J. ASTM E 96/E 96M - Standard Test Methods for Water Vapor Transmission of Materials;
2005.
K. ASTM E 136 - Standard Test Method for Behavior of Materials in a Vertical Tube
Furnace At 750 Degrees C; 2009b.
L. NFPA 255 - Standard Method of Test of Surface Burning Characteristics of Building
Materials; National Fire Protection Association; 2006.
M. UL 723 - Standard for Test for Surface Burning Characteristics of Building Materials;
Underwriters Laboratories Inc.; Current Edition, Including All Revisions.
1.04 SUBMITTALS
A. See Section 01300 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data on product characteristics, performance criteria, and product
limitations.
C. Manufacturer's Installation Instructions: Include information on special environmental
conditions required for installation and installation techniques.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
1.05 FIELD CONDITIONS
A. Do not install insulation adhesives when temperature or weather conditions are
detrimental to successful installation.
PART 2 PRODUCTS
2.01 APPLICATIONS
A. Insulation over waterproof membranes: Extruded polystyrene rigid foam board.
DBI DESIGN PTY LTD
Page 2 of 8
1.
2.
Install under roof cladding and in roof space where shown on the detail drawings.
Install on interior wall and slab soffit surfaces, external walls and slabs where shown
on the detail drawings and as herein specified.
Page 3 of 8
3.
D. Acoustic insulation in steel stud partitions and partition above operable walls:
1. Thickness: 75mm.
2. Density: 80 kg/cu.m.
E. Enclosures around hydraulic services in ceiling spaces:
1. Thickness: 50mm.
2. Density: 80 kg/cu.m.
F. Acoustic lagging to hydraulic pipes:
1. As specified in Section 15100 Hydraulic Services.
2.04 ACCESSORIES
A. Sheet Vapor Retarder: Specified in Section 07260.
B. Tape: Bright aluminum self-adhering type, mesh reinforced, 50 mm wide.
C. Insulation Fasteners: Impaling clip of nylon with washer retainer, to be mechanically
fastened to surface to receive insulation, length to suit insulation thickness and
substrate, capable of securely and rigidly fastening insulation in place.
D. Wire Mesh: Galvanized steel, hexagonal wire mesh.
E. Adhesive: Type recommended by insulation manufacturer for application.
2.05 ESTIDAMA PBRS REQUIREMENT RE-R1: MINIMUM ENERGY PERFORMANCE
& RE-1: IMPROVED ENERGY PERFORMANCE:
A. General
1. The U-values have been calculated during design stage using Area Weightage
Method, it is the CONTRACTOR responsibility to re-calculate the U-value for all
building fabric elements based on the approved shop drawing, and ensure the
project meets the values specified herein.
2. The CONTRACTOR must show compliance to the stated U-Values prior to the
procurement of the envelope components, through the provision of test certificates,
updated calculations and drawings.
3. The CONTRACTOR must provide test certificates to show compliance with the
below thermal conductivity & U-value
4. The COTRACTOR shall update the drawings and calculation as per his shop
drawings & method of construction.
B. Roof Construction
1. The roof assembly consists of one type of construction only and therefore the Uvalue of the same is calculated as follows, the CONTRATOR is strictly required to
comply with the U-value stated:
Page 4 of 8
Layer Description
Thick.
Thermal
R- Value U- Value
Conductivity
W/(MK)
M2.K/W
Roofing material
0.025
1.1
0.023
Sand or Aggregate
0.025
1.6
0.016
Extruded Polystyrene
0.150
0.03
5.000
Waterproofing
Membrane
0.004
1.9
0.002
0.050
0.3
0.167
Concrete Slab
0.300
1.9
0.158
Plaster (Dense)
0.015
0.72
0.021
Total:
5.386
W/M2.K
0.186
0.200
0.015
0.075
Page 5 of 8
1.150
0.720
0.174
0.021
2.195
7696.9 SQM
0.038
2.000
0.456
78.51%
Layer Description
Thickness
M
Thermal
R- Value
Conductivity
W/(MK)
(M2.K)/W
0.200
1.900
0.015
0.720
0.075
0.200
0.015
Element
U- Value
W/(M2.K)
0.105
0.021
2.126
581.9 SQM
0.038
2.000
1.150
0.174
0.720
0.021
2.195
0.470
5.94%
0.456
0.468 W/(M2.K)
A. Glazed Construction
The project includes different types of Glass as per the annexed drawings; The
Contractor shall comply with the following Glass Characteristics:
1. GL1 Glazing System:
a. External Vertical Glazing U-Value: 1.9 W/m2K (Including frame)
b. External Vertical Glazing SHGC: 0.22
2. GL2 Glazing System:
a. External Vertical Glazing U-Value: 5 W/m2K (Including frame)
b. External Vertical Glazing SHGC: 0.3
3. GL3 & GL4Glazing System:
a. External Vertical Glazing U-Value: 2.7 W/m2K (Including frame)
b. External Vertical Glazing SHGC: 0.3
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that substrate, adjacent materials, and insulation materials are dry and that
substrates are ready to receive insulation and adhesive.
B. Verify substrate surfaces are flat, free of honeycomb, fins, irregularities, or materials or
substances that may impede adhesive bond.
3.02 INSULATION BOARD OVER WATERPROOF MEMBRANES
A. Refer to the detail drawings for extent of installation.
B. Lay insulation boards directly over waterproof membranes, do not use adhesives. Butt
edges and ends tightly to adjacent boards and to penetrations.
DBI DESIGN PTY LTD
Page 6 of 8
C. Expansion and construction joints: Stop boards on each side of joints, do not continue
boards across joints in base materials.
D. Prevent insulation from being displaced or damaged before laying geotextile fabric and
paving over.
Coordinate work of this section with construction of air barrier seal specified in Section
07260.
Page 7 of 8
3.04 PROTECTION
A. Do not permit installed insulation to be damaged prior to its concealment.
END OF SECTION