Академический Документы
Профессиональный Документы
Культура Документы
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
Tenderno
584
584
584
584
584
LineItemNo
Pageno
Srno
ItemId
ConfigId
SubDivision
Code
BOQDesc
Construction of cement concrete Excavation in soil (by
Mechanical Means.) Excavation for roadway in soil
using mechanical meanse including loading in tipper for
carrying of cut earth to embankment site and unloading
with all lifts and lead upto 1000 meters as per relevant
clauses of section 300.
Quantity
Unit
Rate
Amount
51158.25
Cum
95
4860033.75
32175
Cum
50
1608750
32175
Cum
250
8043750
33750
Sqm
23
776250
14040
Cum
1423
19978920
AmountInWords
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
584
584
584
584
Cement Concrete Pavement (Construction of unreinforced, dowel jointed, plain cement concrete
pavement pavement as per IRC:58 over a prepared sub
base, coarse and fine aggregate conforming to IS : 383,
and graded as per table 600-3 mixed in a batching and
mixing plant as per approved mix design, transported to
site, laid with a fixed form or slip form paver, spread,
compacted and finished in a continuous operation
including provision of contraction, expansion,
construction and longitudinal joints, joint filler,
separation membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and
grades as per drawing as per clause 602.) (i) with
cement concrete grade M-40 and minimum cement
content @ 400 kg/cum.
11583
Cum
1372
15891876
10125
Cum
2332
23611500
20250
Cum
4926
99751500
30694.95
Cum
120
3683394
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
584
584
584
584
584
584
10
7560
Cum
291
2199960
9000
Meter
207
1863000
200
Cum
2413
482600
2700
Sqm
707
1908900
14
450
Each
26178
1177650
15
48161.85
Sqm
23
1107722.55
11
12
13
csidc.cgeprocurement.gov.in
584
16
csidc.cgeprocurement.gov.in
584
17
csidc.cgeprocurement.gov.in
584
18
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
584
584
19
20
33419.56
Cum
1423
47556033.88
15631.26
Cum
1372
21446088.72
12962.34
Cum
1434
18587995.56
10175.5
Cum
291
2961070.5
49125.09
Sqm
64
3144005.76
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
584
584
584
584
21
22
23
24
49125.09
Sqm
17
835126.53
3929.95
Cum
7916
31109484.2
1964.77
Cum
9812
19278323.24
675
Sqm
707
477225
csidc.cgeprocurement.gov.in
584
25
csidc.cgeprocurement.gov.in
584
26
27
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
584
584
28
14400
Meter
4905
70632000
7300.8
Cum
236
1722988.8
2730
Cum
371
1012830
14601.6
Cum
120
1752192
1238.4
Cum
144
178329.6
csidc.cgeprocurement.gov.in
584
29
csidc.cgeprocurement.gov.in
584
30
619.6
Cum
620
384152
31
2580
RM
1040
2683200
32
Each
787
3148
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
584
584
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
584
584
584
33
Each
1074
6444
34
20
Each
702
14040
35
Each
4494
17976
Each
3434
10302
Each
655
3930
40
Each
1459
58360
40
Each
79
3160
csidc.cgeprocurement.gov.in
584
36
csidc.cgeprocurement.gov.in
584
37
csidc.cgeprocurement.gov.in
584
38
csidc.cgeprocurement.gov.in
584
39
csidc.cgeprocurement.gov.in
584
40
20
Each
30
600
41
0.4
Cum
3267
1306.8
csidc.cgeprocurement.gov.in
584
csidc.cgeprocurement.gov.in
584
42
csidc.cgeprocurement.gov.in
584
43
10.24
Sqm
99
1013.76
44
3.04
Sqm
139
422.56
0.4
Cum
4742
1896.8
46
40
Kg
55
2200
47
0.072
Cum
4031
290.23
48
618.8
Cum
45
27846
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
csidc.cgeprocurement.gov.in
584
584
584
584
584
45
2.048
Cum
2953
6047.74