OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP

OKPAI IPP

Written: Eng ALAAMAKKI


ANTONY STRATTON

NTD/OKPP/OM/OP001

Checked by : DANNY ROBINSON

Rev.
Approved by :JOHN BENNETT

: 0

Page 1 of 14

Ref:
ALSTOM Gas Turbine Document No.:HTCT678821
Revisions:
Rev.: 0

FEB 2008

Introduction
This procedure includes;

LU
SRC
SU
SP
DT
PA

General
Line up
START RELEASE CRITERIA
Start up
GT SET POINT
GT DIRECT TRIP
POWER AUGMENTATION

1
GT STARTUP

OPERATING PROCEDURE

GT13E2 Cold STARTUP

OKPAI IPP
NTD/OKPP/OM/OP001

Date : 15 FEB 2008

Written: Eng ALAAMAKKI


ANTONY STRATTON

Checked by : DANNY ROBINSON

Rev.
Approved by :JOHN BENNETT

: 0

Page 2 of 14

GENERAL
The GT13E2 is a 50 Hz single shaft gas turbine for application in simple cycle and combined cycle plants. The gas turbine is designed to operate within
the ambient temperature range of 20C to +45C. Below the minimum temperature and for special operating modes the GT can be limited by the
maximum GT power (Maximum generator output). Ambient pressure and humidity is not limited.
A distinction is made between cold and warm starts to protect the components in the hot gas path. The ignition and acceleration fuel flow to idle is
controlled depending on the gas turbine temperature. TAT is used to indicate the temperature of the structure. A hot gas turbine requires less fuel flow for
the same acceleration rate because of remaining heat in the hot section. The heat flow into the structure is lower. Also tip clearances are reduced resulting
in improved efficiency. Tip clearances are smaller at warm start conditions because the casing shrinks faster than the rotor during cool down.

If an intended start up of the GT fails, the start up failure shall be analyzed. To support this analysis, consult the alarm and sequence of event display as well as the trends
on the operator station. Before any re-start is attempted, the failure of the previous start should be understood and corrected by appropriate measures. Log events and
actions taken in an operator logbook and save relevant data and records for later use and reference.

2
GT STARTUP

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

Rev. : 0
Page: 3 / 13

OK

Remarks

WEAR PPE
Local Checkup &Line UP
CLOSE
CLOSE

ENCLOSURE DOOR
ALL PERMITS TO WORK
ALL ELECTRICAL JUNCTION

OK

Air conditioning

OK

Gas flow computer


Flame monitoring rack
Pulsation monitoring rack
ODC OPERATING DATA COUNTER

OK
OK

All key switches for emergency oil, jacking oil and rotor barring in operation position
Used AC MCCs
Used DC MCCs
Used MCBs
Local lamp test buttons on the panels
Generator protection system REG216
Inverter monitoring display
UPS essential panel board
SFC READY
Excitation system display
All panel doors and entrance door
A Fire fighting system is in operation mode according manufactures specification
Gas detection system is in operation mode according manufactures specification
Pulse air filter system: Instrument air available

GT STARTUP

OK
OK
OK
OK

NO ALARMS/ ENERGISED
NO ALARMS/ ENERGISED
NO ALARMS/ ENERGISED
ENERGISED NO ALARMS
READING TAKEN BEFORE
START OR EVERY 24H
CHECKED
ENERGISED
ENERGISED
IN OPERATION /ENERGISED

CHECKED
NO FAULTS
NO ALARMS
NO ALARMS
NO ALARMS
NO ALARMS
CLOSED
no faults and alarm
no faults and alarm.
no alarms pending

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 4 / 13
Remarks

GENERATOR ENCLOSURE:
Enclosure ventilation SAM12
Excitation brushes
Shaft grounding at DE (driven end) and NDE (none driven end)
All man holes
Abnormal noises
Generator CCW System
Butterfly valves
Drain and vent valves
Lube oil and jacking oil System
Flow through sight glasses on the return line

OK

MKF10AA006-013

ON
INSTALLED
INSTALLED
CLOSED
NONE
NO LEAKAGES
OPEN
CLOSED
NO LEAKAGE
VISIBLE

AUXILIARY BLOCK
Enclosure ventilation panel SAM13
Enclosure fans and dampers
Lube oil system Drain valve of lube oil accumulator
Shut-Off valve in front of lube oil accumulator
Equalizing valve lube oil twin filters
Drain valves lube oil filter
Vent valve of active lube oil filter
Lube oil tank drain
Lube oil level in lube oil tank
Vacuum in lube oil tank
Lube oil system
Lube oil cooler all drain and vent valves closed cooler in clean condition

MBV21AA004
MBV21AA003
MBV21AA010
MBV21AA005/006/016/017
MBV21AA011/012
MBV10AA005
MBV10CL001
MBV10CP001

ENERGISED/NO ALARMS
OPERATION POSITION
CLOSED
OPEN
CLOSED
CLOSED
CLOSED
CLOSED
>MIN1
>MIN1
NO LEAKAGE
checked

Power oil
System Shut-Off valves of power oil accumulator
Drain valve of power oil accumulator
Shut-Off valves before power oil pumps
Power oil system

GT STARTUP

MBX21AA003
MBX21AA009, 010

OPEN
CLOSED
OPEN LOCKED
NO LEAKAGE

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Control Valve Block

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

All drain and equalizing valves of the fuel oil and NOx water.
Gas and water control valve block

OK

Rev. : 0
Page: 5 / 13
Remarks
CLOSED
NO LEAKAGE

GT ENCLOSURE
Ventilation fans and dampers
All man holes
FDS piping
Gas FDS system
Turbine Bearing (only if GT is cold)
Instrumentation FUNCTIONAL
GT enclosure
All fuel water drain hand valves at the thermal block
VIGV system
Blow off valve system
All drain and equalization valves of the pressure transmitters
Cooling and sealing air pipes
Noises

OPERATING POSITION
CLOSED
NO LEAKAGE
DRAINED/PLUGED
NO LEAKAGE
Complete
CLEAN
CLOSED
NO LEAKAGE
NO LEAKAGE
CLOSED
NO LEAKAGE
NORMAL

NOx WATER BLOCK


All drain and vent hand valves
Enclosure doors
Ventilation fans and dampers SAM14
Oil level and temperature of the NOx water booster pump bearings

GT STARTUP

MBU32CT008/009

CLOSED
CLOSED
OPERATING POSITION
IN OPERATION RANGE

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 6 / 13
Remarks

OPERATOR STATION (OS)(CCR OR EGATROL)


GT alarm list on OS
System failure on all OS mimics screens
GT ready for start on OS
Check ignition fuel
PLS/PLST, TRIP and COM
IDLE SELECTION
LOAD SETPOINT

GT STARTUP

CHECKED AND NOTED


ACKNOWLEDGED / NONE
ACTIVE
selection GAS / PROPANE
ACKNOWLEDGED
AS REQUIRED
AS REQUIRED

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 7 / 13
Remarks

SRC RELEASE FOR GT:


To check missing release criteria select the mimic display READY
RELEASE CRITERIA on the OS.Following release criteria have to be
Fulfilled before a start command for the GT sequencer can be
Issued: Actions to be done from operator if release Criteria are not fulfilled:
FAULT
Battery chargers
Hydr 2oo3
GT Trip / PLS /PLST
Interlock from MKY10
Compressor washing

Alarm
BLOCKED
Active
Active
Release

Speed measurement
CC start interlock

Disturbed
Active

Fire protection panel

Not enabled

Gas detection panel


Vibration monitoring
Pulsation monitoring
Fuel valves
Selected SFC

Not Enabled
Disturbed
not ok
Not Closed
Not ready

GT STARTUP

ACTION TO BE TAKEN
Check battery chargers in DC distribution (BTL/BTM).
Check on MIMIC Protection
Eliminate reason for protection, acknowledge on OS
Check generator protection panel.
FG compressor washing is not completely in off position,
Check compressor washing sequencer.
Check for disturbed speed measurements
Diverter Damper / Boiler not ready for starting, prepare
boiler
Check local control panel in the excitation module. System
must be ready for automatic operation.
Check on local control panel CYQ.
Check Bentley Nevada rack CRC20
Check vibrometer rack CRC20
Check correct position of all fuel valves on
Check SFC, if a major problem on the SFC is present, cross
start from the other GT is possible

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 8 / 13
Remarks

Figure 1 - Operator station, OS mimic display sequence release

GT STARTUP

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 9 / 13
Remarks

SU-START UP
To put the GT in service, proceed as following:
Check the BOP if main and auxiliary circulating pumps are running ,instrument air compressor
Go to OS mimic display GT OVERVIEW
In the section GT STATUS checks for indication GT SEQ PROG REL. The indication STUCRIT shows the release criterias.
In the section ACKNOWLEDGE initiate TRIPON, PLS/T ON and DRV/GRP ON to reset all trips, PLS and disturbed signals.
Select desired fuel for ignition, propane gas or natural gas (if no selection is made, propane gas is pre-selected for ignition); see below.
Confirm that all pre-start checks have been carried out and the results are satisfactory.
In the section GT AUTO PROGRAM initiates GT SEQR DEACTIVATE ON to start the GT sequencer
Select IDLE ON in the section GT AUTO PROGRAM, if no synchronization of the generator breaker is desired.
GT SEQR shows the active step number.
If OBJECT DISPLAY is selected (press right mouse button)

Ignition Fuel Selection:


Go to OS mimic display FUEL GAS SUPPLY (FIG 3):
Initiate DESELECT GAS ON or SELECT GAS ON in the section IGNITION to ignite with propane or natural gas.
The start sequence begins with the start and function check of several systems (lube oil, power oil, hydraulic trip unit, etc.). In addition all valves (blowoff valves, fuel control valve, drain/relief valve, trip valve, ignition system valves, etc.) are adjusted to the required start position. When the feedback
signals indicate sufficient oil pressure, the VIGVs are in the VIGV start-up position and the rotor is free to rotate (via the rotor barring system) the SFC
is turned on and acceleration begins. At the same time,the generator cooling is activated. If in the course of executing the individual starting steps the
required conditions are not achieved within the permitted tolerance times the alarm TIME SUPERVISION FAULT appears and the program stops at the
actual step.
When the conditions for the current step are met, the GT sequencer will continue automatically. The GT will start up automatically until reaching the
predefined load set point
start counts on the Operating Data Counter (ODC) as soon as the flame of the EV burner is established and the blow off valves are closed. The plant
has more than one gas turbine and a start procedure has to be defined depending on the number of gas turbines and static starting devices.

GT STARTUP

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 10 / 13
Remarks

Figure 2 - Operator station, OS mimic display GT Overview

GT STARTUP

10

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 11 / 13
Remarks

Figure 3 - Operator station, OS mimic display fuel gas supply

GT STARTUP

11

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

NTD/OKPP/OM/OP-001

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 12 / 13
Remarks

Startup of gas turbine setting


Purge speed
Purge time
Ignition speed natural gas
Self sustaining speed
SFC power reduction speed
SFC shut off speed
Excitation speed

9.3 min
600 rpm
1500 rpm
2400 rpm
2700 rpm
2850 rpm

LOAD
normal load deload=
Fast loading

+- 8 MW/min
25 Mw/min

TAT startup limit


TAT MAX
TAT PART LOAD LIMIT
TIT BASE LOAD
VIGV CLOSED POSITION
VIGV OPEN POSITION
VIGV STARTUP POSITION

450 C
550 C
550 C
1100 C
-65
0
- 30

GAS SUPPLY
Low-pressure gas alarm limit
Low-pressure gas PLST
Ignition stroke time

21.8 bar
20.8 bar
30 sec

GT STARTUP

835 rpm

12

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 13 / 13
Remarks

DIRECT TRIP
1,Control system trip (Egatrol Trip )
2,Fire in Thermal Block
3,Flame off in GT
4, Low Lube oil pressure loss of pumps
5, Overspeed
6, High thrust bearing temp
7, Overtemp TIT
8, Pressure measurement aft comp
9, Combustion chamber pulsation high
10, Surge protection
11, Unbalance rotor
12, Pls/Plst not executed
13, Gas detection in GT enclosure
MANUAL INITATED TRIP
14, Manual pushbutton
A, At Auxiliaries block
B, at Egatrol control cubicle
C at Main control room

GT STARTUP

3300 rpm
120 C

13

OPERATING PROCEDURE

Date : 15 FEB 2008

GT13E2 Cold STARTUP


OKPAI IPP
NTD/OKPP/OM/OP-001

Written:. ALAAMAKKI
Checked by :DANNY ROBINSON
ANTONY STRATTON
Actions and checkings to be carried out

Approved by : JOHN BENNETT


KKS code

OK

Rev. : 0
Page: 14 / 13
Remarks

Power Augmentation with Water


Power augmentation water can only be selected when following conditions are met:
GT on fuel gas operation

MBU31

WATER SYSTEM,

DISTRIBUTION

Temperature controller ACTIVE


VIGV in VIGV open position
Water purge not ACTIVE
The turbine inlet temperature has to be reduced, relative to TIT base load gas operation, because of
the increased heat transfer to the hot gas path parts with water injection.
If the unit is de-loaded below base load, power augmentation will be turned off automatically.
The demineralised water is injected through the NOx water injection system.
Power Augmentation on fuel gas isproviding a maximum power increase of roughly 10% at highest water
to fuel ratio .
In addition there is an increase in gas consumption of 5 20 %.
To turn on the power augmentation, proceed as following:
Go to OS mimic display GT OVERVIEW.
Initiate GROS ACT in the section SETPOINTS and insert the target load set point through
the keyboard which isat least 20 MW higher then the current base load
Confirm by OK or ENTER on the keyboard.
Go to the OS mimic display GT OVERVIEW
Initiate PWR AUG ON in the section GT AUTO PROGRAM
Once the FG is activated the GT will load to the load set point as far as is allowed within the omega limits.
To deactivate the power augmentation:
Go to the OS mimic display GT OVERVIEW
Initiate PWR AUG OFF in the section GT AUTO PROGRAM

GT STARTUP