MORTEROS

CONCRETOS

TABLA MATERIALES ( Aproximados )


DOSIFICACION
3500 PSI
3000 PSI
2500 PSI
2000 PSI

2
3
4

mm
6.4
9.5
12.7

250.00

5/8"

1.09

240.00

364

1.16

220.00

1:5

302

1.20

VARILLA
2 D=3/8"
1 D="
2 D=3/8"
1 D=5/8"
2 D="
1 D=5/8"

CELOSIA
1 D=3/8"

ALTURA
0.20

1 D=3/8"

0.25

1 D=3/8"

0.30

2 D="
1 D=3/4"
2 D=5/8"
1 D=7/8"
2 D=3/4"
1 D=7/8"

1 D="

0.35

CEM(KG)
420
350
300
280

AREN(M)
0.70
0.56
0.48
0.55

3500 psi

1:2

510

3000 psi

1:3

2500 PSI
2000 psi
LUZ (m)
4.00
5.00
6.00

7.00
8.00
9.00

GRAVI
(M)

Diametro
pulgadas
1/4"
3/8"
1/2"

PROPORCION
1:2:2
1:2:3
1:2:4
1:2:4

BARRA No.

32
48
64

AREA
mm
32
71
129

15.9

80

199

3/4"

19.1

96

284

7/8"

22.2

111

387

220

1"

25.4

127

510

TEJAS LONGITUD (m)


TOTAL
UTIL
1.22
1.08
1.52
1.38
1.83
1.69
2.44
2.30
3.05
2.91

9
10
11
14
18

1-1/8"
1-1/4"
1-3/8"
1-3/4"
2-1/4"

28.7
32.3
35.8
43.0
57.3

144
162
179
215
287

819
1006
1452
2581

AGUA LTS
250
180
170
170

0.97

454

1:4

1 D="

0.40

1 D="

0.45

0.70
0.84
0.95
0.89

#
4
5
6
8
10

LADRILLOS /
U
55
33
118
15.4
15.4
BLOQUE
4
5

MAMPOSTERIA POR M
SOGA e=0.12 m
PANDERETA
DOBLE 0.25m
BLOQUE 4 CANTO
BLOQUE 5 CANTO

MORTERO
M
0.028
0.010
0.068
0.011
0.014
L(m)
30
30

VINLO
SUPERFICIE NUEVA
REPNTE COLOR DIFER
REPINTE COLOR SIMILAR

M/GALON
12-22 MANOS 3
25-33 MANOS 3
35-45 MANOS 2

NUEVA/ESTUCO
REPNTE COLOR DIFER
REPNTE COLOR SIMILAR
ESMALTE
EN METAL

M/GALON
25-30 MANOS 3
30-40 MANOS 3
40-50 MANOS 2
EN MADERA

EN SUPERFICIES NUEVAS

18 a 20 m/galn a 2 manos

15 a 18 m/galn a 2 manos

EN REPINTE SOBRE COLOR DFERENTE

20 a 25 m/galn a 2 manos

20 a 22 m/galn a 2 manos

CEMENTO
KG
13
5
31
5
6
A(m)
10
12

Traslapo
minimo

AREN
M3
0.03052
0.0109
0.07412
0.01199
0.01526
h(m)
20
20

EN REPINTE SOBRE COLOR IGUAL O SMLAR

25 a 30 m/galn a 2 manos

22 a 25 m/galn a 2 manos

1.552
2.235
3.042
3.973
5.060
6.404
7.907
11.380
20.240

TABLA C.3.5.3-2 NSR10

PESO
(kg/m)
0.250
0.560
0.994

EDIFICACIONES
A continuacin se muestra como estudio una tabla de rendimientos aproximados.
ITEM

DESCRIPCION

PRELIMINARES

1.1

Localizacin y replanteo

1.2

Campamento 18 mts.

1.3

Campameto 36 mts.

1.4

Desmonte y retiro de cubierta de teja de barro

1.5

Desmonte y retiro de cubierta de teja de asbesto

1.6

Demolicin muros ladrillo E= 0.15 mts.

1.7

Demolicin muro en ladrillo E=0.25 mts.

1.8

Desmonte marcos y puertas

1.9

Desmonte Ventanas

1.10

Demolicin de placas aligeradas E=0.25 mts:

1.11

Demolicin de placas de piso E= 0,10 mts.

1.12

Demolicin de placas, columnas y vigas

1.13

Descapote manual y retiro

1.14

Descapote mecnico y retiro

1.15

Cerramiento en Tabla Burra H=3.00 mts

1.16

Cerramiento En Alambre de Puas 5 Hilos Postes de Madera

1.17

Retiro de Sobrantes Viaje 3.00 m3

Excavacin manual y retiro

2.2

Excavacin mecnica y retiro

2.3

Concreto ciclpeo 60% rajn 2500 PSI

2.4

Concreto para zapatas 3000 PSI

2.5

Concreto viga de amarre 3000 PSI

2.6

Base concreto pobre E=0.05 mts. 2000 PSI

2.7

Caja de inspeccin de 60x60x60 cms.

2.8

Caja de inspeccin de 80x80x80 cms.

2.9

Caja de inspeccin de 1.00x1,00x1.00 mts.

M2
UN
UN
M2
M2
M2
M2
M2
M2
M2
M2
M3
M2
M3
ML
ML
VJ

CIMENTACION Y DESAGUES

2.1

2.10
2.11
2.12
2.13
2.14
2.15
2.16

UND.

M3
M3
M3
M3
M3
M2
UN
UN
UN

Tubera PVC Sanitaria D=6"

ML

Tubera PVC Sanitaria D=4"

ML

Tubera PVC Sanitaria D=3"

ML

Accesorio PVC Sanit D=8"

UN

Accesorio PVC Sanit D=6"

UN

Accesorio PVC Sanit D=4"

UN

Accesorio PVC Sanit D=3"

UN

ACERO DE REFUERZO

3.1

Suministro figurada y amarre de acero A-37

Kg

3.2

Suministro figurada y amarre de acero PDR-60

Kg

ESRUCTURAS

4.1

Columnas en concreto 3000 PSI, altura menor a 3 mts.

4.2

Columnas en concreto 3000 PSI, altura mayor a 3 mts.

4.3

Viga area 3000 PSI

4.4

Viga de amarre sobre muro 3000 PSI

4.5

Viga canal en concreto 3000 PSI impermeabilizado

4.6

Placa entrepiso aligerado casetn de lona E=0.30 mts. 3000 PSI

4.7

Placa entrepiso aligerado en bloque Concreto 3000 PSI

4.8

Entrepiso placa maciza 3000 PSI E=0.10 mts

4.9

Entrepiso placa maciza 3000 PSI E=0.12 mts

4.10

Entrepiso placa maciza 3000 PSI E=0.15 mts

4.11

Refuerzo malla electrosoldada M-159 Q-4

4.12

Escaleras Maciza 3000 PSI

4.13

Muro de contencin H=2.00 mts.

MAMPOSTERIA

5.1

Sobrecimiento tolete comn E=0.12 mts. incluye paete imp.

5.2

Sobrecimiento tolete comn E=0.23 mts. incluye paete imp.

5.3

Muro tolete comn E=0.06 mts.

5.4

Muro tolete comn E=0.12 mts.

5.5

Muro tolete comn E=0.25 mts.

5.6

Muro prensado Santa F E=0.12 mts.

5.7

Muro tolete semiprensado tipo maguncia E=0.12 mts. o similar

5.8

Muro prensado Santa F E=0.25

5.9

Muro semiprensado tipo maguncia E=0.25 mts. o similar

5.10

Muro en bloque No.4 E=0.10 mts.

5.11

Muro en bloque No.4 E=0.25 mts.

5.12

Muro en bloque No.5 E=0.12 mts.

5.13

Muro en bloque No.5 E=0.23 mts.

5.14

Muro en ladrillo vitrificado E=0.12 mts.

5.15

Dintel en concreto de 15 x 20 cms. 2500 PSI inc.refuerzo

5.16

Alfajia en concreto E=0.15 mts. 2500 PSI inc.refuerzo

5.17

Alfaja en concreto E=0.25 mts. 2500 PSI inc.refuerzo

5.18

Mesones en Concreto A=0.60 2500 PSI inc.refuerzo

5.19

Alfaja ladrillo prensado tipo Maguncia o similar

5.20

Pasamanos en concreto 2500 PSI inc.refuerzo

5.21

Lavada de Fachada

M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
KG
M3
M3
ML
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
ML
ML
M2
ML
ML
M2

PAETES

6.1

Paete liso muro 1:4

6.2

Paete liso muro 1:5

6.3

Paete liso bajo placa 1:4

6.4

Paete rstico muro 1:5

6.5

Paete liso bajo malla 1:4

6.6

Paete rstico placa 1:5

M2
M2
M2
M2
M2
M2

6.7

Paetes liso culatas 1:4

6.8

Paetes liso culatas 1:5

6.9

Paete impermeabilizado 1:3 con Sika 1 o similar

6.10

Filos y dilataciones en paetes

6.11

Goteras

M2
M2
M2
ML
ML

INSTALACIONES HIDRAULICAS Y SANITARIAS


7

ACOMETIDA PVC 1/2" DE 5 mts.

7.1

Acometida PVC 3/4 de 5 mts. RDE11

7.2

Red suministro PVC 1/2". RDE9

7.3

Red suministro PVC 3/4". RDE11

7.4

Red suministro PVC 1" RDE. 13.5

7.5

Red suministro CPVC 1/2"

7.6

Red suministro CPVC 3/4"

7.7

Punto de agua fra PVC

7.8

Punto de agua caliente CPVC

7.9

Suministro e instalacin tanque elevado pvc 250 lts.

7.10

Suministro e instalacin tanque elevado pvc 500 lts.

7.11

Suministro e instalacin tanque elevado pvc 1000 lts.

7.12

Suministro e instalacin tanque elevado pvc 2000 lts.

7.13

Suministro e instalacin tanque elevado pvc 5000 lts.

7.14

Bajante de agua lluvia PVC 3"

7.15

Bajante de agua lluvia PVC 4"

7.16

Bajante de agua negra PVC 3"

7.17

Bajante de agua negra PVC 4"

7.18

Bajante de agua negra PVC 6"

7.19

Punto desagues PVC 3" - 4"

7.20

Canal PVC Raingo

7.21

Canal en Lamina D=0.75

7.22

Canal en Lamina "Pecho de paloma"

7.23

Bajante PVC 3" Raingo

7.24

Cheque RW 1"

7.25

Cheque RW 1 1/2"

7.26

Reventilacin PVC 3"

7.27

Registro RW 1/2"

7.28

Red de suministro de Gas exterior*

7.29

Red de suministro tubera galvanizada 1/2"

7.30

Red de suministro tubera galvanizada 3/4"

7.31

Punto suministro galvanizada

7.32

Instalacin Lavamanos Y Sanitarios

7.33

Conexin tanque elevado pvc

UN
UN
ML
ML
ML
ML
ML
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
ML
UN
ML
ML
ML
ML
UN
UN
ML
UN
ML
ML
ML
UN
UN
UN

INSTALACIONES ELECTRICAS

8.1

Acometida aerea 10 mts.

8.2

Salida lmpara toma PVC completa

UN
UN

8.3

Salida lmpara conmutable PVC completa

8.4

Salida telfono PVC completa

8.5

Salida timbre PVC completa

8.6

Strip telefnico 10 pares

8.7

Salida trifsica PVC completa

8.8

Salida TV PVC completa

8.9

Tablero parcial 4 circuitos

8.10

Tablero parcial 12 circuitos

8.11

Tablero parcial 18 circuitos

8.12

Tubera PVC conduit 3/4"

8.13

Tubera conduit 1"

8.14

Tubera PVC conduit 11/2"

8.15

Linea a Tierra tablero general (varilla cooper well)

8.16

Lmpara 2x48" bajo placa lateral lmina "industrial"

8.17

Lmpara 2x96" bajo placa lateral lamina "industrial"

PINTURA

9.1

Estuco muros

9.2

Estuco y Vinilo (Tipo 1) tres manos en muros

9.3

Vinilo sobre paete dos manos en muros

9.4

Carburo sobre paete en muros

9.5

Marmolina sobre paete

9.6

Estuco Bajo Placa

9.7

Estuco y Vinilo (tipo 1) tres manos bajo placa

9.8

Vinilo sobre paete dos manos bajo placa

9.9

Carburo sobre paete bajo placa

9.10

Esmalte S/marcos Lamina 3 manos

9.11

Esmalte S/madera Llena 3 manos

9.12

Esmalte S/madera lineal 3 manos

9.13

Esmalte lamina llena 3 manos

9.14

Esmalte sobre lmina lineal 3 manos

9.15

Esmalte S/marcos Madera 3 manos

9.16

Filos y dilataciones en estuco

9.17

Granoplast Fachada

9.18

Marmolplast Fachada

9.19

Silcoplast fachada

9.20

Muralfix fachada

9.21

Tintilla sobre madera llena

9.22

Tintilla sobre madera Lineal

9.23

Tintilla sobre muebles

10

UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
UN
UN
UN
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
M2
ML
M2
ML
ML
ML
M2
M2
M2
M2
M2
ML
M2

ENCHAPES

10.1

Enchape en porcelana Olimpia 20*20

10.2

Murete Ducha 0.10*0.20

10.3

Enchape en porcelana Vicenza 25*35

M2
ML
M2

10.4

Espacato Travertino Bosconia

10.5

Incrustaciones Acuacer blanco

10.6

Incrustaciones Tempo

10.7

Incrustaciones Espacio

10.8

Enchape en piedra Crema

10.9

Enchape en piedra Mueca

10.10

Enchape Tipo piedra Santa Rosea o similar

10.11

Remate Bocel porcelana 0,11

10.12

Remate bocel aluminio "wings"

10.13

Rejillas de piso sosco 4*4*3 aluminio

10.14

Rejillas de piso sosco 5*5*4 aluminio

10.15

Rejillas bronce plana 20*20

10.16

Rejillas plasticas sosco 4*4*3

10.17

Rejillas plasticas sosco 5*3

10.18

Rejilla Cupula Tragante 6*4

10.19

Rejilla Cupula Tragante 5*3

10.20

Rejilla Ventilacin 20*20 aluminio

10.21

Tubo cortina ducha

11

M2
JGO
JGO
JGO
M2
M2
M2
ML
ML
UN
UN
UN
UN
UN
UN
UN
UN
UN

PISOS

11.1

Base en Material de afirmado Compactado

11.2

Polisec

11.3

Placa base en concreto E=0.08 2500 PSI

11.4

Placa base en concreto E=0.10 2500 PSI

11.5

Poyos cocina y base muebles , E= 0.08 y A=0.60 M 2500 PSI

11.6

Alistado de pisos E=0.04 - 1:5

11.7

Alistado pendientado e Impermeabilizado E=0.04 - 1:3

11.8

Baldosn de Granito No. 5 30*30*1.7

11.9

Baldosin de cemento 25*25*2

11.10

Piso Plachuela de Marmol Breccia

11.11

Tabln de gres 33*33*2.5

11.12

Tableta gres 20*20*1.2

11.13

Piso ceramica 20,5*20,5 o similar

11.14

Piso ceramica 30*30 Alfa o similar

11.15

Vinisol 20*20*1.6

11.16

Adoqun gres peatonal 10*20*2,5

11.17

Adoqun gres Vehicular 10*20*2,5

11.18

Piso gravilla lavada de 1/2" y 3/4"

11.19

Piso en granito pulido

11.20

Piso en granito Lavado

11.21

Piso listn machihembriado guayacan con alistado madera

11.22

Alfombra residencial Alfa Berber

11.23

Alfombra residencial Teruel 7 mm

11.24

Alfombra Trfico Pesado

M3
M2
M2
M2
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

11.25

Pasos escalera gravilla lavada

11.26

Pasos escalera granito

11.27

Guardaescoba baldosin de granito

11.28

Guardaescoba baldosin de cemento

11.29

Guardaescoba gravilla lavada

11.30

Guardaescoba granito lavado

11.31

Guardaescoba Madera Virola 8 cm

11.32

Guardaescoba Vinisol 7 cm

12

CUBIERTAS

12.1

Asbesto cemento No.4

12.2

Asbesto cemento No.6

12.3

Asbesto cemento No.8

12.4

Canaleta 90 L= 4.50 mts.

12.5

Canaleta 90 L= 5.00 mts.

12.6

Canaleta 90 L= 6.00 mts.

12.7

Canaleta 90 L= 7.00 mts.

12.8

Canaleta 90 L= 9.00 mts.

12.9

Canaleta 43 L= 3.50 mts.

12.10

Canaleta 43 L= 4.00 mts.

12.11

Canaleta 43 L= 4.50 mts.

12.12

Canaleta 43 L= 5.00 mts.

12.13

Canaleta 43 L= 5.50 mts.

12.14

Canaleta 43 L= 6.00 mts.

12.15

Canaleta acesco de 4.50 mts.

12.16

Entramado para teja de barro

12.17

Entramado para teja Moore

12.18

Entramado para teja ondulada

12.19

Caballete teja Moore

12.20

Alistado impermeabilizado para teja de barro

12.21

Afinado cubiertas planas

12.22

Teja de barro

12.23

Teja espaola Eternit

12.24

Suministro e instalacin Teja de barro sobre eternit

12.25

Caballete ondulado asbesto cemento

12.26

Flanche en Lamina

12.27

Cubierta teja transparente No.6. No incluye entramado.

12.28

Impermeabilizacin cubierta manto fiberglass 400X

12.29

Teja Termoacustica

12.30

LAMINA ALVEOLAR 4MM FIBRA DE CARBONO

12.31

LAMINA ALVEOLAR 6MM FIBRA DE CARBONO

12.32

TEJA TERMOACSTICA (1.8 Kg/m2) FIBRA DE CARBN

13
13.1

ML
ML
ML
ML
ML
ML
ML
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
M2
M2
M2
M2
M2
ML
ML
M2
M2
M2
M2
M2
M2

CIELO RASOS
Armadura madera y malla con vena

M2

13.2

Malla con vena para peetar

13.3

Lmina plana eternit incluye alistado aluminio

13.4

Lmina plana Supercell incluye alistado aluminio

13.5

Lmina Acrlico incluye alistado aluminio

13.6

Lmina Icopor Rstico incluye alistado aluminio

13.7

Lmina Fibra de Vidrio incluye alistado aluminio

13.8

Listn Machiembriado cedro rojo

13.9

Listn Machiembriado ciprs

13.10

LUXALON GALV. ACUST. P 130

13.11

Luxaln aluminio Acust.. P 80

13.12

TABLEX PIZANO 9 MM INCLUYE ALISTADO INMUNIZADO

14

CARPINTERIA DE MADERA

14.1

Closet tipo B cedro caquet sin forrar

14.2

Closet tipo A cedro caquet forrado

14.3

Mueble bajo 0.80 cedro caqueta

14.4

Hoja puerta triplex 0.61 mts.Econmica Pizano

14.5

Hoja puerta triplex 0.80 mts.Econmica Pizano

14.6

Hoja puerta triplex 1.00 mts.Econmica Pizano

14.7

Hoja fortec 0.60 Residencial

14.8

Hoja fortec 0.80 Residencial

14.9

Hoja fortec 1.00 Residencial

14.10

Pasamanos escalera 0.15*0.02 cedro caqueta

14.11

Ventanera en madera cedro caqueta

14.12

Puertas marco y hoja cedro caqueta

14.13

Pirlanes en madera cedro macho A=0.15m

14.14

Baranda en madera cedro macho

14.15

Mueble Tipo Linos cedro caqueta

15

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
UN
UN
UN
UN
UN
UN
ML
M2
UN
ML
ML
M2

CARPINTERIA METALICA

15.1

Suministro e Insta. Ventanera en lmina calibre 18 Inc. Anticorr.

15.2

Suministro e Insta. Puerta en lmina cal. 18 Inc. Anticorr.

15.3

Suministro e Insta. Puerta ventana en lmina cal 18 Inc. Anticorr.

15.4

Suministro e Insta. Ventana en aluminio Corrediza anoloc

15.5

Suministro e Insta. Ventana en aluminio Proyectante anoloc

15.6

Puerta de acceso en aluminio

15.7

Suministro e Insta. Reja tipo bancario Inc. Anticorr.

15.8

Suministro e Insta. Reja en lmina cal 18 Inc. Anticorr.

15.9

Cerramiento en malla Eslabonada C.10 Inc.Angulo 1"*1"/tubo 2"

15.10

Escalera de gato Inc. Anticorr.

15.11

Suministro e Insta. Marco puerta en lmina calibre 18 Inc. Anticorr.

15.12

Correa 2 d= 1/2" 1d= 1/2 celosa en 3/8 Inc. Anticorr.

15.13

Correa 2 d= 1/2" 1d= 5/8 celosa en 3/8 Inc. Anticorr.

15.14

Suministro e instalacin de templetes Inc. Anticorr.

15.15

Cercha para cubierta en ngulo Inc. Anticorr.

M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
UN
ML
ML
ML
KG

15.16

Divisin para baos en aluminio y vidrio templado

15.17

Divisin para baos en aluminio y acrlico

16

APARATOS SANITARIOS

16.1

Ducha mezcladora baera tayrona o similar

16.2

Suministro e inst. Lavamanos acuacer blanco c/griferia

16.3

Suministro e inst. Lavamanos sobreponer acuacer color c/griferia

16.4

Suministro e inst. L/manos avanti c/pedestal blancol C/Grif.

16.5

Suministro e inst. L/manos lyra color con pedestal C/Griferia

16.6

Suministro e inst. Sanitario avanti completo inc. Bizcocho y grif.

16.7

Suministro e inst. Sanitario acuacer blanco completo

16.8

Suministro e inst. Sanitario Santafe para fluxometrol. Bizcocho

16.9

Suministro e inst. Sanitario Maximo Completo inc. Bizcocho,grif

16.10

Suministro e inst. Orinal mediano incl. Griferia tridicional cromada

16.11

Suministro e inst. Ducha sencilla

17

UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN

VIDRIOS Y CERRADURAS

17.1

Vidrio 4 MM

17.2

Vidrio 5 MM

17.3

Espejo 4 MM sin bicel

17.4

Cerradura Bao Schlage A - 40S

17.5

Cerradura Alcoba Schlage A - 50WS

17.6

Cerradura entrada Doble Cilindro

18

M2
M2

M2
M2
M2
UN
UN
UN

OBRAS EXTERIORES

18.1

Concreto Sardineles H=0.40m 2500 PSI

18.2

Concreto Andenes 0.10m 2500 PSI

18.3

Concreto Estriado Rampas 2500 PSI

18.4

Piso en grama incl. Tierra negra

18.5

Pradizacion

18.6

Aseo General para entrega

18.7

Sumidero 0.7 X 0,3 MTS

ML
M2
M2
M2
M2
M2
UN

oximados.
REND. DIA

0.50
0.25
10.00
30.00
20.00
18.00
30.00
30.00
10.00
8.00
1.00
80.00
30.00
40.00
40.00
6.00
8.00
50.00
4.00
8.00
8.00
30.00
1.00
1.00
1.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
150
150

6.00
4.00
2.00
2.00
2.00
5.00
5.00
5.00
5.00
5.00
150.00
0.50
0.50
10.00
8.00
10.00
10.00
6.00
8.00
8.00
5.00
5.00
20.00
12.00
15.00
12.00
8.00
10.00
10.00
10.00
5.00
10.00
3.00
10.00
20.00
20.00
20.00
15.00
15.00
15.00

15.00
15.00
15.00
100.00
50.00
3.00
3.00
50.00
50.00
50.00
50.00
50.00
6.00
6.00
1.00
1.00
1.00
1.00
1.00
20.00
20.00
20.00
20.00
20.00
5.00
8.00
8.00
8.00
8.00
16.00
16.00
20.00
24.00
20.00
16.00
16.00
4.00
5.00
1.00
1.00
3.00

3.00
3.00
3.00
3.00
1.00
3.00
1.00
1.00
1.00
50.00
50.00
50.00
150.00
16.00
16.00
60.00
40.00
80.00
80.00
80.00
50.00
40.00
80.00
50.00
50.00
30.00
120.00
30.00
60.00
60.00
100.00
40.00
40.00
40.00
40.00
30.00
30.00
30.00
20.00
10.00
20.00

4.00
4.00
4.00
5.00
6.00
6.00
6.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
15.00
40.00
10.00
10.00
20.00
40.00
40.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
10.00
10.00
10.00
10.00
80.00
100.00
100.00

3.00
3.00
20.00
40.00
7.00
16.00
40.00
40.00
20.00
20.00
20.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
10.00
10.00
10.00
50.00
5.00
10.00
10.00
20.00
20.00
50.00
50.00
20.00
15.00
50.00
20.00
20.00
50.00
8.00

20.00
10.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
30.00
1.00
1.00
1.00
10.00
10.00
10.00
10.00
10.00
10.00
8.00
4.00
3.00
10.00
8.00
2.00
10.00
10.00
10.00
4.00
4.00
4.00
20.00
10.00
40.00
10.00
8.00
4.00
4.00
50.00
100.00

4.00
4.00
30.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
10.00
100.00
100.00
100.00
20.00
20.00
20.00
10.00
30.00
30.00
50.00
50.00
1.00
1.00

Pg. 21

MEMORIA DE CALCULO DE CANTIDADE


OBRA:
LOCALIZACION:
MUNICIPIO:
ELABORO Y CALCULO :
FECHA:
1.
DESCRIPCION
1

PRELIMINARES

1.1

Localizacin y replanteo

1.2

Campamento 18 mts.

1.3

Descapote manual y retiro

1.4

Cerramiento lona H=3.00 mts

CIMENTACION Y DESAGUES

2.1

Excavacin manual y retiro para vigas de cimentacin


EJE A (1-3)
EJE B (1-3)
EJE C (1-3)
EJE D (1-3)
EJE E (1-2)
EJE 1 (A-E)
EJE 2 (C-D)
EJE 2' (B-C)
EJE 3 (A-E)
TOTAL

2.2

Concreto ciclpeo para zapata (Tipo I) 60% rajn 2500 PSI


Concreto ciclpeo para zapata (Tipo II) 60% rajn 2500 PSI
TOTAL

2.3

Recebo (mejoramiento de piso para (Tipo I))


Recebo (mejoramiento de piso para (Tipo I))
TOTAL

2.4

Concreto para zapatas 3000 PSI


Zapata tipo I
Zapata tipo II
TOTAL

2.4

Concreto viga de amarre cimentacin 3000 PSI


EJE A (1-3)
EJE B (1-3)
EJE C (1-3)
EJE D (1-3)
EJE E (1-2)
EJE 1 (A-E)
EJE 2 (D-E)
EJE 2' (B-C)

Pg. 22
EJE 3 (A-E)
TOTAL
2.5

Base concreto pobre E=0.05 mts. 2500 PSI


EJE A (1-3)
EJE B (1-3)
EJE C (1-3)
EJE D (1-3)
EJE E (1-2)
EJE 1 (A-E)
EJE 2 (D-E)
EJE 2' (B-C)
EJE 3 (A-E)
TOTAL

2.6

Caja de inspeccin de 80x80x80 cms.

2.7

Caja de inspeccin de 1.00x1,00x1.00 mts.

2.8

Tubera PVC Sanitaria D=6"

2.9

Tubera PVC Sanitaria D=4"

2.10

Tubera PVC Sanitaria D=2"

2.11

Sifn D=2"

2.12

Sifn D=6"

2.13

Bajante PVC aguas lluvias D=4"

2.14

Bajante PVC aguas residuales D=4"

ACERO DE REFUERZO

3.1

Suministro figurada y amarre de acero PDR-60

ESRUCTURAS

4.1

Columnas en concreto 3000 PSI, altura menor o igual a 3 mts.


TOTAL CONCRETO COLUMNAS

4.2

Viga de amarre sobre muro 3000 PSI


VIGA 201 (A-E)
VIGA 202 (D-E)
VIGA 203 (A-D)
VIGA 204 (1-3)
VIGA 205 (1-3)
VIGA 206 (1-3)
VIGA 207 (1-3)
VIGA 208 (1-2)
VIGA 301 (A-E)
VIGA 302 (D-E)
VIGA 303 (A-D)
VIGA 304 (1-3)
VIGA 305 (1-3)
VIGA 306 (1-3)
VIGA 307 (1-3)

Pg. 23
VIGA 308 (1-2)
VIGA 401 (A-C)
VIGA 402 (A-C)
VIGA 403 (1-3)
VIGA 404 (1-3)
VIGA 405 (1-3)
TOTAL CONCRETO DE VIGAS
4.3

Viga canal en concreto 3000 PSI impermeabilizado

4.4

Placa entrepiso aligerado casetn de lona E=0.48 mts. 3000 PSI


(A-B)x(1-3)
(B-C)x(1-2')
(C-D)x(1-3)
(D-E)x(1-2)
TOTAL CONCRETO PLACA ENTREPISO

4.5

Placa contrapiso. 3000 PSI


(A-B)x(1-3)
(B-C)x(1-3)
(C-D)x(1-3)
(D-E)x(1-2)
TOTAL CONCRETO PLACA CONTRAPISO

4.6

Viguetas placa aligerada


VT -201
VT -202
VT -203
VT -204
VT -209
R-201
VT-305
VT-306
VT-307
VT-308
VT-309
TOTAL CONCRETO VIGUETAS

4.7

Concreto de Escaleras 3000 PSI


Placa de escalera primer nivel
Placa de escalera segundo nivel
Pasos de escallera
TOTAL CONCRETO DE ESCALERA

MAMPOSRERA

5.1

MUROS PRIMER PISO


Eje 1
Eje 1'
Eje 2

Pg. 24

Eje 3
Eje A
Eje A'
Eje A''
Eje B
Eje C
TOTAL MUROS PRIMER PISO
5.2

MUROS SEGUNDO PISO


Eje 1
Eje 1'

Eje 2
Eje 3
Eje A

Eje B
Eje C
Eje C'
Eje D
Eje E
TOTAL MURO SEGUNDO PISO
TOTAL MAMPOSTERA PARA MUROS
Mesn en concreto
Pasamanos en concreto 2500 PSI
6

Paetes

6.1

PAETE PRIMER PISO

6.1.2

Paete liso muro 1:4


EJE A' (1-3)
EJE A'' (1-3)
EJE A (1-3)
EJE B (1-2)
EJE C (1-3)
EJE D (1-3)
EJE E (1-2)
EJE 1 (A''-E)
EJE 2 (A''-E)

Pg. 25
EJE 3 (A''-D)
TOTAL PAETE LISO MURO
6.1.2

Paete liso bajo placa 1:4

6.1.3

Paete rstico muro 1:5

6.1.4

Paete impermeabilizado 1:3 con Sika 1

6.2

PAETE SEGUNDO PISO

6.2.2

Paete liso muro 1:4


EJE A (1-3)
EJE B (1-2)
EJE C (1-3)
EJE D (1-3)
EJE E (1-2)
EJE 1 (A-E)
EJE 2 (A-E)
EJE 3 (A-D)
TOTAL PAETE LISO MURO

6.2.2

Paete liso bajo placa 1:4

6.2.3

Paete rstico muro 1:5

6.2.4

Paete impermeabilizado 1:3 con Sika 1

INSTALACIONES HIDRAULICAS Y SANITARIAS

7.1

Antejardn (Caja de inspeccin de 60x60)

7.2

1 punto hidrulico

7.3

Baos (Caja de inspeccin de 80x80)

7.4

2 puntos sanitarios ; 2 puntos hidrulicos

7.5

Cocina (Caja de inspeccin de 60x60)

7.6

2 puntos sanitarios ; 2 puntos hidrulicos

7.7

Bodega de elementos de aseo (Caja de inspeccin 80x80)

7.8

3 puntos sanitarios ; 2 puntos hidrulicos

7.9

Patio (Caja de inspeccin 60x60)

7.10

2 puntos santarios ; 1 punto hidrulico

INSTALACIONES ELECTRICAS

8.1

Acometida aerea 10 mts.

8.2

Salida lmpara toma PVC completa

8.3

Salida lmpara conmutable PVC completa

8.4

Salida telfono PVC completa

8.5

Salida timbre PVC completa

8.6

Salida trifsica PVC completa

8.7

Salida TV PVC completa

8.8

Tablero parcial 12 circuitos

8.9

Tubera PVC conduit 3/4"

8.10

Linea a Tierra tablero general (varilla cooper well)

8.11

Tubera conduit 1"

Pg. 26
9

PINTURA
Eje 1
Eje 1'
Eje 2

Eje 3
Eje A
Eje A'
Eje A''
Eje B
Eje C
TOTAL PINTURA
Esrtuco en muros segundo piso
Eje 1
Eje 1'

Eje 2
Eje 3
Eje A

Eje B
Eje C
Eje C'
Eje D
Eje E
TOTAL ESTUCO
Esmalte para puertas
Tintilla sobre madera llena
10

ENCHAPES

10.1

Enchapes primer piso

10.1.1

Enchape ceramica pared italia 20*20

10.1.2

Piso en porcelana Vicenza 25*35

10.1.3

Rejilla Ventilacin 20*20 plstico

10.2

Enchapes segundo piso

Pg. 27
10.2.1

Enchape en porcelana Olimpia 20*20

10.2.2

Murete Ducha 0.10*0.20

10.2.3

Piso en porcelana Vicenza 25*35

10.2.4

Puerta para ducha en vidrio

11

PISOS

11.1

Base en material de afirmado compactado

11.2

Placa base en concreto

11.3

Poyos en cocina

11.4

Baldosin de granito (30x30x1,7)

11.5

Piso ceramica 20,5*20,5 o similar

11.6

Pasos escalera granito

12

CUBIERTAS

12.1

Asbesto cemento No.6

12.2

Canaleta 90 L= 7.00 mts.

12.3

Teja espaola Eternit

13

CIELO RASOS

13.1

Armadura madera y malla con vena

13.2

Lmina Acrlico incluye alistado aluminio

13.3

Listn Machiembriado cedro rojo

13.4

TABLEX PIZANO 9 MM INCLUYE ALISTADO INMUNIZADO

14

CARPINTERIA DE MADERA

14.1

Closet tipo A cedro caquet forrado

14.2

Puertas marco y hoja cedro caqueta

14.3

Listones para cubierta 2"x 2"

14.4

Listones para cubierta 2"x 3"

14.5

Vigas de madera para la cubierta 3"x6"

14.6

Camillas

14.7

madera para Formaletas

15

VIDRIOS Y CERRADURAS
Vidrio 5 MM (Tipo 1)
Vidrio 5 MM (Tipo 2)
Vidrio 5 MM (Tipo 3)
Espejo 4 MM sin bicel
Cerradura Bao Schlage A - 40S
Cerradura Alcoba Schlage A - 50WS
Cerradura entrada Doble Cilindro

16

APARATOS SANITARIOS

16.2

Suministro e inst. Combo sanitario happy II Corona

16.3

Suministro e inst. Lavaplatos Poceta Derecha Lavaplatos Technologiestrade Sas

Pg. 28
16.4

Suministro e inst. Ducha Nahla Balance Presion Corona

18

OBRAS EXTERIORES

18.1

Concreto Sardineles H=0.40m 2500 PSI

18.2

Concreto Andenes 0.10m 2500 PSI

18.3

Concreto Estriado Rampas 2500 PSI

18.4

Piso en grama incl. Tierra negra

18.5

Sumidero 0.7 X 0,3 MTS

18.6

Aseo General para entrega

Pg. 29

Pg. 30

DE CANTIDADES DE OBRA - F01


PROYECTO VIVIENDA UNIFAMILIAR URBANIZACIN LAS UINTAS
CARRERA 4 N 45A- 11
TUNJA
ING. NELSON ARBELAEZ CARVAJAL & ING. JUAN CAMILO CASTRO
20-Apr-16
L (m)

A (m)

h (m)

0.00

0.00

16.00

6.00

96.00

96.00

M2

3.00

5.60

16.80

16.80

M2

16.00

6.00

28.80

28.80

M3

45.00

45.00

0.00

0.00

0.00

0.00

0.30

45.00

Cant.

SUBTOTAL TOTAL

UND

5.15

0.30

0.35

0.54

0.54

M3

5.15

0.30

0.35

0.54

0.54

M3

5.15

0.30

0.35

0.54

0.54

M3

5.15

0.30

0.35

0.54

0.54

M3

2.51

0.30

0.35

0.26

0.26

M3

10.50

0.30

0.30

0.95

0.95

M3

2.20

0.30

0.35

0.23

0.23

M3

2.52

0.10

0.30

0.08

0.08

M3

8.30

0.30

0.30

0.75

0.75

M3

0.00

4.43

M3

0.80

0.80

0.75

0.48

1.92

M3

0.80

1.20

0.75

0.72

4.32

M3

0.00

6.24

M3

0.80

0.80

0.50

0.32

1.28

M3

0.80

1.20

0.50

0.48

2.88

M3

4.16

M3

0.00

0.00

0.80

0.80

0.35

0.90

0.90

M3

0.80

1.20

0.35

2.02

2.02

M3

2.92

M3

0.00

0.00

5.15

0.30

0.35

0.54

0.54

M3

5.15

0.30

0.35

0.54

0.54

M3

5.15

0.30

0.35

0.54

0.54

M3

5.15

0.30

0.35

0.54

0.54

M3

2.51

0.30

0.35

0.26

0.26

M3

10.50

0.30

0.30

0.95

0.95

M3

2.20

0.30

0.35

0.23

0.23

M3

2.52

0.10

0.30

0.08

0.08

M3

Pg. 31
8.30

0.30

0.30

0.75

0.75

M3

0.00

4.43

M3

0.00

0.00

0.00

0.00

5.15

0.30

1.55

1.55

M2

5.15

0.30

1.55

1.55

M2

5.15

0.30

1.55

1.55

M2

5.15

0.30

1.55

1.55

M2

2.51

0.30

0.75

0.75

M2

10.50

0.30

3.15

3.15

M2

2.20

0.30

0.66

0.66

M2

2.52

0.10

0.25

0.25

M2

8.30

0.30

2.49

2.49

M2

0.00

11.01

M3

5.00

5.00

UND

1.00

1.00

UND

16.71

16.71

16.71

18.91

18.91

18.91

10.00

10.00

10.00

5.00

UND

2.00

UND

3.00

UND

1.00

5606.58
0.25

0.25

3.00

20

UND

0.00

0.00

5606.58

5606.58

0.00

0.00

0.19

3.75

M3

3.75

M3

0.00

0.00

0.00

0.00

KG

13

0.25

0.3

0.98

0.98

M3

2.77

0.25

0.3

0.21

0.21

M3

13

0.25

0.3

0.98

0.98

M3

0.25

0.3

0.45

0.45

M3

0.25

0.3

0.45

0.45

M3

0.25

0.3

0.45

0.45

M3

5.99

0.25

0.3

0.45

0.45

M3

3.07

0.25

0.3

0.23

0.23

M3

13

0.25

0.3

0.98

0.98

M3

2.77

0.25

0.3

0.21

0.21

M3

10.5

0.25

0.3

0.79

0.79

M3

0.25

0.3

0.45

0.45

M3

0.25

0.3

0.45

0.45

M3

0.25

0.3

0.45

0.45

M3

5.99

0.25

0.3

0.45

0.45

M3

Pg. 32
3.07

0.25

0.3

0.23

0.23

M3

6.8

0.25

0.3

0.51

0.51

M3

6.8

0.25

0.3

0.51

0.51

M3

0.25

0.3

0.45

0.45

M3

0.25

0.3

0.45

0.45

M3

0.25

0.3

0.45

0.45

M3

10.58

M3

5.15

0.30

0.35

0.54

1.08

M3

0.00

0.00

3.38

5.5

0.58

10.78

10.78

M3

2.52

3.33

0.58

4.87

4.87

M3

3.4

5.5

0.58

10.85

10.85

M3

2.2

2.32

0.58

2.96

2.96

M3

0.00

29.46

M3

0.00

0.00

3.38

5.5

0.3

5.58

5.58

M3

2.52

5.5

0.3

4.16

4.16

M3

3.4

5.5

0.3

5.61

5.61

M3

2.2

2.32

0.3

1.53

1.53

M3

0.00

16.88

M3

11.5

0.1

0.3

0.35

0.35

M3

9.6

0.1

0.3

0.29

0.29

M3

3.38

0.1

0.3

0.10

0.10

M3

3.40

0.1

0.3

0.10

0.10

M3

2.52

0.1

0.3

0.08

0.08

M3

5.15

0.1

0.3

0.15

0.15

M3

9.6

0.1

0.3

0.29

0.29

M3

11.5

0.1

0.3

0.35

0.35

M3

3.38

0.1

0.3

0.10

0.10

M3

3.40

0.1

0.3

0.10

0.10

M3

2.52

0.1

0.3

0.08

0.08

M3

0.00

0.63

M3

0.00

0.00

2.88

1.38

0.10

0.40

0.40

M3

2.18

1.38

0.10

0.30

0.30

M3

0.22

1.38

0.18

16

0.44

0.44

M3

0.00

1.14

M3

0.00

0.00

0.00

0.00
38.89

M2

4.90

M2

16.86

M2

17.00

2.55

38.89

1.23

2.55

3.14

0.69

2.55

1.76

2.24

2.55

4.44

0.69

2.55

1.76

Pg. 33
16.86

M2

4.43

2.55

10.66

14.50

2.55

33.15

33.15

M2

6.00

2.55

3.11

3.11

M2

3.06

2.55

3.56

3.56

M2

6.00

2.55

13.39

13.39

M2

3.06

2.55

7.17

7.17

M2

1.68

2.55

3.65

3.65

M2

2.06

2.55

5.25

5.25

M2

129.93
0.00

0.00
30.73

M2

6.77

M2

26.14

M2

24.23

M2

2.70

M2

9.18

M2

6.78

M2

13.30

2.55

30.73

0.72

2.55

1.84

1.21

2.55

3.09

0.72

2.55

1.84

6.50

2.55

15.94

4.00

2.55

10.20

2.55

24.23

0.42

2.55

0.43

0.72

2.55

1.84

0.42

2.55

0.43

1.92

2.55

4.26

2.18

2.55

4.92

0.98

2.55

1.86

2.18

2.55

4.92

2.08

2.55

5.30

5.30

0.49

2.55

1.25

0.00

0.12

2.55

0.31

0.12

2.55

0.31

10.50

0.00

0.62

M2

112.45
242.38
2.80

0.60

7.30

1.68

1.68

M2

7.30

7.30

ML

0.00

0.00

0.00

0.00

M2

5.85

2.55

14.92

14.92

M2

6.02

2.55

15.35

12.44

M2

6.22

2.55

15.86

5.88

M2

6.13

2.55

15.63

15.63

M2

7.51

2.55

19.15

19.15

M2

2.27

2.55

5.79

2.61

M2

1.26

2.55

3.21

3.21

M2

17.77

2.55

45.31

45.31

M2

21.14

2.55

53.91

53.91

M2

Pg. 34
14.13
17.00

2.55
6.00

5.21
1.26

2.55
1.38

36.03

36.03

M2

0.00

209.09

M2

102.00

79.72

M2

13.29

13.29

M2

1.74

1.74

M2

0.00

0.00

0.00

0.00

6.56

2.55

16.73

8.07

M2

6.90

2.55

17.60

17.60

M2

11.06

2.55

28.20

28.20

M2

3.46

2.55

8.82

3.21

M2

3.08

2.55

7.85

1.93

M2

8.6

2.55

21.93

21.93

M2

18.12

2.55

46.21

46.21

M2

9.62

2.55

24.53

24.53

M2

0.00

151.68

M2

78.00

76.65

M2

36.82

36.82

M2

7.78

7.78

M2

0.00

0.00

0.00

0.00

1.00

1.00

UND

0.00

0.00

UND

4.00

4.00

UND

0.00

0.00

UND

4.00

4.00

UND

0.00

0.00

UND

5.00

5.00

UND

0.00

0.00

UND

3.00

3.00

UND

0.00

0.00

UND

0.00

0.00

1.00

1.00

UN

31

31.00

31.00

UN

24

24.00

24.00

UN

1.00

1.00

UN

1.00

1.00

UN

1.00

1.00

UN

7.00

7.00

UN

1.00

1.00

UN

1.00

1.00

ML

2.00

2.00

UN

1.00

1.00

ML

0.00

0.00

13.00

6.00

14.44
4.16

2.55
1.87

1
4
4
5
3

Pg. 35
0.00

0.00

0.00

0.00

17.00

2.55

43.43

43.43

M3

1.23

2.55

0.06

0.06

M3

0.69

2.55

0.03

0.03

M3

2.24

2.55

5.73

5.73

M3

0.69

2.55

0.03

0.03

M3

4.43

2.55

11.31

11.31

M3

14.50

2.55

37.04

37.04

M3

6.00

2.55

0.06

0.06

M3

3.06

2.55

0.02

0.02

M3

6.00

2.55

15.33

15.33

M3

3.06

2.55

7.81

7.81

M3

1.68

2.55

4.30

4.30

M3

2.06

2.55

0.09

0.09

M3

125.24
0.00

0.00

M3

13.30

2.55

33.97

33.97

M3

0.72

2.55

0.03

0.03

M3

1.21

2.55

0.06

0.06

M3

0.72

2.55

0.03

0.03

M3

6.50

2.55

16.59

16.59

M3

2.55

0.18

0.18

M3

2.55

26.82

26.82

M3

0.42

2.55

1.08

1.08

M3

0.72

2.55

0.03

0.03

M3

0.42

2.55

1.08

1.08

M3

1.92

2.55

4.91

4.91

M3

2.18

2.55

5.57

5.57

M3

0.98

2.55

2.51

2.51

M3

2.18

2.55

5.57

5.57

M3

2.08

2.55

0.10

0.10

M3

0.49

2.55

0.02

0.02

M3

0.12

2.55

0.01

0.01

M3

0.12

2.55

0.01

0.01

M3

4.00
10.50

0.00

98.57
0.95

2.20

14

2.09

29.26

M2

0.95

2.20

20

2.09

41.80

M2

0.00

0.00

0.00

0.00

76.64

76.64

76.64

M2

13.29

13.29

M2

1.00

1.00

UN

0.00

0.00

5.21

2.55

Pg. 36

3.54
14.44

17.00

2.55

6.00

74.39

74.39

74.39

M2

3.54

7.08

ML

36.82

36.82

M2

4.00

4.00

UND

0.00

0.00

0.00

0.00

0.10

10.20

10.20

M3

17.00

0.10

1.70

1.70

M2

2.80

0.08

0.22

0.22

M2

17.00

6.00

102.00

102.00

M2

17.00

6.00

97.16

97.16

M2

5.06

5.06

ML

0.00

0.00

1.00

78.00

78.00

M2

2.00

0.53

1.05

M2

1.00

105.00

105.00

M2

0.00

0.00

5.06

13.00

6.00

7.00

0.25

15.00

7.00

0.30

0.00

0.00

0.95

2.20

14

2.09

29.26

M2

0.97

2.55

2.47

7.41

M2

3.16

2.18

6.89

27.56

M2

3.16

2.18

6.89

27.56

M2

0.00

0.00

4.00

1.84

7.34

M2

1.20

0.60

2.55

9.00

9.00

9.00

UN

1.50

54.00

1.50

81.00

ML

7.00

16

7.00

112.00

ML

9.00

9.00

72.00

ML

28.00

28.00

28.00

UN

3.00

1026.00

3078.00

M2

0.00

0.00

0.00

0.00

38.00

27.00

1.01

1.21

1.22

4.89

M2

1.63

1.95

3.18

3.18

M2

2.22

1.95

4.33

8.66

M2

0.60

0.50

0.30

0.90

M2

3.00

3.00

UND

4.00

4.00

UND

4.00

4.00

UND

0.00

0.00

3.00

3.00

UN

1.00

1.00

UN

Pg. 37
2

2.00

2.00

0.00

0.00

UN

0.00

0.00

3.00

3.00

ML

2.00

6.00

5.60

M2

2.00

6.00

6.00

M2

0.8

0.50

0.40

0.40

M2

1.00

1.00

UN

96.00

192.00

M2

16

6.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Pg. 38
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

MEMORIA DE CALCULO DE CANTIDADES DE ACERO DE REFUERZO - F01ACER


OBRA: PROYECTO VIVIENDA UNIFAMILIAR URBANIZACIN LAS UINTAS
LOCALIZACION: CARRERA 4 N 45A- 11
MUNICIPIO: TUNJA
ELABORO Y CALCULO : ING. NELSON ARBELAEZ CARVAJAL & ING. JUAN CAMILO CASTRO
FECHA:
20-Apr-16

CLASE
PDR60 /
A37

CANT
DIAMETRO VARILLAS

LONG
15.6
3.6
6
5.4
0.98

TIPO

DESCRIPCION

1- CIMENTACION
VIGA VC-101
VIGA VC-101
VIGA VC-101
VIGA VC-101
VIGA VC-101 Estribos

4 N4 long= 6.00
1 N4 long= 3.60
4 N3 long= 6.00
2 N3 long= 5.40
50 N3 long= 0.98

PDR60
PDR60

4
4

PDR60

5
1
4
3
50

VIGA VC-102
VIGA VC-102
VIGA VC-102 Estribos

2 N6 long= 3.03
2 N4 long= 3.03
10 N3 long= 0.98

PDR60
PDR60
PDR60

6
4
3

2
2
10

3.03
3.03
0.98

VIGA
VIGA
VIGA
VIGA
VIGA

2 N4 long=6.00
2 N4 long=5.40
2 N3 long= 5.40
2 N3 long=6.00
40 N3 long= 0.84

PDR60
PDR60
PDR60
PDR60
PDR60

4
4
3
3
3

2
2
2
2
40

6
5.4
5.4
6
0.84

2 N6 long=6.00

PDR60

VC-103
VC-103
VC-103
VC-103
VC-103 Estribos

VIGA VC-104

VIGA
VIGA
VIGA
VIGA

VC-104
VC-104
VC-104
VC-104 Estribos

2 N6 long=1.00
2 N4 long= 1.00
2 N4 long= 6.00
23 N3 long= 0.84

PDR60
PDR60
PDR60
PDR60

6
4
4
3

2
2
2
23

1
1
6
0.98

VIGA
VIGA
VIGA
VIGA
VIGA

VC-105
VC-105
VC-105
VC-105
VC-105 Estribos

2 N6 long= 6.00
2 N6 long= 1.00
2 N4 long= 1.00
2 N4 long= 6.00
23 N3 long= 0.98

PDR60
PDR60
PDR60
PDR60
PDR60

6
6
4
4
3

2
2
2
2
23

6
1
1
6
0.98

VIGA
VIGA
VIGA
VIGA
VIGA

VC-106
VC-106
VC-106
VC-106
VC-106 Estribos

2 N6 long= 6.00
2 N6 long= 1.00
2 N4 long= 1.00
2 N4 long= 6.00
23 N3 long= 0.98

PDR60
PDR60
PDR60
PDR60
PDR60

6
6
4
4
3

2
2
2
2
23

6
1
1
6
0.98

VIGA
VIGA
VIGA
VIGA
VIGA

VC-107
VC-107
VC-107
VC-107
VC-107 Estribos

2 N6 long= 6.00
2 N6 long= 1.00
2 N4 long= 1.00
2 N4 long= 6.00
23 N3 long= 0.98

PDR60
PDR60
PDR60
PDR60
PDR60

6
6
4
4
3

2
2
2
2
23

6
1
1
6
0.98

VIGA VC-108
VIGA VC-108
VIGA VC-108 Estribos

2 N6 long=3.57
2 N4 long= 3.57
12 N3 long= 0.98

PDR60
PDR60
PDR60

6
4
3

2
2
12

3.57
3.57
0.98

VIGA VC-109
VIGA VC-109 Estribos

3 N4 long= 3.36
30 N3 long= 0.84

PDR60
PDR60

4
3

3
30

3.36
0.84

Acero de refuerzo Zapata T1

4 N5 long= 1.46
4 N5 long= 1.06
4 N5 long= 1.46

PDR60
PDR60
PDR60

5
5
5

4
4
4

1.46
1.06
1.46

Acero de refuerzo Zapata T2

2- Estructuras
VIGA 201 (A-E) 25*30

VIGA 201 ESTRIBOS (A-E) 25*30


VIGA 202 (D-E) 25*30

VIGA 202 ESTRIBOS (D-E) 25*30


VIGA 203 (A-D) 25*30
VIGA 203 ESTRIBOS (A-D) 25*30
VIGA 204 (1-3) 25*30

VIGA 204 ESTRIBOS (1-3) 25*30


VIGA 205 (1-3) 25*30

VIGA 205 ESTRIBOS (1-3) 25*30


VIGA 206 (1-3) 25*30

4 N5 long= 1.06

PDR60

1.06

2 # 4 log= 9m
2 # 4 log= 5m
2 # 4 log= 6m
2 # 4 log= 8,50m
130 # 3 log= 1,25m

PDR60
PDR60
PDR60
PDR60
PDR60

2
2
2
2
130

9
5
6
8.5
1.01

2 # 5 log= 3,20m
1 # 4 log= 1,50m
2 # 4 log= 3m
22 # 3 log= 0,22m

PDR60
PDR60
PDR60
PDR60

4
4
4
4
3
4
5
4
4
3

2
1
2
22

3.2
1.5
3
1.01

2 # 4 log= 10,80m
2 # 4 log= 10,80m
103 # 3 log= 1,25m

PDR60
PDR60
PDR60

4
4
3

2
2
103

10.8
10.8
1.01

1 # 4 log= 1,50m
2 # 6 log= 4m
2 # 7 log= 4m
2 # 5 log= 2,40m
52 # 3 log= 1,25m

PDR60
PDR60
PDR60
PDR60
PDR60

4
6
7
5
3

1
2
2
2
52

1.5
4
4
2.4
1.01

1 # 7 log= 2m
2 # 8 log= 6,70m
1 # 6 log= 2m
1 # 6 log= 6,50m
1 # 7 log= 6,58m
52 # 3 log= 1,25m

PDR60
PDR60
PDR60
PDR60
PDR60
PDR60

7
8
6
6
7
3

1
2
1
1
1
52

2
6.7
2
6.5
6.58
1.01

1 # 6 log= 2m
2 # 8 log= 6,70m

PDR60
PDR60

6
8

1
2

2
6.7

VIGA 206 ESTRIBOS (1-3) 25*30


VIGA 207 (1-3) 25*30

VIGA 207 ESTRIBOS (1-3) 25*30


VIGA 208 (1-2) 25*30

VIGA 208 ESTRIBO (1-2) 25*30


VIGA 301 (A-E) 25*30

VIGA 301 ESTRIBOS (A-E) 25*30


VIGA 302 (D-E) 25*30
VIGA 302 ESTRIBOS (D-E) 25*30
VIGA 303 (A-D) 25*30
VIGA 303 ESTRIBOS (A-D) 25*30
VIGA 304 (1-3) 25*30

1 # 5 log= 1,50m
1 # 7 log= 6,50m
1 # 7 log= 3,50m
52 # 3 log= 1,25m

PDR60
PDR60
PDR60
PDR60

5
7
7
3

1
1
1
52

1.5
6.5
3.5
1.01

2 # 7 log= 2,50m
2 # 7 log= 2,50m
1 # 4 log= 4,50m
1 # 4 log= 6,30m
2 # 5 log= 6,40m
50 # 3 log= 1,25m

PDR60
PDR60
PDR60
PDR60
PDR60
PDR60

7
7
4
4
5
3

2
2
1
1
2
50

2.5
2.5
4.5
6.3
6.4
1.01

1 # 4 log= 1,50m
2 # 4 log= 3,40m
2 # 4 log= 3,40m
29 # 3 log= 1,25m

PDR60
PDR60
PDR60
PDR60

4
4
4
3

1
2
2
29

1.5
3.4
3.4
1.01

2 # 4 log= 9m
PDR60
2 # 4 log= 5m
PDR60
2 # 4 log= 6m
PDR60
2 # 4 log= 8,50m
PDR60
130 # 3 (18x23)-96 log= 1,0 PDR60

4
4
4
4
3

2
2
2
2
130

9
5
6
8.5
1.01

2 # 4 log= 3m
PDR60
2 # 4 log= 3m
PDR60
22 # 3 (18x23)-96 log= 1,01 PDR60

4
4
3

2
2
22

3
3
1.01

2 # 4 log= 10,80m
PDR60
2 # 4 log= 10,80m
PDR60
103 # 3 (18x23)-96 log= 1,0 PDR60

4
4
3

2
2
103

10.8
10.8
1.01

1 # 4 log= 1,50m
2 # 6 log= 4m

4
6

1
2

1.5
4

PDR60
PDR60

VIGA 304 ESTRIBOS (1-3) 25*30


VIGA 305 (1-3) 25*30

VIGA 305 ESTRIBO (1-3) 25*30


VIGA 306 (1-3) 25*30

VIGA 306 ESTRIBOS (1-3) 25*30


VIGA 307 (1-3) 25*30

VIGA 307 ESTRIBOS (1-3) 25*30


VIGA 308 (1-2) 25*30
VIGA 308 ESTRIBOS (1-2) 25*30
VIGA 401 (A-C) 25*30
VIGA 401 ESTRIBOS (A-C) 25*30
VIGA 402 (A-C) 25*30

2 # 7 log= 4m
PDR60
2 # 5 log= 6,40m
PDR60
52 # 3 (18x23)-96 log= 1,01 PDR60

7
5
3

2
5
52

4
6.4
1.01

1 # 6 log= 2m
PDR60
2 # 8 log= 6,70m
PDR60
1 # 5 log= 1,50m
PDR60
2 # 7 log= 6,50m
PDR60
1 # 7 log= 3,50m
PDR60
52 # 3 (18x23)-96 log= 1,01 PDR60

6
8
5
7
7
3

1
2
1
2
1
52

2
6.7
1.5
6.5
3.5
1.01

2 # 7 log= 4m
PDR60
1 # 4 log= 1,50m
PDR60
2 # 6 log= 4m
PDR60
2 # 5 log= 6,40m
PDR60
52 # 3 (18x23)-96 log= 1,01 PDR60

7
4
6
5
3

2
1
2
2
52

4
1.5
4
6.4
1.01

1 # 4 log= 1,50m
PDR60
2 # 4 log= 6,30m
PDR60
1 # 4 log= 1,50m
PDR60
2 # 4 log= 6,30m
PDR60
50 # 3 (18x23)-96 log= 1,01 PDR60

4
4
4
4
3

1
2
1
2
50

1.5
6.3
1.5
6.3
1.01

2 # 4 log= 3,40m
PDR60
2 # 4 log= 3,40m
PDR60
29 # 3 (18x23)-96 log= 1,01 PDR60

4
4
3

2
2
29

3.4
3.4
1.01

2 # 4 log= 7m
PDR60
2 # 4 log= 7m
PDR60
66 # 3 (18x23)-96 log= 1,01 PDR60

4
4
3

2
2
66

7
7
1.01

2 # 4 log= 7m
2 # 4 log= 7m

4
4

2
2

7
7

PDR60
PDR60

VIGA 402 ESTRIBOS (A-C) 25*30

66 # 3 (18x23)-96 log= 1,01 PDR60

66

1.01

VIGA 403 (1-3) 25*30

2 # 4 log= 6,30m
PDR60
2 # 4 log= 6,30m
PDR60
52 # 3 (18x23)-96 log= 1,01 PDR60

4
4
3

2
2
52

6.3
6.3
1.01

2 # 4 log= 6,30m
PDR60
1 # 4 log= 1,50
PDR60
1 # 4 log= 1,50
PDR60
52 # 3 (18x23)-96 log= 1,01 PDR60

4
4
4
3

2
1
1
52

6.3
1.5
1.5
1.01

VIGA 405 ESTRIBOS (1-3) 25*30

2 # 4 log= 6,30m
PDR60
2 # 4 log= 6,30m
PDR60
52 # 3 (18x23)-96 log= 1,01 PDR60

4
4
3

2
2
52

6.3
6.3
1.01

MALLA ELECTRO SOLDADA

4 mm c/ 15cm

PDR60

ESCALERA PRIMERA MITAD

5 # 4 log= 3,22m c/25 A


5 # 4 log= 1,20m c/ 25 C
5 # 3 log= 1,30m c/25 B
1 # 3 log= 1,38m c/25 G
5 # 4 log= 2,53m c/25 E
5 # 4 log= 0,95m c/25 F
5 # 4 log= 1,30m c/25 D
1 # 3 log= 1,38m c/25 G
1 N3 long= 6.00
1 N4 LONG= 5.15
1 N3 long= 4.88
2 N4 long = 6.00
1 N3 long= 4.58
1 N3 long= 4.88
56 N3 LONG=0.35
2 N3 long= 6.00

PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60

4
4
3
3
4
4
4
3
3
4
3
4
3
3
2
3

VIGA 403 ESTRIBOS (1-3) 25*30


VIGA 404 (1-3) 25*30

VIGA 404 ESTRIBOS (1-3) 25*30


VIGA 405 (1-3) 25*30

ESCALERA SEGUNDA MITAD

VIGUETA VT-202

VIGUETA VT-202 ESTRIBOS


VIGUETA VT-201

96
5
5
5
1
5
5
5
1
1
1
1
2
1
1
56
2

3.22
1.2
1.3
1.38
2.53
0.95
1.3
1.38
6
5.15
4.88
6
4.58
4.88
0.35
6

2 N4 long= 6.00
2N3 long= 5.48
1 N3 long= 2.70
70 N3 long= 0.35

PDR60
PDR60
PDR60
PDR60

4
3
3
3

2
2
1
70

6
5.48
2.7
0.35

1 N3 long= 4.30
1 N4 long= 4.30
30 N3 long= 0.35

PDR60
PDR60
PDR60

3
4
3

1
1
30

4.3
4.3
0.35

2 N3 long= 4.60
1 n4 long= 4.60
20 N3 long= 0.35

PDR60
PDR60
PDR60

3
4
3

2
1
20

4.6
4.6
0.35

VIGUETA VT-209

2 N4 long= 3.36
1 N4 long= 3.36
30 N3 long= 0.35

PDR60
PDR60
PDR60

4
4
3

2
1
30

3.36
3.36
0.35

VIGUETA R 201

2 N3 long= 5.00
2 N3 long= 2.00
24 N3 long= 0.35

PDR60
PDR60
PDR60

3
3
3

2
2
24

5
2
0.35

VIGUETA VT-305

1 N3 long= 3.18
1 N4 long= 6.00
1 N3 long= 3.70
1 N3 long= 2.70
1 N3 long= 6.00
1 N4 long= 4.48
1 N4 long= 6.00
1 N3 long= 6.00
56 N3 long= 0,35

PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60
PDR60

3
4
3
3
3
4
4
3
3

1
1
1
1
1
1
1
1
56

3.18
6
3.7
2.7
6
4.48
6
6
0.36

1 N3 long= 3.18
1 N4 long = 6.00

PDR60
PDR60

3
4

1
1

3.18
6

VIGUETA VT-201 ESTRIBOS


VIGUETA VT-203
VIGUETA VT-203 ESTRIBOS
VIGUETA VT-204
VIGUETA VT-204 ESTRIBOS

VIGUETA VT-305 ESTRIBOS


VIGUETA VT-306

3 N3 long= 6.00
1 N3 long= 5.48
1 N3 long= 3.40
70 N3 long= 0.35

PDR60
PDR60
PDR60
PDR60

3
3
3
3

3
1
1
70

6
5.48
3.4
0.35

1 N3 long= 4.30
1 N4 long= 4.30
20 N3 long= 0.35

PDR60
PDR60
PDR60

3
4
3

1
1
20

4.3
4.3
0.35

VIGUETA VT-308

2 N3 long= 4.60
1 N4 long= 4.60
20 N3 long= 0.35

PDR60
PDR60
PDR60

3
4
3

2
1
20

4.6
4.6
0.35

VIGUETA VT-309

3 N4 long= 3.36

PDR60

3.36

COLUMNA A-3

4 N5 long= 6.50
4 N5 long= 6.10
4 N5 long= 3.50
4 N5 long= 6.50
4 N5 long= 3.60
95 N3 long= 0.40

PDR60
PDR60
PDR60
PDR60
PDR60
PDR60

5
5
5
5
5
3

4
4
4
4
4
95

6.5
6.1
35
6.5
3.6
0.4

4 N5 long=6.50
4 N5 long= 5.00
4 N5 long= 3.50
4 N5 long= 6.50
4 N5 long= 3.50
84 N3 long= 0.35

PDR60
PDR60
PDR60
PDR60
PDR60
PDR60

5
5
5
5
5
3

4
4
4
4
4
85

6.5
5
3.5
6.5
3.5
0.35

VIGUETA VT-306 ESTRIBOS


VIGUETA VT-307
VIGUETA VT-307 ETRIBOS

ESTRIBOS
COLUMNAS A1, B1, B3, C1,C3

ESTRIBOS
TOTAL ACERO DE REFUERZO

O DE REFUERZO - F01ACEROS

TOTAL ACERO
CANT
ESTRUCTURAS

PESO Kg/mlPDR60

A37

1
1
1
1
1

0.994
0.56
0.56
#N/A
2.235
0.994
0.56

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
1
1

0.994
0.56
0.56
0.994
0.56
0.56
#N/A
2.235

77.532
48.72
27.44
0
13.5441
6.02364
5.488
0
23.856
25.536
18.816
0
23.856
25.536
18.816
0
26.82

6 N3 long= 1 PDR60

VIGA VC-102 2 N6 long= 3 PDR60


VIGA VC-102 2 N4 long= 3 PDR60
VIGA VC-102 E
10 N3 long= PDR60
VIGA VC-103 4 N4 long= 6 PDR60
VIGA VC-103 4 N3 long= 1 PDR60
VIGA VC-103 E
40 N3 long= PDR60
VIGA VC-104 4 N6 long= 7 PDR60
VIGA VC-104 4 N3 long= 1 PDR60
VIGA VC-104 E
40 N3 long= PDR60

1
1
1
1

2.235
0.994
0.994
0.56

1
1
1
1
1

2.235
2.235
0.994
0.994
0.56

1
1
1
1
1

2.235
2.235
0.994
0.994
0.56

1
1
1
1
1

2.235
2.235
0.994
0.994
0.56

1
1
1

2.235
0.994
0.56

1
1

0.994
0.56

4
4
6

1.552
1.552
1.552

4.47
1.988
11.928
12.6224
0
26.82
4.47
1.988
11.928
12.6224
0
26.82
4.47
1.988
11.928
12.6224
0
26.82
4.47
1.988
11.928
12.6224
0
15.9579
7.09716
6.5856
0
10.01952
14.112
0
36.25472
26.32192
54.38208

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1.552

1
1
1
1
1
1
1
1
1

0.994
0.994
0.994
0.994
0.56
0.994
1.552
0.994
0.994
0.56

1
1
1

0.994
0.994
0.56

1
1
1
1
1

0.994
2.235
3.042
1.552
0.56

1
1
1
1
1
1

3.042
3.973
2.235
2.235
3.042
0.56

1
1

2.235
3.973

39.48288
0
0
17.892
9.94
11.928
16.898
73.528
0
9.9328
1.491
5.964
12.4432
0
21.4704
21.4704
58.2568
0
1.491
17.88
24.336
7.4496
29.4112
0
6.084
53.2382
4.47
14.5275
20.01636
29.4112
0
4.47
53.2382

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
1
1
1

1.552
3.042
3.042
0.56

1
1
1
1
1
1

3.042
3.042
0.994
0.994
1.552
0.56

1
1
1
1

0.994
0.994
0.994
0.56

1
1
1
1
1

0.994
0.994
0.994
0.994
0.56

1
1
1

0.994
0.994
0.56

1
1
1

0.994
0.994
0.56

1
1

0.994
2.235

2.328
19.773
10.647
29.4112
0
15.21
15.21
4.473
6.2622
19.8656
28.28
0
1.491
6.7592
6.7592
16.4024
0
17.892
9.94
11.928
16.898
73.528
0
5.964
5.964
12.4432
0
21.4704
21.4704
58.2568
0
1.491
17.88

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
1
1

3.042
1.552
0.56

1
1
1
1
1
1

2.235
3.973
1.552
3.042
3.042
0.56

1
1
1
1
1

3.042
0.994
2.235
1.552
0.56

1
1
1
1
1

0.994
0.994
0.994
0.994
0.56

1
1
1

0.994
0.994
0.56

1
1
1

0.994
0.994
0.56

1
1

0.994
0.994

24.336
49.664
29.4112
0
4.47
53.2382
2.328
39.546
10.647
29.4112
0
24.336
1.491
17.88
19.8656
29.4112
0
1.491
12.5244
1.491
12.5244
28.28
0
6.7592
6.7592
16.4024
0
13.916
13.916
37.3296
0
13.916
13.916

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.56

1
1
1

0.994
0.994
0.56

1
1
1
1

0.994
0.994
0.994
0.56

1
1
1

0.994
0.994
0.56

3
Err:504
0.994
0.994
0.56
0.56
0.994
0.994
0.994
0.56
0.56
0.994
0.56
0.994
0.56
0.56
0.25
0.56

1
1
1
23
1
1
1
20
1
1
1
1
1
1
1
1

37.3296
0
12.5244
12.5244
29.4112
0
12.5244
1.491
1.491
29.4112
0
12.5244
12.5244
29.4112
0
288
0
16.0034
5.964
3.64
17.7744
12.5741
4.7215
6.461
15.456
3.36
5.1191
2.7328
11.928
2.5648
2.7328
4.9
6.72

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
1
1
1

0.994
0.56
0.56
0.56

1
1
1

0.56
0.994
0.56

1
1
1

0.56
0.994
0.56

1
1
1

0.994
0.994
0.56

1
1
1

0.56
0.56
0.56

1
1
1
1
1
1
1
1
1

0.56
0.994
0.56
0.56
0.56
0.994
0.994
0.56
0.56

1
1

0.56
0.994

11.928
6.1376
1.512
13.72
0
2.408
4.2742
5.88
0
5.152
4.5724
3.92
0
6.67968
3.33984
5.88
0
5.6
2.24
4.704
0
1.7808
5.964
2.072
1.512
3.36
4.45312
5.964
3.36
11.2896
0
1.7808
5.964

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
1
1
1

0.56
0.56
0.56
0.56

1
1
1

0.56
0.994
0.56

1
1
1

0.56
0.994
0.56

0.994

4
4
4
4
4
4

1.552
1.552
1.552
1.552
1.552
0.56

6
6
6
6
6
6

1.552
1.552
1.552
1.552
1.552
0.56

10.08
3.0688
1.904
13.72
0
2.408
4.2742
3.92
0
5.152
4.5724
3.92
0
10.01952
0
161.408
151.4752
869.12
161.408
89.3952
85.12
0
242.112
186.24
130.368
242.112
130.368
99.96
5606.57964

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

14.5

6
4
3

2
2
10

3.03
3.03
0.98

1
1
1

4
3
3

4
4
40

6
11.4
0.84

1
1
1

4
3
3

4
4
40

6
11.4
0.84

1
1
1

PRESUPUESTO
OBRA:
LIZACION:
MUNICIPIO:
ALCULO :
FECHA:

ITEM
1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
3.4
4
4.1
5.3
5.8
9.5
9.6
9.7
11.2
11.3
11.4
11.5
13.1
14.3
14.4

ITEM
14.121053
14.522874
14.924696
15.326518
15.72834
16.130162
16.531984
16.933806
17.335628
17.737449
18.139271
18.541093
18.942915
19.344737
19.746559
20.148381
20.550202
20.952024
21.353846
21.755668
22.15749
22.559312
22.961134
23.362955
23.764777
24.166599
24.568421
24.970243
25.372065
25.773887
26.175709
26.57753
26.979352
27.381174
27.782996
28.184818
28.58664
28.988462
29.390283
ITEM
29.792105
30.193927

30.595749
30.997571
31.399393
31.801215
32.203036
32.604858
33.00668
33.408502
33.810324
34.212146
34.613968
35.015789
35.417611
35.819433
36.221255
36.623077
37.024899
37.426721
37.828543
38.230364
38.632186
39.034008

PRESUPUESTO F-02
PROYECTO VIVIENDA UNIFAMILIAR URBANIZACIN LAS UINTAS
CARRERA 4 N 45A- 11
TUNJA
ING. NELSON ARBELAEZ CARVAJAL & ING. JUAN CAMILO CASTRO

20-Ap

DESCRIPCION
LOCALIZACIN Y REPLANTEO OBRA ARQUITECTONICA
CAMPAMENTO MT2
CIMENTACIN Y DESAGES
EXCAVACIN MANUAL Y RETIRO MATERIAL COMUN
CONCRETO CICLOPEO 17.5MPa (2500 PSI) RELACIN 60C/40P
CONCRETO PARA ZAPATAS 3000 PSI INCLUYE FORMALETA
CONCRETO VIGA DE AMARRE 3000 PSI INCLUYE FORMALETA
BASE CONCRETO POBRE E=0.05 MTS. 2000 PSI (SOLADO)
SUMINISTRO E INSTALACIN MALLA ELECTROSOLDADA
CAJA INSPECCION 80 x 80 x 80 CM [LADRILLO]
SUMINISTRO E INSTALACION TUBERIA PVC SANITARIA 2"
SUMINISTRO E INSTALACION TUBERIA PVC SANITARIA 4"
SUMINISTRO E INSTALACION TUBERIA 6" SANITARIA NOVAFORT
LOSA MACIZA CIMIENTO CONCRETO 3000 psi H=10 CM
ESTRUCTURAS
COLUMNAS EN CONCRETO 3000 PSI, ALTURA MENOR A 3 MTS.
TOTAL CONCRETO DE VIGAS
Viga canal en concreto 3000 PSI impermeabilizado
TOTAL CONCRETO PLACA ENTREPISO
TOTAL CONCRETO PLACA CONTRAPISO
Viguetas placa aligerada
TOTAL CONCRETO VIGUETAS
TOTAL CONCRETO DE ESCALERA
TOTAL MAMPOSTERA PARA MUROS
Mesn en concreto
Pasamanos en concreto 2500 PSI
TOTAL PAETE LISO MURO
Paete liso bajo placa 1:4
Paete rstico muro 1:5
Paete impermeabilizado 1:3 con Sika 1
INSTALACIONES HIDRAULICAS Y SANITARIAS
INSTALACIONES ELECTRICAS
Acometida aerea 10 mts.

Salida lmpara toma PVC completa


Salida lmpara conmutable PVC completa
Salida telfono PVC completa
Salida timbre PVC completa
Salida trifsica PVC completa
Salida TV PVC completa
Tablero parcial 12 circuitos
Tubera PVC conduit 3/4"
Linea a Tierra tablero general (varilla cooper well)
Tubera conduit 1"
TOTAL PINTURA
TOTAL ESTUCO
Esmalte para puertas
Tintilla sobre madera llena
Enchape ceramica pared italia 20*20
Piso en porcelana Vicenza 25*35
Rejilla Ventilacin 20*20 plstico
Enchapes segundo piso
Enchape en porcelana Olimpia 20*20
Murete Ducha 0.10*0.20
Piso en porcelana Vicenza 25*35
Puerta para ducha en vidrio
PISOS
Base en material de afirmado compactado
Placa base en concreto
Poyos en cocina
Baldosin de granito (30x30x1,7)
Piso ceramica 20,5*20,5 o similar
Pasos escalera granito
CUBIERTAS
Asbesto cemento No.6
Canaleta 90 L= 7.00 mts.
Teja espaola Eternit
CIELO RASOS
Armadura madera y malla con vena
Lmina Acrlico incluye alistado aluminio
Listn Machiembriado cedro rojo
TABLEX PIZANO 9 MM INCLUYE ALISTADO INMUNIZADO
CARPINTERIA DE MADERA
Closet tipo A cedro caquet forrado
Puertas marco y hoja cedro caqueta
Listones para cubierta 2"x 2"
Listones para cubierta 2"x 3"

Vigas de madera para la cubierta 3"x6"


Camillas
madera para Formaletas
VIDRIOS Y CERRADURAS
Vidrio 5 MM (Tipo 1)
Vidrio 5 MM (Tipo 2)
Vidrio 5 MM (Tipo 3)
Espejo 4 MM sin bicel
Cerradura Bao Schlage A - 40S
Cerradura Alcoba Schlage A - 50WS
Cerradura entrada Doble Cilindro
APARATOS SANITARIOS
Suministro e inst. Combo sanitario happy II Corona
Suministro e inst. Lavaplatos Poceta Derecha Lavaplatos Technologiestrade Sas
Suministro e inst. Ducha Nahla Balance Presion Corona
OBRAS EXTERIORES
Concreto Sardineles H=0.40m 2500 PSI
Concreto Andenes 0.10m 2500 PSI
Concreto Estriado Rampas 2500 PSI
Piso en grama incl. Tierra negra
Sumidero 0.7 X 0,3 MTS
Aseo General para entrega

VALOR TOTAL PROPUESTA ..$


SON: Seiscientos millones trecientos veintitres mil ciento cincuenta y tres

UND.
M2
M2
M3
M3
M3
M3
M2
Kg
UND
ML
ML
ML
M2
M3
ML
ML
M2
M3
M2
UND
UND
M2
M2
M2
M2
M2
UND
UND
UN

CANTIDAD
0.00
96.00
16.80
28.80
4.43
6.24
2.92
4.43
11.01
3.00
5.00
1.00
16.71
18.91
16.88
0.00
3.75
10.58
1.08
29.46
16.88
0.00
0.63
1.14
242.38
1.68
7.30
360.77
156.37
50.11
9.52
17.00
0.00
1.00

V/UNITARIO
0.00
3,218.00
75,079.00
0.00
38,858.00
242,455.00
461,263.00
494,560.00
20,820.00
3,535.00
369,069.00
11,471.00
17,834.00
23,524.00
55,278.00
0.00
631,902.00
39,878.00
40,080.00
64,880.00
1,129,261.00
0.00
20,239.00
50,630.00
0.00
10,799.00
37,236.00
37,658.00
45,869.00
139,011.00
50,893.00
17631
$41,860.00

V/PARCIAL
0.00
308,928.00
1,261,327.20
0.00
172,140.94
1,512,919.20
1,346,887.96
2,190,900.80
229,228.20
10,605.00
1,845,345.00
11,471.00
298,006.14
444,838.84
933,092.64
0.00
2,369,632.50
421,909.24
43,286.40
1,911,364.80
19,061,925.68
0.00
12,750.57
57,718.20
0.00
18,142.32
271,822.80
13,585,876.66
7,172,535.53
6,965,841.21
484,501.36
299,727.00
0.00
41,860.00

UN
UN
UN
UN
UN
UN
UN
ML
UN
ML
M3
M3
M4
M2
M2
M2
M2
M2
ML
M2
UND
M3
M2
M2
M2
M2
UND
M2
M2
M2
M2
M2
M2
M2
UN
ML
ML
ML

31.00
24.00
1.00
1.00
1.00
7.00
1.00
1.00
2.00
1.00
125.24
98.57
29.26
41.80
76.64
13.29
1.00
0.00
74.39
7.08
36.82
4.00
0.00
10.20
1.70
0.22
102.00
97.16
5.06
0.00
78.00
1.05
105.00
0.00
29.26
7.41
27.56
27.56
0.00
7.34
9.00
81.00
112.00

$46,246.00
$172,382.00
$43,983.00
$44,416.00
$56,322.00
$0.00
$6,602.00
$23,638.00
$20,931.00
$25,037.00
$20,239.00
0
92056
19505
14267
50630
525744
36533
70795
31610
319069
0
6746
12312
10891
5157
20885
6824
7415
148931
123740
29731
37658
45869
139011
50893
0
33225
122961
169436
254810

1,433,626.00
4,137,168.00
43,983.00
44,416.00
56,322.00
0.00
6,602.00
23,638.00
41,862.00
25,037.00
2,534,732.36
0.00
2,693,558.56
815,309.00
1,093,422.88
672,872.70
525,744.00
0.00
5,266,440.05
223,798.80
11,748,120.58
0.00
0.00
125,582.40
18,514.70
1,134.54
2,130,270.00
663,019.84
37,519.90
0.00
11,616,618.00
129,927.00
3,121,755.00
0.00
1,101,873.08
339,889.29
3,831,143.16
1,402,611.08
0.00
243,871.50
1,106,649.00
13,724,316.00
28,538,720.00

UN
M2
M2
M2
M2
M2
M2
UND
UND
UND
UN
UN
UN
ML
M2
M2
M2
UN
M2

PROPONENTE:
C.C.#

72.00
28.00
3078.00
0.00
4.89
3.18
8.66
0.90
3.00
4.00
4.00
0.00
3.00
1.00
2.00
0.00
3.00
5.60
6.00
0.40
1.00
192.00

252016
527630
86130

41921
4993
13457
73869
76204
3931

18,145,152.00
14,773,640.00
265,108,140.00
0.00
468,246.84
180,185.16
614,349.06
17,153.10
210,069.00
570,900.00
530,648.00
0.00
305,274.00
5,548.00
150,944.00
0.00
125,763.00
27,960.80
80,742.00
29,547.60
76,204.00
754,752.00

TOTAL COSTO DIRECTO


COSTOS INDIRECTOS A.I.U =

25%

95756
56662
70941
19059
70023
142725
132662
101758
5548
75472

480,258,522.30
120,064,630.58
600,323,152.88

MAT
INSUMOS

LOCALIZACIN Y REPLANTEO OBRA ARQUITECTONICA


CAMPAMENTO MT2
CIMENTACIN Y DESAGES
EXCAVACIN MANUAL Y RETIRO MATERIAL COMUN
CONCRETO CICLOPEO 17.5MPa (2500 PSI) RELACIN 60C/40P
CONCRETO PARA ZAPATAS 3000 PSI INCLUYE FORMALETA
CONCRETO VIGA DE AMARRE 3000 PSI INCLUYE FORMALETA
BASE CONCRETO POBRE E=0.05 MTS. 2000 PSI (SOLADO)
SUMINISTRO E INSTALACIN MALLA ELECTROSOLDADA
CAJA INSPECCION 80 x 80 x 80 CM [LADRILLO]
SUMINISTRO E INSTALACION TUBERIA PVC SANITARIA 2"
SUMINISTRO E INSTALACION TUBERIA PVC SANITARIA 4"
SUMINISTRO E INSTALACION TUBERIA 6" SANITARIA NOVAFORT
LOSA MACIZA CIMIENTO CONCRETO 3000 psi H=10 CM
ESTRUCTURAS
COLUMNAS EN CONCRETO 3000 PSI, ALTURA MENOR A 3 MTS.
CINTA CONFINAMIENTO MURO 20*20
COLUMNA AMARRE MURO
VIGA AEREA 3000 PSI
PLACA ENTREPISO ALIGERADO CASETN DE LONA E=0.35 MTS. 3000 PSI
ENTREPISO PLACA MACIZA 3000 PSI E=0.10 MTS
REFUERZO MALLA ELECTROSOLDADA
ESCALERAS MACIZA 21 MPa - (3000 PSI)
LOSA CONCRETO MACIZA E=10CM
ACERO ESTRUCTURAL A-36
PANTALLA EN CONCRETO 3100 PSI E=10-30CMS
PERFORACION ,5/8" 35-40CM EN ESTRUCTURA DE CONCRETO
ANCLAJE HIERRO ,5/8"-PERF. ,3/4" 10-15C EN CONCRETO
MURO CONCRETO TANQUE ELEVADO 3100PSI
TANQUE ELEVADO CONCRETO 3000 PSI
MAMPOSTERA
SOBRECIMIENTO TOLETE COMUN E=0.12 mts.INCLUYE PAETE IMP.
MURO TOLETE COMUN E=0.12 mts.
MURO PRENSADO SANTA FE E=0.25 mts.
DINTELES EN CONCRETO DE 15X20 cms. 17.5 MPa - (2500 PSI)
ALFAGIA EN CONCRETO E=0.25mts. 17.5 MPa - (2500 PSI) INC. REFUERZO
PASAMANOS EN CONCRETO 17.5 MPA (2500 PSI) INC. REFUERZO

PAETES
FILOS Y DILATACIONES EN PAETE
PAETE MALLA VENADA 1:3
PAETE MURO 1:3
PAETE MURO IMPERMEABILIZADO 1:3
PAETE BAJO PLACA1:3
INSTALACIONES HIDRULICAS Y SANITARIAS
SUMINISTRO E INSTALACIN DE ACOMETIDA 2" X 1/2" INCLUYE TUBERA PF + UAD 1/2", REGISTRO DE
TUBERIA PVC 3 VENTILACION
RED SUMINISTRO CPVC 1/2"
PUNTO AGUA CALIENTE CPVC 1/2"
SUMINISTRO, INSTALACIN Y CONEXION TANQUE ELEVADO PVC 1000 LTS
BAJANTE DE AGUA LLUVIA PVC 4"
PUNTO DESAGUES PVC 4"
RED SUMINISTRO GALVANIZADA 1/2"
CONEXIN TANQUE ELEVADO PVC
PINTURA
ESTUCO MUROS
ESTUCO Y VINILO TRES MANOS EN MUROS
VINILO SOBRE PAETE TRES MANOS EN MUROS
ESMALTE GUARDESCOBA
ESMALTE SOBRE MURO
ACRILICA TRES MANOS
KORAZA PLASTICA TRES MANOS
LETRA EN PINTURA ACRILICA A=30-50CM2
ENCHAPES
ENCHAPE CERAMICA 20X30
GRANITO LAVADO
FILOS
ENCHAPE EN PIEDRA CREMA
REMATE BOCEL PORCELANA 0.11
REJILLAS DE PISO SOSCO 5*5*4 ALUMINIO
PISOS
BASE EN MATERIAL DE AFIRMADO COMPACTADO
PLACA BASE EN CONCRETO E=0.08 2500 PSI
PISO CERAMICA 20,5*20,5 O SIMILAR
PISO GRAVILLA LAVADA DE 1/2" Y 3/4"
PISO EN GRANITO LAVADO
PASOS ESCALERA GRAVILLA LAVADA
ALISTADO PISO IMPERMEABILIZADO 4 CM
ANDEN CONCRETO 10CM 3000 PSI
CONTRAPISO CONCRETO E= 8CM 2.500PSI
SARDINEL TRAPEZOIDAL B(15-20) H=26-35CM
TABLETA GRESS 20X20
ADOQUIN CONCRETO VEHICULAR CRUZ

GUARDAESCOBA CEMENTO + PINTURA


GUARDAESCOBA TABLON
CUBIERTAS
VARILLA ROSCA.GALV.1/2" L=80-100C+TUERCA
IMPERMEABILIZACION DE PLACAS Y TERRAZAS
IMPERMEABILIZACION DE CANALES Y VIGACANALES
CANALETA 90 DE 3.75M
TEJA FIBRO CEMENTO # 3
CABALLETE TEJA BARRO NORMAL
CONECTOR H LAMINA POLICARBONATO A=8-10MM
LAMINA POLICARBONATO ALVEOLAR 8MM
CANAL RAINGO PVC AGUAS LLUVIAS
TAPA INTERNA CANAL RAINGO PVC
TAPA EXTERNA CANAL RAINGO PVC
UNION CANAL RAINGO PVC
CONSTRUCCIN DE CUBIERTA EN TEJA PANEL METLICO DE ALUZINC - ALUZINC CAL 26 TIPO SANDUCH
LAMINA ALVEOLAR 6MM FIBRA DE CARBONO
CIELO RASOS
C.F.ESQUELETO ALUMINIO ,7/8"
C.F.ICOPOR TEXTURIZADO 1CM - PVC
C.F.LAMINA BOARD 1214x605x6MM P.ALUMINIO
CIELO RASO METALICOS
C.F.PANEL YESO 12.7MM S.JUNTA+VINILO
CARPINTERA DE MAMERA
COLOC.PUERTA MADERA
PUERTA MADERA.TRIPLEX ENTAMBORADA
MARCO MAD.CEDRO PUERTA
PUERTA MADERA.MACIZA AMARIL/NOGAL
VENTANA MADERA 100% CEDRO CAQUETA
CLOSET MADERA CEDRO PERSIANA FORRADO
PASAMANOS MADERA CEDRO A=15CM E=2CM
MARCO MACHARE 80-90 H=210C
APARATOS SANITARIOS
SUMINISTRO E INSTALACION DUCHA SENCILLA L.PICIS (E)
SUMINISTRO E INSTALACION LAVAMANOS COLGAR LINEA ECONOMICA
INSTALACION APARATO SANITARIO
SUMINISTRO E INSTALACION LAVAMANOS COLGAR
SUMINISTRO E INSTALACION SANITARIO LINEA ECONOMICA
VIDRIOS Y CERRADURAS
CERRADURA SAFE ENTRADA (CILIN)
CERRADURA YALE TRES VUELTAS
TOPE PARA PUERTA
CERRADURA YALE ALCOBA REF.5304 C/P
VIDRIO ESMERILADO DE 5MM
INSTALACION ESPEJO

OBRAS EXTERIORES
LAVADA DE FACHADA EN LADRILLO A LA VISTA
TIERRA NEGRA PARA NIVELACION
CONCRETO ESTRIADO RAMPAS 2500 PSI
ASEO GENERAL PARA ENTREGA
PISO EN ADOQUIN
CENEFA EN ADOQUIN DE ARCILLA a=6cm( suministro einstalacion . No incluye material de base)

UNIDAD

M2
M2
M3
M3
M3
M3
M2
Kg
UND
ML
ML
ML
M2
M3

ML
ML
M3
M2
M2
KG
M3
M2
KG
M3
UND
PTO
M3
M3

ML
M2
M2
ML
ML
ML

PRECIO

$3,218.00
$75,079.00
$38,858.00
$242,455.00
$461,263.00
$494,560.00
$20,820.00
$3,535.00
$369,069.00
$11,471.00
$17,834.00
$23,524.00
$55,278.00
$631,902.00
$39,878.00
$40,080.00
$873,813.00
$150,068.00
$107,708.00
$3,400.00
$847,103.00
$64,880.00
$4,410.00
$581,631.00
$15,772.00
$50,202.00
$971,637.00
$1,129,261.00

$41,860.00
$46,246.00
$172,382.00
$43,983.00
$44,416.00
$56,322.00

S PARA SU

ML
ML
M2
M2
M2
UND
ML
ML
UND
UND
ML
UND
ML
UND
M2
M2
M2
ML
M2
M2
M2
UND
M2
M2
ML
M2
ML
UND
M3
M2
M2
M2
M2
ML
M2
M2
M2
ML
M2
M2

$6,602.00
$23,638.00
$20,931.00
$25,037.00
$20,239.00
$92,056.00
$19,505.00
$14,267.00
$50,630.00
$525,744.00
$36,533.00
$70,795.00
$31,610.00
$319,069.00
$6,746.00
$12,312.00
$10,891.00
$5,157.00
$8,636.00
$10,525.00
$12,983.00
$1,055.00
$38,158.00
$96,987.00
$5,313.00
$135,502.00
$10,954.00
$14,969.00
$45,180.00
$40,291.00
$44,169.00
$64,107.00
$95,708.00
$63,124.00
$30,745.00
$57,668.00
$42,918.00
$45,582.00
$48,332.00
$93,067.00

O EN PINTU

ML
ML
UND
M2
ML
M2
UND
ML
ML
M2
ML
UND
UND
UND
M2
M2
M2
M2
M2
M2
M2
UND
M2
ML
M2
M2
M2
ML
UND
UND
UND
UND
UND
JGO
UND
UND
UND
UND
M2
M2

$10,522.00
$8,854.00
$10,799.00
$37,236.00
$37,712.00
$56,757.00
$18,491.00
$13,671.00
$16,315.00
$151,137.00
$20,885.00
$6,824.00
$7,415.00
17,631
148,931
123,740
29,731
37,658
45,869
139,011
50,893
33,225
122,961
169,436
254,810
252,016
527,630
86,130
95,756
56,662
70,941
19,059
70,023
142,725
132,662
101,758
5,548
75,472
41,921
4,993

M2

13,457
73,869
76,204
3,931

ML

9,869

M2
M3
M2

EQUIPO
NOMBRE

VOLQUETA 6m3
ASPERSOR MANUAL
BOMBA DE CONCRETO
BOMBA DE INYECCIN DE LECHADA
BOMBA PARA GATO DE TENSIONAMIENTO
BULDOZER D6
BULDOZER D8 (INCLUIDO RIPPER)
CALENTADOR A GAS
CAMIN DE SLURRY
CAMIONETA D-300
CARGADOR
CARGADOR 930
CARROTANQUE AGUA
CARROTANQUE IRRIGADOR DE ASFALTO
CILINDRO NEUMTICO
COMPACTADOR BENITIN
COMPACTADOR DE LLANTA
COMPACTADOR MANUAL (RANA)
COMPACTADOR MANUAL DE RODILLO
COMPACTADOR NEUMATICO
COMPACTADOR VIBRATORIO TIPO DD-20
COMPRESOR
COMPRESOR (BARRIDO Y SOPLADO)
COMPRESOR 125 PIES 3 CON MARTILLO
COMPRESOR 250 PIES 3 CON MARTILLO
CORTADORA DE PAVIMENTO
DIFERENCIAL DE 3 TON
EQUIPO APLICADOR PARA BANDAS
EQUIPO DE CONTROL (BANDAS SONORAS REDUCE VELOCIDAD) (TERMOHIGOMETROS, TERMMETROS, GALGAS, ETC)
EQUIPO DE OXICORTE
EQUIPO DE PERFORACIN (TRACKDRILL)
EQUIPO DE RADIOGRAFIA
EQUIPO DE SAND BLASTING
EQUIPO DE SOLDADURA
EQUIPO DE SOLDADURA 250 AMP
EQUIPO DE TOPOGRAFA (ESTACION,NIVEL Y ELEMENTOS)
ESPARCIDOR DE GRAVILLA

FORMALETA MET. SARDINEL (ML)


FORMALETA METLICA (CONCRETO HIDRAULICO)
FORMALETA PARA CAMISA DE PILOTE
FRESADORA DE PAVIMENTO
FRESADORA Y RECICLADORA DE PAVIMENTO
FUNDIDORA
GATO PARA TENSIONAMIENTO
GRUA 10 TON
GUADAADORA
HERRAMIENTA MENOR (10%)
HERRAMIENTA MENOR (2%)
HERRAMIENTA MENOR (5%)
MAQUINA APLICADORA DE PINTURA
MAQUINA TRMICA PEGATACHAS
MOTOBOMBA 3 PULGADAS
MOTOBOMBA 4 PULGADAS
MOTOBOMBA 6" DIAMETRO DE BOMBEO DE 2M/SEG.
MOTONIVELADORA CAT-12-F
MOTOSIERRA
PILOTEADORA
PLANTA DE MEZCLA Y SECADO
PLANTA ELECTRICA
PLAQUETA VIBRATORIA
PLUMA CAPACIDAD 100 KG
PUENTE GRUA
QUEMADOR A GAS
REGLA VIBRATORIA
RETROCARGADOR CAT 510
RETROEXCAVADORA (PAJARITA)
RETROEXCAVADORA 320
RETROEXCAVADORA DE ORUGA
RETROEXCAVADORA E-200 CON MARTILLO NEUMATICO
RETROEXCAVADORA SOBRE LLANTAS
TERMINADORA DE ASFALTO
VEHICULO DELINEADOR
VIBRADOR A GASOLINA
VIBROCOMPATADOR DYNAPAC (10 TON)
VIBROCOMPATADOR DYNAPAC C15
VOLQUETA
MEZCLADORA
HERRAMIENTA Y EQUIPO MENOR (%M.O.)
MARTILLO NEUMATICO
VIBROCOMPACTADOR RANA
SEGUETA
ANDAMIO TUBULAR

VIBRADOR DE CONCRETO
VIBRADOR ELECTRICO
FORMALETA
FORMALETA E

CUADRILLAS
MARCA

TIPO

$ HORA

38,750.00

2,800.00

120,000.00

18,000.00

35,000.00

120,000.00

125,000.00

52,000.00

100,000.00

38,000.00

80,000.00

130,000.00

50,000.00

75,000.00

60,000.00

16,000.00

60,000.00

8,000.00

8,000.00

80,000.00

112,000.00

40,000.00

40,000.00

55,000.00

60,000.00

8,000.00

1,600.00

25,000.00

1,300.00

15,000.00

120,000.00

15,000.00

48,000.00

15,000.00

23,000.00

22,000.00

90,000.00

NOMBRE
A1
B1
C1
D1
E1

$ PAGO
99,940
214,510
138,130
176,320
214,510

300.00

6,000.00

15,000.00

120,000.00

290,000.00

195,000.00

120,000.00

140,000.00

5,000.00

1.00

1.00

1.00

15,000.00

6,000.00

6,000.00

10,000.00

12,000.00

130,000.00

5,000.00

120,000.00

195,000.00

50,000.00

45,000.00

8,000.00

8,500.00

18,000.00

6,500.00

90,000.00

80,000.00

120,000.00

120,000.00

120,000.00

90,000.00

110,000.00

95,000.00

5,000.00

65,000.00

70,000.00

50,000.00

10,000.00

18,795.00

6,000.00

6,250.00

2,500.00

6,000.00

1,666.67

40,000.00

40,000.00

10,000.00

ANALISIS DE PRECIOS UNITARIOS F-04


OBJETO:

Vivienda Unifamiliar Urbanizacin las Quintas

CAPITULO:
DESCRIPCION:

PRELIMINARES
LOCALIZACIN Y REPLANTEO OBRA ARQUITECTONICA

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramienta menor

2. MATERIALES EN OBRA
DESCRIPCION
Puntilla
Madera durmiente

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

A1

PROPONENTE

CAPITULO:
DESCRIPCION:

PRELIMINARES
CAMPAMENTO MT2

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor

MARCA

2. MATERIALES EN OBRA
DESCRIPCION
Puntilla
Madera durmiente
Porta Candado Simple
Recebo Comn
Teja Eternit #6
3. MANO DE OBRA
TRABAJADOR
Cuadrilla

A1

PROPONENTE

CAPITULO:
DESCRIPCION:

PRELIMINARES
EXCAVACIN MANUAL Y RETIRO MATERIAL COMUN

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramienta menor
VOLQUETA 6m3
CARGADOR 930

2. MATERIALES EN OBRA
DESCRIPCION

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

C1

PROPONENTE

CAPITULO:
DESCRIPCION:

CIMENTACIN Y DESAGES
CONCRETO CICLOPEO 17.5MPa (2500 PSI) RELACIN 60C/40P

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramienta menor
VIBRADOR DE CONCRETO

2. MATERIALES EN OBRA
DESCRIPCION
Puntilla
Concreto 2500 PSI
Tabla 1x15x200
Cuartn 2x4x300

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

B1

PROPONENTE

CAPITULO:
DESCRIPCION:

CIMENTACIN Y DESAGES
CONCRETO PARA ZAPATAS 3000 PSI INCLUYE FORMALETA

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
Herramienta menor
VIBRADOR DE CONCRETO

MARCA

2. MATERIALES EN OBRA
DESCRIPCION
Puntilla
Concreto 2500 PSI
Tabla 1x15x200
Cuartn 2x4x300

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

B1

PROPONENTE

CAPITULO:
DESCRIPCION:

CIMENTACIN Y DESAGES
CONCRETO VIGA DE AMARRE 3000 PSI INCLUYE FORMALETA

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramienta menor
VIBRADOR DE CONCRETO

2. MATERIALES EN OBRA
DESCRIPCION
Puntilla
Alambre Negro No18
Concreto 3000 PSI
Madera Repisa
Madera Tabla Burra
3. MANO DE OBRA
TRABAJADOR

Cuadrilla

CAPITULO:
DESCRIPCION:

B1

ESTRUCTURAS
COLUMNAS EN CONCRETO 3000 PSI, ALTURA MENOR A 3 MTS.

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

VIBRADOR DE CONCRETO
ANDAMIO TUBULAR

2. MATERIALES EN OBRA
DESCRIPCION
Puntilla
Alambre Negro No18
Concreto 3000 PSI
Madera Repisa
Madera Tabla Burra
3. MANO DE OBRA
TRABAJADOR
Cuadrilla

CAPITULO:
DESCRIPCION:

B1

ESTRUCTURAS
ENTREPISO PLACA MACIZA 3000 PSI E=0.10 MTS

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION
FORMALETA
VIBRADOR DE CONCRETO

MARCA

2. MATERIALES EN OBRA
DESCRIPCION

Concreto 3000 PSI

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

B1

CAPITULO:
DESCRIPCION:

ESTRUCTURAS
REFUERZO MALLA ELECTROSOLDADA

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
Alambre Negro No18
Malla Electrosoldada m-221 Q6

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

B1

CAPITULO:
DESCRIPCION:

ESTRUCTURAS
ESCALERAS MACIZA 21 MPa - (3000 PSI)

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
Puntilla
Alambre Negro No18
Concreto 3000 PSI
Madera Repisa
Madera Tabla Burra
3. MANO DE OBRA
TRABAJADOR
Cuadrilla

B1

CAPITULO:
DESCRIPCION:

MAMPOSTERA
MURO PRENSADO SANTA FE E=0.25 mts.

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
Mortero 1:3

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

E1

CAPITULO:
DESCRIPCION:

PAETES
PAETE MURO 1:3

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
Cementro Gris
Arena de Pea
Agua

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

B1

CAPITULO:
DESCRIPCION:

PAETES
FILOS Y DILATACIONES EN PAETE

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
Mortero 1:3
Agua

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

B1

CAPITULO:
DESCRIPCION:

INSTALACIONES HIDRULICAS Y SANITARIAS


RED SUMINISTRO CPVC 1/2"

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
ADAPTADOR MACHO CPVC 1/2"
CODO 45 CPVC 1/2"
CODO 90 CPVC 1/2"
CINTA TEFLON 10 m 1/2``
LIMPIADOR 1/4 PVC
SOLDADURA LIQUIDA PVC 1/4``

TAPON SOLDADO CPVC 1/2"


TUBO CPVC 1/2" A.C. 82C 100 PSI

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

D1

CAPITULO:
DESCRIPCION:

INSTALACIONES HIDRULICAS Y SANITARIAS


SUMINISTRO, INSTALACIN Y CONEXION TANQUE ELEVADO PVC 1000 LTS

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
ADAPTADOR MACHO CPVC 1/2"
CODO 45 CPVC 1/2"
CODO 90 CPVC 1/2"
CINTA TEFLON 10 m 1/2``
LIMPIADOR 1/4 PVC
SOLDADURA LIQUIDA PVC 1/4``

TAPON SOLDADO CPVC 1/2"


TUBO CPVC 1/2" A.C. 82C 100 PSI

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

D1

CAPITULO:

INSTALACIONES HIDRULICAS Y SANITARIAS

DESCRIPCION:

RED SUMINISTRO GALVANIZADA 1/2"

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
ADAPTADOR MACHO CPVC 1/2"
CODO 45 CPVC 1/2"
CODO 90 CPVC 1/2"
CINTA TEFLON 10 m 1/2``
LIMPIADOR 1/4 PVC
SOLDADURA LIQUIDA PVC 1/4``

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

D1

CAPITULO:
DESCRIPCION:

INSTALACIONES HIDRULICAS Y SANITARIAS


CAJA DE INSPECCIN 0,6X0,6

1. EQUIPO Y HERRAMIENTAS
DESCRIPCION

MARCA

Herramiento menor
0

2. MATERIALES EN OBRA
DESCRIPCION
ACERO 60000 PSI
LADRILLO TOLETE COMUN
RECEBO COMUN
MARCO Y TAPA 1,0*1,0
BASE EN CONCRETO POBRE E=0.05 mts. 14 MPa - (2000 PSI)
MORTERO 1:3

3. MANO DE OBRA
TRABAJADOR
Cuadrilla

D1

UNITARIOS F-04

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

Lb

0.40

3,550.00

1,420.00

ML

0.02

1,350.00

27.00

M2

300.00

0.00
0.00
0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

99,940.00

150.00

666.27
SUBTOTAL

1,447.00

666.27

2,413

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

SUBTOTAL

UNIDAD

300.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

Lb

5.00

3,550.00

17,750.00

ML

20.00

1,350.00

27,000.00

UNIDAD

3.00

3500.00

10,500.00

M3

3.15

25000.00

78,750.00

UNIDAD

18.00

20000.00

360,000.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

99,940.00

0.85

117,576.47
SUBTOTAL

494,000.00

117,576.47

611,876

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

15,000.00

4.00

3,750.00

38,750.00

4.00

9,687.50

130,000.00

4.00

32,500.00

M3

4.00
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

45,937.50

V\PARCIAL
0.00
0.00
0.00
0.00
0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

138,130.00

32.00

4,316.56
SUBTOTAL

0.00

4,316.56

50,254

TOTAL COSTOS DIRECTOS

ACIN 60C/40P
UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

15,000.00

4.00

3,750.00

1,666.67

0.94

1,773.05

M3

0.00
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

5,523.05

V\PARCIAL

Lb

0.30

3,550.00

1,065.00

M3

1.20

285,650.00

342,780.00

UNIDAD

0.22

9050.00

1,991.00

ML

0.15

3000.00

450.00
0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

7.50

28,601.33
SUBTOTAL

346,286.00

28,601.33

380,410

TOTAL COSTOS DIRECTOS

FORMALETA
UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

15,000.00

4.00

3,750.00

1,666.67

0.94

1,773.05

M3

0.00
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

Lb

0.30

3,550.00

1,065.00

M3

1.20

285,650.00

342,780.00

UNIDAD

0.22

9050.00

1,991.00

ML

0.15

3000.00

450.00

5,523.05

0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

7.50

28,601.33
SUBTOTAL

346,286.00

28,601.33

380,410

TOTAL COSTOS DIRECTOS

E FORMALETA
UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

15,000.00

4.00

3,750.00

1,666.67

0.25

6,666.68

M3

0.00
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

Lb

0.30

3,550.00

1,065.00

Kg

2.30

3,800.00

8,740.00

M3

1.05

315850.00

331,642.50

ML

3.52

4000.00

14,080.00

ML

3.21

4500.00

14,445.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

10,416.68

V\UNITARIO

369,972.50

214,510.00

2.00

107,255.00
SUBTOTAL

107,255.00

487,644

TOTAL COSTOS DIRECTOS

MENOR A 3 MTS.
UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

1,666.67

4.00

416.67

6,000.00

1.38

4,347.83

M3

0.00
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

Lb

0.30

3,550.00

1,065.00

Kg

2.30

3,800.00

8,740.00

M3

1.05

315850.00

331,642.50

ML

3.52

4000.00

14,080.00

ML

3.21

4500.00

14,445.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

11.00

19,500.91
SUBTOTAL

369,972.50

19,500.91

394,238

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

4,764.50

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

40,000.00

4.00

10,000.00

1,666.67

0.75

2,222.23

M3

0.00
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

12,222.23

V\PARCIAL
0.00
0.00

M3

0.15

315850.00

47,377.50
0.00
0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

6.00

35,751.67
SUBTOTAL

47,377.50

35,751.67

95,351

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

20.00

M3

20.00
20.00
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

Kg

0.05

3,800.00

190.00

Kg

1.05

3,000.00

3,150.00

300.00

0.00
0.00
0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

160.00

1,340.69
SUBTOTAL

3,340.00

1,340.69

4,981

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

1.00

M3

1.00
1.00
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

Lb

1.70

315,850.00

536,945.00

Kg

0.12

3,800.00

456.00

M3

1.05

315850.00

331,642.50

ML

2.85

4000.00

11,400.00

ML

9.15

4500.00

41,175.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

8.00

26,813.75
SUBTOTAL

300.00

921,618.50

26,813.75

948,732

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

1.00
1.00
1.00

ML

SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

M3

0.08

315,850.00

25,268.00

300.00

0.00
0.00
0.00
0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

8.00

26,813.75
SUBTOTAL

25,268.00

26,813.75

52,382

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

2.50

ML

2.50
2.50
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

Kg

7.10

650.00

4,615.00

M3

0.05

31,000.00

1,550.00

LT

5.00

150.00

750.00

300.00

0.00
0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

20.00

10,725.50
SUBTOTAL

6,915.00

10,725.50

17,941

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

12.50

ML

12.50
12.50
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

M3

0.03

315,850.00

9,475.50

LT

1.20

40.00

48.00

300.00

0.00
0.00
0.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

214,510.00

100.00

2,145.10
SUBTOTAL

9,523.50

2,145.10

11,969

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

0.75

UNIDAD

0.75
0.75
SUBTOTAL

300.00

UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

UN

3.20

1200.00

3,840.00

UN

3.10

1000.00

3,100.00

UN

3.00

1000.00

3,000.00

RL

1.20

850.00

1,020.00

GLN

0.05

16000.00

800.00

GLN

0.05

30000.00

1,500.00

UN

2.95

1000.00

2,950.00

ML

3.78

4500.00

17,010.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

176,320.00

6.00

29,386.67
SUBTOTAL

11,760.00

29,386.67

41,447

TOTAL COSTOS DIRECTOS

QUE ELEVADO PVC 1000 LTS


UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

0.50

UNIDAD

0.50
0.50
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

UN

3.20

1200.00

3,840.00

UN

4.00

1000.00

4,000.00

UN

2.36

1000.00

2,360.00

RL

4.25

850.00

3,612.50

GLN

4.32

16000.00

69,120.00

GLN

0.06

30000.00

1,800.00

UN

3.86

1000.00

3,860.00

ML

4.50

4500.00

20,250.00

300.00

SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

176,320.00

4.00

44,080.00
SUBTOTAL

82,932.50

44,080.00

127,313

TOTAL COSTOS DIRECTOS

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

0.25

UNIDAD

0.25
0.25
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

UN

4.20

1200.00

5,040.00

UN

3.50

1000.00

3,500.00

UN

4.00

1000.00

4,000.00

RL

2.20

850.00

1,870.00

GLN

0.07

16000.00

1,120.00

GLN

0.07

30000.00

2,100.00
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

176,320.00

2.00

88,160.00

300.00

15,530.00

SUBTOTAL
TOTAL COSTOS DIRECTOS

88,160.00

103,990

UNIDAD :
TIPO

TARIFA\HORA

RENDIMIENTO

V\PARCIAL

Global

300.00

1.00

300.00

0.00

0.25

UNIDAD

0.25
0.25
SUBTOTAL
UNIDAD

CANTIDAD

PRECIO UNITARIO

V\PARCIAL

KG

6.83

3000.00

20,490.00

UN

244.00

320.00

78,080.00

M3

0.20

25000.00

5,000.00

UN

1.00

215000.00

215,000.00

M2

0.18

20000.00

3,600.00

M3

0.15

320850.00

48,127.50
SUBTOTAL

TIPO

JORNAL TOT

RENDIMIENTO

V\UNITARIO

176,320.00

2.00

88,160.00

300.00

322,170.00

SUBTOTAL
TOTAL COSTOS DIRECTOS

88,160.00

410,630

CALCULO DE CUADRILLAS

F0-05

OBJETO:
OFICIAL
AYUDANTE

VALOR DIA
32,500.00
20,100.00

F.P.S = 90%

OFICIAL
A1
B1
C1
D1
E1

CUADRILLA
Preliminares
Concreto
Maquinaria
Hidrulica y Elctrica
Mampostera

ELABORO- CALCULO : __________________

CANT
1
1
1
1
1

$
$
$
$
$

V/DIA
32,500.00
32,500.00
32,500.00
32,500.00
32,500.00

AYUDANTE
CANT
V/DIA
1
$
20,100.00
4
$
20,100.00
2
$
20,100.00
3
$
20,100.00
4
$
20,100.00

$
$
$
$
$

SUBTOTAL
52,600.00
112,900.00
72,700.00
92,800.00
112,900.00

05

F.P.S
$
$
$
$
$

47,340.00
101,610.00
65,430.00
83,520.00
101,610.00

FECHA: ______________

$
$
$
$
$

JORNAL TOTAL
99,940.00
214,510.00
138,130.00
176,320.00
214,510.00

OBRA:
ZACION:
ICIPIO:
CULO :
FECHA:

ITEM

1
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3
3.1

3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5
5.1
5.2
5.3
5.4

5.5
5.6
5.7
5.8
5.9
6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
7
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
8
8.1
8.2
8.3
8.4
8.5

8.6
8.7
8.8
8.9
9
9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
10
10.1
10.2
10.3
10.4
10.5
10.6
10.7

10.8
10.9
11
11.1
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.9
12
12.1
12.2
12.3
12.4
12.5
12.6
12.7
12.8
12.9
13
13.1
13.2
13.3
13.4
13.5
13.6
13.7
13.8
13.9

14
14.1
14.2
14.3
14.4

PROYECTO VIVIENDA UNIFAMILIAR URBANIZACIN LAS UINTAS


CARRERA 4 N 45A- 11
TUNJA
ING. NELSON ARBELAEZ CARVAJAL & ING. JUAN CAMILO CASTRO
20-Apr-16

DESCRIPCION

LOCALIZACIN Y REPLANTEO OBRA ARQUITECTONICA


CAMPAMENTO MT2
CIMENTACIN Y DESAGES
EXCAVACIN MANUAL Y RETIRO MATERIAL COMUN
CONCRETO CICLOPEO 17.5MPa (2500 PSI) RELACIN 60C/40P
CONCRETO PARA ZAPATAS 3000 PSI INCLUYE FORMALETA
CONCRETO VIGA DE AMARRE 3000 PSI INCLUYE FORMALETA
BASE CONCRETO POBRE E=0.05 MTS. 2000 PSI (SOLADO)
SUMINISTRO E INSTALACIN MALLA ELECTROSOLDADA
CAJA INSPECCION 80 x 80 x 80 CM [LADRILLO]
SUMINISTRO E INSTALACION TUBERIA PVC SANITARIA 2"
SUMINISTRO E INSTALACION TUBERIA PVC SANITARIA 4"
SUMINISTRO E INSTALACION TUBERIA 6" SANITARIA NOVAFORT
LOSA MACIZA CIMIENTO CONCRETO 3000 psi H=10 CM
ESTRUCTURAS
COLUMNAS EN CONCRETO 3000 PSI, ALTURA MENOR A 3 MTS.
CINTA CONFINAMIENTO MURO 20*20
COLUMNA AMARRE MURO
VIGA AEREA 3000 PSI
PLACA ENTREPISO ALIGERADO CASETN DE LONA E=0.35 MTS. 3000 PSI
ENTREPISO PLACA MACIZA 3000 PSI E=0.10 MTS

REFUERZO MALLA ELECTROSOLDADA


ESCALERAS MACIZA 21 MPa - (3000 PSI)
LOSA CONCRETO MACIZA E=10CM
ACERO ESTRUCTURAL A-36
PANTALLA EN CONCRETO 3100 PSI E=10-30CMS
PERFORACION ,5/8" 35-40CM EN ESTRUCTURA DE CONCRETO
ANCLAJE HIERRO ,5/8"-PERF. ,3/4" 10-15C EN CONCRETO
MURO CONCRETO TANQUE ELEVADO 3100PSI
TANQUE ELEVADO CONCRETO 3000 PSI
MAMPOSTERA
SOBRECIMIENTO TOLETE COMUN E=0.12 mts.INCLUYE PAETE IMP.
MURO TOLETE COMUN E=0.12 mts.
MURO PRENSADO SANTA FE E=0.25 mts.
DINTELES EN CONCRETO DE 15X20 cms. 17.5 MPa - (2500 PSI)
ALFAGIA EN CONCRETO E=0.25mts. 17.5 MPa - (2500 PSI) INC. REFUERZO
PASAMANOS EN CONCRETO 17.5 MPA (2500 PSI) INC. REFUERZO
PAETES
FILOS Y DILATACIONES EN PAETE
PAETE MALLA VENADA 1:3
PAETE MURO 1:3
PAETE MURO IMPERMEABILIZADO 1:3
PAETE BAJO PLACA1:3
INSTALACIONES HIDRULICAS Y SANITARIAS
SUMINISTRO E INSTALACIN DE ACOMETIDA 2" X 1/2" INCLUYE TUBERA PF + UAD 1/2", REGISTRO DE CORTE, COLLAR
DERIVACIN Y ACCESORIOS COMPLEMENTARIOS PARA SU CONEXIN.
TUBERIA PVC 3 VENTILACION
RED SUMINISTRO CPVC 1/2"
PUNTO AGUA CALIENTE CPVC 1/2"
SUMINISTRO, INSTALACIN Y CONEXION TANQUE ELEVADO PVC 1000 LTS
BAJANTE DE AGUA LLUVIA PVC 4"
PUNTO DESAGUES PVC 4"
RED SUMINISTRO GALVANIZADA 1/2"
CONEXIN TANQUE ELEVADO PVC
PINTURA
ESTUCO MUROS
ESTUCO Y VINILO TRES MANOS EN MUROS
VINILO SOBRE PAETE TRES MANOS EN MUROS
ESMALTE GUARDESCOBA
ESMALTE SOBRE MURO
ACRILICA TRES MANOS
KORAZA PLASTICA TRES MANOS
LETRA EN PINTURA ACRILICA A=30-50CM2
ENCHAPES
ENCHAPE CERAMICA 20X30
GRANITO LAVADO
FILOS
ENCHAPE EN PIEDRA CREMA
REMATE BOCEL PORCELANA 0.11
REJILLAS DE PISO SOSCO 5*5*4 ALUMINIO
PISOS
BASE EN MATERIAL DE AFIRMADO COMPACTADO
PLACA BASE EN CONCRETO E=0.08 2500 PSI
PISO CERAMICA 20,5*20,5 O SIMILAR
PISO GRAVILLA LAVADA DE 1/2" Y 3/4"
PISO EN GRANITO LAVADO

PASOS ESCALERA GRAVILLA LAVADA


ALISTADO PISO IMPERMEABILIZADO 4 CM
ANDEN CONCRETO 10CM 3000 PSI
CONTRAPISO CONCRETO E= 8CM 2.500PSI
SARDINEL TRAPEZOIDAL B(15-20) H=26-35CM
TABLETA GRESS 20X20
ADOQUIN CONCRETO VEHICULAR CRUZ
GUARDAESCOBA CEMENTO + PINTURA
GUARDAESCOBA TABLON
CUBIERTAS
VARILLA ROSCA.GALV.1/2" L=80-100C+TUERCA
IMPERMEABILIZACION DE PLACAS Y TERRAZAS
IMPERMEABILIZACION DE CANALES Y VIGACANALES
CANALETA 90 DE 3.75M
TEJA FIBRO CEMENTO # 3
CABALLETE TEJA BARRO NORMAL
CONECTOR H LAMINA POLICARBONATO A=8-10MM
LAMINA POLICARBONATO ALVEOLAR 8MM
CANAL RAINGO PVC AGUAS LLUVIAS
TAPA INTERNA CANAL RAINGO PVC
TAPA EXTERNA CANAL RAINGO PVC
UNION CANAL RAINGO PVC
CONSTRUCCIN DE CUBIERTA EN TEJA PANEL METLICO DE ALUZINC - ALUZINC CAL 26 TIPO SANDUCHE, CON
POLIURETANO EXPANDIDO DE ALTA DENSIDAD, ACABADO EN PINTURA POLIESTER HORNEADA EN AMBAS CARAS. ESPESOR
DE 2``
LAMINA ALVEOLAR 6MM FIBRA DE CARBONO
CIELO RASOS
C.F.ESQUELETO ALUMINIO ,7/8"
C.F.ICOPOR TEXTURIZADO 1CM - PVC
C.F.LAMINA BOARD 1214x605x6MM P.ALUMINIO
CIELO RASO METALICOS
C.F.PANEL YESO 12.7MM S.JUNTA+VINILO
CARPINTERA DE MAMERA
COLOC.PUERTA MADERA
PUERTA MADERA.TRIPLEX ENTAMBORADA
MARCO MAD.CEDRO PUERTA
PUERTA MADERA.MACIZA AMARIL/NOGAL
VENTANA MADERA 100% CEDRO CAQUETA
CLOSET MADERA CEDRO PERSIANA FORRADO
PASAMANOS MADERA CEDRO A=15CM E=2CM
MARCO MACHARE 80-90 H=210C
APARATOS SANITARIOS
SUMINISTRO E INSTALACION DUCHA SENCILLA L.PICIS (E)
SUMINISTRO E INSTALACION LAVAMANOS COLGAR LINEA ECONOMICA
INSTALACION APARATO SANITARIO
SUMINISTRO E INSTALACION LAVAMANOS COLGAR
SUMINISTRO E INSTALACION SANITARIO LINEA ECONOMICA
VIDRIOS Y CERRADURAS
CERRADURA SAFE ENTRADA (CILIN)
CERRADURA YALE TRES VUELTAS
TOPE PARA PUERTA
CERRADURA YALE ALCOBA REF.5304 C/P
VIDRIO ESMERILADO DE 5MM
INSTALACION ESPEJO
OBRAS EXTERIORES
LAVADA DE FACHADA EN LADRILLO A LA VISTA

TIERRA NEGRA PARA NIVELACION


CONCRETO ESTRIADO RAMPAS 2500 PSI
ASEO GENERAL PARA ENTREGA
PISO EN ADOQUIN
CENEFA EN ADOQUIN DE ARCILLA a=6cm( suministro einstalacion . No incluye material de base)

CALCULO DURACION ACTIVIDADES

UND.

CANTIDAD

RENDIM DIA

# CUADRILLAS A
UTILIZAR

DURACION TOTAL
DIAS

F-06

DURACION TOTAL
(APROX)

M2

1.00

0.6

0.83

M2

0.25

0.25

0.33

M3

28.80

10

0.72

45.00

30

0.75

0.00

20

0.00

0.00

18

0.00

M3

4.43

30

0.15

M3

6.24

30

0.05

M3

4.16

10

0.14

M3

2.92

0.18

M3

4.43

4.43

M3

11.01

80

0.05

UND

5.00

30

0.08

UND

1.00

40

0.01

16.71

40

0.21

18.91

10.00

0.56

UND

5.00

0.16

UND

2.00

50

0.02

UND

3.00

0.38

UND

1.00

0.06

3.1516666667

M3
M3
M3
M3
M3
M3
M3
ML
ML
M3
M2
ML

0.00
150.36
0.00
0.00
3.76
10.58
1.08
29.46
16.88
0.63
1.14
2.36
1.02
242.38
1.68
7.30

8
30
1
1
1
30
30
30
30
30
30
30
30
15
12
25

ML
ML
ML
M2
M2
M2

5.50
1.26
8.25
5.23
13.29
1.74

15
25
25
2
5
5

1
1
1
1
2
3
2
1
3
2
1
2
2
2
3
2
1
3
2
1
1
2
2

UND
UND
UND

2.00
151.68
76.65
36.82
7.78
2.00
7.78
2.23
3.21

5
5
5
150
0.5
0.5
0.5
10
8

UND
UND
UND
UND
UND
UND
UND
UND

6.32
1.32
4.23
2.00
3.00
5.00
4.00
5.00

UN
UN
UN
UN
UN
UN
UN
ML
UN
ML
ML

KG

M2
M2
M2
M2

0.00
5.01
0.00
0.00
1.88
0.12
0.02
0.98
0.19
0.01
0.04

0
6
0
0
2
1
1
1
1
1
1

0.0393333333

0.02
8.08
0.05
0.15

1
9
1
1

0.12
0.03
0.33
2.62
1.33
0.17

1
1
1
3
2
1

3
3
2
1
2
2
3
3
2

0.13
10.11
7.67
0.25
7.78

1
11
8
1
8

5.19
0.07
0.20

6
1
1

10
6
8
8
5
5
20
20

1
2
3
1
2
3
3
2

0.63
0.11
0.18
0.25
0.30
0.33
0.07
0.13

1
1
1
1
1
1
1
1

1.00
31.00
24.00
1.00
1.00
1.00

12
8
10
10
10
5

1
2
2
3
2
1

0.08
1.94
1.20

1
2
2

1.00
0.00
2.00
2.00
2.00

3
10
1
20
20

2
3
2
1
2

0.0333333333

0.05
0.20

1
1

0.17
0.00
1.00
0.10
0.05

1
0
1
1
1

M3
M3
M2
M2
M2
M2
M2
M2
M2
UN
M2
M2
ML
M2
UND
M2
M2
M3
M2
M2
M2
M2

125.24
98.57
29.26
41.80
35.32
45.21
12.32
76.64
13.29
1.00
2.00
74.39
7.08
36.82
4.00
3.65
4.52
10.20
1.70
0.22
2.00
2.00

20
15
15
15
10
12
10
10
50
12
4
3
50
50
50
50
50
6
6
1
1
1

1
2
3
2
1
3
1
2
2
1
2
1
2
2
3
3
2
1
2
3
2
2

0.08
0.25
24.80
0.07
0.37
0.03
0.02
0.05
1.70
0.14
0.07
1.00
1.00

1
1
25
1
1
1
1
1
2
1
1
1
1

M2
M2

5.06
6.36

1
2

3
3

1.69
1.06

2
2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
UN
ML
ML
ML
UN
M2
M2
M2
M2
M2
M2
M2
UND
UND
UND
UND
M2

78.00
1.05
105.00
12.58
32.25
29.26
7.41
27.56
27.56
15.25
14.23
7.34
9.00
81.00
112.00
72.00
28.00
12.00
2.40
4.50
4.89
3.18
8.66
0.90
0.80
0.78
0.65
0.90
2.20

20
20
20
6
6
8
8
8
8
6
6
20
24
20
16
16
4
5
1
1
1
3
3
3
3
3
1
2
1

2
1
2
2
1
1
2
3
2
1
4
1
2
3
2
1
2
1
2
2
2
1
3
3
1
2
3
2
1

6.26
3.29
0.65
1.39
3.53
1.26
1.23
3.83

7
4
1
2
4
2
2
4

0.1329

1.95

0.05
2.63
1.05
5.38
3.66
0.46
1.15
1.72
2.54
0.59
0.37
0.19
1.35
3.50
4.50
3.50

1
3
2
6
4
1
2
2
3
1
1
1
2
4
5
4

2.4

1.20
2.25
2.45
1.06
0.96
0.10
0.27
0.13
0.22
0.23
2.20

2
3
3
2
1
1
1
1
1
1
3

UN
UN
UN
UN
UN

3.00
1.00
2.00
2.00
2.00

1
1
50
30
20

1
2
2
3
3

3.00
0.50
0.02
0.02
0.03

3
1
1
1
1