Вы находитесь на странице: 1из 6

TARAPUR#6 WELL

Flowing Pressure Gradient Plot


PRESSURE (psi)

600
0

700

800

900

1000

1100

1200

1300

1400

1500

1000
f(x) = 7.48x - 4935.26
R = 1
2000

3000

f(x) = 6.45x - 3881.83


R = 1

4000

5000

6000

DEPT
H (ft)

f(x) = 4.81x - 1676.15


R = 1

Results Based on Flowing Pressure Gradient Plot:


DEPTH
(M)
400-800

SLOPE
Ft/psi
7.4753

FLOWING PG
Psi/ft
0.1337

800-1500

6.4486

0.1550

1500-1604

4.8132

0.2077

FLUID

Type of Flow

Very Light
Oil with
gas
Very Light
Oil with
gas
Very Light
Oil

Churn /Slug
Flow

Flowing Temperature Gradient Plot

Churn /Slug
Flow
Bubble Flow

Temperature gradient
30
0
1000

40

50

60

70

80

90

100

110

f(x) = 61.85x - 1818.39


R = 1

2000
3000
4000
5000
6000

Results Based on Temperature Gradient Plot:


Depth

slope

TG

ft/Deg C

Deg C/ft

0-1604

61.845

0.0161

POOH FLOWING GRADIENT SURVEY

120

S.No
.

Depth
(m)

Reached Time (Hrs)

Left Time (Hrs)

1604

10:03

10:23

1600

10:23

10:26

1550

10:28

10:31

1500

10:32

10:35

1450

10:36

10:39

1400

10:40

10:43

1350

10:44

10:47

1300

10:48

10:51

1250

10:53

10:56

10

1200

10:57

11:00

11

1150

11:01

11:04

12

1100

11:05

11:08

13

1050

11:09

11:12

14

1000

11:13

11:16

15

900

11:18

11:21

16

800

11:23

11:26

17

700

11:28

11:31

18

600

11:33

11:36

19

500

11:38

11:41

20

400

11:43

11:46

21

300

11:48

11:51

22

200

11:53

11:56

23

100

11:58

12:01

24

12:04

12:07

Pressure
Average

Temperature
Average

Depth(Feet)

1439.16

113.99

5261.12

1439.04

113.92

5248

1407.58

112.5

5084

1369.05

110.52

4920

1340.96

107.78

4756

1315.2

105.25

4592

1291.48

101.97

4428

1261.26

98.72

4264

1230.96

95.11

4100

1207.01

92.57

3936

1185.3

89.89

3772

1160.61

87.10

3608

1134.21

84.63

3444

1112.02

82.03

3280

1067.13

76.81

2952

1009.8

69.92

2624

965.16

63.9

2296

927.2

58.65

1968

883.35

53.83

1640

831.88

49.24

1312

780.64

44.54

984

748.09

40.75

656

722.74

37.83

328

686.37

34.03

APPENDIX:Operation Summary

S.No

Description

From

To

Reporting @ wellsite

HSE & TBT

07:50 hrs

08:00 hrs

Rig up

08:00 hrs

08:40 hrs

Dummy run

08:40 hrs

09:20 hrs

RIH of EMG

09:30 hrs(27/6/16)

Bottom reach time of EMG

10:03 hrs(27/6/16)

EMG parked @ bottom

10

POOH of EMG with FGS

10:23 hrs(27/6/16)

11

Surface reach of EMG

12:07 hrs(27/6/16)

12

Rig down

12:45 hrs(27/6/16)

13

ILM to well Ta#6A6

13:00 hrs(27/6/16)

BHP Plot:

07:50 hrs(27/6/16)

20 min