HOJA DE METRADOS

PROY:

chfgh

Ubicacin

: Lugar:

Realizado

ING.

Distrito:

PARTIDA

Provincia:

DESCRIPCION

Departamento:
VECES

26 de Enero 2015
OE.OBRAS
01
PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
OE. 01.01
OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
OE.01.01.01 OBRAS PROVISIONALES
OE. 01.01.01.01OFICINAS+B12:B13
OFICINA DE RESIDENCIA DE OBRA
1
OE. 01.01.01.02ALMACENES
ALMACEN DE OBRA

OE. 01.01.01.03CASETAS DE GUARDIANIA


VUGILANCIA

OE. 01.01.01.04VESTUARIOS
VESTIDORES (D) Y (V)

OE. 01.01.01.05SERVICIOS HUGIENICOS


SS.HH (D) Y (V)
SSHH PORTATIL

1
3

OE. 01.01.01.06CERCOS
CERCO DE TRIPLEY

OE. 01.01.01.07AGUA PARA LA CONSTRUCCION


INSTALACION Y SERVICIO DE AGUA

OE. 01.01.01.08DESAGUE PARA LA CONSTRUCCION


INSTALACION Y SERVICIO DE DESAGUE

OE. 01.01.01.09INSTALACION ELECTRICA PROVISONAL


INSTALACION Y SERVICIO Y ENERGIA HIDRAULICA

OE.01.01.02 TRABAJOS PRELIMINARES


OE. 01.01.02.02ELIMINACION DE RAICES
ELEMINACION DE RAICES DE EUCALIPTO
OE. 01.01.02.01DEMOLICIONES
ELEMINACION DE VIVIENDA EN RUINAS

PARTIDA

DESCRIPCION
ELEMENTO A
ELEMENTO B

OE. 01.01.02.03ELIMINACION DE DEMOLICIONES


ELEMINACION DE DEMOLICIONES
ESPONJAMIENTO 25%

VECES
1
1

1
1

OE. 01.01.02.04MOVILIZACION Y REGRESION DE MAQUINARIAS Y HERRAMIENTAS


MOVILIZACION DE MAQUINARIAS Y HERRAMINETAS
OE.01.01.03 TRAZOS, NIVELES Y REPLANTEO
OE. 01.01.03.01TRAZOS, NIVELES Y REPLANTEO PRELIMINAR
TRAZO DE OBRA

OE. 01.01.03.01REPLANTEO DURANTE EL PROCESO


TRAZO DE OBRA

OE. 01.02
SEGURIDAD Y SALUD
OE.01.02.01 EQUIPOS DE PROTECCION INDIVIDUAL
MAMELUCOS
BOTAS
CASCOS
GUANTES DE CUERO
TROTECORES DE VISTA
RESPIRADORES
PROTECTORES DE OIDOS
ZAPATOS DE SEGURIDAD

15
10
20
10
4
4
3
8

OE.01.02.02 EQUIPOS DE PROTECCION COLECTIVA


SIRENA

OE.01.02.03 SEALIZACION TEMPORAL DE SEGURIDAD


SEALIZACION INTERIOR
27 de Enero 2015
OE.02
ESTRUCTURAS
OE. 02.01
MOV. DE TIERRA
OE.02.01.01 NIVELACION DE TERRENO
NIVELACION DE AREA DE TERRENO
OE.02.01.02 NIVELADO APISONADO

20

1
1

PARTIDA

DESCRIPCION

VECES

AREA A
AREA B
OE.02.02
EXCAVACIONES
OE.02.02.01 EXCAVACIONES SIMPLES
OE. 02.02.01.01 EXCAVAVION PARA ZAPATAS
Z-1
Z-2
OE. 02.02.01.02 EXCAVAVION PARA CIMIENTOS
CIMENTACION EN EJE A,EJE B, TRAMO 1-2
CIMENTACION EN EJE A, EJE B, TRAMO 2-3
CIMENTACION EN EJE A,EJE B TRAMO 3-4
CIMENTACION EN EJE A,EJE B TRAMO 4-5
CIMENTACION EN EJE A, EJE B, TRAMO 5-6
CIMENTACION EN TRAMO A-B, TRAMO 1-1
CIMENTACION EN TRAMO A-B, TRAMO 6-6
OE. 02.03

1
1

4
8
EJES VERTICALES
EJES VERTICALES
EJES VERTICALES
EJES VERTICALES
EJES VERTICALES
HORIZ.
VERT.

2
2
2
2
2
1
1

RELLENOS

OE.02.03.01 RELLENO CON MATERIAL PROPIO

OE. 02.04

ARE. CU

Z-1

Z-2

OBRAS DE CONCRETO SIMPLE

OE.02.04.01 CIMENTAIONES
OE. 02.04.01.01CIMENTACION EN EJE A, EJE B TRAMOS 1-2,2-3,3-4,4-5,5-6 EJE
CIMENTACION EN EJE A-B, TRAMO 1-1//6-6

10
2

OE.02.04.02 SOLADOS
Z-1

Z-2

03 de FEBRERO 2015
OE.02.04.03 COLUMNAS
OE. 02.03.01

CONCRETO
C-1

OE. 02.03.02

12

ENCOFRADO Y DESENCOFRADO

PERIMET

C-1
4 de febrero 2015
OE.02.03.04 VIGAS

12

PARTIDA

DESCRIPCION

VECES

PRIMERA LOSA SLIGERADA


CONCRETO
VP-103 EN EJE A (0.25 X 0.40) VERTICALES

VP-103 EN EJE A (0.25 X 0.40)+ VOLADIZO Y TRAMO 2-3

VP-104 EN EJE B (0.25 X 0.40)

VP-104 EN EJE B (0.25 X 0.20)+ VOLADIZO Y TRAMO 2-3

VP-105 EN EJE C (0.25 X 0.40)

VP-105 EN EJE C (0.25 X 0.20)+ VOLADIZO Y TRAMO 2-3

VP-105 EN EJE D (0.25 X 0.40)

VP-105 EN EJE D (0.25 X 0.20)+ VOLADIZO Y TRAMO 2-3

VP-105 EN EJE C (0.25 X 0.20)

VP-103 EN EJE D (0.25 X 0.20)

VP-101 EN EJE 1 (0.25 X 0.40) HORIZONTALES

VP-102 EN EJE 2 (0.25 X 0.40)

VP-101 EN EJE 3 (0.25 X 0.40)

VA-101 EN EJE 1 (0.25 X 0.20)

ENCOFRADO Y DESENCOFRADO
VP-103 EN EJE A (0.25 X 0.40) VERTICALES

VP-103 EN EJE A (0.25 X 0.40)+ VOLADIZO Y TRAMO 2-3

VP-104 EN EJE B (0.25 X 0.40)

VP-104 EN EJE B (0.25 X 0.20)+ VOLADIZO Y TRAMO 2-3

VP-105 EN EJE C (0.25 X 0.40)

VP-105 EN EJE C (0.25 X 0.20)+ VOLADIZO Y TRAMO 2-3

VP-105 EN EJE D (0.25 X 0.40)

VP-105 EN EJE D (0.25 X 0.20)+ VOLADIZO Y TRAMO 2-3

VP-105 EN EJE C (0.25 X 0.20)

VP-103 EN EJE D (0.25 X 0.20)

VP-101 EN EJE 1 (0.25 X 0.40) HORIZONTALES

VP-102 EN EJE 2 (0.25 X 0.40)

VP-101 EN EJE 3 (0.25 X 0.40)

VA-101 EN EJE 1 (0.25 X 0.20)

OE.02.03.05 LOSA ALIGERADA


PRIMER PISO LOSA ALIGERADA
CONCRETO
PAO ENTRE EJE 1-2 Y A-B

PARTIDA

DESCRIPCION

VECES

PAO ENTRE EJE 1-2 Y A-B ( VIGUETAS)


PAO EJE A-B VOLADIZO

PAO ENTRE EJE 1-2 Y B-C

PAO ENTRE EJE 1-2 Y B-C ( VIGUETAS)


PAO EJE A-B VOLADIZO

11
1

ENCOFRADO Y DESENCOFRADO
PAO ENTRE EJE 1-2 Y A-B

PAO ENTRE EJE 1-2 Y A-B ( VIGUETAS)


PAO EJE A-B VOLADIZO

PAO ENTRE EJE 1-2 Y B-C

PAO ENTRE EJE 1-2 Y B-C ( VIGUETAS)


PAO EJE A-B VOLADIZO

11
1

9 de febrero 2015
10 de febrero 2015
OE.02.03.07 escaleras
CONCRETO
ALEMENTO 1 CIMENTACION

ALEMENTO 2 PASOS Y CONTRAPAOS

ALEMENTO 3 - DESCANSO

ENCOFRADO
PRIMER TRAMO
ELEMENTO 1 ( CARAS LATERALES) CIMETACION

ALEMENTO 3 - DESCANSO

CONTRAPASOS

16 de febrero 2015
OE. 03
OE. 03.01

ARQUITECTURA
MUROS Y TABIQUERIA DE ALBAILERIA

OE.03.01.01 MUROS DE LADRILLO KING KONG

PARTIDA

DESCRIPCION

VECES

OE. 01.01.01.01MUROS DE SOGA ( 0.15m)


EJE A ENTRE 1-2

EJE A ENTRE 2-3

PARTIDA

DESCRIPCION

V-9

V-10

VECES

1.00

PARTIDA

DESCRIPCION
V-8

OE. 03.08

VECES
1

CERRAJERIA

OE.03.08.01 VISAGRAS
BISAGRA DE ALUMINIO DE 3X3
SEGUNDO PISO
P-7

1.00

P-8

1.00

OE.03.08.02 CERRADURAS (CHAPAS DE LAS PUERTAS)

UNIDAD

P-4

1.00

P-5

1.00

OE.03.08.03 ACCESORIOS EN GENERAL


JALADORES /TIRADORES
P-4 JALADORES DE ALUMIUNIO

OE. 03.09

1.00

VIDRIOS CRISTALES Y SIMILARES

OE.03.09.01 ESPEJOS
PRIMER PISO
SS.HH

1.00

OE.03.09.01 VITRAL O ESPEJOS


V-9

V-10

1.00

PARTIDA

DESCRIPCION
V-8

OE. 03.10

VECES
1

PINTURAS

OE.03.09.01 PINTURA DE CIELO RASOS,VIGAS COLUMNAS Y PAREDES


CIELORAOS

CIELORASO INTERIOR Y EXTERIOR

1.00

VIGAS

METRADO TOTAL DE VIGAS

1.00

COLUMNAS

METRADO TOTAL DE COLUMNAS

1.00

PAREDES INTERIORES

1.00

OE.03.09.01 PINTURA DE PUERTAS


PUERTAS CONTRAPLACADAS (JALAR INFORMACION)
P-3

1.00

P-5

1.00

P-6

1.00

OE.03.09.01 PINTURA DE VENTANAS

OE. 03.11

V-9

V-10

V-8

VARIOS, LIMPIEZA, JARDINERIA

OE.03.09.01 LIMPIEZA PERMANETE DE OBRA


AREA GENERAL DE OBRA

6.00

OE.03.09.02 LIMPIEZA FINAL


AREA GENERAL DE OBRA

26 de Enero 2015
OE. 04
OE. 04.11

INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS

1.00

PARTIDA

DESCRIPCION

OE.04.01.01 SUMINISTRO DE APARATOS SANITARIOS

VECES

NUMERO DE VECES POR

PRIMER PISO

1.00

INODORO

1.00

LAVATORIO

2.00

SEGUNDO PISO
INODORO
LAVATORIO
LAVATORIO METALICO DE UNA POZA

OE.04.01.02 SUMINISTRO DE ACCESORIOS


PRIMER PISO
PAPELERAS TOALLAS

OE.04.02.03 INSTALACION DE APARATOS SANITARIOS


PRIMER PISO
INODORO

1.00

LAVATORIO

1.00

SEGUNDO PISO

OE.04.0.02
OE. 04.2

INODORO

1.00

LAVATORIO

1.00

LAVATORIO METALICO DE UNA POZA

1.00

INSTALACION DE ACCESORIOS
SISTEMA DE AGUA FRIA

OE.04.02.01 SUMINISTRO DE APARATOS SANITARIOS


PRIMER PISO
INODORO

1.00

LAVATORIO

1.00

SEGUNDO PISO
INODORO

1.00

LAVATORIO

1.00

LAVATORIO METALICO DE UNA POZA

1.00

OE.04.02.02 REDES DE DISTRIBUCION (del tanque elevado destribulle a los pisos)


PRIMER PISO
MEDIDOR 1

PARTIDA

DESCRIPCION

VECES

TUBERIA PVC 1/2 C-05 ( LA DISTANIA LINEAL + LA ALTURA DESDE EL P

1.00

MEDIDOR 2
TUBERIA PVC 1/2 C-05 ( LA DISTANIA LINEAL + LA ALTURA DESDE EL P

1.00

TUBERIA PVC 1" C-05 TUB. DE SUCCION ( DEL TANQUE CISTER

1.00

HACIA EL SEGUNDO PISO Y AZOTEA


TUBERIA PVC 3/4 C-05

1.00

TUBERIA PVC 1/2 C-05

1.00

HACIA EL TERCER PISO


TUBERIA PVC 3/4 C-05

1.00

TUBERIA PVC 1/2 C-05

1.00

OE.04.02.03 REDES DE ALIMENTACION ( desde la red matriz)


PRIMER PISO
MEDIDOR 1
TUBERIA PVC 3/4 C-05( DISTANIA LINEAL de la der matriz + LA ALTUR

1.00

MEDIDOR 2
TUBERIA PVC 3/4 C-05 ( LA DISTANIA LINEAL + LA ALTURA DESDE EL P

1.00

OE.04.02.04 accesorio de las redes de agua


segundo piso

piso

codos de 90 de 1/2

1.00

tee de 1/2

1.00

OE.04.02.05 valvulas
valvulas de contro

OE. 04.2

1.00

SISTEMA DE DRENAJE PLIVIAL ( en la azotea llevan a los sumideros,otro

OE.04.02.01 red de recoleccion


TUBERIA PVC 2" (tambien la altura del tanque por el material sedim

1.00

TUBERIA PVC 3" (solo la tuberia de 3")

1.00

PARTIDA

DESCRIPCION

VECES

OE.04.02.02 accesorios
abrazaderas de 1/2 metalicas @1.00 M

OE. 04.3

EN TUBERIAS DE BAJADA (de la red )

1.00

CODOS 45 PVC 2"

1.00

yee de 3" con reduccion a 2"

1.00

CODOS 90 PVC 3"

1.00

desague y ventilacion

OE.04.02.01 salidas de desague


PRIMER PISO
INODORO

1.00

LAVATORIO

1.00

SEGUNDO PISO
INODORO

1.00

LAVATORIO

1.00

LAVATORIO METALICO DE UNA POZA

2.00

OE.04.02.01 redes de derivacion ( desague del bao lavader)


tercer piso
TUBERIA PVC 4"

1.00

TUBERIA PVC 2"

1.00

TUBERIA PVC 2" (ventilacion)

1.00

OE.04.02.01 accesorios de redes


codo de 45 de 4"

1.00

tee de 4

1.00

codo de 90 de 2"

1.00

yee de 4" a 2"

1.00

OE.04.02.01 camaras d einspeccionj


cajas de registro

26 de Enero 2015
OE. 05

INSTALACIONES electricas y mecanicas

1.00

PARTIDA
OE. 05.01

DESCRIPCION
sconexion de la red externa de medidores
conexin al medidor

OE. 05.02

VECES

1.00

salidas d alumbrado, tomacorrientes, fuerza y seales debiles

OE.05.02.01 salidas (para los focos)


alumbardo

NDE VE

alumbrado interior

1.00

alumbrado exterior

1.00

TOMACORRIENTES
TOMACORRIENTES INTERIORES

1.00

OE.05.02.01 canalizaciones, conductos o tuberias


puberias PVC 3/4" SAP
ALUMBRADOS
INTERIOR EXTERIOR

1.00

TOMACVORRIENTES ( mas la altura del suelo)


INTERIORES

1.00

COCINA ELECTRICA

1.00

TERMA ELECTRICA

1.00

OE.05.02.01 conductores de cables de energia en tuberias (cables)


alumbrado

2.00

tomacorrientes

3.00

puesta a tierra

1.00

OE.05.02.05 tableros principales


tablero principal

1.00

OE.05.02.05 tableros de distribucion


tablero de distribucion

OE. 05.03

instalacion del sistema de puesta de tierra


pozo a tierra

OE. 05.04

1.00

artefactos

1.00

PARTIDA

DESCRIPCION

VECES

OE.05.04.01 lamparas
focos ahorradores

1.00

flourescentes

1.00

PARTIDA

DESCRIPCION

VECES

PARTIDA

DESCRIPCION

VECES

ETRADOS
chfgh

Fecha

Jan-15

METRADO
SUB TOTAL
LARGO ANCHO ALTO

TOTAL

UND

5.00

4.00

20.00

m2

11

88.00

m2

1.5

1.5

2.25

m2

18.00

m2

24.00

m2

54

3.5

189.00

m2

3.00

MES

3.00

MES

3.00

MES

UNID.

31.50

m2

METRADO
SUB TOTAL
LARGO ANCHO ALTO
24.00
6
4
7.50
3
2.5

TOTAL

UND

72.00
90.00

m3

80.00

m2

80.00

m2

6
72.00

20

20

AMIENTAS

UNID.
PAR
UNID.
PAR
UNID.
UNID.
UNID.
PAR

UND.

UND.

7.35
1.53

13
1.38

97.66

m2

#REF!

m2

95.55
2.11

METRADO
SUB TOTAL
LARGO ANCHO ALTO
95.55
7.35
13
2.11
1.53
1.38

1.2
2
2.73
2.73
2.73
2.73
2.73
2.75
2.75

1.2
1.5
0.4
0.4
0.4
0.4
0.4
0.4
0.4

0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6
0.6

TOTAL

UND

17.86

m3

7.87

m3

2.66

m3

6.56

m3

5.95

m3

3.46
14.40
1.31
1.31
1.31
1.31
1.31
0.66
0.66

ARE. CUAD.

ALTURA

1.44

0.6

0.86

0.6

1.80

2.73

0.4

0.5

5.46

2.75

0.4

0.5

1.10

1.2

1.2

0.2

1.15

1.5

0.2

4.80

2.55
0.25

0.25

3.4

2.55
40.80

PERIMETRO
1.00

3.4

m3

40.80

METRADO
SUB TOTAL
LARGO ANCHO ALTO

5.00

0.25

0.40

0.50

3.15

0.25

0.20

0.16

5.00

0.25

0.40

0.50

3.75

0.25

0.20

0.19

5.00

0.25

0.40

0.50

3.15

0.25

0.20

0.16

5.00

0.25

0.40

0.50

3.15

0.25

0.20

0.16

2.25

0.25

0.20

0.11

2.25

0.25

0.20

0.11

13.00

0.25

0.40

1.30

13.00

0.25

0.40

1.30

13.00

0.25

0.40

1.30

3.38

0.25

0.20

0.17

5.00

0.65

3.25

3.15

0.45

1.42

5.00

0.65

3.25

3.75

0.45

1.69

5.00

0.65

3.25

3.15

0.45

1.42

5.00

0.65

3.25

3.15

0.45

1.42

2.25

0.45

1.01

2.25

0.45

1.01

13.00

0.65

8.45

13.00

0.65

8.45

13.00

0.65

8.45

3.38

0.45

1.52

4.50

4.18

0.05

0.94

TOTAL

UND

6.95

m3

47.84

3.08

m3

METRADO
SUB TOTAL
LARGO ANCHO ALTO
0.02
0.10
0.15

TOTAL

UND

51.77

m2

3.37

m3

AREA
3.03

0.05

0.15

4.50

4.95

0.05

1.11

4.50

0.10

0.15

0.74

0.05

0.11

AREA
2.25

4.50

4.18

18.81

4.50

0.10

0.45

AREA

3.03

3.03
4.50

4.95

22.28

4.50

0.10

4.95

AREA

2.25

2.25

1.00

0.50

0.88

0.44

AREA
0.24

1.00

1.24

1.00

0.24
0.15

0.19
0.44

0.44
AREA
0.48

0.96

0.19

0.38

1.00

0.18

0.72

METRADO
SUB TOTAL
LARGO ANCHO ALTO

TOTAL
24.53

4.50

2.20

9.90

5.15

2.84

14.63

UND

METRADO
SUB TOTAL
LARGO ANCHO ALTO

..

1.00

3.99

1.5

5.99

TOTAL

UND

METRADO
SUB TOTAL
LARGO ANCHO ALTO
0.60
1.2
0.5

TOTAL

UND

UNI.
UNIDADES
3.00

3.00

3.00

3.00

UNI.

UNIDADES
2.00

2.00

1.00

1.00

UNIDADES

1.00

UNI.

1.00

UNI.

109.59

UNI.

1.00

1.00

UNID

1.00

1.00

10.76

2.40

1.50

38.74

10.76

3.99

1.5

64.40

METRADO
SUB TOTAL
LARGO ANCHO ALTO
6.46
1.2
0.5
10.76

AREA
#REF!

CARAS
2.00

0.90

2.00

0.70

2.00

0.70

CARAS
2.00
2.00
2.00

2.40

TOTAL

UND

METRADO
SUB TOTAL
LARGO ANCHO ALTO

TOTAL

UND
UNID

MERO DE VECES POR SS.HH

1.00
1.00
2.00

1.00
1.00
1.00
1.00
1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

5.00

pto

104.59

ml

le a los pisos)

METRADO
SUB TOTAL
LARGO ANCHO ALTO
3.42
3.42

14.55

14.55

2.30

2.30

16.67

16.67

22.79

22.79

19.37

19.37

25.49

25.49

10.56

TOTAL

UND

10.56

ml

9.00

ml

28.15

ml

10.56

13.45

cant.acc.
9.00

9.00

4.00

4.00

4.00

4.00

s sumideros,otros)
7.92

7.92

20.23

20.23

METRADO
SUB TOTAL
LARGO ANCHO ALTO

9.00

9.00

3.00

3.00

1.00

1.00

TOTAL

UND

13.00

ml

6.00

pto

2.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

2.00

15.62

2.00

2.00

2.00

2.00

3.00

3.00

2.00

2.00

2.00

2.00

METRADO
SUB TOTAL
LARGO ANCHO ALTO
4.00

4.00

NDE VECES
13.00

13.00

1.00

1.00

17.00

17.00

25.45

25.45

38.81

38.81

12.64

12.64

8.54

8.54

25.45

50.90

51.45

154.35

8.54

8.54

4.00

TOTAL

UND

GBL

14.00

PTO.

85.44

ml

213.79

ml

4.00

und

1.00

und

4.00

1.00

1.00

1.00

1.00

METRADO
SUB TOTAL
LARGO ANCHO ALTO

TOTAL

UND

METRADO
SUB TOTAL
LARGO ANCHO ALTO

TOTAL

UND

METRADO
SUB TOTAL
LARGO ANCHO ALTO

TOTAL

UND

PLANILLA DE METRADOS DE ACERO


PROY:
Ubicacin
Realizado
PARTIDA

OE.02.03.01

VIVIENDA multifamiliar

: Lugar:av. Los incas


Distrito:huancan
ING. VELIZ SULCARAY MAX JERRY
DISEO DEL ACERO

1.65

UBICACIN

Provincia:hyo

# de piezas
Iguales

zapatas tipo 01 - Acero F'y 4200 Kg/cm2

1/2"

zapatas tipo 01 - Acero F'y 4200 Kg/cm2

1/2"

zapatas tipo 02 - Acero F'y 4200 Kg/cm2

1/2"

zapatas tipo 02 - Acero F'y 4200 Kg/cm2

1/2"

zapatas tipo 03 - Acero F'y 4200 Kg/cm2

1/2"

1.35

zapatas tipo 03 - Acero F'y 4200 Kg/cm2

1/2"

1.65

zapatas tipo 04 - Acero F'y 4200 Kg/cm2

1/2"

1.05

zapatas tipo 04 - Acero F'y 4200 Kg/cm2

1/2"

1.05

zapatas tipo 05 - Acero F'y 4200 Kg/cm2

1/2"

1.25

zapatas tipo 05 - Acero F'y 4200 Kg/cm2

1/2"

1.05

zapatas tipo 06 - Acero F'y 4200 Kg/cm2

1/2"

0.85

zapatas tipo 06 - Acero F'y 4200 Kg/cm2

1/2"

0.75

zapatas tipo 07 - Acero F'y 4200 Kg/cm2

1/2"

0.75

zapatas tipo 07 - Acero F'y 4200 Kg/cm2

1/2"

0.75

zapatas tipo 08 - Acero F'y 4200 Kg/cm2

1/2"

0.75

zapatas tipo 08 - Acero F'y 4200 Kg/cm2

1/2"

0.75

zapatas tipo 09 - Acero F'y 4200 Kg/cm2

1/2"

0.75

zapatas tipo 09 - Acero F'y 4200 Kg/cm2

1/2"

1.65
1.25
1.55
1.35

Peso en Kilogramos por metro lineal


Longitud Total por en metros lineales
Peso Total por en Kilogramos

OE.02.03.03.03

COLUMNAS Acero F'y 4200 Kg/cm2


1er Piso

ES LA LONGITUD
DEL FIERRO SU
DOBLES

0.30
4.59

COLUMNA 1 de 0.40x0.25

5/8"

SUNCHADO de 3/8"

3/8"

COLUMNA 2 de 0.25x0.25

1/2"

5/8"

Estribos

3/8"

3.00

COLUMNA 3 de 0.25x0.15

1/2"

25.00

Estribos

3/8"

25.00

0.30
.

L=1.10

17.

17.

0.30
4.59

0.30
PARA LA COLUMNA
C-2

0.30
4.59

0.30

PARA LA COLUMNA
C-2

0.17

17.

17.

0.17

0.17

PARA LA COLUMNA
C-2

0.17

0.25
2.94

0.25
0.17

0.07

0.07

0.17

0.20
4.55

0.20

0.17
0.17

Estribos

3/8"

6.00

COLUMNA 5

1/2"

1.00

3/8"

1.00

COLUMNETA 6

3/8"

10.00

Estribos

1/4"

10.00

Vigueta de amarre entre columnetas

3/8"

1.00

Estribos

1/4"

1.00

COLUMNETA 7

3/8"

16.00

1/4"

16.00

5/8"

8.00

1/2"

8.00

0.17
0.17

0.30
4.80

0.30
Estribos

0.17
0.17

0.17
0.17

0.20
1.80

0.20
0.17

0.07

0.07

0.17

18.65
6.
0.25

0.20
3.90

0.20
Estribos

0.17

0.07

0.07

0.17
2do Piso

0.30
3.30

COLUMNA 1

0.30

P=1.50
17.

17.

Zunchos

3/8"

8.00

5/8"

8.00

3/8"

8.00

COLUMNA 4

1/2"

4.00

Estribos

3/8"

4.00

COLUMNETA 6

3/8"

9.00

1/4"

9.00

3/8"

1.00

1/4"

1.00

3/8"

21.00

0.30
3.30

COLUMNA 2

0.30
.

P=1.50
17.

17.

Zunchos

0.20
1.95

0.20
0.17
0.17

0.17
0.17

0.20
1.25

0.20
Estribos

0.17

0.07

0.07

0.17
Vigueta de amarre entre columnetas

18.65
6.

Estribos

0.25

0.20
3.30

0.20

COLUMNETA 7

Estribos

0.17

0.07

0.07

1/4"

21.00

0.17
Peso en Kilogramos por metro lineal
Longitud Total por en metros lineales

4 de febrero 2015
OE.02.03.04.03

Peso Total por en Kilogramos


Vigas Acero F'y 4200 Kg/cm2

11.47

para las vigas


peraltadas

6.
6.

6.12

11.06
6.
6.

8.13

VP-101 (0.25x0.40) fe 5/8" +

5/8"

VP-101 (0.25x0.40) fe 5/8" REFUERZO+

5/8"

VP-101 (0.25x0.40) fe 5/8" -

5/8"

VP-101 (0.25x0.40) fe 5/8" REFUERZO+

5/8"

Estribos fe 3/8"

3/8"

Estribos fe 3/8"

3/8"

5/8"

1.00

1/2"

1.00

5/8"

1.00

1/2"

1.00

3/8"

1.00

VA 103 (0.25x0.40) fe 5/8" +

5/8"

1.00

VA 103 (0.25x0.40) fe 1/2" +

1/2"

1.00

VA 103 (0.25x0.40) fe 5/8" -

5/8"

1.00

VA 103 (0.25x0.40) fe 1/2" -

1/2"

1.00

0.19
0.14

0.14
0.19
0.17

.
0.32

6.
6.
0.32

0.17

20.95
VA 102 (0.25x0.40) fe 5/8" +

15.65

6.
6.
VA 102 (0.25x0.40) fe 1/2" +

20.20
VA 102 (0.25x0.40) fe 5/8" -

13.50

6.
6.
VA 102 (0.25x0.40) fe 1/2" -

0.17

.
0.32

0.32

0.17

Estribos fe 3/8"

21.30
15.80

6.
6.

21.30
12.15

6.
6.

0.17

.
0.32

0.32

Estribos fe 3/8"

3/8"

1.00

VA 104 (0.25x0.40) fe 5/8" +

5/8"

1.00

VA 104 (0.25x0.40) fe 1/2" +

1/2"

1.00

VA 104 (0.25x0.40) fe 5/8" -

5/8"

1.00

VA 104 (0.25x0.40) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VA 105 (0.25x0.40) fe 5/8" +

5/8"

1.00

VA 105 (0.25x0.40) fe 1/2" +

1/2"

1.00

VA 105 (0.25x0.40) fe 5/8" -

5/8"

1.00

VA 105 (0.25x0.40) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VA 106 (0.25x0.20) fe 1/2" +

1/2"

2.00

VA 106 (0.25x0.20) fe 1/2" -

1/2"

2.00

Estribos fe 3/8"

3/8"

1.00

VP 100 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 100 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 100 (0.30x0.50) fe 1/2" +

1/2"

1.00

VP 100 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 100 (0.30x0.50) fe 5/8" -

5/8"

1.00

0.17

8.45
5.10

6.
6.

8.45
4.65

6.
6.

0.17

.
0.32

0.32

0.17

6.05
4.20

6.
6.

6.05
2.65

6.
6.

0.17

.
0.32

0.32

0.17

4.00
4.00
0.17
0.12

6.
6.
6.
6.
0.12

0.17

19.90
5.65

6.
6.

2.30

6.
6.

19.40
6.10

6.
6.

2.05

6.
6.

VP 100 (0.30x0.50) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VP 101 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 101 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 101 (0.30x0.50) fe 1/2" +

1/2"

1.00

VP 101 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 101 (0.30x0.50) fe 5/8" -

5/8"

1.00

VP 101 (0.30x0.50) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VP 102 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 102 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 102 (0.30x0.50) fe 1/2" +

1/2"

1.00

VP 102 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 102 (0.30x0.50) fe 5/8" -

5/8"

1.00

VP 102 (0.30x0.50) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VP 103 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 103 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 103 (0.30x0.50) fe 1/2" +

1/2"

1.00

VP 103 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 103 (0.30x0.50) fe 5/8" -

5/8"

1.00

0.22

.
0.42

0.42

0.22

14.00
5.85

6.
6.

4.30

6.
6.

13.50
3.10

6.
6.

6.10

6.
6.

0.22

.
0.42

0.42

0.22

12.85
7.15

6.
6.

2.50

6.
6.

12.35
3.10

6.
6.

3.20

6.
6.

0.22

.
0.42

0.42

0.22

12.85
7.15

6.
6.

2.50

6.
6.

12.35
3.10

6.
6.

3.20

6.
6.

VP 103 (0.30x0.50) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VP 104 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 104 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 104 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 104 (0.30x0.50) fe 5/8" -

5/8"

1.00

Estribos fe 3/8"

3/8"

1.00

VA 201 (0.25x0.40) fe 5/8" +

5/8"

1.00

VA 201 (0.25x0.40) fe 1/2" +

1/2"

1.00

VA 201 (0.25x0.40) fe 5/8" -

5/8"

1.00

VA 201 (0.25x0.40) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VA 202 (0.25x0.40) fe 5/8" +

5/8"

1.00

VA 201 (0.25x0.40) fe 1/2" +

1/2"

1.00

VA 201 (0.25x0.40) fe 5/8" -

5/8"

1.00

VA 201 (0.25x0.40) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VA 203 (0.25x0.40) fe 5/8" +

5/8"

1.00

0.22

.
0.42

0.42

0.22

9.50
7.30

6.
6.

9.50
4.80

6.
6.

0.22

.
0.42

0.42

0.22

18.65
14.45

6.
6.

18.65
9.45

6.
6.

0.17

.
0.32

0.32

0.17

20.40
15.50

6.
6.

20.40
11.20

6.
6.

0.17

.
0.32

0.32

0.17

21.30

15.80

6.
6.

21.30
12.15

6.
6.

VA 203 (0.25x0.40) fe 1/2" +

1/2"

1.00

VA 203 (0.25x0.40) fe 5/8" -

5/8"

1.00

VA 203 (0.25x0.40) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VA 205 (0.25x0.40) fe 5/8" +

5/8"

1.00

VA 205 (0.25x0.40) fe 1/2" +

1/2"

1.00

VA 205 (0.25x0.40) fe 5/8" -

5/8"

1.00

VA 205 (0.25x0.40) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VA 206 (0.25x0.20) fe 1/2" +

1/2"

1.00

VA 206 (0.25x0.20) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VC (0.50x0.40) fe 1/2"

1/2"

1.00

VC (0.50x0.40) fe 3/8"

3/8"

1.00

VP 200 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 200 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 200 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 200 (0.30x0.50) fe 5/8" -

5/8"

1.00

0.17

.
0.32

0.32

0.17

6.05
4.20

6.
6.

6.05
2.65

6.
6.

0.17

.
0.32

0.32

0.17

4.00
4.00
0.17
0.12

6.
0.12

0.17

1.95
1.80
6.
6.
10.40
10.40

6.
6.

10.40

6.
6.

3.40

6.
6.

0.22

.
0.42

6.
6.
0.42

Estribos fe 3/8"

3/8"

1.00

VP 201 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 201 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 201 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 201 (0.30x0.50) fe 5/8" -

5/8"

1.00

Estribos fe 3/8"

3/8"

1.00

VP 202 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 202 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 202 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 202 (0.30x0.50) fe 5/8" -

5/8"

1.00

VP 202 (0.30x0.50) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

VP 203 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 203 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 203 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 203 (0.30x0.50) fe 5/8" -

5/8"

1.00

VP 203 (0.30x0.50) fe 1/2" -

1/2"

1.00

Estribos fe 3/8"

3/8"

1.00

0.22

9.50
7.30

6.
6.

9.50
4.80

6.
6.

0.22

.
0.42

0.42

0.22

12.35
9.55

6.
6.

12.35
3.10

6.
6.

1.70

6.
6.

0.22

.
0.42

0.42

0.22

12.35
9.55

6.
6.

12.35
3.10

6.
6.

1.70

6.
6.

0.22

.
0.42

0.42

0.22

9.50
7.30

6.
6.

9.50

4.80

6.
6.

0.22

6.
6.

0.42

0.42

VP 204 (0.30x0.50) fe 3/4" +

3/4"

1.00

VP 204 (0.30x0.50) fe 5/8" +

5/8"

1.00

VP 204 (0.30x0.50) fe 3/4" -

3/4"

1.00

VP 204 (0.30x0.50) fe 5/8" -

5/8"

1.00

Estribos fe 3/8"

3/8"

1.00

VIGA TIMPANO (0.25x0.20) fe 1/2" +

1/2"

2.00

VIGA TIMPANO (0.25x0.20) fe 1/2" -

1/2"

2.00

Estribos fe 3/8"

1/4"

2.00

0.22

14.20
12.25

6.
6.

0.17

6.
6.

0.12

0.12
0.17

Peso en Kilogramos por metro lineal


Longitud Total por en metros lineales
Peso Total por en Kilogramos
05.10.00

Viga de conexin Acero F'y 4200 Kg/cm2

18.50
Eje A de 1-5 (0.25x0.40) fe 5/8" +

18.50

6.
6.
Eje A de 1-5 (0.25x0.40) fe 5/8" -

15.10

6.
6.
Eje C de 1-4 (0.25x0.40) fe 5/8" +

15.10

6.
6.
Eje C de 1-4 (0.25x0.40) fe 5/8" -

8.65

6.
6.
Eje E de 4-5 (0.25x0.40) fe 5/8" +

8.65

6.
6.
Eje E de 4-5 (0.25x0.40) fe 5/8" -

9.35

6.
6.
Eje 1 de A-C (0.25x0.40) fe 5/8" +

9.35

6.
6.
Eje 1 de A-C (0.25x0.40) fe 5/8" -

9.35

6.
6.
Eje 3 de A-C (0.25x0.40) fe 5/8" +

9.35

6.
6.
Eje 3 de A-C (0.25x0.40) fe 5/8" -

11.25

6.
6.
Eje 5 de A-E (0.25x0.40) fe 5/8" +

11.25

6.
6.
Eje 5 de A-E (0.25x0.40) fe 5/8" -

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

5/8"

1.00

0.17

.
0.32

6.
6.
0.32

Estribos fe 3/8"

3/8"

1.00

0.17
Peso en Kilogramos por metro lineal
Longitud Total por en metros lineales
Peso Total por en Kilogramos

OE.01.01.01.03

Losa Aligerada Acero F'y 4200 Kg/cm2

4.33
1.95

66..

11.25

Tramo A-C, ENTRE 2-2"+ BOLADISO (+)

1/2"

Tramo A-C, ENTRE 2-2" (+)

3/8"

Tramo A-C, ENTRE 2-2"+ BOLADISO (-)

1/2"

Tramo A-C, ENTRE 1"-2+ BOLADISO (+)

1/2"

Tramo A-C, ENTRE 1"-2

3/8"

Tramo A-C, ENTRE 1"-1+ BOLADISO (+)

1/2"

Tramo A-C, ENTRE 1"-1+ BOLADISO (+)

1/2"

Tramo A-C, ENTRE 1"-1

3/8"

Tramo A-C, ENTRE 1"-1+ BOLADISO (+)

1/2"

Tramo A-C, ENTRE 1"-2+ BOLADISO (+)

1/2"

Tramo A-C, ENTRE 1"-2

3/8"

Tramo A-C, ENTRE 1"-1+ BOLADISO (+)

1/2"

Tramo 1-3, ENTRE A-B"+ BOLADISO (+)

1/2"

Tramo 1-3, ENTRE A-B"

3/8"

Tramo 1-3, ENTRE A-B"+ BOLADISO (+)

1/2"

Tramo 1-3, ENTRE B-B"+ BOLADISO (+)

1/2"

Tramo 1-3, ENTRE B-B"

3/8"

Tramo 1-3, ENTRE B-B"+ BOLADISO (+)

1/2"

6.
6.
4.33
1.95

66..

11.25
6.
6.
4.33
1.95

66..

11.25
6.
6.
4.97
ASUMIENDO UN
DATO PROMEDIO

1.95

66..

6.94
6.
6.
3.05
2.90

66..

5.25
6.
6.
3.05
2.90
5.25

66..

6.
6.
3.05
66..

2.90
5.25

Tramo 1-3, ENTRE B"-C+ BOLADISO (+)

1/2"

Tramo 1-3, ENTRE B"-C

3/8"

Tramo 1-3, ENTRE B"-C+ BOLADISO (+)

1/2"

ACERO HORIZONTAL EN FORMA DE U

3/8"

ACERO HORIZONTAL EN FORMA DE U

3/8"

ACERO HORIZONTAL EN FORMA


RECTANGULAR

3/8"

ACERO VERTICLA EN FORMA DE U

3/8"

ACERO DEL CONTORNO DEL CORTE A-A

3/8"

ACERO VERTICLA EN FORMA DE U

3/8"

6.
6.

OE.02.03.01.03

TANUE CISTERNA ACERO F"y 4200 Kg/cm2

5.55
5.55
6.
6.

1.75

6.
6.

2.25

2.25

1.75
.

1.75

6.
6.
2.25

1.75
1.8

.
2.5

2.5

6.
6.

1.75
2.25

1.75

2.70
4.00

66..

1.60
10.75

66..

2.05
20.30

66..

4.35

6.
6.

1.65
5.45

2.00

1/2"

7.00

Tramo B-C,1-5 Viguetas fe +

1/2"

7.00

Tramo B-C,1-5 Viguetas fe +

1/2"

7.00

Tramo B-C,1-5 Viguetas fe +

1/2"

7.00

Tramo B-C,1-5 Viguetas fe -

1/2"

7.00

1/2"

7.00

1/2"

7.00

1/2"

7.00

5/8"

7.00

Tramo 4-5 en Eje A Voladizo Viguetas fe -

Tramo B-C,1-5 Viguetas fe -

Tramo C-D,2-3 Viguetas fe +

6.
6.

2.15
5.45

1/2"

Tramo 4-5 en Eje A Voladizo Viguetas fe +

Tramo C-D,2-3 Viguetas fe -

Tramo D-E,4-5 Viguetas fe +

6.
6.

Tramo D-E,4-5 Viguetas fe -

Peso en Kilogramos por metro lineal


Longitud Total por en metros lineales
Peso Total por en Kilogramos

OE.01.02.01.03

ESCALERAS Acero F'y 4200 Kg/cm2

6.
6.
6.
6.

3/8"

1.00

Acero 1

3/8"

1.00

Acero 2 (eje X)

3/8"

1.00

Cara inclinada

3/8"

1.00

Parte cimentacion

3/8"

1.00

Acero 3 (eje X)

3/8"

1.00

Cara inclinada

3/8"

1.00

PRIMER TRAMO

6.
6.
6.
6.
6.
6.
6.
6.
6.
6.

6.
6.

Parte cimentacion

Peso en Kilogramos por metro lineal


Longitud Total por en metros lineales
Peso Total por en Kilogramos

METRADOS DE ACERO

Provincia:hyo
Fecha

Departamento: junin
Jan-15

# de elem.

Longitud de

por pieza

c/elemento

LONGITUD POR EN METROS LINEALES


1/4"

3/8"

1/2"

12

1.65

19.8

12

1.65

19.8

1.55

27.9

11

1.25

27.5

10

1.35

13.5

10

1.35

13.5

12

1.05

12.6

1.65

13.2

1.25

33.75

1.05

25.2

0.85

13.6

1.05

14.7

0.75

5.25

0.75

5.25

0.75

5.25

0.75

5.25

0.75

5.25

0.75

5.25

5/8"

3/4"

Total
1"

Kilogramos por metro lineal

0.25

0.58

1.02

1.60

2.26

4.04

Total por en metros lineales

0.00

0.00

266.55

0.00

0.00

0.00

al por en Kilogramos

0.00

0.00

271.88

0.00

0.00

0.00

271.88

5.19

37.40

41.52

37.40

37.40

5.19

5.19

68.00

0.85

4.00

3.44

24.00

0.58

8.60

4.35

62.28

CLASE

62.28

173.40

344

348.00

38.00

0.88

200.64

4.00

5.40

31.00

0.88

27.28

4.00

2.20

88.00

31.00

0.63

2.00

18.65

85.00

0.25

4.00

4.30

17.00

0.63

4.00

3.90

4.00

3.50

21.60

195.30

37.30

21.25

275.20

171.36

124.80

112.00

36.00

1.50

432.00

8.00

3.90

36.00

1.50

6.00

2.35

19.00

0.88

66.88

4.00

1.65

59.40

5.00

0.63

2.00

24.10

115.00

0.25

4.00

3.70

249.60

432.00

56.40

28.35

48.20

28.75

310.80

14.00

0.63

Kilogramos por metro lineal

185.22

0.25

0.58

1.02

1.60

2.26

4.04

Total por en metros lineales

667.63

2507.70

600.63

478.20

37.40

0.00

al por en Kilogramos

166.91

1454.47

612.64

765.12

84.52

0.00

11.47

22.94

6.12

12.24

11.14

22.28

8.13

16.26

0.81

31

1.13

CLASE

4.05

35.03

2.00

20.95

2.00

15.65

2.00

20.20

2.00

13.50

136.00

1.18

2.00

21.30

2.00

15.80

2.00

21.30

2.00

12.15

41.90
31.30
40.40
27.00

160.48

42.60
31.60
42.60
24.30

3,083.66

144.00

1.18

2.00

8.45

2.00

5.10

2.00

8.45

2.00

4.65

46.00

1.18

2.00

6.05

2.00

4.20

2.00

6.05

2.00

2.65

32.00

1.18

2.00

4.00

16.00

2.00

4.00

16.00

27.00

0.78

2.00

19.90

2.00

5.65

2.00

2.30

2.00

19.40

2.00

6.10

169.92

16.90
10.20
16.90
9.30

54.28

12.10
8.40
12.10
5.30

37.76

21.06

39.80
11.30
4.60
38.80
12.20

2.00

2.05

81.00

1.48

2.00

14.00

2.00

5.85

2.00

4.30

2.00

13.50

2.00

3.10

2.00

6.10

99.00

1.48

2.00

12.85

2.00

7.15

2.00

2.50

2.00

12.35

2.00

3.10

2.00

3.20

88.00

1.48

2.00

12.85

2.00

7.15

2.00

2.50

2.00

12.35

2.00

3.10

4.10

119.88

28.00
11.70
8.60

27.00
6.20
12.20

146.52

25.70
14.30
5.00

24.70
6.20
6.40

130.24

25.70
14.30
5.00

24.70
6.20

2.00

3.20

88.00

1.48

2.00

9.50

2.00

7.30

2.00

9.50

2.00

4.80

64.00

1.48

2.00

18.65

2.00

14.45

2.00

18.65

2.00

9.45

32.00

1.18

2.00

20.40

2.00

15.50

2.00

20.40

2.00

11.20

130.00

1.18

2.00

21.30

6.40

130.24

19.00
14.60

19.00
9.60

94.72

37.30
28.90
37.30
18.90

37.76

40.80
31.00
40.80
22.40

153.40

42.60

2.00

15.80

31.60

2.00

21.30

2.00

12.15

144.00

1.18

2.00

6.05

2.00

4.20

2.00

6.05

2.00

2.65

32.00

1.18

2.00

4.00

8.00

2.00

4.00

8.00

27.00

0.78

9.00

1.95

10.00

1.80

2.00

10.40

2.00

10.40

2.00

10.40

2.00

3.40

42.60
24.30

169.92

12.10
8.40
12.10
5.30

37.76

21.06

17.55
18.00

20.80
20.80

20.80
6.80

74.00

1.48

2.00

9.50

2.00

7.30

2.00

9.50

2.00

4.80

64.00

1.48

2.00

12.35

2.00

9.55

2.00

12.35

2.00

3.10

2.00

1.70

87.00

1.48

2.00

12.35

2.00

9.55

2.00

12.35

2.00

3.10

2.00

1.70

87.00

1.48

109.52

19.00
14.60

19.00
9.60

94.72

24.70
19.10

24.70
6.20
3.40

128.76

24.70
19.10

24.70
6.20
3.40

128.76

2.00

9.50

2.00

7.30

2.00

9.50

2.00

4.80

64.00

1.48

2.00

14.20

56.80

2.00

12.25

49.00

86.00

0.78

Kilogramos por metro lineal


Total por en metros lineales

al por en Kilogramos

19.00
14.60

19.00
9.60

94.72

134.16

0.25

0.58

1.02

1.60

2.26

4.04

134.16

2098.56

622.37

724.30

488.80

0.00

33.54

1217.16

634.82

1158.88

1104.69

0.00

2.00

18.50

37.00

2.00

18.50

37.00

2.00

15.10

30.20

2.00

15.10

30.20

2.00

8.65

17.30

2.00

8.65

17.30

2.00

9.35

18.70

2.00

9.35

18.70

2.00

9.35

18.70

2.00

9.35

18.70

2.00

11.25

22.50

2.00

11.25

22.50

4,149.09

888

1.18

1,047.45

Kilogramos por metro lineal

0.25

0.58

1.02

1.60

2.26

4.04

Total por en metros lineales

0.00

1047.45

0.00

288.80

0.00

0.00

al por en Kilogramos

0.00

607.52

0.00

462.08

0.00

0.00

4.33

1.95

8.10

64.80

4.33

21.65

1.95

8.10

40.50

6.22

37.32

5.42

8.10

48.60

4.97

29.82

4.17

6.94

41.64

3.05

27.45

2.90

5.25

47.25

3.05

12.20

2.90

5.25

1,069.60

34.64
15.60

9.75

32.52

25.02

CLASE

26.10

11.60
21.00

3.05

18.30

2.90

5.25

8.00

2.55

40.80

8.00

3.55

56.80

8.00

8.80

70.40

7.00

3.25

45.50

17.40
31.50

clase

7.00

6.95

48.65

7.00

3.25

45.50

1.00

4.00

8.00

1.00

1.60

11.20

2.00

10.75

150.50

2.00

2.05

28.70

1.00

20.30

142.10

1.00

4.35

30.45

2.00

1.65

23.10

1.00

5.45

38.15

2.00

2.15

30.10

1.00

5.45

38.15

Kilogramos por metro lineal

0.25

0.58

1.02

1.60

2.26

4.04

Total por en metros lineales

0.00

445.64

938.97

38.15

0.00

0.00

al por en Kilogramos

0.00

258.47

957.75

61.04

0.00

0.00

6.00

2.60

15.60

5.00

0.92

4.60

4.00

0.92

3.68

5.00

0.92

4.60

5.00

0.92

4.60

7.00

0.92

6.44

4.00

0.92

3.68

1,277.26

Kilogramos por metro lineal

0.25

0.58

1.02

1.60

2.26

4.04

Total por en metros lineales

0.00

43.20

0.00

0.00

0.00

0.00

al por en Kilogramos

0.00

25.06

0.00

0.00

0.00

0.00

25.06

Вам также может понравиться

  • Ficha Snip 258961
    Ficha Snip 258961
    Документ8 страниц
    Ficha Snip 258961
    Jocava Civ
    Оценок пока нет
  • Acta de Donación de Terreno de Uso Comunal
    Acta de Donación de Terreno de Uso Comunal
    Документ6 страниц
    Acta de Donación de Terreno de Uso Comunal
    Jocava Civ
    0% (1)
  • Asistencia 2
    Asistencia 2
    Документ5 страниц
    Asistencia 2
    Jocava Civ
    Оценок пока нет
  • Articulo Cientifico Dr. Diaz
    Articulo Cientifico Dr. Diaz
    Документ5 страниц
    Articulo Cientifico Dr. Diaz
    Jocava Civ
    Оценок пока нет
  • INFORME
    INFORME
    Документ14 страниц
    INFORME
    Jocava Civ
    Оценок пока нет
  • Resumen Ejecutivo
    Resumen Ejecutivo
    Документ18 страниц
    Resumen Ejecutivo
    Jocava Civ
    Оценок пока нет
  • Acta de Compromiso de Libre Disponibilidad y Entrega de Terreno para La Ejecucion Del Proyecto
    Acta de Compromiso de Libre Disponibilidad y Entrega de Terreno para La Ejecucion Del Proyecto
    Документ2 страницы
    Acta de Compromiso de Libre Disponibilidad y Entrega de Terreno para La Ejecucion Del Proyecto
    Jocava Civ
    Оценок пока нет
  • Informe Carpapata
    Informe Carpapata
    Документ13 страниц
    Informe Carpapata
    Jocava Civ
    Оценок пока нет
  • CARATULA
    CARATULA
    Документ1 страница
    CARATULA
    Jocava Civ
    Оценок пока нет
  • Saeamiento Total
    Saeamiento Total
    Документ7 страниц
    Saeamiento Total
    Jocava Civ
    Оценок пока нет
  • Saeamiento Total
    Saeamiento Total
    Документ7 страниц
    Saeamiento Total
    Jocava Civ
    Оценок пока нет
  • Estudio Tecnico de Una Cantera de Agregados de Construccion
    Estudio Tecnico de Una Cantera de Agregados de Construccion
    Документ39 страниц
    Estudio Tecnico de Una Cantera de Agregados de Construccion
    Jocava Civ
    Оценок пока нет
  • EXAMEN
    EXAMEN
    Документ6 страниц
    EXAMEN
    Jocava Civ
    Оценок пока нет
  • EXAMEN
    EXAMEN
    Документ6 страниц
    EXAMEN
    Jocava Civ
    Оценок пока нет
  • EXAMEN
    EXAMEN
    Документ6 страниц
    EXAMEN
    Jocava Civ
    Оценок пока нет
  • CITACIÓN
    CITACIÓN
    Документ2 страницы
    CITACIÓN
    Jocava Civ
    Оценок пока нет
  • Saeamiento Total
    Saeamiento Total
    Документ7 страниц
    Saeamiento Total
    Jocava Civ
    Оценок пока нет
  • Hoja Menbretada
    Hoja Menbretada
    Документ1 страница
    Hoja Menbretada
    Jocava Civ
    Оценок пока нет
  • Exmen Final
    Exmen Final
    Документ62 страницы
    Exmen Final
    Jocava Civ
    Оценок пока нет
  • Anexo Primaria 2011
    Anexo Primaria 2011
    Документ9 страниц
    Anexo Primaria 2011
    Jocava Civ
    Оценок пока нет
  • EXAMEN
    EXAMEN
    Документ6 страниц
    EXAMEN
    Jocava Civ
    Оценок пока нет
  • Abastos Reservorio
    Abastos Reservorio
    Документ16 страниц
    Abastos Reservorio
    Jocava Civ
    Оценок пока нет
  • Reglamento Interno - 2015
    Reglamento Interno - 2015
    Документ16 страниц
    Reglamento Interno - 2015
    Jocava Civ
    Оценок пока нет
  • Propuesta Etapa Planificacion WRHP
    Propuesta Etapa Planificacion WRHP
    Документ3 страницы
    Propuesta Etapa Planificacion WRHP
    Jocava Civ
    Оценок пока нет
  • Reglas Dej.
    Reglas Dej.
    Документ3 страницы
    Reglas Dej.
    Jocava Civ
    Оценок пока нет
  • Directorio !!
    Directorio !!
    Документ1 страница
    Directorio !!
    Jocava Civ
    Оценок пока нет
  • Reglamento Interno - 2015
    Reglamento Interno - 2015
    Документ16 страниц
    Reglamento Interno - 2015
    Jocava Civ
    Оценок пока нет
  • Memo-Dir
    Memo-Dir
    Документ3 страницы
    Memo-Dir
    Jocava Civ
    Оценок пока нет
  • Control de Resoluciones
    Control de Resoluciones
    Документ1 страница
    Control de Resoluciones
    Jocava Civ
    Оценок пока нет