
0.1
0.0
1.4
15.2
B
398
14.7
B
2
2
24.0
5.0
28.0
4.9
5.0

4
4
17.3
5.0
22.0
10.4
1.8

1.00
1863
323
2
0.92
2
1070
0.30
3539
323
1770
4.2
4.2
1070
0.30
1705
1.00
1.00
16.1
0.2
0.0
2.1
16.3
B
765
18.1
B
5
5
9.0
5.0
4.0
5.7
0.0

1.00
1863
22
1
0.92
2
29
0.10
301
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
120
34.2
C

6
6
23.2
5.0
29.0
13.9
4.3

1.00
1863
0
0
0.92
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
616
23.5
C

8
8
10.7
5.0
15.0
6.3
0.3

20.1
C

Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016

Synchro 9 Report
Page 1
135

HCM 2010 Signalized Intersection Summary


2016-0202 Walker Drive
2019 Total Sat w/improve
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

421
421
5
0
1.00
1.00
1863
458
1
0.92
2
750
0.26
1774
458
1774
7.7
7.7
1.00
750
0.61
1496
1.00
1.00
8.1
0.8
0.0
3.9
8.9
A

261
261
2
0

0
0
12
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0
1
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

227
227
6
0

132
132
16
0
1.00
1.00
1863
85
1
0.92
2
289
0.18
1583
85
1583
2.0
2.0
1.00
289
0.29
739
1.00
1.00
15.1
0.6
0.0
0.9
15.7
B

216
216
3
0
1.00
1.00
1900
235
0
0.92
0
327
0.21
1553
265
1751
6.0
6.0
0.89
368
0.72
1063
1.00
1.00
15.7
2.6
0.0
3.1
18.4
B

1
1
8
0

27
27
18
0
1.00
1.00
1900
29
0
0.92
0
40
0.21
192
0
0
0.0
0.0
0.11
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0

0
0

0
0

1.00
1863
284
2
0.92
2
1968
0.56
3632
284
1770
1.7
1.7
1968
0.14
4462
1.00
1.00
4.6
0.0
0.0
0.8
4.6
A
742
7.2
A
2
2
28.8
5.0
54.0
3.7
4.0

1.00
1863
247
2
0.92
2
647
0.18
3632
247
1770
2.6
2.6
647
0.38
1653
1.00
1.00
15.4
0.4
0.0
1.3
15.7
B
332
15.7
B
5
5
16.0
5.0
29.0
9.7
1.4

1.00
1863
1
1
0.92
2
1
0.21
7
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
265
18.4
B

6
6
12.8
5.0
20.0
4.6
3.2

8
8
14.0
5.0
26.0
8.0
1.4

11.6
B

Synchro 9 Report
Page 2
136

HCM 2010 Signalized Intersection Summary


8: Walker Dr & Site Access A

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

2016-0202 Walker Drive


2019 Total Sat w/improve + Sig

NWL

NWR

NET

NER

SWL

SWT

204
204
3
0
1.00
1.00
1863
222
1
0.92
2
331
0.19
1774
222
1774
4.1
4.1
1.00
331
0.67
1558
1.00
1.00
13.4
2.4
0.0
2.2
15.7
B
295
15.0
B

67
67
18
0
1.00
1.00
1863
73
1
0.92
2
295
0.19
1583
73
1583
1.4
1.4
1.00
295
0.25
1390
1.00
1.00
12.3
0.4
0.0
0.6
12.7
B

428
428
2
0

266
266
12
0
1.00
1.00
1863
0
1
0.92
2
561
0.00
1583
0
1583
0.0
0.0
1.00
561
0.00
1615
1.00
0.00
0.0
0.0
0.0
0.0
0.0

75
75
1
0
1.00
1.00
1863
82
1
0.92
2
552
0.06
1774
82
1774
0.9
0.9
1.00
552
0.15
894
1.00
1.00
5.6
0.1
0.0
0.4
5.7
A

445
445
6
0

1
1
6.2
4.0
9.0
2.9
0.1

2
2
17.5
5.0
36.0
5.4
7.1

1.00
1863
465
2
0.92
2
1255
0.35
3632
465
1770
3.4
3.4
1255
0.37
3609
1.00
1.00
8.5
0.2
0.0
1.7
8.6
A
465
8.6
A
3

1.00
1863
484
2
0.92
2
1877
0.53
3632
484
1770
2.6
2.6
1877
0.26
4913
1.00
1.00
4.5
0.1
0.0
1.3
4.6
A
566
4.7
A
6
6
23.7
5.0
49.0
4.6
7.5

8
8
11.6
5.0
31.0
6.1
0.9

8.4
A

Synchro 9 Report
Page 1
137

HCM 2010 TWSC


1: Walker Dr & Academy Hill Rd

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


34
0
27
34
0
27
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
37
0
29
Minor2
644
341
303
7.54
6.54
6.54
3.52
358
647
681

766
341
425
6.54
5.54
5.54
4.02
331
637
585

323
416
595
618

294
383
616
538

Approach
HCM Control Delay, s
HCM LOS

EB
12.5
B

RH
3/25/2016

2025 Total Sat

3.9

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1278
0.071
8
A
0.2

WBL WBT WBR


63
0
11
63
0
11
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
68
0
12

NBL NBT NBR


84 227
0
84 227
0
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
90 244
0

140
6.94
3.32
882
-

Minor1
626
425
201
7.54
6.54
6.54
3.52
369
578
782

779
425
354
6.54
5.54
5.54
4.02
326
585
629

122
6.94
3.32
906
-

Major1
281
4.14
2.22
1278
-

882
-

326
411
531
731

290
373
538
608

906
-

1278
-

WB
14.8
B
NBT NBR EBLn1WBLn1 SBL
- 543 447 1319
- 0.121 0.178 0.028
0.2
- 12.5 14.8
7.8
A
B
B
A
0.4
0.6
0.1

NB
2.3

0
-

0
-

SBL SBT SBR


34 237
24
34 237
24
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
37 255
26
Major2
244
4.14
2.22
1319
1319
-

0
-

0
-

SB
1

SBT SBR
0.1
A
-

Synchro 9 Report
Page 1
138

HCM 2010 TWSC


2: Walker Dr & Breezewood Dr/Office Bldg Ent

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


1
0
11
1
0
11
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
1
0
12
Minor2
658
458
200
7.54
6.54
6.54
3.52
350
552
783

866
458
408
6.54
5.54
5.54
4.02
290
565
595

336
435
550
763

283
386
553
593

Approach
HCM Control Delay, s
HCM LOS

EB
9.9
A

RH
3/25/2016

2025 Total Sat

1.3

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1134
0.004
8.2
A
0

WBL WBT WBR


41
0
17
41
0
17
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
44
0
18

NBL NBT NBR


4 356
15
4 356
15
0
0
0
Free Free Free
- None
150
0
0
93
93
93
2
2
2
4 383
16

211
6.94
3.32
794
-

Minor1
646
399
247
7.54
6.54
6.54
3.52
357
598
735

859
399
460
6.54
5.54
5.54
4.02
292
601
564

199
6.94
3.32
809
-

Major1
422
4.14
2.22
1134
-

794
-

345
450
596
709

285
391
599
552

809
-

1134
-

WB
12.9
B
NBT NBR EBLn1WBLn1 SBL
- 743 517 1156
- 0.017 0.121 0.017
9.9 12.9
8.2
A
B
A
0.1
0.4
0.1

NB
0.1

0
-

0
-

SBL SBT SBR


18 388
4
18 388
4
0
0
0
Free Free Free
- None
0
0
93
93
93
2
2
2
19 417
4
Major2
399
4.14
2.22
1156
1156
-

0
-

0
-

SB
0.5

SBT SBR
0.1
A
-

Synchro 9 Report
Page 2
139

HCM 2010 TWSC


3: Walker Dr & Hidden Creek La./Site Access B

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


7
0
20
7
0
20
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
8
0
22
Minor2
720
536
184
7.54
6.54
6.54
3.52
315
496
800

874
536
338
6.54
5.54
5.54
4.02
287
522
639

275
376
490
734

265
356
488
631

Approach
HCM Control Delay, s
HCM LOS

EB
11
B

RH
3/25/2016

2025 Total Sat

4.2

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBL
1179
0.013
8.1
A
0

WBL WBT WBR


169
0
56
169
0
56
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
184
0
61

NBL NBT NBR


14 283 208
14 283 208
0
0
0
Free Free Free
- None
115
- 100
0
0
92
92
92
2
2
2
15 308 226

188
6.94
3.32
822
-

Minor1
686
338
348
7.54
6.54
6.54
3.52
334
650
641

877
338
539
6.54
5.54
5.54
4.02
285
639
520

154
6.94
3.32
864
-

Major1
376
4.14
2.22
1179
-

822
-

306
414
642
583

263
361
631
486

864
-

1179
-

WB
17.7
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 629 414 864 1249
- 0.047 0.444 0.07 0.065
11 20.4
9.5
8.1
B
C
A
A
0.1
2.2
0.2
0.2

NB
0.2

0
-

0
-

SBL SBT SBR


75 340
6
75 340
6
0
0
0
Free Free Free
- None
100
0
0
92
92
92
2
2
2
82 370
7
Major2
308
4.14
2.22
1249
1249
-

0
-

0
-

SB
1.4

SBT SBR
-

Synchro 9 Report
Page 3
140

HCM 2010 AWSC


4: Falmouth St & E Lee St

Intersection
Intersection Delay, s/veh
Intersection LOS

13.7
B

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes

EBU
0
0
0.92
2
0
0

Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q

RH
3/25/2016

2016-0202 Walker Drive


2025 Total Sat

EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
14.4
B

EBT
210
210
0.92
2
228
1

EBR
36
36
0.92
2
39
0

WBU
0
0
0.92
2
0
0

WBL
52
52
0.92
2
57
0
WB
EB
1
NB
1
SB
1
13.3
B

WBT
187
187
0.92
2
203
1

WBR
204
204
0.92
2
222
1

NBU
0
0
0.92
2
0
0

NBL
11
11
0.92
2
12
0

NBT
115
115
0.92
2
125
1

NBR
48
48
0.92
2
52
0

NB
SB
1
EB
1
WB
2
12.7
B

NBLn1 EBLn1 WBLn1 WBLn2 SBLn1


6%
1%
22%
0%
54%
66%
85%
78%
0%
44%
28%
15%
0% 100%
2%
Stop
Stop
Stop
Stop
Stop
174
248
239
204
220
11
2
52
0
119
115
210
187
0
97
48
36
0
204
4
189
270
260
222
237
2
5
7
7
2
0.337 0.463 0.465 0.347 0.428
6.409 6.179 6.574
5.75 6.518
Yes
Yes
Yes
Yes
Yes
562
585
551
630
554
4.434 4.206 4.274
3.45 4.542
0.336 0.462 0.472 0.352 0.428
12.7
14.4
14.9
11.5
14.3
B
B
B
B
B
1.5
2.4
2.4
1.5
2.1

Synchro 9 Report
Page 4
141

HCM 2010 AWSC


4: Falmouth St & E Lee St

2016-0202 Walker Drive


2025 Total Sat

Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS

SBU
0
0
0.92
2
0
0

SBL
119
119
0.93
2
128
0

SBT
97
97
0.93
2
104
1

SBR
4
4
0.93
2
4
0

SB
NB
1
WB
2
EB
1
14.3
B

Lane

RH
3/25/2016

Synchro 9 Report
Page 5
142

HCM 2010 TWSC


5: Walker Dr & E Lee St

Intersection
Int Delay, s/veh

2025 Total Sat

139.5

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


147 228
6
147 228
6
0
0
0
Free Free Free
- None
250
- 135
0
0
92
92
92
2
2
2
160 248
7

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
342
4.14
2.22
1214
-

Approach
HCM Control Delay, s
HCM LOS

EB
3.2

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

2016-0202 Walker Drive

1214
-

0
-

NBLn1 EBL
537 1214
0.229 0.132
13.7
8.4
B
A
0.9
0.5

0
-

WBL WBT WBR


88 315 541
88 315 541
0
0
0
Free Free Free
- None
225
- 375
0
0
92
92
92
2
2
2
96 342 588
Major2
248
4.14
2.22
1315
1315
-

0
-

0
-

WB
0.7

NBL NBT NBR


7
20
86
7
20
86
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
8
22
93
Minor1
949 1101
567 567
382 534
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
215 211
476 505
612 523
135
207
413
432

170
245
438
485

NB
13.7
B

124
6.94
3.32
904
904
-

SBL SBT SBR


471
35 134
471
35 134
0
0
0
Stop Stop Stop
- None
115
0
1
0
92
92
92
2
2
2
512
38 146
Minor2
988 1101
534 534
454 567
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
~ 201 211
~ 498 523
555 505
~ 143
~ 229
~ 432
~ 411

170
257
485
438

171
6.94
3.32
843
843
-

SB
$ 447.7
F

EBT EBR WBL WBT WBR SBLn1 SBLn2 SBLn3


- 1315
- 229 257 843
- 0.073
- 2.236 0.148 0.173
8
-$ 603.9 21.4 10.2
A
F
C
B
0.2
- 40.2
0.5
0.6

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 6
143

HCM 2010 TWSC


2016-0202 Walker Drive
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd 2025 Total Sat

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

7
EBL EBT EBR
0 576 186
0 576 186
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 626 202

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
467
4.14
2.22
1091
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

RH
3/25/2016

1091
-

EBL
1091
0
A
0

0
-

0
-

WBL WBT WBR


20 430
0
20 430
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
22 467
0
Major2
626
4.14
2.22
952
952
-

0
-

0
-

WB
0.4

NBL NBT NBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

SBL SBT SBR


106
1 497
106
1 497
0
0
0
Stop Stop Stop
- None
0
1
0
92
92
92
2
2
2
115
1 540
Minor2
824 1137
511 511
313 626
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
311 200
567 535
715 475
304
304
554
715

0
0
0
0

234
6.94
3.32
768
768
-

SB
20.7
C

EBT EBR WBL WBT WBR SBLn1 SBLn2


- 952
- 304 768
- 0.023
- 0.383 0.703
8.9
24
20
A
C
C
0.1
1.7
5.9

Synchro 9 Report
Page 7
144

HCM 2010 TWSC


2016-0202 Walker Drive
2025 Total Sat
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Intersection
Int Delay, s/veh

170.3

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

EBL EBT EBR


431 275
0
431 275
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
468 299
0

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
260
4.14
2.22
1302
-

Approach
HCM Control Delay, s
HCM LOS

EB
5.7

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity

RH
3/25/2016

1302
-

0
-

NBLn1 EBL
98 1302
2.773 0.36
$ 893.3
9.3
F
A
25.7
1.7

0
-

WBL WBT WBR


0 239 140
0 239 140
0
0
0
Free Free Free
- None
- 115
0
0
92
92
92
2
2
2
0 260 152
Major2
299
4.14
2.22
1259
1259
-

0
-

0
-

WB
0

NBL NBT NBR


220
1
29
220
1
29
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
239
1
32
Minor1
1366 1496
1236 1236
130 260
6.84 6.54
5.84 5.54
5.84 5.54
3.52 4.02
~ 138 122
~ 237 246
882 692
~ 88
~ 88
~ 152
882

0
0
0
0

SBL SBT SBR


0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
92
92
92
2
2
2
0
0
0

149
6.94
3.32
871
871
-

NB
$ 893.3
F

EBT EBR WBL WBT WBR


- 1259
0
A
0
-

$: Delay exceeds 300s

+: Computation Not Defined

*: All major volume in platoon

Synchro 9 Report
Page 8
145

HCM 2010 TWSC


8: Walker Dr & Site Access A

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2025 Total Sat

9.5
NWL
204
204
0
Stop
0
1
0
92
2
222

NWR
67
67
0
Stop
None
0
92
2
73

NET NER
435 266
435 266
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
473 289

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
884
473
411
6.84
5.84
5.84
3.52
285
593
638

236
6.94
3.32
766
-

263
263
593
590

766
-

Approach
HCM Control Delay, s
HCM LOS

NW
50.4
F

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NET NERNWLn1NWLn2 SWL SWT


- 263 766 1085
- 0.843 0.095 0.075
- 63.6 10.2
8.6
F
B
A
6.9
0.3
0.2
-

RH
3/25/2016

Major1
0
NE
0

0
-

SWL SWT
75 456
75 456
0
0
Free Free
- None
100
0
0
92
92
2
2
82 496
Major2
473
4.14
2.22
1085
1085
-

0
-

SW
1.2

Synchro 9 Report
Page 9
146

HCM 2010 TWSC


9: Walker Dr & Site Access C

Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

2016-0202 Walker Drive


2025 Total Sat

1
WBL
0
0
0
Stop
1
0
92
2
0

WBR
89
89
0
Stop
None
0
92
2
97

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Minor1
557
334
223
6.84
5.84
5.84
3.52
460
697
793

209
6.94
3.32
797
-

460
460
697
793

797
-

Approach
HCM Control Delay, s
HCM LOS

WB
10.1
B

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

NBT NBRWBLn1 SBL


- 797 1138
- 0.121
- 10.1
0
B
A
0.4
0

RH
3/25/2016

NBT NBR
229 156
229 156
0
0
Free Free
- None
0
0
92
92
2
2
249 170
Major1
0
NB
0

0
-

SBL SBT
0 410
0 410
0
0
Free Free
- None
0
0
92
92
2
2
0 446
Major2
418
4.14
2.22
1138
1138
-

0
-

SB
0

SBT
-

Synchro 9 Report
Page 10
147

HCM 2010 TWSC


10: Site Access D & Academy Hill Rd

Intersection
Int Delay, s/veh

EBT EBR
0
34
0
34
0
0
Free Free
- None
0
0
92
92
2
2
0
37

Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2

Major1
0
-

Approach
HCM Control Delay, s
HCM LOS

EB
0

RH
3/25/2016

2025 Total Sat

Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow

Minor Lane/Major Mvmt


Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)

2016-0202 Walker Drive

NBLn1
998
0.08
8.9
A
0.3

0
-

WBL WBT
0
1
0
1
0
0
Free Free
- None
0
0
92
92
2
2
0
1
Major2
37
4.12
2.218
1574
1574
WB
0

0
-

NBL
73
73
0
Stop
0
0
0
92
2
79

NBR
0
0
0
Stop
None
92
2
0

Minor1
19
18
1
6.42
5.42
5.42
3.518
998
1005
1022

18
6.22
3.318
1061
-

998
998
1005
1022

1061
-

NB
8.9
A

EBT EBR WBL WBT


- 1574
0
A
0
-

Synchro 9 Report
Page 11
148

HCM 2010 Signalized Intersection Summary


5: Walker Dr & E Lee St

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

2016-0202 Walker Drive


2025 Total Sat w/improve

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

147
147
5
0
1.00
1.00
1863
160
1
0.92
2
406
0.07
1774
160
1774
3.8
3.8
1.00
406
0.39
406
1.00
1.00
13.5
0.6
0.0
1.9
14.2
B

228
228
2
0

6
6
12
0
1.00
1.00
1863
7
1
0.92
2
498
0.31
1583
7
1583
0.2
0.2
1.00
498
0.01
725
1.00
1.00
14.4
0.0
0.0
0.1
14.4
B

88
88
1
0
1.00
1.00
1863
96
1
0.92
2
511
0.06
1774
96
1774
2.2
2.2
1.00
511
0.19
557
1.00
1.00
13.3
0.2
0.0
1.1
13.4
B

315
315
6
0

541
541
16
0
1.00
1.00
1863
353
1
0.92
2
483
0.31
1583
353
1583
12.2
12.2
1.00
483
0.73
750
1.00
1.00
19.0
2.1
0.0
5.6
21.2
C

7
7
3
0
1.00
1.00
1900
8
0
0.92
2
10
0.10
107
123
1639
4.5
4.5
0.07
160
0.77
402
1.00
1.00
26.9
7.5
0.0
2.3
34.4
C

20
20
8
0

86
86
18
0
1.00
1.00
1900
93
0
0.92
2
121
0.10
1239
0
0
0.0
0.0
0.76
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

471
471
7
0
1.00
1.00
1863
539
2
0.92
2
727
0.20
3548
539
1774
8.7
8.7
1.00
727
0.74
1276
1.00
1.00
22.8
1.5
0.0
4.4
24.3
C

35
35
4
0

134
134
14
0
1.00
1.00
1863
87
1
0.92
2
325
0.20
1583
87
1583
2.8
2.8
1.00
325
0.27
569
1.00
1.00
20.5
0.4
0.0
1.3
20.9
C

1
1
8.4
5.0
5.0
4.2
0.0

1.00
1863
248
2
0.92
2
1113
0.31
3539
248
1770
3.2
3.2
1113
0.22
1620
1.00
1.00
15.5
0.1
0.0
1.6
15.6
B
415
15.0
B
2
2
24.2
5.0
28.0
5.2
5.2

4
4
17.5
5.0
22.0
10.7
1.8

1.00
1863
342
2
0.92
2
1080
0.31
3539
342
1770
4.5
4.5
1080
0.32
1678
1.00
1.00
16.4
0.2
0.0
2.3
16.5
B
791
18.2
B
5
5
9.0
5.0
4.0
5.8
0.0

1.00
1863
22
1
0.92
2
29
0.10
293
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
123
34.4
C

6
6
23.7
5.0
29.0
14.2
4.5

1.00
1863
0
0
0.92
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
626
23.8
C

8
8
11.0
5.0
15.0
6.5
0.3

20.4
C

Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016

Synchro 9 Report
Page 1
149

HCM 2010 Signalized Intersection Summary


2016-0202 Walker Drive
2025 Total Sat w/improve
7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

EBL

EBT

EBR

WBL

WBT

WBR

NBL

NBT

NBR

SBL

SBT

SBR

431
431
5
0
1.00
1.00
1863
468
1
0.92
2
749
0.26
1774
468
1774
8.0
8.0
1.00
749
0.63
1497
1.00
1.00
8.2
0.9
0.0
3.9
9.1
A

275
275
2
0

0
0
12
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0
1
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

239
239
6
0

140
140
16
0
1.00
1.00
1863
91
1
0.92
2
295
0.19
1583
91
1583
2.2
2.2
1.00
295
0.31
719
1.00
1.00
15.5
0.6
0.0
1.0
16.0
B

220
220
3
0
1.00
1.00
1900
239
0
0.92
0
328
0.21
1537
272
1750
6.4
6.4
0.88
374
0.73
993
1.00
1.00
16.1
2.7
0.0
3.3
18.8
B

1
1
8
0

29
29
18
0
1.00
1.00
1900
32
0
0.92
0
44
0.21
206
0
0
0.0
0.0
0.12
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0

0
0

0
0

0
0

1.00
1863
299
2
0.92
2
1979
0.56
3632
299
1770
1.8
1.8
1979
0.15
4420
1.00
1.00
4.7
0.0
0.0
0.9
4.7
A
767
7.4
A
2
2
29.6
5.0
55.0
3.8
4.3

1.00
1863
260
2
0.92
2
660
0.19
3632
260
1770
2.8
2.8
660
0.39
1607
1.00
1.00
15.7
0.4
0.0
1.4
16.1
B
351
16.1
B
5
5
16.4
5.0
30.0
10.0
1.4

1.00
1863
1
1
0.92
2
1
0.21
6
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
272
18.8
B

6
6
13.2
5.0
20.0
4.8
3.4

8
8
14.4
5.0
25.0
8.4
1.4

11.8
B

Synchro 9 Report
Page 2
150

HCM 2010 Signalized Intersection Summary


8: Walker Dr & Site Access A

Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS

RH
3/25/2016

2016-0202 Walker Drive


2025 Total Sat w/improve+Sig

NWL

NWR

NET

NER

SWL

SWT

204
204
3
0
1.00
1.00
1863
222
1
0.92
2
321
0.18
1774
222
1774
4.3
4.3
1.00
321
0.69
1444
1.00
1.00
14.1
2.7
0.0
2.3
16.8
B
273
16.1
B

67
67
18
0
1.00
1.00
1863
51
1
0.92
2
286
0.18
1583
51
1583
1.0
1.0
1.00
286
0.18
1289
1.00
1.00
12.8
0.3
0.0
0.5
13.1
B

435
435
2
0

266
266
12
0
1.00
1.00
1863
0
1
0.92
2
555
0.00
1583
0
1583
0.0
0.0
1.00
555
0.00
1546
1.00
0.00
0.0
0.0
0.0
0.0
0.0

75
75
1
0
1.00
1.00
1863
82
1
0.92
2
534
0.06
1774
82
1774
1.0
1.0
1.00
534
0.15
858
1.00
1.00
6.0
0.1
0.0
0.5
6.1
A

456
456
6
0

1
1
7.3
5.0
9.0
3.0
0.1

2
2
17.9
5.0
36.0
5.7
7.2

1.00
1863
473
2
0.92
2
1241
0.35
3632
473
1770
3.7
3.7
1241
0.38
3457
1.00
1.00
9.0
0.2
0.0
1.8
9.2
A
473
9.2
A
3

1.00
1863
496
2
0.92
2
1940
0.55
3632
496
1770
2.7
2.7
1940
0.26
4801
1.00
1.00
4.4
0.1
0.0
1.3
4.4
A
578
4.7
A
6
6
25.2
5.0
50.0
4.7
7.7

8
8
11.7
5.0
30.0
6.3
0.8

8.6
A

Synchro 9 Report
Page 1
151

Queuing and Blocking Report

2016-0202 Walker Drive


Existing PM

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
66
29
52
813

WB
LTR
33
5
24
418

NB
LT
36
8
30
471

SB
LT
9
0
5
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
26
3
17
278

WB
LTR
62
29
55
200

NB
L
19
1
10

NB
TR
1
0
1
429

SB
LT
50
6
28
226

150

Intersection: 3: Walker Dr & Hidden Creek La.


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
LR
30
12
32
268

NB
L
33
5
23

115

SimTraffic Report
Page 1
152

Queuing and Blocking Report

2016-0202 Walker Drive


Existing PM

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
90
32
71
551

WB
LT
152
70
121
1122

WB
R
63
29
50
1122

NB
LTR
122
57
95
683

SB
LTR
128
66
111
541

WB
R
15
1
7

NB
LTR
24
8
24
337

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
56
20
44

WB
L
21
2
13

250

225

WB
T
1
0
1
804

375

SB
L
137
63
117

SB
T
37
2
33
524

SB
R
59
26
45
524

115
3
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
T
1
0
1
804

EB
R
1
0
1

WB
L
37
10
33

200

200

WB
T
2
0
2
768

SB
LT
147
60
111
529

SB
R
118
58
94
529

SimTraffic Report
Page 2
153

Queuing and Blocking Report

2016-0202 Walker Drive


Existing PM

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
79
34
63

WB
R
17
1
9

200

115

NB
LTR
94
41
76
517

Network Summary
Network wide Queuing Penalty: 0

RH
3/24/2016

SimTraffic Report
Page 3
154

Queuing and Blocking Report

2016-0202 Walker Drive


Existing Sat

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
47
25
45
813

WB
LTR
20
1
11
418

NB
LT
34
4
20
471

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
31
9
30
278

WB
LTR
47
24
47
200

NB
L
5
0
4

SB
LT
10
1
9
226

150

Intersection: 3: Walker Dr & Hidden Creek La.


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
LR
29
14
34
268

NB
L
24
2
14

115

SimTraffic Report
Page 1
155

Queuing and Blocking Report

2016-0202 Walker Drive


Existing Sat

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
51
11
34
551

WB
LT
82
39
66
1122

WB
R
75
33
58
1122

NB
LTR
91
45
72
683

SB
LTR
87
45
74
541

SB
L
76
34
60

SB
T
25
2
14
524

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
34
10
30

WB
L
22
1
9

250

225

NB
LTR
22
6
21
338

SB
R
44
19
36
524

115
0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

WB
L
29
5
22

SB
LT
70
36
58
529

SB
R
81
35
59
529

200

SimTraffic Report
Page 2
156

Queuing and Blocking Report

2016-0202 Walker Drive


Existing Sat

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
71
29
59

WB
R
14
1
7

200

115

NB
LTR
81
37
64
517

Network Summary
Network wide Queuing Penalty: 0

RH
3/24/2016

SimTraffic Report
Page 3
157

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Background PM

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
65
29
53
813

WB
LTR
35
5
24
418

NB
LT
55
16
44
473

SB
TR
4
0
3
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
26
4
20
278

WB
LTR
76
37
61
200

NB
L
27
2
13

NB
TR
3
0
2
429

SB
LT
38
8
28
224

150

Intersection: 3: Walker Dr & Hidden Creek La.


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
LR
30
12
32
268

NB
L
36
7
28

115

SimTraffic Report
Page 1
158

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Background PM

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
87
30
66
551

WB
LT
109
54
90
1122

WB
R
62
29
50
1122

NB
LTR
91
47
76
683

SB
LTR
131
59
104
541

EB
R
2
0
1

WB
L
50
21
41

WB
R
19
1
8

135

225

375

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
51
18
42

EB
T
6
0
3
1122

250

NB
LTR
123
46
94
337

SB
L
165
124
196

115
46
23

SB
T
443
151
433
524
4
7

SB
R
97
30
110
524
0
0

B8
T
48
10
98
700

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
T
1
0
1
804

EB
T
2
0
1
804

EB
R
2
0
1

WB
L
44
12
36

200

200

WB
T
2
0
1
768

SB
LT
162
66
124
529

SB
R
146
71
121
529

SimTraffic Report
Page 2
159

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Background PM

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
82
37
67

WB
T
2
0
2
446

200

WB
R
17
1
9

NB
LTR
136
56
106
517

115

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
51
24
47
175

NB
TR
4
0
4
224

Network Summary
Network wide Queuing Penalty: 31

RH
3/24/2016

SimTraffic Report
Page 3
160

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Background PM

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
56
28
50
813

WB
LTR
32
4
20
418

NB
LT
54
14
42
473

SB
TR
4
0
3
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
28
4
19
278

WB
LTR
72
35
62
200

NB
L
22
2
12

NB
TR
7
0
4
429

SB
LT
49
9
32
224

150

Intersection: 3: Walker Dr & Hidden Creek La.


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
LR
28
12
32
268

NB
L
31
7
27

115

SimTraffic Report
Page 1
161

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Background PM

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
101
31
70
551

WB
LT
120
53
93
1122

WB
R
64
29
50
1122

NB
LTR
96
48
79
683

SB
LTR
126
62
102
541

EB
R
1
0
1

WB
L
56
21
44

WB
R
17
1
8

135

225

375

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
64
20
48

EB
T
3
0
4
1122

EB
T
6
0
3
1122

250

NB
LTR
125
45
90
337

SB
L
164
127
198

115
49
25

SB
T
398
165
484
524
8
14

SB
R
98
33
112
524

B8
T
57
16
141
700

B8
T
40
4
67
700

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
T
2
0
1
804

EB
R
1
0
1

WB
L
37
13
37

200

200

SB
LT
149
68
119
529

SB
R
143
72
117
529

SimTraffic Report
Page 2
162

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Background PM

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
84
39
70

200

EB
T
2
0
2
768

WB
T
2
0
2
446

WB
R
15
2
10

NB
LTR
120
53
102
517

115

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
55
24
48
175

Network Summary
Network wide Queuing Penalty: 39

RH
3/24/2016

SimTraffic Report
Page 3
163

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Background PM

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
71
32
57
813

WB
LTR
31
5
23
418

NB
LT
46
16
42
473

SB
LT
16
1
11
496

SB
TR
9
0
5
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
25
3
18
278

WB
LTR
82
37
65
200

NB
L
26
2
12

NB
TR
4
0
3
429

SB
LT
56
9
35
224

SB
TR
1
0
1
224

150

Intersection: 3: Walker Dr & Hidden Creek La.


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
LR
30
13
34
268

NB
L
33
7
28

SB
T
62
11
82
429

SB
TR
48
6
54
429

115

SimTraffic Report
Page 1
164

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Background PM

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
90
34
70
551

WB
LT
134
59
103
1122

WB
R
65
30
52
1122

NB
LTR
108
51
86
683

SB
LTR
161
70
132
541

EB
R
2
0
1

WB
L
55
21
43

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
54
20
44

EB
T
1
0
1
1122

EB
T
5
0
2
1122

250

WB
T
3
0
2
804

WB
T
87
3
86
804

WB
R
16
1
8

375

NB
LTR
140
51
109
337

SB
L
165
154
201

115
85
46

SB
T
568
406
754
524
41
80

SB
R
390
95
354
524
1
2

0
0

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

B8
T
369
151
550
700
4
9

B8
T
311
78
403
700
1
2

SimTraffic Report
Page 2
165

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Background PM

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
T
3
0
2
804

EB
R
3
0
2

WB
L
43
14
39

200

200

SB
LT
168
75
131
529

SB
R
177
79
134
529

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
97
42
77

WB
R
22
2
12

200

115

NB
LTR
161
60
123
517

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
51
24
46
175

Network Summary
Network wide Queuing Penalty: 138

RH
3/24/2016

SimTraffic Report
Page 3
166

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Background Sat

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
56
25
49
813

WB
LTR
22
1
10
418

NB
LT
36
8
30
473

SB
TR
6
0
3
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
32
9
30
278

WB
LTR
58
28
52
200

NB
L
8
0
5

NB
TR
2
0
2
429

SB
LT
41
4
23
224

150

Intersection: 3: Walker Dr & Hidden Creek La.


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
LR
31
14
34
268

NB
L
27
2
16

115

SimTraffic Report
Page 1
167

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Background Sat

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
46
13
34
551

WB
LT
74
36
60
1122

WB
R
73
34
58
1122

NB
LTR
77
42
66
683

SB
LTR
80
46
72
541

WB
L
42
14
38

WB
R
4
0
3

NB
LTR
82
31
58
338

225

375

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
46
12
35

EB
T
7
0
5
1122

250

SB
L
117
51
95

SB
T
56
19
44
524

SB
R
44
20
37
524

115
1
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
R
2
0
1

WB
L
29
7
26

200

200

WB
T
4
0
4
768

SB
LT
82
37
65
529

SB
R
89
44
73
529

SimTraffic Report
Page 2
168

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Background Sat

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
73
35
62

200

WB
T
2
0
2
446

WB
R
17
2
10

NB
LTR
93
42
73
517

115

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
46
21
45
175

Network Summary
Network wide Queuing Penalty: 0

RH
3/24/2016

SimTraffic Report
Page 3
169

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Background Sat

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
62
29
52
813

WB
LTR
22
1
10
418

NB
LT
42
8
32
473

SB
TR
4
0
4
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
29
8
29
278

WB
LTR
54
28
50
200

NB
L
11
1
7

SB
LT
22
2
11
224

150

Intersection: 3: Walker Dr & Hidden Creek La.


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
LR
31
14
35
268

NB
L
24
2
13

115

SimTraffic Report
Page 1
170

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Background Sat

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
55
13
37
551

WB
LT
81
37
64
1122

WB
R
66
33
56
1122

NB
LTR
80
41
65
683

SB
LTR
86
46
74
541

EB
R
1
0
1

WB
L
47
14
37

WB
R
6
0
4

135

225

375

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
38
11
31

EB
T
3
0
2
1122

250

NB
LTR
72
29
56
338

SB
L
107
47
84

SB
T
59
21
46
524

SB
R
49
19
37
524

115
0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

WB
L
29
6
24

SB
LT
82
37
63
529

SB
R
88
42
69
529

200

SimTraffic Report
Page 2
171

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Background Sat

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
75
34
63

WB
R
26
2
13

200

115

NB
LTR
104
45
83
517

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
60
22
49
175

Network Summary
Network wide Queuing Penalty: 0

RH
3/24/2016

SimTraffic Report
Page 3
172

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Background Sat

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
58
27
49
813

WB
LTR
20
1
10
418

NB
LT
39
8
32
473

SB
TR
4
0
3
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
30
8
29
278

WB
LTR
61
28
52
200

NB
L
13
1
7

SB
LT
37
4
21
224

SB
TR
9
0
9
224

150

Intersection: 3: Walker Dr & Hidden Creek La.


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
LR
34
15
36
268

NB
L
30
2
15

115

SimTraffic Report
Page 1
173

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Background Sat

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
54
14
39
551

WB
LT
81
36
62
1122

WB
R
69
34
58
1122

NB
LTR
91
43
71
683

SB
LTR
88
46
75
541

WB
L
47
16
40

WB
R
6
0
5

NB
LTR
78
32
61
338

225

375

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
31
10
31

EB
T
5
0
2
1122

250

SB
L
124
53
104

SB
T
68
20
51
524

SB
R
46
19
37
524

115
2
1

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/24/2016

EB
R
2
0
1

WB
L
31
7
26

200

200

SB
LT
75
38
63
529

SB
R
86
43
71
529

SimTraffic Report
Page 2
174

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Background Sat

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
77
37
66

200

WB
T
2
0
2
446

WB
R
18
2
10

NB
LTR
115
47
83
517

115

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
62
23
50
175

Network Summary
Network wide Queuing Penalty: 1

RH
3/24/2016

SimTraffic Report
Page 3
175

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total PM

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
133
49
208
813

WB
LTR
31
6
24
390

NB
LT
58
16
46
473

SB
LT
151
34
209
496
3
0

SB
TR
139
29
199
496
2
0

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
37
6
33
278

WB
LTR
159
86
209
200
24
0

NB
L
19
1
10

NB
T
3
0
3
433

NB
TR
2
0
2
433

SB
LT
169
80
243
224
22
46

SB
TR
154
45
180
224
5
9

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
LTR
161
57
184
268
6
0

WB
LT
266
147
324
258
41
0

WB
R
221
48
193
258
13
0

NB
L
38
7
29

NB
R
6
0
6

SB
L
200
46
177

115

100

100

SB
T
443
241
560
433
30
65

SB
TR
434
170
486
433
7
16

57
19

SimTraffic Report
Page 1
176

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total PM

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
129
41
94
551

WB
LT
144
61
110
1122

WB
R
65
30
52
1122

NB
LTR
99
51
84
683

SB
LTR
155
66
120
541

EB
R
2
0
1

WB
L
59
20
45

WB
T
3
0
2
804

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
96
34
71

EB
T
4
0
2
1122

250

WB
R
64
16
51

375

NB
LTR
158
52
117
337

SB
L
165
165
166

115
100
51

SB
T
534
525
539
520
68
200

SB
R
523
134
434
520
1
2

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
T
2
0
1
804

EB
R
1
0
1

WB
L
41
12
36

200

200

SB
LT
166
73
130
529

SB
R
267
116
210
529

SimTraffic Report
Page 2
177

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total PM

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
91
44
76

WB
T
6
0
3
446

200

WB
R
19
2
11

NB
LTR
282
101
220
517

115

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
312
281
320
285
96
0

NW
R
274
206
407
285
64
0

NE
R
50
4
26

SW
L
175
90
233

100

100

SW
T
721
635
868
692
53
119

SW
T
723
424
909
692
9
21

98
43

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
51
24
46
175

SB
T
246
103
404
473
9
16

SB
T
248
89
362
473
3
5

Network Summary
Network wide Queuing Penalty: 613

RH
3/25/2016

SimTraffic Report
Page 3
178

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total PM w/improve

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
64
30
54
813

WB
LTR
32
4
20
390

NB
LT
57
17
46
473

SB
LT
3
0
3
496

SB
TR
4
0
3
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
28
4
20
278

WB
LTR
79
36
65
200

NB
L
19
2
12

NB
TR
5
0
3
433

SB
LT
48
10
34
224

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
LTR
32
12
32
268

WB
LT
65
28
52
258

WB
R
49
15
35
258

NB
L
32
6
26

NB
R
6
0
4

SB
L
49
12
39

115

100

100

SimTraffic Report
Page 1
179

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total PM w/improve

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
123
42
86
551

WB
LT
208
91
166
1122

WB
R
80
36
64
1122

NB
LTR
98
49
81
683

SB
LTR
149
66
113
541

EB
R
12
3
10

WB
L
100
42
79

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
108
47
87

EB
T
122
52
97
1122

EB
T
105
49
92
1122

250
0
0

WB
T
130
61
109
804

WB
T
119
51
93
804

WB
R
133
65
106

375

NB
LTR
122
48
93
337

SB
L
136
73
122

SB
LT
174
98
154
520

SB
R
68
30
56
520

200
0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
T
7
0
6
804

EB
R
7
0
4

WB
L
47
12
37

200

200

SB
LT
153
71
123
529

SB
R
296
126
227
529

SimTraffic Report
Page 2
180

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total PM w/improve

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
182
89
150

EB
T
75
29
64
768

EB
T
98
45
83
768

WB
T
98
42
79
446

200
0
0

WB
T
91
35
73
446

WB
R
68
30
57

NB
LTR
152
75
126
517

115
0
0

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
152
70
124
285

NW
R
56
22
46
285

NE
R
43
4
27

SW
L
43
13
38

100

100

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
49
24
46
175

Network Summary
Network wide Queuing Penalty: 0

RH
3/25/2016

SimTraffic Report
Page 3
181

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total PM

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
579
230
590
813
1
0

WB
LTR
397
215
476
384
35
19

NB
LT
89
17
66
473

NB
TR
36
1
20
473

SB
LT
529
328
700
496
53
0

SB
TR
531
312
689
496
42
0

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
45
10
39
278

WB
LTR
221
170
280
200
72
0

NB
L
11
1
7

NB
TR
10
0
6
433

SB
LT
245
202
318
224
75
186

SB
TR
246
107
276
224
20
49

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
LTR
195
87
217
268
5
0

WB
LT
275
253
315
258
91
0

WB
R
273
172
362
258
52
0

NB
L
40
6
29

NB
R
4
0
4

SB
L
200
68
222

115

100

100

SB
T
457
417
550
433
79
205

SB
TR
471
307
579
433
21
56

96
55

SimTraffic Report
Page 1
182

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total PM

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
127
50
102
551

WB
LT
141
58
103
1122

WB
R
54
27
47
1122

NB
LTR
97
49
79
683

SB
LTR
145
66
116
541

EB
R
1
0
1

WB
L
54
19
42

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
141
51
104

EB
T
2
0
2
1122

EB
T
4
0
2
1122

250

WB
T
3
0
2
804

WB
T
2
0
2
804

WB
R
72
25
63

375

NB
LTR
290
111
268
337
3
0

SB
L
165
164
167

115
100
52

SB
T
533
523
530
520
77
295

SB
R
476
75
313
520
1
2

0
1

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
R
2
0
1

WB
L
47
12
37

200

200

SB
LT
356
111
313
529
3
0

SB
R
464
228
462
529
4
0

SimTraffic Report
Page 2
183

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total PM

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
110
47
83

EB
T
2
0
2
768

WB
T
2
0
2
446

WB
T
3
0
3
446

200

WB
R
18
2
10

NB
LTR
355
154
322
517
0
0

115

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
301
285
300
285
100
0

NW
R
272
141
377
285
44
0

NE
R
49
3
22

SW
L
200
77
236

100

100

SW
T
718
699
728
692
81
251

SW
T
734
443
928
692
13
41

100
57

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

WB
R
58
32
53
175

SB
T
499
379
679
473
64
128

SB
T
510
349
670
473
43
86

SimTraffic Report
Page 3
184

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total PM

Intersection: 10: Site Access D & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
LT
29
4
23
126

NB
LR
237
76
209
268
8
0

Network Summary
Network wide Queuing Penalty: 1483

RH
3/25/2016

SimTraffic Report
Page 4
185

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total PM w/improve + Sig

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
67
28
54
813

WB
LTR
65
29
54
384

NB
LT
69
22
53
473

NB
TR
2
0
2
473

SB
LT
55
9
36
496

SB
TR
11
0
6
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
30
3
19
278

WB
LTR
82
39
69
200

NB
L
29
2
15

NB
TR
3
0
2
433

SB
LT
77
13
47
224

SB
TR
21
1
17
224

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

EB
LTR
32
11
32
268

WB
LT
161
68
128
258

WB
R
48
18
37
258

NB
L
35
8
31

115

NB
T
2
0
2
692

NB
R
31
3
17

SB
L
52
20
48

100

100

SB
TR
2
0
2
433

SimTraffic Report
Page 1
186

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total PM w/improve + Sig

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
158
50
104
551

WB
LT
212
101
179
1122

WB
R
82
35
63
1122

NB
LTR
107
54
89
683

SB
LTR
144
73
124
541

EB
R
14
3
11

WB
L
99
44
82

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
135
63
111

EB
T
121
56
101
1122

EB
T
120
53
96
1122

250
0
0

WB
T
141
69
120
804

WB
T
190
59
147
804
0
0

WB
R
165
84
130

375

NB
LTR
137
50
98
337

SB
L
216
105
176

200
0
1

SB
LT
230
125
196
520

SB
R
72
36
64
520

1
2

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

EB
T
8
0
6
804

EB
R
5
0
2

WB
L
54
15
42

200

200

SB
LT
320
98
224
529
0
0

SB
R
445
212
405
529
1
0

SimTraffic Report
Page 2
187

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total PM w/improve + Sig

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
207
113
184

EB
T
79
32
71
768

EB
T
101
50
88
768

WB
T
118
50
92
446

200
0
1

WB
T
106
45
87
446

WB
R
74
31
60

0
0

115
0
0

NE
R
82
6
40

SW
L
64
28
56

100
0
0

100
0
0

NB
LTR
198
91
156
517

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
146
70
118
285

NW
R
57
24
49
285

NE
T
99
40
78
520

NE
T
132
73
116
520

2
4

SW
T
140
64
110
692

SW
T
98
37
77
692

1
1

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

WB
R
66
32
54
175

SimTraffic Report
Page 3
188

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total PM w/improve + Sig

Intersection: 10: Site Access D & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NB
LR
55
26
48
268

Network Summary
Network wide Queuing Penalty: 8

RH
4/5/2016

SimTraffic Report
Page 4
189

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total PM

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
619
216
605
813
3
0

WB
LTR
392
202
453
384
31
16

NB
LT
68
13
47
473

NB
TR
25
1
17
473

SB
LT
534
338
701
496
55
0

SB
TR
529
320
697
496
48
0

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
46
11
42
278

WB
LTR
211
170
269
200
74
0

NB
L
21
2
11

NB
TR
2
0
2
433

SB
LT
243
209
308
224
78
199

SB
TR
246
115
281
224
20
52

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
LTR
205
99
244
268
12
0

WB
LT
285
256
307
258
94
0

WB
R
226
113
325
258
36
0

NB
L
32
5
23

115

NB
T
2
0
2
692

NB
R
8
0
6

SB
L
200
60
210

100

100

SB
T
452
423
535
433
82
219

SB
TR
473
316
611
433
31
83

97
55

SimTraffic Report
Page 1
190

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total PM

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
130
48
100
551

WB
LT
128
60
104
1122

WB
R
61
28
48
1122

NB
LTR
98
49
80
683

SB
LTR
163
71
129
541

EB
R
3
0
1

WB
L
71
23
50

WB
T
3
0
2
804

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
174
53
121

EB
T
2
0
1
1122

250
0
0

WB
T
2
0
2
804

WB
R
81
24
64

375

NB
LTR
316
135
325
337
12
0

SB
L
165
164
168

115
100
54

SB
T
534
524
533
520
78
306

SB
R
482
110
393
520
1
2

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
T
1
0
1
804

EB
T
2
0
1
804

EB
R
3
0
1

WB
L
50
13
39

200

200

WB
T
2
0
2
768

SB
LT
339
121
333
529
4
0

SB
R
480
248
476
529
5
0

SimTraffic Report
Page 2
191

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total PM

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
98
48
82

WB
T
2
0
2
446

WB
T
12
0
5
446

200

WB
R
24
2
13

NB
LTR
468
237
512
517
8
0

115

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
306
289
305
285
99
0

NW
R
233
96
318
285
31
0

NE
R
40
2
18

SW
L
200
68
224

100

100

SW
T
718
700
718
692
82
262

SW
T
734
497
930
692
14
45

100
57

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

WB
R
69
32
56
175

SB
T
503
400
671
473
66
137

SB
T
505
364
658
473
44
91

SimTraffic Report
Page 3
192

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total PM

Intersection: 10: Site Access D & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
LT
43
10
54
126
3
0

NB
LR
211
67
199
268
9
0

Network Summary
Network wide Queuing Penalty: 1578

RH
3/25/2016

SimTraffic Report
Page 4
193

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total PM w/improve+Sig

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
69
31
57
813

WB
LTR
71
31
58
384

NB
LT
64
25
57
473

NB
TR
6
0
4
473

SB
LT
53
8
34
496

SB
TR
9
0
5
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
28
3
18
278

WB
LTR
93
40
70
200

NB
L
22
2
13

NB
TR
10
0
5
433

SB
LT
70
12
45
224

SB
TR
18
1
13
224

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

EB
LTR
30
12
32
268

WB
LT
170
70
132
258

WB
R
45
18
35
258

NB
L
37
9
32

115

NB
T
2
0
2
692

NB
R
19
2
12

SB
L
51
19
47

100

100

SB
TR
5
0
4
433

SimTraffic Report
Page 1
194

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total PM w/improve+Sig

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
153
56
112
551

WB
LT
240
106
184
1122

WB
R
86
36
66
1122

NB
LTR
111
52
88
683

SB
LTR
163
73
126
541

EB
R
15
3
11

WB
L
114
48
92

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
154
67
126

EB
T
126
57
104
1122

EB
T
123
57
103
1122

250
0
0

WB
T
144
75
127
804

WB
T
122
60
107
804

WB
R
177
92
146

375

NB
LTR
133
51
102
337

SB
L
216
111
180

200
0
1

SB
LT
233
132
205
520

SB
R
82
37
67
520

1
2

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

EB
T
1
0
1
804

EB
R
4
0
2

WB
L
58
16
45

200

200

SB
LT
405
142
378
529
4
0

SB
R
507
274
518
529
6
0

SimTraffic Report
Page 2
195

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total PM w/improve+Sig

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
228
119
195

EB
T
92
37
74
768

EB
T
105
54
95
768

WB
T
116
51
94
446

200
1
1

WB
T
114
50
93
446

WB
R
79
33
62

NB
LTR
188
97
161
517

115
0
0

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
145
73
124
285

NW
R
60
26
53
285

NE
T
94
40
78
520

NE
T
141
70
118
520

2
4

NE
R
63
5
35

SW
L
64
27
55

100

100
0
0

SW
T
135
67
112
692

SW
T
97
36
76
692

1
1

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

WB
R
69
33
56
175

SimTraffic Report
Page 3
196

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total PM w/improve+Sig

Intersection: 10: Site Access D & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NB
LR
56
26
48
268

Network Summary
Network wide Queuing Penalty: 9

RH
4/5/2016

SimTraffic Report
Page 4
197

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total Sat

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
60
28
50
813

WB
LTR
25
1
11
390

NB
LT
42
11
36
473

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
30
9
30
278

WB
LTR
72
30
57
200

NB
L
18
1
11

NB
TR
2
0
1
433

SB
LT
35
4
21
224

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
LTR
34
14
36
268

WB
LT
54
24
45
258

WB
R
45
16
34
258

NB
L
30
3
18

NB
R
8
0
5

SB
L
39
11
35

115

100

100

SB
TR
2
0
2
433

SimTraffic Report
Page 1
198

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total Sat

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
70
23
52
551

WB
LT
86
41
69
1122

WB
R
70
34
58
1122

NB
LTR
86
43
71
683

SB
LTR
101
50
83
541

WB
T
2
0
2
804

WB
R
61
13
46

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
64
25
51

EB
T
3
0
2
1122

250

WB
L
51
13
36

225

375

NB
LTR
103
39
80
337

SB
L
165
154
194

115
76
26

SB
T
527
289
608
520
8
17

SB
R
100
27
83
520

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
R
1
0
1

WB
L
32
7
27

200

200

SB
LT
86
39
67
529

SB
R
148
71
122
529

SimTraffic Report
Page 2
199

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total Sat

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
97
45
80

EB
T
2
0
2
768

WB
T
8
0
4
446

200

WB
R
26
3
15

NB
LTR
215
91
181
517

115

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
200
82
197
285
6
0

NW
R
112
35
132
285
3
0

NE
R
80
10
49

SW
L
71
14
61

100
0
0

100

SW
T
159
24
153
692

SW
T
39
2
49
692

5
3

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
52
22
47
175

NB
TR
6
0
5
224

Network Summary
Network wide Queuing Penalty: 46

RH
3/25/2016

SimTraffic Report
Page 3
200

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total Sat w/improve

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
56
27
49
813

WB
LTR
17
1
10
390

NB
LT
41
9
33
473

SB
TR
2
0
2
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
30
9
30
278

WB
LTR
64
28
54
200

NB
L
16
1
8

SB
LT
29
3
16
224

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
LTR
31
13
33
268

WB
LT
56
24
45
258

WB
R
46
16
33
258

NB
L
27
3
17

NB
R
6
0
4

SB
L
33
9
32

115

100

100

SimTraffic Report
Page 1
201

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total Sat w/improve

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
76
22
53
551

WB
LT
106
47
83
1122

WB
R
87
40
70
1122

NB
LTR
89
43
71
683

SB
LTR
108
49
85
541

EB
R
10
1
5

WB
L
79
32
67

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
94
42
80

EB
T
74
26
57
1122

EB
T
59
18
44
1122

250

WB
T
90
36
70
804

WB
T
88
38
73
804

WB
R
93
51
79

375

NB
LTR
95
36
72
337

SB
L
117
52
92

SB
LT
127
64
108
520

SB
R
61
23
44
520

200

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
T
1
0
1
804

EB
R
0
0
1

WB
L
29
6
23

200

200

SB
LT
86
40
71
529

SB
R
170
71
125
529

SimTraffic Report
Page 2
202

Queuing and Blocking Report

2016-0202 Walker Drive


2018 Total Sat w/improve

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
146
75
127

EB
T
51
16
44
768

EB
T
68
26
59
768

WB
T
84
38
74
446

WB
T
89
33
72
446

200
0
0

WB
R
84
31
61

NB
LTR
160
71
121
517

115
0
0

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
118
60
99
285

NW
R
56
22
47
285

NE
R
84
10
50

SW
L
40
11
35

100
0
0

100

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

WB
R
55
22
47
175

Network Summary
Network wide Queuing Penalty: 0

RH
3/25/2016

SimTraffic Report
Page 3
203

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total Sat

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
132
40
128
813

WB
LTR
140
57
195
384
4
3

NB
LT
46
13
39
473

SB
LT
172
45
241
496
3
0

SB
TR
143
34
221
496
2
0

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
54
12
44
278

WB
LTR
163
86
216
200
24
0

NB
L
21
1
10

NB
TR
4
0
4
433

SB
LT
208
99
273
224
25
51

SB
TR
189
46
177
224
2
4

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
LTR
175
63
184
268
4
0

WB
LT
279
227
354
258
77
0

WB
R
275
131
341
258
42
0

NB
L
32
3
18

NB
R
29
2
16

SB
L
200
99
253

115

100

100
0
0

SB
T
455
304
587
433
35
75

SB
TR
439
198
498
433
8
16

73
55

SimTraffic Report
Page 1
204

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total Sat

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
79
27
61
551

WB
LT
88
42
73
1122

WB
R
65
31
52
1122

NB
LTR
80
42
67
683

SB
LTR
94
48
78
541

EB
R
1
0
0

WB
L
43
11
32

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
138
46
98

EB
T
3
0
2
1122

EB
T
2
0
1
1122

250
0
0

WB
T
2
0
2
804

WB
T
85
3
84
804
0
0

WB
R
72
26
66

375

NB
LTR
170
51
121
337

SB
L
165
164
167

115
100
34

SB
T
536
524
532
520
66
215

SB
R
422
75
292
520
0
0

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
R
2
0
1

WB
L
31
6
25

200

200

SB
LT
84
41
71
529

SB
R
265
111
202
529

SimTraffic Report
Page 2
205

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total Sat

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
106
47
82

WB
T
10
1
6
446

200

WB
R
22
2
13

NB
LTR
391
152
338
517
0
0

115

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
300
282
323
285
95
0

NW
R
278
213
414
285
69
0

NE
R
83
13
56

SW
L
200
128
284

100
0
1

100

SW
T
715
661
873
692
59
154

SW
T
716
374
876
692
5
14

98
73

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

WB
R
64
32
53
175

NB
TR
6
0
5
224

SB
T
317
114
412
473
9
15

SB
T
308
87
352
473
2
4

SimTraffic Report
Page 3
206

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total Sat

Intersection: 10: Site Access D & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NB
LR
99
37
106
268
1
0

Network Summary
Network wide Queuing Penalty: 715

RH
3/25/2016

SimTraffic Report
Page 4
207

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total Sat w/improve + Sig

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
70
30
55
813

WB
LTR
62
32
56
384

NB
LT
50
15
43
473

SB
LT
49
7
32
496

SB
TR
2
0
2
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
32
8
29
278

WB
LTR
65
29
56
200

NB
L
21
1
8

NB
TR
2
0
1
433

SB
LT
50
5
26
224

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

EB
LTR
37
15
36
268

WB
LT
146
63
117
258
0
0

WB
R
39
17
32
258

NB
L
34
4
22

NB
R
29
3
18

SB
L
70
23
55

115

100

100
0
0

SimTraffic Report
Page 1
208

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total Sat w/improve + Sig

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
73
26
59
551

WB
LT
122
61
102
1122

WB
R
92
44
75
1122

NB
LTR
88
44
70
683

SB
LTR
103
50
82
541

EB
R
9
1
6

WB
L
69
29
60

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
129
55
103

EB
T
86
34
70
1122

EB
T
85
24
58
1122

250
0
0

WB
T
112
52
94
804

WB
T
114
55
97
804

WB
R
170
86
137

375

NB
LTR
107
43
84
337

SB
L
176
88
148

200
0
0

SB
LT
178
98
158
520

SB
R
78
31
60
520

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

EB
R
1
0
1

WB
L
36
8
29

200

200

SB
LT
99
43
77
529

SB
R
240
111
199
529

SimTraffic Report
Page 2
209

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total Sat w/improve + Sig

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
221
113
188

EB
T
58
21
51
768

EB
T
84
37
73
768

WB
T
105
42
82
446

200
0
1

WB
T
110
49
92
446

WB
R
78
35
64

0
0

115
0
0

NE
R
106
10
58

SW
L
74
32
60

100
0
0

100
0
0

NB
LTR
177
90
153
517

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
136
69
115
285

NW
R
64
25
51
285

NE
T
82
30
66
520

NE
T
138
67
113
520

1
4

SW
T
109
50
89
692

SW
T
85
32
69
692

0
0

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

WB
R
58
31
51
175

NB
TR
5
0
5
224

SimTraffic Report
Page 3
210

Queuing and Blocking Report

2016-0202 Walker Drive


2019 Total Sat w/improve + Sig

Intersection: 10: Site Access D & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NB
LR
57
30
49
268

Network Summary
Network wide Queuing Penalty: 6

RH
4/5/2016

SimTraffic Report
Page 4
211

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total Sat

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
143
50
168
813

WB
LTR
174
66
225
384
6
5

NB
LT
61
15
46
473

NB
TR
14
1
13
473

SB
LT
243
62
293
496
4
0

SB
TR
188
49
267
496
3
0

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
81
18
68
278

WB
LTR
200
111
244
200
38
0

NB
L
26
1
12

SB
LT
236
131
310
224
39
80

SB
TR
218
73
232
224
8
17

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
LTR
182
60
173
268
3
0

WB
LT
284
229
351
258
77
0

WB
R
275
134
342
258
43
0

NB
L
26
3
16

NB
R
21
2
11

SB
L
200
85
237

115

100

100
0
0

SB
T
455
324
605
433
48
105

SB
TR
461
229
541
433
12
26

75
56

SimTraffic Report
Page 1
212

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total Sat

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
88
29
64
551

WB
LT
89
45
75
1122

WB
R
70
32
55
1122

NB
LTR
92
46
75
683

SB
LTR
101
51
83
541

EB
R
0
0
0

WB
L
51
13
36

WB
T
2
0
2
804

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
129
47
101

EB
T
3
0
1
1122

250
0
0

WB
R
66
25
62

375

NB
LTR
167
61
139
337

SB
L
165
164
166

115
100
35

SB
T
535
523
539
520
67
222

SB
R
476
79
309
520
0
2

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

EB
R
1
0
1

WB
L
33
7
27

200

200

SB
LT
96
43
75
529

SB
R
250
116
203
529

SimTraffic Report
Page 2
213

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total Sat

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
114
50
87

WB
T
9
0
5
446

200

WB
R
20
3
13

NB
LTR
341
152
297
517
0
0

115

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
306
287
312
285
98
0

NW
R
304
214
419
285
64
0

NE
R
77
11
52

SW
L
200
120
279

100
0
1

100

SW
T
720
667
871
692
63
168

SW
T
718
435
908
692
6
16

97
73

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
3/25/2016

WB
R
61
32
53
175

SB
T
426
176
508
473
14
23

SB
T
406
153
476
473
9
14

SimTraffic Report
Page 3
214

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total Sat

Intersection: 10: Site Access D & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NB
LR
100
41
124
268
4
0

Network Summary
Network wide Queuing Penalty: 842

RH
3/25/2016

SimTraffic Report
Page 4
215

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total Sat w/improve+Sig

Intersection: 1: Walker Dr & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
66
30
55
813

WB
LTR
63
32
55
384

NB
LT
56
17
47
473

SB
LT
42
7
30
496

SB
TR
7
0
4
496

Intersection: 2: Walker Dr & Breezewood Dr/Office Bldg Ent


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
31
9
30
278

WB
LTR
67
31
57
200

NB
L
21
1
10

SB
LT
51
7
32
224

SB
TR
1
0
1
224

150

Intersection: 3: Walker Dr & Hidden Creek La./Site Access B


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

EB
LTR
40
14
35
268

WB
LT
140
57
108
258
0
0

WB
R
55
19
39
258

NB
L
30
4
20

115

NB
T
2
0
2
692

NB
R
41
4
21

SB
L
63
24
54

100

100

SB
TR
2
0
2
433

SimTraffic Report
Page 1
216

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total Sat w/improve+Sig

Intersection: 4: Falmouth St & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
LTR
102
33
71
551

WB
LT
136
64
111
1122

WB
R
102
46
82
1122

NB
LTR
84
44
70
683

SB
LTR
109
52
87
541

EB
R
10
1
6

WB
L
82
32
66

135

225

Intersection: 5: Walker Dr & E Lee St


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
110
52
92

EB
T
94
36
76
1122

EB
T
84
30
64
1122

250

WB
T
116
55
99
804

WB
T
116
54
98
804

WB
R
181
88
148

375

0
0

NB
LTR
110
40
79
337

SB
L
180
95
158

200
0
0

SB
LT
178
101
160
520

SB
R
72
31
57
520

0
0

Intersection: 6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

EB
T
1
0
1
804

EB
R
3
0
1

WB
L
35
9
31

200

200

WB
T
5
0
5
768

SB
LT
90
42
72
529

SB
R
288
121
234
529

SimTraffic Report
Page 2
217

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total Sat w/improve+Sig

Intersection: 7: US 29 Bypass NB Off Ramp/US 29 Bypass NB On Ramp & Meetze Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

EB
L
237
116
195

EB
T
74
24
59
768

EB
T
78
37
70
768

WB
T
104
43
82
446

200
1
1

WB
T
136
52
102
446

WB
R
120
40
80

1
1

115
0
0

NE
R
107
15
67

SW
L
74
31
59

100
0
0

100
0
0

NB
LTR
212
96
165
517

Intersection: 8: Walker Dr & Site Access A


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NW
L
145
72
122
285

NW
R
65
27
54
285

NE
T
80
30
66
520

NE
T
135
67
112
520

2
4

SW
T
109
54
93
692

SW
T
82
32
67
692

0
0

Intersection: 9: Walker Dr & Site Access C


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

RH
4/5/2016

WB
R
56
32
50
175

NB
TR
4
0
4
224

SimTraffic Report
Page 3
218

Queuing and Blocking Report

2016-0202 Walker Drive


2025 Total Sat w/improve+Sig

Intersection: 10: Site Access D & Academy Hill Rd


Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)

NB
LR
50
29
47
268

Network Summary
Network wide Queuing Penalty: 7

RH
4/5/2016

SimTraffic Report
Page 4
219

SimTraffic Performance Report

2016-0202 Walker Drive


2019 Total PM w/improve + Sig

6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd Performance by move
Movement
Denied Del/Veh (s)
Total Del/Veh (s)

RH
3/29/2016

EBT
0.0
1.9

EBR
0.0
2.3

WBL
0.0
8.8

WBT
0.0
2.6

SBL
0.4
25.5

SBR
0.5
27.7

All
0.2
11.7

SimTraffic Report
Page 1
220

SimTraffic Performance Report

2016-0202 Walker Drive


2025 Total PM w/improve+Sig

6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd Performance by move
Movement
Denied Del/Veh (s)
Total Del/Veh (s)

RH
3/29/2016

EBT
0.0
2.0

EBR
0.0
2.5

WBL
0.0
9.6

WBT
0.0
2.7

SBL
1.2
31.5

SBR
1.2
38.5

All
0.5
15.3

SimTraffic Report
Page 1
221

SimTraffic Performance Report

2016-0202 Walker Drive


2019 Total Sat w/improve + Sig

6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd Performance by move
Movement
Denied Del/Veh (s)
Total Del/Veh (s)

RH
3/30/2016

EBT
0.0
1.6

EBR
0.0
1.8

WBL
0.0
6.5

WBT
0.0
2.5

SBL
0.2
13.8

SBT

SBR
0.4
13.0

All
0.1
5.7

SimTraffic Report
Page 1
222

SimTraffic Performance Report

2016-0202 Walker Drive


2025 Total Sat w/improve+Sig

6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd Performance by move
Movement
Denied Del/Veh (s)
Total Del/Veh (s)

RH
3/30/2016

EBT
0.0
1.7

EBR
0.0
1.9

WBL
0.0
6.6

WBT
0.0
2.5

SBL
0.2
13.4

SBT
0.2
14.1

SBR
0.4
14.7

All
0.1
6.1

SimTraffic Report
Page 1
223

APPENDIX C
Turning Lane Warrant
Worksheets

Intersection: Walker Drive & Site Access A

AM Peak Hour
PM Peak Hour
SB Left Turn Volumes

Opposing Volumes

Storage Length Required

PM

44

549

75'

Year
2018

2019

2025

Sat

59

476

75'

PM

57

718

100'

Sat

75

694

100'

PM

57

734

100'

Sat

75

701

100'

EXHIBIT C-1
LEFT TURN LANE WARRANT FOR
WALKER DR & SITE ACCESS A
rh, 160202\initial\los.xls-t1, f03/26/16

Intersection: Walker Drive & Site Access B

AM Peak Hour
PM Peak Hour
SB Left Turn Volumes

Opposing Volumes

Storage Length Required

PM

34

401

50'

Year
2018

2019

2025

Sat

44

277

50'

PM

57

576

75'

Sat

75

498

100'

PM

57

592

100'

Sat

75

505

100'

EXHIBIT C-2
LEFT TURN LANE WARRANT FOR
WALKER DR & SITE ACCESS B
rh, 160202\initial\los.xls-t2, f03/26/16

Intersection: Walker Drive & Site Access A

AM Peak Hour
PM Peak Hour
NB Right Turn

Approach Total

Fuu-Width Turn Lane

PM

187

549

Yes

Year
2018

2019

2025

Sat

241

476

Yes

PM

205

718

Yes

Sat

266

694

Yes

PM

205

734

Yes

Sat

266

701

Yes

EXHIBIT C-3
RIGHT TURN LANE WARRANT FOR
WALKER DR & SITE ACCESS A
rh, 160202\initial\los.xls-r1, f03/28/16

Intersection: Walker Drive & Site Access B

AM Peak Hour
PM Peak Hour
Year
2018

2019

2025

PM

NB Right Turn

Approach Total

Fuu-Width Turn Lane

69

401

No But Taper Required

Sat

89

277

No But Taper Required

PM

160

576

Yes

Sat

208

498

Yes

PM

160

592

Yes

Sat

208

505

Yes

EXHIBIT C-4
RIGHT TURN LANE WARRANT FOR
WALKER DR & SITE ACCESS B
rh, 160202\initial\los.xls-r2, f03/28/16