Вы находитесь на странице: 1из 13

PREGUNTA 1

DATOS:
P.E.=
Ka=
Kp=
mu=
qa=
kh=
kv=
Kae=
Kpe=
S/C=

1800
0.33
3.03
0.45
2.50
0.23
0.15
0.52
3.91
500.00

kg/m3

kg/cm2
Coef. Aceleracin horizontal Z=0.45, kh = Z/2
Coef. Aceleracin vertical kv = 2/3 x kh

30.25

ngulo de friccin del terreno

=
=
i=
=

14.83
15.12
0.00
0.00

atan(kh/(1-kv))

KAE =

0.93
0.84
0.93
0.84

x (1+ (

KPE =
kg/m2

ngulo de friccin entre terreno


Pendiente del relleno
Pendiente de pantalla con la ve

x (1- (

(1) Clculo de Estabilidad (Condicin Esttica) CARGAS MUERTAS + CARGAS VIVAS + EMPUJE

S/C

0.25
W5

W1
W4
6.00
W2

W6

EA

EP

W3

Fr
0.50

0.70

0.40

O
0.50

0.65

P.E.
2.40
2.40
2.40
1.80
1.80
1.80
0.50

=
=
=
=
=
=
=

4.05

VERIFICACIN POR DESLIZAMIENTO


Fuerza resistentes
W1
W2
W3
W4
W5
W6
S/C

1.63
1.30
3.64
26.33
1.30
0.25
4.05

x
x
x
x
x
x
x

Fuerza
3.90
3.12
8.74
47.39
2.34
0.45
2.03
67.96

tn
tn
tn
tn
tn
tn
tn
tn

Fr=

67.96

0.45

30.58

tn

EP=

3.03

1.80

x
2.00

1.20

Fres=

30.58

3.93

34.51

tn

1.20

Fuerzas actuantes
EA=

0.33

1.80

x
2.00

7.20

7.20

ES/C=

0.50

0.33

7.20

1.19

tn

Fact=

15.40

1.19

16.58

34.51
16.58

2.08

>

1.50

x
x
x
x
x
x
x
x

Brazo
0.63
0.88
2.60
3.18
1.02
0.25
3.18
0.40

=
=
=
=
=
=
=
=

Momento
2.44
2.76
22.71
150.45
2.38
0.11
6.43
1.57
187.28

tn.m
tn.m
tn.m
tn.m
tn.m
tn.m
tn.m
tn.m
tn.m

x
x

Brazo
2.40
3.60

=
=

Momento
36.95
4.28
41.23

tn.m
tn.m
tn.m

4.54

>

1.50

F.S.D=

VERIFICACIN POR VOLTEO


Momentos resistentes

W1
W2
W3
W4
W5
W6
S/C
EP

Fuerza
3.90
3.12
8.74
47.39
2.34
0.45
2.03
3.93

Momentos actuantes

EA
ES/C

F.S.D=

Fuerza
15.40
1.19

187.28
41.23

VERIFICACION DE ESFUERZOS EN EL SUELO


Mtotal=
Ptotal=
e=
q1 =
q2 =
Bef =

146.05
67.96
0.45
19.87
6.27
5.20

tn.m
tn
m
tn/m2
tn/m2

<

W5 0.87

m.

W1

W4SSMICO
(2) Clculo de Estabilidad (Condicin
Sismica) CARGAS MUERTAS + EMPUJE
(W1+W2)xkh
0.25
W6

W2

W6

W2

EPE

EA

(W3)xkh

W3

Fr

6.00

0.50

0.70

0.40

O
0.50

0.65

4.05

VERIFICACIN POR DESLIZAMIENTO


Fuerza resistentes
1.63
1.30
3.64
26.33
1.30
0.25

x
x
x
x
x
x

P.E.
2.40
2.40
2.40
1.80
1.80
1.80

=
=
=
=
=
=

Fr=

65.93

0.45

x ( 1.00 -

EPE=

3.91

1.80

1.20
2.00

Fres=

25.22

4.31

29.53

tn

W1
W2
W3
W4
W5
W6

Fuerza
3.90
3.12
8.74
47.39
2.34
0.45
65.93

0.15

tn
tn
tn
tn
tn
tn
tn
)

25.22

tn

1.20

x ( 1.00 -

Fuerzas actuantes
EA=

0.33

1.80

x
2.00

7.20

7.20

EAE=

0.52

1.80

7.20
2.00

7.20

x ( 1.00 -

W3 x kh=

8.74

0.23

1.97

tn

3.90

3.12

1.58

(W1+W2) x kh =

0.23

Fact=
F.S.D=

15.40

5.04

1.97

29.53
23.98

1.23

>

1.50

x
x
x
x
x
x
x

Brazo
0.63
0.88
2.60
3.18
1.02
0.25
0.40

=
=
=
=
=
=
=

Momento
2.44
2.76
22.71
150.45
2.38
0.11
1.72
180.85

tn.m
tn.m
tn.m
tn.m
tn.m
tn.m
tn.m
tn.m

Fuerza
15.40
5.04
1.97
1.58

x
x
x
x

Brazo
2.40
4.80
0.35
3.95

=
=
=
=

Momento
36.95
24.18
0.69
6.24
68.06

2.66

>

1.50

0.87

m.

1.58

VERIFICACIN POR VOLTEO


Momentos resistentes

W1
W2
W3
W4
W5
W6
EPE

Fuerza
3.90
3.12
8.74
47.39
2.34
0.45
4.31

Momentos actuantes

EA
EAE
W3 x kh
(W1+W2) x kh

F.S.D=

180.85
68.06

tn.m
tn.m
tn.m
tn.m
tn.m

VERIFICACION DE ESFUERZOS EN EL SUELO


Mtotal=
Ptotal=
e=
q1 =
q2 =
Bef =

112.79
65.93
0.89
25.69
0.00
5.13

tn.m
tn
m
tn/m2
tn/m2

ES/C
<

EA

DISEO EN CONCRETO ARMADO


Diseo de la pantalla
Consideramos un factor de amplificacin de cargas para el caso estatico y sismico
En la base de la pantalla

6.50
3.25
2.17

EA=

1.80

0.33

6.50

2.17

x
2.00
=

MEA=

12.55

ES/C

0.50

MES/C=

27.19

tn.m

6.50

0.33

1.07

3.25

3.49

tn.m

Mu=

1.70

27.19

1.70

3.49

b=

100.00

cm

d=

59.00

Ku=

14.98

p=

Usamos:

6.50

=
0.0043

1"@ 0.20 m.

6.50
4.33
2.17

EA=

1.80

0.33

MEA=
EAE
=

12.55

1.80

MEAE=
(W1+W2)xkh=

4.11

M(W1+W2)xkh
=

6.50

2.17

x
2.00
=

27.19

tn.m

0.52

6.50

4.33

17.79

x
2.00
tn.m

3.90

3.12

EAE ) x

0.23

3.25

5.13

tn.m

1.58

EA

6.50

6.50

1.70

27.19

1.70

17.79

b=

100.00

cm

d=

59.00

Ku=

21.97

p=

1"@ 0.125 m.

Diseo de taln

=
(W1+W2)xkh

Mu=

Usamos:

+
0.0063

ngulo de friccin del terreno

0.53

rad

atan(kh/(1-kv))

0.26
0.26
0.00
0.00

rad
rad
rad
rad

ngulo de friccin entre terreno-muro (/2)


Pendiente del relleno
Pendiente de pantalla con la vertical
0.19
0.87
0.19
0.87

)^0.5 )^-2
)^0.5 )^-2

ES/C

3.60

2.40

3.93

tn

15.40

tn

EAE

4.80

2.40

0.15

15.40

0.15

4.31

tn

15.40

tn

5.04

tn

23.98

12.55

tn

1.07

tn

52.14

tn.m

As=

25.37

cm2

3.25

12.55

tn

1.00

1.58

tn

1.70

5.13

As=

37.17

cm2

0.15

12.55

76.46

4.11

tn.m

tn

PREGUNTA 2
DATOS:
P.E.=
Ka=
Kp=
mu=
qa=
S/C=

1800
0.33
3.03
0.45
4.50
250.00

kg/m3

kg/cm2
kg/m2

No se considera mononobe, para el diseo de este muro de contencin

S/C

2.50

W1

ES/C
EA

W3

0.50

0.00

EP
0.60

0.37

1.20

W2

Fr
2.05

0.20

VERIFICACIN POR DESLIZAMIENTO


Fuerza resistentes
0.60
1.35
1.03

x
x
x

P.E.
2.40
2.40
1.80

=
=
=

Fr=

6.53

0.45

EP=

3.03

1.80

Fres=

2.94

3.30

W1
W2
W3

Fuerza
1.44
3.24
1.85
6.53

tn
tn
tn
tn

2.94

tn

x
2.00
=

1.10

6.24

tn

3.60

1.10

3.30

tn

3.60

3.85

tn

3.60

0.30

tn

tn

0.59

<

0.38

Fuerzas actuantes
EA=

0.33

1.80

ES/C=

0.25

0.33

x
2.00
x

Fact=

3.85

0.30

4.15

6.24
4.15

1.50

>

1.50

x
x
x
x

Brazo
2.15
1.13
1.03
0.37

=
=
=
=

Momento
3.10
3.65
1.89
1.21
8.63

tn.m
tn.m
tn.m
tn.m
tn.m

x
x

Brazo
1.20
1.80

=
=

Momento
4.62
0.53
5.15

tn.m
tn.m
tn.m

1.67

>

1.50

0.20

<

45 tn/m2

3.48
6.53
Cumple

F.S.D=

VERIFICACIN POR VOLTEO


Momentos resistentes

W1
W2
W3
EP

Fuerza
1.44
3.24
1.85
3.30

Momentos actuantes

EA
ES/C

F.S.D=

Fuerza
3.85
0.30

8.63
5.15

VERIFICACION DE ESFUERZOS EN EL SUELO


Mtotal=
Ptotal=
e=

3.48
6.53
2.05

q1 =
q2 =
Bef =

8.16
0.00
1.60

tn.m
tn
+
2.00
tn/m2
tn/m2

m.

1.80

DISEO EN CONCRETO ARMADO


Diseo de la pantalla
Consideramos la combinacin de carga de la norma E-060
U=

1.4CM + 1.7CV+ 1.7CE

En la base de la pantalla

ES/C

3.00

EA
1.50
1.00

EA=

1.80

3.00

0.33

1.00

x
2.00
=

MEA=

2.67

ES/C

0.25

MES/C=

2.67

tn.m

3.00

0.33

0.25

1.50

0.37

tn.m

Mu=

1.70

2.67

1.70

0.37

b=

100.00

cm

d=

14.00

Ku=

26.40

p=

Usamos:

3.00

2.67

tn

0.25

tn

5.18

tn.m

0.0077

As=

10.78

1.44

tn

0.18

tn

2.13

tn.m

0.0030

As=

4.20

cm2

14.00

=
=

9.14
4.96

cm2

1/2"@ 0.10 m.

A una altura H= 0.80 m. de nivel superior de zapata

ES/C

2.20

EA
1.10
0.73

EA=

1.80

2.20

0.33

0.73

x
2.00
=

MEA=

1.44

ES/C

0.25

MES/C=

1.05

tn.m

2.20

0.33

0.18

1.10

0.20

tn.m

Mu=

1.70

1.05

1.70

0.20

b=

100.00

cm

d=

14.00

Ku=

10.87

p=

x
x

0.53
2.67

210.00
1.70

x
x

100.00
0.25

Vn

>

Vu

Cumple

Usamos:

2.20

1/2"@ 0.20 m.

Verificacin por corte


Vn=
Vu=

0.85
1.70

Diseo de taln
Multiplicamos por 1.55 las presiones obtenidas en el chequeo de presiones sobre el suelo para pasar a rotura.
W3

0.50

0.60

1.60

W2'
0.00

12.65

tn/m2
2.05

R
W3=
W2'=
R=

tn/m2

Fuerza
1.85
2.95
12.96

Brazo
0.45
1.03
1.52

0.20
Factor
1.70
1.40
1.00

Momento
1.41
4.24
19.66

tn.m
tn.m
tn.m

tn
tn

Mu=

19.66

4.24

1.41

14.01

b=

100.00

cm

d=

50.00

Ku=

5.61

p=

Usamos:

5/8"@ 0.20 m.

DETALLE DE ACERO

tn.m
0.0016

(Flexin hacia arriba)


As=

8.00

cm2

Вам также может понравиться