1.75m
1.45m
0.30m
1800Kg/Cum
M20
Fe415
0.6m below GL
35
85.14
0
17.5
0.60m
2300Kg/sqm
20N/sqmm
415N/sqmm
0.30m
0.15m
Sin(a+Q)
sina
sin(a-q)
sin(Q+q)sin(Q-b)
sin(a+b)
0.28
Pa =
The pressure distribution along the height of the wall is as given below:Pressure due to
Surcharge load =
302.4
302.4
1.75m
882.00
Total Active earth pressure force =
1300.95
0.70m
882.00Kg/sqm
0.15
22.36
0.70m
1.75
85.14
0.30
1203.23Kg/m
494.68Kg/m
Intial proportioning of the structure:Though the height of the retaining wall is small,either gravity or cantilever retaining walls are not feasible due to
possibility of scouring of earth on canal side,ie,on toe side.It is proposed to support the wall on longitudinal beams,which are
supported on piles.
One row of 300mm dia DUR piles are proposed at spacing of
Breadth of the beam assumed =
Depth of the beam assumed =
2.00m
0.30m
0.30m
Checks for stability of the structural system:Check for lateral stability:As per IS 2911(Part-III)-1973,the lateral load carrying capacity of 300mm dia DUR pile is
2.40t
Apart from the lateral load carrying capacity of piles,the following forces resist the lateral movement of the structur
system:1.Passive earth pressure resistance offered by the soil on longitudinal beams connecting piles
2.Passive earth pressure resistnace offered by the soil in toe portion of the wall.
Assuming that the soil on toe portion is scoured,the passive resistance on longitudinal beam is
(1/2)Kpyh2 =
289.29Kg/m
Considering the length of the wall between piles,the total resisting force on the beam =
Hence,the total lateral load carrying capacity of the structure is
2.98t
2406.46Kg
0.58t
2.41t
Hence safe.
Check for uplift&bearing resistance of piles:Total vertical load on the pile composes the following components(Per 2m length) :1.Self weight of beam =
2.Self weight of retaining wall =
3.Vertical component of active earth pressure
4.Weight of soil on heel portion =
450.00Kg
1968.75Kg
989.35Kg
472.50Kg
3880.60Kg
24.00t
>3.88
1266.96Kgm
Mu/0.138fckb =
300.00mm
67.75mm
252.00mm
0.2
0.085
214.20sqmm
565.20sqmm
0.22
12.03KN
18.05KN
The design shear strength of concrete for the above steel percentage from
Table 19 of IS 456 is
0.34 N/sqmm > 0.07
Hence,no shear reinforcement is required.
Provide temperature re inforcement @ 0.12%
Area required =
270.00sqmm
90.00sqmm
180.00sqmm
0.30m
0.30m
225.00Kg/m
984.38Kg/m
236.25Kg/m
1446Kg/m
1025.13Kgm
2.00
4.82Knm
2.41Knm
7.23Knm
15.38Knm
18.09Knm
25.32Knm
Mu/0.138fckb =
300.00mm
174.87mm
252.00mm
1.329
0.417
315.25sqmm
Hence provide 4 Nos of 16mm dia HYSD bars(As torsional moment more than bending for
Me2,excessive steel is provided on compression side also)
Hence Ast provided =
803.84sqmm
Percentage of tension steel =
1.06
To be corrected:Maximum shear force on the member =
Factored shear force =
14.46KN
21.68KN
103.69KN
46.87KN
56.82KN
2.25 KN/cm
Using 8mm dia two legged vertical stirrups,from table 62 of SP 16,the spacing required is
Hence provide 8mm dia 2 legged stirrups @ 150mm c/c
al beams,which are
160mm
Section of beam:-