Вы находитесь на странице: 1из 1

CS337

80k * 2.5 = 250k <- cost for the company. Always multiply 2.5 to the salary to get
the cost for the company. This goes per year.
Programming units are lines of codes.
For programmers a month is 30 days. 8 hours a day, 5 days a week.
How many lines of codes do one programmers make for a company a day? 50 per
day, 1500 per month
12 months per year/ 30 days per month/ 50 Lines of codes per day.
Exponential formulas cannot be compute as an algorithm. They are called
Intractable. T (n) = an!
T (n) = 2abn are examples of intractable algorithms.
SRD Software Requirement Documents.
You have to know what the definition of software.
Incompleteness theorem of arithmetic<- You need to know this. It means you
cannot prove everything mathematics.
Mostly everything in computing does not have a solution
Lord Rayleigh top physics in 19th century.
Kurt Godel
Time and Money or Schedule and budget affects the development of Software
Engineer. This will probably be on the midterm.
Know the difference between computer science and software engineering.
Order of magnitude is 10n. n order of magnitude is 10n.
The different between a program and algorithm is that a program can run for ever
and a program is finite.
+*++++++

+++++++++++++++