Warrenton,Virginia
April6,2016
TrafficImpactAnalysis
Preparedfor:
WalkerDriveInvestmentGroup,LLC
andMr.MikeForsten
(540)2709971
redsun33@comcast.net
TABLEOFCONTENTS
INTRODUCTIONandSUMMARYOFFINDINGS......................................................1
EXISTINGTRAFFICCONDITIONS.............................................................................5
1
LocationMapofStudyIntersections..................................................................8
2
ConceptPlan.......................................................................................................9
3
ExistingLaneUse..............................................................................................10
4
ExistingPeakHourTrafficVolumes..................................................................11
5
LevelofServiceforStudyIntersections(ExistingTraffic).................................12
BACKGROUNDTRAFFICCONDITIONS...................................................................13
6A RegionalTrafficGrowth(1%for3Years)..........................................................16
6B RegionalTrafficGrowth(1%for4Years)..........................................................17
6C RegionalTrafficGrowth(1%for10Years)........................................................18
7A 2018BasePeakHourTrafficVolumes..............................................................19
7B 2019BasePeakHourTrafficVolumes..............................................................20
7C 2025BasePeakHourTrafficVolumes..............................................................21
8
TripGenerationRatesandTotalforBackgroundDevelopments.....................22
9A TripAssignmentforWalkerDriveByRight...................................................23
9B TripAssignmentforWarrentonCrossing.........................................................24
9C ProposedWilliamsWaytoConnectOliverCityRoad......................................25
10A 2018BackgroundPeakHourTrafficVolumes..................................................26
10B 2018TrafficAdjustmentDuetoConstructionofWilliamsWay......................27
10C Adjusted2018BackgroundPeakHourTrafficVolumes...................................28
10D LevelofServiceforStudyIntersections(2018BackgroundTraffic).................29
11A 2019BackgroundPeakHourTrafficVolumes..................................................30
11B 2019TrafficAdjustmentDuetoConstructionofWilliamsWay......................31
11C Adjusted2019BackgroundPeakHourTrafficVolumes...................................32
11D LevelofServiceforStudyIntersections(2019BackgroundTraffic).................33
12A 2025BackgroundPeakHourTrafficVolumes..................................................34
12B 2025TrafficAdjustmentDuetoConstructionofWilliamsWay......................35
12C Adjusted2025BackgroundPeakHourTrafficVolumes...................................36
12D LevelofServiceforStudyIntersections(2025BackgroundTraffic).................37
TABLEOFCONTENTS(contd.)
TOTALTRAFFICCONDITIONS...............................................................................38
13A
13B
13C
13D
14A
14B
14C
15A
15B
16A
16B
17A
17B
18A
18B
19A
19B
20A
20B
21A
21B
22A
22B
22C
TripsGenerationRatesandTotalforSubjectSite............................................43
TripGenerationforSubjectSitebyPhases......................................................44
SiteDevelopmentPMPeakHourMultiUseTripGenerationWorksheet.......45
SiteDevelopmentSatPeakHourMultiUseTripGenerationWorksheet........46
TripAssignmentforPodsA&B........................................................................47
TripAssignmentforPodsA,B,C,&D...............................................................48
TripAssignmentforPodE.................................................................................49
PassByTripAssignmentforPhase1................................................................50
PassByTripAssignmentforPhase1+Phase2................................................51
2018TotalPeakHourTrafficVolumes.............................................................52
LevelofServiceforStudyintersections(2018TotalTraffic)............................53
2019TotalPeakHourTrafficVolumes.............................................................54
LevelofServiceforStudyIntersections(2019TotalTraffic)............................55
2025TotalPeakHourTrafficVolumes.............................................................56
LevelofServiceforStudyIntersections(2025TotalTraffic)............................57
ResultsofIntersectionCapacityAnalyses(PMPeakHour)..............................58
ResultsofIntersectionCapacityAnalyses(Sat.peakHour).............................59
ResultsofintersectionQueueAnalyses(PMPeakHour).................................60
ResultsofIntersectionQueueAnalyses(SatPeakHour).................................61
ADTSignalWarrantforWalkerDr./E.LeeSt.&US29NBBypassRamp/.......62
MeetzeRd.
ADTSignalWarrantforUS29SBBypassRamp/MeetzeRd.&WalkerDr./....63
SiteEnt.A
RecommendedImprovementsfor2018Phase1.............................................64
RecommendedImprovementsfor2019Phase2.............................................65
RecommendedImprovementsforYear2025..................................................66
RESULTS,RECOMMENDATIONS,ANDCONCLUSIONS...........................................67
APPENDICES
APPENDIXAScopingLetter,IntersectionTurningMovementCounts,andPhotos
APPENDIXBIntersectionCapacityAnalysisWorksheets
APPENDIXCTurningLaneWarrantWorksheets
Preparedby: MickeyA.Cornelius,P.E.,PTOE
FuhsiungHuang,P.E.,PTOE
MAC:rek
(F:\2016\20160202_WarrentonWalkerDrive\DOCS\REPORTS\TIS.docx)
TheTrafficGroup,Inc.
TrafficEngineers&TransportationPlanners
MergingInnovationandExcellence
CORPORATEOFFICE
9900FranklinSquareDrive,SuiteH
Baltimore,Maryland21236
4109316600Fax:4109316601
18005838411
www.trafficgroup.com
INTRODUCTIONANDSUMMARYOFFINDINGS
StudyPurpose
This Traffic Impact Analysis has been prepared to identify the impact of the
proposedrezoningandsubsequentdevelopmentoftheWalkerDriveProperties
onsurroundingareatrafficconditions.TheWalkerDrivesiteislocatedalongthe
east side of Walker Drive between E. Lee Street and Academy Hill Road in the
Town of Warrenton, Virginia. The site is currently zoned Industrial and is
proposedtoberezonedforamultiuseresidential/commercialcommunity.The
siteisproposedtobedevelopedintwophaseswiththefirstphasecompletedin
Year2018andthesecondphasecompletedinYear2019.Atthistime,thefull
sitedevelopmentisplannedtoincludethefollowing:
21,000squarefootbowlingalley
35,000squarefootmultiplexmovietheatre
37,356squarefeetofofficespace
55,967squarefeetofretailspace
33,550squarefeetofrestaurantspace
116apartmentunits
AccesstothesubjectpropertyisproposedatthreeaccesspointsalongWalker
DriveandoneaccessalongAcademyHillRoad.
StudyCriteria/Methodology
ThisTrafficImpactAnalysiswasconductedinaccordancewithVDOTregulations.
A scoping meeting was held with representatives of VDOT and the Town of
WarrentonandacopyoftheapprovedscopingformisincludedinAppendixAof
this report. The parameters of the Traffic Impact Analysis as detailed in the
improvedscopingformareasfollows:
Study Periods Existing, Phase 1 (2018), Phase 2 (2019), and six years
aftercompletion(2025)
StudyHoursWeekdayeveningandSaturdaymiddaypeakhours
Intersectionstobeincludedintheanalysis:
WalkerDriveandAcademyHillRoad
WalkerDriveandHiddenCreek/SiteAccessB
E.LeeStreetandFalmouthStreet
E.LeeStreetandWalkerDrive
E.LeeStreet/MeetzeRoadandUS29bypasssouthboundramp
MeetzeRoadandUS29bypassnorthboundramp
WalkerDriveandSiteAccessA
WalkerDriveandSiteAccessC
AcademyHillRoadandSiteAccessD
OtherTransportationImprovementsTheconstructionofWilliamsWay
throughtheWarrentonCrossingSubdivision
AnnualTrafficGrowth1%peryearcompounded
TripGenerationUseofITETripGenerationManual(9thEdition)withtrip
rates for office and retail uses based upon the full development of the
site
TripDistribution
NorthalongWalkerDrive20%
NorthalongUS29Bypass40%
SouthalongUS29Bypass20%
WestalongE.Lee15%
EastalongMeetzeRoad5%
TripAdjustmentFactorsInternaltripreductionusingthesmallerof15%
of residential trips or 15% nonresidential trips, and reduction of the
smaller of 5% office trips or 5% retail trips; passby allowance for retail
andrestaurantusesof20%
OtherbackgrounddevelopmentstobeconsideredWarrentonCrossing
andWalkerDrivematterofrightdevelopment
E.LeeStreet/WalkerDrive
US29bypasssouthboundrampandMeetzeRoad
US29bypassnorthboundrampandMeetzeRoad
AllofthisinformationisdetailedintheScopeofWorkMeetingFormcontained
inAppendixAofthisreport.
SummaryofFindingsandRecommendations
TheresultsofIntersectionCapacityAnalysesconductedaspartofthisstudyfor
existing, 2018, 2019, and 2025 total projected traffic volumes are shown in
Exhibits19Aand19BfortheweekdayPMandSaturdaypeakhours,respectively.
SimTraffic95thpercentilequeueresultsareprovidedinExhibits20Aand20Bfor
the weekday PM and Saturday peak hours, respectively. Exhibits 21A and 21B
provide the results of the traffic signal warrant evaluations using estimated
ADTs.
Based upon the results of the analyses, the following recommendations have
beendevelopedaspartofthisstudy.
Phase12018DesignYear
InstallTrafficSignalizationattheintersectionofE.LeeStreetand
Walker Drive. It is recommended that split phasing be used for
this signal with the threelane southbound approach of Walker
Driveconsistingofanexclusiverightturnlane,asharedthrough/
left turn lane, and an exclusive left turn lane. It is also
recommended that the exclusive left turn lane be extended to
provideaminimumstoragecapacityof200feet.
The two site access points for the Walker Drive Properties are
recommendedtohaveleftturnlanesprovidedofatleast100feet
in length along Walker Drive and right turn lanes of at least 100
feet in length. Both approaches from the subject property are
recommendedtobedesignedastwolaneapproaches.
Phase22019DesignYear
The data and methodology used to undertake this study is detailed in the
sectionsthatfollow.
EXISTINGTRAFFICCONDITIONS
SiteInformation
StudyArea
E.LeeStreet/MeetzeRoad(Route643)Route643isaneast/westfour
lanedividedroadwayinthestudyareabetweenFalmouthStreettothe
west and the US 29 bypass to the east. This roadway presently serves
localresidentialusesandcontains12footwidetravellaneswithanopen
section east of Walker Drive and curb and gutter west of Walker Drive.
Route643hasapostedspeedlimitof45mileperhoureastofUS29and
35mileperhourwestofUS29.Thecurrentaveragedailytraffic(ADT)
volumeaccordingtothelatest2015VDOTpublisheddatainthevicinity
ofthesiteis10,000vehiclesperdaywestoftheUS29bypassand8,000
vehiclesperdayeastoftheUS29bypass.
Theintersectionsincludedwithinthestudyareaareasfollows:
WalkerDriveandAcademyHillRoad
WalkerDriveandBreezewoodDrive/existingofficeaccess
WalkerDriveandHiddenCreek/SiteAccessB
E.LeeStreetandFalmouthStreet
E.LeeStreetandWalkerDrive
E.LeeStreetandUS29bypasssouthboundramp
MeetzeRoadandUS29bypassnorthboundramp
WalkerDriveandSiteAccessA
WalkerDriveandSiteAccessC
AcademyHillRoadandSiteAccessD
TrafficVolumes
AnalysisofExistingTrafficConditions
IntersectionCapacityAnalyseswereconductedforthestudyintersectionsusing
Synchro, and the results of the Intersection Capacity Analyses are detailed in
Exhibits 19A and 19B for the weekday evening and Saturday peak hours,
respectively. The results show acceptable Level of Service D or better
conditionsthroughoutthestudyareaduringtheweekdayeveningpeakhourand
EXHIBIT 2
CONCEPT PLAN
10
11
12
BACKGROUNDTRAFFICCONDITIONS
DesignYear(s)
InaccordancewiththeproposeddevelopmentandtheScopeofWorkMeeting
Form, this study addresses future Design Years of 2018 for Phase 1, 2019 for
Phase2(fullbuild)andYear2025toreflectsixyearsaftercompletion.
BackgroundTraffic
Inadditionaltoregionaltrafficgrowth,informationwasalsoobtainedregarding
otherapproveddevelopmentinthesurroundingvicinity.Twospecificprojects
wereidentifiedtobeincludedasfollows:
UsingtripgenerationratesfromtheITETripGenerationReport(9thEdition),the
totalprojectedweekdayeveningandSaturdaypeakhourtripstobegenerated
by the background developments are shown in Exhibit 8. These trips were
assigned to the surrounding area road system in accordance with the
distribution agreed to in the scoping meeting. Exhibit 9A shows the trip
assignmentfortheWalkerDrivebyrightdevelopment,andExhibit9Bshowsthe
tripassignmentforWarrentonCrossing.
13
AspartoftheWarrentonCrossingProject,aconnectorroadwillbeconstructed
which will provide a northsouth travelway between E. Lee Street, opposite
WalkerDrive,southerlytoFalmouthStreet.Exhibit9CprovidesaConceptPlan
for Warrenton Crossing which shows that connector road identified as
WilliamsWay. With the construction of Williams Way, traffic which currently
proceeds westbound on E. Lee Street from Walker Drive then turns left on
Falmouth Street would have the potential to be diverted to the newly
constructed Williams Way which provides a more direct connection further
southonFalmouthStreet.
AnalysisofBackgroundTrafficConditions
Combining the trips generated by the approved developments with the 2018
basetrafficvolumesprovidesthe2018backgroundpeakhourtrafficvolumesat
the study intersections shown in Exhibit 10A. Traffic diversions were then
accountedforduetotheconstructionofWilliamsWaybydiverting50%ofthe
westbound left turn movements on E. Lee Street on Falmouth Street to the
proposedWilliamsWayconnectorroad.Exhibit10Bshowstheimpactofthose
traffic diversions. The resulting adjusted 2018 background peak hour traffic
volumesareshowninExhibit10C.
IntersectionCapacityAnalyseswereconductedforthestudyintersectionsusing
the2018adjustedbackgroundtrafficvolumesusingSynchro,andtheresultsare
displayed in Exhibits 19A and 19B for the weekday evening and Saturday peak
hours,respectively.TheseresultsshowaLevelofServiceFconditionforthe
northboundUS29bypassofframpatMeetzeRoadduringtheweekdayevening
peakhourandaLevelofServiceFconditionforthesouthboundleftturnsfrom
WalkerDrivetoE.LeeStreetduringtheweekdayeveningpeakhour.Allother
locations continue to provide acceptable Level of Service D or better
conditions during the both the weekday evening and Saturday peak hours.
Exhibit 10D provides the level of service results by lane group at the study
intersections.
Forthe2019DesignYear,theapproveddevelopmentswerecombinedwiththe
2019 base traffic volumes resulting in the 2019 background peak hour traffic
volumes shown in Exhibit 11A. Fifty percent of the left turn movements from
E.Lee Street to southbound Falmouth Street were diverted to the proposed
Williams Way connector road and Exhibit 11B provides the impact of those
trafficadjustments.Exhibit11Cshowstheresulting2019adjustedbackground
peakhourtrafficvolumes.
14
for the weekday evening and Saturday peak hours, respectively. Exhibit 11D
provides the results of the Intersection Capacity Analyses showing levels of
service by lane group. This exhibit shows continued Level of Service F
conditions for the northbound US 29 bypass offramp at Meetze Road and the
southbound left turns Walker Drive movement to E. Lee Street during the
weekday evening peak hour. All other locations show acceptable Level of
ServiceDorbetterconditionsthroughoutthestudyareaduringtheweekday
eveningandSaturdaypeakhours.
For Year 2025 evaluations, Exhibit 12A shows the 2025 background peak hour
trafficvolumeswhichcombinesthe2025basepeakhourtrafficvolumesandthe
tripsgeneratedbytheidentified,nearbyapproveddevelopments.Adjustments
weremadetoaccountfortheconstructionofWilliamsWayasshowninExhibit
12B,andtheresultingadjusted2025backgroundpeakhourtrafficvolumesare
showninExhibit12C.IntersectionCapacityAnalyseswereconductedusingthe
Synchromethodology,andtheresultsareshowninExhibits19Aand19Bforthe
weekday evening and Saturday peak hours, respectively. Exhibit 12D provides
the level of service results by lane group for the 2025 background traffic
conditions. Once again, Level of Service F movements are projected for the
southboundleftturnsfromWalkerDrivetoE.LeeStreetandthenorthboundUS
29 bypass offramp approach at Meetze Road. All other locations continue to
show acceptable Level of Service D or better conditions during both the
weekdayeveningandSaturdaypeakhours.
QueuingAnalyseswerealsoconductedforthe2018,2019,and2025background
traffic conditions using the SimTraffic 95th percentile queues, and those results
are displayed in Exhibits 20A and 20B for the weekday evening and Saturday
peakhours,respectively.
15
16
17
18
19
20
21
PM Peak Hour
IN
OUT
IN
OUT
57%
43%
45%
55%
28%
72%
57%
43%
63%
37%
54%
46%
Note:Trip generation formula and rates obtained from ITE Trip Generation Manual, 9th Edition, 2012.
Size
In
PM Peak Hour
Out
Total
18,202
sq.ft.
36
28
64
23
28
51
Medical-Dental Office
14,900
sq.ft.
15
38
53
31
23
54
51
66
117
54
51
105
87
51
138
70
59
129
135
F:\2016\2016-0202_Warrenton-Walker Drive\ENG\INITIAL\Trips
Units
EXHIBIT 8
TRIP GENERATION RATES AND TOTAL
FOR BACKGROUND DEVELOPMENTS
22
23
24
EXHIBIT259C
PROPOSED WILLIAMS WAY
TO CONNECT OLIVER CITY RD
26
27
28
29
30
31
32
33
34
35
36
37
TOTALTRAFFICCONDITIONS
SiteInformation
Phase12018DesignYear:
21,000squarefootbowlingalley
35,000squarefootmultiplexmovietheatre
20,550squarefeetofofficespace
20,550squarefeetretailspace
20,550squarefeetofhighturnoverrestaurantspace
Phase22019DesignYear:
MiddleParcel(PodsCandD)
o 76apartmentunits
o 16,806squarefeetofofficespace
o 23,417squarefeetofretailspace
o 5,000ofhighturnoverrestaurantspace
NorthParcel(PodE)
o 40apartmentunits
o 12,000squarefeetofretailspace
o 8,000squarefeetofhighturnoverrestaurantspace
ThePhase1DevelopmentwouldbeservedbySiteAccessPointsAandBalong
Walker Drive. The middle parcel for Phase 2 would be served by the Phase 1
38
access points while the north parcel (Pod E) would be served by a rightin/
rightout access along Walker Drive at Site Entrance C, and a full movement
accessatSiteEntranceDalongAcademyHillRoad.
TripGeneration/Distribution
TripgenerationratesfortheproposeddevelopmentwereobtainedfromtheITE
TripGenerationManual(9thEdition).Thetripgenerationratesfortheretailand
officeportionsofthesitewerebasedupontheITEregressionequationsandthe
ultimatebuildoutofthesiteinaccordancewiththeTrafficStudyScopingForm.
The trip generation rates and projected peak hour trips for the overall site
development are shown in Exhibit 13A. Trip reductions were taken in
accordance with VDOT regulations for both internal trips and passby trips.
Internaltripswereaccountedforbytakingthesmallerof15%oftheresidential
generatedtripsversus15%ofthecommercialgeneratedtripsandbytakingthe
smallerof5%oftheofficegeneratedtripsversus5%oftheretailandrestaurant
generatedtrips.Theeffectofpassbytripswasagreedtointhescopingmeeting
as 20% of the retail and restaurant generated trips. Exhibit 13A provides the
totalsitegeneratedtripsaswellasthenetnewtripsaddedtotheroadsystem
forthefulldevelopmentofthesite.
Thetripgenerationforthepropertywasthenbrokendownintovariousphases
andsitedevelopmentpodsasshowninExhibit13B.Exhibits13Cand13Dshow
theinternaltripcalculationsinaccordancewithVDOTguidelines.
39
roads. Exhibit 14C provides the trips assignment for the Phase 2 development
locatedinPodEutilizingSiteAccessPointsCandD.Thisexhibitalsoshowsthe
ADTsalongthoseaccesspointsandtheADTsaddedtotheadjacentroads.
TheimpactofpassbytripsforPhase1andfullsitedevelopmentareshownin
Exhibits15Aand15B,respectively.
AnalysisofTotalTrafficConditions
The site generated trips were combined with the background traffic volumes
resultinginthe2018(Phase1)totalpeakhourtrafficvolumesshowninExhibit
16A.IntersectionCapacityAnalyseswereconductedforthestudyintersections
usingSynchrosoftware,andtheresultsaredisplayedinExhibits19Aand19Bfor
the weekday evening and Saturday peak hours, respectively. A review of the
IntersectionCapacityAnalysisresultsshowsthatLevelofServiceFmovements
are projected for the southbound left turns from Walker Drive to E. Lee Street
andforthenorthboundUS29bypassofframpatMeetzeRoadduringboththe
weekday evening and Saturday peak hours. At all other locations, acceptable
Level of Service D or better movements are projected to be maintained.
Exhibit16BprovidestheresultsoftheSynchroanalysesbylanegroupateachof
thestudyintersectionsforthePhase1totaltrafficvolumes.Baseduponthese
results,itwasidentifiedthattrafficsignalizationmaybewarrantedatboththe
WalkerDrive/E.LeeStreetintersectionandtheMeetzeRoad/US29northbound
ramp intersection. Additional analyses were conducted assuming traffic
signalization, and those results show acceptable Level of Service D or better
conditionsforallapproachesduringtheboththeweekdayeveningandSaturday
peakhourswithtrafficsignalizationatthoseintersections.
ThePhase2(2019)totalprojectedtrafficvolumesweredevelopedusingthesite
generated trips and the 2019 background traffic volumes resulting in the total
2019 peak hour traffic volumes displayed in Exhibit 17A. Intersection Capacity
Analyses were conducted for the study intersections based upon the Phase 2
totaltrafficvolumesfor2019,andtheresultsareshowninExhibits19Aand19B
for the weekday evening and Saturday peak hours, respectively. Exhibit 17B
providestheresultsoftheSynchrocapacityanalysesbylanegroupforthePhase
2totaltrafficvolumes.AreviewofthisexhibitshowsthatLevelofServiceF
movements would remain for the southbound Walker Drive left turn to E.Lee
Street and the northbound US 29 bypass offramp approach at Meetze Road
under existing stop controlled conditions. In addition, the left turn movement
exiting Site Access A is projected to have Level of Service F conditions under
the proposed Phase 2 stop control condition. As previously identified under
Phase 1, with traffic signalization both the Walker Drive/E. Lee Street and
MeetzeRoad/US29northboundbypassrampintersectionswouldoperatewith
40
acceptablelevelsofserviceforallapproacheswithtrafficsignalization.Forthe
Site Access A intersection with Walker Drive, traffic signalization may also be
warranted. With signalization, Intersection Capacity Analyses using Synchro
show good Level of Service B or better conditions for both the weekday
eveningandSaturdaypeakhoursunderPhase2totaltrafficvolumes.
The Synchro results show a Level of Service E condition with a delay of 43.8
seconds for the southbound left turn movement from the US 29 bypass
southboundofframptoE.LeeStreet/MeetzeRoadduringtheweekdayevening
peak hour. However, with potential traffic signalization at the Walker
Drive/E.Lee Street and Meetze Road/US 29 bypass northbound ramp
intersections, additional gaps would be created, and the SimTraffic evaluation
shows the southbound left turn movement from the US 29 bypass to E. Lee
Street/MeetzeRoadwouldimprovetoanacceptableLevelofServiceDwitha
delayof25.5secondsunderthatscenario.
Year 2025 total traffic volumes were developed using the background traffic
volumesandsitegeneratedtripsasshowninExhibit18A.IntersectionCapacity
Analyses were conducted for the study intersections using Synchro, and the
results show similar conditions as Phase 2 traffic volumes. With the
improvements recommended in Phase 2, acceptable traffic conditions would
remain for all movements/approaches based upon the Synchro Analyses.
Exhibit18Bprovidesthelevelsofserviceforthelanegroups/approachesunder
2025totaltrafficconditions.
Once again, the southbound left turn movement from the US 29 bypass to
MeetzeRoadshowsaLevelofServiceFconditionwithadelayof56.1seconds
during the weekday evening peak hour. However, with assumed traffic
signalization at both the Walker Drive/E. Lee Street and US 29 bypass
northboundramps/MeetzeRoadintersections,theSimTrafficevaluationsshows
theUS29southboundofframpleftturnwouldimprovetoanacceptableLevel
ofServiceDwithadelayof31.5seconds.
Turnlanewarrantevaluationswerealsoconductedforallsiteaccesslocationsin
accordancewithVDOTguidelines.Copiesofthecapacityworksheetsforthese
41
Exhibits 22A, 22B, and 22C show the recommended improvements to the
surroundingarearoadsystemforPhase1,Phase2,andYear2025,respectively.
42
43
Size
ADT
In
Out
Total
In
Out
Total
Phase 1 - 2018
South Parcel (Pods A & B)
Bowling Alley
21,000
sq.ft.
26
48
74
37
37
74
700
35,000
sq.ft.
107
65
172
124
41
165
2732
General Office
20,550
sq.ft.
10
51
61
308
Shopping Center
20,550
sq.ft.
69
75
144
113
104
217
1668
-14
-15
-29
-23
-21
-44
-334
Pass-by Trips
Net Shopping Center Trips
55
60
115
90
83
173
1334
122
81
203
154
136
290
2613
Pass-by Trips
-25
-16
-41
-31
-27
-58
-522
97
65
162
123
109
232
2091
295
289
584
379
274
653
7165
29
16
45
21
18
39
467
20,550
sq.ft.
76
Units
General Office
16,806
sq.ft.
41
49
251
Shopping Center
23,417
sq.ft.
78
86
164
129
119
248
1900
-15
-17
-32
-26
-24
-50
-380
63
69
132
103
95
198
1520
30
20
50
37
34
71
636
Pass-by Trips
-6
-4
-10
-7
-7
-14
-127
24
16
40
30
27
57
509
124
142
266
158
143
301
2747
24
11
10
21
246
Pass-by Trips
Net Shopping Center Trips
High Turnover Restaurant
5,000
sq.ft.
40
Units
16
12,000
sq.ft.
40
44
84
66
61
127
975
Pass-by Trips
-8
-9
-17
-13
-12
-25
-195
32
35
67
53
49
102
780
46
31
77
59
52
111
1017
8,000
sq.ft.
Pass-by Trips
-9
-6
-15
-12
-10
-22
-204
37
25
62
47
42
89
813
85
68
153
111
101
212
1839
209
210
419
269
244
513
4586
F:\2016\2016-0202_Warrenton-Walker Drive\ENG\INITIAL\Trips
EXHIBIT 13B
TRIP GENERATION FOR
SUBJECT SITE BY 44
PHASES
s.f.
Total
Internal
External
Enter
195
187
Exit
211
205
xxx
Total
406
14
392
xxx
ADT
ADT
4657
114
4543
100%
3%
97%
Size:
Exit to External
205
187
Enter from External
5%
11
233
5%
Demand
1
31
5%
Demand
10%
Demand
31
Balanced
5%
10
21
10%
Demand
20
466
Demand
Balanced
Balanced
Balanced
10%
Demand
83
10%
Demand
37,356 sf GLA
Size:
Total
Internal
Exit to External
92
Enter
20
83
Demand
Demand
External
5%
Balanced
1
Demand
5%
18
Enter
Exit
100
92
18
Total
120
10
110
ADT
621
62
100%
8%
559
31
31
92%
Demand
5%
5%
Balanced
53
External
45
24
Exit
28
Total
81
12
69
41
ADT
827
114
713
100%
15%
85%
Demand
45
24
Exit to External
LAND USE B
LAND USE C
TOTAL
Enter
187
18
45
250
Exit
205
92
24
321
Total
392
110
69
571
INTERNAL CAPTURE
406
120
81
607
6%
Note: Internal trip capture rate obtained from ITE Trip Generation Hanbook 3rd Edition, 2014.
EXHIBIT 13C
SITE DEVELOPMENT PM PEAK HOUR
MULTI-USE TRIP GENERATION WORKSHEET
rh, 160202\initial\trips.xls-inter pm, f04/06/16
45
Exit to External
284
Total
308
External
311
308
Exit
288
284
Total
599
592
100%
1%
99%
14
5%
Demand
5%
s.f.
Internal
Enter
5%
55,967
16
10%
Demand
29
10%
Demand
31
Demand
Balanced
Balanced
Balanced
Balanced
5%
Demand
10%
Demand
10%
Demand
Demand
Exit to External
Total
Enter
37,356 sf GLA
Internal
Demand
External
5%
Balanced
0
Demand
5%
Exit
Total
16
16
100%
0%
100%
5%
Demand
5%
Balanced
Demand
Internal
External
Enter
36
32
28
Exit
31
Total
67
60
100%
10%
90%
32
28
Exit to External
LAND USE B
LAND USE C
TOTAL
Enter
308
32
349
Exit
284
28
319
Total
592
16
60
668
INTERNAL CAPTURE
599
16
67
682
2%
Note: Internal trip capture rate obtained from ITE Trip Generation Hanbook 3rd Edition, 2014.
EXHIBIT 13D
SITE DEVELOPMENT SAT PEAK HOUR
MULTI-USE TRIP GENERATION WORKSHEET
rh, 160202\initial\trips.xls-inter sat, f03/25/16
46
47
48
49
50
51
52
53
54
55
56
57
Control Type
Two Way
Stop
Two Way
Stop
Two Way
Stop
All Way
Stop
Two Way
Stop
Signal
Two Way
Stop
2015
Existing
Traffic
2018
Background
Traffic
2018
Total
Traffic
2019
Background
Traffic
2019
Total
Traffic
2025
Background
Traffic
2025
Total
Traffic
LOS / Delay
LOS / Delay
LOS / Delay
LOS / Delay
LOS / Delay
LOS / Delay
LOS / Delay
B
B
A
A
/
/
/
/
11.3
11.1
7.9
7.6
B / 11.9
B / 11.9
A / 8.1
A / 7.7
B / 12.7
B / 12.7
A / 8.3
A / 7.8
B / 11.9
B / 12.0
A / 8.1
A / 7.7
B / 14.1
C / 16.1
A / 8.4
A / 8.0
B
B
A
A
/
/
/
/
12.2
12.2
8.1
7.7
B / 14.6
C / 16.6
A / 8.5
A / 8.0
A
B
A
A
/
/
/
/
9.2
11.3
7.9
8.0
A / 9.3
B / 12.7
A / 8.0
A / 8.1
A / 9.5
B / 13.5
A / 8.2
A / 8.3
A / 9.3
B / 12.7
A / 8.0
A / 8.1
A / 9.8
C / 15.2
A / 8.4
A / 8.6
A
B
A
A
/
/
/
/
9.4
12.9
8.0
8.2
A / 9.9
C / 15.5
A / 8.5
A / 8.7
A / 9.2
----A / 7.9
--C / 20.9
C / 17.4
D / 29.0
B / 11.7
C / 17.9
C / 21.3
A / 9.5
----A / 8.1
--B / 15.0
B / 14.5
C / 17.0
B / 10.7
B / 13.0
C / 17.0
A / 9.6
C / 19.0
A / 9.5
A / 8.2
A / 8.0
C / 17.5
C / 17.5
C / 21.2
B / 11.1
B / 14.1
C / 18.9
A / 9.5
----A / 8.1
--C / 15.2
B / 14.7
C / 17.2
B / 10.7
B / 13.2
C / 17.3
A / 9.8
D / 25.3
A / 9.9
A / 8.4
A / 8.4
C / 20.8
C / 21.4
D / 27.0
B / 11.5
C / 15.4
C / 21.0
A / 9.6
----A / 8.2
--C / 16.9
C / 16.3
C / 19.4
B / 11.4
B / 14.3
C / 19.7
A / 9.9
D / 26.6
A / 10.0
A / 8.5
A / 8.4
D / 25.4
D / 26.2
D / 34.6
B / 12.5
C / 17.2
D / 25.4
A
A
B
C
C
B
/ 8.4
/ 8.1
/ 10.6
/ 24.1
/ 16.3
/ 10.3
-----------
A / 8.3
A / 8.4
B / 14.2
F / 91.7
C / 23.8
A / 9.9
-----------
A / 8.4
A / 8.4
C / 15.4
F / 599.8
D / 27.7
B / 10.2
B / 19.4
B / 15.8
B / 17.3
C / 31.0
C / 22.5
A / 8.3
A / 8.4
B / 14.3
F / 96.6
C / 24.2
A / 9.9
-----------
A / 8.5
A / 8.4
C / 17.0
F / >999
D / 32.6
B / 10.5
C / 21.7
B / 18.0
B / 19.3
D / 35.3
C / 24.8
A
A
B
F
D
B
A / 8.6
A / 8.5
C / 18.4
F / >999
E / 36.3
B / 10.7
C / 24.0
B / 18.0
C / 22.9
D / 37.7
C / 27.5
A / 8.2
C / 18.0
B / 11.7
A / 8.4
C / 21.4
B / 13.1
A / 8.8
D / 30.4
C / 17.7
A / 8.4
C / 21.9
B / 13.2
A / 9.2
E / 43.8
D / 25.6
A / 8.5
C / 24.7
B / 13.9
--Two Way
Stop
A / 8.2
D / 28.0
--A / 8.4
F / 60.6
-------
-------
A / 8.9
F / 496.4
A / 9.1
A / 5.5
B / 12.6
B / 18.6
-------
-------
D / 27.7
A / 9.7
A / 8.2
-------
-------
Signal
Two Way
Stop
---
--A / 8.4
F / 63.6
-------------
Signal
Two Way
Stop
Two Way
Stop
-----
A / 9.6
---
------A / 9.8
---
------A / 9.6
---
D / 25.5
A / 9.4
F / >999
B / 10.6
A / 6.6
B / 15.3
C / 20.1
F / 95.5
B / 10.5
A / 8.8
A / 8.5
B / 16.9
A / 9.0
A / 4.8
B / 10.5
A / 8.8
/ 8.4
/ 8.5
/ 15.0
/ 139.9
/ 26.3
/ 10.1
-----------
--A / 8.5
F / 87.7
------------------A / 9.6
---
A / 9.3
F / 56.1
D / 29.5
D / 31.5
A / 9.6
F / >999
B / 11.0
A / 6.9
B / 16.0
C / 20.2
F / 108.0
B / 10.6
A / 8.9
A / 8.5
B / 17.8
A / 8.8
A / 4.6
B / 10.6
A / 8.8
EXHIBIT 19A
RESULTS OF INTERSECTION
CAPACITY ANALYSES (PM PEAK HOUR)
rh, 160202\initial\los.xls-pm, f03/29/16
58
Control Type
Two Way
Stop
Two Way
Stop
Two Way
Stop
All Way
Stop
Two Way
Stop
Signal
Two Way
Stop
Two Way
Stop
2015
Existing
Traffic
2018
Background
Traffic
2018
Total
Traffic
2019
Background
Traffic
2019
Total
Traffic
2025
Background
Traffic
2025
Total
Traffic
LOS / Delay
LOS / Delay
LOS / Delay
LOS / Delay
LOS / Delay
LOS / Delay
LOS / Delay
A / 9.8
A / 8.6
A / 7.5
---
B / 10.4
A / 8.7
A / 7.7
---
B / 11.0
A / 8.8
A / 7.9
---
B / 10.4
A / 8.7
A / 7.7
---
B / 12.4
B / 14.5
A / 8.0
A / 7.8
B / 10.5
A / 8.7
A / 7.7
---
B / 12.5
B / 14.8
A / 7.8
A / 8.0
A
A
A
A
A / 9.1
B / 10.7
A / 7.7
A / 7.7
A / 9.4
B / 11.4
A / 7.8
A / 7.8
A / 9.1
B / 10.8
A / 7.7
A / 7.7
A / 9.9
B / 12.8
A / 8.2
A / 8.1
A
B
A
A
9.1
10.8
7.7
7.7
A / 9.9
B / 12.9
A / 8.2
A / 8.2
A / 9.3
----A / 7.6
--B / 11.6
B / 10.7
B / 12.6
B / 10.5
B / 11.8
B / 12.1
A / 9.6
----A / 7.7
--B / 10.8
B / 10.4
B / 11.1
B / 10.1
B / 10.6
B / 11.8
B / 10.3
B / 14.0
A / 9.0
A / 7.8
A / 7.7
B / 11.8
B / 11.9
B / 12.4
B / 10.5
B / 11.3
B / 12.6
A / 9.6
----A / 7.8
--B / 10.9
B / 10.4
B / 11.2
B / 10.2
B / 10.7
B / 11.8
B / 10.8
C / 20.1
A / 9.4
A / 8.1
A / 8.1
B / 12.8
B / 13.4
B / 14.0
B / 10.9
B / 11.9
B / 13.4
A / 9.7
----A / 7.8
--B / 11.3
B / 10.8
B / 11.6
B / 10.6
B / 11.1
B / 12.4
B / 11.0
C / 20.4
A / 9.5
A / 8.1
A / 8.1
B / 13.7
B / 14.4
B / 14.9
B / 11.5
B / 12.7
B / 14.3
A
A
B
B
B
A
/ 8.1
/ 7.8
/ 10.5
/ 14.9
/ 13.5
/ 9.7
-----------
A / 8.0
A / 7.9
B / 11.7
C / 21.9
C / 16.2
A / 9.5
-----------
A / 8.2
A / 7.9
B / 12.5
F / 138.9
C / 18.2
A / 9.8
B / 12.7
A / 9.9
A / 9.8
C / 24.9
B / 16.1
A / 8.0
A / 7.9
B / 11.7
C / 22.3
C / 16.3
A / 9.5
-----------
A / 8.3
A / 7.9
B / 13.4
F / 536.8
C / 20.4
B / 10.1
C / 20.1
B / 14.7
B / 18.1
C / 34.2
C / 23.5
A
A
B
C
C
A
A / 8.4
A / 8.0
B / 13.7
F / 603.9
C / 21.4
B / 10.2
C / 20.4
B / 15.0
B / 18.2
C / 34.4
C / 23.8
A / 7.9
B / 13.1
A / 10.0
A / 8.0
B / 14.2
B / 10.6
A / 8.4
C / 17.9
B / 13.7
A / 8.0
B / 14.3
B / 10.6
A / 8.8
C / 22.3
C / 18.9
A / 8.1
B / 15.0
B / 10.8
A / 8.9
C / 24.0
C / 20.0
A / 8.0
C / 16.5
A / 8.2
C / 23.8
A / 8.2
C / 24.1
A / 9.2
F / 756.3
B / 11.6
A / 7.2
B / 15.7
B / 18.4
A / 8.3
D / 27.3
A / 9.3
F / 893.3
B / 11.8
A / 7.4
B / 16.1
B / 18.8
/
/
/
/
8.9
9.8
7.5
7.5
-------
-------
A / 8.6
F / 169.7
A / 9.7
A / 5.8
B / 12.5
B / 16.9
-------
-------
C / 18.8
A / 9.2
A / 7.9
-------
-------
Signal
Two Way
Stop
-------------
Signal
Two Way
Stop
Two Way
Stop
-----
A / 9.1
---
------A / 9.3
---
------A / 9.1
---
F / 59.6
B / 10.2
A / 8.6
A / 8.4
B / 15.0
A / 8.6
A / 4.7
B / 10.1
A / 8.9
/
/
/
/
/ 8.1
/ 8.0
/ 11.9
/ 24.5
/ 16.9
/ 9.6
-----------
------------------A / 9.1
---
F / 63.6
B / 10.2
A / 8.6
A / 8.6
B / 16.1
A / 9.2
A / 4.7
B / 10.1
A / 8.9
EXHIBIT 19B
RESULTS OF INTERSECTION
CAPACITY ANALYSES (SAT PEAK HOUR)
rh, 160202\initial\los.xls-sat, f03/26/16
59
Storage
Length (ft)
2015
Existing
Traffic
2018
Background
Traffic
2018
Total
Traffic
2019
2018
Total Traffic Background
w/Improve
Traffic
95th Queue
(ft)
95th Queue
(ft)
95th Queue
(ft)
95th Queue
(ft)
95th Queue
(ft)
95th Queue
(ft)
95th Queue
(ft)
52
<25
30
<25
53
<25
44
<25
208
<25
46
209
54
<25
46
<25
50
<25
42
<25
590
476
66
700
<25
55
<25
28
<25
61
<25
28
33
209
<25
243
<25
65
<25
34
<25
62
<25
32
32
----<25
---
32
----28
---
184
324
193
29
177
32
52
35
26
39
71
121
50
95
111
66
90
50
76
104
94
110
52
84
120
44
<25
<25
117
33
45
42
41
94
196
433
110
-------------
2019
Total
Traffic
2025
2019
Total Traffic Background
w/Improve
Traffic
2025
Total
Traffic
2025
Total Traffic
w/Improve
95th Queue
(ft)
95th Queue
(ft)
95th Queue
(ft)
54
54
53
36
57
<25
42
<25
605
453
47
701
57
58
57
34
39
280
<25
318
<25
69
<25
47
<25
65
<25
35
42
269
<25
308
<25
70
<25
45
32
----27
---
217
315
362
29
222
32
128
37
31
48
34
----28
---
244
307
325
<25
210
32
132
35
32
47
86
166
64
81
113
70
93
50
79
102
102
103
47
79
116
104
179
63
89
124
70
103
52
86
132
100
104
48
80
129
112
184
66
88
126
71
45
117
166
539
434
-------------
48
44
90
198
484
112
104
42
268
167
530
313
-------------
44
43
109
201
754
354
121
50
325
168
533
393
-------------
-------------
-------------
87
79
93
122
154
56
-------------
-------------
111
82
98
176
196
64
-------------
-------------
126
92
102
180
205
67
33
111
94
36
124
121
36
130
210
37
123
227
37
119
117
37
313
462
42
224
405
39
131
134
39
333
476
45
378
518
63
76
67
106
76
220
-----
70
102
83
322
-----
77
123
82
512
-----
-----
-----
-----
150
126
-----
-----
184
156
-----
-----
195
161
-------
-------
320
407
233
124
46
38
-------
300
377
236
-------
-------
305
318
224
-------
-------
-------
-------
-------
-------
-------
118
49
56
-------
-------
124
53
55
---
47
46
46
48
53
54
46
56
56
---
---
---
---
---
209
48
---
54
48
EXHIBIT 20A
RESULTS OF INTERSECTION
QUEUE ANALYSES (PM PEAK HOUR)
rh, 160202\initial\los.xls-pq, f04/05/16
60
2015
Existing
Traffic
Storage
Length (ft)
2018
Background
Traffic
2018
Total
Traffic
2018
Total Traffic
w/Improve
2019
Background
Traffic
2019
Total
Traffic
2019
Total Traffic
w/Improve
2025
Background
Traffic
2025
Total
Traffic
2025
Total Traffic
w/Improve
95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft) 95th Queue (ft)
---
45
49
50
49
52
128
55
49
168
55
WB/LTR
---
<25
<25
<25
<25
<25
195
56
<25
225
55
NB/LT
---
<25
30
36
33
32
39
43
32
46
47
SB/LT
---
---
<25
---
<25
<25
221
32
<25
293
30
30
---
30
30
30
30
29
44
29
29
68
WB/LTR
---
47
52
57
54
50
216
56
52
244
57
NB/L
150'
<25
<25
<25
<25
<25
<25
<25
<25
<25
<25
SB/LT
---
<25
<25
<25
<25
<25
273
26
<25
310
32
EB/LR or LTR
---
34
34
36
33
35
184
36
36
173
35
WB/LT
---
---
---
45
45
---
354
117
---
351
108
WB/R
---
---
---
34
33
---
341
32
---
342
39
NB/L
115'
<25
<25
<25
<25
<25
<25
<25
<25
<25
<25
SB/L
---
---
---
35
32
---
253
55
---
237
54
EB/LTR
---
34
34
52
53
37
61
59
39
64
71
WB/LT
---
66
60
69
83
64
73
102
62
75
111
WB/R
---
58
58
58
70
56
52
75
58
55
82
NB/LTR
---
72
66
71
71
65
67
70
71
75
70
SB/LTR
---
74
72
83
85
74
78
82
75
83
87
---
250'
30
35
51
---
31
98
---
31
101
WB/L
225'
<25
<25
36
---
37
32
---
40
36
---
---
<25
58
80
---
56
121
---
61
139
---
NB/LTR
SB/L
115'
60
95
194
---
84
167
---
104
166
---
SB/T
---
<25
44
608
---
46
532
---
51
539
---
SB/R
---
36
37
83
---
37
292
---
37
309
---
w/Signal Improvement
EB/L
250'
---
---
---
80
---
---
103
---
---
92
WB/L
225'
---
---
---
67
---
---
60
---
---
66
---
---
---
---
72
---
---
84
---
---
85
200'
---
---
---
92
---
---
148
---
---
158
NB/LTR
SB/L
SB/LT
---
---
---
---
108
---
---
158
---
---
160
SB/R
---
---
---
---
44
---
---
60
---
---
57
WB/L
200'
<25
26
27
<25
<25
25
29
26
27
31
SB/LT
---
58
65
67
71
63
71
77
63
75
72
SB/R
315'
59
73
122
125
69
202
199
71
203
234
200'
59
62
80
---
63
82
---
66
87
---
---
64
73
181
---
83
338
---
83
297
---
w/Signal
EB/L
NB/LTR
200'
---
---
---
127
---
---
188
---
---
195
---
---
---
---
121
---
---
153
---
---
165
---
---
---
---
197
99
---
323
---
---
312
WB/R
---
---
---
132
47
---
414
---
---
419
---
SB/L
---
---
---
61
35
---
284
---
---
279
--122
w/Signal
WB/L
---
---
---
---
---
---
---
115
---
---
WB/R
---
---
---
---
---
---
---
51
---
---
54
SB/L
---
---
---
---
---
---
---
60
---
---
59
---
---
45
47
47
49
53
51
50
53
50
---
---
---
---
---
---
106
49
---
124
47
EXHIBIT 20B
RESULTS OF INTERSECTION
QUEUE ANALYSES (SAT PEAK HOUR)
rh, 160202\initial\los.xls-sq, f04/05/16
61
Minor - 2 Lanes
Traffic Volumes
Major
Condition A
Condition B
Combination of
Condition A and B
Major
Minor
Major
Minor
80% of Condition A
80% of Condition B
Minor
(9,600)
(3,200)
(14,400)
(1,600)
4,080
No
Yes
No
No
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Existing Traffic
9,230
No
Satisfied?
2018 Total Traffic
15,100
10,300
Yes
Satisfied?
Yes
14,080
Yes
Satisfied?
Yes
14,340
Yes
Satisfied?
Yes
Minor - 1 Lane
Traffic Volumes
Major
Combination of
Condition A
Condition B
Condition A and B
Major
Minor
Major
Minor
80% of Condition A
80% of Condition B
Minor
(9,600)
(2,400)
(14,400)
(1,200)
920
No
No
No
No
No
No
No
No
Yes
No
No
No
No
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Existing Traffic
7,470
Satisfied?
No
1,890
Yes
Satisfied?
No
2,370
Yes
Satisfied?
Yes
2,430
Satisfied?
Yes
Yes
EXHIBIT 21A
ADT SIGNAL WARRANT FOR
WALKER DR/ E. LEE ST & US29 NB BYPASS RAMP/MEETZE RD
rh, 160202\initial\los.xls-w5&7, f03/26/16
62
Minor - 2 Lanes
Traffic Volumes
Major
Condition A
Condition B
Combination of
Condition A and B
Major
Minor
Major
Minor
80% of Condition A
80% of Condition B
Minor
(9,600)
(3,200)
(14,400)
(1,600)
4,160
No
Yes
No
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Existing Traffic
9,090
Satisfied?
No
6,150
Yes
Satisfied?
Yes
7,150
Yes
Satisfied?
Yes
7,410
Yes
Satisfied?
Yes
Minor - 2 Lanes
Traffic Volumes
Major
Condition A
Condition B
Combination of
Condition A and B
Major
Minor
Major
Minor
80% of Condition A
80% of Condition B
Minor
(9,600)
(2,400)
(14,400)
(1,200)
5,016
Yes
Yes
No
Yes
Yes
No
Yes
No
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
5,352
Yes
Satisfied?
Yes
5,352
Satisfied?
Yes
Yes
EXHIBIT 21B
ADT SIGNAL WARRANT FOR
US29 SB BYPASS RAMP/MEETZE RD & WALKER DR/SITE ENT A
rh, 160202\initial\los.xls-w6&8, f04/06/16
63
64
65
66
RESULTS,RECOMMENDATIONS,ANDCONCLUSIONS
StudyPurpose
AdetailedTrafficImpactAnalysishasbeenpreparedfortheproposedrezoning
and multiuse development of the Walker Drive Properties. As a result of the
analyses and findings of the study, it has been shown that the proposed
developmentcanbeaccommodatedbythesurroundingarearoadsystemwith
recommendedmitigatingtrafficimprovements.Thespecificroadimprovements
recommendedaspartofthisstudyforthePhase1andPhase2(buildout)ofthe
sitearedetailedbelow.
Phase1(2018DesignYear)
ProvidetrafficsignalizationattheintersectionoftheUS29bypass
northboundrampswithMeetzeRoad.
Provide100feetleftturnandrightturnlanesalongWalkerDrive
at both Site Access Points A and B and provide twolane
approachesfortheexitingsitemovements.
Phase2(2019DesignYear)
Withtheimplementationoftherecommendedimprovements,acceptabletraffic
conditionscanbemaintainedonthesurroundingarearoadsystemwiththefull
developmentoftheWalkerDriveProperties.
67
APPENDIX A
Scoping Letter
Intersection Turning Movement Counts,
and Photos
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Length AADT
QA
4Tire
Bus
98%
1%
QC
K
Dir
QK
Factor
Factor
AAWDT QW
Year
Town of Warrenton
From:
Fletcher Dr
2200
Bus US 29
To:
1600
99%
1%
1%
97%
1%
0%
0%
1%
0%
0%
0%
0.562
2200
2015
0%
NA
1600
2015
1%
0%
NA
4100
2015
NA
10000
2015
Falmouth St
G
To:
0.101
4th St
From:
10000
3rd St
G
To:
Meetze Rd
0%
Fauquier Rd
From:
4100
0%
Bear Wallow Dr
G
To:
Lee St
0%
Oak Springs Dr
From:
Foxcroft Rd
1%
98%
1%
1%
0%
East St
45
2/23/2016
81
Length AADT
QA
4Tire
Bus
96%
0%
96%
0%
96%
0%
QC
K
Dir
QK
Factor
Factor
AAWDT QW
Year
Fauquier County
From:
643 Meetze Rd
3.33
2600
SR 28 S, Catlett Rd
To:
From:
643 Meetze Rd
4.61
4200
643 Meetze Rd
0.59
8000
644 Ritchie Rd
1.40
1200
220
110
1.38
4.46
810
98%
0%
0.30
720
1700
2700
30
0%
98%
0%
0.36
1%
98%
0%
1%
0.59
230
1900
0.60
1%
0.094
0.612
8200
2015
380
430
600
320
0%
0%
1500
95%
0%
1%
99%
0%
0%
1.80
1300
651 Sumerduck Rd
2.10
1700
NA
NA
08/12/2015
NA
NA
09/02/2015
NA
NA
08/12/2015
0.098
0.667
830
2015
0%
0%
0%
0.095
0.804
740
2015
0%
0%
0%
0.100
0.75
1700
2015
0%
0%
0%
0.097
0.747
2800
2015
NA
NA
08/12/2015
NA
NA
08/12/2015
1%
2%
0%
0.099
0.556
2000
2015
0%
0%
0%
0.101
0.732
390
2015
0%
0%
0.11
0.532
440
2015
0%
0%
0.114
0.63
610
2015
30-602 W; Rogues Rd
30-602 W, Rogues Rd
99%
0%
99%
0%
0%
0%
30-650 Messick Rd
0%
0%
NA
NA
11/02/2015
30-649 Germantown Rd
US 17 Marsh Rd, Warrenton Rd
97%
0%
97%
0%
97%
0%
97%
0%
1%
1%
2%
0%
0.100
0.752
1200
2015
0%
0.103
0.531
1500
2015
0%
0.105
0.507
1400
2015
0%
0.113
0.594
1700
2015
1%
1%
2%
To:
From:
To:
08/12/2015
SR 28 Catlett Rd
To:
From:
651 Sumerduck Rd
NA
0%
1200
NA
30-610 Midland Rd
To:
From:
651 Sumerduck Rd
0%
30-610 Midland Rd
From:
3.82
1%
30-646 Blackwelltown Rd
To:
651 Sumerduck Rd
1%
From:
1.20
2015
30-602 Rogues Rd
To:
650 Messick Rd
To:
From:
649 Germantown Rd
4300
From:
1.13
0.585
30-635 Hume Rd
To:
649 Germantown Rd
30-733 Wilson Rd
To:
From:
649 Germantown Rd
1%
98%
From:
0.54
1%
To:
649 Germantown Rd
0.096
To:
From:
From:
1.50
0%
To:
1%
To:
From:
1%
To:
From:
1%
To:
From:
3.23
2015
From:
To:
2.89
2700
From:
0.622
To:
2.10
From:
646 Blackwelltown Rd
0.106
US 17 Marsh Rd
To:
3.25
To:
From:
0%
ECL Warrenton
From:
1300
1%
30-672 Duhollow Rd
To:
1.90
1%
30-616 S, Casanova Rd
To:
From:
644 Ritchie Rd
1%
1%
1%
2%
30-637 Courtneys Rd
1%
1%
2%
46
2/23/2016
25
APPENDIX B
Intersection Capacity
Analysis Worksheets
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
563
273
290
6.54
5.54
5.54
4.02
434
683
671
471
543
684
768
418
493
682
646
Approach
HCM Control Delay, s
HCM LOS
EB
11.3
B
RH
3/24/2016
Existing PM
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1268
0.032
7.9
A
0.1
145
6.94
3.32
876
-
Minor1
417
290
127
7.54
6.54
6.54
3.52
520
694
863
583
290
293
6.54
5.54
5.54
4.02
423
671
669
104
6.94
3.32
931
-
Major1
291
4.14
2.22
1268
-
876
-
487
548
668
831
407
476
646
668
931
-
1268
-
WB
11.1
B
NBT NBR EBLn1WBLn1 SBL
- 649 597 1360
- 0.113 0.01 0.001
0.1
- 11.3 11.1
7.6
A
B
B
A
0.4
0
0
NB
1.4
0
-
0
-
0
-
0
-
SB
0
SBT SBR
0
A
-
Synchro 9 Report
Page 1
1
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
683
354
329
6.54
5.54
5.54
4.02
370
629
645
428
509
632
808
358
443
612
641
Approach
HCM Control Delay, s
HCM LOS
EB
9.2
A
RH
3/24/2016
Existing PM
1.7
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1259
0.005
7.9
A
0
149
6.94
3.32
871
-
Minor1
504
299
205
7.54
6.54
6.54
3.52
451
685
778
653
299
354
6.54
5.54
5.54
4.02
385
665
629
157
6.94
3.32
861
-
Major1
299
4.14
2.22
1259
-
871
-
438
524
681
753
373
458
661
612
861
-
1259
-
WB
11.3
B
NBT NBR EBLn1WBLn1 SBL
- 871 642 1242
- 0.005 0.115 0.022
9.2 11.3
8
A
B
A
0
0.4
0.1
NB
0.2
0
-
0
-
0
-
0
-
SB
0.8
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
2
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.6
EBL
0
0
0
Stop
0
1
0
91
2
0
EBR
19
19
0
Stop
None
91
2
21
NBL NBT
22 232
22 232
0
0
Free Free
- None
115
0
0
91
91
2
2
24 255
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
473
297
176
6.84
5.84
5.84
3.52
520
728
837
150
6.94
3.32
870
-
Major1
300
4.14
2.22
1258
-
510
510
728
821
870
-
1258
-
Approach
HCM Control Delay, s
HCM LOS
EB
9.2
A
RH
3/24/2016
NBL
1258
0.019
7.9
A
0.1
NB
0.7
NBT EBLn1
- 870
- 0.024
9.2
A
0.1
0
-
SBT SBR
267
6
267
6
0
0
Free Free
- None
0
0
91
91
2
2
293
7
Major2
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 3
3
Intersection
Intersection Delay, s/veh
Intersection LOS
20.9
C
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/24/2016
EBL
1
1
0.85
2
1
0
EB
WB
2
SB
1
NB
1
17.4
C
EBT
178
178
0.85
2
209
1
EBR
29
29
0.85
2
34
0
WBU
0
0
0.92
2
0
0
WBL
176
176
0.90
2
196
0
WB
EB
1
NB
1
SB
1
23.9
C
WBT
146
146
0.90
2
162
1
WBR
134
134
0.90
2
149
1
NBU
0
0
0.92
2
0
0
NBL
19
19
0.87
2
22
0
NBT
92
92
0.87
2
106
1
NBR
131
131
0.87
2
151
0
NB
SB
1
EB
1
WB
2
17.9
C
Synchro 9 Report
Page 4
4
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
175
175
0.87
2
201
0
SBT
92
92
0.87
2
106
1
SBR
1
1
0.87
2
1
0
SB
NB
1
WB
2
EB
1
21.3
C
Lane
RH
3/24/2016
Synchro 9 Report
Page 5
5
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Approach
HCM Control Delay, s
HCM LOS
EB
1.7
RH
3/24/2016
Existing PM
4.5
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
1153
-
0
-
NBLn1 EBL
664 1153
0.024 0.088
10.6
8.4
B
A
0.1
0.3
0
-
0
-
0
-
213
308
445
582
NB
10.6
B
199
6.94
3.32
809
809
-
201
6.94
3.32
806
-
213
321
582
445
806
-
SB
18.2
C
Synchro 9 Report
Page 6
6
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
6
EBL EBT EBR
0 393 119
0 393 119
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 401 121
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
247
4.14
2.22
1316
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/24/2016
1316
-
EBL
1316
0
A
0
0
-
0
-
0
-
0
-
WB
0.9
707
306
401
6.54
5.54
5.54
4.02
359
660
599
123
6.94
3.32
905
-
482
482
701
813
0
0
0
0
905
-
SB
14
B
Synchro 9 Report
Page 7
7
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
4.4
EBL EBT EBR
202 397
0
202 397
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
217 427
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
215
4.14
2.22
1352
-
Approach
HCM Control Delay, s
HCM LOS
EB
2.8
RH
3/24/2016
1352
-
0
-
NBLn1 EBL
260 1352
0.405 0.161
28
8.2
D
A
1.9
0.6
0
-
0
-
0
-
WB
0
0
0
0
0
213
6.94
3.32
792
792
-
NB
28
D
Synchro 9 Report
Page 8
8
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
288
126
162
6.54
5.54
5.54
4.02
621
791
763
690
706
848
867
609
628
791
748
Approach
HCM Control Delay, s
HCM LOS
EB
9.8
A
RH
3/24/2016
Existing Sat
2.4
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1443
0.019
7.5
A
0.1
69
6.94
3.32
980
-
Minor1
219
162
57
7.54
6.54
6.54
3.52
718
824
948
300
54
162
138
6.54 6.94
5.54
5.54
4.02 3.32
611 1002
763
781
-
Major1
138
4.14
2.22
1443
-
980
-
688
697
808
923
599 1002
616
748
781
-
1443
-
WB
8.6
A
NBT NBR EBLn1WBLn1 SBL
- 804 1002 1479
- 0.074 0.001
0.1
9.8
8.6
0
A
A
A
A
0.2
0
0
NB
1.6
0
-
0
-
0
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 1
9
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
324
173
151
6.54
5.54
5.54
4.02
592
755
771
671
692
810
909
587
613
750
769
Approach
HCM Control Delay, s
HCM LOS
EB
8.9
A
RH
3/24/2016
Existing Sat
1.7
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1417
0.003
7.5
A
0
80
6.94
3.32
964
-
Minor1
235
142
93
7.54
6.54
6.54
3.52
700
846
904
317
142
175
6.54
5.54
5.54
4.02
598
778
753
71
6.94
3.32
977
-
Major1
160
4.14
2.22
1417
-
964
-
688
707
844
889
593
617
776
748
977
-
1417
-
WB
9.8
A
NBT NBR EBLn1WBLn1 SBL
- 931 794 1438
- 0.013 0.058 0.005
8.9
9.8
7.5
A
A
A
0
0.2
0
NB
0.2
0
-
0
-
0
-
0
-
SB
0.3
SBT SBR
0
A
-
Synchro 9 Report
Page 2
10
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
1.1
EBL
6
6
0
Stop
0
1
0
90
2
7
EBR
18
18
0
Stop
None
90
2
20
NBL NBT
13 102
13 102
0
0
Free Free
- None
115
0
0
90
90
2
2
14 113
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
262
176
86
6.84
5.84
5.84
3.52
705
837
927
89
6.94
3.32
951
-
Major1
179
4.14
2.22
1394
-
698
698
837
918
951
-
1394
-
Approach
HCM Control Delay, s
HCM LOS
EB
9.3
A
RH
3/24/2016
NBL
1394
0.01
7.6
A
0
NB
0.9
NBT EBLn1
- 872
- 0.031
9.3
A
0.1
0
-
SBT SBR
156
5
156
5
0
0
Free Free
- None
0
0
90
90
2
2
173
6
Major2
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 3
11
Intersection
Intersection Delay, s/veh
Intersection LOS
11.6
B
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/24/2016
EBL
2
2
0.89
2
2
0
EB
WB
2
SB
1
NB
1
10.7
B
EBT
91
91
0.89
2
102
1
EBR
33
33
0.89
2
37
0
WBU
0
0
0.92
2
0
0
WBL
95
95
0.90
2
106
0
WB
EB
1
NB
1
SB
1
11.5
B
WBT
89
89
0.90
2
99
1
WBR
185
185
0.90
2
206
1
NBU
0
0
0.92
2
0
0
NBL
10
10
0.84
2
12
0
NBT
104
104
0.84
2
124
1
NBR
87
87
0.84
2
104
0
NB
SB
1
EB
1
WB
2
11.8
B
Synchro 9 Report
Page 4
12
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
108
108
0.93
2
116
0
SBT
88
88
0.93
2
95
1
SBR
4
4
0.93
2
4
0
SB
NB
1
WB
2
EB
1
12.1
B
Lane
RH
3/24/2016
Synchro 9 Report
Page 5
13
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Approach
HCM Control Delay, s
HCM LOS
EB
1.2
RH
3/24/2016
Existing Sat
2.9
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
1208
-
0
-
NBLn1 EBL
662 1208
0.018 0.04
10.5
8.1
B
A
0.1
0.1
0
-
0
-
0
-
726
364
362
6.54
5.54
5.54
4.02
350
622
624
368
457
602
725
334
419
597
621
NB
10.5
B
134
6.94
3.32
890
-
Minor2
592
362
230
7.54
6.54
6.54
3.52
390
629
752
726
362
364
6.54
5.54
5.54
4.02
350
624
622
174
6.94
3.32
839
-
890
-
373
465
604
716
334
428
621
597
839
-
SB
12.8
B
Synchro 9 Report
Page 6
14
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3.8
EBL EBT EBR
0 265
55
0 265
55
0
0
0
Free Free Free
- None
- 200
0
0
91
91
91
2
2
2
0 291
60
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
235
4.14
2.22
1329
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/24/2016
1329
-
EBL
1329
0
A
0
0
-
0
-
0
-
0
-
WB
0.6
566
275
291
6.54
5.54
5.54
4.02
432
681
670
118
6.94
3.32
912
-
552
552
735
866
0
0
0
0
912
-
SB
11.1
B
Synchro 9 Report
Page 7
15
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3.5
EBL EBT EBR
163 220
0
163 220
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
177 239
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
196
4.14
2.22
1374
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.4
RH
3/24/2016
1374
-
0
-
NBLn1 EBL
408 1374
0.232 0.129
16.5
8
C
A
0.9
0.4
0
-
0
-
0
-
WB
0
789
593
196
6.54
5.54
5.54
4.02
321
492
737
120
6.94
3.32
909
-
329
329
449
915
0
0
0
0
909
-
NB
16.5
C
Synchro 9 Report
Page 8
16
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2018 Background PM
2.3
EBL EBT EBR
37
0
28
37
0
28
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
40
0
30
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
555
292
263
7.54
6.54
6.54
3.52
414
692
719
667
292
375
6.54
5.54
5.54
4.02
378
670
615
391
478
644
669
352
440
669
573
Approach
HCM Control Delay, s
HCM LOS
EB
11.9
B
NBL
1247
0.06
8.1
A
0.2
RH
3/24/2016
155
6.94
3.32
863
-
Minor1
512
375
137
7.54
6.54
6.54
3.52
445
618
852
687
375
312
6.54
5.54
5.54
4.02
368
615
656
113
6.94
3.32
918
-
Major1
310
4.14
2.22
1247
-
863
-
406
474
575
821
342
419
573
655
918
-
1247
-
WB
11.9
B
NBT NBR EBLn1WBLn1 SBL
- 592 525 1341
- 0.119 0.01 0.001
0.2
- 11.9 11.9
7.7
A
B
B
A
0.4
0
0
NB
2.2
0
-
0
-
0
-
0
-
SB
0
SBT SBR
0
A
-
Synchro 9 Report
Page 1
17
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
794
420
374
6.54
5.54
5.54
4.02
319
588
616
366
458
578
783
305
400
566
612
Approach
HCM Control Delay, s
HCM LOS
EB
9.3
A
RH
3/24/2016
2018 Background PM
1.9
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1210
0.005
8
A
0
173
6.94
3.32
840
-
Minor1
593
346
247
7.54
6.54
6.54
3.52
389
643
735
766
346
420
6.54
5.54
5.54
4.02
331
634
588
180
6.94
3.32
832
-
Major1
346
4.14
2.22
1210
-
840
-
374
474
639
703
317
414
630
566
832
-
1210
-
WB
12.7
B
NBT NBR EBLn1WBLn1 SBL
- 840 560 1194
- 0.005 0.163 0.031
9.3 12.7
8.1
A
B
A
0
0.6
0.1
NB
0.1
0
-
0
-
0
-
0
-
SB
0.9
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
18
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.6
EBL
0
0
0
Stop
0
1
0
92
2
0
EBR
20
20
0
Stop
None
92
2
22
NBL NBT
23 290
23 290
0
0
Free Free
- None
115
0
0
92
92
2
2
25 315
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
586
378
208
6.84
5.84
5.84
3.52
441
663
807
191
6.94
3.32
818
-
Major1
382
4.14
2.22
1173
-
432
432
663
790
818
-
1173
-
Approach
HCM Control Delay, s
HCM LOS
EB
9.5
A
RH
3/24/2016
NBL
1173
0.021
8.1
A
0.1
NB
0.6
NBT EBLn1
- 818
- 0.027
9.5
A
0.1
0
-
SBT SBR
345
6
345
6
0
0
Free Free
- None
0
0
92
92
2
2
375
7
Major2
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 3
19
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/24/2016
15
B
EBU
0
0
0.92
2
0
0
EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
14.5
B
EBT
195
195
0.92
2
212
1
EBR
30
30
0.92
2
33
0
WBU
0
0
0.92
2
0
0
WBL
91
91
0.92
2
99
0
WB
EB
1
NB
1
SB
1
14.8
B
WBT
163
163
0.92
2
177
1
WBR
138
138
0.92
2
150
1
NBU
0
0
0.92
2
0
0
NBL
20
20
0.92
2
22
0
NBT
95
95
0.92
2
103
1
NBR
67
67
0.92
2
73
0
NB
SB
1
EB
1
WB
2
13
B
Synchro 9 Report
Page 4
20
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
180
180
0.92
2
196
0
SBT
95
95
0.92
2
103
1
SBR
1
1
0.92
2
1
0
SB
NB
1
WB
2
EB
1
17
C
Lane
RH
3/24/2016
Synchro 9 Report
Page 5
21
Intersection
Int Delay, s/veh
2018 Background PM
15.5
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
353
4.14
2.22
1202
-
Approach
HCM Control Delay, s
HCM LOS
EB
1.7
RH
3/24/2016
1202
-
0
-
NBLn1 EBL
529 1202
0.259 0.081
14.2
8.3
B
A
1
0.3
0
-
0
-
0
-
WB
1.5
159
247
473
429
177
6.94
3.32
835
835
-
NB
14.2
B
159
245
429
473
177
6.94
3.32
835
835
-
SB
59.6
F
Synchro 9 Report
Page 6
22
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
6.6
EBL EBT EBR
0 458 146
0 458 146
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 467 149
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
289
4.14
2.22
1270
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/24/2016
1270
-
EBL
1270
0
A
0
0
-
0
-
0
-
0
-
WB
0.8
817
350
467
6.54
5.54
5.54
4.02
309
631
560
144
6.94
3.32
877
-
430
430
665
783
0
0
0
0
877
-
SB
15.8
C
Synchro 9 Report
Page 7
23
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
8.8
EBL EBT EBR
255 415
0
255 415
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
274 446
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
229
4.14
2.22
1336
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.2
RH
3/24/2016
1336
-
0
-
NBLn1 EBL
192 1336
0.717 0.205
60.6
8.4
F
A
4.5
0.8
0
-
0
-
0
-
WB
0
0
0
0
0
223
6.94
3.32
780
780
-
NB
60.6
F
Synchro 9 Report
Page 8
24
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.6
WBL
0
0
0
Stop
1
0
92
2
0
WBR
46
46
0
Stop
None
0
92
2
50
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
512
321
191
6.84
5.84
5.84
3.52
491
708
822
174
6.94
3.32
839
-
491
491
708
822
839
-
Approach
HCM Control Delay, s
HCM LOS
WB
9.6
A
RH
3/24/2016
NBT NBR
270
51
270
51
0
0
Free Free
- None
0
0
92
92
2
2
293
55
Major1
0
NB
0
0
-
SBL SBT
0 352
0 352
0
0
Free Free
- None
0
0
92
92
2
2
0 383
Major2
349
4.14
2.22
1207
1207
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 9
25
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2019 Background PM
2.3
EBL EBT EBR
37
0
28
37
0
28
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
40
0
30
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
559
295
264
7.54
6.54
6.54
3.52
412
689
718
672
295
377
6.54
5.54
5.54
4.02
376
668
614
390
476
641
668
350
438
667
572
Approach
HCM Control Delay, s
HCM LOS
EB
11.9
B
NBL
1245
0.06
8.1
A
0.2
RH
3/24/2016
156
6.94
3.32
862
-
Minor1
516
377
139
7.54
6.54
6.54
3.52
442
616
850
691
377
314
6.54
5.54
5.54
4.02
366
614
655
114
6.94
3.32
917
-
Major1
312
4.14
2.22
1245
-
862
-
404
472
573
819
340
418
572
654
917
-
1245
-
WB
12
B
NBT NBR EBLn1WBLn1 SBL
- 590 523 1339
- 0.12 0.01 0.001
0.2
- 11.9
12
7.7
A
B
B
A
0.4
0
0
NB
2.2
0
-
0
-
0
-
0
-
SB
0
SBT SBR
0
A
-
Synchro 9 Report
Page 1
26
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
799
423
376
6.54
5.54
5.54
4.02
317
586
615
363
456
576
781
303
398
563
611
Approach
HCM Control Delay, s
HCM LOS
EB
9.3
A
RH
3/24/2016
2019 Background PM
1.9
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1207
0.005
8
A
0
174
6.94
3.32
839
-
Minor1
596
348
248
7.54
6.54
6.54
3.52
387
641
734
771
348
423
6.54
5.54
5.54
4.02
329
633
586
182
6.94
3.32
829
-
Major1
349
4.14
2.22
1207
-
839
-
372
472
637
702
314
412
629
563
829
-
1207
-
WB
12.7
B
NBT NBR EBLn1WBLn1 SBL
- 839 558 1192
- 0.005 0.164 0.031
9.3 12.7
8.1
A
B
A
0
0.6
0.1
NB
0.1
0
-
0
-
0
-
0
-
SB
0.9
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
27
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.6
EBL
0
0
0
Stop
0
1
0
92
2
0
EBR
20
20
0
Stop
None
92
2
22
NBL NBT
23 292
23 292
0
0
Free Free
- None
115
0
0
92
92
2
2
25 317
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
591
382
209
6.84
5.84
5.84
3.52
438
660
806
192
6.94
3.32
817
-
Major1
385
4.14
2.22
1170
-
429
429
660
789
817
-
1170
-
Approach
HCM Control Delay, s
HCM LOS
EB
9.5
A
RH
3/24/2016
NBL
1170
0.021
8.1
A
0.1
NB
0.6
NBT EBLn1
- 817
- 0.027
9.5
A
0.1
0
-
SBT SBR
348
6
348
6
0
0
Free Free
- None
0
0
92
92
2
2
378
7
Major2
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 3
28
Intersection
Intersection Delay, s/veh
Intersection LOS
15.2
C
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/24/2016
EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
14.7
B
EBT
197
197
0.92
2
214
1
EBR
30
30
0.92
2
33
0
WBU
0
0
0.92
2
0
0
WBL
91
91
0.92
2
99
0
WB
EB
1
NB
1
SB
1
14.9
B
WBT
165
165
0.92
2
179
1
WBR
139
139
0.92
2
151
1
NBU
0
0
0.92
2
0
0
NBL
20
20
0.92
2
22
0
NBT
96
96
0.92
2
104
1
NBR
68
68
0.92
2
74
0
NB
SB
1
EB
1
WB
2
13.2
B
Synchro 9 Report
Page 4
29
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
182
182
0.92
2
198
0
SBT
96
96
0.92
2
104
1
SBR
1
1
0.92
2
1
0
SB
NB
1
WB
2
EB
1
17.3
C
Lane
RH
3/24/2016
Synchro 9 Report
Page 5
30
Intersection
Int Delay, s/veh
2019 Background PM
16.1
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
356
4.14
2.22
1199
-
Approach
HCM Control Delay, s
HCM LOS
EB
1.7
RH
3/24/2016
1199
-
0
-
NBLn1 EBL
526 1199
0.263 0.082
14.3
8.3
B
A
1
0.3
0
-
0
-
0
-
WB
1.5
156
244
470
427
179
6.94
3.32
833
833
-
NB
14.3
B
156
242
427
470
178
6.94
3.32
834
834
-
SB
62.4
F
Synchro 9 Report
Page 6
31
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
6.8
EBL EBT EBR
0 462 147
0 462 147
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 471 150
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
292
4.14
2.22
1267
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/24/2016
1267
-
EBL
1267
0
A
0
0
-
0
-
0
-
0
-
WB
0.8
824
353
471
6.54
5.54
5.54
4.02
307
629
558
146
6.94
3.32
875
-
426
426
663
781
0
0
0
0
875
-
SB
16.1
C
Synchro 9 Report
Page 7
32
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
9.2
EBL EBT EBR
257 419
0
257 419
0
0
0
0
Free Free Free
- None
200
0
0
93
93
93
2
2
2
276 451
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
231
4.14
2.22
1334
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.2
RH
3/24/2016
1334
-
0
-
NBLn1 EBL
189 1334
0.734 0.207
63.6
8.4
F
A
4.7
0.8
0
-
0
-
0
-
WB
0
0
0
0
0
225
6.94
3.32
778
778
-
NB
63.6
F
Synchro 9 Report
Page 8
33
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.6
WBL
0
0
0
Stop
1
0
92
2
0
WBR
46
46
0
Stop
None
0
92
2
50
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
516
323
193
6.84
5.84
5.84
3.52
489
706
821
176
6.94
3.32
837
-
489
489
706
821
837
-
Approach
HCM Control Delay, s
HCM LOS
WB
9.6
A
RH
3/24/2016
NBT NBR
272
51
272
51
0
0
Free Free
- None
0
0
92
92
2
2
296
55
Major1
0
NB
0
0
-
SBL SBT
0 355
0 355
0
0
Free Free
- None
0
0
92
92
2
2
0 386
Major2
351
4.14
2.22
1204
1204
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 9
34
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
707
310
397
6.54
5.54
5.54
4.02
359
658
602
370
460
626
654
332
424
657
558
Approach
HCM Control Delay, s
HCM LOS
EB
12.2
B
RH
3/24/2016
2025 Background PM
2.3
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1227
0.064
8.1
A
0.2
165
6.94
3.32
850
-
Minor1
543
397
146
7.54
6.54
6.54
3.52
423
600
842
729
397
332
6.54
5.54
5.54
4.02
348
602
643
120
6.94
3.32
909
-
Major1
329
4.14
2.22
1227
-
850
-
384
455
556
809
322
403
558
642
909
-
1227
-
WB
12.2
B
NBT NBR EBLn1WBLn1 SBL
- 573 505 1324
- 0.133 0.011 0.001
0.2
- 12.2 12.2
7.7
A
B
B
A
0.5
0
0
NB
2.1
0
-
0
-
0
-
0
-
SB
0
SBT SBR
0
A
-
Synchro 9 Report
Page 1
35
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
833
440
393
6.54
5.54
5.54
4.02
303
576
604
347
443
562
771
289
387
554
600
Approach
HCM Control Delay, s
HCM LOS
EB
9.4
A
RH
3/24/2016
2025 Background PM
1.8
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1189
0.006
8
A
0
183
6.94
3.32
828
-
Minor1
623
366
257
7.54
6.54
6.54
3.52
370
626
725
806
366
440
6.54
5.54
5.54
4.02
314
621
576
189
6.94
3.32
821
-
Major1
366
4.14
2.22
1189
-
828
-
355
459
622
693
300
400
617
554
821
-
1189
-
WB
12.9
B
NBT NBR EBLn1WBLn1 SBL
- 828 545 1177
- 0.005 0.168 0.031
9.4 12.9
8.2
A
B
A
0
0.6
0.1
NB
0.2
0
-
0
-
0
-
0
-
SB
0.8
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
36
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.6
EBL
0
0
0
Stop
0
1
0
92
2
0
EBR
21
21
0
Stop
None
92
2
23
NBL NBT
24 307
24 307
0
0
Free Free
- None
115
0
0
92
92
2
2
26 334
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
620
401
219
6.84
5.84
5.84
3.52
420
645
796
202
6.94
3.32
805
-
Major1
404
4.14
2.22
1151
-
411
411
645
778
805
-
1151
-
Approach
HCM Control Delay, s
HCM LOS
EB
9.6
A
RH
3/24/2016
NBL
1151
0.023
8.2
A
0.1
NB
0.6
NBT EBLn1
- 805
- 0.028
9.6
A
0.1
0
-
SBT SBR
365
7
365
7
0
0
Free Free
- None
0
0
92
92
2
2
397
8
Major2
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 3
37
Intersection
Intersection Delay, s/veh
Intersection LOS
16.9
C
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/24/2016
EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
16.3
C
EBT
209
209
0.92
2
227
1
EBR
32
32
0.92
2
35
0
WBU
0
0
0.92
2
0
0
WBL
97
97
0.92
2
105
0
WB
EB
1
NB
1
SB
1
16.6
C
WBT
174
174
0.92
2
189
1
WBR
148
148
0.92
2
161
1
NBU
0
0
0.92
2
0
0
NBL
21
21
0.92
2
23
0
NBT
102
102
0.92
2
111
1
NBR
72
72
0.92
2
78
0
NB
SB
1
EB
1
WB
2
14.3
B
Synchro 9 Report
Page 4
38
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
193
193
0.92
2
210
0
SBT
102
102
0.92
2
111
1
SBR
1
1
0.92
2
1
0
SB
NB
1
WB
2
EB
1
19.7
C
Lane
RH
3/24/2016
Synchro 9 Report
Page 5
39
Intersection
Int Delay, s/veh
2025 Background PM
21.7
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
380
4.14
2.22
1175
-
Approach
HCM Control Delay, s
HCM LOS
EB
1.7
RH
3/24/2016
1175
-
0
-
NBLn1 EBL
503 1175
0.286 0.088
15
8.4
C
A
1.2
0.3
0
-
0
-
0
-
WB
1.5
141
227
452
410
190
6.94
3.32
820
820
-
NB
15
C
141
226
410
452
190
6.94
3.32
820
820
-
SB
87.9
F
Synchro 9 Report
Page 6
40
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
7.3
EBL EBT EBR
0 487 154
0 487 154
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 497 157
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
307
4.14
2.22
1250
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/24/2016
1250
-
EBL
1250
0
A
0
0
-
0
-
0
-
0
-
WB
0.8
869
372
497
6.54
5.54
5.54
4.02
289
617
543
154
6.94
3.32
864
-
407
407
646
770
0
0
0
0
864
-
SB
17.5
C
Synchro 9 Report
Page 7
41
Intersection
Int Delay, s/veh
11.9
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
245
4.14
2.22
1318
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.2
RH
3/24/2016
1318
-
0
-
NBLn1 EBL
172 1318
0.85 0.22
87.9
8.5
F
A
6
0.8
0
-
0
-
0
-
WB
0
0
0
0
0
239
6.94
3.32
762
762
-
NB
87.9
F
Synchro 9 Report
Page 8
42
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.6
WBL
0
0
0
Stop
1
0
92
2
0
WBR
46
46
0
Stop
None
0
92
2
50
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
541
339
202
6.84
5.84
5.84
3.52
471
693
812
183
6.94
3.32
828
-
471
471
693
812
828
-
Approach
HCM Control Delay, s
HCM LOS
WB
9.6
A
RH
3/24/2016
NBT NBR
286
51
286
51
0
0
Free Free
- None
0
0
92
92
2
2
311
55
Major1
0
NB
0
0
-
SBL SBT
0 371
0 371
0
0
Free Free
- None
0
0
92
92
2
2
0 403
Major2
366
4.14
2.22
1189
1189
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 9
43
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2.6
EBL EBT EBR
32
0
25
32
0
25
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
34
0
27
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
336
156
180
7.54
6.54
6.54
3.52
594
831
804
403
156
247
6.54
5.54
5.54
4.02
535
768
701
574
619
795
769
512
557
768
671
Approach
HCM Control Delay, s
HCM LOS
EB
10.4
B
NBL
1406
0.04
7.7
A
0.1
RH
3/24/2016
84
6.94
3.32
958
-
Minor1
319
247
72
7.54
6.54
6.54
3.52
610
735
929
416
247
169
6.54
5.54
5.54
4.02
526
701
758
68
6.94
3.32
981
-
Major1
169
4.14
2.22
1406
-
958
-
573
604
703
903
503
542
671
758
981
-
1406
-
WB
8.7
A
NBT NBR EBLn1WBLn1 SBL
- 733 981 1447
- 0.084 0.001
0.1
- 10.4
8.7
0
A
B
A
A
0.3
0
0
NB
2.3
0
-
0
-
0
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 1
44
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
458
244
214
6.54
5.54
5.54
4.02
498
703
724
563
613
736
872
489
541
692
722
Approach
HCM Control Delay, s
HCM LOS
EB
9.1
A
RH
3/24/2016
1.9
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1360
0.003
7.7
A
0
104
6.94
3.32
931
-
Minor1
346
206
140
7.54
6.54
6.54
3.52
584
777
849
452
206
246
6.54
5.54
5.54
4.02
502
730
701
103
6.94
3.32
932
-
Major1
208
4.14
2.22
1360
-
931
-
569
623
775
826
493
547
728
690
932
-
1360
-
WB
10.7
B
NBT NBR EBLn1WBLn1 SBL
- 889 690 1364
- 0.013 0.09 0.014
9.1 10.7
7.7
A
B
A
0
0.3
0
NB
0.2
0
-
0
-
0
-
0
-
SB
0.7
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
45
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.8
EBL
6
6
0
Stop
0
1
0
92
2
7
EBR
19
19
0
Stop
None
92
2
21
NBL NBT
13 160
13 160
0
0
Free Free
- None
115
0
0
92
92
2
2
14 174
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
352
237
115
6.84
5.84
5.84
3.52
619
780
897
120
6.94
3.32
909
-
Major1
240
4.14
2.22
1324
-
612
612
780
888
909
-
1324
-
Approach
HCM Control Delay, s
HCM LOS
EB
9.6
A
RH
3/24/2016
NBL
1324
0.011
7.7
A
0
NB
0.6
NBT EBLn1
- 814
- 0.033
9.6
A
0.1
0
-
SBT SBR
216
5
216
5
0
0
Free Free
- None
0
0
92
92
2
2
235
5
Major2
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 3
46
Intersection
Intersection Delay, s/veh
Intersection LOS
10.8
B
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/24/2016
EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
10.4
B
EBT
105
105
0.92
2
114
1
EBR
34
34
0.92
2
37
0
WBU
0
0
0.92
2
0
0
WBL
49
49
0.92
2
53
0
WB
EB
1
NB
1
SB
1
10.5
B
WBT
103
103
0.92
2
112
1
WBR
191
191
0.92
2
208
1
NBU
0
0
0.92
2
0
0
NBL
10
10
0.92
2
11
0
NBT
107
107
0.92
2
116
1
NBR
45
45
0.92
2
49
0
NB
SB
1
EB
1
WB
2
10.6
B
Synchro 9 Report
Page 4
47
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
111
111
0.93
2
119
0
SBT
91
91
0.93
2
98
1
SBR
4
4
0.93
2
4
0
SB
NB
1
WB
2
EB
1
11.8
B
Lane
RH
3/24/2016
Synchro 9 Report
Page 5
48
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Approach
HCM Control Delay, s
HCM LOS
EB
1.4
RH
3/24/2016
5.7
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
1236
-
0
-
NBLn1 EBL
659 1236
0.18 0.04
11.7
8
B
A
0.7
0.1
0
-
0
-
0
-
832
329
503
6.54
5.54
5.54
4.02
303
645
540
262
356
632
507
271
357
619
503
NB
11.7
B
116
6.94
3.32
914
-
Minor2
727
503
224
7.54
6.54
6.54
3.52
312
519
758
832
503
329
6.54
5.54
5.54
4.02
303
540
645
160
6.94
3.32
857
-
914
-
247
349
498
634
271
359
503
619
857
-
SB
17.9
C
Synchro 9 Report
Page 6
49
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
4
EBL EBT EBR
0 322
79
0 322
79
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 350
86
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
274
4.14
2.22
1286
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/24/2016
1286
-
EBL
1286
0
A
0
0
-
0
-
0
-
0
-
WB
0.6
665
315
350
6.54
5.54
5.54
4.02
379
654
631
137
6.94
3.32
886
-
498
498
701
838
0
0
0
0
886
-
SB
11.7
B
Synchro 9 Report
Page 7
50
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
5.1
EBL EBT EBR
211 233
0
211 233
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
229 253
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
209
4.14
2.22
1359
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.9
RH
3/24/2016
1359
-
0
-
NBLn1 EBL
315 1359
0.397 0.169
23.8
8.2
C
A
1.8
0.6
0
-
0
-
0
-
WB
0
921
712
209
6.54
5.54
5.54
4.02
269
434
728
127
6.94
3.32
900
-
262
262
372
909
0
0
0
0
900
-
NB
23.8
C
Synchro 9 Report
Page 8
51
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.7
WBL
0
0
0
Stop
1
0
92
2
0
WBR
36
36
0
Stop
None
0
92
2
39
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
308
193
115
6.84
5.84
5.84
3.52
660
821
897
111
6.94
3.32
921
-
660
660
821
897
921
-
Approach
HCM Control Delay, s
HCM LOS
WB
9.1
A
RH
3/24/2016
NBT NBR
151
54
151
54
0
0
Free Free
- None
0
0
92
92
2
2
164
59
Major1
0
NB
0
0
-
SBL SBT
0 211
0 211
0
0
Free Free
- None
0
0
92
92
2
2
0 229
Major2
223
4.14
2.22
1343
1343
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 9
52
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2.6
EBL EBT EBR
32
0
25
32
0
25
0
0
0
Stop Stop Stop
- None
1
0
93
93
93
2
2
2
34
0
27
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
338
158
180
7.54
6.54
6.54
3.52
592
828
804
406
158
248
6.54
5.54
5.54
4.02
533
766
700
572
617
792
769
510
555
766
670
Approach
HCM Control Delay, s
HCM LOS
EB
10.4
B
NBL
1405
0.04
7.7
A
0.1
RH
3/24/2016
85
6.94
3.32
957
-
Minor1
321
248
73
7.54
6.54
6.54
3.52
608
734
928
418
248
170
6.54
5.54
5.54
4.02
524
700
757
68
6.94
3.32
981
-
Major1
170
4.14
2.22
1405
-
957
-
572
603
702
902
501
541
670
757
981
-
1405
-
WB
8.7
A
NBT NBR EBLn1WBLn1 SBL
- 731 981 1445
- 0.084 0.001
0.1
- 10.4
8.7
0
A
B
A
A
0.3
0
0
NB
2.3
0
-
0
-
0
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 1
53
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
461
246
215
6.54
5.54
5.54
4.02
496
701
724
560
611
734
870
487
540
690
722
Approach
HCM Control Delay, s
HCM LOS
EB
9.1
A
RH
3/24/2016
1.9
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1358
0.003
7.7
A
0
105
6.94
3.32
929
-
Minor1
348
207
141
7.54
6.54
6.54
3.52
582
776
847
455
207
248
6.54
5.54
5.54
4.02
500
729
700
103
6.94
3.32
932
-
Major1
210
4.14
2.22
1358
-
929
-
567
621
774
824
491
545
727
689
932
-
1358
-
WB
10.8
B
NBT NBR EBLn1WBLn1 SBL
- 887 688 1363
- 0.013 0.091 0.014
9.1 10.8
7.7
A
B
A
0
0.3
0
NB
0.2
0
-
0
-
0
-
0
-
SB
0.7
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
54
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.8
EBL
6
6
0
Stop
0
1
0
92
2
7
EBR
19
19
0
Stop
None
92
2
21
NBL NBT
14 161
14 161
0
0
Free Free
- None
115
0
0
92
92
2
2
15 175
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
357
239
118
6.84
5.84
5.84
3.52
615
778
894
121
6.94
3.32
908
-
Major1
241
4.14
2.22
1323
-
608
608
778
884
908
-
1323
-
Approach
HCM Control Delay, s
HCM LOS
EB
9.6
A
RH
3/24/2016
NBL
1323
0.012
7.8
A
0
NB
0.6
NBT EBLn1
- 812
- 0.033
9.6
A
0.1
0
-
SBT SBR
217
5
217
5
0
0
Free Free
- None
0
0
92
92
2
2
236
5
Major2
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 3
55
Intersection
Intersection Delay, s/veh
Intersection LOS
10.9
B
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/24/2016
EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
10.4
B
EBT
106
106
0.92
2
115
1
EBR
34
34
0.92
2
37
0
WBU
0
0
0.92
2
0
0
WBL
49
49
0.92
2
53
0
WB
EB
1
NB
1
SB
1
10.6
B
WBT
104
104
0.92
2
113
1
WBR
193
193
0.92
2
210
1
NBU
0
0
0.92
2
0
0
NBL
10
10
0.92
2
11
0
NBT
108
108
0.92
2
117
1
NBR
45
45
0.92
2
49
0
NB
SB
1
EB
1
WB
2
10.7
B
Synchro 9 Report
Page 4
56
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
112
112
0.93
2
120
0
SBT
92
92
0.93
2
99
1
SBR
4
4
0.93
2
4
0
SB
NB
1
WB
2
EB
1
11.8
B
Lane
RH
3/24/2016
Synchro 9 Report
Page 5
57
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Approach
HCM Control Delay, s
HCM LOS
EB
1.4
RH
3/24/2016
5.8
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
1234
-
0
-
NBLn1 EBL
657 1234
0.182 0.041
11.7
8
B
A
0.7
0.1
0
-
0
-
0
-
842
334
508
6.54
5.54
5.54
4.02
299
642
537
258
352
627
504
267
353
616
500
NB
11.7
B
117
6.94
3.32
913
-
Minor2
736
508
228
7.54
6.54
6.54
3.52
307
516
754
842
508
334
6.54
5.54
5.54
4.02
299
537
642
161
6.94
3.32
855
-
913
-
242
345
495
629
267
355
500
616
855
-
SB
18.2
C
Synchro 9 Report
Page 6
58
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
4
EBL EBT EBR
0 325
79
0 325
79
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 353
86
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
277
4.14
2.22
1283
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/24/2016
1283
-
EBL
1283
0
A
0
0
-
0
-
0
-
0
-
WB
0.6
671
318
353
6.54
5.54
5.54
4.02
376
652
629
139
6.94
3.32
884
-
495
495
698
836
0
0
0
0
884
-
SB
11.7
B
Synchro 9 Report
Page 7
59
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
5.1
EBL EBT EBR
213 235
0
213 235
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
232 255
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
211
4.14
2.22
1357
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.9
RH
3/24/2016
1357
-
0
-
NBLn1 EBL
311 1357
0.402 0.171
24.1
8.2
C
A
1.9
0.6
0
-
0
-
0
-
WB
0
929
718
211
6.54
5.54
5.54
4.02
266
431
726
128
6.94
3.32
898
-
259
259
368
908
0
0
0
0
898
-
NB
24.1
C
Synchro 9 Report
Page 8
60
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.7
WBL
0
0
0
Stop
1
0
92
2
0
WBR
36
36
0
Stop
None
0
92
2
39
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
311
195
116
6.84
5.84
5.84
3.52
657
819
896
112
6.94
3.32
920
-
657
657
819
896
920
-
Approach
HCM Control Delay, s
HCM LOS
WB
9.1
A
RH
3/24/2016
NBT NBR
152
54
152
54
0
0
Free Free
- None
0
0
92
92
2
2
165
59
Major1
0
NB
0
0
-
SBL SBT
0 213
0 213
0
0
Free Free
- None
0
0
92
92
2
2
0 232
Major2
224
4.14
2.22
1342
1342
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 9
61
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
426
166
260
6.54
5.54
5.54
4.02
519
760
692
556
605
783
759
496
545
760
661
Approach
HCM Control Delay, s
HCM LOS
EB
10.5
B
RH
3/24/2016
2.6
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1395
0.042
7.7
A
0.1
89
6.94
3.32
951
-
Minor1
336
260
76
7.54
6.54
6.54
3.52
594
722
924
438
260
178
6.54
5.54
5.54
4.02
511
692
751
72
6.94
3.32
975
-
Major1
178
4.14
2.22
1395
-
951
-
556
590
690
896
488
531
661
751
975
-
1395
-
WB
8.7
A
NBT NBR EBLn1WBLn1 SBL
- 721 975 1436
- 0.091 0.001
0.1
- 10.5
8.7
0
A
B
A
A
0.3
0
0
NB
2.3
0
-
0
-
0
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 1
62
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
479
256
223
6.54
5.54
5.54
4.02
484
694
718
548
601
724
866
475
532
683
716
Approach
HCM Control Delay, s
HCM LOS
EB
9.1
A
RH
3/24/2016
1.9
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1348
0.003
7.7
A
0
110
6.94
3.32
922
-
Minor1
361
215
146
7.54
6.54
6.54
3.52
570
767
842
473
215
258
6.54
5.54
5.54
4.02
488
724
693
107
6.94
3.32
926
-
Major1
219
4.14
2.22
1348
-
922
-
555
612
765
818
479
537
722
682
926
-
1348
-
WB
10.8
B
NBT NBR EBLn1WBLn1 SBL
- 883 680 1353
- 0.015 0.092 0.014
9.1 10.8
7.7
A
B
A
0
0.3
0
NB
0.2
0
-
0
-
0
-
0
-
SB
0.7
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
63
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.8
EBL
7
7
0
Stop
0
1
0
92
2
8
EBR
20
20
0
Stop
None
92
2
22
NBL NBT
14 168
14 168
0
0
Free Free
- None
115
0
0
92
92
2
2
15 183
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
372
250
122
6.84
5.84
5.84
3.52
602
768
890
127
6.94
3.32
900
-
Major1
253
4.14
2.22
1309
-
595
595
768
880
900
-
1309
-
Approach
HCM Control Delay, s
HCM LOS
EB
9.7
A
RH
3/24/2016
NBL
1309
0.012
7.8
A
0
NB
0.6
NBT EBLn1
- 794
- 0.037
9.7
A
0.1
0
-
SBT SBR
227
6
227
6
0
0
Free Free
- None
0
0
92
92
2
2
247
7
Major2
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 3
64
Intersection
Intersection Delay, s/veh
Intersection LOS
11.3
B
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/24/2016
EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
10.8
B
EBT
112
112
0.92
2
122
1
EBR
36
36
0.92
2
39
0
WBU
0
0
0.92
2
0
0
WBL
52
52
0.92
2
57
0
WB
EB
1
NB
1
SB
1
11
B
WBT
109
109
0.92
2
118
1
WBR
204
204
0.92
2
222
1
NBU
0
0
0.92
2
0
0
NBL
11
11
0.92
2
12
0
NBT
115
115
0.92
2
125
1
NBR
48
48
0.92
2
52
0
NB
SB
1
EB
1
WB
2
11.1
B
Synchro 9 Report
Page 4
65
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
119
119
0.93
2
128
0
SBT
97
97
0.93
2
104
1
SBR
4
4
0.93
2
4
0
SB
NB
1
WB
2
EB
1
12.4
B
Lane
RH
3/24/2016
Synchro 9 Report
Page 5
66
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Approach
HCM Control Delay, s
HCM LOS
EB
1.4
RH
3/24/2016
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
1214
-
0
-
NBLn1 EBL
644 1214
0.191 0.044
11.9
8.1
B
A
0.7
0.1
0
-
0
-
0
-
888
354
534
6.54
5.54
5.54
4.02
281
629
523
238
333
608
485
249
337
602
485
NB
11.9
B
124
6.94
3.32
904
-
Minor2
775
534
241
7.54
6.54
6.54
3.52
288
498
741
888
534
354
6.54
5.54
5.54
4.02
281
523
629
171
6.94
3.32
843
-
904
-
224
328
476
612
249
340
485
602
843
-
SB
19.6
C
Synchro 9 Report
Page 6
67
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
4.1
EBL EBT EBR
0 342
83
0 342
83
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 372
90
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
291
4.14
2.22
1268
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/24/2016
1268
-
EBL
1268
0
A
0
0
-
0
-
0
-
0
-
WB
0.6
707
335
372
6.54
5.54
5.54
4.02
359
641
617
146
6.94
3.32
875
-
476
476
684
827
0
0
0
0
875
-
SB
12.1
B
Synchro 9 Report
Page 7
68
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
5.5
EBL EBT EBR
223 249
0
223 249
0
0
0
0
Free Free Free
- None
200
0
0
92
92
92
2
2
2
242 271
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
224
4.14
2.22
1342
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.9
RH
3/24/2016
1342
-
0
-
NBLn1 EBL
290 1342
0.454 0.181
27.3
8.3
D
A
2.2
0.7
0
-
0
-
0
-
WB
0
979
755
224
6.54
5.54
5.54
4.02
249
415
717
135
6.94
3.32
889
-
239
239
348
900
0
0
0
0
889
-
NB
27.3
D
Synchro 9 Report
Page 8
69
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.7
WBL
0
0
0
Stop
1
0
92
2
0
WBR
36
36
0
Stop
None
0
92
2
39
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
323
202
121
6.84
5.84
5.84
3.52
646
812
891
116
6.94
3.32
914
-
646
646
812
891
914
-
Approach
HCM Control Delay, s
HCM LOS
WB
9.1
A
RH
3/24/2016
NBT NBR
159
54
159
54
0
0
Free Free
- None
0
0
92
92
2
2
173
59
Major1
0
NB
0
0
-
SBL SBT
0 222
0 222
0
0
Free Free
- None
0
0
92
92
2
2
0 241
Major2
232
4.14
2.22
1333
1333
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 9
70
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
795
357
438
6.54
5.54
5.54
4.02
319
627
577
333
430
585
637
294
395
626
533
Approach
HCM Control Delay, s
HCM LOS
EB
12.7
B
RH
3/25/2016
2018 Total PM
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1181
0.064
8.3
A
0.2
187
6.94
3.32
823
-
Minor1
608
438
170
7.54
6.54
6.54
3.52
380
567
815
814
438
376
6.54
5.54
5.54
4.02
311
577
615
144
6.94
3.32
877
-
Major1
374
4.14
2.22
1181
-
823
-
344
424
524
784
287
376
533
614
877
-
1181
-
WB
12.7
B
NBT NBR EBLn1WBLn1 SBL
- 541 473 1271
- 0.131 0.011 0.001
0.2
- 12.7 12.7
7.8
A
B
B
A
0.4
0
0
NB
1.9
0
-
0
-
0
-
0
-
SB
0
SBT SBR
0
A
-
Synchro 9 Report
Page 1
71
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
921
484
437
6.54
5.54
5.54
4.02
269
550
578
310
413
530
749
256
360
527
574
Approach
HCM Control Delay, s
HCM LOS
EB
9.5
A
RH
3/25/2016
2018 Total PM
1.7
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1145
0.006
8.2
A
0
205
6.94
3.32
802
-
Minor1
688
409
279
7.54
6.54
6.54
3.52
333
590
704
893
409
484
6.54
5.54
5.54
4.02
279
594
550
212
6.94
3.32
793
-
Major1
410
4.14
2.22
1145
-
802
-
319
429
586
671
266
373
590
527
793
-
1145
-
WB
13.5
B
NBT NBR EBLn1WBLn1 SBL
- 802 513 1132
- 0.005 0.178 0.033
9.5 13.5
8.3
A
B
A
0
0.6
0.1
NB
0.1
0
-
0
-
0
-
0
-
SB
0.8
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
72
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
865
479
386
6.54
5.54
5.54
4.02
290
553
609
300
300
525
712
275
275
536
596
Approach
HCM Control Delay, s
HCM LOS
EB
9.6
A
RH
3/25/2016
2018 Total PM
2.4
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1146
0.022
8.2
A
0.1
204
6.94
3.32
803
-
Minor1
661
386
275
7.54
6.54
6.54
3.52
348
609
708
869
386
483
6.54
5.54
5.54
4.02
289
609
551
168
6.94
3.32
847
-
Major1
409
4.14
2.22
1146
-
803
-
325
325
596
668
274
274
596
534
847
-
1146
-
WB
15.4
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 803 325 847 1220
- 0.027 0.207 0.047 0.03
9.6
19
9.5
8
A
C
A
A
0.1
0.8
0.1
0.1
NB
0.5
0
-
0
-
0
-
0
-
SB
0.7
SBT SBR
-
Synchro 9 Report
Page 3
73
Intersection
Intersection Delay, s/veh
Intersection LOS
17.5
C
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/25/2016
EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
17.5
C
EBT
239
239
0.92
2
260
1
EBR
30
30
0.92
2
33
0
WBU
0
0
0.92
2
0
0
WBL
91
91
0.92
2
99
0
WB
EB
1
NB
1
SB
1
18
C
WBT
206
206
0.92
2
224
1
WBR
138
138
0.92
2
150
1
NBU
0
0
0.92
2
0
0
NBL
20
20
0.92
2
22
0
NBT
95
95
0.92
2
103
1
NBR
67
67
0.92
2
73
0
NB
SB
1
EB
1
WB
2
14.1
B
Synchro 9 Report
Page 4
74
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
180
180
0.92
2
196
0
SBT
95
95
0.92
2
103
1
SBR
1
1
0.92
2
1
0
SB
NB
1
WB
2
EB
1
18.9
C
Lane
RH
3/25/2016
Synchro 9 Report
Page 5
75
Intersection
Int Delay, s/veh
2018 Total PM
118.2
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
353
4.14
2.22
1202
-
Approach
HCM Control Delay, s
HCM LOS
EB
2.4
RH
3/25/2016
1202
-
0
-
NBLn1 EBL
481 1202
0.285 0.119
15.4
8.4
C
A
1.2
0.4
0
-
0
-
0
-
WB
1.2
134
212
412
429
NB
15.4
C
177
6.94
3.32
835
835
-
134
212
429
412
177
6.94
3.32
835
835
-
SB
$ 409.5
F
Synchro 9 Report
Page 6
76
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
8.4
EBL EBT EBR
0 588 204
0 588 204
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 600 208
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
364
4.14
2.22
1191
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
1191
-
EBL
1191
0
A
0
0
-
0
-
0
-
0
-
WB
0.7
0
0
0
0
182
6.94
3.32
829
829
-
SB
21.2
C
Synchro 9 Report
Page 7
77
Intersection
Int Delay, s/veh
72.6
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
245
4.14
2.22
1318
-
Approach
HCM Control Delay, s
HCM LOS
EB
4.1
RH
3/25/2016
1318
-
0
-
NBLn1 EBL
107 1318
1.879 0.303
$ 496.4
8.9
F
A
16.4
1.3
0
-
0
-
0
-
WB
0
0
0
0
0
231
6.94
3.32
771
771
-
NB
$ 496.4
F
Synchro 9 Report
Page 8
78
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
4.8
NWL
184
184
0
Stop
0
1
0
92
2
200
NWR
37
37
0
Stop
None
0
92
2
40
NET NER
362 187
362 187
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
393 203
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
710
393
317
6.84
5.84
5.84
3.52
368
651
711
197
6.94
3.32
811
-
353
353
651
682
811
-
Approach
HCM Control Delay, s
HCM LOS
NW
24.7
C
RH
3/25/2016
Major1
0
NE
0
0
-
SWL SWT
44 408
44 408
0
0
Free Free
- None
100
0
0
92
92
2
2
48 443
Major2
393
4.14
2.22
1162
1162
-
0
-
SW
0.8
Synchro 9 Report
Page 9
79
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.5
WBL
0
0
0
Stop
1
0
92
2
0
WBR
46
46
0
Stop
None
0
92
2
50
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
607
384
223
6.84
5.84
5.84
3.52
428
658
793
206
6.94
3.32
800
-
428
428
658
793
800
-
Approach
HCM Control Delay, s
HCM LOS
WB
9.8
A
RH
3/25/2016
NBT NBR
328
51
328
51
0
0
Free Free
- None
0
0
92
92
2
2
357
55
Major1
0
NB
0
0
-
SBL SBT
0 411
0 411
0
0
Free Free
- None
0
0
92
92
2
2
0 447
Major2
412
4.14
2.22
1143
1143
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 10
80
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
135
135
5
0
1.00
1.00
1863
144
1
0.94
2
427
0.08
1774
144
1774
3.2
3.2
1.00
427
0.34
467
1.00
1.00
13.2
0.5
0.0
1.6
13.6
B
333
333
2
0
12
12
12
0
1.00
1.00
1863
13
1
0.94
2
436
0.28
1583
13
1583
0.3
0.3
1.00
436
0.03
756
1.00
1.00
15.0
0.0
0.0
0.2
15.0
B
122
122
1
0
1.00
1.00
1863
130
1
0.94
2
460
0.08
1774
130
1774
2.9
2.9
1.00
460
0.28
513
1.00
1.00
13.3
0.3
0.0
1.5
13.6
B
332
332
6
0
404
404
16
0
1.00
1.00
1863
258
1
0.94
2
425
0.27
1583
258
1583
8.1
8.1
1.00
425
0.61
756
1.00
1.00
18.1
1.4
0.0
3.7
19.5
B
5
5
3
0
1.00
1.00
1900
5
0
0.94
2
7
0.11
60
137
1638
4.6
4.6
0.04
180
0.76
464
1.00
1.00
24.5
6.5
0.0
2.4
31.0
C
25
25
8
0
99
99
18
0
1.00
1.00
1900
105
0
0.94
2
138
0.11
1256
0
0
0.0
0.0
0.77
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
392
392
7
0
1.00
1.00
1863
456
2
0.94
2
656
0.18
3548
456
1774
6.8
6.8
1.00
656
0.70
1318
1.00
1.00
21.6
1.3
0.0
3.4
22.9
C
51
51
4
0
138
138
14
0
1.00
1.00
1863
103
1
0.94
2
293
0.18
1583
103
1583
3.2
3.2
1.00
293
0.35
588
1.00
1.00
20.1
0.7
0.0
1.5
20.8
C
1
1
9.3
5.0
6.0
4.9
0.0
1.00
1863
354
2
0.94
2
975
0.28
3539
354
1770
4.6
4.6
975
0.36
1690
1.00
1.00
16.5
0.2
0.0
2.2
16.7
B
511
15.8
B
2
2
20.6
5.0
27.0
6.6
5.5
4
4
15.4
5.0
21.0
8.8
1.6
1.00
1863
353
2
0.94
2
950
0.27
3539
353
1770
4.6
4.6
950
0.37
1690
1.00
1.00
16.8
0.2
0.0
2.2
17.0
B
741
17.3
B
5
5
9.7
5.0
6.0
5.2
0.0
1.00
1863
27
1
0.94
2
35
0.11
323
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
137
31.0
C
6
6
20.2
5.0
27.0
10.1
5.1
1.00
1863
0
0
0.94
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
559
22.5
C
8
8
11.2
5.0
16.0
6.6
0.4
19.4
B
Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016
Synchro 9 Report
Page 1
81
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/26/2016
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
371
371
5
0
1.00
1.00
1863
399
1
0.93
2
760
0.22
1774
399
1774
5.6
5.6
1.00
760
0.52
1731
1.00
1.00
6.6
0.6
0.0
2.8
7.1
A
429
429
2
0
0
0
12
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
1
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
228
228
6
0
109
109
16
0
1.00
1.00
1863
82
1
0.93
2
361
0.23
1583
82
1583
1.6
1.6
1.00
361
0.23
936
1.00
1.00
12.2
0.3
0.0
0.7
12.5
B
161
161
3
0
1.00
1.00
1900
173
0
0.93
0
245
0.16
1502
201
1745
4.2
4.2
0.86
285
0.71
986
1.00
1.00
15.4
3.2
0.0
2.3
18.6
B
0
0
8
0
26
26
18
0
1.00
1.00
1900
28
0
0.93
0
40
0.16
243
0
0
0.0
0.0
0.14
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
0
0
0
0
1.00
1863
461
2
0.93
2
2052
0.58
3632
461
1770
2.4
2.4
2052
0.22
5274
1.00
1.00
3.9
0.1
0.0
1.2
4.0
A
860
5.5
A
2
2
27.6
5.0
58.0
4.4
5.6
1.00
1863
245
2
0.93
2
807
0.23
3632
245
1770
2.2
2.2
807
0.30
2091
1.00
1.00
12.5
0.2
0.0
1.1
12.7
B
327
12.6
B
5
5
13.7
5.0
30.0
7.6
1.2
1.00
1863
0
1
0.93
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
201
18.6
B
6
6
13.9
5.0
23.0
4.2
4.6
8
8
11.4
5.0
22.0
6.2
0.9
9.1
A
Synchro 9 Report
Page 1
82
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
954
432
522
6.54
5.54
5.54
4.02
257
581
529
251
354
514
563
224
327
564
475
Approach
HCM Control Delay, s
HCM LOS
EB
14.1
B
RH
3/25/2016
2019 Total PM
3.2
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1160
0.083
8.4
A
0.3
197
6.94
3.32
811
-
Minor1
756
522
234
7.54
6.54
6.54
3.52
297
506
748
973
522
451
6.54
5.54
5.54
4.02
251
529
569
164
6.94
3.32
852
-
Major1
395
4.14
2.22
1160
-
811
-
258
349
454
699
219
312
475
552
852
-
1160
-
WB
16.1
C
NBT NBR EBLn1WBLn1 SBL
- 467 382 1228
- 0.151 0.154 0.023
0.3
- 14.1 16.1
8
A
B
C
A
0.5
0.5
0.1
NB
2.1
0
-
0
-
0
-
0
-
SB
0.6
SBT SBR
0.1
A
-
Synchro 9 Report
Page 1
83
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
RH
3/25/2016
1.6
EBL EBT EBR
0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
4
Minor2
824 1116
573 573
251 543
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
265 206
472 502
731 518
242
355
469
694
EB
9.8
A
NBL
1061
0.006
8.4
A
0
194
306
477
515
249
6.94
3.32
751
751
-
202
319
529
477
265
6.94
3.32
733
-
Major1
499
4.14
2.22
1061
-
733
-
1061
-
WB
15.2
C
NBT NBR EBLn1WBLn1 SBL
- 751 445 1033
- 0.006 0.205 0.036
9.8 15.2
8.6
A
C
A
0
0.8
0.1
NB
0.1
0
-
0
-
0
-
0
-
SB
0.8
SBT SBR
0.2
A
-
Synchro 9 Report
Page 2
84
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
RH
3/25/2016
4.3
EBL EBT EBR
0
0
20
0
0
20
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
22
Minor2
857 1070
593 593
264 477
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
251 220
459 492
718 554
219
329
448
651
EB
9.8
A
NBL
1085
0.023
8.4
A
0.1
203
308
465
541
236
6.94
3.32
766
766
-
201
311
541
463
214
6.94
3.32
791
-
Major1
473
4.14
2.22
1085
-
791
-
1085
-
WB
21.7
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 766 356 791 1129
- 0.028 0.513 0.071 0.055
9.8 25.3
9.9
8.4
A
D
A
A
0.1
2.8
0.2
0.2
NB
0.3
0
-
0
-
0
-
0
-
SB
1
SBT SBR
-
Synchro 9 Report
Page 3
85
Intersection
Intersection Delay, s/veh
Intersection LOS
20.8
C
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/25/2016
EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
21.4
C
EBT
273
273
0.92
2
297
1
EBR
30
30
0.92
2
33
0
WBU
0
0
0.92
2
0
0
WBL
91
91
0.92
2
99
0
WB
EB
1
NB
1
SB
1
22.4
C
WBT
240
240
0.92
2
261
1
WBR
139
139
0.92
2
151
1
NBU
0
0
0.92
2
0
0
NBL
20
20
0.92
2
22
0
NBT
96
96
0.92
2
104
1
NBR
68
68
0.92
2
74
0
NB
SB
1
EB
1
WB
2
15.4
C
Synchro 9 Report
Page 4
86
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
182
182
0.92
2
198
0
SBT
96
96
0.92
2
104
1
SBR
1
1
0.92
2
1
0
SB
NB
1
WB
2
EB
1
21
C
Lane
RH
3/25/2016
Synchro 9 Report
Page 5
87
Intersection
Int Delay, s/veh
2019 Total PM
270.7
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
356
4.14
2.22
1199
-
Approach
HCM Control Delay, s
HCM LOS
EB
2.8
RH
3/25/2016
1199
-
0
-
NBLn1 EBL
438 1199
0.316 0.149
17
8.5
C
A
1.3
0.5
0
-
0
-
0
-
WB
1
116
185
368
427
NB
17
C
179
6.94
3.32
833
833
-
116
185
427
368
178
6.94
3.32
834
834
-
SB
$ 856.9
F
Synchro 9 Report
Page 6
88
Intersection
Int Delay, s/veh
11.6
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
420
4.14
2.22
1136
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
1136
-
EBL
1136
0
A
0
0
-
0
-
0
-
0
-
WB
0.6
0
0
0
0
210
6.94
3.32
796
796
-
SB
30.2
D
Synchro 9 Report
Page 7
89
Intersection
Int Delay, s/veh
203.1
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
258
4.14
2.22
1304
-
Approach
HCM Control Delay, s
HCM LOS
EB
4.8
WB
0
NBLn1 EBL
69 1304
3.584 0.376
$ 1288.4
9.4
F
A
25.9
1.8
1304
-
Notes
~: Volume exceeds capacity
RH
3/25/2016
0
-
0
-
Major2
477
4.14
2.22
1082
1082
-
0
-
0
-
~ 62
~ 62
~ 112
883
0
0
0
0
239
6.94
3.32
762
762
-
NB
$ 1288.4
F
Synchro 9 Report
Page 8
90
Intersection
Int Delay, s/veh
12.8
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
NWL
203
203
0
Stop
0
1
0
92
2
221
NWR
60
60
0
Stop
None
0
92
2
65
NET NER
513 205
513 205
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
558 223
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
987
558
429
6.84
5.84
5.84
3.52
244
537
624
279
6.94
3.32
718
-
229
229
537
586
718
-
Approach
HCM Control Delay, s
HCM LOS
NW
76.1
F
RH
3/25/2016
Major1
0
NE
0
0
-
SWL SWT
57 562
57 562
0
0
Free Free
- None
100
0
0
92
92
2
2
62 611
Major2
558
4.14
2.22
1009
1009
-
0
-
SW
0.8
Synchro 9 Report
Page 9
91
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.8
WBL
0
0
0
Stop
1
0
92
2
0
WBR
82
82
0
Stop
None
0
92
2
89
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
717
449
268
6.84
5.84
5.84
3.52
364
610
753
259
6.94
3.32
740
-
364
364
610
753
740
-
Approach
HCM Control Delay, s
HCM LOS
WB
10.5
B
RH
3/25/2016
NBT NBR
349 128
349 128
0
0
Free Free
- None
0
0
92
92
2
2
379 139
Major1
0
NB
0
0
-
SBL SBT
0 493
0 493
0
0
Free Free
- None
0
0
92
92
2
2
0 536
Major2
518
4.14
2.22
1044
1044
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 10
92
Intersection
Int Delay, s/veh
EBT EBR
1
25
1
25
0
0
Free Free
- None
0
0
92
92
2
2
1
27
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
2019 Total PM
5.4
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
NBLn1
997
0.053
8.8
A
0.2
0
-
WBL WBT
0
5
0
5
0
0
Free Free
- None
0
0
92
92
2
2
0
5
Major2
28
4.12
2.218
1585
1585
WB
0
0
-
NBL
49
49
0
Stop
0
0
0
92
2
53
NBR
0
0
0
Stop
None
92
2
0
Minor1
20
15
5
6.42
5.42
5.42
3.518
997
1008
1018
15
6.22
3.318
1065
-
997
997
1008
1018
1065
-
NB
8.8
A
Synchro 9 Report
Page 11
93
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
168
168
5
0
1.00
1.00
1863
179
1
0.94
2
385
0.06
1774
179
1774
4.0
4.0
1.00
385
0.46
385
1.00
1.00
16.1
0.9
0.0
0.8
17.0
B
337
337
2
0
12
12
12
0
1.00
1.00
1863
13
1
0.94
2
457
0.29
1583
13
1583
0.4
0.4
1.00
457
0.03
632
1.00
1.00
16.6
0.0
0.0
0.2
16.6
B
123
123
1
0
1.00
1.00
1863
131
1
0.94
2
452
0.07
1774
131
1774
3.3
3.3
1.00
452
0.29
484
1.00
1.00
14.5
0.4
0.0
1.6
14.9
B
335
335
6
0
541
541
16
0
1.00
1.00
1863
346
1
0.94
2
477
0.30
1583
346
1583
12.7
12.7
1.00
477
0.72
680
1.00
1.00
20.3
2.2
0.0
5.9
22.6
C
5
5
3
0
1.00
1.00
1900
5
0
0.94
2
6
0.11
59
138
1638
5.3
5.3
0.04
178
0.78
377
1.00
1.00
28.3
7.1
0.0
2.8
35.3
D
25
25
8
0
100
100
18
0
1.00
1.00
1900
106
0
0.94
2
137
0.11
1258
0
0
0.0
0.0
0.77
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
529
529
7
0
1.00
1.00
1863
602
2
0.94
2
786
0.22
3548
602
1774
10.4
10.4
1.00
786
0.77
1253
1.00
1.00
23.8
1.6
0.0
5.2
25.4
C
52
52
4
0
171
171
14
0
1.00
1.00
1863
110
1
0.94
2
351
0.22
1583
110
1583
3.8
3.8
1.00
351
0.31
559
1.00
1.00
21.2
0.5
0.0
1.7
21.7
C
1
1
9.8
5.0
6.0
5.3
0.0
1.00
1863
359
2
0.94
2
1022
0.29
3539
359
1770
5.2
5.2
1022
0.35
1412
1.00
1.00
18.3
0.2
0.0
2.6
18.5
B
551
18.0
B
2
2
23.8
5.0
26.0
7.2
5.8
4
4
19.4
5.0
23.0
12.4
2.1
1.00
1863
356
2
0.94
2
1067
0.30
3539
356
1770
5.1
5.1
1067
0.33
1521
1.00
1.00
17.7
0.2
0.0
2.5
17.9
B
833
19.3
B
5
5
9.0
5.0
4.0
6.0
0.0
1.00
1863
27
1
0.94
2
35
0.11
320
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
138
35.3
D
6
6
24.6
5.0
28.0
14.7
4.9
1.00
1863
0
0
0.94
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
712
24.8
C
8
8
12.1
5.0
15.0
7.3
0.4
21.7
C
Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016
Synchro 9 Report
Page 1
94
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
456
456
5
0
1.00
1.00
1863
490
1
0.93
2
781
0.26
1774
490
1774
8.2
8.2
1.00
781
0.63
1625
1.00
1.00
7.7
0.8
0.0
4.0
8.5
A
444
444
2
0
0
0
12
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
1
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
240
240
6
0
110
110
16
0
1.00
1.00
1863
71
1
0.93
2
330
0.21
1583
71
1583
1.7
1.7
1.00
330
0.22
744
1.00
1.00
14.7
0.3
0.0
0.8
15.0
B
204
204
3
0
1.00
1.00
1900
219
0
0.93
0
299
0.19
1552
247
1750
5.9
5.9
0.89
337
0.73
823
1.00
1.00
17.0
3.1
0.0
3.1
20.1
C
0
0
8
0
26
26
18
0
1.00
1.00
1900
28
0
0.93
0
38
0.19
198
0
0
0.0
0.0
0.11
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
0
0
0
0
1.00
1863
477
2
0.93
2
2066
0.58
3632
477
1770
2.9
2.9
2066
0.23
4675
1.00
1.00
4.5
0.1
0.0
1.4
4.5
A
967
6.6
A
2
2
31.1
5.0
59.0
4.9
5.8
1.00
1863
258
2
0.93
2
738
0.21
3632
258
1770
2.8
2.8
738
0.35
1664
1.00
1.00
15.1
0.3
0.0
1.4
15.4
B
329
15.3
B
5
5
16.8
5.0
33.0
10.2
1.5
1.00
1863
0
1
0.93
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
247
20.1
C
6
6
14.3
5.0
21.0
4.8
4.5
8
8
13.6
5.0
21.0
7.9
1.1
10.6
B
Synchro 9 Report
Page 2
95
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
NWL
NWR
NET
NER
SWL
SWT
203
203
3
0
1.00
1.00
1863
221
1
0.92
2
328
0.18
1774
221
1774
4.6
4.6
1.00
328
0.67
1378
1.00
1.00
15.1
2.4
0.0
2.5
17.5
B
266
16.9
B
60
60
18
0
1.00
1.00
1863
45
1
0.92
2
293
0.18
1583
45
1583
1.0
1.0
1.00
293
0.15
1230
1.00
1.00
13.6
0.2
0.0
0.4
13.9
B
513
513
2
0
205
205
12
0
1.00
1.00
1863
0
1
0.92
2
617
0.00
1583
0
1583
0.0
0.0
1.00
617
0.00
1388
1.00
0.00
0.0
0.0
0.0
0.0
0.0
57
57
1
0
1.00
1.00
1863
62
1
0.92
2
502
0.05
1774
62
1774
0.7
0.7
1.00
502
0.12
814
1.00
1.00
6.0
0.1
0.0
0.4
6.1
A
562
562
6
0
1
1
7.0
5.0
9.0
2.7
0.0
2
2
20.5
5.0
35.0
6.6
9.0
1.00
1863
558
2
0.92
2
1378
0.39
3632
558
1770
4.6
4.6
1378
0.40
3103
1.00
1.00
8.8
0.2
0.0
2.2
9.0
A
558
9.0
A
3
1.00
1863
611
2
0.92
2
1998
0.56
3632
611
1770
3.6
3.6
1998
0.31
4345
1.00
1.00
4.6
0.1
0.0
1.7
4.7
A
673
4.8
A
6
6
27.5
5.0
49.0
5.6
9.9
8
8
12.4
5.0
31.0
6.6
0.8
8.5
A
Synchro 9 Report
Page 1
96
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3.2
EBL EBT EBR
40
0
30
40
0
30
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
43
0
33
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor2
818
447
371
7.54
6.54
6.54
3.52
268
560
622
988
447
541
6.54
5.54
5.54
4.02
246
572
519
206
6.94
3.32
800
-
238
341
500
549
213
317
555
463
800
-
Approach
HCM Control Delay, s
HCM LOS
EB
14.6
B
RH
3/25/2016
NBL
1143
0.087
8.5
A
0.3
207
301
463
543
171
6.94
3.32
843
-
Major1
412
4.14
2.22
1143
-
843
-
1143
-
WB
16.6
C
NBT NBR EBLn1WBLn1 SBL
- 452 370 1215
- 0.168 0.159 0.023
0.3
- 14.6 16.6
8
A
B
C
A
0.6
0.6
0.1
NB
2.1
0
-
0
-
0
-
0
-
SB
0.6
SBT SBR
0.1
A
-
Synchro 9 Report
Page 1
97
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
RH
3/25/2016
1.6
EBL EBT EBR
0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
4
Minor2
850 1151
590 590
260 561
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
254 197
461 493
722 508
232
345
457
684
EB
9.9
A
NBL
1046
0.007
8.5
A
0
186
298
468
504
258
6.94
3.32
741
741
-
192
310
519
468
273
6.94
3.32
725
-
Major1
516
4.14
2.22
1046
-
725
-
1046
-
WB
15.5
C
NBT NBR EBLn1WBLn1 SBL
- 741 434 1019
- 0.006 0.21 0.036
9.9 15.5
8.7
A
C
A
0
0.8
0.1
NB
0.1
0
-
0
-
0
-
0
-
SB
0.8
SBT SBR
0.2
A
-
Synchro 9 Report
Page 2
98
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
RH
3/25/2016
4.3
EBL EBT EBR
0
0
21
0
0
21
0
0
0
Stop Stop Stop
- None
1
0
92
92
92
2
2
2
0
0
23
Minor2
887 1109
613 613
274 496
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
239 208
446 481
709 544
208
319
435
642
EB
9.9
A
NBL
1068
0.024
8.5
A
0.1
192
298
454
531
246
6.94
3.32
754
754
-
191
301
531
453
222
6.94
3.32
782
-
Major1
492
4.14
2.22
1068
-
782
-
1068
-
WB
22.7
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 754 345 782 1113
- 0.03 0.529 0.072 0.056
9.9 26.6
10
8.4
A
D
B
A
0.1
2.9
0.2
0.2
NB
0.3
0
-
0
-
0
-
0
-
SB
0.9
SBT SBR
-
Synchro 9 Report
Page 3
99
Intersection
Intersection Delay, s/veh
Intersection LOS
25.4
D
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/25/2016
EBL
1
1
0.92
2
1
0
EB
WB
2
SB
1
NB
1
26.2
D
EBT
285
285
0.92
2
310
1
EBR
32
32
0.92
2
35
0
WBU
0
0
0.92
2
0
0
WBL
97
97
0.92
2
105
0
WB
EB
1
NB
1
SB
1
28
D
WBT
249
249
0.92
2
271
1
WBR
148
148
0.92
2
161
1
NBU
0
0
0.92
2
0
0
NBL
21
21
0.92
2
23
0
NBT
102
102
0.92
2
111
1
NBR
72
72
0.92
2
78
0
NB
SB
1
EB
1
WB
2
17.2
C
Synchro 9 Report
Page 4
100
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
193
193
0.92
2
210
0
SBT
102
102
0.92
2
111
1
SBR
1
1
0.92
2
1
0
SB
NB
1
WB
2
EB
1
25.4
D
Lane
RH
3/25/2016
Synchro 9 Report
Page 5
101
Intersection
Int Delay, s/veh
2025 Total PM
314.1
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
380
4.14
2.22
1175
-
Approach
HCM Control Delay, s
HCM LOS
EB
2.8
RH
3/25/2016
1175
-
0
-
NBLn1 EBL
411 1175
0.349 0.157
18.4
8.6
C
A
1.5
0.6
0
-
0
-
0
-
WB
1
105
170
353
410
NB
18.4
C
190
6.94
3.32
820
820
-
105
171
410
353
190
6.94
3.32
820
820
-
SB
$ 1007.6
F
Synchro 9 Report
Page 6
102
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
14
EBL EBT EBR
0 711 254
0 711 254
0
0
0
Free Free Free
- None
- 200
0
0
98
98
98
2
2
2
0 726 259
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
436
4.14
2.22
1120
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
1120
-
EBL
1120
0
A
0
0
-
0
-
0
-
0
-
WB
0.6
0
0
0
0
218
6.94
3.32
786
786
-
SB
36.3
E
Synchro 9 Report
Page 7
103
Intersection
Int Delay, s/veh
238.3
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
272
4.14
2.22
1288
-
Approach
HCM Control Delay, s
HCM LOS
EB
4.8
WB
0
NBLn1 EBL
62 1288
4.11 0.392
$ 1535.6
9.6
F
A
27.6
1.9
1288
-
Notes
~: Volume exceeds capacity
RH
3/25/2016
0
-
0
-
Major2
505
4.14
2.22
1056
1056
-
0
-
0
-
~ 55
~ 55
~ 102
876
0
0
0
0
253
6.94
3.32
746
746
-
NB
$ 1535.6
F
Synchro 9 Report
Page 8
104
Intersection
Int Delay, s/veh
14.1
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
NWL
203
203
0
Stop
0
1
0
92
2
221
NWR
60
60
0
Stop
None
0
92
2
65
NET NER
529 205
529 205
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
575 223
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
1014
575
439
6.84
5.84
5.84
3.52
235
526
617
288
6.94
3.32
709
-
~ 220
~ 220
526
579
709
-
Approach
HCM Control Delay, s
HCM LOS
NW
85.8
F
Notes
~: Volume exceeds capacity
RH
3/25/2016
Major1
0
-
0
-
NE
0
SWL SWT
57 580
57 580
0
0
Free Free
- None
100
0
0
92
92
2
2
62 630
Major2
575
4.14
2.22
994
994
-
0
-
SW
0.8
Synchro 9 Report
Page 9
105
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.8
WBL
0
0
0
Stop
1
0
92
2
0
WBR
82
82
0
Stop
None
0
92
2
89
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
741
464
277
6.84
5.84
5.84
3.52
352
599
745
267
6.94
3.32
731
-
352
352
599
745
731
-
Approach
HCM Control Delay, s
HCM LOS
WB
10.6
B
RH
3/25/2016
NBT NBR
363 128
363 128
0
0
Free Free
- None
0
0
92
92
2
2
395 139
Major1
0
NB
0
0
-
SBL SBT
0 509
0 509
0
0
Free Free
- None
0
0
92
92
2
2
0 553
Major2
534
4.14
2.22
1030
1030
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 10
106
Intersection
Int Delay, s/veh
EBT EBR
1
25
1
25
0
0
Free Free
- None
0
0
92
92
2
2
1
27
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
2025 Total PM
5.4
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
NBLn1
997
0.053
8.8
A
0.2
0
-
WBL WBT
0
5
0
5
0
0
Free Free
- None
0
0
92
92
2
2
0
5
Major2
28
4.12
2.218
1585
1585
WB
0
0
-
NBL
49
49
0
Stop
0
0
0
92
2
53
NBR
0
0
0
Stop
None
92
2
0
Minor1
20
15
5
6.42
5.42
5.42
3.518
997
1008
1018
15
6.22
3.318
1065
-
997
997
1008
1018
1065
-
NB
8.8
A
Synchro 9 Report
Page 11
107
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
173
173
5
0
1.00
1.00
1863
184
1
0.94
2
420
0.10
1774
184
1774
5.0
5.0
1.00
420
0.44
424
1.00
1.00
15.3
0.7
0.0
2.5
16.0
B
357
357
2
0
13
13
12
0
1.00
1.00
1863
14
1
0.94
2
491
0.31
1583
14
1583
0.4
0.4
1.00
491
0.03
583
1.00
1.00
17.0
0.0
0.0
0.2
17.0
B
127
127
1
0
1.00
1.00
1863
135
1
0.94
2
459
0.08
1774
135
1774
3.7
3.7
1.00
459
0.29
476
1.00
1.00
15.6
0.4
0.0
1.8
16.0
B
357
357
6
0
552
552
16
0
1.00
1.00
1863
352
1
0.94
2
457
0.29
1583
352
1583
14.4
14.4
1.00
457
0.77
560
1.00
1.00
23.0
5.3
0.0
6.9
28.3
C
5
5
3
0
1.00
1.00
1900
5
0
0.94
2
6
0.11
57
144
1637
6.1
6.1
0.03
183
0.79
348
1.00
1.00
30.5
7.2
0.0
3.1
37.7
D
26
26
8
0
104
104
18
0
1.00
1.00
1900
111
0
0.94
2
141
0.11
1262
0
0
0.0
0.0
0.77
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
539
539
7
0
1.00
1.00
1863
614
2
0.94
2
780
0.22
3548
614
1774
11.5
11.5
1.00
780
0.79
1155
1.00
1.00
26.0
2.2
0.0
5.9
28.2
C
54
54
4
0
176
176
14
0
1.00
1.00
1863
113
1
0.94
2
348
0.22
1583
113
1583
4.2
4.2
1.00
348
0.32
515
1.00
1.00
23.2
0.5
0.0
1.9
23.7
C
1
1
10.3
5.0
6.0
5.7
0.0
1.00
1863
380
2
0.94
2
1097
0.31
3539
380
1770
5.9
5.9
1097
0.35
1302
1.00
1.00
18.8
0.2
0.0
2.9
19.0
B
578
18.0
B
2
2
26.9
5.0
26.0
7.9
6.0
4
4
20.5
5.0
23.0
13.5
2.0
1.00
1863
380
2
0.94
2
1020
0.29
3539
380
1770
6.0
6.0
1020
0.37
1252
1.00
1.00
20.0
0.2
0.0
3.0
20.3
C
867
22.9
C
5
5
11.8
5.0
7.0
7.0
0.0
1.00
1863
28
1
0.94
2
36
0.11
318
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
144
37.7
D
6
6
25.4
5.0
25.0
16.4
4.0
1.00
1863
0
0
0.94
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
727
27.5
C
8
8
12.9
5.0
15.0
8.1
0.4
24.0
C
Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016
Synchro 9 Report
Page 1
108
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
469
469
5
0
1.00
1.00
1863
504
1
0.93
2
776
0.27
1774
504
1774
9.0
9.0
1.00
776
0.65
1473
1.00
1.00
8.1
0.9
0.0
4.4
9.0
A
470
470
2
0
0
0
12
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
1
0
1.00
1.00
0
0
0
0.93
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
253
253
6
0
117
117
16
0
1.00
1.00
1863
75
1
0.93
2
336
0.21
1583
75
1583
1.8
1.8
1.00
336
0.22
740
1.00
1.00
15.3
0.3
0.0
0.8
15.7
B
209
209
3
0
1.00
1.00
1900
225
0
0.93
0
314
0.20
1543
255
1749
6.4
6.4
0.88
355
0.72
818
1.00
1.00
17.5
2.7
0.0
3.3
20.2
C
0
0
8
0
28
28
18
0
1.00
1.00
1900
30
0
0.93
0
42
0.20
206
0
0
0.0
0.0
0.12
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
0
0
0
0
1.00
1863
505
2
0.93
2
2068
0.58
3632
505
1770
3.3
3.3
2068
0.24
4363
1.00
1.00
4.7
0.1
0.0
1.6
4.8
A
1009
6.9
A
2
2
32.5
5.0
58.0
5.3
6.2
1.00
1863
272
2
0.93
2
751
0.21
3632
272
1770
3.1
3.1
751
0.36
1655
1.00
1.00
15.8
0.3
0.0
1.5
16.1
B
347
16.0
B
5
5
17.5
5.0
31.0
11.0
1.6
1.00
1863
0
1
0.93
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
255
20.2
C
6
6
15.0
5.0
22.0
5.1
4.9
8
8
14.6
5.0
22.0
8.4
1.2
11.0
B
Synchro 9 Report
Page 2
109
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
NWL
NWR
NET
NER
SWL
SWT
203
203
3
0
1.00
1.00
1863
221
1
0.92
2
312
0.18
1774
221
1774
4.7
4.7
1.00
312
0.71
1374
1.00
1.00
15.5
3.0
0.0
2.5
18.5
B
264
17.8
B
60
60
18
0
1.00
1.00
1863
43
1
0.92
2
279
0.18
1583
43
1583
0.9
0.9
1.00
279
0.15
1227
1.00
1.00
14.0
0.3
0.0
0.4
14.2
B
529
529
2
0
205
205
12
0
1.00
1.00
1863
0
1
0.92
2
632
0.00
1583
0
1583
0.0
0.0
1.00
632
0.00
1385
1.00
0.00
0.0
0.0
0.0
0.0
0.0
57
57
1
0
1.00
1.00
1863
62
1
0.92
2
504
0.05
1774
62
1774
0.7
0.7
1.00
504
0.12
815
1.00
1.00
5.8
0.1
0.0
0.3
5.9
A
580
580
6
0
1
1
7.0
5.0
9.0
2.7
0.0
2
2
21.0
5.0
35.0
6.7
9.3
1.00
1863
575
2
0.92
2
1413
0.40
3632
575
1770
4.7
4.7
1413
0.41
3096
1.00
1.00
8.6
0.2
0.0
2.3
8.8
A
575
8.8
A
3
1.00
1863
630
2
0.92
2
2032
0.57
3632
630
1770
3.7
3.7
2032
0.31
4334
1.00
1.00
4.4
0.1
0.0
1.8
4.5
A
692
4.6
A
6
6
28.0
5.0
49.0
5.7
10.3
8
8
12.0
5.0
31.0
6.7
0.7
8.5
A
Synchro 9 Report
Page 1
110
111
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
544
238
306
6.54
5.54
5.54
4.02
445
707
660
476
546
708
736
424
495
707
628
Approach
HCM Control Delay, s
HCM LOS
EB
11
B
RH
3/25/2016
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1311
0.043
7.9
A
0.1
125
6.94
3.32
902
-
Minor1
419
306
113
7.54
6.54
6.54
3.52
518
679
880
557
306
251
6.54
5.54
5.54
4.02
437
660
698
97
6.94
3.32
940
-
Major1
251
4.14
2.22
1311
-
902
-
484
539
646
854
416
480
628
698
940
-
1311
-
WB
8.8
A
NBT NBR EBLn1WBLn1 SBL
- 660 940 1375
- 0.093 0.001
0.1
11
8.8
0
A
B
A
A
0.3
0
0
NB
1.8
0
-
0
-
0
-
0
-
SB
0
SBT SBR
-
Synchro 9 Report
Page 1
112
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
599
326
273
6.54
5.54
5.54
4.02
414
647
683
468
540
659
837
406
481
636
681
Approach
HCM Control Delay, s
HCM LOS
EB
9.4
A
RH
3/25/2016
1.6
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1270
0.003
7.8
A
0
145
6.94
3.32
876
-
Minor1
446
265
181
7.54
6.54
6.54
3.52
496
717
803
593
265
328
6.54
5.54
5.54
4.02
417
688
646
132
6.94
3.32
893
-
Major1
289
4.14
2.22
1270
-
876
-
482
559
715
780
409
486
686
635
893
-
1270
-
WB
11.4
B
NBT NBR EBLn1WBLn1 SBL
- 829 628 1296
- 0.014 0.099 0.015
9.4 11.4
7.8
A
B
A
0
0.3
0
NB
0.1
0
-
0
-
0
-
0
-
SB
0.6
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
113
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
586
368
218
6.54
5.54
5.54
4.02
421
620
721
425
425
617
820
402
402
598
713
Approach
HCM Control Delay, s
HCM LOS
EB
10.3
B
RH
3/25/2016
2.7
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1285
0.011
7.8
A
0
137
6.94
3.32
886
-
Minor1
448
218
230
7.54
6.54
6.54
3.52
494
764
752
589
218
371
6.54
5.54
5.54
4.02
419
721
618
95
6.94
3.32
943
-
Major1
275
4.14
2.22
1285
-
886
-
466
466
756
709
400
400
713
597
943
-
1285
-
WB
12
B
NBT NBR EBLn1WBLn1WBLn2 SBL
- 703 466 943 1381
- 0.039 0.142 0.045 0.035
- 10.3
14
9
7.7
B
B
A
A
0.1
0.5
0.1
0.1
NB
0.4
0
-
0
-
0
-
0
-
SB
1.1
SBT SBR
-
Synchro 9 Report
Page 3
114
Intersection
Intersection Delay, s/veh
Intersection LOS
11.8
B
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/25/2016
EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
11.9
B
EBT
162
162
0.92
2
176
1
EBR
34
34
0.92
2
37
0
WBU
0
0
0.92
2
0
0
WBL
49
49
0.92
2
53
0
WB
EB
1
NB
1
SB
1
11.5
B
WBT
144
144
0.92
2
157
1
WBR
191
191
0.92
2
208
1
NBU
0
0
0.92
2
0
0
NBL
10
10
0.92
2
11
0
NBT
107
107
0.92
2
116
1
NBR
45
45
0.92
2
49
0
NB
SB
1
EB
1
WB
2
11.3
B
Synchro 9 Report
Page 4
115
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
111
111
0.93
2
119
0
SBT
91
91
0.93
2
98
1
SBR
4
4
0.93
2
4
0
SB
NB
1
WB
2
EB
1
12.6
B
Lane
RH
3/25/2016
Synchro 9 Report
Page 5
116
Intersection
Int Delay, s/veh
29.2
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
321
4.14
2.22
1236
-
Approach
HCM Control Delay, s
HCM LOS
EB
2.6
RH
3/25/2016
1236
-
0
-
NBLn1 EBL
600 1236
0.197 0.09
12.5
8.2
B
A
0.7
0.3
0
-
0
-
0
-
WB
0.9
956
453
503
6.54
5.54
5.54
4.02
257
568
540
191
278
506
479
218
299
517
503
NB
12.5
B
116
6.94
3.32
914
-
Minor2
851
503
348
7.54
6.54
6.54
3.52
~ 253
519
641
956
503
453
6.54
5.54
5.54
4.02
257
540
568
160
6.94
3.32
857
-
914
-
~ 191
~ 288
472
504
218
309
503
517
857
-
SB
101.4
F
Synchro 9 Report
Page 6
117
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
5
EBL EBT EBR
0 445 134
0 445 134
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 484 146
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
377
4.14
2.22
1178
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
1178
-
EBL
1178
0
A
0
0
-
0
-
0
-
0
-
WB
0.4
902
418
484
6.54
5.54
5.54
4.02
276
589
550
189
6.94
3.32
821
-
388
388
620
776
0
0
0
0
821
-
SB
14.6
B
Synchro 9 Report
Page 7
118
Intersection
Int Delay, s/veh
32
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
229
4.14
2.22
1336
-
Approach
HCM Control Delay, s
HCM LOS
EB
4.9
RH
3/25/2016
1336
-
0
-
NBLn1 EBL
179 1336
1.16 0.26
169.7
8.6
F
A
10.8
1
0
-
0
-
0
-
WB
0
0
0
0
0
134
6.94
3.32
890
890
-
NB
169.7
F
Synchro 9 Report
Page 8
119
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
4.1
NWL
182
182
0
Stop
0
1
0
92
2
198
NWR
40
40
0
Stop
None
0
92
2
43
NET NER
235 241
235 241
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
255 262
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
529
255
274
6.84
5.84
5.84
3.52
479
764
747
128
6.94
3.32
898
-
456
456
764
710
898
-
Approach
HCM Control Delay, s
HCM LOS
NW
17.1
C
RH
3/25/2016
Major1
0
NE
0
0
-
SWL SWT
59 269
59 269
0
0
Free Free
- None
100
0
0
92
92
2
2
64 292
Major2
255
4.14
2.22
1307
1307
-
0
-
SW
1.4
Synchro 9 Report
Page 9
120
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.6
WBL
0
0
0
Stop
0
0
92
2
0
WBR
36
36
0
Stop
None
0
92
2
39
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
409
253
156
6.84
5.84
5.84
3.52
570
766
856
141
6.94
3.32
881
-
570
570
766
856
881
-
Approach
HCM Control Delay, s
HCM LOS
WB
9.3
A
RH
3/25/2016
NBT NBR
206
54
206
54
0
0
Free Free
- None
0
0
92
92
2
2
224
59
Major1
0
NB
0
0
-
SBL SBT
0 287
0 287
0
0
Free Free
- None
0
0
92
92
2
2
0 312
Major2
283
4.14
2.22
1276
1276
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 10
121
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
102
102
5
0
1.00
1.00
1863
111
1
0.92
2
430
0.36
850
111
850
4.3
6.9
1.00
430
0.26
854
1.00
1.00
11.6
0.3
0.0
1.0
11.9
B
213
213
2
0
6
6
12
0
1.00
1.00
1863
7
1
0.92
2
572
0.36
1583
7
1583
0.1
0.1
1.00
572
0.01
1362
1.00
1.00
8.3
0.0
0.0
0.1
8.4
A
84
84
1
0
1.00
1.00
1863
91
1
0.92
2
536
0.36
1136
91
1136
2.4
4.2
1.00
536
0.17
1103
1.00
1.00
10.3
0.1
0.0
0.8
10.5
B
295
295
6
0
360
360
16
0
1.00
1.00
1863
234
1
0.92
2
572
0.36
1583
234
1583
4.5
4.5
1.00
572
0.41
1362
1.00
1.00
9.7
0.5
0.0
2.0
10.2
B
7
7
3
0
1.00
1.00
1900
8
0
0.92
2
11
0.10
110
119
1641
2.9
2.9
0.07
158
0.75
726
1.00
1.00
17.9
7.0
0.0
1.6
24.9
C
20
20
8
0
82
82
18
0
1.00
1.00
1900
89
0
0.92
2
119
0.10
1227
0
0
0.0
0.0
0.75
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
305
305
7
0
1.00
1.00
1863
358
2
0.92
2
616
0.17
3548
358
1774
3.8
3.8
1.00
616
0.58
1918
1.00
1.00
15.5
0.9
0.0
1.9
16.3
B
34
34
4
0
94
94
14
0
1.00
1.00
1863
72
1
0.92
2
275
0.17
1583
72
1583
1.6
1.6
1.00
275
0.26
856
1.00
1.00
14.6
0.5
0.0
0.7
15.1
B
1.00
1863
232
2
0.92
2
1278
0.36
3539
232
1770
1.8
1.8
1278
0.18
3044
1.00
1.00
8.9
0.1
0.0
0.9
9.0
A
350
9.9
A
2
2
19.7
5.0
35.0
8.9
5.8
1.00
1863
321
2
0.92
2
1278
0.36
3539
321
1770
2.6
2.6
1278
0.25
3044
1.00
1.00
9.1
0.1
0.0
1.3
9.2
A
646
9.8
A
4
4
12.1
5.0
22.0
5.8
1.4
1.00
1863
22
1
0.92
2
29
0.10
303
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
119
24.9
C
6
6
19.7
5.0
35.0
6.5
5.9
1.00
1863
0
0
0.92
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
430
16.1
B
8
8
8.9
5.0
18.0
4.9
0.4
12.7
B
Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016
Synchro 9 Report
Page 1
122
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
320
320
5
0
1.00
1.00
1863
348
1
0.92
2
724
0.21
1774
348
1774
4.7
4.7
1.00
724
0.48
1691
1.00
1.00
6.7
0.5
0.0
2.2
7.2
A
247
247
2
0
0
0
12
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
1
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
211
211
6
0
131
131
16
0
1.00
1.00
1863
100
1
0.92
2
323
0.20
1583
100
1583
1.9
1.9
1.00
323
0.31
1059
1.00
1.00
12.1
0.5
0.0
0.9
12.7
B
163
163
3
0
1.00
1.00
1900
177
0
0.92
0
255
0.17
1492
207
1745
4.0
4.0
0.86
298
0.69
1167
1.00
1.00
14.0
2.9
0.0
2.1
16.9
B
1
1
8
0
27
27
18
0
1.00
1.00
1900
29
0
0.92
0
42
0.17
244
0
0
0.0
0.0
0.14
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
0
0
0
0
1.00
1863
268
2
0.92
2
1948
0.55
3632
268
1770
1.3
1.3
1948
0.14
5523
1.00
1.00
3.9
0.0
0.0
0.6
4.0
A
616
5.8
A
2
2
24.8
5.0
56.0
3.3
3.8
1.00
1863
229
2
0.92
2
722
0.20
3632
229
1770
2.0
2.0
722
0.32
2367
1.00
1.00
12.2
0.2
0.0
1.0
12.4
B
329
12.5
B
5
5
12.4
5.0
27.0
6.7
1.0
1.00
1863
1
1
0.92
2
1
0.17
8
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
207
16.9
B
6
6
12.3
5.0
24.0
4.0
3.3
8
8
11.1
5.0
24.0
6.0
1.0
9.7
A
Synchro 9 Report
Page 2
123
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
746
333
413
6.54
5.54
5.54
4.02
340
642
592
332
423
602
626
303
390
621
545
Approach
HCM Control Delay, s
HCM LOS
EB
12.4
B
RH
3/25/2016
3.8
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1288
0.068
8
A
0.2
136
6.94
3.32
888
-
Minor1
610
413
197
7.54
6.54
6.54
3.52
378
587
786
758
413
345
6.54
5.54
5.54
4.02
335
592
635
118
6.94
3.32
912
-
Major1
272
4.14
2.22
1288
-
888
-
336
420
541
737
298
380
545
614
912
-
1288
-
WB
14.5
B
NBT NBR EBLn1WBLn1 SBL
- 549 457 1327
- 0.112 0.174 0.028
0.2
- 12.4 14.5
7.8
A
B
B
A
0.4
0.6
0.1
NB
2.3
0
-
0
-
0
-
0
-
SB
1
SBT SBR
0.1
A
-
Synchro 9 Report
Page 1
124
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
848
448
400
6.54
5.54
5.54
4.02
297
571
600
343
441
558
767
290
392
559
598
Approach
HCM Control Delay, s
HCM LOS
EB
9.9
A
RH
3/25/2016
1.3
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1143
0.004
8.2
A
0
206
6.94
3.32
800
-
Minor1
634
392
242
7.54
6.54
6.54
3.52
364
604
740
843
392
451
6.54
5.54
5.54
4.02
299
605
569
196
6.94
3.32
812
-
Major1
412
4.14
2.22
1143
-
800
-
352
456
602
715
292
396
603
557
812
-
1143
-
WB
12.8
B
NBT NBR EBLn1WBLn1 SBL
- 745 523 1164
- 0.016 0.119 0.017
9.9 12.8
8.1
A
B
A
0
0.4
0.1
NB
0.1
0
-
0
-
0
-
0
-
SB
0.5
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
125
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
854
524
330
6.54
5.54
5.54
4.02
294
528
644
284
383
498
738
271
361
494
636
Approach
HCM Control Delay, s
HCM LOS
EB
10.8
B
RH
3/25/2016
4.2
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1191
0.013
8.1
A
0
182
6.94
3.32
829
-
Minor1
672
330
342
7.54
6.54
6.54
3.52
342
657
646
857
330
527
6.54
5.54
5.54
4.02
293
644
527
150
6.94
3.32
870
-
Major1
364
4.14
2.22
1191
-
829
-
314
420
649
589
270
368
636
493
870
-
1191
-
WB
17.4
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 648 420 870 1258
- 0.042 0.437 0.07 0.065
- 10.8 20.1
9.4
8.1
B
C
A
A
0.1
2.2
0.2
0.2
NB
0.2
0
-
0
-
0
-
0
-
SB
1.5
SBT SBR
-
Synchro 9 Report
Page 3
126
Intersection
Intersection Delay, s/veh
Intersection LOS
12.8
B
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/25/2016
EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
13.4
B
EBT
204
204
0.92
2
222
1
EBR
34
34
0.92
2
37
0
WBU
0
0
0.92
2
0
0
WBL
49
49
0.92
2
53
0
WB
EB
1
NB
1
SB
1
12.6
B
WBT
182
182
0.92
2
198
1
WBR
193
193
0.92
2
210
1
NBU
0
0
0.92
2
0
0
NBL
10
10
0.92
2
11
0
NBT
108
108
0.92
2
117
1
NBR
45
45
0.92
2
49
0
NB
SB
1
EB
1
WB
2
11.9
B
Synchro 9 Report
Page 4
127
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
112
112
0.93
2
120
0
SBT
92
92
0.93
2
99
1
SBR
4
4
0.93
2
4
0
SB
NB
1
WB
2
EB
1
13.4
B
Lane
RH
3/25/2016
Synchro 9 Report
Page 5
128
Intersection
Int Delay, s/veh
126
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
323
4.14
2.22
1234
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.3
RH
3/25/2016
1234
-
0
-
NBLn1 EBL
550 1234
0.217 0.127
13.4
8.3
B
A
0.8
0.4
0
-
0
-
0
-
WB
0.7
182
258
450
500
NB
13.4
B
117
6.94
3.32
913
913
-
182
270
500
450
161
6.94
3.32
855
855
-
SB
$ 399.4
F
Synchro 9 Report
Page 6
129
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
6.6
EBL EBT EBR
0 559 182
0 559 182
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 608 198
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
453
4.14
2.22
1104
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
1104
-
EBL
1104
0
A
0
0
-
0
-
0
-
0
-
WB
0.4
0
0
0
0
227
6.94
3.32
776
776
-
SB
19.5
C
Synchro 9 Report
Page 7
130
Intersection
Int Delay, s/veh
146.6
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
247
4.14
2.22
1316
-
Approach
HCM Control Delay, s
HCM LOS
EB
5.7
RH
3/25/2016
1316
-
0
-
NBLn1 EBL
107 1316
2.479 0.348
$ 756.3
9.2
F
A
23.9
1.6
0
-
0
-
0
-
WB
0
0
0
0
0
142
6.94
3.32
880
880
-
NB
$ 756.3
F
Synchro 9 Report
Page 8
131
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
9.1
NWL
204
204
0
Stop
0
1
0
92
2
222
NWR
67
67
0
Stop
None
0
92
2
73
NET NER
428 266
428 266
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
465 289
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
870
465
405
6.84
5.84
5.84
3.52
291
599
642
233
6.94
3.32
769
-
269
269
599
594
769
-
Approach
HCM Control Delay, s
HCM LOS
NW
47.4
E
RH
3/25/2016
Major1
0
NE
0
0
-
SWL SWT
75 445
75 445
0
0
Free Free
- None
100
0
0
92
92
2
2
82 484
Major2
465
4.14
2.22
1093
1093
-
0
-
SW
1.2
Synchro 9 Report
Page 9
132
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
1
WBL
0
0
0
Stop
1
0
92
2
0
WBR
89
89
0
Stop
None
0
92
2
97
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
544
326
218
6.84
5.84
5.84
3.52
469
704
797
205
6.94
3.32
802
-
469
469
704
797
802
-
Approach
HCM Control Delay, s
HCM LOS
WB
10.1
B
RH
3/25/2016
NBT NBR
222 156
222 156
0
0
Free Free
- None
0
0
92
92
2
2
241 170
Major1
0
NB
0
0
-
SBL SBT
0 401
0 401
0
0
Free Free
- None
0
0
92
92
2
2
0 436
Major2
411
4.14
2.22
1144
1144
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 10
133
Intersection
Int Delay, s/veh
EBT EBR
0
34
0
34
0
0
Free Free
- None
0
0
92
92
2
2
0
37
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
NBLn1
998
0.08
8.9
A
0.3
0
-
WBL WBT
0
1
0
1
0
0
Free Free
- None
0
0
92
92
2
2
0
1
Major2
37
4.12
2.218
1574
1574
WB
0
0
-
NBL
73
73
0
Stop
0
0
0
92
2
79
NBR
0
0
0
Stop
None
92
2
0
Minor1
19
18
1
6.42
5.42
5.42
3.518
998
1005
1022
18
6.22
3.318
1061
-
998
998
1005
1022
1061
-
NB
8.9
A
Synchro 9 Report
Page 11
134
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
144
144
5
0
1.00
1.00
1863
157
1
0.92
2
415
0.07
1774
157
1774
3.7
3.7
1.00
415
0.38
415
1.00
1.00
13.3
0.6
0.0
1.8
13.9
B
215
215
2
0
6
6
12
0
1.00
1.00
1863
7
1
0.92
2
499
0.31
1583
7
1583
0.2
0.2
1.00
499
0.01
736
1.00
1.00
14.2
0.0
0.0
0.1
14.2
B
85
85
1
0
1.00
1.00
1863
92
1
0.92
2
518
0.05
1774
92
1774
2.1
2.1
1.00
518
0.18
569
1.00
1.00
13.2
0.2
0.0
1.0
13.4
B
297
297
6
0
536
536
16
0
1.00
1.00
1863
350
1
0.92
2
479
0.30
1583
350
1583
11.9
11.9
1.00
479
0.73
763
1.00
1.00
18.8
2.2
0.0
5.4
21.0
C
7
7
3
0
1.00
1.00
1900
8
0
0.92
2
10
0.10
109
120
1640
4.3
4.3
0.07
156
0.77
409
1.00
1.00
26.6
7.6
0.0
2.3
34.2
C
20
20
8
0
83
83
18
0
1.00
1.00
1900
90
0
0.92
2
117
0.10
1230
0
0
0.0
0.0
0.75
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
465
465
7
0
1.00
1.00
1863
531
2
0.92
2
722
0.20
3548
531
1774
8.4
8.4
1.00
722
0.74
1297
1.00
1.00
22.5
1.5
0.0
4.3
23.9
C
34
34
4
0
131
131
14
0
1.00
1.00
1863
85
1
0.92
2
322
0.20
1583
85
1583
2.7
2.7
1.00
322
0.26
579
1.00
1.00
20.2
0.4
0.0
1.2
20.6
C
1
1
8.2
5.0
5.0
4.1
0.0
1.00
1863
234
2
0.92
2
1115
0.31
3539
234
1770
2.9
2.9
1115
0.21
1646
1.00
1.00
15.1
0.1
0.0
1.4
15.2
B
398
14.7
B
2
2
24.0
5.0
28.0
4.9
5.0
4
4
17.3
5.0
22.0
10.4
1.8
1.00
1863
323
2
0.92
2
1070
0.30
3539
323
1770
4.2
4.2
1070
0.30
1705
1.00
1.00
16.1
0.2
0.0
2.1
16.3
B
765
18.1
B
5
5
9.0
5.0
4.0
5.7
0.0
1.00
1863
22
1
0.92
2
29
0.10
301
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
120
34.2
C
6
6
23.2
5.0
29.0
13.9
4.3
1.00
1863
0
0
0.92
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
616
23.5
C
8
8
10.7
5.0
15.0
6.3
0.3
20.1
C
Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016
Synchro 9 Report
Page 1
135
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
421
421
5
0
1.00
1.00
1863
458
1
0.92
2
750
0.26
1774
458
1774
7.7
7.7
1.00
750
0.61
1496
1.00
1.00
8.1
0.8
0.0
3.9
8.9
A
261
261
2
0
0
0
12
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
1
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
227
227
6
0
132
132
16
0
1.00
1.00
1863
85
1
0.92
2
289
0.18
1583
85
1583
2.0
2.0
1.00
289
0.29
739
1.00
1.00
15.1
0.6
0.0
0.9
15.7
B
216
216
3
0
1.00
1.00
1900
235
0
0.92
0
327
0.21
1553
265
1751
6.0
6.0
0.89
368
0.72
1063
1.00
1.00
15.7
2.6
0.0
3.1
18.4
B
1
1
8
0
27
27
18
0
1.00
1.00
1900
29
0
0.92
0
40
0.21
192
0
0
0.0
0.0
0.11
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
0
0
0
0
1.00
1863
284
2
0.92
2
1968
0.56
3632
284
1770
1.7
1.7
1968
0.14
4462
1.00
1.00
4.6
0.0
0.0
0.8
4.6
A
742
7.2
A
2
2
28.8
5.0
54.0
3.7
4.0
1.00
1863
247
2
0.92
2
647
0.18
3632
247
1770
2.6
2.6
647
0.38
1653
1.00
1.00
15.4
0.4
0.0
1.3
15.7
B
332
15.7
B
5
5
16.0
5.0
29.0
9.7
1.4
1.00
1863
1
1
0.92
2
1
0.21
7
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
265
18.4
B
6
6
12.8
5.0
20.0
4.6
3.2
8
8
14.0
5.0
26.0
8.0
1.4
11.6
B
Synchro 9 Report
Page 2
136
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
NWL
NWR
NET
NER
SWL
SWT
204
204
3
0
1.00
1.00
1863
222
1
0.92
2
331
0.19
1774
222
1774
4.1
4.1
1.00
331
0.67
1558
1.00
1.00
13.4
2.4
0.0
2.2
15.7
B
295
15.0
B
67
67
18
0
1.00
1.00
1863
73
1
0.92
2
295
0.19
1583
73
1583
1.4
1.4
1.00
295
0.25
1390
1.00
1.00
12.3
0.4
0.0
0.6
12.7
B
428
428
2
0
266
266
12
0
1.00
1.00
1863
0
1
0.92
2
561
0.00
1583
0
1583
0.0
0.0
1.00
561
0.00
1615
1.00
0.00
0.0
0.0
0.0
0.0
0.0
75
75
1
0
1.00
1.00
1863
82
1
0.92
2
552
0.06
1774
82
1774
0.9
0.9
1.00
552
0.15
894
1.00
1.00
5.6
0.1
0.0
0.4
5.7
A
445
445
6
0
1
1
6.2
4.0
9.0
2.9
0.1
2
2
17.5
5.0
36.0
5.4
7.1
1.00
1863
465
2
0.92
2
1255
0.35
3632
465
1770
3.4
3.4
1255
0.37
3609
1.00
1.00
8.5
0.2
0.0
1.7
8.6
A
465
8.6
A
3
1.00
1863
484
2
0.92
2
1877
0.53
3632
484
1770
2.6
2.6
1877
0.26
4913
1.00
1.00
4.5
0.1
0.0
1.3
4.6
A
566
4.7
A
6
6
23.7
5.0
49.0
4.6
7.5
8
8
11.6
5.0
31.0
6.1
0.9
8.4
A
Synchro 9 Report
Page 1
137
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
766
341
425
6.54
5.54
5.54
4.02
331
637
585
323
416
595
618
294
383
616
538
Approach
HCM Control Delay, s
HCM LOS
EB
12.5
B
RH
3/25/2016
3.9
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1278
0.071
8
A
0.2
140
6.94
3.32
882
-
Minor1
626
425
201
7.54
6.54
6.54
3.52
369
578
782
779
425
354
6.54
5.54
5.54
4.02
326
585
629
122
6.94
3.32
906
-
Major1
281
4.14
2.22
1278
-
882
-
326
411
531
731
290
373
538
608
906
-
1278
-
WB
14.8
B
NBT NBR EBLn1WBLn1 SBL
- 543 447 1319
- 0.121 0.178 0.028
0.2
- 12.5 14.8
7.8
A
B
B
A
0.4
0.6
0.1
NB
2.3
0
-
0
-
0
-
0
-
SB
1
SBT SBR
0.1
A
-
Synchro 9 Report
Page 1
138
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
866
458
408
6.54
5.54
5.54
4.02
290
565
595
336
435
550
763
283
386
553
593
Approach
HCM Control Delay, s
HCM LOS
EB
9.9
A
RH
3/25/2016
1.3
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1134
0.004
8.2
A
0
211
6.94
3.32
794
-
Minor1
646
399
247
7.54
6.54
6.54
3.52
357
598
735
859
399
460
6.54
5.54
5.54
4.02
292
601
564
199
6.94
3.32
809
-
Major1
422
4.14
2.22
1134
-
794
-
345
450
596
709
285
391
599
552
809
-
1134
-
WB
12.9
B
NBT NBR EBLn1WBLn1 SBL
- 743 517 1156
- 0.017 0.121 0.017
9.9 12.9
8.2
A
B
A
0.1
0.4
0.1
NB
0.1
0
-
0
-
0
-
0
-
SB
0.5
SBT SBR
0.1
A
-
Synchro 9 Report
Page 2
139
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
874
536
338
6.54
5.54
5.54
4.02
287
522
639
275
376
490
734
265
356
488
631
Approach
HCM Control Delay, s
HCM LOS
EB
11
B
RH
3/25/2016
4.2
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
NBL
1179
0.013
8.1
A
0
188
6.94
3.32
822
-
Minor1
686
338
348
7.54
6.54
6.54
3.52
334
650
641
877
338
539
6.54
5.54
5.54
4.02
285
639
520
154
6.94
3.32
864
-
Major1
376
4.14
2.22
1179
-
822
-
306
414
642
583
263
361
631
486
864
-
1179
-
WB
17.7
C
NBT NBR EBLn1WBLn1WBLn2 SBL
- 629 414 864 1249
- 0.047 0.444 0.07 0.065
11 20.4
9.5
8.1
B
C
A
A
0.1
2.2
0.2
0.2
NB
0.2
0
-
0
-
0
-
0
-
SB
1.4
SBT SBR
-
Synchro 9 Report
Page 3
140
Intersection
Intersection Delay, s/veh
Intersection LOS
13.7
B
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
EBU
0
0
0.92
2
0
0
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
Lane
Vol Left, %
Vol Thru, %
Vol Right, %
Sign Control
Traffic Vol by Lane
LT Vol
Through Vol
RT Vol
Lane Flow Rate
Geometry Grp
Degree of Util (X)
Departure Headway (Hd)
Convergence, Y/N
Cap
Service Time
HCM Lane V/C Ratio
HCM Control Delay
HCM Lane LOS
HCM 95th-tile Q
RH
3/25/2016
EBL
2
2
0.92
2
2
0
EB
WB
2
SB
1
NB
1
14.4
B
EBT
210
210
0.92
2
228
1
EBR
36
36
0.92
2
39
0
WBU
0
0
0.92
2
0
0
WBL
52
52
0.92
2
57
0
WB
EB
1
NB
1
SB
1
13.3
B
WBT
187
187
0.92
2
203
1
WBR
204
204
0.92
2
222
1
NBU
0
0
0.92
2
0
0
NBL
11
11
0.92
2
12
0
NBT
115
115
0.92
2
125
1
NBR
48
48
0.92
2
52
0
NB
SB
1
EB
1
WB
2
12.7
B
Synchro 9 Report
Page 4
141
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Number of Lanes
Approach
Opposing Approach
Opposing Lanes
Conflicting Approach Left
Conflicting Lanes Left
Conflicting Approach Right
Conflicting Lanes Right
HCM Control Delay
HCM LOS
SBU
0
0
0.92
2
0
0
SBL
119
119
0.93
2
128
0
SBT
97
97
0.93
2
104
1
SBR
4
4
0.93
2
4
0
SB
NB
1
WB
2
EB
1
14.3
B
Lane
RH
3/25/2016
Synchro 9 Report
Page 5
142
Intersection
Int Delay, s/veh
139.5
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
342
4.14
2.22
1214
-
Approach
HCM Control Delay, s
HCM LOS
EB
3.2
RH
3/25/2016
1214
-
0
-
NBLn1 EBL
537 1214
0.229 0.132
13.7
8.4
B
A
0.9
0.5
0
-
0
-
0
-
WB
0.7
170
245
438
485
NB
13.7
B
124
6.94
3.32
904
904
-
170
257
485
438
171
6.94
3.32
843
843
-
SB
$ 447.7
F
Synchro 9 Report
Page 6
143
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
7
EBL EBT EBR
0 576 186
0 576 186
0
0
0
Free Free Free
- None
- 200
0
0
92
92
92
2
2
2
0 626 202
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
467
4.14
2.22
1091
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
1091
-
EBL
1091
0
A
0
0
-
0
-
0
-
0
-
WB
0.4
0
0
0
0
234
6.94
3.32
768
768
-
SB
20.7
C
Synchro 9 Report
Page 7
144
Intersection
Int Delay, s/veh
170.3
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
260
4.14
2.22
1302
-
Approach
HCM Control Delay, s
HCM LOS
EB
5.7
RH
3/25/2016
1302
-
0
-
NBLn1 EBL
98 1302
2.773 0.36
$ 893.3
9.3
F
A
25.7
1.7
0
-
0
-
0
-
WB
0
0
0
0
0
149
6.94
3.32
871
871
-
NB
$ 893.3
F
Synchro 9 Report
Page 8
145
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
9.5
NWL
204
204
0
Stop
0
1
0
92
2
222
NWR
67
67
0
Stop
None
0
92
2
73
NET NER
435 266
435 266
0
0
Free Free
- Yield
- 100
0
0
92
92
2
2
473 289
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
884
473
411
6.84
5.84
5.84
3.52
285
593
638
236
6.94
3.32
766
-
263
263
593
590
766
-
Approach
HCM Control Delay, s
HCM LOS
NW
50.4
F
RH
3/25/2016
Major1
0
NE
0
0
-
SWL SWT
75 456
75 456
0
0
Free Free
- None
100
0
0
92
92
2
2
82 496
Major2
473
4.14
2.22
1085
1085
-
0
-
SW
1.2
Synchro 9 Report
Page 9
146
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
1
WBL
0
0
0
Stop
1
0
92
2
0
WBR
89
89
0
Stop
None
0
92
2
97
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Minor1
557
334
223
6.84
5.84
5.84
3.52
460
697
793
209
6.94
3.32
797
-
460
460
697
793
797
-
Approach
HCM Control Delay, s
HCM LOS
WB
10.1
B
RH
3/25/2016
NBT NBR
229 156
229 156
0
0
Free Free
- None
0
0
92
92
2
2
249 170
Major1
0
NB
0
0
-
SBL SBT
0 410
0 410
0
0
Free Free
- None
0
0
92
92
2
2
0 446
Major2
418
4.14
2.22
1138
1138
-
0
-
SB
0
SBT
-
Synchro 9 Report
Page 10
147
Intersection
Int Delay, s/veh
EBT EBR
0
34
0
34
0
0
Free Free
- None
0
0
92
92
2
2
0
37
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
RH
3/25/2016
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
NBLn1
998
0.08
8.9
A
0.3
0
-
WBL WBT
0
1
0
1
0
0
Free Free
- None
0
0
92
92
2
2
0
1
Major2
37
4.12
2.218
1574
1574
WB
0
0
-
NBL
73
73
0
Stop
0
0
0
92
2
79
NBR
0
0
0
Stop
None
92
2
0
Minor1
19
18
1
6.42
5.42
5.42
3.518
998
1005
1022
18
6.22
3.318
1061
-
998
998
1005
1022
1061
-
NB
8.9
A
Synchro 9 Report
Page 11
148
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
147
147
5
0
1.00
1.00
1863
160
1
0.92
2
406
0.07
1774
160
1774
3.8
3.8
1.00
406
0.39
406
1.00
1.00
13.5
0.6
0.0
1.9
14.2
B
228
228
2
0
6
6
12
0
1.00
1.00
1863
7
1
0.92
2
498
0.31
1583
7
1583
0.2
0.2
1.00
498
0.01
725
1.00
1.00
14.4
0.0
0.0
0.1
14.4
B
88
88
1
0
1.00
1.00
1863
96
1
0.92
2
511
0.06
1774
96
1774
2.2
2.2
1.00
511
0.19
557
1.00
1.00
13.3
0.2
0.0
1.1
13.4
B
315
315
6
0
541
541
16
0
1.00
1.00
1863
353
1
0.92
2
483
0.31
1583
353
1583
12.2
12.2
1.00
483
0.73
750
1.00
1.00
19.0
2.1
0.0
5.6
21.2
C
7
7
3
0
1.00
1.00
1900
8
0
0.92
2
10
0.10
107
123
1639
4.5
4.5
0.07
160
0.77
402
1.00
1.00
26.9
7.5
0.0
2.3
34.4
C
20
20
8
0
86
86
18
0
1.00
1.00
1900
93
0
0.92
2
121
0.10
1239
0
0
0.0
0.0
0.76
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
471
471
7
0
1.00
1.00
1863
539
2
0.92
2
727
0.20
3548
539
1774
8.7
8.7
1.00
727
0.74
1276
1.00
1.00
22.8
1.5
0.0
4.4
24.3
C
35
35
4
0
134
134
14
0
1.00
1.00
1863
87
1
0.92
2
325
0.20
1583
87
1583
2.8
2.8
1.00
325
0.27
569
1.00
1.00
20.5
0.4
0.0
1.3
20.9
C
1
1
8.4
5.0
5.0
4.2
0.0
1.00
1863
248
2
0.92
2
1113
0.31
3539
248
1770
3.2
3.2
1113
0.22
1620
1.00
1.00
15.5
0.1
0.0
1.6
15.6
B
415
15.0
B
2
2
24.2
5.0
28.0
5.2
5.2
4
4
17.5
5.0
22.0
10.7
1.8
1.00
1863
342
2
0.92
2
1080
0.31
3539
342
1770
4.5
4.5
1080
0.32
1678
1.00
1.00
16.4
0.2
0.0
2.3
16.5
B
791
18.2
B
5
5
9.0
5.0
4.0
5.8
0.0
1.00
1863
22
1
0.92
2
29
0.10
293
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
123
34.4
C
6
6
23.7
5.0
29.0
14.2
4.5
1.00
1863
0
0
0.92
2
0
0.00
0
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
626
23.8
C
8
8
11.0
5.0
15.0
6.5
0.3
20.4
C
Notes
User approved volume balancing among the lanes for turning movement.
RH
3/25/2016
Synchro 9 Report
Page 1
149
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
431
431
5
0
1.00
1.00
1863
468
1
0.92
2
749
0.26
1774
468
1774
8.0
8.0
1.00
749
0.63
1497
1.00
1.00
8.2
0.9
0.0
3.9
9.1
A
275
275
2
0
0
0
12
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
1
0
1.00
1.00
0
0
0
0.92
0
0
0.00
0
0
0
0.0
0.0
0.00
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
239
239
6
0
140
140
16
0
1.00
1.00
1863
91
1
0.92
2
295
0.19
1583
91
1583
2.2
2.2
1.00
295
0.31
719
1.00
1.00
15.5
0.6
0.0
1.0
16.0
B
220
220
3
0
1.00
1.00
1900
239
0
0.92
0
328
0.21
1537
272
1750
6.4
6.4
0.88
374
0.73
993
1.00
1.00
16.1
2.7
0.0
3.3
18.8
B
1
1
8
0
29
29
18
0
1.00
1.00
1900
32
0
0.92
0
44
0.21
206
0
0
0.0
0.0
0.12
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
0
0
0
0
0
0
1.00
1863
299
2
0.92
2
1979
0.56
3632
299
1770
1.8
1.8
1979
0.15
4420
1.00
1.00
4.7
0.0
0.0
0.9
4.7
A
767
7.4
A
2
2
29.6
5.0
55.0
3.8
4.3
1.00
1863
260
2
0.92
2
660
0.19
3632
260
1770
2.8
2.8
660
0.39
1607
1.00
1.00
15.7
0.4
0.0
1.4
16.1
B
351
16.1
B
5
5
16.4
5.0
30.0
10.0
1.4
1.00
1863
1
1
0.92
2
1
0.21
6
0
0
0.0
0.0
0
0.00
0
1.00
0.00
0.0
0.0
0.0
0.0
0.0
272
18.8
B
6
6
13.2
5.0
20.0
4.8
3.4
8
8
14.4
5.0
25.0
8.4
1.4
11.8
B
Synchro 9 Report
Page 2
150
Movement
Lane Configurations
Traffic Volume (veh/h)
Future Volume (veh/h)
Number
Initial Q (Qb), veh
Ped-Bike Adj(A_pbT)
Parking Bus, Adj
Adj Sat Flow, veh/h/ln
Adj Flow Rate, veh/h
Adj No. of Lanes
Peak Hour Factor
Percent Heavy Veh, %
Cap, veh/h
Arrive On Green
Sat Flow, veh/h
Grp Volume(v), veh/h
Grp Sat Flow(s),veh/h/ln
Q Serve(g_s), s
Cycle Q Clear(g_c), s
Prop In Lane
Lane Grp Cap(c), veh/h
V/C Ratio(X)
Avail Cap(c_a), veh/h
HCM Platoon Ratio
Upstream Filter(I)
Uniform Delay (d), s/veh
Incr Delay (d2), s/veh
Initial Q Delay(d3),s/veh
%ile BackOfQ(50%),veh/ln
LnGrp Delay(d),s/veh
LnGrp LOS
Approach Vol, veh/h
Approach Delay, s/veh
Approach LOS
Timer
Assigned Phs
Phs Duration (G+Y+Rc), s
Change Period (Y+Rc), s
Max Green Setting (Gmax), s
Max Q Clear Time (g_c+I1), s
Green Ext Time (p_c), s
Intersection Summary
HCM 2010 Ctrl Delay
HCM 2010 LOS
RH
3/25/2016
NWL
NWR
NET
NER
SWL
SWT
204
204
3
0
1.00
1.00
1863
222
1
0.92
2
321
0.18
1774
222
1774
4.3
4.3
1.00
321
0.69
1444
1.00
1.00
14.1
2.7
0.0
2.3
16.8
B
273
16.1
B
67
67
18
0
1.00
1.00
1863
51
1
0.92
2
286
0.18
1583
51
1583
1.0
1.0
1.00
286
0.18
1289
1.00
1.00
12.8
0.3
0.0
0.5
13.1
B
435
435
2
0
266
266
12
0
1.00
1.00
1863
0
1
0.92
2
555
0.00
1583
0
1583
0.0
0.0
1.00
555
0.00
1546
1.00
0.00
0.0
0.0
0.0
0.0
0.0
75
75
1
0
1.00
1.00
1863
82
1
0.92
2
534
0.06
1774
82
1774
1.0
1.0
1.00
534
0.15
858
1.00
1.00
6.0
0.1
0.0
0.5
6.1
A
456
456
6
0
1
1
7.3
5.0
9.0
3.0
0.1
2
2
17.9
5.0
36.0
5.7
7.2
1.00
1863
473
2
0.92
2
1241
0.35
3632
473
1770
3.7
3.7
1241
0.38
3457
1.00
1.00
9.0
0.2
0.0
1.8
9.2
A
473
9.2
A
3
1.00
1863
496
2
0.92
2
1940
0.55
3632
496
1770
2.7
2.7
1940
0.26
4801
1.00
1.00
4.4
0.1
0.0
1.3
4.4
A
578
4.7
A
6
6
25.2
5.0
50.0
4.7
7.7
8
8
11.7
5.0
30.0
6.3
0.8
8.6
A
Synchro 9 Report
Page 1
151
EB
LTR
66
29
52
813
WB
LTR
33
5
24
418
NB
LT
36
8
30
471
SB
LT
9
0
5
496
EB
LTR
26
3
17
278
WB
LTR
62
29
55
200
NB
L
19
1
10
NB
TR
1
0
1
429
SB
LT
50
6
28
226
150
RH
3/24/2016
EB
LR
30
12
32
268
NB
L
33
5
23
115
SimTraffic Report
Page 1
152
EB
LTR
90
32
71
551
WB
LT
152
70
121
1122
WB
R
63
29
50
1122
NB
LTR
122
57
95
683
SB
LTR
128
66
111
541
WB
R
15
1
7
NB
LTR
24
8
24
337
EB
L
56
20
44
WB
L
21
2
13
250
225
WB
T
1
0
1
804
375
SB
L
137
63
117
SB
T
37
2
33
524
SB
R
59
26
45
524
115
3
0
RH
3/24/2016
EB
T
1
0
1
804
EB
R
1
0
1
WB
L
37
10
33
200
200
WB
T
2
0
2
768
SB
LT
147
60
111
529
SB
R
118
58
94
529
SimTraffic Report
Page 2
153
EB
L
79
34
63
WB
R
17
1
9
200
115
NB
LTR
94
41
76
517
Network Summary
Network wide Queuing Penalty: 0
RH
3/24/2016
SimTraffic Report
Page 3
154
EB
LTR
47
25
45
813
WB
LTR
20
1
11
418
NB
LT
34
4
20
471
EB
LTR
31
9
30
278
WB
LTR
47
24
47
200
NB
L
5
0
4
SB
LT
10
1
9
226
150
RH
3/24/2016
EB
LR
29
14
34
268
NB
L
24
2
14
115
SimTraffic Report
Page 1
155
EB
LTR
51
11
34
551
WB
LT
82
39
66
1122
WB
R
75
33
58
1122
NB
LTR
91
45
72
683
SB
LTR
87
45
74
541
SB
L
76
34
60
SB
T
25
2
14
524
EB
L
34
10
30
WB
L
22
1
9
250
225
NB
LTR
22
6
21
338
SB
R
44
19
36
524
115
0
0
RH
3/24/2016
WB
L
29
5
22
SB
LT
70
36
58
529
SB
R
81
35
59
529
200
SimTraffic Report
Page 2
156
EB
L
71
29
59
WB
R
14
1
7
200
115
NB
LTR
81
37
64
517
Network Summary
Network wide Queuing Penalty: 0
RH
3/24/2016
SimTraffic Report
Page 3
157
EB
LTR
65
29
53
813
WB
LTR
35
5
24
418
NB
LT
55
16
44
473
SB
TR
4
0
3
496
EB
LTR
26
4
20
278
WB
LTR
76
37
61
200
NB
L
27
2
13
NB
TR
3
0
2
429
SB
LT
38
8
28
224
150
RH
3/24/2016
EB
LR
30
12
32
268
NB
L
36
7
28
115
SimTraffic Report
Page 1
158
EB
LTR
87
30
66
551
WB
LT
109
54
90
1122
WB
R
62
29
50
1122
NB
LTR
91
47
76
683
SB
LTR
131
59
104
541
EB
R
2
0
1
WB
L
50
21
41
WB
R
19
1
8
135
225
375
EB
L
51
18
42
EB
T
6
0
3
1122
250
NB
LTR
123
46
94
337
SB
L
165
124
196
115
46
23
SB
T
443
151
433
524
4
7
SB
R
97
30
110
524
0
0
B8
T
48
10
98
700
0
0
RH
3/24/2016
EB
T
1
0
1
804
EB
T
2
0
1
804
EB
R
2
0
1
WB
L
44
12
36
200
200
WB
T
2
0
1
768
SB
LT
162
66
124
529
SB
R
146
71
121
529
SimTraffic Report
Page 2
159
EB
L
82
37
67
WB
T
2
0
2
446
200
WB
R
17
1
9
NB
LTR
136
56
106
517
115
WB
R
51
24
47
175
NB
TR
4
0
4
224
Network Summary
Network wide Queuing Penalty: 31
RH
3/24/2016
SimTraffic Report
Page 3
160
EB
LTR
56
28
50
813
WB
LTR
32
4
20
418
NB
LT
54
14
42
473
SB
TR
4
0
3
496
EB
LTR
28
4
19
278
WB
LTR
72
35
62
200
NB
L
22
2
12
NB
TR
7
0
4
429
SB
LT
49
9
32
224
150
RH
3/24/2016
EB
LR
28
12
32
268
NB
L
31
7
27
115
SimTraffic Report
Page 1
161
EB
LTR
101
31
70
551
WB
LT
120
53
93
1122
WB
R
64
29
50
1122
NB
LTR
96
48
79
683
SB
LTR
126
62
102
541
EB
R
1
0
1
WB
L
56
21
44
WB
R
17
1
8
135
225
375
EB
L
64
20
48
EB
T
3
0
4
1122
EB
T
6
0
3
1122
250
NB
LTR
125
45
90
337
SB
L
164
127
198
115
49
25
SB
T
398
165
484
524
8
14
SB
R
98
33
112
524
B8
T
57
16
141
700
B8
T
40
4
67
700
0
0
RH
3/24/2016
EB
T
2
0
1
804
EB
R
1
0
1
WB
L
37
13
37
200
200
SB
LT
149
68
119
529
SB
R
143
72
117
529
SimTraffic Report
Page 2
162
EB
L
84
39
70
200
EB
T
2
0
2
768
WB
T
2
0
2
446
WB
R
15
2
10
NB
LTR
120
53
102
517
115
WB
R
55
24
48
175
Network Summary
Network wide Queuing Penalty: 39
RH
3/24/2016
SimTraffic Report
Page 3
163
EB
LTR
71
32
57
813
WB
LTR
31
5
23
418
NB
LT
46
16
42
473
SB
LT
16
1
11
496
SB
TR
9
0
5
496
EB
LTR
25
3
18
278
WB
LTR
82
37
65
200
NB
L
26
2
12
NB
TR
4
0
3
429
SB
LT
56
9
35
224
SB
TR
1
0
1
224
150
RH
3/24/2016
EB
LR
30
13
34
268
NB
L
33
7
28
SB
T
62
11
82
429
SB
TR
48
6
54
429
115
SimTraffic Report
Page 1
164
EB
LTR
90
34
70
551
WB
LT
134
59
103
1122
WB
R
65
30
52
1122
NB
LTR
108
51
86
683
SB
LTR
161
70
132
541
EB
R
2
0
1
WB
L
55
21
43
135
225
EB
L
54
20
44
EB
T
1
0
1
1122
EB
T
5
0
2
1122
250
WB
T
3
0
2
804
WB
T
87
3
86
804
WB
R
16
1
8
375
NB
LTR
140
51
109
337
SB
L
165
154
201
115
85
46
SB
T
568
406
754
524
41
80
SB
R
390
95
354
524
1
2
0
0
RH
3/24/2016
B8
T
369
151
550
700
4
9
B8
T
311
78
403
700
1
2
SimTraffic Report
Page 2
165
EB
T
3
0
2
804
EB
R
3
0
2
WB
L
43
14
39
200
200
SB
LT
168
75
131
529
SB
R
177
79
134
529
EB
L
97
42
77
WB
R
22
2
12
200
115
NB
LTR
161
60
123
517
WB
R
51
24
46
175
Network Summary
Network wide Queuing Penalty: 138
RH
3/24/2016
SimTraffic Report
Page 3
166
EB
LTR
56
25
49
813
WB
LTR
22
1
10
418
NB
LT
36
8
30
473
SB
TR
6
0
3
496
EB
LTR
32
9
30
278
WB
LTR
58
28
52
200
NB
L
8
0
5
NB
TR
2
0
2
429
SB
LT
41
4
23
224
150
RH
3/24/2016
EB
LR
31
14
34
268
NB
L
27
2
16
115
SimTraffic Report
Page 1
167
EB
LTR
46
13
34
551
WB
LT
74
36
60
1122
WB
R
73
34
58
1122
NB
LTR
77
42
66
683
SB
LTR
80
46
72
541
WB
L
42
14
38
WB
R
4
0
3
NB
LTR
82
31
58
338
225
375
EB
L
46
12
35
EB
T
7
0
5
1122
250
SB
L
117
51
95
SB
T
56
19
44
524
SB
R
44
20
37
524
115
1
0
RH
3/24/2016
EB
R
2
0
1
WB
L
29
7
26
200
200
WB
T
4
0
4
768
SB
LT
82
37
65
529
SB
R
89
44
73
529
SimTraffic Report
Page 2
168
EB
L
73
35
62
200
WB
T
2
0
2
446
WB
R
17
2
10
NB
LTR
93
42
73
517
115
WB
R
46
21
45
175
Network Summary
Network wide Queuing Penalty: 0
RH
3/24/2016
SimTraffic Report
Page 3
169
EB
LTR
62
29
52
813
WB
LTR
22
1
10
418
NB
LT
42
8
32
473
SB
TR
4
0
4
496
EB
LTR
29
8
29
278
WB
LTR
54
28
50
200
NB
L
11
1
7
SB
LT
22
2
11
224
150
RH
3/24/2016
EB
LR
31
14
35
268
NB
L
24
2
13
115
SimTraffic Report
Page 1
170
EB
LTR
55
13
37
551
WB
LT
81
37
64
1122
WB
R
66
33
56
1122
NB
LTR
80
41
65
683
SB
LTR
86
46
74
541
EB
R
1
0
1
WB
L
47
14
37
WB
R
6
0
4
135
225
375
EB
L
38
11
31
EB
T
3
0
2
1122
250
NB
LTR
72
29
56
338
SB
L
107
47
84
SB
T
59
21
46
524
SB
R
49
19
37
524
115
0
0
RH
3/24/2016
WB
L
29
6
24
SB
LT
82
37
63
529
SB
R
88
42
69
529
200
SimTraffic Report
Page 2
171
EB
L
75
34
63
WB
R
26
2
13
200
115
NB
LTR
104
45
83
517
WB
R
60
22
49
175
Network Summary
Network wide Queuing Penalty: 0
RH
3/24/2016
SimTraffic Report
Page 3
172
EB
LTR
58
27
49
813
WB
LTR
20
1
10
418
NB
LT
39
8
32
473
SB
TR
4
0
3
496
EB
LTR
30
8
29
278
WB
LTR
61
28
52
200
NB
L
13
1
7
SB
LT
37
4
21
224
SB
TR
9
0
9
224
150
RH
3/24/2016
EB
LR
34
15
36
268
NB
L
30
2
15
115
SimTraffic Report
Page 1
173
EB
LTR
54
14
39
551
WB
LT
81
36
62
1122
WB
R
69
34
58
1122
NB
LTR
91
43
71
683
SB
LTR
88
46
75
541
WB
L
47
16
40
WB
R
6
0
5
NB
LTR
78
32
61
338
225
375
EB
L
31
10
31
EB
T
5
0
2
1122
250
SB
L
124
53
104
SB
T
68
20
51
524
SB
R
46
19
37
524
115
2
1
RH
3/24/2016
EB
R
2
0
1
WB
L
31
7
26
200
200
SB
LT
75
38
63
529
SB
R
86
43
71
529
SimTraffic Report
Page 2
174
EB
L
77
37
66
200
WB
T
2
0
2
446
WB
R
18
2
10
NB
LTR
115
47
83
517
115
WB
R
62
23
50
175
Network Summary
Network wide Queuing Penalty: 1
RH
3/24/2016
SimTraffic Report
Page 3
175
EB
LTR
133
49
208
813
WB
LTR
31
6
24
390
NB
LT
58
16
46
473
SB
LT
151
34
209
496
3
0
SB
TR
139
29
199
496
2
0
EB
LTR
37
6
33
278
WB
LTR
159
86
209
200
24
0
NB
L
19
1
10
NB
T
3
0
3
433
NB
TR
2
0
2
433
SB
LT
169
80
243
224
22
46
SB
TR
154
45
180
224
5
9
150
RH
3/25/2016
EB
LTR
161
57
184
268
6
0
WB
LT
266
147
324
258
41
0
WB
R
221
48
193
258
13
0
NB
L
38
7
29
NB
R
6
0
6
SB
L
200
46
177
115
100
100
SB
T
443
241
560
433
30
65
SB
TR
434
170
486
433
7
16
57
19
SimTraffic Report
Page 1
176
EB
LTR
129
41
94
551
WB
LT
144
61
110
1122
WB
R
65
30
52
1122
NB
LTR
99
51
84
683
SB
LTR
155
66
120
541
EB
R
2
0
1
WB
L
59
20
45
WB
T
3
0
2
804
135
225
EB
L
96
34
71
EB
T
4
0
2
1122
250
WB
R
64
16
51
375
NB
LTR
158
52
117
337
SB
L
165
165
166
115
100
51
SB
T
534
525
539
520
68
200
SB
R
523
134
434
520
1
2
0
0
RH
3/25/2016
EB
T
2
0
1
804
EB
R
1
0
1
WB
L
41
12
36
200
200
SB
LT
166
73
130
529
SB
R
267
116
210
529
SimTraffic Report
Page 2
177
EB
L
91
44
76
WB
T
6
0
3
446
200
WB
R
19
2
11
NB
LTR
282
101
220
517
115
NW
L
312
281
320
285
96
0
NW
R
274
206
407
285
64
0
NE
R
50
4
26
SW
L
175
90
233
100
100
SW
T
721
635
868
692
53
119
SW
T
723
424
909
692
9
21
98
43
WB
R
51
24
46
175
SB
T
246
103
404
473
9
16
SB
T
248
89
362
473
3
5
Network Summary
Network wide Queuing Penalty: 613
RH
3/25/2016
SimTraffic Report
Page 3
178
EB
LTR
64
30
54
813
WB
LTR
32
4
20
390
NB
LT
57
17
46
473
SB
LT
3
0
3
496
SB
TR
4
0
3
496
EB
LTR
28
4
20
278
WB
LTR
79
36
65
200
NB
L
19
2
12
NB
TR
5
0
3
433
SB
LT
48
10
34
224
150
RH
3/25/2016
EB
LTR
32
12
32
268
WB
LT
65
28
52
258
WB
R
49
15
35
258
NB
L
32
6
26
NB
R
6
0
4
SB
L
49
12
39
115
100
100
SimTraffic Report
Page 1
179
EB
LTR
123
42
86
551
WB
LT
208
91
166
1122
WB
R
80
36
64
1122
NB
LTR
98
49
81
683
SB
LTR
149
66
113
541
EB
R
12
3
10
WB
L
100
42
79
135
225
EB
L
108
47
87
EB
T
122
52
97
1122
EB
T
105
49
92
1122
250
0
0
WB
T
130
61
109
804
WB
T
119
51
93
804
WB
R
133
65
106
375
NB
LTR
122
48
93
337
SB
L
136
73
122
SB
LT
174
98
154
520
SB
R
68
30
56
520
200
0
0
RH
3/25/2016
EB
T
7
0
6
804
EB
R
7
0
4
WB
L
47
12
37
200
200
SB
LT
153
71
123
529
SB
R
296
126
227
529
SimTraffic Report
Page 2
180
EB
L
182
89
150
EB
T
75
29
64
768
EB
T
98
45
83
768
WB
T
98
42
79
446
200
0
0
WB
T
91
35
73
446
WB
R
68
30
57
NB
LTR
152
75
126
517
115
0
0
NW
L
152
70
124
285
NW
R
56
22
46
285
NE
R
43
4
27
SW
L
43
13
38
100
100
WB
R
49
24
46
175
Network Summary
Network wide Queuing Penalty: 0
RH
3/25/2016
SimTraffic Report
Page 3
181
EB
LTR
579
230
590
813
1
0
WB
LTR
397
215
476
384
35
19
NB
LT
89
17
66
473
NB
TR
36
1
20
473
SB
LT
529
328
700
496
53
0
SB
TR
531
312
689
496
42
0
EB
LTR
45
10
39
278
WB
LTR
221
170
280
200
72
0
NB
L
11
1
7
NB
TR
10
0
6
433
SB
LT
245
202
318
224
75
186
SB
TR
246
107
276
224
20
49
150
RH
3/25/2016
EB
LTR
195
87
217
268
5
0
WB
LT
275
253
315
258
91
0
WB
R
273
172
362
258
52
0
NB
L
40
6
29
NB
R
4
0
4
SB
L
200
68
222
115
100
100
SB
T
457
417
550
433
79
205
SB
TR
471
307
579
433
21
56
96
55
SimTraffic Report
Page 1
182
EB
LTR
127
50
102
551
WB
LT
141
58
103
1122
WB
R
54
27
47
1122
NB
LTR
97
49
79
683
SB
LTR
145
66
116
541
EB
R
1
0
1
WB
L
54
19
42
135
225
EB
L
141
51
104
EB
T
2
0
2
1122
EB
T
4
0
2
1122
250
WB
T
3
0
2
804
WB
T
2
0
2
804
WB
R
72
25
63
375
NB
LTR
290
111
268
337
3
0
SB
L
165
164
167
115
100
52
SB
T
533
523
530
520
77
295
SB
R
476
75
313
520
1
2
0
1
RH
3/25/2016
EB
R
2
0
1
WB
L
47
12
37
200
200
SB
LT
356
111
313
529
3
0
SB
R
464
228
462
529
4
0
SimTraffic Report
Page 2
183
EB
L
110
47
83
EB
T
2
0
2
768
WB
T
2
0
2
446
WB
T
3
0
3
446
200
WB
R
18
2
10
NB
LTR
355
154
322
517
0
0
115
NW
L
301
285
300
285
100
0
NW
R
272
141
377
285
44
0
NE
R
49
3
22
SW
L
200
77
236
100
100
SW
T
718
699
728
692
81
251
SW
T
734
443
928
692
13
41
100
57
RH
3/25/2016
WB
R
58
32
53
175
SB
T
499
379
679
473
64
128
SB
T
510
349
670
473
43
86
SimTraffic Report
Page 3
184
WB
LT
29
4
23
126
NB
LR
237
76
209
268
8
0
Network Summary
Network wide Queuing Penalty: 1483
RH
3/25/2016
SimTraffic Report
Page 4
185
EB
LTR
67
28
54
813
WB
LTR
65
29
54
384
NB
LT
69
22
53
473
NB
TR
2
0
2
473
SB
LT
55
9
36
496
SB
TR
11
0
6
496
EB
LTR
30
3
19
278
WB
LTR
82
39
69
200
NB
L
29
2
15
NB
TR
3
0
2
433
SB
LT
77
13
47
224
SB
TR
21
1
17
224
150
RH
4/5/2016
EB
LTR
32
11
32
268
WB
LT
161
68
128
258
WB
R
48
18
37
258
NB
L
35
8
31
115
NB
T
2
0
2
692
NB
R
31
3
17
SB
L
52
20
48
100
100
SB
TR
2
0
2
433
SimTraffic Report
Page 1
186
EB
LTR
158
50
104
551
WB
LT
212
101
179
1122
WB
R
82
35
63
1122
NB
LTR
107
54
89
683
SB
LTR
144
73
124
541
EB
R
14
3
11
WB
L
99
44
82
135
225
EB
L
135
63
111
EB
T
121
56
101
1122
EB
T
120
53
96
1122
250
0
0
WB
T
141
69
120
804
WB
T
190
59
147
804
0
0
WB
R
165
84
130
375
NB
LTR
137
50
98
337
SB
L
216
105
176
200
0
1
SB
LT
230
125
196
520
SB
R
72
36
64
520
1
2
RH
4/5/2016
EB
T
8
0
6
804
EB
R
5
0
2
WB
L
54
15
42
200
200
SB
LT
320
98
224
529
0
0
SB
R
445
212
405
529
1
0
SimTraffic Report
Page 2
187
EB
L
207
113
184
EB
T
79
32
71
768
EB
T
101
50
88
768
WB
T
118
50
92
446
200
0
1
WB
T
106
45
87
446
WB
R
74
31
60
0
0
115
0
0
NE
R
82
6
40
SW
L
64
28
56
100
0
0
100
0
0
NB
LTR
198
91
156
517
NW
L
146
70
118
285
NW
R
57
24
49
285
NE
T
99
40
78
520
NE
T
132
73
116
520
2
4
SW
T
140
64
110
692
SW
T
98
37
77
692
1
1
RH
4/5/2016
WB
R
66
32
54
175
SimTraffic Report
Page 3
188
NB
LR
55
26
48
268
Network Summary
Network wide Queuing Penalty: 8
RH
4/5/2016
SimTraffic Report
Page 4
189
EB
LTR
619
216
605
813
3
0
WB
LTR
392
202
453
384
31
16
NB
LT
68
13
47
473
NB
TR
25
1
17
473
SB
LT
534
338
701
496
55
0
SB
TR
529
320
697
496
48
0
EB
LTR
46
11
42
278
WB
LTR
211
170
269
200
74
0
NB
L
21
2
11
NB
TR
2
0
2
433
SB
LT
243
209
308
224
78
199
SB
TR
246
115
281
224
20
52
150
RH
3/25/2016
EB
LTR
205
99
244
268
12
0
WB
LT
285
256
307
258
94
0
WB
R
226
113
325
258
36
0
NB
L
32
5
23
115
NB
T
2
0
2
692
NB
R
8
0
6
SB
L
200
60
210
100
100
SB
T
452
423
535
433
82
219
SB
TR
473
316
611
433
31
83
97
55
SimTraffic Report
Page 1
190
EB
LTR
130
48
100
551
WB
LT
128
60
104
1122
WB
R
61
28
48
1122
NB
LTR
98
49
80
683
SB
LTR
163
71
129
541
EB
R
3
0
1
WB
L
71
23
50
WB
T
3
0
2
804
135
225
EB
L
174
53
121
EB
T
2
0
1
1122
250
0
0
WB
T
2
0
2
804
WB
R
81
24
64
375
NB
LTR
316
135
325
337
12
0
SB
L
165
164
168
115
100
54
SB
T
534
524
533
520
78
306
SB
R
482
110
393
520
1
2
0
0
RH
3/25/2016
EB
T
1
0
1
804
EB
T
2
0
1
804
EB
R
3
0
1
WB
L
50
13
39
200
200
WB
T
2
0
2
768
SB
LT
339
121
333
529
4
0
SB
R
480
248
476
529
5
0
SimTraffic Report
Page 2
191
EB
L
98
48
82
WB
T
2
0
2
446
WB
T
12
0
5
446
200
WB
R
24
2
13
NB
LTR
468
237
512
517
8
0
115
NW
L
306
289
305
285
99
0
NW
R
233
96
318
285
31
0
NE
R
40
2
18
SW
L
200
68
224
100
100
SW
T
718
700
718
692
82
262
SW
T
734
497
930
692
14
45
100
57
RH
3/25/2016
WB
R
69
32
56
175
SB
T
503
400
671
473
66
137
SB
T
505
364
658
473
44
91
SimTraffic Report
Page 3
192
WB
LT
43
10
54
126
3
0
NB
LR
211
67
199
268
9
0
Network Summary
Network wide Queuing Penalty: 1578
RH
3/25/2016
SimTraffic Report
Page 4
193
EB
LTR
69
31
57
813
WB
LTR
71
31
58
384
NB
LT
64
25
57
473
NB
TR
6
0
4
473
SB
LT
53
8
34
496
SB
TR
9
0
5
496
EB
LTR
28
3
18
278
WB
LTR
93
40
70
200
NB
L
22
2
13
NB
TR
10
0
5
433
SB
LT
70
12
45
224
SB
TR
18
1
13
224
150
RH
4/5/2016
EB
LTR
30
12
32
268
WB
LT
170
70
132
258
WB
R
45
18
35
258
NB
L
37
9
32
115
NB
T
2
0
2
692
NB
R
19
2
12
SB
L
51
19
47
100
100
SB
TR
5
0
4
433
SimTraffic Report
Page 1
194
EB
LTR
153
56
112
551
WB
LT
240
106
184
1122
WB
R
86
36
66
1122
NB
LTR
111
52
88
683
SB
LTR
163
73
126
541
EB
R
15
3
11
WB
L
114
48
92
135
225
EB
L
154
67
126
EB
T
126
57
104
1122
EB
T
123
57
103
1122
250
0
0
WB
T
144
75
127
804
WB
T
122
60
107
804
WB
R
177
92
146
375
NB
LTR
133
51
102
337
SB
L
216
111
180
200
0
1
SB
LT
233
132
205
520
SB
R
82
37
67
520
1
2
RH
4/5/2016
EB
T
1
0
1
804
EB
R
4
0
2
WB
L
58
16
45
200
200
SB
LT
405
142
378
529
4
0
SB
R
507
274
518
529
6
0
SimTraffic Report
Page 2
195
EB
L
228
119
195
EB
T
92
37
74
768
EB
T
105
54
95
768
WB
T
116
51
94
446
200
1
1
WB
T
114
50
93
446
WB
R
79
33
62
NB
LTR
188
97
161
517
115
0
0
NW
L
145
73
124
285
NW
R
60
26
53
285
NE
T
94
40
78
520
NE
T
141
70
118
520
2
4
NE
R
63
5
35
SW
L
64
27
55
100
100
0
0
SW
T
135
67
112
692
SW
T
97
36
76
692
1
1
RH
4/5/2016
WB
R
69
33
56
175
SimTraffic Report
Page 3
196
NB
LR
56
26
48
268
Network Summary
Network wide Queuing Penalty: 9
RH
4/5/2016
SimTraffic Report
Page 4
197
EB
LTR
60
28
50
813
WB
LTR
25
1
11
390
NB
LT
42
11
36
473
EB
LTR
30
9
30
278
WB
LTR
72
30
57
200
NB
L
18
1
11
NB
TR
2
0
1
433
SB
LT
35
4
21
224
150
RH
3/25/2016
EB
LTR
34
14
36
268
WB
LT
54
24
45
258
WB
R
45
16
34
258
NB
L
30
3
18
NB
R
8
0
5
SB
L
39
11
35
115
100
100
SB
TR
2
0
2
433
SimTraffic Report
Page 1
198
EB
LTR
70
23
52
551
WB
LT
86
41
69
1122
WB
R
70
34
58
1122
NB
LTR
86
43
71
683
SB
LTR
101
50
83
541
WB
T
2
0
2
804
WB
R
61
13
46
EB
L
64
25
51
EB
T
3
0
2
1122
250
WB
L
51
13
36
225
375
NB
LTR
103
39
80
337
SB
L
165
154
194
115
76
26
SB
T
527
289
608
520
8
17
SB
R
100
27
83
520
0
0
RH
3/25/2016
EB
R
1
0
1
WB
L
32
7
27
200
200
SB
LT
86
39
67
529
SB
R
148
71
122
529
SimTraffic Report
Page 2
199
EB
L
97
45
80
EB
T
2
0
2
768
WB
T
8
0
4
446
200
WB
R
26
3
15
NB
LTR
215
91
181
517
115
NW
L
200
82
197
285
6
0
NW
R
112
35
132
285
3
0
NE
R
80
10
49
SW
L
71
14
61
100
0
0
100
SW
T
159
24
153
692
SW
T
39
2
49
692
5
3
WB
R
52
22
47
175
NB
TR
6
0
5
224
Network Summary
Network wide Queuing Penalty: 46
RH
3/25/2016
SimTraffic Report
Page 3
200
EB
LTR
56
27
49
813
WB
LTR
17
1
10
390
NB
LT
41
9
33
473
SB
TR
2
0
2
496
EB
LTR
30
9
30
278
WB
LTR
64
28
54
200
NB
L
16
1
8
SB
LT
29
3
16
224
150
RH
3/25/2016
EB
LTR
31
13
33
268
WB
LT
56
24
45
258
WB
R
46
16
33
258
NB
L
27
3
17
NB
R
6
0
4
SB
L
33
9
32
115
100
100
SimTraffic Report
Page 1
201
EB
LTR
76
22
53
551
WB
LT
106
47
83
1122
WB
R
87
40
70
1122
NB
LTR
89
43
71
683
SB
LTR
108
49
85
541
EB
R
10
1
5
WB
L
79
32
67
135
225
EB
L
94
42
80
EB
T
74
26
57
1122
EB
T
59
18
44
1122
250
WB
T
90
36
70
804
WB
T
88
38
73
804
WB
R
93
51
79
375
NB
LTR
95
36
72
337
SB
L
117
52
92
SB
LT
127
64
108
520
SB
R
61
23
44
520
200
RH
3/25/2016
EB
T
1
0
1
804
EB
R
0
0
1
WB
L
29
6
23
200
200
SB
LT
86
40
71
529
SB
R
170
71
125
529
SimTraffic Report
Page 2
202
EB
L
146
75
127
EB
T
51
16
44
768
EB
T
68
26
59
768
WB
T
84
38
74
446
WB
T
89
33
72
446
200
0
0
WB
R
84
31
61
NB
LTR
160
71
121
517
115
0
0
NW
L
118
60
99
285
NW
R
56
22
47
285
NE
R
84
10
50
SW
L
40
11
35
100
0
0
100
WB
R
55
22
47
175
Network Summary
Network wide Queuing Penalty: 0
RH
3/25/2016
SimTraffic Report
Page 3
203
EB
LTR
132
40
128
813
WB
LTR
140
57
195
384
4
3
NB
LT
46
13
39
473
SB
LT
172
45
241
496
3
0
SB
TR
143
34
221
496
2
0
EB
LTR
54
12
44
278
WB
LTR
163
86
216
200
24
0
NB
L
21
1
10
NB
TR
4
0
4
433
SB
LT
208
99
273
224
25
51
SB
TR
189
46
177
224
2
4
150
RH
3/25/2016
EB
LTR
175
63
184
268
4
0
WB
LT
279
227
354
258
77
0
WB
R
275
131
341
258
42
0
NB
L
32
3
18
NB
R
29
2
16
SB
L
200
99
253
115
100
100
0
0
SB
T
455
304
587
433
35
75
SB
TR
439
198
498
433
8
16
73
55
SimTraffic Report
Page 1
204
EB
LTR
79
27
61
551
WB
LT
88
42
73
1122
WB
R
65
31
52
1122
NB
LTR
80
42
67
683
SB
LTR
94
48
78
541
EB
R
1
0
0
WB
L
43
11
32
135
225
EB
L
138
46
98
EB
T
3
0
2
1122
EB
T
2
0
1
1122
250
0
0
WB
T
2
0
2
804
WB
T
85
3
84
804
0
0
WB
R
72
26
66
375
NB
LTR
170
51
121
337
SB
L
165
164
167
115
100
34
SB
T
536
524
532
520
66
215
SB
R
422
75
292
520
0
0
0
0
RH
3/25/2016
EB
R
2
0
1
WB
L
31
6
25
200
200
SB
LT
84
41
71
529
SB
R
265
111
202
529
SimTraffic Report
Page 2
205
EB
L
106
47
82
WB
T
10
1
6
446
200
WB
R
22
2
13
NB
LTR
391
152
338
517
0
0
115
NW
L
300
282
323
285
95
0
NW
R
278
213
414
285
69
0
NE
R
83
13
56
SW
L
200
128
284
100
0
1
100
SW
T
715
661
873
692
59
154
SW
T
716
374
876
692
5
14
98
73
RH
3/25/2016
WB
R
64
32
53
175
NB
TR
6
0
5
224
SB
T
317
114
412
473
9
15
SB
T
308
87
352
473
2
4
SimTraffic Report
Page 3
206
NB
LR
99
37
106
268
1
0
Network Summary
Network wide Queuing Penalty: 715
RH
3/25/2016
SimTraffic Report
Page 4
207
EB
LTR
70
30
55
813
WB
LTR
62
32
56
384
NB
LT
50
15
43
473
SB
LT
49
7
32
496
SB
TR
2
0
2
496
EB
LTR
32
8
29
278
WB
LTR
65
29
56
200
NB
L
21
1
8
NB
TR
2
0
1
433
SB
LT
50
5
26
224
150
RH
4/5/2016
EB
LTR
37
15
36
268
WB
LT
146
63
117
258
0
0
WB
R
39
17
32
258
NB
L
34
4
22
NB
R
29
3
18
SB
L
70
23
55
115
100
100
0
0
SimTraffic Report
Page 1
208
EB
LTR
73
26
59
551
WB
LT
122
61
102
1122
WB
R
92
44
75
1122
NB
LTR
88
44
70
683
SB
LTR
103
50
82
541
EB
R
9
1
6
WB
L
69
29
60
135
225
EB
L
129
55
103
EB
T
86
34
70
1122
EB
T
85
24
58
1122
250
0
0
WB
T
112
52
94
804
WB
T
114
55
97
804
WB
R
170
86
137
375
NB
LTR
107
43
84
337
SB
L
176
88
148
200
0
0
SB
LT
178
98
158
520
SB
R
78
31
60
520
0
0
RH
4/5/2016
EB
R
1
0
1
WB
L
36
8
29
200
200
SB
LT
99
43
77
529
SB
R
240
111
199
529
SimTraffic Report
Page 2
209
EB
L
221
113
188
EB
T
58
21
51
768
EB
T
84
37
73
768
WB
T
105
42
82
446
200
0
1
WB
T
110
49
92
446
WB
R
78
35
64
0
0
115
0
0
NE
R
106
10
58
SW
L
74
32
60
100
0
0
100
0
0
NB
LTR
177
90
153
517
NW
L
136
69
115
285
NW
R
64
25
51
285
NE
T
82
30
66
520
NE
T
138
67
113
520
1
4
SW
T
109
50
89
692
SW
T
85
32
69
692
0
0
RH
4/5/2016
WB
R
58
31
51
175
NB
TR
5
0
5
224
SimTraffic Report
Page 3
210
NB
LR
57
30
49
268
Network Summary
Network wide Queuing Penalty: 6
RH
4/5/2016
SimTraffic Report
Page 4
211
EB
LTR
143
50
168
813
WB
LTR
174
66
225
384
6
5
NB
LT
61
15
46
473
NB
TR
14
1
13
473
SB
LT
243
62
293
496
4
0
SB
TR
188
49
267
496
3
0
EB
LTR
81
18
68
278
WB
LTR
200
111
244
200
38
0
NB
L
26
1
12
SB
LT
236
131
310
224
39
80
SB
TR
218
73
232
224
8
17
150
RH
3/25/2016
EB
LTR
182
60
173
268
3
0
WB
LT
284
229
351
258
77
0
WB
R
275
134
342
258
43
0
NB
L
26
3
16
NB
R
21
2
11
SB
L
200
85
237
115
100
100
0
0
SB
T
455
324
605
433
48
105
SB
TR
461
229
541
433
12
26
75
56
SimTraffic Report
Page 1
212
EB
LTR
88
29
64
551
WB
LT
89
45
75
1122
WB
R
70
32
55
1122
NB
LTR
92
46
75
683
SB
LTR
101
51
83
541
EB
R
0
0
0
WB
L
51
13
36
WB
T
2
0
2
804
135
225
EB
L
129
47
101
EB
T
3
0
1
1122
250
0
0
WB
R
66
25
62
375
NB
LTR
167
61
139
337
SB
L
165
164
166
115
100
35
SB
T
535
523
539
520
67
222
SB
R
476
79
309
520
0
2
0
0
RH
3/25/2016
EB
R
1
0
1
WB
L
33
7
27
200
200
SB
LT
96
43
75
529
SB
R
250
116
203
529
SimTraffic Report
Page 2
213
EB
L
114
50
87
WB
T
9
0
5
446
200
WB
R
20
3
13
NB
LTR
341
152
297
517
0
0
115
NW
L
306
287
312
285
98
0
NW
R
304
214
419
285
64
0
NE
R
77
11
52
SW
L
200
120
279
100
0
1
100
SW
T
720
667
871
692
63
168
SW
T
718
435
908
692
6
16
97
73
RH
3/25/2016
WB
R
61
32
53
175
SB
T
426
176
508
473
14
23
SB
T
406
153
476
473
9
14
SimTraffic Report
Page 3
214
NB
LR
100
41
124
268
4
0
Network Summary
Network wide Queuing Penalty: 842
RH
3/25/2016
SimTraffic Report
Page 4
215
EB
LTR
66
30
55
813
WB
LTR
63
32
55
384
NB
LT
56
17
47
473
SB
LT
42
7
30
496
SB
TR
7
0
4
496
EB
LTR
31
9
30
278
WB
LTR
67
31
57
200
NB
L
21
1
10
SB
LT
51
7
32
224
SB
TR
1
0
1
224
150
RH
4/5/2016
EB
LTR
40
14
35
268
WB
LT
140
57
108
258
0
0
WB
R
55
19
39
258
NB
L
30
4
20
115
NB
T
2
0
2
692
NB
R
41
4
21
SB
L
63
24
54
100
100
SB
TR
2
0
2
433
SimTraffic Report
Page 1
216
EB
LTR
102
33
71
551
WB
LT
136
64
111
1122
WB
R
102
46
82
1122
NB
LTR
84
44
70
683
SB
LTR
109
52
87
541
EB
R
10
1
6
WB
L
82
32
66
135
225
EB
L
110
52
92
EB
T
94
36
76
1122
EB
T
84
30
64
1122
250
WB
T
116
55
99
804
WB
T
116
54
98
804
WB
R
181
88
148
375
0
0
NB
LTR
110
40
79
337
SB
L
180
95
158
200
0
0
SB
LT
178
101
160
520
SB
R
72
31
57
520
0
0
RH
4/5/2016
EB
T
1
0
1
804
EB
R
3
0
1
WB
L
35
9
31
200
200
WB
T
5
0
5
768
SB
LT
90
42
72
529
SB
R
288
121
234
529
SimTraffic Report
Page 2
217
EB
L
237
116
195
EB
T
74
24
59
768
EB
T
78
37
70
768
WB
T
104
43
82
446
200
1
1
WB
T
136
52
102
446
WB
R
120
40
80
1
1
115
0
0
NE
R
107
15
67
SW
L
74
31
59
100
0
0
100
0
0
NB
LTR
212
96
165
517
NW
L
145
72
122
285
NW
R
65
27
54
285
NE
T
80
30
66
520
NE
T
135
67
112
520
2
4
SW
T
109
54
93
692
SW
T
82
32
67
692
0
0
RH
4/5/2016
WB
R
56
32
50
175
NB
TR
4
0
4
224
SimTraffic Report
Page 3
218
NB
LR
50
29
47
268
Network Summary
Network wide Queuing Penalty: 7
RH
4/5/2016
SimTraffic Report
Page 4
219
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd Performance by move
Movement
Denied Del/Veh (s)
Total Del/Veh (s)
RH
3/29/2016
EBT
0.0
1.9
EBR
0.0
2.3
WBL
0.0
8.8
WBT
0.0
2.6
SBL
0.4
25.5
SBR
0.5
27.7
All
0.2
11.7
SimTraffic Report
Page 1
220
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd Performance by move
Movement
Denied Del/Veh (s)
Total Del/Veh (s)
RH
3/29/2016
EBT
0.0
2.0
EBR
0.0
2.5
WBL
0.0
9.6
WBT
0.0
2.7
SBL
1.2
31.5
SBR
1.2
38.5
All
0.5
15.3
SimTraffic Report
Page 1
221
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd Performance by move
Movement
Denied Del/Veh (s)
Total Del/Veh (s)
RH
3/30/2016
EBT
0.0
1.6
EBR
0.0
1.8
WBL
0.0
6.5
WBT
0.0
2.5
SBL
0.2
13.8
SBT
SBR
0.4
13.0
All
0.1
5.7
SimTraffic Report
Page 1
222
6: US 29 Bypass SB On Ramp/US 29 Bypass SB Off Ramp & E Lee St/Meetze Rd Performance by move
Movement
Denied Del/Veh (s)
Total Del/Veh (s)
RH
3/30/2016
EBT
0.0
1.7
EBR
0.0
1.9
WBL
0.0
6.6
WBT
0.0
2.5
SBL
0.2
13.4
SBT
0.2
14.1
SBR
0.4
14.7
All
0.1
6.1
SimTraffic Report
Page 1
223
APPENDIX C
Turning Lane Warrant
Worksheets
AM Peak Hour
PM Peak Hour
SB Left Turn Volumes
Opposing Volumes
PM
44
549
75'
Year
2018
2019
2025
Sat
59
476
75'
PM
57
718
100'
Sat
75
694
100'
PM
57
734
100'
Sat
75
701
100'
EXHIBIT C-1
LEFT TURN LANE WARRANT FOR
WALKER DR & SITE ACCESS A
rh, 160202\initial\los.xls-t1, f03/26/16
AM Peak Hour
PM Peak Hour
SB Left Turn Volumes
Opposing Volumes
PM
34
401
50'
Year
2018
2019
2025
Sat
44
277
50'
PM
57
576
75'
Sat
75
498
100'
PM
57
592
100'
Sat
75
505
100'
EXHIBIT C-2
LEFT TURN LANE WARRANT FOR
WALKER DR & SITE ACCESS B
rh, 160202\initial\los.xls-t2, f03/26/16
AM Peak Hour
PM Peak Hour
NB Right Turn
Approach Total
PM
187
549
Yes
Year
2018
2019
2025
Sat
241
476
Yes
PM
205
718
Yes
Sat
266
694
Yes
PM
205
734
Yes
Sat
266
701
Yes
EXHIBIT C-3
RIGHT TURN LANE WARRANT FOR
WALKER DR & SITE ACCESS A
rh, 160202\initial\los.xls-r1, f03/28/16
AM Peak Hour
PM Peak Hour
Year
2018
2019
2025
PM
NB Right Turn
Approach Total
69
401
Sat
89
277
PM
160
576
Yes
Sat
208
498
Yes
PM
160
592
Yes
Sat
208
505
Yes
EXHIBIT C-4
RIGHT TURN LANE WARRANT FOR
WALKER DR & SITE ACCESS B
rh, 160202\initial\los.xls-r2, f03/28/16