No.
Material
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
2
B.T. metal 22.4 to 45.0 mm
B.T. metal 19 to 26.5 mm
B.T. metal 13.2 to 19mm
B.T. Grit 9.50 to 4.75mm
B.T. Grit 4.75 to 13.2mm
B.T Grit 13.2mm to 11.3 mm
Metal 13.2mm to 9.50 mm
B.T. Grit 5.6 to 11.2 mm
B.T. Grit 2.36 to 4.75 mm
Stone Dust
Quarry Spall
Bulk asphalt (80/100) VG-10
Bulk asphalt (60/70) VG-30
Bulk asphalt (SS1) Emulsion
Lead
Km
###
###
###
Total
Less for Paver work (-)
Total Km
###
###
###
Rate
3
70.00
413.00 +
70.00
413.00 +
70.00
413.00 +
70.00
274.00 +
70.00
330.00 +
70.00
413.00 +
70.00
330.00 +
70.00
284.70 +
70.00
365.00 +
70.00
105.00 +
70.00
84.00 +
218.00 31820.00 +
218.00 32777.00 +
218.00 45627.00 +
4
293.00
413.00
413.00
274.00
274.00
390.00
330.00
330.00
365.00
105.00
84.00
/ 2.00
/ 2.00
/ 2.00
/ 2.00
/ 2.00
/ 2.00
/ 2.00
/ 2.00
/ 2.00
/ 2.00
/ 2.00
= 353.00
= 413.00
= 390.00
= 274.00
= 332.00
= 401.50
= 390.00
= 307.35
= 274.00
= 105.00
= 84.00
= 31820.00
= 32777.00
= 45627.00
50.00 km
10.00 km
233.00 km
15.00 km
218.00
Conveyan
Conveyance beyond
Total
Total
ce up to
5Km.
Conveyance
5Km.
.
5
6
7
8 ( 5 + 7)
9(4+8)
140.37
65.00 x 7.39 = 480.35
620.72
973.72
140.37
65.00 x 7.39 = 480.35
620.72
1033.72
140.37
65.00 x 7.39 = 480.35
620.72
1010.72
140.37
65.00 x 7.39 = 480.35
620.72
894.72
140.37
65.00 x 7.39 = 480.35
620.72
952.72
140.37
65.00 x 7.39 = 480.35
620.72
1022.22
140.37
65.00 x 7.39 = 480.35
620.72
1010.72
140.37
65.00 x 7.39 = 480.35
620.72
928.07
140.37
65.00 x 7.39 = 480.35
620.72
894.72
140.37
65.00 x 7.39 = 480.35
620.72
725.72
106.54
65.00 x 4.95 = 321.75
428.29
512.29
263.01
213.00 x 5.45 = 1160.85
1423.86
33243.86
263.01
213.00 x 5.45 = 1160.85
1423.86
34200.86
263.01
213.00 x 5.45 = 1160.85
1423.86
47050.86
Koyali.
Lead Cal
Executive Engineer
Page 1 of 2