CONTENTS
Topic
Pg No
List of Figures
List of Tables
List of Maps
PREFACE
EXECUTIVE SUMMARY
1.1 BACKGROUND
10
16
20
21
21
31
51
58
3.1 HOUSING
58
67
68
70
70
77
5. INFRASTRUCTURE
89
89
107
6. ENVIRONMENTAL ISSUES
117
117
117
118
7. PROBLEMS
119
121
121
122
124
125
130
131
132
133
134
137
137
137
138
138
139
9.3 DENSITY
139
140
140
9.6 PROPOSALS
141
141
145
149
150
9.6.5
158
SECTORAL PROPOSALS
176
180
11.1 ACTIONS
180
182
183
PART II
185
12.1 INTRODUCTION
185
199
218
242
ANNEXURES
LIST OF FIGURES
Figure No
Title
Pg No
1.1
1.2
1.3
1.4
1.5
2.1
23
2.2
24
2.3
25
2.4
25
2.5
26
2.6
27
2.7
29
2.8
32
2.9
32
2.10
33
2.11
33
2.12
34
2.13
34
2.14
35
2.15
35
2.16
36
2.17
36
2.18
37
2.19
37
2.20
42
2.21
47
2.22
47
2.23
48
3.1
59
3.2
60
3.3
60
3.4
61
3.5
61
3.6
62
4.1
76
4.2
86
5.1
90
5.2
90
5.3
92
5.4
98
5.5
99
5.6
106
5.7
108
5.8
108
5.9
109
5.10
110
5.11
5.12
110
111
5.13
111
5.14
114
6.1
118
8.1
122
8.2
123
8.3
130
8.4
133
LIST OF TABLES
Table No
Title
Pg No
1.1
1.2
1.3
17
1.4
20
2.1
22
2.2
28
2.3
28
2.4
HDI composition
30
2.5
38
2.6
38
2.7
39
2.8
39
2.9
40
2.10
42
2.11
44
2.12
45
2.13
46
2.14
46
2.15
51
2.16
53
2.17
54
2.18
56
3.1
59
3.2
63
3.3
64
3.4
64
3.5
65
3.6
65
3.7
66
3.8
Features of IHSDP
66
3.9
66
3.10
68
4.1
70
4.1 A
70
4.2
71
4.3
73
4.4
74
4.5
75
4.6
80
4.7
80
4.8
81
4.9
82
4.10
83
4.11
85
5.1
91
5.2
91
5.3
92
5.4
93
5.5
94
5.6
98
5.7
103
5.8
103
5.9
104
5.10
107
5.11
113
5.13
116
8.1
121
8.2
121
8.3
122
8.4
123
8.5
125
Natural growth of population calculated through various statistical methods
8.6
125
8.7
129
8.8
129
8.9
130
8.9
131
8.10
131
8.11
132
8.12
132
8.13
133
8.14
134
8.15
135
9.1
139
9.1 A
141
9.1 B
141
9.1 C
142
9.2
142
9.3
143
9.4
141
9.5
144
9.6
148
9.7
148
9.8
149
9.9
149
9.9
150
9.10
151
9.11
152
9.12
154
9.13
155
9.14
155
9.15
155
9.16
156
9.17
156
9.18
157
9.19
158
10.1
Phasing of development
177
10.2
177
10.3
177
10.4
177
10.5
177
10.6
178
10.7
178
10.8
179
10.9
179
11.1
Financial Proposal
183
LIST OF MAPS
Sl.No
Title
Map No.
Drawing
1
Location
01
Administrative Boundary
02
Study Maps
3
Regional Setting
03
Climatological Studies
04
05
06
Soil Classification
07
Demographic Studies
08
9A
10
9B
11
Problem Map
10
11
13
12
14
13
15
14
16
15
16
18
17
19
20
18
18A
18B
21
18C
22
19
19A
19B
23
19C
17A
24
25
20
20A
21
27
22
28
23
29
24
25
31
26
Phasing of Development
32
27
33
28
34
29
35
30
36
31
37
32
38
33
39
34
40
35
41
36
42
37
Preface
PREFACE
Bangalore Metropolitan Region Development Authority prepared the Structure Plan (SP) for
Bangalore Metropolitan Region (BMR) with an inductive approach with the prime objective of
decentralising growth away from Bangalore to harness and constrain its increasing primacy in the
region, lessen the regional disparities and in the process relieve the developmental pressure within the
conurbation. The strategic issues considered to be key determinants to future growth patterns were
studies and summed up as follows:
How effectively the strategic intervention combinations would compliment the
achievement of the induced population growth targets and developmental interventions of
the preferred growth strategy.
How effectively they would counter anomalies and negative development trends identified
in the BMR.
The structure plan was intended to provide a generic model for formulation of such plans for other
regions in Karnataka besides providing a strategic policy framework for planning & development
control locally to ensure that provision of development is realistic and complements with national state
& regional policy guidance and securing consistency between local plans for contiguous or
neighbouring areas.
Structure Plan has proposed five Area Planning Zones and Interstitial zones in the entire
Bangalore Metropolitan Region. For the purpose of planning and development of important and
potential zones, Karnataka Town and Country Planning Act, 1961 has been extended to various Area
Planning Zones and Planning Authorities have been constituted for controlling and regulating the
developments in these Local Planning Areas. With the increase of Bangalores population and spatial
spread in the last 2 decades owing to its increasing global recognition as a preferred IT destination.
Sky Group
Page |A
Preface
With increasing outgrowth of Bangalore and the proposed population influx into the
Kanakapura Local Planning Area, BMRDA has rightly taken the preparation of Interim Master
Plan to dovetail the regional policies of development the local requirements of the ever-increasing
population and as a result guide & regulate urban growth for a planned & compatiable physical
development of the region. The preparation of Interim Master Plan started during 2006 and the govt.
have approved the five IMPs provisionally in 2007 and finally approved them during 2009.
A Master Plan (MP) is defined as A plan for the development and re-development of the
area within the jurisdiction of the planning authority. The Master Plan has to be prepared not
later than 2 years from the declaration of the LPA as per Sec 9 of The KT & CP Act. According to the
Act the contents of a Master Plan are defined as follows.
Zoning of land use
Street pattern i.e. Circulation pattern
Area reservation for Parks/Playgrounds/Open Spaces
Area reservation for future developments
Reservation of land for the purposes of Central Govt., State Govt etc.
Declaring and framing regulations for areas of special control
Phasing of development
BMRDA prepared scientific base maps for the Local Planning Area by acquiring Quick Bird
data based on 2009 data as there were no proper base maps. The Planning Authorities incorporated all
approved lay outs and were finalised during 2012.
Government constituted a committee vides its G.O. dated 28-11-2012 under the chairmanship of
Metropolitan Commissioner to finalise the Master Plans for five Local Planning Areas and along with
some guidelines. The following were the members of the committee.
Sky Group
Page |B
Preface
1. Metropolitan Commissioner
Chairman
Member
Member
Member
Member
Member
Member
Meanwhile there was a petition in High court of Karnataka for delayed preparation of Master
Plans for BMRDA submitted an affidavit saying that the plans would be finalised by June 2012 and
subsequently another affidavit that it would be finalised on 31-1-2013. But, we could not finalise the
plans within date and immediately the committee met on 24-1-2013 and reviewed the progress made
in the preparation of Master Plans. During the discussion it was also observed that notification under
section 10/1 of Karnataka Town and Country Planning Act, 1961 was not declared so far and it would
be further delayed if we notify it now (2 months) and therefore, it was decided that If BMRDA is to
prepare the Master Plans, then the notification under section 10/1 is not required. However, it was
opined that in one case law the govt. has to delegate/empower the preparation of Master Plans under
section 9/2 of Karnataka Town and Country Planning Act, 1961. Accordingly, BMRDA requested the
govt. and govt. have empowered the preparation of Master Plans for five Local Planning Areas to
BMRDA under section 9/2 Karnataka Town and Country Planning Act, 1961 on 4-3-2013.
The committee formulated broad guidelines for the preparation of Master Plans and directed
the Authorities to work out the proposals based on:
1. Existing developments
2. Approved IMP
3. Change of land uses approved by the govt. and P.A. under section 14-A (3)
Sky Group
Page |C
Executive Summary
EXECUTIVE SUMMARY
The Kanakapura Local Planning Area was declared by the BMRDA in 2006. It is located in the southwest part of the Bangalore Metropolitan Region (BMR). The total extent of the LPA is 412.78 sqkm
and consists of 86 settlements consisting of 85 villages and Kanakapura TMC. The LPA is well
connected by the NH-206, connecting Bangalore with Mysore via Kanakapura LPA. The Interim
Master Plan of the LPA was commissioned in 2007. It was provisionally approved in April 2007 and
finally approved by the BMRDA in May 2009. The process of Master Plan preparation started with the
preparation of the Basemap and Existing Landuse Map which were prepared by Pixel using 0.6 m
resolution Quickbird satellite Image. The maps were scrutinised by the KSRAC and submitted to the
BMRDA in 2012.
The Master Plan of Kanakapura was prepared with to promote the LPAs role as a counter magnet to
Bangalore. The Bangalore Mysore Infrastructure Corridor passes in close proximity to the LPA on the
north-east which increases its development potential. There are four important growth nodes in the
LPA Kaggalipura, Harohalli, Kanakapura and Sathanur. Likewise all Master plan Proposals have
made as per the four conurbations Kaggalipura, Harohalli, Kanakapura and Sathanur.
Kaggalipura is located along the NH 206 and is closest to Bangalore. There is rapid urbanization in
the area with the construction of residential apartments. International schools and spiritual institutions
have come up in the area. Harohalli is characterized by the KIADB industrial estate which has few
industries at present. Kanakapura is the Taluk headquarter of the Kanakapura Taluk and is also a
Town Municipal Council as per Census. The area is mainly residential with few institutional buildings
to cater to the civic needs. Sathanur is the southern-most settlement in the LPA. It consists of
residential areas as few commercial and institutional setups. A township of 65 sqkm has been
proposed at Sathanur by the BMRDA to form a hub of agro processing industries with work-homeplay concept. The township would further increase the development potential of the LPA.
Sky Group
Page |E
Executive Summary
The river Arkavathi flows through the LPA and is the only perennial source of water. Depletion of
ground water is a major concern of development.
The Master Plan 2031 has been prepared to uphold the potential of the areas. There have been
some changes in landuse in the LPA under KTCP Act. All changes and approved layouts have been
retained in the Master Plan proposal. Guidelines and standards have been followed and additional
landuse has been assigned scientifically.
The concept of phasing of development has been introduced as required under section 12 (g) of
Karnataka Town and Country Planning Act, 1861 to bring about gradual and compact development in
the Local Planning Area. The primary objective of act is to guide and regulate the developments
within the Local Planning Area in a phased manner so as to facilitate planning for the provision of
infrastructure services like water supply, sanitation, drainage, transport and social infrastructure.
Sky Group
Page |F
86
District
June 2006
10
April 2007
11
May 2009
12
13
14
15
16
8 lakhs
17
80 pph
18
19
6 lakhs
20
67 pph
21
167 pph
22
23
Density Phase 1
24
25
Density phase 2
Sky Group
412.78 sqkm
2006
85
Ramanagara
Kanakapura TMC
Kaggalipura, Harohalli, Kanakapura & Sathanur
25.65 sqkm
1.80 lakhs
70 pph
101.66 sqkm
90.75 sqkm
3137.62 Ha
115 pph
5938.03 Ha
67 pph
PART I
MASTER PLAN PROPOSALS
Chapter 1 | Introduction
CHAPTER 1
INTRODUCTION
1.1 BACKGROUND
Karnataka is one of the fastest growing states in India. It is the 9 th largest state in India in terms of
population with a decadal growth rate of 15.67%1. 38.57% of the state is urbanised with a growth rate
of 31.27%. The BMR has an area of 8005 sq km and a population of 10.57 lakhs as per census 2011.
The decadal population growth rate in the BMR is 25.68%. Needless to say, this fast growth calls for
a strategic planning to sustain the additional pressure on services and maintain the quality of life.
The BMR at present faces the challenges of a rapidly urbanising region on the verge of becoming an
international metropolis. While the strategic location, economic potential and an efficient workforce of
the area provides impetus to the process of globalization, lack of perennial water availability, rising
pressure on infrastructure in core are inevitable constraints in the process of the same. Hence a
policy of decentralisation advocates spatial distribution of population from the core to the outer less
congested areas.
Planning in India, traditionally had been largely socio-economic, restricted to a few urban centres.
The three tier planning system was often overridden by state agenda. The 73rd and 74th
Constitutional Amendment Acts, implemented in the year 1992, provide a spatial framework for
integration between all levels of planning. Known as the decentralisation agenda, the aim was to
facilitate a gradual shift in power to the grass root levels. As a part of the functional devolution, the
local bodies (LB) are now expected to perform urban planning including town planning, regulation of
land use and construction of buildings, planning for economic and social development, planning for
the poor in the society, slum improvement and up gradation and urban poverty alleviation.
The Master Plan for Kanakapura Local Planning Area has been prepared in the context of the BMR
to redefine its role for the future within the overall framework of Structure Plan 2031.
Census 2011
Sky Group
Page |1
Chapter 1 | Introduction
The Structure Plan (SP) 2011 had an inductive approach to planning since it was governed by the
decentralisation policy in the BMR. Hence, the SP 2011 proposed a targeted induced population
distribution of over 7.4 lakhs in the south Karnataka Region, of which 4.9 lakhs were to be
accommodated in the BMR. The Interim Master Plan (IMP) prepared for the Kanakapura LPA for the
plan period 2021 envisaged a population of 11.22 lakhs in the LPA by the year 2021 also prepared by
an inductive approach.
The vision and the growth directions stated in the SP 2011 had not been able to live up to the pace of
growth in the BMR. Hence a Revised Structure Plan (RSP) has been prepared for the region for the
year 2031, to provide strategic policy framework for planning, ensure sectoral development and
coordination and securing consistency between the various local plans.
It
identifies
the
development
patterns,
KANAKAPURA
Sky Group
Page |2
Chapter 1 | Introduction
LAND
Land being a limited and fixed resource, there is competing demand on agriculture and allied
activities, non-agriculture sectors like industries, communication systems, buildings, and power
projects, new townships, mining and so on.
Demand for land from both agriculture and non-agricultural sectors are exerting a great pressure on
land resources. The demand for firewood, timber and fodder for livestock has resulted in excessive
pressure on forest and pasture lands which has progressively affected the grass and tree cover
resulting in accelerated forest and greenery (pasture) degradation leading to ecological imbalance
and environmental problems.
Pasture lands have to be provided to facilitate grazing of animals and also fodder augmentation in
community/government lands. In the LPA the pasture land appears to be significant contributor to live
stock. In the LPA special efforts have to be made to develop pasture lands to encourage animal
husbandry.
PHYSIOGRAPHY
The elevation falls from 833 m to 620 m from north of the LPA to the south up to Arkavathy valley and
increases in elevation generally towards the south-west. Terrain shows undulating topography with
varying elevation between 833 meters to 620 meters above MSL. The lowest elevation being 620 m
is found around Kanakapura town in the valley portion. The slopes vary from 20-150
metres/kilometre.
The Kanakapura LPA lies in the Cauvery basin. The main tributary of Cauvery, river Arkavathy, flows
in the LPA. LPA is covered by the sub basin of Arkavathy and drains southwards. The drainage
density and stream frequency are moderate to high (hilly zone, in northern, eastern and western part)
and medium to low in central part. Drainage map shows the drainage network is integrated with
surface water body within the LPA. The drainage pattern is dendratic and parallel. It encourages for
infiltration than runoff, as the stream frequency and density are medium to low and have good
constant channel maintenance. These drainages are controlled by structures and lithology.
Sky Group
Page |3
Chapter 1 | Introduction
GEOMORPHOLOGY
Kanakapura LPA lies predominantly in Pedi plain geomorphic unit. Small patches of Structural and
Denudational hills are also traced in north eastern and southern part. The figure shows geomorphic
pattern within the LPA. This map clearly indicates that, infiltration zones are larger in area than runoff
and are suitable for ground water recharge. The potentiality will also be moderate to good.
Apart from the structural valleys, supported by the surface water bodies as showing better prospects
for ground water developments.Ground water potential clearly shows that the ground water prospects
in the valley portion is good and in majority area of the LPA, it is moderate. This can be converted as
good potential zone by adopting artificial recharge techniques.
The area is underlain with grey and pink granites and granite gneisses and intruded by dolomatic
pegmatite and quartz veins. The map shows the general lithological units in and around Kanakapura
LPA. The inclusions of dolorate and amphibolite dykes are also traced. The general trend of the
peninsular genesis is North West South East to North East South West. These show a steep dip
of about 70 to 80 degrees due South East. According to the Earthquake Map of Karnataka, the LPA
belongs to very low damage risk zone and is in stable belt.
Major portion of the LPA consists of red loamy sandy soils, which is moderately porous and medium
permeability. The patches of loamy, loamy clayey, sandy type of soils are noticed within the LPA.
The clayey and loamy types of soils are more in area extent in southern part than in the rest of the
LPA. Uplands show these types of soils. The map shows the soil types in and around the LPA.
The soils are favourable zones for ground water recharge. As permeability and porosity for the soils
are medium, the infiltration rates will be medium to high. Since, the characteristics are almost uniform
across the LPA; it is advisable to avoid the water polluting industries in the entire LPA to avoid
contamination of water.
There is a need for striking a balance between the competing claims of different sectors. It is
imperative to think of a systematic and scientific long range plan to harness the land resources not
only for satisfying the competing demands from various sectors, but also for ensuring sustainability
of the systems.
Sky Group
Page |4
Chapter 1 | Introduction
The soils belong to the Alifisols order. Red soils are predominant. These soils have developed on
gneisses and granites and up to little extent on metamorphic rocks. These soils occur on hills, ridges,
rolling to undulating and gently sloping lands of LPA.
Soils
Rolling lands
Undulating lands
Valleys
These are moderately eroded and severely eroded lands, which need appropriate soil, and water
conservation measures for both agricultural and non-agricultural areas for preventing further
degradation of soils.
CLIMATE
The climate in the region is hot, moist, semi-arid Ecological Sub Region with length of growing period
of 150-180 days.2 The Kanakapura Local Planning Area belongs to the Eastern Dry Agro-Climatic
Zone. The LPA experiences pleasant weather almost all throughout the year. March, April and May
are the predominant summer months while December and January constitute winter.
The nearest IMD station giving the rainfall, humidity, temperature and wind is at Bangalore. Hence,
the data was collected from the IMD station from 1998 to 2008 for the mentioned parameters to
understand the climate in the area.
Sky Group
Page |5
Chapter 1 | Introduction
WIND DIRECTIONS
It is seen from the wind roses collected from the Indian Meteorological Department (IMD) at
Bangalore that the wind direction is mostly east to west. In the morning i.e., 0830 hrs, the wind is
towards west during May to September and east during November to February. Whereas, in the
evening i.e., 17:30hrs, the wind blows towards west during June to September and east in November
to March. Hence, it can be taken that the wind generally blows towards west. The strongest winds
(>19 kmph) are observed in the months from June to August.
N
2.1%
8.6%
8.0%
KLPA
28.0%
14.0%
26.9%
10.6%
1.6%
S
It is seen from the IMD data from 1951-80, that the mean wind speeds are greatest in the months of
June and July .According to the Wind Map of Karnataka, the LPA belongs to Low Damage Risk Zone.
Hence, the structure design of infrastructure in the LPA with respect to wind, loading may be taken
into consideration while planning and constructing high rise structures only. Further, the location of
Sky Group
Page |6
Chapter 1 | Introduction
industry, generally, should be located in a direction where wind force is going away from the human
habitation.
RAINFALL
Bangalore IMD station recorded an average rainfall of around 875 mm over the years 1998-2010. It is
observed from the IMD data provided that there are two peaks in the rainfall in Bangalore namely
May and September months. But the highest rainfall months are mainly August, September and
October.
2000
Kanakapura Taluk avg annual
1056
rainfall
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
554
413
510
938
1261
494
635
640
807
975
TEMPERATURE
The annual temperature in the LPA is around 24-25oC. Generally the mean minimum (January) is 1418 oC and the mean Maximum (May) is 32-35oC. The maximum temperature recorded is around 34oC
and the minimum temperature is around 14.1oC. The most appropriate building materials with respect
to temperature in the LPA are bricks and stones which are locally available.
Sky Group
Page |7
Chapter 1 | Introduction
40
35
30
25
20
15
10
5
0
JAN
FEB
MAR
APR
MAY
JUNE
JULY
AUG
SEPT
OCT
NOV
DEC
It is observed
from table, that the temperature peaks around 350C in April and May months. The lowest
temperatures (15-17 oC) are observed in months of November and December.
Sky Group
Wind
Month
Daily Max.
0
C
Daily Min.
0
C
January
27.0
15.1
9.5
February
29.6
16.6
9.2
March
32.4
19.2
8.5
April
33.6
21.5
7.5
May
32.7
21.2
9.4
June
29.2
19.9
13.6
July
27.5
19.5
13.8
August
27.4
19.4
12.3
September
28.0
19.3
9.5
October
27.7
19.1
7.1
November
26.6
17.2
7.7
Page |8
Chapter 1 | Introduction
December
25.9
15.6
9.0
Annual
28.97
18.63
9.76
Source: www.imdbangalore.gov.in
HUMIDITY
The relative humidity is generally 86% during monsoon months and 63% during dry months. It can be
seen from the Figure below that, that the mornings have exhibited more humidity mean relative than
67 per cent with the highest in the months of July and August (around 87 per cent) and the lowest
humidity in the month of March. The evenings have exhibited humidity more than 31 per cent with the
highest in the months of August and October (around 69 per cent) and the lowest in the month of
March. Generally nearly 25 per cent difference is observed from mornings to evenings with the
highest differences seen in the months of January, February and March (> 35 per cent).
100
90
80
70
60
50
40
30
20
10
0
JAN
FEB
MAR
APR
MAY
JUNE JULY
AUG
SEPT
OCT
NOV
DEC
Sky Group
Page |9
Chapter 1 | Introduction
KANAKAPURA
Situated to the (56 km from Bangalore) South of Bangalore is on the right bank of the river Arkavathy.
The place was originally under the Gangas and later under the Cholas, who administered it as a part
of Kilalainad.
Later, the Hoysalas made it a major headquarters of province (sime). Its name was
Kanikaranahalli in two Hoysala records dated 1319 and 1317 A.D. from Hachchalu and Nyakanahalli
(Kanakapura tq) villages respectively. Even a recent record dated 1662 A.D by Mysore rulers from
Malagala also mention the place as Kanikaranahalli being the headquarters of a sime. The local
people universally call it as Kanikaranahalli, which is otherwise corrupted as Kankanahalli, says
Buchanan. He further says Kanikaranahalli has a Tamil origin Kani + Karna or Kanikara signifies
a proprietor of land. Kanikara literally means an accountant (Karanika) or a teller of fortune. The
fort here is said to have been erected by Jagadeva Raya, the chief of Channapatna. The remains of
the fort can be now seen near the Arkavathy bridge. The town was twice burnt or laid waste by Tipu
Sultan to prevent its being of use to the British army on their march to Shrirangapattana. The place
was conquered by Mysore rulers in 1630 A.D.
The place has temples dedicated to Ranganatha, Valakotamma, Kodandarama, Anjaneya (two), etc.
The Ranganatha temple is a huge structure with a spacious inner Prakara and a gateway having a
Rayagopura. Over the Mukhamantapa along the hara are niches enshrining are in Vijayanagara
style with a cell to the right having images of Rama, Lakshmana and Seetha. Facing this is a shrine
with a seated image of Anjaneya. The Navaranga has a seated image of Vishnu with attributes like
Shankha, Chakra, Gada and Abhaya. Perhaps, this must have been the main deity as it is locally
said that the present image of Srinivasa was installed as the original image was broken. The central
garbhagriha has a ShalaShikhara.
Besides the main sanctum is another cell outside to the right having a recent image of Ranganatha.
To the left of the main temple is another shrine of a Padmavati with a small Ardhamantapa and a
Navaranga.
The annual Jatra is held for a span of nine days beginning from Ugadi, when a cattle fair is also held.
The Ganesha temple is an ordinary square structure having an image in Vijayanagara style. In front
of this is a modern Kalyanamantapa. The Kodandarama temple is also an ordinary structure in
Vijayanagar style.
There is an open
Mukhamantapa in front of the spacious Navaranga. Facing this temple is the KoteAnjaneya, a small
structure. The Kenkeramma temple is about 200 years old with a huge compound. The deity is
Sky Group
P a g e | 10
Chapter 1 | Introduction
regarded as Gramadevata, will have special attraction for the devotees during its Jatra held for a
week after Ugadi when about 5000 people assemble. Nearby is another Anjaneya temple whose
image is believed to have been installed by Vyasateertha.
The Valakotamma, another temple of the village deity has an image resembling Durga. The place
has one VeerashaivaMatha called DegulaMatha.
DevarajaWodeyar of Mysore, announcing certain grants made in the Virupasamudra village by one
Timmamma, mother of a Dalavayi to the Matha.
The place has three mosques and the Jamia mosque inside the town is old, perhaps of Tipus time.
There are three Dargahs one ascribed to Hazrath Syed Yakhub Ali, who is said to have lived here
about 200 years ago.
The Urus is held at this Dargah during the month of Bakrid when more than
5,000 people assemble. The second Dargah one ascribed to Kambli Peer and the Urus is held
during Ramzan. There is also one more Dargah ascribed to Khan Khan Sab, an official perhaps of
Tipus time and the Urus is held here during Ramzan.
The place has a Roman Catholic church locally called the St. Rita built in 1964. Tippu was running a
huge workshop at Kanakapura with a steel foundry. The place has a Government Silk Filature
Factory founded in 1943. The Rural College here is a good memorial to noted Gandhian constructive
worker S Kariyappa. Malagala (two km from Kanakapura) situated across the Arkavati river (now
within Municipal limits) has a huge temple of Mahadeshwara with a spacious Navaranaga, two
Ardhamantapas and a Garbhagriha. Over the Garbhagriha is a brick and mortar Shikhara with many
stucco images. The pillars of the Navaranga are in later Vijayanagara style. This temple is older
than those in Kanakapura proper. To the left of the main temple is a separate modern shrine of
Parvati.
Outside the temple are two inscriptions. One damaged record dated 1375 A.D. of BukkarayaOdeyas
son HariharaOdeya announces one MahasamantaDoddaKallimayaNayaka making some grants to
the temple. The second record dated 1662 of DevarajaWodeyar of Mysore records rich grants for the
maintenance and car festival at the temple of Mahadeshwara and it also mentions Kanikaianahalli,
obviously referring to Kanakapura. The annual Jatra and the car festival are held during Chaitra.
There is also a Sidikamba in wood. Other temples of the place are Morasandamma (Gramadevata)
and one more small shrine of Mahadeshwara.
approached by a deviation road to the left from the Kanakapura-Bangalore road. The place is noted
for its huge Srinivasa temple built in Vijayanagara style. The Garbhagriha has a standing image of
Srinivasa (about two meters tall). There is a brick and mortar Shikhara over it. There is a spacious
Navaranga in front of the Ardhamantapa with plain Vijayanagarapillas. The annual Jatraand car
Sky Group
P a g e | 11
Chapter 1 | Introduction
festival is held during MaghaPoornima when more than 15 to 20,000 people assemble. The village
also has an Anjaneya temple. There is also a choultry managed by the Dharmasthala trust.
HAROHALLI
Located on the main road (16 km from Kanakapura) appears to have gained prominence under the
Vijayanagara rulers. The place name is referred as Haruvahalli in a record dated 1532 A.D. from the
same place. This must have been an old Agrahara granted to the Brahmanas. The place has
temples dedicated to Arunachaleshwara, Krishnaswami, Basaveshwara (old), Anjaneya, etc. The
Arunachaleshwara temple is a huge structure with a spacious inner Prakara having many small
shrines such as Someshwara, Narayana, Lakshmi and Subrahmanya.
Shivalingaperphas of the Hoysala times and also has a Shikhara in Dravidian style. The Navaranga
has four Vijayanagara pillars and all of them have fine relief sculptures. There is an outer Mantapa
said to have been added by the Subedars of Haider and Tippu, SuryanarayanaIyer and
VenkateshIyer respectively.
workmanship. To the left of the main temple is the shrine of Ammanavaru (Parvati). The entrance to
the temple is from the south which has a tall brick Rayagopura in Vijayanagara style and has many
stucco sculptures on Shiava themes. This temple is in an area described as fort built or expanded
during Tipus times.
The Krishnaswamy temple seen in the fort area has been totally renovated. The Garbhagriha and
the Ardhamantapa have some later Vijayanagara features. There are two cells on either sides of the
Garbhagriha and one to its right has an image of Lakshmi in it. The other to the left has an image of
Venkatesha standing with Shridevi and Bhudevi. This must be the image referred to a Vijayanagara
record found at the western wasteweir of Vengallayyanakere (outskirts) and is dated 1532 A.D.
issued by ViraPratapaAchutaraya. It states that God Tiruvengadanatha was brought to Haruvahalli
by an official VaradaTimmaya who also made land grants to the deity. In the outskirts of the village,
amidst fields is an old Bhimeshwara temple of later Vijayanagara times. The pillars of the Navaranga
have no sculptures but are square with Vijayanagara brackets atop.
Dwarapalas in relief at the entrance of the Garbhagriha.
ground level from the centre of a circular hidden (underground) Panipeetha. To the left of the main
temple is the small shrine of Ammanavaru. The village proper has two mosques in recent style .
Sky Group
P a g e | 12
Chapter 1 | Introduction
SATHANUR
Situated at a distance of 10 km from Magadi has been mentioned as Sathanur in a record dated
1497 A.D. from the same place.
ACHCHALU
Situated 10 km from Kanakapura and can be approached form a deviation road before Sathanur from
Kanakapura. The place name is found mentioned as Achala, headquarters of a nadu in a hoysala
record of 1318 A.D. (of Ballala III) from the same place. The village has a tall hillock having an
Sky Group
P a g e | 13
Chapter 1 | Introduction
ordinary cave on in enshrining a Shivalinga called locally as the GaviMuneshwara temple. The annual
Jatra here is held during MakaraSankranti. The village proper has interesting antiquities all over and
particularly within the precincts of the Hanumantha temple. The Hanumantha image in profile is about
one meter tall and the god holds a branch of a tree in one of his hands. Nearby is a Basaveshwara
temple over a small hillock, below which is many hero-stones. There are in all, three inscriptions in
the area around the Anjanaya temple. One lying in a field is illegible but refers to the rule of
HoysalaNarasimha. The second inscription, also found in a field, states that when HoysalaBallal III
was ruling (1318 A.D.), one Maradeva of Sigalanadu made some grants to one Allappanayaka, son
of Madappa of Kanikaranahalli (modern Kanakapura) for the maintenance of a temple at Achalanadu.
The last record also found in a field is damaged, but tries to say that under Ballala III one
Mahapradhana Someyas son Javideva made certain grants to Pattanaswamy Setti, etc.
ARALALU
Situated on the banks of the Arkavathi (3 km from Kanakapura) appears to be an ancient place with
political importance especially in early Vijayanagara times when nearly a dozen hero-stones in the
places are taken into account. In a record from Nayakanahalli dated 1295 AD of HoysalaBallala II the
place is mentioned as Arulahalu under Singalanadu in a later record dated 1312 AD from the same
village. The place was the headquarters of Singalanada Prabhus. One record (Kn 97) also speaks of
Arulahalu Rajya. All the hero-stones are found in fields around the village and of these one in the
field of one Chikkamarigowda has a horse rider wielding a javelin, beautifully wrought in relief. In
same field remains of an ancient Shiva temple have been unearthed with a huge Shivalinga, perhaps
of the Ganga times. The Narayanaswamy temple here is a considerably big and its outer Mantapa
has fine pillars in Vijayanagara style with relief sculptures on them.
NarayanswamyKodugeJameenu is an inscription dated 1393 AD.
In a field called
In the Harijana colony is a hero stone illustrating a terrible war scene. Of the other two inscriptions
from the place, the one in the Agrahara to the north-east of the village is dated 1400 AD speaking of
the strengthening the sluice of the local Marasamudra Tank by a Minister Channa Vodeyar under
Hariahara II of the Vijayanagar when Malla Rayas son Narayanadeva was ruling at Arulahala. The
Sky Group
P a g e | 14
Chapter 1 | Introduction
other inscriptions at the same village on a stone in the yard of Muddamma Ganiga dated 1390 AD
states that Siddaya, the Minister of Bukka Rayas Son ChannaVodeyar accepted the rules of
Arulahala in the Sigalanadu and further states that Marappa, son of AralahalaSiddaya, was wounded
in the Hegabe hill. The place also has a Gadduge of Manteswamy.
KABBAL
A border village in the taluk (14 km from Kanakapura) is noted for a vertical steep hill resembling a
Shivalinga. The place is mentioned as Kabbahala in Hoysala record by Ballala III from the same
place. At the foot of the hill is the village with a temple locally called Kabbalamma. It appears to have
been a flourishing marketing centre in that time. The deity here is referred as Kalikadevi in a
Vijayanagara record from the same place. This temple is an ordinary structure in Vijayanagara style
with square pillars without any figures. The Garbhagriha is an ordinary brick and mortar Shikara of
recent times. Besides this is a Basaveswara temple (modern). The Jatra of Kabbalamma is held
during Shivaratri for a span of one week and more than 20000 people assembled. Special poojas are
offered on every Tuesday and Friday when on an average, 500 people visit the temple. Facing the
temple is a long Konda (pit) where fire walking ritual is held during the Jatra Adjacent to this in an
enclosure having two hero stones, also being worshipped by devotees and both have inscriptions.
On the first hero stone is a record dated 1291AD by Ballala-III which states that one Sahuranna, son
of Somagunda ofKabbala died while fighting with robber son his return from HanikyurJatra. The
second hero stone has an inscription which announces several grants made by PratapaDevaraya of
Vijayanagara before goddess Kalikadevi to Veerapanchalas belonging to different crafts. To the north
of the temple is Bhairava shrine which has two masks described as of Kenchanna and Kariyanna. It
has a Prakara and a small Mukhamantapa. Above the tall vertical hill are located an old Bhimeshwara
temple, a granary, Magazine house, a small pond, etc. To climb the hill one can use the regular steps
as well as footpath having severe gradient. In the middle of the hill is a small cavern being converted
into a temple enshrining an image of god Srinivasa, measuring about half meter in height. Above the
rocky ceiling is a Shikara and there are two ponds within the precincts of this temple. The top most
portion of the hill has one more pond. The hill has fortifications all around. It was used as a durgeon
for political prisoners by Mysore rulers and Prince Chamaraja VII was confined to this place by
DalvayiDevarajayya and the Prince died here in 1734. Hyder too had confined many prisoners here
and MurarraoGorpade of Gutti was also confined to this place and was killed in 1779. Tipu changed
the name of the place as Jafferabad. Viewing from this hill in the evening, one can undergo sublime
experience of enjoying the enchanting scenes including green fields, the gold coated horizon, etc. If
necessary, amenities are further provided; this can become a lovely hill station in the district.
Sky Group
P a g e | 15
Chapter 1 | Introduction
The NH 209 is the major connector that passes through the LPA linking the LPA to Bangalore city
and Mysore. There is no railway connectivity in the LPA.
The area of the LPA is 412.78 sq. km. It comprises of parts of the Kanakapura Taluk and the
Bangalore South Taluk. It consists of 86 villages and one TMC and has a total population of 1.81
lakhs. The total urban population in the LPA is 54,021 while the rural population in 1.27 lakhs. The list
of the villages and the town are given in the table below.
Sky Group
Gram Panchayat
VILLAGE NAME
CENSUS
AREA
(Ha)
POPULATION
2011
P a g e | 16
Chapter 1 | Introduction
Doddamaralawadi
Cheeluru
Cheeluru
1040
3144
Doddamaralawadi
T.Hosahalli
Chikkadevarahalli
106
374
Doddamaralawadi
Cheeluru
Jakkasandra
340
1772
Doddamaralawadi
T.Hosahalli
Keeranagere
340
718
Doddamaralawadi
T.Hosahalli
T.Hosahalli
555
723
Harohalli
Doddamuduwadi
Bandiganahalli
268
517
Harohalli
Cheelur
Bannikuppe
601
1340
Harohalli
Kaggalahalli
BettahalliKaval
247
518
Harohalli
Yalachavadi
Bheemasandra
157
318
10
Harohalli
Dyavasandra
ChulakanakereKava
l
43
153
11
Harohalli
Cheelur
Devarakaggalahalli
244
557
12
Harohalli
Doddamuduwadi
Doddamuduwadi
651
1068
13
Harohalli
Dyavasandra
Dyavasandra
331
575
14
Harohalli
Hunusanahalli
Gabbadi
633
1867
15
Harohalli
Kaggalahalli
Gabbadi Kaval
90
74
16
Harohalli
Harohalli
Harohalli
1675
12988
17
Harohalli
Kaggalahalli
Hosakote
18
Harohalli
Kolliganahalli
Hulugondanahalli
552
1923
19
Harohalli
Kaggalahalli
Kaggalahalli
358
1164
20
Harohalli
T.Hosahalli
Maralagere
204
239
21
Harohalli
Harohalli
Marasandra
258
712
22
Harohalli
Kolliganahalli
Medamaranahalli
315
1519
23
Harohalli
Kaggalahalli
Mudenahalli
380
1143
24
Harohalli
Doddamuduwadi
Singasandra
362
1003
25
Harohalli
Kaggalahalli
Vaderahalli
390
1287
26
Harohalli
Kaggalahalli
Yadamadu
307
871
27
Kasaba
Tungani
Agrahara
138
476
28
Kasaba
Allimaranahalli
Allimaranahalli
402
1939
29
Kasaba
Chikkamuduwadi
Anajawadi
526
2165
30
Kasaba
Shivanahalli
Aralalu
663
1790
31
Kasaba
Tungani
Aralalusandra
582
1318
Sky Group
733
P a g e | 17
Chapter 1 | Introduction
32
Kasaba
Kallahalli
Aranakuppe
178
832
33
Kasaba
Budiguppe
Baradanahalli
266
882
34
Kasaba
T.Bekuppe
Bekuppe
480
1308
35
Kasaba
Chakanahalli
Cheeranakuppe
173
821
36
Kasaba
Chikkamuduwadi
Chikkamuduwadi
567
3445
37
Kasaba
T.Bekuppe
Chokasandra
209
1205
38
Kasaba
Allimaranahalli
Ganalu
301
1353
39
Kasaba
Shivanahalli
Hanumanahalli
594
1022
40
Kasaba
Kallahalli
Kallahalli
200
1891
41
Kasaba
Kabbalu
Kanakapura (Rural)
1075
631
42
Kasaba
Tungani
Ramapura
534
1073
43
Kasaba
Tungani
Rayasandra
1178
1727
44
Kasaba
Shivanahalli
Seegekote
479
1551
45
Kasaba
Shivanahalli
Shivanahalli
1250
1799
46
Kasaba
Kallahalli
Thammasandra
674
989
47
Kasaba
Kallahalli
Tigalarahalli
73
680
48
Kasaba
T.Bekuppe
Tigalarahosahalli
482
1255
49
Kasaba
Tungani
Tungani
404
1717
50
Kasaba
Allimaranahalli
Vadedoddi
410
1265
51
Kasaba
Chakanahalli
Virupasandra
361
1812
52
Sathanur
Achalu
Achalu
1601
2498
53
Sathanur
Kabbalu
Alur
215
531
54
Sathanur
Arekattedoddi
Anamanahalli
519
599
55
Sathanur
Achalu
Bommanahalli
189
1084
56
Sathanur
Arekattedoddi
Dalimba
233
1056
57
Sathanur
Sathanur
Deshohalli
243
58
Sathanur
Honniganahalli
Halasinamaradahalli
88
361
59
Sathanur
Honniganahalli
Honniganahalli
212
959
60
Sathanur
Arekattedoddi
Hosahalli
353
115
61
Sathanur
Kabbalu
Kabbal
550
1160
62
Sathanur
Arekattedoddi
Kachavanahalli
312
1678
Sky Group
P a g e | 18
Chapter 1 | Introduction
63
Sathanur
Kadahalli
Kadahalli
420
1099
64
Sathanur
Kabbalu
Kambasagara
326
805
65
Sathanur
Honniganahalli
Kemmale
362
1117
66
Sathanur
Arekattedoddi
Mudalaswamikuppe
124
18
67
Sathanur
Arekattedoddi
Naripura
108
68
Sathanur
Honniganahalli
Sasalapura
841
1595
69
Sathanur
Sathanur
Sathanur
587
4968
70
Sathanur
Kabbalu
Tailuru Forest
3478
427
71
Sathanur
Achalu
Thotahalli
292
1325
72
Sathanur
Yadugowdanahalli
84
73
Uttarahalli
Taralu
Alakabelalu
70
62
74
Uttarahalli
Taralu
Gulakamale
485
2288
75
Uttarahalli
Somanahalli
K. Chudahalli
389
1371
76
Uttarahalli
Kaggalipura
Kaggalipura
939
12070
77
Uttarahalli
Somanahalli
Naganayakanahalli
168
776
78
Uttarahalli
Somanahalli
Nelaguli
375
1189
79
Uttarahalli
Somanahalli
Nettigere
472
1846
80
Uttarahalli
Somanahalli
Ravugodlu
389
1370
81
Uttarahalli
Somanahalli
Somanahalli
540
4657
82
Uttarahalli
Somanahalli
Sunkadakatte
254
433
83
Uttarahalli
Taralu
Tharalu
601
1502
84
Uttarahalli
Taralu
Thattaguppe
383
2528
85
Uttarahalli
Kaggalipura
Uttari
496
1454
86
Uttarahalli
Somanahalli
Vaddarapalya
613
1729
The LPA also consists of a class III census town, Kanakapura, with an area of 3.71 sq. km and a
population of 54,021.
Sky Group
P a g e | 19
Chapter 1 | Introduction
SL
TMC
AREA (Ha)
POPULATION3
Kanakapura
371
54,021
The KPA has been declared as per the government order Number
87 villages has been declared as per section 4a of KTCP act 1961, were in the villages Uttari,
Naganayakanahalli & K.Choodalli of Bangalore South Taluk have also been notified by the
government for BMICAPA. These three villages are overlapping in both the planning authorities & in
this regard correspondence with BMICAPA has been made requesting their opinion to delete these
villages from BMICAPA as for these three villages, the IMP has been prepared & as per that the KPA
has issued many planning permissions but BMICAPA has opined that they will retain three villages as
their notification was made quite earlier to KPA. With all these details KPA submitted a proposal to
BMRDA & In turn BMRDA already requested the government to take immediate decision in respect of
these three villages. However KPA is preparing the master plan as per the earlier notification & delete
the said villages after the government approval & the same will be rectified during the final approval
of the master plan.
The Limitations of the Master Plan process is the lack of primary household data and primary traffic
survey data.
Census 2011
Sky Group
P a g e | 20
CHAPTER 2
Size of the population gives an overall dimension of the physical environment and supplies a basic
yardstick for the estimation of space requirements for various categories of land use.
Studies of population composition extend this analysis to qualitative considerations like age groups,
household sizes, income levels, and needs of each segment of the life cycle. They can be used to
assist in determining the space required for facilities for all segments of the population.
Analysis of population distribution provides clues as to how these various land uses and facilities
should be located in the urban area.
The population of Kanakapura LPA, as per census 2011 and other thematic data from census 2001
has been studied and analysed to arrive at future growth scenarios and determination of
infrastructural requirements.
Sky Group
P a g e | 21
The BMRDA area includes Bangalore Urban and Rural Districts. As per census 2011, the population
is around 105, 76,167 (105 lakhs). The percentage rural population in the area has reduced from 27
per cent in 2001 to 15.02% in 2011 and the percentage urban population has increased from 73% in
2001 to 84.98% in 2011. Hence, the area has gone through a great deal of urbanization.
Population of the BMRDA area represented 16% of Karnatakas population in 2001 and represents
17.3% of Karnatakas population in 2011. The rural population of BMR has decreased from 7% of
total rural population of Karnataka in 2001 to 4.2% of total rural population of Karnataka in 2011.
Whereas, urban population which was 34 per cent of Karnatakas total urban population in 2001 is
now 8.11%. The growth of the rural and urban population in 2011 is 7.63% and 31.27% respectively.
The urban and rural population figures of Karnataka, Bangalore Urban District, Bangalore Rural
District and BMRDA area are presented in the table below.
1971
1981
1991
2001
2011
29,299,014
37,135,714
44,977,201
52,850,562
61,130,704
22,176,921
26,406,108
31,069,413
34,889,033
37,552,529
7,122,093
10,729,606
13,907,788
17,961,529
23,578,175
3,365,515
4,947,610
4,839,162
6,537,124
9,588,910
1,499,761
1,754,394
669,409
777,137
868,971
1,865,754
3,193,216
4,169,253
5,759,987
8,719,939
1,673,194
1,877,416
987,257
1,369,908
1,470,542
719,564
303,286
406,874
267,693
Karnataka
Karnataka
Rural
1,91,791
Urban
Bangalore Urban District
Total
Rural
2,190
Urban
Bangalore Rural District
Total
Rural
Urban
2,260
Ramanagara District
Sky Group
P a g e | 22
Total
1,082,739
Rural
3,555
815,368
Urban
267,353
BMR
Total
Rural
8,005
Urban
3,365,515
4,947,610
6,512,356
8,414,540
10,576,167
1,499,761
1,754,394
2,039,317
2,247,679
1,588,535
1,865,754
3,193,216
4,472,539
6,166,861
8,987,632
Kanakapura Town or TMC is the only urban settlement in the Kanakapura LPA. It has an area of 7.31
sq. km1. The table below shows population in Kanakapura TMC from 1961 to 2011. The present
population of the TMC is 54,021.
Population in Kanakapura Town
60000
POpulation
50000
40000
30000
20000
10000
0
Kanakapura
1961
15000
1971
20000
1981
29000
1991
38000
2001
47000
2011
54021
Sky Group
P a g e | 23
It can be noted that the population growth in the town is less which can be attributed to lack of
economic activity and growth generators in the LPA.
The Kanakapura LPA is composed of 86 villages and 1 town. The present population of the LPA
villages (census 2011) is 126,916. Total population of the LPA, including Kanakapura TMC is
180,931. Figure 2 below shows the population growth in the LPA from1961 to 2011.
Population
140000
120000
100000
80000
60000
40000
20000
0
Kanakapura LPA
1961
83194
1971
95887
1981
125993
1991
151998
2001
170278
2011
180937
Sky Group
P a g e | 24
30%
25%
21%
20%
growth rate
15%
12%
10%
6%
5%
0%
1971
1981
1991
2001
2011
8000000
Kanakapura LPA
6000000
BMR
4000000
2,069,996
2000000
180937
0
1971
1981
1991
2001
Bangalore rural +
Ramanagara
bangalore urban
district
2011
P a g e | 25
rich in agricultural produce but the agro-industry has not been supported. Migration has been a major
trend in many villages in the LPA
The total area of the Kanakapura LPA is 412 sq. km (approx.). The figure below shows the population
density in the Kanakapura LPA.
Population density in Kanakapura LPA
160.00
140.00
Gross density
120.00
100.00
80.00
60.00
40.00
20.00
0.00
Series1
Doddamaralawadi
Harohalli
Kasaba
Sathanur
Uttarahalli
kanakapura TMC
3.04
2.82
3.79
2.63
4.46
145.61
The Structure Plan 2031 advocates clustered growth around exiting growth nodes; hence the future
scenario for the LPA would also follow the present trend of concentrated growth. However, new
growth centres would be promoted in the LPA around Harohalli and Sathanur to create a spur of
economic activities.
Analysis is done Hobli wise, taking average value of individual village, municipal boundary has been considered for Kanakapura TMC
Census of India and Analysis
Sky Group
P a g e | 26
The urban and rural population distribution can be seen in the figure below. The urban population is
contributed by the Kanakapura TMC while the population in the villages constitute the rural
population. It can be seen that 30% of the population lives the urban areas while rural population
constitute 70% of the total population in the LPA.
RURAL
30%
70%
SEX RATIO
Sex ratio is defined as number of females per 1000 males. The sex ratio of the Kanakapura LPA has
been shown in context of the larger framework. It can be seen that the sex ratio in Karnataka is 968 4
females per 1000 males, while that of the BMR is 935. Sex ratio is alarmingly low in the Kanakapura
Town where it is 923 females per 1000 males. The table below shows a comparative list of sex ratios
according to census 2011. Ramanagara ranks 18th among the 30 districts of Karnataka in terms of
sex ratio.
Census 2011
Sky Group
P a g e | 27
Karnataka
SEX RATIO
968
Ramanagara
Kanakapura
5
Kanakapura
District
Taluk
TMC6
976
941
923
The proportion of child population in an area determines the educational infrastructure demand.
According to census 2011 data the 9.38% of the total population of the Ramanagara district belongs
to age group 0-6 years. The table below shows a comparative table of the child population proportion
in Bangalore, Bangalore rural and Ramanagara.
Bangalore
Bangalore Rural
9,88,482 (10.31%)
1,02,019 (10.33%)
Ramanagara
Kanakapura
district
Taluk
1,01,565 (9.38%)
31,868 (9.1%)
of
population in age
group 0-6 years
LITERACY RATE
According to census data 2011, the literacy rate in Ramanagara district is 69.2% which is 9% higher
than that of 2001. Literacy rate among men is 76.92% compared to 69.88% in 2001 an that among
5
Sky Group
P a g e | 28
women is 61.33% compared to 51.22% in 2001. The average literacy rate of Kanakapura Taluk is
65.1, while that in urban areas in 80.5% and in rural areas is 62.5%. Though there has been
considerable increase in the literacy rate in the region, it is abysmally poor compared to the rest of
BMR. The literacy rate of Bangalore is 88.48% the figures below show the comparative data for the
literacy rates in the district.
90
LITERACY RATE
80.5
80
73.9
66.7
70
65.1
62.5
60
56
53.1
50
43.1
46.3
40
30
20
10
0
KANAKAPURA URBAN
AVERAGE LITERACY RATE
KANAKAPURA RURAL
MALE LITERACY RATE
TOTAL
FEMALE LITERACY RATE
The human development index data, according to Karnataka Human Development Report 2005
shows that Bangalore Rural district has a human development index of 0.653 7 . The table below
shows the composition of HD8I in Bangalore Urban and Bangalore Rural district.
7
8
availability of data on adult literacy rates for 2001, literacy rates for 7 years plus, the combined gross enrolment ratios of primary and
secondary level education (class I-XII) have been substituted. Hence, there is element of double counting in the age group 6-18 years for
educational status. It may be noted that due to changes in methodology, i.e. adopting the logarithm method in computation, there has been
a sudden increase in the values of the income index. Another important factor is that changing the base year from 1980-81 to 1993-94 for
estimation of GDP at constant prices for India and the states (introduced by the CSO) has contributed to higher values of income indices for
1991-92 and 2001-02. In Karnataka, the estimates of life expectancy at birth for districts and the state have been made on the basis of the
regression method involving the crude birth rate, the crude death rate, the rate of natural increase in population and the infant mortality rate
Sky Group
P a g e | 29
Health
Education
Income
HDI
Bangalore Rural
0.692
0.662
0.605
0.653
Bangalore Urban
0.705
0.887
0.666
0.753
It is noted that the HDI of the Bangalore Rural district is poor compared to Bangalore Urban district. It
is however higher than the national HDI of 0.621. Care should be taken at policy and proposal level to
augment the HDI status of the area and bring it at par with that of the Bangalore Urban District.
for 2001. In order to enable for the districts and the state are higher than the HDI values in KHDR I. The GDI values have also been revised
for 27 districts for 1991, so as to facilitate a comparison of GDI estimates for 1991 with those of 2001.
Sky Group
P a g e | 30
Under the framework of the draft RSP 2031, a scenario of 75-25 population sharing between the core
and the outside is being aimed for. Since this includes inducing a considerable amount of population
from the core to the outside, there is a need to provide an economic impetus to the LPA.
Bangalore has been experiencing rapid development because of accelerated industries and
economic activities. This has resulted in growth of congestion of Bangalore, because of which there is
tremendous pressure on infrastructure. Land is becoming scarce and hence costly day by day.
Investors are opting to move outwards from Bangalore to the nearest town. Investors prefer
Kanakapura Taluk as their investment destination.
already has a developed industrial base, more and more projects are proposed in this location. Thus
Kanakapura Taluk is expected to register faster economic growth.
These initiatives taken viz, development of infrastructure & housing facilities in mega scale have
enthused major investors to opt Kanakapura taluk for their investments.
WORKFORCE PARTICIPATION
The BMR RSP 2031 states the work participation rate of the BMR as a little over 41%. The workforce
participation rate of the Kanakapura town is however 17.5%11. The industrial work participation rate of
the BMR is considered to be 21%12.WPR13 of Kanakapura Taluk is 49%.
Sky Group
P a g e | 31
WORKFORCE DISTRIBUTION
Workforce Distribution in Kanakapura Taluk
MAIN
38%
and
the
marginal
NONWORKERS
51%
MARGINAL
11%
unemployed and the housewives. In 2001 the percentage of main workers in the Kanakapura Taluk
was 38.1%, while the percentage of marginal workers was 11.1%. Non-workers constituted 50.9% of
the total population. The figure shows the workforce distribution in the Kanakapura Taluk.
Performance of the government employment programmes such as the PMRY, MGNREGA etc should
be analysed in the LPA to uncover the cause of unemployment in the LPA. Economic activities
should be introduced to combat unemployment and reduce out-migration.
FEMALE
38%
females
workers
constitute
the
P a g e | 32
PERSONS
100000
80000
60000
40000
20000
0
MALE
MAIN
90598
MARGINAL
12,709
NON-WORKERS
70,413
FEMALE
37,741
24,660
101,087
Measures should hence be taken at policy and proposal level to augment the share of female
workforce in the economy.
workers.
The Kanakapura town has negligible
industries at present. The livelihood of the
MAIN
35%
NONWORKERS
63%
Sky Group
P a g e | 33
FEMALE
24%
20,000
PERSONS
16,000
12,000
8,000
4,000
0
MALE
FEMALE
MAIN
12,727
3,935
MARGINAL
579
372
NON-WORKERS
11,311
18,136
Sky Group
P a g e | 34
MAIN
38%
below
shows
the
workforce
NONWORKERS
52%
Kanakapura LPA.
MARGINAL
10%
Sustenance
activities
through
attributes
agricultural
to
higher
Nevertheless, the share of non-workers is high. The LPA falls under SEZ for agricultural facilities and
has high potential for sericulture. The opportunities should be explored in order to develop the rural
areas.
Taluk
shows
OTHER
WORKERS
22%
CULTIVATORS
53%
total
workers
household
AGRICULTURAL
LABOURERS
23%
are
industry
in
while
Sky Group
P a g e | 35
PERSONS
50,000
40,000
30,000
20,000
10,000
0
MALE
52,461
AGRICULTURAL
LABOURERS
14,953
FEMALE
25,953
19,673
CULTIVATORS
HOUSEHOLD
INDUSTRY WORKERS
1,619
1,504
OTHER WORKERS
20,968
10,964
W O R K E R D I S T R I B U T I O N I N E C O N O M I C AC T I V I T I E S :
K AN A K A P U R A T M C
CULTIVATORS
3%
AGRICULTURAL
LABOURERS
2%
of
the
total
workers
are
labourers,
9%
are
household
OTHER
WORKERS
86%
are
engaged
in
Sky Group
P a g e | 36
OCCUPATIONAL STRUCTURE
PRIMARY SECTOR
AGRICULTURAL LAND HOLDINGS
L AND U T I L IS AT ION I N KA N A KA P U RA T A L U K
Forest area
28%
Net area
sown
40%
Other
uncultivable
land
8%
Fallow land
10%
Land not
available for
cultivation
14%
Number of holdings
Area (Ha)
44330
20448
19805
18930
14218
7150
4398
314
14
Sky Group
P a g e | 37
The figure above shows the agricultural land holdings in Kanakapura Taluk. 43133 Ha is the total
land under agricultural land holdings. 10.2% of the land is under large holdings, 43.88% under
medium land holdings and rest under marginal farmer held lands. It is noted that the largest
proportion of agricultural land falls under small holdings. While 14 Ha is the average size of large land
holdings, 2.64 Ha is the average medium holding size and 1.4 is the average plot size for small
landholders.
PRINCIPAL CROPS
Kanakapura LPA falls in the eastern dry agricultural zone. It consists of red loamy soil in major areas
and clay lateritic soil in other areas. Ragi, Avare, Ground nut and Niger are important Kharif crops in
the area. Major Rabi crops are paddy, horse gram, maize and castor. The table below shows the
important crop types in each category.
Table2.5: Principal crops in Kanakapura Taluk.
CATEGORY
PRINCIPAL CROPS
Principal pulses
tur, horse gram, black gram, green gram, avare, cow pea
flower
CROP
PRODUCTION (MT)
Coconut
631.5
Arecanut
130
Banana
Mango
2.1
Sapota
2.05
Sky Group
P a g e | 38
Pisciculture is also practiced in small scale in the Taluk. There are about 145 tanks in the Taluk
belonging to Panchayat and minor irrigation. There are almost 430 families that depend on
pisciculture for their livelihood. The no of beneficiaries in the Taluk under The Mahasasraya
Schemeare 17015. There are no fish markets in the Taluk.
SERICULTURE
Sericulture forms an important activity in the Kanakapura LPA as well as in the BMR. Government
has set up 10 silk exchanges in the region to facilitate trading of silk. One of the silk exchanges is
located in Kanakapura Town.
Table 2.7: Sericulture statistics of Kanakapura Taluk .
Sericulture in Kanakapura Taluk
Statistics
5945.25
6591.21
614
13527
15315.792
Kanakapura
1278
No
under
of
farmers
Vandana
Yojna
Beneficiaries
under
69
66
The National Research and Development Corporation (NRDC) through CSB and in turn NSSO, in
Bangalore and CSR&TI, in Mysore had drawn schemes to identify and support financially and
technologically the sericulturists of Kanakapura area. The components are as follows:
15
Sky Group
P a g e | 39
The Chawki Rearing Centre has shown improvement in yield and also adoption of better methods of
sericulture farming in and around 20 villages of Kanakapura Taluk. The training program to the
farmers drawn from the villages is continuing batch wise at CSR&TI, Mysore. The table below shows
the infrastructure facilities available in the Taluk for sericulture.
Table 2.9: Mulberry and Sericulture Infrastructure in Kanakapura Taluk
Description
Kanakapura Taluk
21
48
4551
3896
12291
39
Kanakapura Taluk is classified in Zone 2 i.e. potential taluks for textile development, under the
Karnataka Suvarna Vastra Neethi- 2008-2013 (Textile policy), which entitles it to receive normal
incentives for textile development. Hence, sericulture can be developed as a foremost sector using
the incentives of this scheme.
At present however there exists a cocoon market and an area earmarked for Silk industries in the
Kanakapura TMC. Industrial activity is however extremely meagre.
Sky Group
P a g e | 40
Kanakapura is known for its granite quarrying potential and its products are known for their export
potential.
SECONDARY SECTOR
Existing Industrial Activities in the LPA is concentrated mainly in the Harohalli region. The KIADB
Industrial Estate stage 1 and 2 host a number of small scale and medium scale industries.
According to the Industrial Perspective Plan of Kanakapura Taluk, the Taluk has potential for
investment of around Rs. 176 crores in 794 units in tiny & SSI sector including services. These units
are expected to generate employment opportunities for about 9000 persons. The investment
opportunities have been identified mainly in the following relatively more potential sectors:
Sky Group
P a g e | 41
Apart from these relatively more potential sectors, there are other segments, which also have
potential which include electrical, information technology, construction materials, services,
metallurgical, chemicals & pharmaceuticals and other industries have also been identified and
presented.
DISTRIBUTION OF UNITS & WORKERS IN SMALL SCALE INDUSTRIES
310
200
1
0
104
87
15
1
17
165
11
1
1
19
4
95
16
32
30
11
NO OF UNITS
NO OF WORKERS
It is evident from records that most of the tiny and SSI units in Kanakapura Taluk have been
registered in the District Industries Centre. However, there are few un-registered units in the Taluk. It
is estimated that, un-registered units are in the range of 350 to 450 units and are mainly tailoring,
carpentry, pottery, bamboo, masonry, jelly crushing units. An estimated investment from these units
is in the range of Rs. 350 lakhs to Rs. 400 lakhs. The employment generated from these units is in
the range of 1000 to 1100 nos.
Details of proposals in the Tiny and SSI Sector are given in Annexure 5.
Artisans
There are about 5910 artisans working on different artisans based crafts in the Taluk. The major
artisans are tailors, carpenters, Handloom weavers, masons, etc. The details are furnished in the
Table.
Sky Group
Category
No. of Artisans
Tailors
2000
P a g e | 42
2.
Carpenters
1000
3.
Handloom weavers
1000
4.
Masons
350
5.
Blacksmiths
200
6.
Leather workers
200
7.
Bamboo workers
200
8.
Dhobi
200
9.
Stone crushers
200
10. Others
200
100
12. Potters
100
13. Electricians
60
50
15. TV Repairers
50
Total
5910
The Taluk has potential for investment of the order of Rs.1250 crores in 168 units in Large & Medium
Scale. These units are expected to generate employment opportunities for about 50,000 persons.
The investment opportunities have been identified mainly in the following relatively more potential
sectors:
Information Technology
Textiles
Precision Engineering & Machine Tools
Infrastructure
Plastic & Rubber
Tourism
Construction Materials
There exist 4 medium scale industries in the Kanakapura LPA 16 at present. Details of proposals for
Medium and Small Scale Industries is given in Annexure 5.
16
Sky Group
P a g e | 43
A commercial centre is absent in Kanakapura town.Since Kanakapura is the only town with urban
facilities in the LPA; a regional commercial centre should be located which can amalgamate functions
of a retail as well as a wholesale market.
Table 2.11: Commercial activities in Kanakapura Town
SL
MARKET NAME
LOCATION
CHARACTERISTICS
City Market
NH 209
SH 3 in parts
NH 209
Farm produce
Sky Group
P a g e | 44
EMPLOYMENT PROGRAMMES
Prime Minister Rozgar Yojana (PMRY)
The District Industries Center (DIC) is conducting self-employment programmes in the Taluk mainly
to provide self-employment opportunities to unemployed educated persons. In the recent times,
Under PMRY scheme, the number of persons seeking assistance has increased substantially. During
the year 2003-04, 237 cases were recommended to Banks, of which only 106 cases were
sanctioned.
During 2005-06, 211 persons received assistance out of 439 cases recommended. There is a need
to encourage more number of persons to take up self-employment activities under the scheme by
increasing the allocation of funds. The details are furnished in the Table
Year
Target
No. of cases
Recommended to
banks
2003-04
102
237
106
2005-06
401
439
211
Cases
Sanctioned(Nos
.)
Swarnajayanthi Shahari Rozgar Yojna (SJSRY) has benefitted more than 250 people in the
Kanakapura LPA. Almost 125 people are engaged in wage employment and 40 people are self
17
Sky Group
P a g e | 45
employed. There exist 57 groups who are benefitted under this scheme. 57 women groups have also
been taken up by SJSRY.
Table2.13: No of people benefitted by Swarnajayanthi Shahari Rozgar Yojna
Kanakapura Taluk
Employment Type
Self-employment
40
Wage
employment
125
Groups
Women groups
57
57
The Mahatma Gandhi National Rural Employment Guarantee Act aims at enhancing the livelihood
security of people in rural areas by guaranteeing hundred days of wage-employment in a financial
year to a rural household whose adult members volunteer to do unskilled manual work 18. The table
below shows a list of benefitted people under MGNREGA.
Table2.14: No of people benefitted by MGNREGS
Mahatma Gandhi national Rural Employment Guarantee Scheme ( MGNREGS)
Kanakapura Taluk
No of people in employment
program
No of persons/households working
under MGNREGS
days of employment
20098
1647
18
MGNREGA website
Sky Group
P a g e | 46
Renovation of
traditional water
bodies; 3%
Drought
proofing; 4%
irrigation canals;
2% irrigation
facilities; 8%
Flood controll;
33%
land
development;
18%
flood
control,
renovation
of
irrigation
canals,
irrigationfacilities,
land
complete
in
the
irrigation canals
1%
land
development
11%
irrigation
facilities
26%
conservationan
d water
harvesting
10%
Drought
proofing
14%
Renovation
of traditional
water
bodies
4%
Water
other works
12%
Flood controll
11%
rural
Rural
connectivity
10%
connectivity
enhancement
The
figure
below
shows
the
Figur2.22: Works in-progress under MGNREGA in Kanakapura Taluk ;Source: mgnrega.nic.in; work status report
Sky Group
P a g e | 47
The figure shows a more uniform distribution of works in the various sectors. Majority of the works are
for development of irrigation facilities. Land development, rural connectivity enhancement, flood
control, water conservation and water harvesting, drought proofing and renovation of traditional water
bodies constituted the other major works.
FINANCIAL INSTITUTIONS
Banks are important financial institutions that are indispensible for economic growth. Kanakapura
has fairly good banking network. There are 21 nationalised banks, 5 grameen banks, one DCC and
one KSCARD bank, 22 credit cooperatives and one non-credit cooperative in the LPA.
No of institutions
25
20
15
10
5
0
Kanakapura taluk
Nationalised
banks
Grameen
banks
DCC Banks
KSCARD
Banks
21
Credit co
operative
societies
22
Non credit co
operative
societies
1
Sky Group
P a g e | 48
CREDIT FACILITIES
NABARD, the apex Development Bank, has been preparing District-wise Potential linked Credit
plans (PLPs), with a view to bringing about a qualitative improvement in the credit planning exercise
undertaken annually by banks.
The Potential Linked Credit Plan looks at the resource endowments of the District, the present stage
of development in Agriculture & Rural sectors and estimates the potentials for rural economic
activities both in physical and financial terms. It also takes into consideration the present state of the
infrastructure of the District, institutional support available, the policy/thrust being given to various
sectors of the economy, etc. while estimating the realizable potential for various sectors.
Potential linked plan (PLP), prepared by NABARD for Bangalore Rural District projects a credit
requirement of Rs.462.48 crores of which Rs.41.36 crores (9%) were for non farm sector and balance
amount for other sectors.
Sky Group
P a g e | 49
The existing Bangalore Dindigal Road which passes through the Taluk has been upgraded
to National Highway (NH 209) by the National Highway Authority of India and has potential for
investment in industry and tourism related projects.
The Bangalore International Airport is about 75 km from Kanakapura, is likely to provide a vital
link to international destinations enhancing the overall economic development.
The existing domestic Airport at HAL, Bangalore is 45 km away.
The flow of investment into Bangalore (Urban) will be constrained due to non-availability /
expensive land.
Ramanagara District will be the emerging investment destination for industrial segments such
as pharmaceuticals, automobiles & auto components, aerospace, apparel, food
processing, machine tools, floriculture, precision components, tooling, etc., because of
the proximity to Bangalore and due to the constraint on the availability of land in Bangalore
Urban District.
Kanakapura is known for Granite quarrying and processing and the products have export
potential.
Ramanagara District is covered under Agri Export Zone (AEZ) for gherkins, rose onion and
flowers. The climate of the Taluk suits for cultivation of these commodities.
Ramanagara District including the Taluk ranks third in milk production in the State.
Continuous market availability for milk products in Bangalore
Kanakapura Taluk is rich in attractive tourist spots viz, Sangama and Makedatu.
Scope for improvements at Sangama and Chunche falls, construction of hanging bridge at
Makedatu.
Opportunity for attracting investment in good holiday resorts, recreation clubs, hotels,
ethnic food courts, community / convention centers, nursing homes etc.
Scope for commercial exploitation of biotechnology.
Sky Group
P a g e | 50
ISSUES
Agriculture is the primary activity in the LPA and the yield is high, but in order to induce
population industrial base has to be created. Care has to be taken in the process to conserve
precious agricultural land.
Industrial activity is concentrated in the Harohalli region while activity in the rest of the LPA is
extremely low.
Even though earmarked provision for sericulture industries exists in Kanakapura town, its
growth and productivity is slow
HAROHALLI
GP
Village
Doddamuduwadi
Singasandra
Adishakti temple
Maramma temple
Harohalli
Anjaneya temple
Bandiganahalli
Sky Group
Maramma temple
P a g e | 51
Basappa temple
Anjeneya temple
Dodamuduwadi
Adishakti temple
Mugamaramma temple
Venugopal temple
Kaggalahalli
Gabbadi Kaval
Mudenahalli
Muguthamma temple
Adishakti temple
Basaveswar temple (Pyramid spiritual
Hosakote
temple)
Muthurayanaswamy temple
Kaggalahalli
Church
Bisilmaramma temple
Maruthi temple
Basaveswara temple
Gabbadi
Gabbalamma temple
Maramma temple
Basaveswsara temple
Maramma temple
Vaderahalli
SidiKambaDoddamma temple
Kollapuradamma temple
Dyavasandra
Kolliganahali
Dyavasandra
Maramma temple
ChulaknakereKaval
Hulugondahalli
Basaveswara temple
Muthuraya temple,
Cave (Hulugavi, Kardigavi)
Yadumodu
Maruthi temple
Maramma temple
Sri Maruthi temple
Medamaranahalli
Basaveswara temple
Arunachala temple (1/1)
Harohalli
Harohalli
Hanuman temple
Gopalkrishna temple
Sky Group
P a g e | 52
Maramma temple
Byrappa temple
Marasandra
Hill stations
Chulakanabetta
Byrappabetta
SATHANUR
Gram Panchayat
Village
Yadugowdanahalli
Basaveswara temple
Maruthi temple
Kachavanahalli
Mahadeswara temple
Maladevaralinga temple
Arekattedoddi
Dalimba
Basaveswara temple
Hosahalli
Anjaneya temple
Dandinadevi temple
Kadahalli
Kadahalli
Basaveswara temple
Basaveswara temple
Honniganahalli
Uttarayana temple
Darga
Sathanur
Honniganahalli
Basaveswara temple
Saslapura
Maremma temple
Valamahadeswara temple
Siddapajiswamy Temple
Bommanahalli
Muneswara temple
Basaveswara temple
Anjaneya temple
Achalu
Thotahalli
Ramadevi temple
Kardimaremma temple
Muneswara temple
Achalu
Basaveswara temple
Gurumalleshana cave
Sky Group
P a g e | 53
Narayanaswamy cave
Maruthi temple
Dhabaleswara temple
Maremma temple
Ram temple
Parangi (British) bungalow
Darga
Sathnur
Jama masjid
Sathnur
Laxmi temple
Siddappaji temple
Ashur Khan (Allabigudi)
Shanidevar temple
Kabbalamma temple
Basavanna temple
Kabbalu
Kabbal
Basaveswara temple
KabbalammaDurga
KASABA
GP
Village
Budiguppe
Baradanahalli
Chikkamuduwadi
Chikkamuduwadi
Basaveswara temple
Gangaleswara temple
Anjanawadi
Someswara temple
Chakanahalli
Cheeranakoppe
Basaveswara temple
Kallahalli
Aranakuppe
Veerabhadreswara temple
Kasaba
Maramma temple
Shivanahalli
Seegekote
Basaveswara temple
Anjaneya temple
Sky Group
P a g e | 54
Narayanaswamy temple
Chikkammana temple
Aralalu
Venkataramana temple
Mahadeswara temple
Veerabhadraswamy temple
Anjaneyaswamy temple
Shivanahalli
Kyathammana temple
Dabbagulappa temple
Venkataramaswamy temple
Hanumanahalli
Maramma temple
Tigalarahalli
Muttappa temple
Thammasandra
Basaveswara temple
Kallahalli
Venkteshwar temple
T.Bekuppe
Chokkasandra
Kalmath cave
Allimaranahalli
Ganalu
Anjaneya temple
Kallahalli
Doddamana temple
Tungani
Aralalusandra
Basaveswara temple
Masavamma temple
Anjaneya temple
Rayasandra
Gavigangadharayya temple
Maruthi temple
Benati temple
Someswara temple
Maramma temple
Tungani
Gopalswamy temple
Telamangalamma temple
Shanimahatma temple
Arasamma temple
Anganaya temple
Basaveshwar temple
Ramapura
Mahadeshwar temple
Dandinmaramma temple
Sky Group
P a g e | 55
UTTARAHALLI
GP
Villages
Kaggalipura
Kaggalipura
Basaveswaratemple (18)
Anjaneyatemple
Anjaneyatemple
Uttari
Basaveswaratemple
Venkataramaswamytemple
Anjaneyatemple
Basavannatemple
Somanahalli
K.Chudahalli
Kabbalammatemple
Chellapuradammatemple
Marammatemple
Uttarahalli
Jeevalammatemple
Anjaneyatemple
Nelaguli
Muttalammatemple
Siddeswaratemple
Anjaneyatemple (GramaTana)
Maramma temple
Nettigere
Pattaladammatemple
Muneswaratemple - 103
Gundanjaneyatemple
Ravugodlu
Uttarayaswamitemple
Taralu
Sky Group
Somanahalli
Anjaneyatemple
Thattaguppe
CarmelMatheDevalaya (GramaTana)
P a g e | 56
KONDHARAMAR TEMPLE
KABALAMMA TEMPLE
KABALAMMA TEMPLE
SANGAM
CHENNEKESAVA TEMPLE
Sky Group
P a g e | 57
CHAPTER 3
Housing is certainly a basic human need. No single type of housing can serve the varied needs of
todays diverse households. Whether a home owner or renter, senior citizen, school aged child or
disabled adult, all residents need an affordable, comfortable and safe place to live. A place is better
to live and work when a variety of appealing and affordable housing options exist.
Affordable housing has a positive impact on educational outcomes, health, and wealth accumulation.
Hence housing initiatives must be viewed in the back ground of overall economic development and
the needs of the people. The State Housing Policy aims to provide Affordable Housing for All. The
poorer sections of the society often do not have access to formal land markets and access to
financial institutions. Supplementing the condition is the severe mismatch of demand and supply
arising from dynamic socio-economic conditions and inadequate land policies which make affordable
housing scarce.
Providing housing is not limited to provision of a built structure. The Karnataka Housing and Habitat
policy, 2009 therefore advocates a Habitat approach to housing, which translates into access to
basic services such as water, sanitation, clean fuel, electricity, healthcare, education and livelihood.
Hence the aspects of water supply, sanitation and waste disposal should be taken into account
during spatial planning of residential areas.
Sky Group
P a g e | 58
Harohalli
172.94
3.78%
Kanakapura TMC
325.91
11.86%
Sathanur
92.31
4.68%
Kaggalipura
132.65
6.17%
Total
550.87
1.34%
HOUSEHOLD SIZE
5 member
17%
4 member
30%
have household size of 4 and below, which might be a result of migration in the Bangalore Region
from other parts of the state.
P a g e | 59
The
No of habitable rooms: Ramanagara District
Four room Five
room
Three room 3%
1%
9%
figure
below
shows
the
distribution of houses by no of
No exclusive
room
21%
Two room
26%
One room
40%
houses
however
have
no
exclusive rooms.
60% of the population has one or no
exclusive rooms, which suggests
low habitable rooms per person. Habitable rooms per person is an important housing indicator, the
present data suggests poor housing condition.
FLOOR MATERIAL
The distribution of households by
Others
0%
Wood/bamboo
0%
Burnt stick
1%
Stone
1%
Cement
68%
Census 2011 data was available for Ramanagara District level only
Sky Group
P a g e | 60
WALL MATERIAL
The
Concrete
5%
Plastic/Polythen
e
0%
Grass/Thatch
4%
figure
below
shows
the
Mud/Unburnt
brinks
29%
Burnt bricks
51%
Stone
11%
Wood
0%
G.I.
sheets/metal/as
bestos sheets
0%
Figure3.4: Distribution
of households by wall
material
ROOF MATERIAL
The major roofing materials in the district are grass/thatch, plastic/polythene, tiles, brick, stone/slate,
G.I. sheets/metal/asbestos sheets etc. It can be seen from the figure below that 49% of the houses
have
Roofing Material-RAMANAGARA DISTRICT
Others; 0% Grass/Thatch;
10%
Plastic/Polythen
e; 0%
Concrete; 16%
G.I.
sheets/metal/as
bestos sheets;
22%
tiles
materials,
their
while
roofing
22%
G.I./metal/asbestos
16%
of
the
have
sheets.
houses
have
Stone/slate; 3%
as
material
in
minor
Brick; 0%
Sky Group
P a g e | 61
AVAILABILITY OF FACILITIES
The figure below shows the distribution of houses in Ramanagara district by the availability of
facilities. It can be seen that 75.3% of the houses avail bathroom facility, 10.2 have bathroom
enclosure without roof and 14.5% have no bathroom. 54.6% of the houses have open drainage, 13.4
% have closed drainage while 32% houses have no drainage facility. Kitchen facility is available for
88.8% of the houses, 7.6% of the houses have no exclusive cooking space while 3.3% cook in open.
no of households
90
80
70
60
50
40
30
20
10
0
Bathroom
RAMANAGARA DISTRICT
Bathroom
no
enclosure
bathroom
without roof
75.3
10.2
14.5
closed
drainage
open
drainage
no drainage
kitchen
available
cooking
inside
house
13.4
54.6
32
88.8
7.6
cooking in
no cooking
open
3.3
0.3
Sky Group
P a g e | 62
Plotted developments
Departments
Department of Housing,
Govt. of Karnataka
Sky Group
Housing Schemes
P a g e | 63
scheme of GPHP.
Urban Ashraya Housing Scheme.
Rural and Urban Ashraya Sites Schemes
Dr.Ambedkar Housing Scheme
Neralina Bhagya
Housing for Special occupational groups
Gram Panchayat Housing scheme
Navagrama Housing Scheme
Karnataka Housing Board
(KHB)
Karnataka Slum
The Ashraya scheme is a housing scheme introduced by the Govt. of Karnataka to aid people in
economically weaker section, in both urban and rural areas to avail improved housing through
financial assistance in the form of loans and subsidies. The maximum value for financial assistance
including both loan and subsidy is 20,000 in rural areas and 25,000 in urban areas. Under the
Ashraya rural housing sites scheme free house sites may be distributed to the houseless
beneficiaries of the EWS in rural areas. The tables below shows a list of housing sites allotted and
houses constructed under Ashraya scheme in Kanakapura Taluk.
Scheduled
Scheduled
Caste
Tribe
174
119
Others
Total
769
1062
Sky Group
Scheduled
Scheduled
Caste
Tribe
Others
Total
P a g e | 64
Houses
Constructed Under
Ashraya
Scheme (2010-11)
153
12
452
617
Indira Awaas Yojana (IAY) is a flagship scheme of the Ministry of Rural Development to provide
houses to the poor in the rural areas. The objective of the Indira Awaas Yojana is primarily to help
construction/up gradation of dwelling units of members of Scheduled Castes/Scheduled Tribes, freed
bonded labourers, minorities in the below poverty line category and other below poverty line nonSC/ST rural households by providing them a lump sum financial assistance.
Scheduled
Scheduled
Caste
Tribe
487
133
Others
Total
428
1068
Ambedkar Housing scheme is an initiative for providing housing to the economically weaker section
and the scheduled castes and scheduled tribes in rural areas. Under this scheme a maximum
financial assistance of 20,000 may be provided for construction of houses.
Houses
Constructed
B.R.Ambedkar Scheme
Under
Scheduled Caste
Scheduled Tribe
Total
45
52
P a g e | 65
Scheduled
Scheduled
Caste
Tribe
Total
The basic objective of Integrated Housing and Slum Development programme is the holistic slum
development with a healthy and enabling urban environment by providing adequate shelter and basic
infrastructure facilities to the slum dwellers who do not possess adequate shelter and reside in
dilapidated conditions as identified by the Urban Local Body.
Physical Infrastructure
in-situ
housing
provision of 25 sq. m
Component
plinth
area
with
two
Social Infrastructure
Water Supply
Roads
Drains
Community
Seva
Community Toilet
Kendra
Community Bath
Community Centre
Street Light
SWM
be
considered
for
all
categories of population
20%
contribution
from
state
/ULB
The sharing of fund between Central Government and State Government/ ULB/ Parastatal is 80:20.
Under the ISHDP scheme, 720 units have been constructed in Kanakapura LPA.
Sky Group
P a g e | 66
Town
No of units
Kanakapura
727
Sky Group
P a g e | 67
Ward No
Status
Population
1. Kurupete
21
Declared
551
2. Budhigere
Declared
250
Declared
394
3. Kotehalla
4. Maharaja Katte
16
Declared
370
12
Declared
510
Declared
614
Declared
352
Declared
610
Identified
350
16
Identified
2950
10
Identified
1700
16
Identified
1350
13. Thotihola
16
Identified
435
TOTAL
10436
P a g e | 68
ISSUES
1. PROVISION OF HOUSING FOR INDUCED POPULATION: Induced population constitute a
major proportion of the future population of the LPA. As such, the present housing supply is
inadequate for the future growth scenario.
2. CONDITION OF DWELLING UNITS: Condition of dwelling unit is poor in many parts of the
LPA. As such they would not contribute to the housing stock in future.
3. Low habitable rooms per person in the LPA suggesting housing shortage.
Sky Group
P a g e | 69
CHAPTER 4
Tables below show the existing land utilisation and landuse in the LPA.
DEVELOPED/BUILT UP AREA
AGRICULTURE
WATER BODIES
FOREST
TOTAL
AREA
(IN HECTARES)
AREA
(IN SQ KM)
PERCENTAGE
2565.92
36517.12
1249.86
945.10
41278
25.66
365.17
12.50
9.45
412.78
6.22%
88.47%
3.03%
2.29%
100.00%
Sky Group
AREA
(IN HECTARES)
AREA
(IN SQ KM)
PERCENTAGE
2299.52
21.95
11.64
59.71
13.82
48.64
105.13
5.51
2565.92
36517.12
1249.86
945.10
23.00
0.22
0.12
0.60
0.14
0.49
1.05
0.06
25.66
365.17
12.50
9.45
412.78
89.62%
0.86%
0.45%
2.33%
0.54%
1.90%
4.10%
0.21%
100%
-
41278
P a g e | 70
AREA
(IN HECTARES)
AREA
(IN SQ KM)
PERCENTAGE
RESIDENTIAL
216.31
2.16
68.90%
COMMERCIAL
14.92
0.14
4.75%
INDUSTRIAL
2.21
0.02
0.70%
22.44
0.22
7.15%
5.58
0.05
1.78%
PUBLIC UTILITY
8.43
0.08
2.69%
TRANSPORTATION
43.83
0.43
13.96%
VACANT LAND
0.21
0.02
0.07%
313.94
3.13
100%
GRAND TOTAL
The Residential area contributes to around 68.90 per cent of the developed area. These are mainly
concentrated in wards 3 to 9. The older areas have higher density when compared to the new
extensions. These wards have organic growth pattern with irregular plot sizes and irregular pattern of
roads. The newer extension shows a regular grid iron pattern of growth.
Sky Group
P a g e | 71
the people and mostly consist of petty shops. Other daily commercial setups are distributed sparsely
in various wards. Most of the main roads have developed mixed land use.
Parks/Playgrounds/Open Spaces
Parks, Playgrounds & Open spaces is around 1.78percent of the total area. There are no organized
parks in Kanakapura. Hence the playgrounds and open spaces some of which are burial ground
contribute to the area. The area under play grounds is bare minimum. The old areas having high
density do not have lung spaces. Incidental open spaces are found due to the irregular growth pattern
of the town.
Sky Group
P a g e | 72
AREA
(IN HECTARES)
AREA
(IN SQ KM)
PERCENTAGE
RESIDENTIAL
74.91
0.74
69.13%
COMMERCIAL
3.60
0.03
3.32%
INDUSTRIAL
4.91
0.049
4.53%
4.98
0.049
4.60%
1.54
0.015
1.42%
PUBLIC UTILITY
0.00
0%
TRANSPORTATION
18.42
0.18
17.00%
VACANT LAND
0.00
0%
108.37
1.08
100%
GRAND TOTAL
Residential
The above table indicates the existing land use of Harohalli conurbation area in Kanakapura LPA.
Out of the total area in Harohalli, residential forms the major land use and accounts to about 69.13
percent of the total area.
Transportation
17% of the land comes under traffic and transportation. The major connectivity is through the NH 209.
The road widths vary according to the levels of accessibility. The KSRTC bus stand is located at the
critical junction of the NH 209 and Maralwadi-Anekal road.
Public and Semi Public
4.60% of the land is under Public and Semi Public use and is located along the NH 209. This land
use consists of government schools, hospitals, religious buildings, hostel and gram Panchayat offices
and related buildings.
Sky Group
P a g e | 73
Commercial
Commercial accounts for 3.32% of the total land use and most of them are daily commercials in the
form of petty shops. These are mainly distributed linearly along the State Highway and the Maralwadi
Anekal road.
AREA
(IN HECTARES)
AREA
(IN SQ KM)
PERCENTAGE
RESIDENTIAL
47.86
0.48
66.22%
COMMERCIAL
1.43
0.14
1.98%
INDUSTRIAL
0.15
0.01
0.21%
9.81
0.09
13.58%
1.44
0.014
1.99%
PUBLIC UTILITY
0%
TRANSPORTATION
11.57
0.11
16.01%
VACANT LAND
0%
72.27
0.72
100%
GRAND TOTAL
The figure indicates the existing land use of Sathanur village. Out of the total area, 66.22% of land
use is under Residential. The residential density is very low and the households are sparsely
Sky Group
P a g e | 74
distributed. Parks, Playgrounds and open spaces account for 1.99% of the total land use. These are
located next to the public and semi-public uses.
16.01% of land is under Transportation and 13.58 % of land is under Public and semi-public use,
mostly concentrated along the south eastern end of the village. The public buildings include schools,
PHC, religious buildings and government offices.
LANDUSE
AREA
(IN HECTARES)
AREA
(IN SQ KM)
PERCENTAGE
RESIDENTIAL
74.80
0.74
40.28%
COMMERCIAL
2.00
0.02
1.07%
INDUSTRIAL
4.37
0.04
2.35%
22.48
0.22
12.10%
5.26
0.05
2.83%
PUBLIC UTILITY
40.21
0.40
21.65%
TRANSPORTATION
31.31
0.31
16.86%
VACANT LAND
5.30
0.05
2.85%
185.71
1.85
100%
GRAND TOTAL
The pie diagram indicates the existing land use of Kaggalipura village. Out of the total area, 40.28%
of land is under Residential land use. The residential density is very low and the households are
sparsely distributed. Parks, playgrounds and open spaces account for 2.83% of the total land use.
16.86% of land is under transportation and 12.10% of land is under public and semi-public mostly
distributed linearly along the Kanakapura Bangalore road passing through the village. These public
Sky Group
P a g e | 75
buildings include schools, PHCs, religious buildings and Government offices. Commercial accounts to
1.07% of the total developed area located along the Kanakapura road.
total private
land; 81%
Sky Group
P a g e | 76
This chapter presents the transportation scenario in Kanakapura Local Planning Area. Key issues like
road network and its characteristics, impact of enhanced regional connectivity due to formation of the
STRR, PRR, ITRR, its potentials and drawbacks have been discussed here. 2.23%of the total area in
the LPA is devoted to transportation.
REGIONAL LINKAGES
ROAD LINKAGE
The Kanakapura LPA is well connected to the various urban centres of the region. It is intercepted by
the NH 209 which connects Bangalore to Mysore. Traffic volume on this road is low as major traffic in
the Bangalore-Mysore corridor flows through SH 17 (Mysore road). The PRR, the STRR and the IRR
are proposed regional roads that pass through the LPA. The PRR is the northernmost road in the
LPA which connects to NICE corridor in the north-west and the Bannerghatta Main Road in the east.
The IRR connects Harohalli to Bidadi in the west and Anekal in the east. The STRR connects
Kanakapura town with Ramanagaram town in the west and Anekal in the east.
Harohalli is intercepted by NH209, which connects the town to Bangalore in north and Kanakapura in
the south. Harohalli is connected to Bidadi by a regional road, which joins the Mysore Road (SH 17)
near Bidadi town. The Anekal-Harohalli road connects it to Anekal town in the east. The Maralwadi
road is another regional road in the town that connects Harohalli to Dhodda Maralwadi.
Kanakapura town is a class III census town. It is intercepted by the NH 209 which connects the town
to Harohalli in the north and Sathanur in the south. The SH 3 connects Kanakapura to Ramanagara
in the west and Hunasanahalli in the east. The SH-92 (Kanakapura-Sangam road) is another important
regional road.
Sky Group
P a g e | 77
Sathanur is a village that lies in the southern end of the LPA. The NH 209 connects it to Kanakapura
in the north and Malavalli in the south. Sathanur is connected to Channapatna in the north and to
Cauvery river valley and the elephant corridor in the south.
There is no rail
linkage at present in
the LPA. The draft
RSP 2031 however
proposed a railway
corridor in the region,
connecting Sathanur,
Kanakapura and
Harohalli with
Bangalore.
SEAPORT
The nearest seaport is at Mangalore, which is about 380 km and Chennai Seaport is around 415 km
from Kanakapura Town. The existing Mangalore Port is an all-weather port-providing gateway for
exports & import trade throughout the year.
AIRPORT
The nearest airport at present is the Bengaluru International Airport, Bangalore at a distance of
about 90 kms from Kanakapura Town.
Sky Group
P a g e | 78
Major travel demand between Bangalore and Kanakapura is catered by KSRTC buses which forms
the major mode of transport in the LPA. KSRTC bus stands are located in Kanakapura town,
Harohalli and Sathanur. Private bus service is also present in Kanakapura Town and Harohalli
connecting the villages and towns of the LPA with Bangalore.
Para-transit or Intermediate-transit service like Auto-rickshaw service exists in Kanakapura Town and
Harohalli. Both intra-settlement and inter-settlement service is available. Organised auto stand is
located in Kanakapura town beside the KSRTC bus stand.
P a g e | 79
Sl
ROAD CATEGORY
ROAD LENGTH
MAINTAINED BY
National Highway
47
PWD
State Highway
78.5
PWD
505.35
PWD
785.4
PWD
Forest roads
21
FOREST DEPT
The National Highway (NH) 209 runs from north to south forming the major arterial road in the
transport network in the LPA. The Bannerghatta Road is a major regional road that originates in
Kaggalipura and connects the town to Bangalore in the east. The Agara main Road connects the
town to Dinnepalya and further west. Local roads form the rest of the road network in the town.
Name of
road
Hierarchy
RoW
(ft)
Carriag
Metalled/
eway
Non-
(ft)
metalled
No of
Street
lanes
Lights
Foo
Median
tpat
h
Yes
1
NH 209
NH
70
30
Metalled
Yes
(within
municip
No
al limits)
2
Bannerghatta
Arterial
Road
Road
Sky Group
30
21
Metalled
Partial
No
No
P a g e | 80
Agara Main
Sub-
Road
arterial
30
15
Partially
Metalled
No
No
No
Harohalli
The National Highway running North-South forms the arterial road in Harohalli town. The AnekalBidadi road forms a major link in east-west connectivity, connecting Anekal in the east and Bidadi in
the west. Local streets form the rest of the road network in the town.
Name of
road
Hierarchy
RoW
Carriageway
(ft)
(ft)
Metalled/
Nonmetalled
No of
Street
lanes
Lights
Median
Foot
path
Yes
1
NH 209
NH
70
30
Metalled
Yes
(within
municipal
No
limits)
Anekal2
Bidadi
Arterial
35
24
Metalled
Partial
No
No
Road
Sky Group
P a g e | 81
Road network inventory has been carried along the major roads in the Kanakapura Town. After an
initial reconnaissance survey, the following roads have been shortlisted as major roads in the town.
All major roads are metalled and all roads besides the national Highway consist of two lanes. Median
is present on the National Highway within the municipal limits. Streetlights are present in almost all
major roads. Footpath is not present in any of the major roads in the town. The table below lists out
the inventory of the major roads in the LPA.
Sl
Name of
Hierarch
RoW
road
(ft)
Carriagewa
Metalled/
Non-
(ft)
metalled
No of
Street
lanes
Lights
Median
Footpath
Yes
1
NH 209
National
Highway
70
30
Metalled
Yes
(within
municipal
No
limits)
2
SH 3
NH-SH link
road
SH
24
20
Metalled
Yes
No
No
Collector
26
20
Metalled
Yes
No
No
Collector
24
18
Metalled
Yes
No
No
Kanakapura
4
- Malagalu
Rd
Sky Group
P a g e | 82
The major roads in Sathanur besides the NH 209 is the Sathanur Channapatna Road which connects
Channapatna to Sathanur and the Sathanur-Muthathi Road which connects Sathanur to the Cauvery
river valley and the Elephant Corridor in the south. The Road network in Sathanur is composed
mainly of local roads. The inventory of major roads is listed in the table below.
Sl
Name of
Hierarch
RoW
road
(ft)
Carriag
Metalled/
eway
Non-
(ft)
metalled
No of
Street
Media
Footpat
lanes
Lights
Yes
(within
1
NH 209
NH
70
30
Metalled
Yes
munici
No
pal
limits)
Sathanur2
Muthathi
Arterial
21
18
Metalled
No
No
No
Arterial
36
14
Metalled
No
No
No
Road
3
SathanurChannapatna
P a g e | 83
The World Bank report for Rural accessibility index says Rural access is measured in terms of no of
people within 2kms (walking distance of 20-25 min) of an all-weather road as a percentage of the
total rural population. An all-weather road is a road that is accessible all year round by the prevailing
means of rural transport (typically a pick-up or a truck which does not have four-wheel-drive).
Occasional interruptions of short duration during inclement weather (e.g., heavy rainfall) are
accepted, particularly on lightly trafficked roads.
The relationship between transport and poverty reduction is neither straightforward nor automatic.
However it is apparent that improvements in transport have the greatest impact on poor people when
made in concert with activities in other sectors. It is similarly apparent that development in other
sectors will be hampered without attention to transport issues.
Accessibility in urban areas can also be defined in terms of kilometres of road length per 1000
people. As per data, the accessibility index for Kanakapura Taluk is 4.47 km per 1000 population.
TRIP CHARACTERISTICS
There is no defined Central Business District or Commercial Area in the Kanakapura Town, though
commercial activities are concentrated mainly along the National Highway and the State Highway.
More over the entire town has a predominant residential land use. So deriving specific trip directions
is not possible. However, the KSRTC bus stand can be considered as the origin and destination of
major outstation trips in the peak hours.
Sky Group
P a g e | 84
CATEGORY
NO OF VEHICLES
Goods Vehicles
1423
Buses
39
Motor Cabs
219
Maxi Cabs
197
880
987
Two Wheelers
14212
Cars
2239
Jeeps
10
Omni Bus
45
11
Tractors
1251
12
Trailers
1237
13
Ambulance
14
Others
275
TOTAL
23008
Source: RTO
It can be seen from the figure below that, two wheelers constitute the largest share of the vehicles in
the Taluk followed by four wheelers.
Sky Group
P a g e | 85
Vehicles in Kanakapura
Goods vehicles
Buses
motor cabs
0%
0% 1%
0%
0%
6%
5%
maxi cabs
1% 1%
6%
4%
4%
10%
62%
trailers
ambulance
others
FREIGHT MOVEMENT
The KIADB industrial estate is the major industrial area in the Kanakapura LPA. Since the National
Highway 209 is the primary regional linkage, it forms the major corridor of freight movement. Phase 1
and 2 of the Industrial Estate has been commissioned presently and occupancy of the plots is
presently low2, hence the impact of freight movement on the traffic flow is not visible presently.
However, with increase in the number of industries in Harohalli and development of Harohalli-Bidadi
Industrial corridor, a separate freight route would be necessary, especially around the Kanakapura
Town, which sees heavy traffic on the NH 209.
Sky Group
P a g e | 86
MAJOR ISSUES
Road hierarchy is non-existent in the road network of Kanakapura Town. As such all major
traffic flows through the NH 209 and SH 3. Proper segregation of intra-settlement and intersettlement traffic is essential to ensure unhindered flow to regional traffic.
Regional Freight route originating in the industrial areas should be delineated to avoid conflict
with normal traffic flow.
On street parking of two wheelers and four wheelers on NH 209, SH 3 and other major roads
cause hindrance to regional traffic flow. Adequate parking facility should be provided in the
commercial areas.
Sky Group
P a g e | 87
The regional roads in the LPA SH3, Bannerghatta main Road, and Anekal-Bidadi Road
have inadequate carriageway width and are ill maintained3. Initiative should be taken to
improve the existing regional linkages of the LPA.
The National Highway has given rise to major commercial activities in the adjacent properties
in Kanakapura Town. Pedestrian-vehicular traffic movement conflict is hence a major problem.
Footpaths and adequate pedestrian transfer facilities are required in the areas.
Sky Group
P a g e | 88
Chapter 5 : Infrastructure
CHAPTER 5
INFRASTRUCTURE
5.1 PHYSICAL INFRASTRUCTURE
WATER SUPPLY
Water supply is related to the main themes in the development agenda poverty alleviation,
environment protection, private sector led growth, participatory development and good governance.
The growth process and the expansion of economic activities inevitably lead to increasing demands
for water for diverse purposes of which drinking and domestic needs attains paramount importance.
However this essential commodity for sustenance of life is not adequately available to a large number
of people especially in the rural areas and even in parts of urban settlements. Domestic and industrial
water needs have largely been concentrated in and around principal cities but with steep population
hike, demand for water is increasing at a superfast pace. As a result water, which is already a scarce
commodity, is going to become a scarcer commodity in future.
Water quality deterioration has also set in and maintaining water quality is a foremost requirement. It
is one of the most crucial elements in planning. Efforts to develop, conserve, utilize and manage this
immensely important resource have to be whole heartedly made keeping the National perspectives in
view. AT the same time a strong database needs to be prepared to monitor and integrate the water
based activities like city planning, industrial planning and development etc. Serious wastage of water,
water loss in transmission, wastage by public are also issues that need to be addressed.
Sky Group
P a g e | 89
Chapter 5 : Infrastructure
premises.
Majority
of
the
BWSSB supplies water to Kanakapura Town along with Bangalore. Hence there are no town level
pumping, distribution and treatment facilities for the surface water source. Cauvery is the surface
Sky Group
P a g e | 90
Chapter 5 : Infrastructure
water source to the LPA. The surface sourceis Cauvery River at a distance of 10km from the town.
An average of2.5 MLD of water is drawn from thesource through BWSSB pipelines.
SOI maps followed by field observations supplemented by WRDO reports, indicates that there exists
many lakes and tanks network systems in the conurbation area and neighbouring villages. The
ground water source includes134 borewells out of which 74 borewells are fitted with power pumpand
the remaining bore wells arefitted with handpumps. A total of 1.5MLD of water is extracted from
borewell sources. The present water supply to thetown is 4.8 MLD 1 with per capita rate of water
supply being 75-80 lpcd.
SOURCE OF WATER
YEILD
Cauvery River
2.5 MLD
1.5 MLD
The per capita domestic requirements as per norms prescribed by Central Public Health and
Environmental Engineering Organization (CPHEEO), Ministry of Urban Development, and Govt. of
India are as under:
Category
70
existing/ contemplated
135
150
Sky Group
P a g e | 91
Chapter 5 : Infrastructure
The present water demand in the Kanakapura LPA has been calculated as follows:
AREA
POPULATION
PER CAPITA
WATER
CONSUMPTION
PER DAY (litres)
WATER DEMAND
(MLD)
Kanakapura TMC
54021
135
7.3
Villages in LPA
126916
552
6.9
TOTAL
14.27
The domestic water requirement of the Kanakapura TMC @ 135 lpcd is calculated to be 7.3 million
litres per day, while that of the villages is 6.9 million litres per day.
VOLUME (Mld)
3
2
1
0
PRESENT DEMAND
PRESENT SUPPLY
CPHEEO norms
Sky Group
P a g e | 92
Chapter 5 : Infrastructure
724 acres of industrial area have been proposed in the Landuse Plan of the LPA. According to the
Industrial Perspective Plan, 794 Tiny and SSI Units have been proposed and 168 Large and Medium
Industries have been planned. The water requirement is calculated (from existing supply at Bidadi
cluster) to be 3.3 MLD for the industrial area,
There is no water treatment plant in Kanakapura Town. The head works are located at
Jakkegowdnadoddi constructed on banks of River Cauvery at a distance of about 10 KM from the
town. The town doesnot have separate town level water pumping and raw water storage system for
the surface water source.The BWSSB which provides water to Bangalore city also provideswater to
the Kanakapura town. The treated water is distributed through the BWSSBpipelines to the service
reservoirs.The borewell water is pumped by pumping stations located at Malagala road and Rural
police station. The pump house at Malagala road is situated on the banks of Arkavati River. It pumps
water from 3 borewells and supplies to a 75 KL sump.From there it is pumped to OHT at
Chamundeshwara choultry using submersible25HP pump with 100% standby. The pump house at
rural police station also has asump of 75KL and pumps water from 3 borewells by 25 HP pump with
100% standby. It is further pumped to the service reservoir.
There are 4 Over Head Tanks (OHTs) and 2 Ground Level Storage Reservoirs (GLSR) in the town.
The total storage capacity of the reservoirs in the town is 3.05ML (2.45 ML in OHT and 1.5ML in the
GLSR). The details of the service reservoirs in the town are listed in the table below.
LOCATION of OHT
OHT
1
Sky Group
10.00
P a g e | 93
Chapter 5 : Infrastructure
Near IB
10.00
4.50
Chamundershwari choultry
4.50
GLSR
1
0.75
0.75
TOTAL
30.5
The total length of existing distribution network in the city is 50 km. The distribution network coverage
is 75% with comparison to existing road length of 67 km. The status of water supply in Kanakapura
Town is shown in the table below:
No of existing units
54
89
5159
151
No of public taps
1563
Source: www.kanakapuratown.gov.in
Surface water, tanks and ground water are the primary sources of drinking water in rural Kanakapura.
The Major and Medium irrigation projects are potential sources for drinking water supplies in their
respective command areas. Cauvery if the major source of drinking water in the urban areas though
Sky Group
P a g e | 94
Chapter 5 : Infrastructure
rural areas are excluded from its coverage. There is a recorded history of providing priority to tank
development in each village. They were primarily meant for irrigation and as a source of drinking
water. Their development was mostly done on a aquifer basis and was in a networked and cascading
manner i.e. over-flow of upper (higher elevation) tank used to reach the next tank and so on until the
last tank (lower most elevation) was filled. Their capacity was decided more on the basis of local
needs. Geology and soil type make ground water recharge favourable in the LPA. Hence ground
water is a major source of drinking water.
WATER QUALITY
With increasing industrialization, urbanization and deforestation, the quality of water resources
available to mankind is deteriorating day by day. The supply of drinking water in terms of both quality
and quantity is a major concern now. Out of many chemical and biological contaminants in drinking
water, excess Fluoride and arsenic are of the utmost concern due to their serious health impacts. The
study conducted by Rajiv Gandhi National Drinking Water Mission during 1990-1992 has reported 15
States (including Karnataka) endemic for the Fluorosis. Therefore, effective surveillance and
monitoring of water quality becomes very important in the state of Karnataka.
The quality of drinking water affects health of the consumers because certain bacteria and microbial
diseases, toxic chemical compounds etc. can be transmitted to the human body through water.
Experience has shown that community health and water quality is directly related to each other and
that an improvement in the quality of drinking water supply is followed by an improvement in
community's health. The Karnataka Ground Water Quality Data report3 says that out of 612 villages
in the Kanakapura Taluk, 16 villages were affected with excess fluoride in drinking water while 4
villages were affected with excess Iron.
ISSUES
1. The per capita water supplied to Kanakapura Town at present is 75-80 lpcd, which is
considerably lower than the 135 lpcd stipulated by the CPHEEO norms. As such there is
water scarcity in the LPA. The gap between supply and demand would increase in future as
shown in figure 9.3.
Sky Group
P a g e | 95
Chapter 5 : Infrastructure
2. At present only 75% of the Kanakapura TMC is covered by the water supply network,
whereas ideally the entire town should have access to potable water.
3. Excess fluoride (above 1.5 ppm)4 and iron in drinking water has been reported in the villages
of Kanakapura posing serious threat to health.
4. Brackishness in water has also been reported in ground water in rural areas. Such
characteristics of water are highly harmful for public health and should be removed by
treatment.
5. Only 20% of the total population get treated water from taps. Water treatment is an important
aspect of water supply
6. 14% of the population avail water from a source away from their dwelling unit. Care should be
taken to provide potable water within or near the dwelling unit for the entire population.
7. Water supply system should be designed in consideration with the natural topography of the
land, to assure adequate water pressure in all areas.
Sky Group
P a g e | 96
Chapter 5 : Infrastructure
INTRODUCTION
Efficient sewerage and sanitation system is a pre requisite for maintaining health and hygiene in
society. Diseases, especially water borne diseases spread due to unsanitary conditions. Due to rapid
growth of population in Kanakapura LPA, additional pressure would be created in the existing
network. Hence, upgradation and extension of the system is necessary.
DRAINAGE NETWORK
The general topography of the town slopes towards the River Arkavathy which flows adjacent to the
town. The total length of drains in the town is approximately 55km out of which 8km of drains is in
major valley portions. 33 km of the total drains is of pukka type and 13km is kachha type. The storm
water drains also receive partial sullage since the town is only partially covered by underground
drainage system.
With respect to the existing road network, there is 70% coverage of storm water drains in the town.
Sky Group
P a g e | 97
Chapter 5 : Infrastructure
The sewage generation is approximately assumed to be 80 % of total net water supply has
beenconsidered out of which water supplied for green areas, washing streets, Horticulture, Fire
fighting would cover the ground water infiltration. Present sewage generation in the LPA is calculated
as shown in the table below.
AREA
POPULATION
Sewerage generation
(Mld)
Kanakapura TMC
54021
7.29
5.83
Villages in LPA
126916
6.98
5.58
14.27
11.42
TOTAL
Kanakapura Town is only partially covered by underground sewerage system. A total of 71.6 km of
sewerage network is proposed to be laid to cover the entire town area. 19.28 Ha land has been
acquired in Aralalu village for construction of Sewage Treatment Plant (STP).
The
figure
below
shows
the
Open
defecation
56%
Sky Group
P a g e | 98
Chapter 5 : Infrastructure
Percentage of households
Bathroom
facility Kanakapura
Taluk
Percentage
53.4
Bathroom
facility-Rural
Areas
48.1
Bathroom
Toilet faciltyToilet facilty- Toilet faciltyfacilityKanakapura
Rural Areas Urban Areas
Urban Areas
Taluk
87.4
24.8
15.6
83.6
RURAL SANITATION
Promotion of rural sanitation is being carried out through the implementation of Nirmala Grama
Yojane. Providing toilet facilities to primary schools with water supply facility is also a component of
the programme. Efforts have also been made to create awareness among the people on hygiene and
cleanliness through the Total Sanitation Campaign (TSC).
ISSUES
The critical issues for sewerage and sanitation in the Kanakapura LPA are as follows:
Sky Group
P a g e | 99
Chapter 5 : Infrastructure
1. Access to toilets in rural areas is alarmingly poor (15.6%). Abandoning of open defecation is
needed not only for human health but also for economic and social development. It pollutes
ground water, contaminates ground water and spreads diseases like diarrhoea and cholera.
2. Underground sewerage system has only partial coverage in Kanakapura town whereas ideally
the entire town limits should be under coverage.
3. In majority of the urban area surface drains are either absent, improperly constructed and
maintained or are blocked.
4. There is lack of municipal maintenance of the drainage system.
5. Total coverage of the town area is absent.
Sky Group
P a g e | 100
Chapter 5 : Infrastructure
INTRODUCTION
Solid waste can be defined as material that no longer has any value to the person who is responsible
for it, and is not intended to be discharged through a pipe. It is generated by domestic, commercial,
industrial, healthcare, agricultural and mineral extraction activities and accumulates in streets and
public places.
The production of solid waste in an urban area is an attribute of the socio economic profile of the
population and activities in the area. More the city is developed; more is the generation of wastes.
Again, the pre dominance of the industrial and commercial land use in the city increases the
generation of wastes.
It is estimated that about 1, 00,000 MT of Municipal Solid Waste isgenerated daily in the country. Per
capita waste generation in major cities rangesfrom 0.20 Kg to 0.6 Kg. Generally the collection
efficiency ranges between 70 to90% in major metro cities whereas in several smaller cities the
collectionefficiency is below 50%. It is also estimated that the Urban Local Bodies spendabout Rs.500
to Rs.1500 per tonne on solid waste for collection, transportation, treatment and disposal. About 6070% of this amount is spent on street sweepingof waste collection, 20 to 30% on transportation and
less than 5% on final disposalof waste, which shows that hardly any attention is given to scientific and
safedisposal of waste.
Sky Group
P a g e | 101
Chapter 5 : Infrastructure
Municipal Waste:Municipal wastes include wastes resulting from municipal activities and services
such as street waste, dead animals, market waste and abandoned vehicles. However, the term is
commonly applied in a wider sense to incorporate domestic wastes, institutional wastes and
commercial wastes.
Industrial Waste:In the category are the discarded solid material of manufacturing processesand
industrial operations. They cover a vast range of substances which are uniqueto each industry. For
this reason they are considered separately from municipalwastes. It should be noted, however, that
solid wastes from small industrial plantsand ash from power plants are frequently disposed of at
municipal landfills.
Municipal Solid Waste Management (MSWM) involves management of activities associated with
generation, storage, collection, transfer and transport, processing and disposal of solid waste.
Management of Industrial Solid Waste (ISW) is not the responsibility oflocal bodies. Industries
generating solid waste have to manage such waste bythemselves and are required to seek
authorizations from respective State PollutionControl Boards (SPCBs) under relevant rules. However,
through joint efforts ofSPCBs, local bodies and the industries, a mechanism could be evolved for
bettermanagement.
Assessment of industrial solid waste management problem greatly variesdepending on the nature of
the industry, their location and mode of disposal ofwaste. Further, for arriving at an appropriate
solution for better management ofindustrial solid waste, assessment of nature of waste generated is
also essential.
Industries are required to collect and dispose of their waste at specificdisposal sites and such
collection, treatment and disposal is required to bemonitored by the concerned State Pollution Control
Board (SPCB) or PollutionControl Committee (PCC) in Union Territory. The following problems
aregenerally encountered in cities and towns while dealing with industrial solid waste
There are no specific disposal sites where industries can dispose their waste;
Mostly, industries generating solid waste in city and town limits are ofsmall scale nature and
even do not seek consents of SPCBs/PCCs ;
Sky Group
P a g e | 102
Chapter 5 : Infrastructure
Industries are located in non-conforming areas and as a result they causewater and air
pollution problems besides disposing solid waste.
Industrial estates located in city limits do not have adequate facilities so thatindustries can
organize their collection, treatment and disposal of liquid andsolid waste;
There is no regular interaction between urban local bodies andSPCBs/PCCs to deal such
issues relating to treatment and disposal of waste
and issuance of licenses in non-conforming areas.
By comparing the per capita waste generation in different Indian cities, CPHEEO has suggested
norm for solid waste generation according to different activities.
Hence the total waste generated in the LPA can be computed as follows:
Non-domestic Solid
waste generated
(in ton)
Total waste
generated
(in ton)
Sl.
Area
Population
Urban area
54021
27.01
5.40
32.41
1.97
Rural Area
126916
38.07
12.70
50.77
3.08
TOTAL
83.18
5.05
Sky Group
Total MSW
collected (in ton)
No of vehicles for
Transport and
Disposal
Percentage of houses
covered under door-todoor collection
P a g e | 103
19
16
Chapter 5 : Infrastructure
05
10.01
45%
Source: www.kanakapuratown.gov.in
Action plan for Solid Waste Management in the Kanakapura town has been approved and is currently
in the state of implementation. Tools, equipment and vehicles have been procured as seen in the
table below.
Numbers
Tractor placers
02
01
01
Push cart
26
12
640
Metal Scrapper
160
Metal Tray
160
Litter bins
10
Ghamela
32
Source: www.kanakapuratown.gov.in
Information, Education, Communication (IEC) activities are carried out the TMC by engaging the Self
Help Groups5.
Collection: Door-to-door collection is carried out in 21 out of 27 wards. Manual scavenging does not
exist in the TMC area.
Secondary Collection and Transportation: Metal containers of dimension 3 cum are being used for
secondary storage which is handled mechanically through tractor placers.
Policy on Integrated Solid Waste Management, Government of Karnataka as prescribed by the Karnataka Urban Infrastructure Corporation
KUIDC for compliance by the local bodies.l
Sky Group
P a g e | 104
Chapter 5 : Infrastructure
ISSUES
1.
A landfill site of 10 acres has been allocated in Kanakapura TMC. Even though it is adequate for
2011, it would be inadequate for 2031. Provision for landfill sites is also required at Harohalli,
Kaggalipura and Sathanur.
2.
INADEQUATE RESOURCE
There is inadequacy of resource in terms of municipal workers, solid waste management tools and
equipment in the municipality.
3.
NO WASTE SEGREGATION
Concept of segregation of waste is largely absent and people are totally ignorant about the
significance and necessity of segregation of Solid waste
4.
The process of collection, which requires substantial man and logistics management, is very poor.
This coupled with lack of proper transportation has resulted in a situation wherein 50-70% of the
waste is not collected at all.
5.
There is no awareness among the general public about the solid waste management. People are not
aware of the way to dispose the waste. Careless disposal of waste on streets has resulted in littering
of waste.
Sky Group
P a g e | 105
Chapter 5 : Infrastructure
INTRODUCTION
The power supply is an important component of physical infrastructure for any city or town to work
efficiently. Efficient supply of power ensures proper working of all other infrastructure facilities like
water supply, sanitation etc.
Based on the estimated requirements of power supply in urban area as per the new master plan of
Delhi, the consumption works out to be about 2kw per household/day. The allocation of electric substations is to be done as per the population that is one 11 kV of sub-station for every 15000
population. (UDPFI guidelines) It is the general standard for all categories of towns/ cities.
There
Kanakapura Taluk
7330
domestic
Commercial
consumption
3%
Industrial
consumption
3%
Domestic
consumption
13%
are
compared
consumers.
I P sets
75%
to
4612
15605
commercial
IP
sets
are
Others
5%
Kanakapura Taluk.
Street Light
installations
1%
Sky Group
P a g e | 106
Chapter 5 : Infrastructure
INTRODUCTION
Education is recognised as a fundamental human right, along with other necessities, such as food,
shelter and water in The Universal Declaration on Human Rights (1948). The advantages it confers
on individuals and nations are multi-dimensional and multi-faceted. It sustains economic growth by
providing basic as well as specialised skills that ensure increased productivity and higher per capita
incomes.
Achievements in education in Karnataka have been quite remarkable, and the state is moving
towards universal literacy at a steady pace. The literacy rate increased from 56.04 per cent in 1991 to
66.64 per cent in 2001
According to Department of Public Instruction, Govt. of Karnataka there exist 324 primary schools
and 185 higher secondary schoolsin Kanakapura Taluk. The table below shows the distribution of
educational facilities in the Taluk.
324
185
High schools
74
PU colleges
15
Engineering Colleges
Sky Group
P a g e | 107
Chapter 5 : Infrastructure
NO OF SCHOOLS
1400
1200
1000
800
600
400
200
0
Govt Schools
1424
123
Primary
Secondary
Unaided schools
171
102
700
600
500
400
300
200
100
0
RAMANA
GARA
Lower primary
946
Common
toilet
875
625
891
Play
ground
205
396
923
Compoun
d walls
533
Upper primary
455
447
417
445
217
339
454
342
447
High schools
106
80
74
66
71
17
103
67
89
Girls toilet
Electricity
Ramps
Library
Drinking
water
883
P a g e | 108
Chapter 5 : Infrastructure
There are 324 lower primary schools and 185 higher primary schools in Kanakapura Taluk, while the
number of high schools is 74.
LITERACY RATE
According to census data 2011, the literacy rate in Ramanagara district is 69.2% which is 9% higher
than that of 2001. Literacy rate among men is 76.92% compared to 69.88% in 2001 an that among
women is 61.33% compared to 51.22% in 2001. The average literacy rate of Kanakapura Taluk is
65.1, while that in urban areas in 80.5% and in rural areas is 62.5%. Though there has been
considerable increase in the literacy rate in the region, it is abysmally poor compared to the rest of
BMR. The literacy rate of Bangalore is 88.48% the figures below show the comparative data for the
Percentage of Literates
KANAKAPURA URBAN
KANAKAPURA RURAL
TOTAL
80.5
62.5
65.1
66.7
43.1
46.3
73.9
53.1
56
Sky Group
P a g e | 109
Chapter 5 : Infrastructure
Percentage of literates
LITERACY RATE
100
80
60
40
20
0
Total
Male
Female
60.71
69.88
51.22
69.2
76.92
61.3
Percentage of literates
100
90
80
70
60
50
40
30
20
10
0
Total
Male
Female
69.2
76.92
61.3
88.48
91.82
84.8
According to Department of Public Instruction, Govt. of Karnataka there exist 504 primary schools in
Kanakapura Taluk and 74 higher secondary schools. The enrolment rate for 2009-2010 for
Ramanagara District for 1st to 10th grade is shown below.
Sky Group
P a g e | 110
Chapter 5 : Infrastructure
NO OF STUDENTS
17,500
17,000
16,500
16,000
15,500
15,000
14,500
14,000
13,500
13,000
12,500
ENROLMENT 2009-10
CLASS 1
CLASS 2
CLASS 3
CLASS 4
CLASS 5
CLASS 6
CLASS 7
CLASS 8
CLASS 9
CLASS
10
15,546
15,813
15,543
16,093
16,464
15,910
16,642
16,403
16,963
14,152
No of children
in school
99%
Figure9.11: Distribution of
school children in age
group 6-14
Source: Ramanagara District Book, 2010-11
Sky Group
P a g e | 111
Chapter 5 : Infrastructure
The total no of students in the LPA is 54,359 while the total no of teachers is 2124. Hence the student
teacher ratio is 26:1. The Right Of Children To Free And Compulsory Education Act 2009 states the
student teacher ratio in 1st to 5th standard as 1:30 and that from 6th to 10th as 1:35. Segregated class
wise and school wise data is not available, but the aggregate data meets the national standards of
education.
EDUCATION SCHEMES
The Akshara Dasoha program is an initiative to provide free food to school children and improve their
health and nutrition. It is anticipated that improvement of health and nutrition would automatically
improve the education level and would also support the education objectives of the state.
Akshara Dasoha program aims at providing hot cooked meals to all the children studying in 1 st to 5th
standard in all the Government Primary Schools of the State. The Mission of the program is to free all
the primary school children from hunger, improve their learning abilities and bring about equity.
Sky Group
P a g e | 112
Chapter 5 : Infrastructure
HEALTH
INTRODUCTION
Health status is an important indicator of the socio economic conditions of a society since it has far
reaching effects across all socio economic strata. Hence commitment to improvement of health status
especially among women, children and vulnerable population such as schedule casts and scheduled
tribes, is an important goal of any planning process. Efficient planning requires an appraisal of the
current infrastructure and policies, assessment of progress, identification of gaps and proposals to
mitigate the condition.
Health care infrastructure in Kanakapura Taluk consists of one Taluk headquarter hospital, 22 govt.
hospitals, one nursing home and 22 clinics. The table below shows the distribution of healthcare
facilities in the Taluk.
No of Beds
50
Govt. Hospitals
22
224
Nursing Homes
20
Clinics
22
Allopathic Hospitals
50
Private Hospitals
20
19
114
Sky Group
P a g e | 113
Chapter 5 : Infrastructure
60
19
72
TOTAL
538
Population of Kanakapura Taluk as per census 2001 is 3, 37,208. Hence the no of hospital seats per
1000 population is less than 2, which is much less than the standard value of 4 seats per 1000
population.
5
4
4
3
2
1.59
1
0
KANAKAPURA Taluk
Sky Group
STANDARD
P a g e | 114
Chapter 5 : Infrastructure
HEALTH SCHEMES
The National Rural health mission has been introduced to provide universal access to equitable,
affordable and quality healthcare which is responsive to the needs of the people. Initiatives for
reducing child and maternal mortality, stabilising population along with gender and demographic
balance have been taken.
The key features for delivery of NRHM in Karnataka includes making public health delivery system
fully functional and accountable to the community, working in a mission mode, decentralised
planning, delegation of power, human resource management, community involvement, rigorous
monitoring and evaluation against standards, convergence of health related programs and flexible
financing.
Promotion of maternal and child health: Maternal ill health and death impacts families, communities
and societies and has far reaching impacts across all socio-economic strata. Promotion of maternal
and child health is an important objective of NRHM, since mother hood encompasses reproductive
health, family planning, pregnancy, childbirth, infant and maternal mortality.
In view of the above goals, an umbrella scheme has been initiated called the Thayi Bhagya
scheme which consists of three sub schemes Janani Suraksha Yojna, Prasooti Araike and Madilu.
Under Janani Suraksha scheme, poor pregnant women are given financial and institutional
assistance through a decentralised medical infrastructure system. Prasooti Araike is also a part of the
maternal healthcare program in which health care and check up facilities are provided to women.
Madilu is another scheme that was devised to encourage women to deliver in hospitals for which they
would be entitled to medical kit for the baby and the mother.
Sky Group
P a g e | 115
Chapter 5 : Infrastructure
Child health care: Health and well being of children during their intra-uterine period, toddler years,
school age and adolescence needs intervention which is reached out through Maternal and child care
programs and the public delivery system, Anganawadis, ASHAs and schools.
Immunisation: It is the most cost-effective and effective intervention in public health system. Polio,
DTP, BCG, Measles, TB and Hepatitis B vaccines are administered through the various PHCs and
FRUs. Beside this childhood diseases and neonatal illnesses are taken care of through IMNCI
(Integrated Management of Neonatal and childhood illnesses) program.
Disease control program: In order to provide health care facilities to patients with diseases like AIDS,
Leprosy, Tuberculosis and terminal diseases like cancer, several programs have been introduced at
the Taluk level, like AIDS control program, Leprosy control program, TB control program and Cancer
control program, vector disease control program etc.
Inter-sectoral convergence: In additional to the above, facilities like ambulance service have also
been introduced. One ambulance per 1.1 lakh population has been provided for rural areas with a
maximum reaching time of 25.5 minutes.
The table below shows a list of health programs in Kanakapura Taluk
Sky Group
Sl
Immunisation program
TB Control program
Madilu Yojna
P a g e | 116
CHAPTER 6
ENVIRONMENTAL ISSUES
6.1 POLLUTION: GENERATION AND CONSEQUENCES
AIR POLLUTION
There is no formal report on air quality in Kanakapura. However approximately 6000 Ha of industrial
area has been proposed in the master plan 2031 out of which manufacturing consist of almost fifty
per cent. Hence, air pollution might be a reality in the area in near future. Proposals have been made
in the master plan for action for prevention of industrial pollution.
SOIL EROSION
Kanakapura has good quality agricultural land within its limits which would transform into urbanised
land due to growth pressure. Sustainable agricultural practices should therefore be adopted in the
remaining agricultural land form maximising and sustaining productivity.
Rainwater harvesting is collected precipitation from rooftops and other above-ground impervious
surfaces that is stored in catchment tanks for later use. Rainwater harvesting systems can range from
a simple barrel at the bottom of a downspout to multiple cisterns with pumps and filtration. The
harvested rainwater is low in sodium and chloramine and fluoride free.
There are two main types of rainwater harvesting systems that vary in complexity, volume of water
stored and permitting requirements.
Sky Group
P a g e | 117
Rain Barrel A rain barrel system is a simple rainwater collector that captures and stores a portion of
the runoff from a roof downspout. A hose attached to the bottom of the rain barrel can be used to
irrigate your garden. A rain barrel will only capture a small fraction of the rainwater that flows off your
roof, the rest of the runoff will still need to drain to a safe overflow location.
Cisterns Cisterns are larger systems that can hold much more water and may include pumps to move
the rainwater to the garden. More complex systems can involve plumbing and electrical work, soil
excavation or other structural work. For rainwater collection projects of this scale, consult a
professional to review design, construction and safety considerations. Permits and zoning certificates
are required for cistern systems.
Proposal has been forwarded in the Master Plan 2031 for rainwater harvesting techniques in the LPA.
The
master
plan
proposes
micro
level
for
equipping
the
Sky Group
P a g e | 118
Chapter 7| Problems
CHAPTER 7
PROBLEMS
The following issues have been identified in the Kanakapura Conurbation Area
The following issues have been identified in the Harohalli Conurbation Area
1. Lack of commercial center. No segregation of inter settlement and intra settlement traffic.
2. Lack of road hierarchy.
3. Inadequate connectivity.
4. No separate freight route.
5. Requirement of additional Residential area for population in 2031. Presently 4.29% residential
area exists.
Sky Group
P a g e | 119
Chapter 7| Problems
The following issues have been identified in the Kaggalipura Conurbation Area
The following issues have been identified in the Sathanur Conurbation Area
Sky Group
P a g e | 120
CHAPTER 8
KAGGALIPURA
AREA (sqkm)
PERCENTAGE
HAROHALLI
AREA (sqkm)
PERCENTAGE
RESIDENTIAL
12.31
56.9
10.68
32.0%
COMMERCIAL
1.19
5.5
0.68
2.0%
21.4%
INDUSTRIAL
0.21
1.0
7.14
PUBLIC/SEMI PUBLIC
3.78
17.5
0.85
2.5%
PARKS/ PLAYGROUNDS
1.53
7.1
4.70
14.1%
2.1%
0.19
0.9
0.69
TRANSPORTATION
2.01
9.3
2.96
8.9%
QUARRIES
0.00
0.0
0.44
1.3%
LAKES/TANKS/RIVER
0.40
1.9
1.53
4.6%
0.0
3.68
11.0%
AGRICULTURE
0.00
TOTAL
21.62
33.35
KANAKAPURA
AREA (sq km)
PERCENTAGE
RESIDENTIAL
10.82
COMMERCIAL
INDUSTRIAL
SATHANUR
AREA (sq km)
PERCENTAGE
43.0%
7.18
0.56
2.2%
0.68
3.6
3.82
15.2%
7.81
41.3
PUBLIC/SEMI PUBLIC
1.27
5.1%
0.68
3.6
PARKS/ PLAYGROUNDS
4.27
17.0%
1.02
5.4
0.23
0.9%
0.06
0.4
TRANSPORTATION
2.92
11.6%
1.38
7.3
QUARRIES
0.55
2.2%
0.00
0.0
LAKES/TANKS/RIVER
0.71
2.8%
0.07
0.4
AGRICULTURE
2.34
8.5%
0.00
0.0
TOTAL
27.49
Sky Group
38.0
18.90
P a g e | 121
The Kanakapura LPA is composed of 85 villages and 1 town. The present population of the LPA
villages (census 2011) is 126,916. Total population of the LPA, including Kanakapura TMC is
180,931. The figure below shows the population growth in the LPA from 1961 to 2011.
Population
140000
120000
100000
80000
60000
40000
20000
0
Kanakapura LPA
1961
83194
1971
95887
1981
125993
1991
151998
2001
170278
2011
180937
1991-2001
12%
1.2%
2001-2011
6.25%
0.6%
Sky Group
P a g e | 122
Kanakapura Town or TMC is the only urban settlement in the Kanakapura LPA. It has an area of 7.31
sq. km1. The table below shows population in Kanakapura TMC from 1961 to 2011. The present
population of the TMC is 54,021.
Population growth in Kanakapura TMC
60000
50000
POpulation
40000
30000
20000
10000
0
Kanakapura
1961
15000
1971
20000
1981
29000
1991
38000
2001
47000
2011
54021
Annual growth
1991-2001
23.6%
2.36%
2001-2011
14.9%
1.49%
Sky Group
P a g e | 123
create
employment opportunities for people in and around the region and spur development and
growth in eth LPA.
Availability of ground water in the region as compared to the others: The Kanakapura LPA has
a higher availability of ground water as compared to the rest of the BMR since it is closer to
the Cauvery region. Hence developments are more sustainable and feasible in the LPA.
The Taluk Industrial Plan for the Kanakapura Taluk envisages promoting around 800 tiny & SSI
units including services. The Taluk also has potential for promotion of 168 units in large & medium
sector spread over five years. These investments are likely to generate direct employment for about
60,000 persons and indirect employment to about 24,000 persons.
Sky Group
P a g e | 124
Inmigrating population
The natural increase in the population has been calculated through statistical methods like arithmetic
progression, geometric progression and ANGM (annual national growth method). It has been
observed from the data that many of the villages have a negative growth rate while some of the
villages have compounding positive growth rates. The growth of the population calculated through
various statistical methods is as follows:
Projected population
Arithmetic Progression
2.75 lakhs
Geometric Progression
2.72 lakhs
2.82 lakhs
All the statistical methods adopted for projection of population in the LPA yield more or less similar
results.
Sky Group
SL
VILLAGE NAME
2021
2031
Cheeluru
3543
3992
Chikkadevarahalli
379
385
Jakkasandra
1741
1710
Keeranagere
817
930
P a g e | 125
Sky Group
T.Hosahalli
695
668
Bandiganahalli
445
383
Bannikuppe
1374
1408
Bettahalli Kaval
661
844
Bheemasandra
345
374
10
Chulakanakere Kaval
183
219
11
Devarakaggalahalli
699
876
12
Doddamuduwadi
1151
1241
13
Dyavasandra
547
520
14
Gabbadi
2015
2174
15
Gabbadi Kaval
84
96
16
Harohalli
15628
18804
17
Hosakote
863
1017
18
Hulugondanahalli
2305
2764
19
Kaggalahalli
1269
1383
20
Maralagere
263
290
21
Marasandra
768
828
22
Medamaranahalli
1820
2181
23
Mudenahalli
1213
1286
24
Singasandra
1083
1170
25
Vaderahalli
1574
1924
26
Yadamadu
1059
1288
27
Agrahara
639
857
28
Allimaranahalli
2159
2404
29
Anajawadi
2410
2682
30
Aralalu
2042
2330
31
Aralalusandra
1396
1479
32
Aranakuppe
921
1019
33
Baradanahalli
914
947
34
Bekuppe
1321
1333
35
Cheeranakuppe
791
761
36
Chikkamuduwadi
3683
3936
37
Chokasandra
1637
2223
38
Ganalu
1444
1541
39
Hanumanahalli
1481
2146
40
Kallahalli
2148
2440
P a g e | 126
Sky Group
41
Kanakapura (Rural)
512
416
42
Ramapura
1214
1374
43
Rayasandra
1944
2189
44
Seegekote
1650
1756
45
Shivanahalli
1845
1892
46
Thammasandra
1006
1024
47
Tigalarahalli
692
704
48
Tigalarahosahalli
1337
1424
49
Tungani
1828
1946
50
Vadedoddi
1504
1787
51
Virupasandra
2096
2424
52
Achalu
2772
3077
53
Alur
730
1004
54
Anamanahalli
726
880
55
Bommanahalli
1175
1273
56
Dalimba
1082
1108
57
Deshohalli
58
Halasinamaradahalli
405
454
59
Honniganahalli
973
986
60
Hosahalli
116
117
61
Kabbal
1144
1129
62
Kachavanahalli
1753
1832
63
Kadahalli
1149
1201
64
Kambasagara
855
909
65
Kemmale
1196
1281
66
Mudalaswamikuppe
17
16
67
Naripura
68
Sasalapura
1848
2142
69
Sathanur
5371
5806
70
Tailuru Forest
457
489
71
Thotahalli
1396
1470
72
Yadugowdanahalli
73
Alakabelalu
81
107
74
Gulakamale
2800
3427
75
K. Chudahalli
1698
2104
76
Kaggalipura
17337
24903
P a g e | 127
77
Naganayakanahalli
973
1219
78
Nelaguli
1471
1821
79
Nettigere
2391
3096
80
Ravugodlu
1705
2123
81
Somanahalli
5578
6682
82
Sunkadakatte
86
17
83
Tharalu
1692
1906
84
Thattaguppe
3079
3749
85
Uttari
1869
2402
86
Vaddarapalya
1998
2308
87
Kanakpura TMC
78000
100100
TOTAL
225061
272932
2.8 lakhs has been considered as the natural growth in the LPA till the year 2031.
The Revised Structure Plan 2031 envisages a 70%-30% population distribution between the core and
the outside by 2031. Hence the local planning areas must be planned to create job opportunities to
realize the regional vision.
The Kanakapura LPA has about 450 tiny and SSI unit at present. KIADB industrial area also exists in
Harohalli area. As such the Industrial Perspective Plan for the Kanakapura Taluk envisaged
promoting around 800 tiny & SSI units including services till 2011. The Taluk also has potential for
promotion of 168 units in large & medium sector spread over five years. These investments are
likely to generate direct employment for about 60,000 persons and indirect employment to about
24,000 persons by 2011.
Since, maximum potential of job creation has not been reached presently; it has been assumed that
the LPA has the potential to create 80,000 jobs by the year 2031. Hence an additional 3.2 lakhs
population will be inmigrating in the LPA by the 2031, out of which 1.25 lakhs is envisaged to be
migrating in 2021 and rest by 2031.
Hence the total projected population in the LPA till the year 2031 is as follows.
Sky Group
P a g e | 128
2.8LAKHS
3.2 LAKHS
6LAKHS
Hence 6 lakhs has been taken as the projected urban population in the LPA till the year 2031.
POPULATION IN 2031
Kaggalipura
1,50,000
Harohalli
1,80,000
Sathanur
90,000
Kanakapura
1,80,000
6,00,000
IMP 2021
8,00,000
A population 6lakh will be accommodated in the four urban areas and a population90,000 will be
accommodated in the villages in the agricultural zone.
A township has been proposed at Sathanur by the BMRDA to host textile and apparel industries. The
township would accommodate a population of 3.2 lakhs. The master plan proposals do not take into
account the population of the township since facilities would be planned separately for it.
Sky Group
P a g e | 129
350000
300000
280000
151998
200000
100000
83194
95887
125993
170278
225000
180937
0
1961
1971
EXISTING POPULATION
1981
1991
2001
2011
2021
2031
NATURAL GROWTH
POPULATION
2031
6,00,000
9000 Ha
The total urbanisable land required by the year 2031 is 9000 Ha (@ 67 persons per Ha gross density)
The overall statistics of the LPA as per proposal of Master Plan 2031 is given in the table below. The
total conurbation area is 9075.65 Ha excluding water bodies, agricultural land, forests and hillocks as
shown in the table below.
Sky Group
P a g e | 130
9075.65
31125.77
TOTAL LPA
41277.99
*Excluding water bodies, agricultural land, forests and hillocks and quarries
Conurbation
area (Ha)*
Gross Density
(pph)
Kaggalipura
1,50,000
2109
72
Harohalli
1,80,000
2721
66
Sathanur
90,000
1858
50
Kanakapura
1,80,000
2386
75
TOTAL URBAN
POPULATION 2031
6,00,000
9075.65
67
AREA
IMP 2021
8,00,000
@ 88 pph
*Excluding water bodies, agricultural land, forests and hillocks and quarries
Sky Group
P a g e | 131
TOTAL
POPULATION
TOTAL HOUSES
REQUIRED
By 2021
3,50,000
80,000
2000
By 2031
6,00,000
1,40,000
3500
Table 8.12: Residential Area requirement in the LPA for the Conurbations
CONURBATION
RESIDENTIAL AREA
2011-2021 ( 40
houses/Ha)
RESIDENTIAL AREA
2021-2031 ( 40
houses/Ha)
TOTAL RESIDENTIAL
AREA
Till 2031
Kaggallipura
400
400
800
Harohalli
550
550
1100
Sathanur
350
350
700
Kanakapura
400
600
1000
TOTAL
1700
1900
3600
Sky Group
P a g e | 132
a.
WATER SUPPLY
The total requirement of the LPA has been calculated using CPHEEO standards for domestic water
supply. Total domestic water requirement in the LPA in the year 2031 is 81 Mld
90
80
70
60
50
40
30
20
10
0
2011
2021
2031
DEMAND
4.8
47.25
81.00
SUPPLY
4.8
4.8
4.8
The total area required for solid waste management has been calculated based on CPHEEO norms
for Municipal Waste Management. Total area requires for landfill management in the LPA till 2031 is
30 acres.
2031
600000
Domestic Waste generated (in kg) @ 0.3 kg per capita per day
180 tonne
Non-domestic Solid waste generated (in kg) @ 0.1 kg per capita per day
60 tonne
240 tonne
Sky Group
P a g e | 133
269 cu m
323 cu m
17 sq m
1.48 acres
30 acres
a. EDUCATION
Requirement for educational facilities have been calculated using UDPFI guidelines for urban areas.
The total area required for educational facilities in each of the conurbations have been tabulated in
the table below.
UNITS REQUIRED
Educational
facility
Kanakapura
Harohalli
Kaggalipura
Sathanu
r
Nursery school
@ 1/2500
population
72
66
66
Basic primary
school @ 1/
2500 population
72
66
Higher
secondary
school @
1/7500
population
24
Colleges @
1/1.25 lakh
population
Technical
institutions @ 1/
1000000
Sky Group
Kanakapur
a
Harohalli
Kaggalipura
Sathanur
36
66
36
44
27
38
35
35
20
P a g e | 134
ITI @ 1 /
1000000
1.4
1.4
Engineering
Colleges @ 2 in
urban extension
60
60
medical
Colleges @ 2 in
urban extension
15
15
136.4
52
127
30
TOTAL
b. HEALTH
Requirement for healthcare facilities have been calculated using UDPFI guidelines for urban areas.
The total area required for educational facilities in each of the conurbations have been tabulated in
the table below.
Sky Group
Kanakapura
Town
Harohalli
Kaggalipura
Kanakapura
Town
Harohalli
Kaggalipura
Sathanur
.6
.6
.3
.3
10
10
10
1.2
1.2
1.2
.6
Sathanur
P a g e | 135
Nursing Home
@ 1 per .45 to
1 lakh
population-25
to 30 beds
Child Welfare
& Maternity
Centre@ 1 per
.45 to 1 lakh
population- 25
to 30 beds
TOTAL
Sky Group
.6
.6
.3
.3
20
25
15
15
P a g e | 136
8.10
PARTICIPATORY APPROACH
As per the provisions of KTCP Act 1961, the Master Plan would be put up for public display after
provisional approval of the plan by the government. The issues and objection raised by the public
would be then considered and included in the proposal if found feasible and for the greater good.
The RTI Act provides scope for gaining information by the public. The Disclosure Act also provides
scope for discussion on the Master Plan.
8.11
S.W.O.T ANALYSIS
WEAKNESS
STRENGTH
Incentives
per
THREAT
8.12
as
OPPORTUNITY
VISION 2031
Sky Group
P a g e | 137
CHAPTER 9
Declaring certain areas, as areas of special control and development in such areas being
subject to such regulations as may be made in regard to building line, height of the building,
floor area ratio, architectural features and such other particulars as may be prescribed;
Sky Group
P a g e | 138
9.3 DENSITY
There are four important growth centres in the LPA Kanakapura, Kaggalipura, Harohalli and
Sathanur. The urban population in the LPA has been calculated for these growth centres which
includes natural growth and inmigrating population. The table below show the distribution of
population and the density in the four growth nodes.
TOTAL POPULATION
CONURBATION AREA
(Ha)*
DENSITY (PPH)
Kaggallipura
1,50,000
2109
72
Harohalli
1,80,000
2721
66
Sathanur
90,000
1858
50
Kanakapura
1,80,000
2386
75
6,00,000
9075.65
67
*Excluding water bodies, agricultural land, forests and hillocks and quarries
Sky Group
P a g e | 139
Sky Group
P a g e | 140
9.6 PROPOSALS
9.6.1
KANAKAPURA LPA
The overall statistics of the LPA as per proposal of Master Plan 2031 is given in the table below. The
total conurbation area is 10152.22 Ha as shown in the table below.
Percentage
10152.22
24.59%
31125.77
75.04%
TOTAL LPA
41277.99
100%
The overall statistics of the four conurbations is given in the table below. Residential area forms
39.25% of the total combined conurbation limit, commercial, industrial, public and semi-public and
and transportation forms, 3.15%, 16.40%, 6.12%, 9.88%,2.37% and 12.24% respectively.
AREA ( IN HA)
AREA ( IN SQKM)
PERCENTAGE
RESIDENTIAL
3984.26
39.84
43.89%
COMMERCIAL
319.61
3.20
3.53%
INDUSTRIAL
1664.62
16.65
18.34%
620.87
6.21
6.84%
1002.72
10.03
11.05%
PUBLIC UTILITY
240.87
2.41
2.66%
TRANSPORTATION
1242.70
12.43
13.69%
TOTAL
9075.65
90.77
100.00%
AGRICULTURE
514.02
5.14
WATER BODIES
478.19
4.78
HILLOCK'S/QUARRY'S
84.35
0.84
10152.22
101.52
GRAND TOTAL
Sky Group
P a g e | 141
The statistics of the agricultural zone (area beyond the fourconurbation limit) is as follows
AREA ( IN HA)
AREA ( IN SQKM)
PERCENTAGE
BUILT-UP *
1314.3368
13.14
4.22%
AGRICULTURE
28095.53
280.96
90.26%
WATER BODIES
770.8053
7.71
2.48%
FOREST
945.0991
9.45
3.04%
GRAND TOTAL
31125.7755
311.26
100%
Area (Ha)
Percentage
RESIDENTIAL
1084.72
10.84
45.51%
COMMERCIAL
84.31
84.31
3.53%
INDUSTRIAL
322.92
3.22
13.52%
132.97
1.32
5.54%
379.18
3.79
15.91%
PUBLIC UTILITY
43.88
0.43
1.81%
TRANSPORTATION
338.89
3.38
14.19%
TOTAL
2386.87
23.82
100.00%
AGRICULTURE
163.60
1.63
WATER BODIES
144.24
1.44
HILLOCK'S/QUARRY'S
54.68
.54
2749.39
27.49
enormous
economic potential
in
terms
of
agriculture,
sericulture
other
GRAND TOTAL
and
small
scale
industrial activities.
The Landuse of the
town
has
proposed
been
as
to
and
supplement
hierarchy
its
in
the
region.
P a g e | 142
Harohalli is one of the most significant nodes of the Kanakapura LPA and a growing industrial cluster.
It is proposed to host more than 2 lakh population by 2031. The total area proposed as the
conurbation limit of Harohalli is 33.34sqkm (3334 ha).
Area (Ha)
RESIDENTIAL
1049.06
10.49
38.55%
COMMERCIAL
55.82
0.56
2.05%
INDUSTRIAL
661.16
6.61
24.30%
85.07
0.85
3.13%
399.44
3.99
14.68%
PUBLIC UTILITY
89.82
0.90
3.30%
TRANSPORTATION
380.7
3.81
13.99%
TOTAL
2721.07
27.21
100.00%
AGRICULTURE
350.33
3.5
WATER BODIES
233.7
2.33
HILLOCK'S/QUARRY'S
29.67
0.29
3334.76
33.34
GRAND TOTAL
Percentage
19.83 % of the area has been dedicated to industries, since it is the future economic mainstay of the
town. 31.46% of the total area is reserved for residential purposes where as 11.42% of the area is
devoted to transportation. 1.67% of the area is reserved for commercial purposes to serve the future
population. 11.98% of the area is park and open space to maintain adequate balance with the
anticipated built up area in the town. 2.55% of the area is proposed to be under public and semipublic use while utility and services take up 2.69% of the area. The rest of the land use is under
quarries, water bodies and agriculture as shown in the table below.
Kaggalipura is also recognized as an important growth node of the LPA and approximately 56,000 of
the future population of 2031 is distributed in this town. Industrial area on the cue to 21 Ha have been
proposed in the area for form the future economic base. The town has been proposed primarily as an
institutional hub for the LPA.
Sky Group
P a g e | 143
51.66% of area has been proposed for residential use while 5.01% of area is under commercial use.
15.43% is devoted to public and semi-public use. 13.06% of the area is dedicated to transportation
and 6.91% of the area is under parks and other open spaces. The rest of the area is comprised of
quarries, water bodies and agriculture as shown in the table below.
Area (Ha)
RESIDENTIAL
1120.76
11.21
53.13%
COMMERCIAL
108.64
1.09
5.15%
INDUSTRIAL
23
0.23
1.09%
334.82
3.35
15.87%
149.94
1.50
7.11%
PUBLIC UTILITY
88.84
0.89
4.21%
TRANSPORTATION
283.41
2.83
13.44%
TOTAL
2109.41
21.09
100.00%
AGRICULTURE
0.1
0.001
WATER BODIES
60.13
0.6
2169.64
21.69
GRAND TOTAL
Percentage
Sathanur has been proposed as a major growth node in the LPA in future. Almost 2 lakh population
has been distributed in Sathanur. The total proposed conurbation area is 18.98 sqkm.38.44% to the
total area has been reserved for residential purposes while 34.64% has been reserved for industrial
use. 3.73 % of the land is proposed to be under commercial use while another 3.58% has been
reserved for public and semi-public use. 3.91% of the area is under parks and open spaces. The rest
of the area has been dedicated to quarries, water bodies and agriculture as seen in the table below.
Sky Group
Landuse
Area (Ha)
Percentage
RESIDENTIAL
729.72
7.30
39.27%
COMMERCIAL
70.84
0.71
3.81%
INDUSTRIAL
657.54
6.58
35.38%
68.01
0.68
3.66%
74.17
0.74
3.99%
P a g e | 144
PUBLIC UTILITY
18.33
0.18
0.99%
TRANSPORTATION
239.7
2.40
12.90%
TOTAL
1858.31
18.58
100.00%
WATER BODIES
40.12
0.4
1898.45
18.98
GRAND TOTAL
Sathanur has been proposed as a major growth node in the LPA in future. Almost 2 lakh population
has been distributed in Sathanur. The total proposed conurbation area is 18.98 sqkm.38.44% to the
total area has been reserved for residential purposes while 34.64% has been reserved for industrial
use. 3.73 % of the land is proposed to be under commercial use while another 3.58% has been
reserved for public and semi-public use. 3.91% of the area is under parks and open spaces. The rest
of the area has been dedicated to quarries, water bodies and agriculture as seen in the table.
9.6.2
Progress follows the lines of transportation. Transportation Corridors are generally considered as
lifelines of any town / city. An efficient Traffic and Transportation system promotes socio - economic
activities. Kanakapura LPA hasone National Highway (NH-206), one State Highway (SH 3), four
Major District Roads with good network of roads. One of the major objectives of MP is to provide
broader roads within Kanakapura LPA with good hierarchy of roads. Its aim is to provide an efficient
and feasible circulation plan for the entire LPA.
The total area covered by traffic and transportation use in the conurbation area is 105 ha,
constituting 4.1% of developed area. By and large the inter town traffic movement is convenient. But
due to very narrow road network in the town area, there are many intra town traffic problems and
proposals for the same are to be made.
Some general guidelines for better connectivity are addressed:
All village roads within LPA having width less than 18 m are proposed for widening to 18 m
Right of Way (ROW).
Within the Town limits, Major roads are proposed for widening to ease out the traffic
movement vide
o
o
o
Parking space is proposed along commercial access roads and around bus-stand areas.
Sky Group
P a g e | 145
Improvements of major intersections. Sufficient space for pedestrians, signals and utilities will
be taken separately with wide footpath and cycle tracks are provided along main market,
shopping/commercial street.
Wherever feasible cycle tracks are separately provided.
Buffer zones/green spaces are proposed for NMT.
Pedestrian Refugee islands are proposed for road width above 18 m ROW.
Any road development/ redevelopment/ widening proposal shall be done only if the road
sections annexed (Annexure 8) are implemented.
City Traffic and Transportation Studies (CTTS) are made for BMR, 2031. This CTTS is
referred for provision of Traffic Management proposals in the Kanakapura LPA. However
road circulation plan for the entire LPA is prepared showing the alignment and pattern of all
existing and proposed roads in the LPA.
PROPOSALS
1. Widening of Village Roads:
All village roads within LPA which are less than 18 m are proposed for widening to 18 m.
5.
Sky Group
P a g e | 146
Kanakapura town and all the major settlements in the LPA have to be planned for NMT and
easy pedestrian movement. Studies should be taken up at the town level to arrive at detailed
planning proposals for NMT mainly for cycling and pedestrian friendly circulation pattern. Old
market area is proposed for Pedestrian Zone by restricting the traffic movement during
specified hours. This can be achieved besides other measures that will be adopted Buffer
zones/green spaces under HT lines, along major drainage lines and area surrounding
lakes/ponds/tanks will be explored for NMT infrastructure for better NMT accessibility as per
DULT recommendations.
10. Truck Terminals/ freight complex/ logistics hub and Provision of Infrastructure near
Truck Terminals/ freight complex/ logistics hub
Sky Group
P a g e | 147
As far as possible the traffic and transportation use should be located as per the envisaged
activity. It is desirable to have truck terminal/ freight complex/ logistics hub next to or along the
side of the industrial use/ KIADB industrial areas.
Map no 27 shows the proposed Circulation Pattern in the Kanakapura LPA. The following tables
show the statistics of the roads in the LPA.
Area (sq m)
18
67.88
1221.86
24
75.02
1800.39
30
56.08
1682.25
80
12.74
1018.95
90
32.11
2890.13
243.82
8613.59
Total
Besides the roads proposed by the Master plan there exists BMR proposed roads in the LPA (IRR,
STRR, TRR). The statistics of the roads are given in the table below.
Length (km)
Area (sqkm)
IRR
90
8.06
0.73
PRR
100
5.30
0.53
RR
90
5.69
0.51
TRR
90
24.65
2.22
STRR
90
1.72
0.15
45.42
4.14
Total
Sky Group
P a g e | 148
9.6.3
The following roads have been identified in the LPA for widening.
ROAD NAME
PROPOSED WIDTH(m)
NH 209
20
30
SH3
12
18
12
30
PIPELINE ROAD
20
SANGAMA ROAD
12
30
The Proposed building line from the major roads has been listed in the table below.
STRR
90.0
10.0
IRR
90.0
10.0
TRR
90.0
10.0
RR
60.0
6.0
NOTE:
For National Highways, State highways, Major District roads, other district roads and village roads
standards specified (road width, building lines etc.,) by the Ministry of Surface Transport, Government
of India are to be followed vide Govt. Notification No: UDD 251 BMR 2005, dated 22-12-2005 and
other circulars of Government of Karnataka)
For all existing roads of width more than 15m shall be provided minimum of 3m building line.
Sky Group
P a g e | 149
9.6.4
POLICY
RECOMMENDATIONS
LU1
LU2
LU3
LU4
LU5
LU6
Minimizing conflicts between the proposed industrial estates and ecologically sensitive areas.
LU7
LU8
LU9
10
EV1
11
EV2
12
EV3
13
EV4
14
EV5
15
EV6
16
EV7
Sky Group
Urban agriculture should be encouraged to achieve urban food security and local employment
generation
P a g e | 150
17
EV8
18
GEV 9
19
GEV 10
All mining and quarrying activities should be strictly monitored and controlled to effectively
address development and environmental issues in a balanced manner.
ECONOMY
The existing situation shows that the major industrial locations are concentrated on the North-West
part of the region, starting from Peenya and extending towards Nelamangala and beyond. The rest of
the region dominated by textiles and agro industries are concentrated in and around the existing
towns. An analysis of the present investment trend, as depicted by the BMR RSP 2031, however
shows the presence of major investment attraction potential along Kanakapura road, Mysore road
and BMIC. The national and state level strategies have spurred economic growth in the regions in the
post 2000 period. The emergence of the SMEs and creation of major infrastructural facilities like the
BIA have given rise to a major growth to the Bangalore region. However, basic infrastructure like
power, transport and water are still concerns for sustained economic growth. High land prices have
lead to a shortage of affordable housing leading to increasing informality in housing and longer travel
hours. In view of the above economic situation the draft BMR RSP 2031 proposes the following
economic policies as listed in the table below.
POLICY
RECOMMENDATION
E1
A comprehensive and elaborate land allocation strategy should be formulated for BMR
E2
Industrial and any other economic locations should be identified based on land capability.
E3
E4
E5
E6
Sky Group
BMR should be developed as a nodal area for locating educational, healthcare facilities
and research institutions
P a g e | 151
E7
BMR should be developed as centre for high-end scientific and engineering industries.
E8
E9
be made integral with the local economy of existing settlement and in conjunction with
larger hinterland.
10
E 10
11
E 11
Small scale and medium scale polluting industries should be located outside the BBMP
Settlements in BMR should be made economically sustainable by clustering of economic
activities.
The areas within the city and emerging investment destinations across BKR and existing
12
E 12
towns (cluster and growth nodes) should be connected with efficient public transport
system.
13
E 13
14
E 14
15
E 15
16
E 16
Local Economic Development (LED) policy should be developed at each town level as a
part of the Local Area Development Plan to boost employment in the surrounding towns.
Special hawking zones within the Bangalore city and in identified locations in each zone
should be earmarked.
Environment impact of industrial estates
Proposed industrial estates and large investment destinations should be so developed to
integrate with local economy and livelihood.
TRANSPORT
The BMR draft RSP 2031 compliments the policy recommendations of the SP 2011 for a balanced
regional growth. The policies are hence aligned towards removing the regional imbalances and
increasing the efficiency of the transport systems. The table below highlights the policies of the draft
RSP 2031 for transport sector.
POLICY
RECOMMENDATION
T1
T2
T3
Sky Group
P a g e | 152
T4
T5
T6
T7
T8
T9
10
T10
Public Transport be developed taking into account the size of the urban settlement
i.e. smaller towns vis a vis the core
HOUSING
The draft Revised Structure Plan 2031 makes policy recommendations for reducing the demandsupply gap in the housing sector and to reduce the regional imbalance in terms of housing types. The
RSP recommends provision of serviced land with transport and employment facilities to give the
Sky Group
P a g e | 153
growth nodes and the clusters a spur of development. It also suggests about shifting the role of the
KHB from housing builder to more of a housing facilitator and providing housing to the poor at
subsidized rates. In-situ up gradation programmes of the slum areas should be undertaken and
housing needs of the urban poor should be addressed as a part of the housing strategy. The table
below lists out the housing policy of the draft RSP 2031 which remains same in aggregate as the SP
2011.
POLICY
H1
RECOMMENDATIONS
Government land should be provided within the priority growth centres and new urbanisable
blocks for composite and joint venture
A policy to restructure the functions, roles and operations of the Karnataka Housing Board (
H2
H3
H4
H5
Measures are required to be taken to provide land for group housing for the urban poor at
subsidized or controlled prices
The main focus of the Karnataka Slum Clearance Board ( KSCB) should be on in-situ upgradation through self help processes incorporating the participation of appropriate NGOs.
A range of innovative housing supply solutions, including rental housing, should be
encouraged to help meet the housing needs of the urban poor.
A programme to carry out regular housing needs surveys and to maintain an appropriate
H6
H7
Unauthorized layouts to be regularized within the overall strategic intent of the BMR RSP
2031
Sky Group
P a g e | 154
POLICY
RECOMMENDATIONS
W1
Adequate measures to augment supply from surface water source in the BMR
W2
W3
W4
W5
POLICY
RECOMMENDATIONS
S1
Maximise the utility and efficiency of the existing sewerage systems in the BMR
S2
S3
S4
POWER
The BMR RSP 2031 proposed increase in power generation in the region by using alternative and
ecologically friendly sources and municipal wastes. It also envisages private players on the power
generation region. It strives to ensure quality supply of power by use of clean coal technology and
renovation of the old power plants in the region. Stringent efficiency standards and emission norms
on vehicles to reduce demand of conventional fuels is also proposed. Operational and financial
performance of distribution network should be improved and demand may be reduced by replacing
power intensive industries through R&D.
POLICY
RECOMMENDATIONS
P1
Sky Group
P a g e | 155
P2
P3
P4
TELECOM
POLICY
RECOMMENDATIONS
TC1
TC2
TC3
POLICY
RECOMMENDATIONS
SWM 1
SWM 2
Sky Group
P a g e | 156
SWM 3
SWM 4
SWM 5
SWM 7
The RSP 2031 proposed the establishment of integrated solid waste management facility at
Kanakapura. These facilities are proposed to be centres for waste storage, processing and disposal
in the area. A buffer zone of 500 m should be created around the site as no development zone by
notifying the prohibition of development in a buffer zone.
EDUCATION
The draft RSP envisages removing the regional disparity in education level and raising the general
education level in the region. It also provides policies to create a workforce more apt to the
requirements of the region.
POLICY
RECOMMENDATIONS
ED1
ED2
ED3
HEALTH
There exists regional disparity in terms of health status as in reported by the Task Force on Health
and Family Welfare 2001. The high level of privatization in the health sector in the Bangalore Urban
district creates a sophisticated pool of medical resource which is absent in the surrounding Bangalore
Sky Group
P a g e | 157
rural and Ramanagara district. The heath policies of the draft RSP hence aims at up grading the
health scenario in the region.
POLICY
RECOMMENDATIONS
HE1
HE2
HE3
9.6.5
SECTORAL PROPOSALS
ECONOMY
The work participation rate in the LPA (Kanakapura Taluk) is 38% that of Kanakapura Town is 17.5%,
whereas that in Karnataka is 41% and at the national level it is 39%1. An increased work participation
rate of 40% should be targeted for the entire LPA (including Kanakapura Town) till the horizon year
2031.
Government
Prime
Swarnajayanthi Shahari Rozgar Yojna, and Mahatma Gandhi National Rural Employment Guarantee
Act should be enforced efficiently to increase work participation.
The industrial potential of the area should also be used to generate employment for local people.
Industrial estates and large investment destinations should be so developed as to integrate with the
local economy. Open settlements should be preferred over closed or gated communities.
Small scale, tiny and cottage industries should be promoted through proper financial, marketing and
distribution schemes. Small scale and cottage industries requires less start-up capital, are labour
intensive, offer better employment opportunities to women and are often better platforms for local
1
Census 2011
Sky Group
P a g e | 158
craftsmanship. Hence promotion of such industries serves the purposes of employment generation,
preserving local craft and empowering women.
The industrial perspective plan for Kanakapura Taluk lists a range of industries in small scale and
medium scale sector as potential investment options. However, the LPA along with the entire BMR
region is under a threat of water scarcity. Hence proper water management plan should be prepared
before commencement of industrial activities to address issues like ground water depletion, ground
water recharge through water treatment, ground water pollution etc.
The RSP 2031 specifies relocation of industries from BBMP limits to outer BMR as one of the
economic strategies. Viability of relocating these industries in the LPA may be looked into, to
introduce industries with established markets into the area.
Local economy should be strengthened in the entire LPA. Planned commercial centers should be
introduced at the major growth nodes in the LPA Kanakapura, Harohalli-Kanakapura and Sathanur.
The influx of population in the LPA would demand a proper commercial network within the LPA for
basic service delivery. Regularization of Delivery chains and markets should be taken up as a major
project
The provisions of the Suvarna Vastra Neethi 2008-1013 should be utilised to develop sericulture as
the prime activity in the LPA.
The centrally sponsored Catalytic Development Programme" should be implemented with the
assistance of Central Silk Board. Schemes under Catalytic Development Programme like Drip
irrigation, construction of rearing houses, raising of mulberry saplings, Installation of multi end reeling
machines, Incentive for Bivoltine Silk etc. are very popular. In order to ensure production of better
quality cocoons and silk with increased productivity, these programmes under Catalytic Development
Programme should be stepped up for which adequate funds will be made available under the State
and Central sector.
Sky Group
P a g e | 159
The initiatives of The National Research and Development Corporation (NRDC) should be supported
and expanded to establish Chawki Rearing Centre (CRC) and for capacity building and skill
development of the local farmers.
Detailed study should be undertaken to investigate the cause of slow development of sericulture
despite high potential and necessary investment plan for the sector. Kanakapura Town should be
used as the focal center for the LPA for development of capacity building, processing and marketing
facilities subject to its viability during the detailed study.
Large industrial units have been planned in the Harohalli Bidadi Cluster. Precision Engineering and
Machine Tools, Textiles, Plastics, Construction Material and Rubber and Agro and Food based
Industries have been proposed in the Taluk Industrial development Plan.
These are some of the sectors with highest backward and forward linkages. Forward and backward
linkage of these units should be analyzed in detail to boost the local economy. Art silk, Synthetic
textile manufacturing, Land based Transport, Petroleum products, retail, rubber tyre manufacturing,
recycling industries, Real estate should be used as key industries for boosting the local economy.
Detail studies should be carried out for estimating the quantum of forward and backward linkage and
the investments required.
AGRICULTURE
Food Park has been proposed at Harohalli by the department of Horticulture/ Food Karnataka Ltd.
Agro and Food Industries have been proposed as primary industries in the Taluk Industrial Plan. The
Taluk is also an AEZ for Gerkins and Rose onions. Processing industries should be promoted for
value addition.
Capacity building of the farmers in terms of knowledge development and awareness of latest
technologies, soil health improvement (by crop rotation etc.), water conservation and micro irrigation,
integrated post-harvest processing, crop insurance and credit facilities should be undertaken.
Soil moisture conservation and soil fertility improvement program through watershed approach.
Composting/green manuring/ tank silt recycling should be promoted.
Promoting alternate land use systems like Agri-horti system for arable lands (mango, sapota,
tamarind, jack fruit etc.) and Horti-silvi system (mango, sapota + silver oak, casurina, teak),
Sky Group
P a g e | 160
Silvipasture (block plantation of acacia, silver oak, casurina, D.Sisso, Meliaazardicta, cassia and
muthuga + S.hamata, S.scabra, calaproimum, anjan, Guinea macuaena, etc.) for non-arable lands.
Dryland vegetables (chilli, beans, brinjal, tomato, cluster bean, gourds etc.), Floriculture
(chrysanthemum, jasmine, crossandra marigold, roses etc.) fruits (guava, papaya, banana),
sericulture and coconut plantations should be promoted.
Livestock component (local draught animals, dairy, sheep, piggery, rabbit, apiculture) should be
developed.
There is an absence of a commercial center in the LPA. Since Kanakapura is the Taluk headquarters,
a regional commercial level should be planned in the town. The proposed landuse plan hence shows
a large area dedicated for commercial activities.
TRANSPORT
Town Ring road has been proposed around Kanakapura which is the major growth node of the LPA.
It would act as a conurbation boundary as well as serve the purpose of diverting traffic from the
centre of the town.
Since major industrial areas have been proposed in the LPA a separate freight corridor is requires
separating the intra settlement traffic and freight traffic. Presently the NH 209 forms the route for both
freight as well as normal traffic. The TRR (town ring road) has been proposed so serve the purpose
by diverting heavy traffic away from the town Centre.
Sky Group
P a g e | 161
Existing roads in the LPA have been proposed to be widened to accommodate the excess traffic. The
table of roads to be widened is included later in the proposal.
All the major settlements in the LPA and specially Kanakapura town have to be planned for easy
pedestrian movement. Studies should be taken up in the town level to arrive at detailed planning
proposal for pedestrian friendly circulation pattern.
Parking facilities is completely absent in the LPA. With the growth of the population in the LPA and
the consequent vehicular growth proper planned parking facilities are indispensible part of the
development. Studies should be taken up at town level to recognize inherent problems and arrive at
detail proposals for parking in the towns.
HOUSING
Housing Stock for both affordable and other categories has to be augmented to support the induced
population in the LPA.
Private real estate development should be encouraged and properly planned along with other models
of housing for viability and utilization of common delivery chains.
Composite and Joint venture housing schemes of the government along with private sector should be
encouraged.
25% of proposed industrial area2 should be used or housing workers and model of housing should be
subsidized by the industrial authority.
Sky Group
P a g e | 162
Housing Schemes such as Indira Awas Yojna, Dr.Ambedkar Housing Scheme, Ashraya Schemes
should be promoted to increase its reach among people.
SLUM IMPROVEMENT
ENVIRONMENT
The Kanakapura LPA has some of the most fertile agricultural land in the BMR and has been
designated as an Agri Export Zone (AEZ). Hence all new developments and landuses have been
planned protecting the productive agricultural lands in the LPA.
Sustainable agricultural practices should be followed in the LPA. Soil health should be continuously
monitored and programmes such as "Bhumi-TayiyaArogya" should be promoted to recover soil
quality and fertility. Drip Irrigation should be introduced for crops which do not require flooded fields.
Crop rotation practices should be introduced into the cropping practice to ensure soil fertility and
productivity.
Sky Group
P a g e | 163
Integrated Water management programmes should be adopted by the municipalities and urban local
bodies to ensure sustained supply of water to the LPA. Incessant digging of bore well should be
controlled and water loss during transmission and distribution should be minimized. Waste water
treatment should be introduced to recycle and reuse waste water. All surface water bodies should be
protected, maintained and enhanced for long term ecological well-being and water supply.
Uncontrolled mining and quarrying activities should be stopped. Mining and Quarrying activities
should run with proper licensing along with detailed survey and inspection of potential damage to
natural resources, human settlements and otherwise.
PHYSICAL INFRASTRUCTURE
WATER SUPPLY
Any plan on water supply must be preceded by a land use plan. New water treatment should be
planned to serve principally first to serve new development areas and then to serve the deficit areas.
Dead end system of distribution of water supply should be adopted as the network system due to its
cost advantage. Minimum capacity for water purification system must be for 1 MGD from economic
point of view, below which it is not recommended.
PROPOSALS
The area experiences shortage of water and wells are the main modes of sustenance in rural areas
as well as part of urban areas. Ground water in this area is fast depleting. The water supply demand
for future has been discussed above. Hence supply of tap water to the LPA needs to be augmented
for both domestic and industrial use.
Sky Group
P a g e | 164
It has been shown in the study that at present only 20% of the population in the LPA avails treated
tap water supply. At present there are no treatment plants in the LPA. Water treatment has to be
made an integral part of the water supply scheme to supply water free of iron and fluoride.
NEW WATER SUPPLY SCHEMES
The study shows that 14% of the population avail water away from their dwelling unit. Water source
close to dwelling unit should be provided in all areas urban and rural. New water supply schemes
should be introduces to make drinking water available to all.
Water treatment plants need to be created in the LPA for providing clean drinking water. 0.22 sq. km
area has been assigned for utilities in the proposed Landuse plan of the Kanakapura LPA while
Harohalli and Kaggalipura have 0.69 and 0.19 sq. km of area assigned for utilities and services.
Treatment plants can be setup centrally for the entire LPA or decentralised in north and south zones.
the future demand of water. All the above strategy will fail if there is no proper maintenance. All
pipeline leakages need to be identified to prevent loss of water. While ULBs shall enhance the tariff
base over a period of time to ensure that O&M is payable from the revenues, there is an immediate
requirement of O&M funds so as to ensure that the assets created under the scheme are properly
maintained.
A series of workshops should be organised across the region to create public awareness on the
importance of water as a national resource and the severe consequences of wasting and polluting
water. Industrial clusters are a source of severe water loss which can pose a serious threat in future.
The State Government along with NGOs should come forward for campaigning.
Private sector participation is desirable in the PPP format in the sector so that there is a balance
between risks and responsibilities between the government Agencies and the Private Sector.
In view of the same, private Sector Participants shall be invited to leverage on the following possible
benefits:
Sky Group
P a g e | 165
1. Industrial growth should be effected in a planned manner and it will be mandatory for the
units to allow periodical monitoring of water quality from nearby wells on a regular basis by
agencies like SPB/PHE and should be open for cross checking;
2. For ground water based industries, regular water level and quality monitoring have to be
made compulsory;
3. Rain water harvesting measures have to be adopted by all the industrial establishments
where the water level is not shallow;
Considering that there is virtually no systematic drainage system, it is felt necessary for each city to
draw up an integrated drainage and sewerage system for the entire area. Accordingly it will be the
endeavours of the city to design and implement an integrated system on a phase wise basis. The
drainage system will be set up initially in Kanakapura and then extended to the other areas of the
region. The drainage plan shall be worked out on the basis of Master Plan, GIS, Land Use & Control
Plan and the existing Drainage Channels. Generally, drains shall be provided along the existing
roads, existing rails and proposed roads and rails. The cost of the Integrated Drainage System shall
be worked out through Detailed Studies and Assessment and will be taken up for implementation
thereafter.
However, the present situation merits urgent attention and requires implementation of immediate
improvement schemes. In view of the same, immediate action plans have been worked out for
implementation.
Sky Group
P a g e | 166
OBJECTIVES
To develop and improve the storm water drainage in KLPA and the new developing areas by
2031.
To solve the water logging problems in the urban areas with better networking of drains.
To cover all existing drains after their repairing by 2021.
To achieve complete coverage of sewer network in newly developing areas along with
progress of development.
To provide total sanitation to major rural areas by 2021.
To achieve complete coverage of sewerage network by 2031, since laying of sewer lines in
already developed and congested areas would be difficult.
To make KLPA free from open defecation by 2031 as per Government of Indias total
sanitary campaign.
The Industrial waste generation has not been considered in the above calculation. Industrial waste
has to be treated separately before releasing into the network. The tolerance limit of the of the
release fluids must conform with the standards prescribed in IS:3306-1974. The volume of industrial
waste would depend on the type of industrial units proposed.
The design volume of the sewerage system would therefore be calculated on the basis of domestic
and industrial waste generated in the LPA.
PROPOSALS
The surface drains do not have total coverage in the LPA. Kanakapura town has surface drainage
system in the 5 percent of the total area. In rural areas surface drains are absent. Surface drains
have to be constructedto cover all settlement areas. Drain covers to be provided to all new and
existing drains.
Sky Group
P a g e | 167
The sewerage system has to be extended to cover all settlements in Kanakapura LPA. 71.6 km of
sewerage system is already under proposal to be constructed in Kanakapura town. The total area
proposed to be developed in the LPA is 27 sqkm and the total length of road network proposed is
10152 km.
Hence an additional 10125 km of sewerage network has to be constructed in order to bring the
coverage up to 100 percent. The design period of the sewerage system should at least be 30 years.
The trunk sewer line from the sources to STPs shall be laid along the contour. The advantage of
natural slopes along the streams, rivers and road network should be adopted while designing the
trunk sewer line.
Provision has to be made for assistance to BPL households to build sanitary toilets and upgrade their
septic tanks and construct soak pits, to extend sanitation facilities in the entire LPA.
Sewage treatment plants have to be constructed in the LPA for treating sewage. Tertiary treatment of
sewage can be used as a strategy for ground water recharge through reclaimed sewage, since water
scarcity is a major issue in the LPA. For treated industrial wastes to be released for irrigation
purposes, the final fluid must conform with BIS code IS: 3307-1965.The STPs shall be accessible for
ease in construction and repairing of plant and machineries.
A community awareness campaign is needed to make people aware about the benefit of sewer
connections and how it can enhance the present living conditions and environmental quality in their
areas.
Appropriate measures have to be taken for safe disposal of septic tank and other wastes. Detachable
dumping chutes should be constructed at selected points in the sewerage system for disposing of the
night soil collected from individual houses. The sewage after treatment should be disposed of either
into a water body like lake, stream, river, ocean or into the land.
Sky Group
P a g e | 168
The sewage may be utilised for several purposes such as (i) Industrial reuse or reclaimed sewage
effluent in cooling systems, boiler feed, process water etc, (ii) Reuse in agriculture and horticulture,
watering of laws, golf courses etc. (iii) Ground water recharge for augmenting ground water
resources.
PUBLIC TOILETS
Provision of public toilets in the market areas and in the LIG areas.
Construction of common effluent treatment plants (CETP) must be made mandatory in the industrial
areas for treatment of industrial wastes before release into the sewerage network.
Proper fund allocation must be made for operation and maintenance of the sewage system.
Appropriate organisational/ institutional framework must be provided in the newly developed areas of
Harohalli, Kaggalipura and Sathanur for operation and maintenance of sewage network.
Sky Group
P a g e | 169
In, India municipal wastes have to be managed as per the provisions of Municipal Solid Wastes
(Management and Handling) Rules, 2000 promulgated under Environment Protection Act, 1986. As
per these rules, all the biodegradable municipal solid wastes shall be required to be processed by
appropriate biological processing method.
Municipal Solid Waste (Management and Handling) Rules 2000 has made MSWM the Litigation
responsibility of Urban Local Bodies (City Corporations and Municipal Corporations), which asks for
source segregation of waste for cleaner composting and recycling. Further, the Supreme Court of
India, acting on Public interest Litigation directed all urban local governments to install scientific solid
waste treatment plants before a set deadline. Thus the installation of a scientific solid waste
management system, though a costly proposition for most of the urban bodies, has become an
imminent necessity. Also the Ministry of Environment and Forest (MOEF), Government of India, has
issued the Municipal Solid Wastes (management and handling) Rules in the year 2000, which identify
the CPCB (Central Pollution Control Board) as the agency to monitor the implementation of these
rules.
PROPOSALS
In view of the projected growth in population and absence of any MSW facilities it is proposed to have
Integrated Solid Waste Management (ISWM) complex.
Existing municipal solid waste management system would follow the following strategies for efficient
management in the future.
COLLECTION OF WASTE
Increasing the coverage and efficiency of collection mechanism would help in better management
and in reducing the formation of unhygienic and open dump sites. Segregation of waste into
biodegradable and non-biodegradable Components shall be carried at source or at primary collection
centres.
Sky Group
P a g e | 170
On the basis of availability of land and financial resources with the service provider, either of the
methods aerobic composting, anaerobic Digestion or sanitary land filling could be adopted for
treatment and disposal of waste. However, since it appears that land filling would continue to be the
most widely Adopted practice in India in the coming few years, in which case certain Improvements
need to be done to ensure sanitary land filling and not mere dumping of Waste.
AWARENESS CAMPAIGN
Awareness Campaign shall be carried out in order to educate the general public about the disposal of
solid waste at the right place. Awareness campaign shall also be carried out to show and illustrate the
segregation of solid waste. Benefits about cleanliness and hygienic environment should be taught.
LANDFILL FACILITY
Landfill facility is present for Kanakapura town, though it is not adequate for horizon year 2031. Land
has been allocated for utilities and services in the Landuse plan of Harohalli, Kaggalipura and
Sathanur. Land fill facilities should be located within those areas after proper design considerations.
Strengthening urban local bodies to perform efficiently in managing the waste and ensuring
strict enforcement of the recently introduced municipal solid waste (Management and
handling) rules.
It is also imperative to harness and integrate the role of three emerging actors in this field
the private sector, NGOs, and rag pickers into the overall institutional Framework.
Many wastes are mixtures of hazardous and non-hazardous wastes. Much of their contents may
even be water. By segregating key toxic constituents, isolating liquid fraction, keeping hazardous
streams away from non-hazardous wastes, generator can save substantial amounts of money on
disposal or find new opportunities for recycling and reuse of wastes. The Ministry of Environment,
Government of India, had identified toxicity of different chemicals, through the Manufacture, Storage
and Import of Hazardous Chemicals Rules, 1989 in exercise of power conferred by Section 6, 8 and
Sky Group
P a g e | 171
25 of Environment Protection (E.P). Act, 1986, and had notified mandatory requirements for its
management. In India quantum of generation of wastes (solid/liquid and hazardous/non-hazardous)
for different industry has not been detailed, which is necessary for wastes exchange system or for
adopting treatment/ disposal alternatives for different wastes segregated.
The unsatisfactory state of storage of hazardous wastes can be remedied to alarge degree by such
low-cost measures as restricting access, fencing off the storagearea to minimize any wind-blown
nuisance, providing separate covered storage forputrifiable of hazardous wastes, and ensuring
regular and frequent collection.There are certain measures a municipal authority can take to control
thetransportation of industrial wastes, even if it does not want to become actuallyinvolved itself. For
instance, contractors should be licensed after ensuring that theyare technically competent and
environmentally aware and should be allowed tohandle industrial wastes. Labelling and coding of
hazardous waste load can be mademandatory so that in the event of an accident, the emergency
services know how tohandle a spillage. Municipal authorities can be given the responsibility to
monitorthe contractors to minimize cases of fly-tipping and ensure that industrial wastes aredisposed
at the appropriate sites. If a municipal authority can also collect industrialwaste; industries must pay
the charge which will be based on the quantity and natureof the waste. This might minimize the
quantity of waste produced by industry and atthe same time the programme will become financially
viable and self-sustaining. Theprinciple the polluter pays should be adhered to in all such cases.
Small-scale industries, which contribute about more than half of the totalproduction, also generate
huge quantity of wastes. The small-scale industries are notin a position to treat their solid wastes or
liquid effluent because of space, technicalknow-how and financial constraints. It is, therefore, deemed
that in a cluster ofsmall-scale industries the different wastes are characterized, identified,
quantifiedand stored for treatment through a combination of recycling, recovery and reuse
ofresources such as, raw material, bio-gas, steam and manure, besides providing anefficient service
facility, to make the system less expensive. The combined effluenttreatment plants (CETP) are to be
operated by the local bodies, where the cost ofconstruction, operation and maintenance need to be
shared by individual industriesdepending upon the quality and quantity of wastes generated.
However, suchcommon treatment facility may require pre-treatment at individual industry to theextent
specified by the State Pollution Control Board. With regard to availability ofwastes along with their
identification, quantum of waste generated should also beascertained so that technology
development/adoption can be considered oneconomic grounds for a small-scale or organised sector
Sky Group
P a g e | 172
of industry. If economicsjustify movement of wastes over longer distances for a centralised plant,
specificsubsidies for storage, collection and transportation could be considered. CETPs are being
successfully operated in Gujarat and Andhra Pradesh andsuch facilities should be promoted in other
States. Small scale industries having waste characteristics similar to those of nearbylarge industry
having waste treatment facilities can take help in treating their wasteson payment basis.
DISPOSAL METHODS
Depending upon the characteristics of the wastes, different types of disposalmethods can be used for
hazardous and non-hazardous industrial wastes. The mostpredominant and widely practiced
methods for wastes disposal are: (a) Landfill, (b)Incineration and (c) Composting.
Landfilling is still the major disposal method in many countries. Yet in manyinstances landfilling sites
are not properly chosen in terms of geophysical soilproperties, hydrogeology, topography and
climate. On a proposed site there is aneed to carefully consider the potential for ground or surface
water contaminationfrom pollution by leachate migration or surface run-off from the site.Nonetheless,
even when a site appears to have the right geophysical properties, itsselection and use are not an
absolute guarantee that contamination of groundwatercan be avoided. Hence, continuous
surveillance of the site and its surroundings mustbe maintained to check that the disposal of
hazardous wastes can continue withoutposing a threat to the environment and to the general public.
To reduce this threatlandfill sites have been lined, for example with plastic materials, in order to
preventleaching into groundwater supplies.
Landfill sites for industries should be proposed in the industrial Landuse area after proper
consideration of contours and design specifications of the industrial park.
Sky Group
P a g e | 173
SOCIAL INFRASTRUCTURE
The pivotal role of social infrastructure in development has been recognized in the various national
and state level planning policies. In conformation with the national and state agenda, healthcare has
been given prime importance during the master planning process. A stock of existing facilities has
been taken and the deficiencies and requirements for year 2031 have been calculated. The existing
indicators of the health have been analysed and targets have been set till the year 2031.
HEALTH
Healthcare facilities should be set up for every village, cluster and major town so that basic
healthcare is accessible to all people. Regulatory and administrative framework should be
strengthened to ensure availability of medical professionals in all healthcare institutions.
Mobile health clinics can be introduced to improve accessibility in remote areas. Healthcare should
also be made a part of corporate social responsibility (CSR) for the industries that would be set up in
the region.
Technology like telemedicine should be used to make healthcare accessible in remote corners of the
LPA.
HEALTHCARE MONITORING
Regular monitoring of health statistics should be undertaken in the LPA to prepare a database and
monitor increase or decrease in health status. Monitoring should be specially undertaken in and
around industrial areas to analyse the impact of industries on public health.
INSTITUTIONAL FRAMEWORK
Institutional and administrative framework should be strengthened and organized to ensure swift
service delivery and strict monitoring and operation of healthcare services. Decentralization of
healthcare service should also be accomplished at LPA level, wherein monitoring can be done
through Panchayats and Civil Societies.
Sky Group
P a g e | 174
EDUCATION
The following table shows the requirement of educational facilities in the LPA. Basic education would
be strengthened by providing primary and secondary schools at settlement level ensuring proper
accessibility and connectivity from all areas of the LPA. Colleges would be provided at the three
major clusters i.e. Kanakapura, Harohalli Kaggalipura and Sathanur. Technical Institutions,
Engineering colleges and Medical colleges would be planned across the LPA to increase technical
capacity in the workforce to match the employment potential of the region.
The literacy rate of Kanakapura Taluk is 65.1%, whereas that in Karnataka is 75% and the national
literacy rate is 74.5%. Basic education facilities need to be strengthened to increase the literacy rate.
Education programmes such as mid-day meals, free bicycles, free uniforms and bags should be
promoted in order to achieve the goal.
There is a sharp decrease in enrolment rates in the LPA in secondary schools. Schools should be set
up within communicable distances from villages so that education is accessible to everyone.
Incentives should be provided so that students do not have to leave education to support their
families economically.
Student teacher ration should meet the standards prescribed by the Right of Children to Free and
Compulsory Education Act 2009. A ratio of 1:30 should be maintained in primary schools and 1:35
should be maintained in secondary schools.
Infrastructure facilities should be improved in schools across the LPA. Separate girls toilet should be
provided in every unit. Drinking water facility and play grounds should be made compulsory in all
schools. Universally accessible design of structures should be followed for all units.
Sky Group
P a g e | 175
CHAPTER 10
PHASING OF DEVELOPMENT
The Master Plan has been prepared for a plan period of 20 years. Since the area proposed is far
more than the requirement of the near future, uncontrolled and sparse development may take place
in absence of a regulating mechanism for the immediate future. Hence the concept of phasing of
development has been introduced as required under section 12 (g) of Karnataka Town and Country
Planning Act, 1861 to bring about gradual and compact development in the Local Planning Area. The
primary objective of act is to guide and regulate the developments within the Local Planning Area in a
phased manner so as to facilitate planning for the provision of infrastructure services like water
supply, sanitation, drainage, transport and social infrastructure.
The projected population in the Local Planning Area is proposed to be accommodated in a phased
manner from 2011-2021 and 2021-2031 as proposed in the phasing map.
phase I.
However, if any development was initiated in pursuance of earlier No Objection Certificate given by
this Authority for conversion to non-agriculture use/ change of land use by the Authority, the same
would be allowed as per rules, though such developments are not in line with the policy of ensuring
compact and planned development.
The stages by which the plan is to be carried out in phased manner has been prepared based on:
-
Present growth trend: the area adjacent to present developed areas have been given priority
for development in the first phase.
The area required to accommodate the projected population in 2021 and 2031.
Sky Group
P a g e | 176
The total population in the LPA in 2021 is 3.5 lakhs and that in 2031 is 6 Lakhs. The area requirement
of the two phases has been calculated to accommodate a population of 6 lakhs @ 67pph by the year
2031.
Table 10.1: Phasing of development
Area to be developed*
YEAR
2011
180000
2011-2021
180000
3137.62(including existing)
2021-2031
240000
5938.03
Total
600000
9075
POPULATION
2011
20000
2011-2021
45000
2021-2031
85000
1205.84
1,50,000
2109.41
AREA
POPULATION
2011
20000
2011-2021
60000
2021-2031
100000
1372.01
Total
1,80,000
2721.07
AREA
POPULATION
2011
5000
Total
Table 10.3: Phasing of development: Harohalli
2011-2021
30000
2021-2031
55000
1566.73
Total
90,000
1858.31
AREA
POPULATION
2011
60000
2011-2021
60000
Sky Group
2021-2031
Total
60000
1793.45
1,80,000
2386.87
The land use analysis for phase-I to be carried out during 2011-21 is detailed below.
Table 10.6: Land use analysis for phase-I: Kaggalipura
KAGGALIPURA
AREA (Ha)
PERCENTAGE
RESIDENTIAL
509.95
53.99%
COMMERCIAL
57.35
6.35%
INDUSTRIAL
16.64
1.84%
75.21
8.32%
97.90
10.83%
TRANSPORTATION
146.51
16.21%
903.57
100.00%
1205.84
2109.41
LANDUSE
LANDUSE
RESIDENTIAL
COMMERCIAL
INDUSTRIAL
PARK & OPEN SPACES
PUBLIC & SEMI PUBLIC
PUBLIC UTIITY
TRANSPORTATION
URBANISABLE AREA - PHASE 1
URBANISABLE AREA - PHASE 2
TOTAL URBANISABLE AREA
Sky Group
AREA (Ha)
PERCENTAGE
479.45
33.10
468.14
57.05
34.05
47.43
229.85
1349.06
1372.01
2721.07
35.54%
2.45%
34.70%
4.23%
2.52%
3.52%
17.04%
100.00%
P a g e | 178
LANDUSE
RESIDENTIAL
COMMERCIAL
INDUSTRIAL
PARK & OPEN SPACES
PUBLIC & SEMI PUBLIC
PUBLIC UTIITY
TRANSPORTATION
URBANISABLE AREA - PHASE 1
URBANISABLE AREA - PHASE 2
TOTAL URBANISABLE AREA
AREA (Ha)
PERCENTAGE
378.90
20.59
3.39
68.17
32.28
13.66
76.40
593.41
1793.46
2386.87
63.85%
3.47%
0.57%
11.49%
5.44%
2.30%
12.88%
100.00%
LANDUSE
RESIDENTIAL
COMMERCIAL
INDUSTRIAL
PARK & OPEN SPACES
PUBLIC & SEMI PUBLIC
PUBLIC UTIITY
TRANSPORTATION
URBANISABLE AREA - PHASE 1
URBANISABLE AREA - PHASE 2
TOTAL URBANISABLE AREA
Sky Group
AREA (Ha)
139.71
23.45
7.55
20.51
25.49
13.44
61.43
291.58
1566.73
1858.31
PERCENTAGE
47.91%
8.04%
2.59%
7.04%
8.74%
4.61%
21.07%
100.00%
P a g e | 179
CHAPTER 11
11.1 ACTIONS
Compact community is a high density urban settlement and is the most sustainable urban form.
Compactness has many advantages, less cost of providing services, less carbon footprint, forging
strong community links being the foremost. A complete urban form has a well-defined and developed
street network with equitable allocation of road space for all modes; mixed land use that reduces the
need and length of a trip; focus on public transport and walking and cycling.
Parameters for review:
Density of development; Completeness of street network with specific focus on completion of missing
links; width and quality of footpaths; creation of bus-bays; development of bus terminals; priority to
public transport by providing dedicated lanes for buses; development of cycle tracks etc.
Sky Group
P a g e | 180
2)
To enhance the character and quality of public realm to suit the varied requirements of
the community.
What makes an urban community liveable? Historically, many towns/cities always had a main market
streets, public plazas etc. where people could congregate and interact. The public realm comprises of
the places where the children could play; the old could meet and chat and the young could hang-out,
and the people in other age-groups could catch up with their friends after work or exercise in the
mornings or do their shopping without the threat of being run over by a passing vehicle. Public realm
must have something for every age group. Well-developed Parks, play grounds, pedestrianized
areas etc. enhance the quality of public realm.
Parameters for review: Development of parks on hierarchical basis (neighbourhood/ city /town
level); Networking of green spaces along nalas, lakes, rivers etc./ buffer spaces to form a network of
green links for walking/cycling; Pedestrianization of market streets, temple streets, heritage areas etc.
3)
To
proactively encourage
the
development of a
sustainable
community by
discouraging use of personal vehicles and thereby, reduce the carbon footprint of the
community.
Unbridled growth of personal vehicles adds to congestion, air-pollution and increase in unproductive
time spent in commuting for the community. Many indirect costs like parking costs are not considered
when people make a choice to buy a two-wheeler or a car as parking is free in many of our
cities/towns. Parking on streets also reduces the road width available for movement of
people/vehicles and further causes congestion problems. Like good habits that need to be inculcated
from childhood, paid parking has to be implemented irrespective of the fact that the city/town has
manageable traffic.
Parameters for review: Implementation of parking policy with parking pricing; demarcation of areas
where vehicles can be parked and where they cannot be parked; enforcement measures;
Provision of cycle parking etc.
4) To facilitate seamless freight movement while ensuring that the ambience of the city is not
affected due to movement of trucks etc. through the city.
Parameters for review:Development of designated parking areas for heavy goods vehicles/logistic
hubs.
Sky Group
P a g e | 181
5) To preserve historically and culturally important landmarks, and to ensure that public
infrastructure and facilities within the city/town are aesthetically designed and
constructed from architectural and functional point of view, and contribute to
enhancing the ethos of the city/town.
Parameters for review: Identification of historically and culturally important buildings and
development of plans for their preservation; developing design guidelines for new public
buildings.
6) To enhance the per-capita green space in the city/town with attention to protection of
local bio-diversity.
Parameters for review: Development of guidelines for city plantation; extent of plantation proposed
during the year etc.
Sl.
Members
Chairman
Member
Member
Member
Member
Member-Convener
Member
Sky Group
P a g e | 182
The committee is expected to meet every quarter to review the performance with respect to specific
targets that must be identified in the first meeting of the committee. All the proposals/ projects/
schemes identified for implementation or enforcement are prioritised to be developed in phases over
the plan period of 20 years depending on the mode of development and funding.
An independent evaluation of master plan will be done by BMRDA every five years to gauge
the effectiveness of the implementation of the Master plan proposals.
ROADS
SL
CATEGORY
WIDTH
(m)
LENGTH (km)
90
8.06
90
5.3
90
5.69
60
24.65
LAND
ACQUISITION
COST (CRORE)
DEVELOPMENT
COST
694.06
64.48
758.54
456.39
4.24
460.63
489.98
4.552
494.53
1910.39
17.748
1928.14
81.456
1133.61
90.024
1640.45
67.296
1516.04
329.796
7931.95
STRR
ITRR
IRR
RR
MASTER PLAN
PROPOSED ROADS
18
67.88
1052.15
MASTER PLAN
PROPOSED ROADS
24
75.02
1550.43
MASTER PLAN
PROPOSED ROADS
30
56.08
1448.75
6
7
TOTAL
7602.16
TOTAL
FINANCIAL
REQUIREMENT
SL
9
Sky Group
10.02
LAND
ACQUISITION
COST (CRORE)
8628.42
DEVELOPMENT
COST
10.02
TOTAL
FINANCIAL
REQUIREMENT
8638.44
P a g e | 183
10
6.20
5338.94
6.2
5345.14
13983.59
21915.54
The total cost of provision of transport infrastructure including the BMR proposed roads (STRR, IRR,
RR, ITRR) is 7931 crores. Provision public amenities in the LPA till 2031 would require a capital sum
of 13983 crores. The total capital required is 21, 915 crores.
Sky Group
P a g e | 184
PART II
ZONING REGULATIONS
CHAPTER 12
ZONING REGULATIONS
12.1 INTRODUCTION
In order to promote public health, safety and the general social welfare of the community, it is
necessary to apply control and reasonable limitation on the development of land and buildings.
This is to ensure that most appropriate, economical and healthy development of the entire
Kanakapura Local Planning Area including Kanakapura Town takes place in accordance
with the land use plan, and its continued maintenance over the years. For this purpose, the LPA
is divided into number of use zones, such as Residential, Commercial, Industrial, Public and
Semi Public, Park and Open Space etc. Each zone has its own regulations, as the same set of
regulations cannot be applied to the entire area.
Zonal Regulations protects residential areas from the harmful invasions of commercial and
industrial uses and at the same time promotes the orderly development of industrial and
commercial areas, by suitable regulations on spacing of buildings to provide adequate light, air,
protection from fire, etc. It prevents overcrowding in buildings and on land to ensure adequate
facilities and services.
Zoning is not retrospective. It does not prohibit the uses of land and buildings that are lawfully
established prior to the coming into effect of these Zonal Regulations. If these uses are contrary
to the newly proposed uses, they are termed non-conforming uses and are gradually eliminated
over years without inflicting unreasonable hardship upon the property owner.
The Zonal Regulations and its enforcement ensure proper land use and development and form
an integral part of the Master Plan. It also ensures solutions to problems of development underlocal conditions.
The Zonal Regulations for Kanakapura Local Planning Area prepared under the clause (a) of
sub-section (1) of section 12 of the Karnataka Town and Country Planning Act, 1961 are
detailed below:
Sky Group
P a g e | 185
12.1. 1
The local planning area is divided into use zones such as Residential, Commercial,
Industrial etc., as shown in the enclosed maps.
12.1.2
a.
b.
The regulations governing minimum size of plot, maximum plot coverage, minimum front, rear
and side setbacks, minimum road widths and maximum number of floors and height of
structures are set out in these regulations.
NOTE:
a.
Where there is uncertainty as regards to the boundary of the zones in the approved
maps, it shall be referred to the Authority and the decision of the Authority in this regard
shall be final.
b.
For any doubt that may arise in interpretation of the provisions of the Zonal Regulations,
the Authority shall consult BMRDA or the Director of Town & Country Planning,
Government of Karnataka, Bangalore.
c.
Where there is uncertainty in identifying alignment of nala, canal, river, existing public
road, railway line, high-tension line and any religious building position and also survey
number boundaries in the approved maps, it shall be referred to the actual position on
ground and decision taken by the Authority in this regard shall be final.
d.
Sky Group
P a g e | 186
e.
12.1.3
Definitions
In these Zonal Regulations, unless the context otherwise requires, the expressions given below
shall have the meaning indicated against each of them.
1.
Act means the Karnataka Town and Country Planning Act (K.T.C.P. Act), 1961.
2.
or change in height or the removal of part of building, or any change to the structure, such
as the construction or removal or cutting of any wall or part of a wall, partition, column,
beam, joist, floor including a mezzanine floor or other support, or a change to or closing of
any required means of access ingress or egress or a change to fixtures or equipment as
provided in these Zonal Regulations.
3. Amalgamation means clubbing of two or more authorized plots.
4. Amenity
dwelling units, or two buildings blocks, each containing two or more dwelling units on a
given property. This word is synonymous with residential flat.
Sky Group
P a g e | 187
7. "Applicant means any person who gives notice to the Authority for any approval with
ground
level. The basement height should not project more than 1.2 m above the
a. A house, out-house, stable, privy, shed, well, verandah, fixed platform, plinth, door
step and any other such structure whether of masonry, bricks, wood, mud, metal or
any other material whatsoever;
b. A structure on wheels simply resting on the ground without foundation;
c. A ship, vessel, boat, tent and any other structure used for human habitation or used
for keeping animals or storing any article or goods on land.
14. Building Line means the line up to which the plinth of buildings may lawfully extend
within the plot on a street or an extension of a street and includes the line prescribed, if
any, or in any scheme.
15. Building Set Back is the minimum distance between any building or structure from the
parking, maintenance and repair of buses. These may include the workshop.
17. Bus Terminal means a premises used by public transport agency to park the buses
for short duration to serve the public. It may include the related facilities for
passengers.
18. Carriageway means the clear motorable width within the road right of way without any
obstructions such as drains, trees, electric poles, etc. The carriageway surface may be
or may not be paved. Width of the carriage way or the width of the pavement depends
on the width of the traffic lane and number of lanes.
Sky Group
P a g e | 188
19. Chajja means a continuous sloping or horizontal cantilever projection provided over
smoke, gas, etc., of a fire or furnace are carried off and by means of which a draught is
created.
21. Civic Amenity" means a market, a post office, a bank, a bus stand or a bus depot, a
fair price shop, a milk booth, a school, a dispensary, a maternity home, a child care
centre, a library, a gymnasium, a recreation centre run by the Government or Local
Authority, a centre for educational, religious, social or cultural activities or philanthropic
service run by a co-operative society or society registered under the Karnataka
Societies Registration Act, 1960 (Karnataka Act 17 of 1960) or by a trust created wholly
for charitable, educational or religious purposes, a police station, fire station, an area
office or a service station of the Local Authority or the Karnataka Urban Water Supply
and Drainage Board or the Karnataka Electricity Supply Companies, State and Central
Govt. offices and such other amenity as the Government may by notification specify.
22. Clinic: A premises used for treatment of outpatients by a doctor.
23. Clinical Laboratory: A premises used for carrying out tests for diagnosis of ailments.
24. Commercial Building means a building or part of a building, which is used as shops,
and/or market for display and sale of merchandise either wholesale or retail, building
used for transaction of business or the keeping of accounts & records for similar
purpose; professional service facilities, corporate offices, software services, offices of
commercial undertakings and companies, petrol bunk, restaurants, lodges, nursing
homes, cinema theatres, multiplex, kalyana mantapa, banks ,community hall and clubs
run on commercial basis.
merchandise and located in the same building shall be included under this group,
except where exempted.
25. Common Wall means a wall built on land belonging to two adjoining owners, the wall
If two adjoining owners build a dividing wall on their property, they are not common
walls and no part of the footings of either wall shall project on to the land of the
adjoining owner, except by legal agreement between the owners.
b)
Any such common or dividing wall shall be considered for the purpose of these
byelaws, as being equivalent to an external wall as far as the thickness and height
are concerned.
Sky Group
P a g e | 189
Local Bodies, Trust, Society, etc., and having a Hall without separate kitchen and
dining. No upper floor shall be permitted.
27. Convention Centre means premises having enclosed space for conducting seminars,
Streets/Roads.
29. Corridor means a common passage or circulation space including a common
entrance hall.
30. Court yard means a space permanently open to the sky either in the interior or
plinth level, but does not include the space covered by;
a. Court yard at the ground level, garden, rocky area, well and well structures, plant,
nursery, water pool, swimming pool (if uncovered) platform around a tree, tank,
fountain, bench with open top and unenclosed sides by walls and the like;
b. Drainage, culvert, conduit, catch-pit, gully-pit, chamber gutter and the like;
c. Compound or boundary wall, gate, un-storied porch and portico, chajja, slide, swing,
uncovered staircase, watchman booth including toilet. The area covered by
watchman booth or pump house shall not exceed 15 sq m depending on the size of
the plot and its requirement.
d. Sump tank and electric transformer.
32. Cross Wall means an internal wall within the building up to the roof level or lintel
level.
33. Cultural Building means a building built by a Trust, Society, Government or Local
any other building in the same plot with open spaces on all sides, except the portion
covered by the garage.
36. Duplex means a residential apartment in two levels connected with an internal
staircase.
37. Drains means natural valleys intended for flow of storm water /rain water.
38. Drainage means the removal of any waste liquid by a system constructed for this
purpose.
Sky Group
P a g e | 190
39. Dwelling Unit /Tenement means an independent housing unit with separate facility
though adjoining a wall of another building and also a wall abutting on an interior open
space of any building.
42. First Floor means the floor immediately above the ground floor or stilt, on which
units as given in Schedule I having not more than 50 workers and these units may be
located in multi-storeyed industrial buildings.
44. Floor means the lower surface in a storey on which one normally walks in a building.
The general term floor does not refer basement or cellar floor and mezzanine.
45. Floor Area Ratio(FAR) means the quotient of the ratio of the combined gross area of
all floors, except the areas specifically exempted under these regulations, to the total
area of the plot, viz.
Floor Area Ratio =
46. Footing means the projecting courses at the base of a wall to spread the weight over a
large area.
47. "Foundation means that part of structure which is below the lowest floor and which
provides support for the superstructure and which transmits the load of the
superstructure to the bearing strata.
48. Frontage means the width of any site/land abutting the access/public road.
49. Garage means a structure designed or used for the parking of vehicles.
50. Government means the Government of Karnataka.
51. Ground Floor means immediately above the level of the adjoining ground level on all
Sky Group
P a g e | 191
54. Ground Coverage means the total area covered by building immediately above the
plinth level. Swimming pool, sump tank, pump house and electric substation, utilities are
not included.
55. Group Housing means apartments or group of apartments on a minimum plot size of
1 hectare or more with one or more floors and with one or more dwelling units in each
floor. They are connected by an access of not less than 3.5 m in width, if they are not
approachable directly from the road.
56. Habitable Room means a room occupied or designed for occupancy by one or more
persons for study, living, sleeping, Eating, cooking but does not include bathrooms
water closet compartments, laundries serving and storage pantries, corridors , cellars,
attics and spaces that are not used frequently or during extended periods.
57. Hazardous Building means a building or part thereof used for:
beams
the average road level of the site to the top of the roof and in the case of pitched roofs
up to the point where the external surface of the outer wall intersects a finished surface
of the sloping roof and in case of gable facing the street, the midpoint between the eavelevel and the ridge. Architectural features, service no other function except that of
decoration shall be excluded for the purpose of measuring height. Water tank,
chimneys, lift room, stair case room, and parapet are also excluded for the purpose of
measuring height. The aggregate area of such structures shall not exceed 1/10th of the
roof area of the building upon which they are erected.
60. Heritage Building means a building possessing architectural, aesthetic, historic or
Sky Group
P a g e | 192
61. Heritage Precinct means an area comprising heritage building or buildings and
precincts there of or related places which is declared as such by the Planning Authority,
or any other Competent Authority within whose jurisdiction such building is situated.
62. High Density Development means development which include star hotels, shopping
average ground level. However, chimneys, cooling towers, boiler, rooms/ lift machine
rooms, cold storage and other not-working areas in case of industrial buildings and
water tanks, and architectural features in respect of other buildings may be permitted
without reckoning for height.
64. Hospital is premises providing medical facilities of general or specialized
nature for
for students up to XII standard and also having boarding facilities for students and
faculty members.
67. Industrial Building means a building wholly or partly used as a factory, for the
manufacture of products of all kinds and related activities (including fabrication and
assembly, power plant, refinery, gas plant distillery, brewery, dairy, factory, workshop
etc.)
68. IT Infrastructure companies means the real estate Infrastructure developer or a
builder, registered under Indian Companies Act, 1956, having core competency in
constructing IT office space for sale or for lease cum sale to IT Industry for the purpose
of IT activities by the IT industry.
69. IT/ITES Park is defined as exclusively delineated or earmarked site/area of 2000 sq m
land and above managed and developed/ to be developed with IT office space and
other amenities and made available on lease basis for IT industry, to provide plug and
play facilities as per the stipulations contained herein.
70. IT/ ITES Campus is defined as IT office space and other amenities developed by an
SEZ developed in an area of 25 acres and above to be developed by a developer or codeveloper, according to the provisions of The SEZ Act, 2005.
72. Junk Yard means premises for covered semi covered or open storage including sale
Sky Group
P a g e | 193
73. Kalyana Mantapa means premises where marriages, social and religious functions
part of the building is in use or permitted to be used by the Authority on any specified
date. Land use includes zoning of land use as stipulated in the Master Plan and the
Zonal regulations.
75. Layout means any subdivision of land with the formation of a new road or an access
building construction.
78. Lodging is a premises used for lodging on payment.
79. Loft means a residual space above normal floor level which may be constructed or
Kanakapura approved by the Government under the Karnataka Town and Country
Planning Act, 1961.
82. Mezzanine Floor means an intermediate floor between Ground floor and First floor
only, with area of mezzanine floor restricted to 1/3 of the area of that floor and with a
minimum height of 2.20m. Mezzanine floor is permitted on commercial uses only. Such
Mezzanine floor shall be accessible only from the Ground floor.
83. Multilevel Car Parking (MLCP) means multilevel R.C.C. structure used for vehicle
parking connected to all floors by means of ramps or ramps with mechanical elevators.
MLCP can be an independent structure or part of a building with other land uses.
Sky Group
P a g e | 194
84. Multiplex means, a building housing an entertainment and cultural centre including
building.
87. Parapet means a low wall or railing built along the edge of a roof or balcony.
88. Parking Space means an area enclosed or unenclosed, covered or open sufficient in
size to park vehicles together with a drive-way connecting the parking space with a
street or any public area and permitting the ingress and egress of the vehicles.
89. Park: An area used for leisure, recreational activities, it may have related landscaping,
surrounding ground.
95. Plot or Site: A parcel of land enclosed by definite boundaries and held in one
ownership.
96. Porch or Portico means a roof cover supported on pillars or cantilevered projection
P a g e | 195
house various types of pumps with self priming mechanism however the entrance shaft
of the pump room of a maximum of 2Mx2M may be permitted above the ground level.
99. Recreational Club is a premises used for assembly of a group of persons for social
and
may
reasonably
provide
for
development along highways, control lines and building lines shall be provided. Control
line is a line which represents the nearest limits of future uncontrolled building activity in
relation to a road. Building line represents a line on either side of the road; between
which and the road no building activity is permitted at all.
100. Road Level is the level of the road at the access to the property or in the event of
more than one entrance to the property the road level considered shall be at the centre
of the property frontage. The level of the road shall be taken at the centre of the carriage
way.
101. Road Width means the distance between the boundaries of a road including footways
P a g e | 196
underside of the joist or beams or tie beams shall determine the upper point of
measurement. The minimum height of the room shall be 2.75 m.
108. Row Housing means more than one residential buildings in a row attached to each
other with only front, rear and interior open spaces.
109. Semi-detached Building means a building detached on three sides with open
spaces as specified in these regulations.
110. Service Apartment means fully furnished room or suite or rooms with kitchen, which
is intended to be used on rental basis.
111. Service Road means a road / lane provided adjacent to a plots(s) for access or
service purposes as the case may be.
112. Services means activities incidental to the land use of the building such as electrical
sub-station, electrical panel room, generators, HVAC (Heating, Ventilation & Air
conditioning) facilities, plumbing and sanitary facilities, STP, refrigeration and cold
storage, fire fighting facilities, building management systems, car park management
facilities and similar such activities.
113. Service Industry means an industry where services are offered with or without
power. If power is used, aggregate installed capacity shall not exceed 5 HP. The site
area shall not exceed 240 sq m.
residential and commercial zone under special circumstances and in the light
industries zone of the Master Plan as given in Schedule I.
114. Set back means the open space prescribed under these Zonal
Regulations
Sky Group
P a g e | 197
120. Wholesale An area where goods and commodities are sold or, delivered to retailers,
the premises include storage/ go down, loading and unloading facilities.
121. Zonal Regulations mean the Regulations governing land use made under the
Karnataka Town and Country Planning Act, 1961.
Note: 1. The words and expressions not defined in these regulations shall have the same
meaning as in the Karnataka Town and Country Planning Act, 1961 and Rules, the
Building Bye Laws of Bangalore Mahanagara Palike and National Building Code of India
2005.
3. Any other unforeseen situations that arise during implementation of this Zonal
Regulations for which provisions are not found in this, the Authority may take decision in
consultation with the BMRDA or Director of Town & Country Planning.
4. The Authority till the framing of its own Building Byelaws under Section 75 of the KTCP
Act 1961 shall adopt the relevant portions of the Building Byelaws of the Bangalore
Mahanagara Palike not covered under these Regulations in respect of size of drawings,
qualifications of persons drawing the plans, size of habitable rooms, ventilation, facilities
for physically handicapped persons, fire safety requirements, staircase details, etc. in a
building
Sky Group
P a g e | 198
1. Residential
2. Commercial
3. Industrial
4. Public and Semi-Public
5. Public Utilities
6. Open Spaces, Parks, Playgrounds, Buffer along River and Burial Ground
7. Transport and Communication
8. Agricultural Use
9. Areas of special control
NOTE:
i.
ii.
iii.
Prior to giving permission for religious use and school or college buildings in
different zones either under uses permissible or under special circumstances by
the Authority, instructions given in Government Circular No. Na A E 237 Be Ma
Praa 2009 dated 19-09-2009 is to be followed.
iv.
Uses permitted in all the above category of zones are subject to space standards
as given in Table-1.
Sky Group
P a g e | 199
v.
Space standards for various buildings/ uses in different zones are strictly adhered
to while giving permission for change of land use / alienation as prescribed in
Table 1.
Uses of land that are permitted and those that may be permitted under special
circumstances by the Kanakapura Planning Authority in different zones of the local planning
area shall be as follows:
Sky Group
P a g e | 200
pay & use toilets and service apartments, vehicle parking including multilevel car
parking.
Note:
a) Diesel generators equivalent to the quantity of power supplied by the Karnataka Power
Transmission Corporation Limited (KPTCL) may be permitted as substitute to power
cut and power failures in any zone after obtaining information on the quantity of power
supplied to a premises and the capacity of generator required from KPTCL. However,
in residential zone installation of diesel generators be discouraged and shall be given
in exceptional cases after spot verification and obtaining No Objection Certificate from
the KSPCB.
b) Where service apartments are permitted, fee under section 18 of KTCP Act, 1961 for
commercial use shall be levied.
All uses that are permitted in residential zone ,traffic & transportation and public/semi
public zones subjected to statutary NOC S like FIRE,KSPCB 7 etc, petty shops/ retail
shops & hardware shops, job typing / computer training institutes, cyber caf, and
internet browsing, departmental stores, grocery/ HOPCOMS, vegetable shops,
newspaper, stationery and milk booth, commercial and corporate offices / clinics
belonging to professional services like advocates and doctors, architects and selfowned, shopping/ commercial complexes and service establishments like hair dressing
saloons, massage centers, laundries, dry cleaning and tailoring shops, restaurants and
hotels, eateries such as darshinis, tea stalls, and take aways, bakery and sweet stalls ,
mutton and poultry stalls, cold storages, clubs, hostels, newspaper or job printing, all
types of offices, STD/FAX/internet center/ ATM centers/ banks, insurance and consulting
and business offices, places of amusement or assembly, microwave towers and stations,
advertising signs conforming to relevant building byelaws, photo studio, church, temple
and other places of worship and assembly, educational, medical/engineering/ technical
and research institutions,(on the sites having minimum 2 ha with a minimum of 12m wide
approach road), financial institutions, education coaching centers, nursing homes and
speciality hospitals, pathological labs, hostels, libraries, any retail business or services
Sky Group
P a g e | 201
not specifically restricted or prohibited therein, filling stations (Fuel stations and pumps,
LPG storage, gas retail outlets), neighborhood shops, nursing homes, service industries
listed in Schedule I (power up to 10HP). Uses for small repair centers (electronic,
mechanical, automobile), vulcanizing shops, printing press, residential buildings
including orphanages and old age homes, gyms, clinics and yoga center, warehouses,
storage areas for goods and kalyana mantapas, cinema theatres, multiplexes,
auditoriums, community centers, recreational /social clubs and amenities, exhibitions
centers, entertainment and amusement centers, convention centers and banquet halls,
hard and software computer offices and information technology related activities (Power
required for air conditioners, lifts and computers are excluded from the HP specified
above), flour mill up to 10 HP
b. Uses that are permitted under special circumstances by the Authority:
Note:
I
All uses that are permissible under special circumstances in Residential and Commercial
zone & traffic & transportation use, all industries like IT and BT industries, microwave
towers, power plants, filling stations, parking lot (including multi-level), bus and truck
terminals, loading and unloading facilities, warehouses, public utilities like garbage and
sewage disposal, municipal and Government offices, dwellings for manager, watch and
ward staff in an area not exceeding 1000 sq m or 10% of the total area, whichever is
Sky Group
P a g e | 202
lower, canteen and recreation facilities, kalyana mantapa, office, shops, clubs, job
printing, banks, restaurants, dispensary and automobile service stations.
All uses as per the categorization of light industries, medium industries and heavy
industries defined by Department of Industries and Commerce (schedule I) except
Obnoxious and hazardous industries. There is no power limitation for industries to be
permitted in this zone.
b. Uses that are permissible under special circumstances by the Authority:
Obnoxious and hazardous industries are subject to clearance from the State Pollution
Control Board, junk yards, dairy and poultry farms, slaughter house and meat processing
unit, ice and freezing plants with power, sports and recreation uses, resorts and
amusement parks.
Note:
i.
ii. Wherever IT and BT industries are permitted in area of 5 hectares and above, 30% of
the area may be allowed for residential apartment for the convenience of the employees
subject to clearance from the KSPCB
iii. Residential regulations shall be followed for approval of residential development within
the premises of industrial/ I.T. and B.T. area.
Schedule I
1. Illustrative list of household and service industries permitted in Residential and
Commercial Zone:
Sl.
Description
No.
1.
2.
3.
Biscuit Making
4.
Ice, ice-Cream
5.
6.
Sky Group
P a g e | 203
7.
8.
9.
10.
11.
12.
13.
14.
15.
Vulcanizing
16.
Tailoring
17.
Hand looms
18.
19.
20.
21.
22.
Umbrella assembly
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
Rubber stamps
34.
Card board box and paper products including paper (manual only)
35.
36.
37
38
39
40
41
Sky Group
P a g e | 204
42
43
44
45
46
Beedi rolling
47
Agarbathi rolling
48
49
50
51
52
53
54
Manufacture of bindi
55
56
Packaging of shampoos
57
58
2.
Sl.
Description
No.
1.
2.
3.
Biscuit making
4.
5.
6.
7.
8.
9.
10.
11.
Sky Group
P a g e | 205
12.
13.
Cotton and silk cordages, twine thread and thread ball making
14.
15.
16.
17.
18.
19.
20.
Stone carving
21.
22.
Umbrella assembly
23.
24.
Sports goods
25.
26.
27.
28.
Musical instruments
29.
30.
31.
32.
33.
Metal polishing
34.
35.
Radio assembly and parts TV, mobile phones, air conditioner, fridge assembly parts
(small scale)
36.
37.
38.
39.
40.
41.
42.
43.
Leather goods
44.
Black smithy
45.
Sky Group
P a g e | 206
46.
47.
Cement products
48.
49.
50.
51.
Cutlery
52.
53.
54.
55.
56.
57.
58.
59.
Mathematical instruments
60.
61.
Tin products
62.
Optical frames
63.
Button clips
64.
Wax polishing
65.
66.
67.
Safety pins
68.
69.
70.
Buckets and metal containers, plastic jugs and fixtures metal embossing.
71.
72.
73.
Washing soaps
74.
Hand tools
75.
76.
77.
Sky Group
P a g e | 207
Sl.
Description
No.
1.
Small domestic appliances and gadgets (room heaters, coolers, hot plates,
iron lamps, etc.)
2.
3.
4.
5.
6.
7.
8.
9.
Sewing machines
10.
11.
Electrical appliances (room heaters, iron and room air coolers, small transformers,
electric fans, fractional HP motors, cooking ranges, water heaters, etc.) computers and
electric goods.
12.
Sl.
Description
No.
1.
2.
All Central, State and Quasi Government offices/ owned complexes, and centres and
institutional office, educational, college campus including hostel facilities for students,
integrated residential schools/colleges, higher educational Institutions, colleges, cultural
Sky Group
P a g e | 208
and religious institutions including libraries, reading rooms and clubs, medical and health
institutions, cultural institutions like community halls, opera houses, clubs, auditoriums,
cultural complexes predominantly non commercial in nature, exclusive places of
worship/congregation, public toilets, nursery creches, civic amenities and large
infrastructure facilities of health, education, sports, cultural and social institutions, utilities
and services, offices/ sub offices of utilities, water supply installations including disposal
works, electric power plants, high tension and low tension transmission lines, sub
stations, gas installation and gas works, fire fighting stations, spastic rehabilitation
centers,
orphanages,
Govt.
dispensaries,
police
stations,
post
offices,
Note:
Retail shops, restaurants, filling stations, clubs, banks, canteens, dwellings required for
power maintenance and functioning of public and semi-public uses in the zone may be
permitted when they are run on non-commercial basis in their own premises and
ancillary to the respective institutions.
b) Uses that are permitted under special circumstances by the Authority:
Parking lot, repair shops, parks, play grounds, maidens and stadiums (no area limit) and
recreational uses, stadium, cemeteries, crematorium, clubs, canteen, libraries, aquarium,
planetarium, museum, horticultural nursery and swimming pool, orphanages and old age
homes, airport related ancillary uses
Note:-
i.
In case any private property is included within the boundary of any existing Public
and Semi Public building and if the owner can establish the ownership of such
property vests with him/her, then the land use adjoining the Public & Semi Public
building may be assigned to such private property by the Authority.
Sky Group
P a g e | 209
Shops, canteens, offices, banking counter, dwellings required for proper maintenance
and functioning of public utility and other ancillary users, in their own premises as an
ancillary to the respective institutions not exceeding 5% of the total area.
Note:
i.
ii.
iii.
iv.
The buffer created for accommodating the utilities such as power, water, pipeline,
oil pipelines and high voltage lines, gas lines and any other utilities. Each buffer
is dictated by technical standards specified by the competent Authority.
The regulations for the above will be decided by the Authority.
In case of new developments, these shall remain as non buildable areas and
remain as reservations and marked for the purpose intended.
For electrical networks, KPTCL standards are followed.
Sky Group
P a g e | 210
Railway lines, railway yards, railway stations, railway workshops, airport roads, road
transport depot, storage depots, bus stations, bus stands and bus shelter, bus bays,
auto stand, parking areas, multi level car parking information, kiosk Integrated, bus
terminals, TTMC & metro stations, truck terminals, MRTS terminals, workshop and
garages for two wheelers/ LMV/ HMV and filling stations, service stations, airports and
helipad, post offices, telegraph offices, telephones and telephone exchanges, television
telecasting and radio broadcasting stations, Transport offices, microwave stations and
offices in their own premises and residential quarters for watch and ward, filling
stations, loading and unloading platforms (with/without cold storage facility), weigh
bridges, cargo terminals and transfer of cargo between different types of transport (rail,
road, air), Automobile spares and services. Automobile spares and services. transport
depot, storage depots, bus stations, bus stands and bus shelter, commercial, office
use shall be permitted & encouraged in all transport hubs & interchanges like TTMC &
IMTH etc. Provided that the biuilt up area for such use does not exceed 25% of
developable
area.
Traffic
and
Transportation
Management
Centres,
Transit
Sky Group
P a g e | 211
Note
1. Regulations for transit oriented development:
1. In case of development for any use abutting road with ROW/Road width of 60 m
and above additional FAR of 0.5 over and above the FAR provided against the
said use shall be allowed within the 150 m radius of any transit hub/ major
interchanges (railway station, B.R.T. and metro) in Zonal Regulations of
Kanakapura Master plan, on payment of fee at twice the applicable prescribed
rates of Betterment levy subject to statutory clearances viz. fire, Airport etc
2. In case of development around Railway station/Metro Station/any other
Mass Rapid Transport System:
Station in the radius of 150 m from the boundary of the same an additional FAR of
0.5 over and above FAR provided against the said use in Zonal Regulations of
Kanakapura Master Plan, on Payment of fee at twice the applicable prescribed rates
of betterment levy subject to statutory clearances e.g. Airport, Fire safety, Pollution
control etc.,
3. Minimum Foot path width shall be 2.0m to 3.0m based on the Road width as
indicated in road cross sections ( refer Annexure ).
4. As far as possible the traffic and transportation use should be located as per the
envisaged activity. It is desirable to have truck terminal/ freight complex/ logistics
hub next to or alongside the industrial use. Similarly the public mass transit is
meant to take on maximum number of repeat trips hence major terminals of
passenger transit should be located at high density work place and high density
residential areas.
To encourage multimodal transit integration, it is desirable to have the terminals located
wherever more than one mode like rail and road are present and they can be integrated.
The bus terminal is being redeveloped to accommodate the metro station and intra city
bus terminal as well as few inter-city bus terminal, there by ensuring seamless physical
multimodal integration.
P a g e | 212
their accessory building and uses not exceeding 200 sq. m. of plinth area for the farmers
own use within the limitation of minimum plot area of 1.20 hectares. Not exceeding 250
sq m of plinth area within the plot area limitation of 1.2 ha limited to G+ 1 floor. Uses
specifically shown as stated in the land use plan like urban village, brick kilns, rice mills,
sugar mills, jaggery mills, gardens, orchards, nurseries and other stable crops, grazing
pastures, forest lands, marshy land, barren land and water sheet, highway amenities
viz., filling stations, weigh bridges and check posts.
b) Uses that are permitted under special circumstances by the Authority:
Agro processing units (as defined by C & I Dept.), Urban amenities such as burial
grounds, sports grounds, clubs/ sports clubs, stadiums, playgrounds, parks and garden
land, water sports, golf centers, race course, race / driving testing tracks, cultural
buildings, places of worship, air terminal and helipads, educational and health
institutions,
hospitals,
libraries,
exhibition
centers,
park
and
open
spaces,
Note:
i.
Coverage:
15 % of the site area of the land may be used for educational and health
For all uses permitted under this zone, regulations for rural development are to be followed.
Within 150 m radius from the existing gramathana (as defined in the note below), for those
Sky Group
P a g e | 213
villages having a population up to 1000 as per 2011 census, and for every additional 1000
population additional 50 m for uses permitted under residential and agricultural zone may be
permitted with the following conditions.
1) FAR: 1.0
2) Maximum no of floors: G+1
3) Setbacks and coverage for the respective uses: As per Table no 8
NOTE:
Gramathana: means old village settlement as earmarked in the revenue survey map
(village map). Any addition already made to the gramathana in any form shall not be
considered while measuring the distance between land in question and gramathana.
12.2.9
12.2.9A
For efficient and scientific management and disposal of solid waste generated within Bruhat
Bangalore Mahanagara Palike limits, certain areas lying within Kanakapura Local Planning Area
have been identified. Following regulations are laid out in order to restrict development around
these areas as per Government Order No. Na A E 325 MNU 2007 dated 06-10-2007:
a.
Area within a distance of 50 m from the premises of the SWM area/ site is
declared as Buffer Zone and No development or construction is permitted in this
zone. However set back and tree plantation may be allowed in this zone.
b.
Area within a distance of 200 m from the premises of the SWM area/ site is
declared as Sensitive Zone and developments or construction may be permitted
without affecting solid waste management area / site.
c.
d.
Permissions in the sensitive zone will be as per the land use specified in Master
Plan. The Authority may impose certain conditions (about the existence of the
site etc.,) that may protect the Solid waste management site and sensitive zone
Sky Group
P a g e | 214
12.2.9B
The historical monuments in any city reflect the past glory of the city. As they attract
tourists both from inside and outside the country. While permitting developments around
historical monuments, care has to be taken to see that their aesthetic environs are not affected.
In order to preserve aesthetic environs around these monuments it is necessary to declare the
areas surrounding these monuments as zones of special control and impose the special
regulations around these monuments.
The Archeological Survey of India has not yet declared any of the monuments in the
Kanakapura town and the State Archeological Department has also not identified any of the
monuments in the Kanakapura town.
If the Planning Authority observes any Heritage structures, precincts of historic and/or aesthetic
and/or Architectural and/or cultural or environmental significance and natural features and sites
of scenic beauty, then Authority may demarcate special Development control areas for
regulation of development around these areas, to preserve the importance of the concerned
heritage structure and also to control the surrounding developments so that they do not mar the
grandeur or beauty or view of the heritage structure for the purposes of implementation.
A special Heritage committee may be constituted with the prior approval of the Government to
examine the proposals of development or any matter related to development, in the various
regulation areas, if received by the Authority, under the provisions of special Regulations and to
make recommendations to this Authority for consideration.
a)
b)
c)
Sky Group
P a g e | 215
d)
In any case no building shall be permitted within 400 m above the height of the declared
monument.
Note:
i.
ii.
iii.
In case of change of land use from the approved Master Plan to other use, the setbacks
shall be the higher of the two uses.
Table- 1
Space Standards for various Buildings /Uses
Sl.
Buildings / Uses
No
1
Min. road
Min. size of
width in m
plot in Sq m
12.0
500
Social clubs
2
Cold storage
12.0
1000
Indoor games
15.0
2000
Hotels / lodges
12.0
500
Kalyana Mantapas
12.0
1000
15.0
500
Nursing homes/polyclinics
12.0
500
Service Apartments
12.0
500
Nursery School
12.0
10
12.0
11
12.0
12
12.0
13
15.0
14
Colleges
15.0
15
15.0
Sky Group
As prescribed by the
competent Authority
As prescribed by
P a g e | 216
16
18.0
the competent
17
Convention centres
15.0
Authority
18
18.0
2000
19
R&D Lab
12.0
1500
NOTE:
1.
A buffer of 45 m is assumed all along the flow of the river on both banks, which shall be
In case of change of land use from the approved Master Plan to other use, the setbacks
Sky Group
P a g e | 217
Table 2
Exterior open spaces / setbacks in percentage (minimum) for residential, commercial, public and
Depth of
site in M.
1.
Up to 6
Over 6
Up to 9
Over 9
Up to 12
Over 12
Up to 18
Over 18
Up to 24
Over 24
Sky Group
Residential
Minimum in m.
Commercial
Traffic &
Transportation,
Public Utility & public
& semi Public
Front
Rear
Front
Rear
Front
Rear
2.
1.00
3.
0
4.
1.00
5.
0
6.
1.50
7.
0
1.00
1.00
1.50
1.50
1.50
1.00
1.00
1.50
1.00
2.00
1.50
1.50
1.50
2.50
1.50
2.50
1.50
2.50
2.00
3.00
2.00
3.00
2.00
3.50
3.00
3.50
2.50
4.00
3.00
Width of
site in M
8.
Up to 6
Over 6
Up to 9
Over 9
Up to 12
Over 12
Up to 18
Over 18
Up to 24
Over 24
Residential
Minimum in m.
Commercial
Traffic &
Transportation,
Public Utility & public
& semi Public
Left
Right
Left
Right
Left
Right
9.
0
10.
0
11.
0
12.
0
13.
0
14.
1.00
1.00
1.00
1.00
1.00
1.50
1.00
1.00
1.00
1.00
1.50
1.75
1.50
2.00
1.50
2.00
1.75
2.50
2.00
3.00
2.00
2.50
2.50
3.00
2.00
3.00
2.00
3.00
3.00
4.00
P a g e | 218
Note:
i.
When car garage is proposed on the right side rear corner, the minimum front
setbacks shall be 3.0 m;
ii.
iii.
Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12
Sky Group
P a g e | 219
TABLE 4
Maximum Floor Area Ratio & Road Widths for Different uses
Road width in
m
Commercial
Traffic&Transportation,
Public utility
Upto 9
1.50
1.50
1.25
Over 9 to 12
1.75
1.75
1.50
Over 12 to 18
2.00
2.00
1.75
Over 18 to 24
2.25
2.25
1.75
Over 24
2.50
2.50
2.00
Note:
Only effluent treatment plant, open to sky swimming pool, car parking are excluded from
FAR computations.
The floor area ratio (FAR) shall be with reference to the width of the public road
abutting
the property and the FAR shall be calculated for the net area of
the plot as prescribed in Table 4 after deducting the area reserved for civic
amenities.
Sky Group
P a g e | 220
g) The coverage shall be with reference to the total area of the development plan.
h) The distance between any two buildings shall not be less than half the height of
the taller building.
I)
15% of the total area to be reserved for civic amenity, parks and open spaces,
subject to a minimum of 10% for parks and open spaces and 5% for Civic
Amenity.
TABLE 6
Plot area
Maximum
in m
Plot coverage
12
12
15
Maximum FAR
60%
1.50
50%
2.00
40%
2.25
Note:
a) Approval of development plan showing the general arrangement of residential
building blocks, and dimensions of plot earmarked for each building blocks, means of
access roads and civic amenity areas, should precede the approval to building plan.
b) In case, the height of group housing building exceeds 10.0 m, then setback to be left
all-round the premises shall be as per Table 2.
c)
Parking requirement shall be as per Table 9. In addition, 10% of the total parking
shall be reserved for visitors parking separately.
d) Internal roads and park area shall be developed by the owner / developer himself for
the specified purpose only.
e) C.A. sites and park area reserved in the development plan shall be handed over free
of cost to the Authority by a relinquishment deed. Preference may be given to the
owner/developer of the respective project for lease of C.A. area reserved in the
Group Housing project.
Sky Group
P a g e | 221
1.
Minimum
combined
area
of
the
140 sq m
neighboring plots
2. Building coverage
3. Floor area ratio
As applicable to individual plots
4. Maximum number of floors
5. Minimum road width
6. Front setback for back to back plots
7.
Side setbacks for plots joined at the proposed, the side set back for each unit shall be
side.
12.3.3
Row housing
The following norms shall be adopted while approving row houses as given in Table 8.
TABLE 8
Row Housing (Maximum 12 units, minimum 3 units)
210 sq m
108 sq m
3 Building coverage
4 Floor area ratio
As applicable to individual plots
5 Number of floors
6 Minimum road width
7 Setbacks minimum
Sky Group
Front: 2.00 m
Rear: 1.50 m
P a g e | 222
12.3.4
Flatted factories
The following norms shall be adopted while approving flatted factories as given in Table
9.
TABLE - 9
Regulations for Flatted Factories
1. Minimum plot area
1,000 sq m
40 %
1.50 up to 12.0 m road width
3. FAR
4. Minimum setbacks
4.50 m.
c. Sides 4.50 m.
12.3.5
Industrial buildings
Coverage, Floor Area Ratio and Open space for Industrial buildings are as given in Table
10 below:
TABLE 10
Coverage, Floor Area Ratio and Open space for Industrial buildings
Minimum
Minimum
Other
Minimum
Frontage
Front setback in
sides
road width
in m.
in m
in m
1.00
3.0
1.00
1.00
60%
1.25
12.0
4.50
3.00
1000 to 2000
50%
1.25
24.0
6.00
5.00
Over 12
2001 to 4000
40%
1.25
28.0
8.00
5.00
Over 12
4001 to 8000
35%
1.00
32.0
8.00
6.00
Over 15
Above 8000
30%
0.50
42.0
15.00
12.00
Over 15
Plot area in
Max. plot
Floor area
sq m
coverage
Ratio
Up to 230
80%
231 to 1000
Sky Group
P a g e | 223
Note: whenever the plot of the minimum size prescribed is not facing the required width of
road, permission shall be granted to the maximum extent of built up area allowable to
that particular road width.
12.3.6
FAR and Ground Coverage in Industrial Zone for IT related activities to be followed as per
table 10 A below
Table -10 A
SL
NO
SIZE OF PLOT (
sq m)
GROUND
COVERAGE
PERMISSIBLE
FAR
Upto 1000
55%
1.50
50 %
1.75
50%
2.00
45%
2.25
45%
2.50
Above 30.0
2
3
4
5
Note: whenever the plot of the minimum size prescribed is not facing the required width of
road, permission shall be granted to the maximum extent of built up area allowable to
that particular road width.
For building of different uses, off-street parking spaces for vehicles shall be provided
as stipulated the Table - 11
Sky Group
P a g e | 224
Table 10 B
SL
NO
GROUND
MIN FRONT
COVERAGE
SETBACKS (m)
SETBACKS (m)
Upto 1000
55%
50 %
50%
45
Above 6000
45
15
12
12.3.7
Parking Regulations
a) Each off-street parking space provided for motor vehicles shall not be less than
(2.5 m x 5.0 m) 12.50 sq m area and for scooter and cycle parking spaces provided
shall not be less than 3 sq m and 1.4 sq m respectively and it shall be 25% of the
car parking space.
b) For building of different uses, off-street parking spaces for vehicles shall be
provided as stipulated in the Table - 11below:
TABLE 11
Off-street parking spaces
Sky Group
P a g e | 225
Sl.
No.
Category
Single dwelling unit
1.
Multi-family residential
sq m
b.
6 guest rooms
and hotels
Educational
a. Hospital
b. Nursing homes
Assembly/Auditorium
25 seats
Retail business
75 sq m floor area
Industrial
10
Storage
11
Kalyana Mantapa
75 sq m floor area
12
Private Offices
75 sq m floor area
13
Restaurant/Pubs/Bars/Coffee Parlours
14
Students Hostels
15 rooms
15
5 rooms
Additional parking or part thereof shall be provided when the part area exceeds 50%
of the prescribed limits/ standards
Note:
Sky Group
P a g e | 226
(a) Parking space shall be with reference to total floor area after deducting space covered
by lift room, stair case, open balcony and ducts open to sky in addition to the area
deducted for the purpose of calculating the F.A.R.
(b) Up to 50 sq m in the case of shops, parking spaces need not be insisted.
(c) Off-street parking space shall be provided with adequate vehicular access to a
Street and the area of drive aisles subject to a minimum of 3.50 m and such other
provision required for adequate maneuvering of vehicles shall be exclusive of the
parking spaces stipulated in these Zonal Regulations.
(a) First basement for plots up to 1000 sq m and second basement shall be
Permissible for plots more than 1000 sq m.
(c) Car parking can be provided in the set back areas provided; a minimum of 3.0 m is
left free from the building.
i. Common and continuous cellar parking floors between adjoining blocks would be
allowed depending upon structural safety aspects.
ii. The parking spaces should be efficiently designed and clearly marked and
provided with adequate access, aisle, drives and ramps required for maneuvering
of vehicles.
iii. Stilt floor/Cellar parking floor shall be used only for parking and not for any
habitation purpose. Misuse of the area specified for parking of vehicles for any
other use shall be summarily demolished / removed by the Enforcement
Authority.
Sky Group
P a g e | 227
iv. For parking spaces in second basement and upper storeys of parking floors, at
least two ramps of minimum 3.5 m width or one ramp of minimum 5.4 m width
and maximum slope of 1:8 shall be provided.
i.
Basement / cellar shall be permitted to extend in the setback area except the
front setback after leaving a minimum of 1.5 m from the property line.
ii. A maximum of three basements in the case of 3-Star Hotels and above can be
permitted for parking and services
iii. Every basement storey shall be at least 2.4 m in height from the floor to the
bottom of the roof slab / beam / ceiling (whichever is less) and this height of
basement floor shall not exceed 2.75 m
iv. The basement storey shall not be projected more than 1.20 m above the average
ground level
12.3.8
Corridor
The minimum widths of corridor for different uses of building are as given in the Table
12.
TABLE 12
Minimum Width of Corridors
Sl.
No.
1
Residential building
1.0
Apartment building
2.0
2.0
2.0
b. Government Hospitals
2.4
Sky Group
2.0
P a g e | 228
12.3.9
2.0
1.5
Areas:
a) No building/ development activity shall be allowed in the bed of water bodies like
nala, and in the Full Tank Level (FTL) of any lake, pond etc,.
b) The above water bodies and courses shall be maintained as recreational/Green
buffer zone, and no building activity other than recreational use shall be carried out
within.
i)
30 meters from the boundary of Lake of 40.00 ha. and 10 m. for others.
Sky Group
P a g e | 229
Sl.
No.
1
2
3
Electrical lines
Vertical clearance
in m
Horizontal
clearance
in m
2.5
6.0
3.7
6.0
3.7
6.0
Sl.
Type of use
No.
1
area
3 rooms
Industrial canteens
50 workers
4 beds
Recreational clubs
Residential buildings:
30 sq m of floor area
100 sq m of floor area
(a) Single dwelling unit measuring 200 sq m of floor area or site area of more than 400
sq m whichever is more.
(b) 500 lpcd for multi dwelling unit / apartments for every 5 units and multiples thereof.
Solar photovoltaic lighting systems shall be installed in multi unit residential buildings
9
(with more than five units) for lighting the set back areas, drive ways, and internal
corridors.
Sky Group
P a g e | 230
The following systems may be adopted for harvesting the rainwater drawn from
terrace and the paved surface.
1.
Open well of a minimum of 1.00 m dia. and 6.00 m in depth into which rainwater may
be channeled and allowed after filtration for removing silt and floating material. The
well shall be provided with ventilating covers. The water from the open well may be
used for non-potable domestic purposes such as washing, flushing and for watering
the garden, etc.
2.
Rainwater harvesting for recharge of ground water may be done through a bore well
around which a pit of one meter width may be excavated up to a depth of at least 3.00
m and refilled with stone aggregate and sand. The filtered rainwater may be
channeled to the refilled pit for recharging the bore well.
3.
4.
The surplus rainwater after storage may be recharged into ground through percolation
pits, trenches, or combination of pits and trenches. Depending on the geomorphologic
and topographical condition, the pits may be of the size of 1.20 m width x 1.20 m
length x 2.00 m to 2.50 m depth. The trenches can be or 0.60 m width x 2.00 m to
6.00 m length x 1.50 m to 2.00 depth. Terrace water shall be channeled to pits or
trenches. Such pits or trenches shall be backfilled with filter media comprising the
following materials.
Sky Group
P a g e | 231
i)
ii)
iii)
iv)
v)
Top 10% of the pits / trenches will be empty and a splash is to be provided in
this portion in such a way that roof top water falls on the splash pad;
vi)
vii)
The depth of wall below ground shall be such that the wall prevents lose soil
entering into pits / trenches. The projection of the wall above ground shall at
least be 15 cm;
5. If the open space surrounding the building is not paved, the top layer up to a sufficient
depth shall be removed land refilled with course sand to allow percolation of rainwater
into ground.
The terrace shall be connected to the open well / bore well / storage tank /recharge pit
/trench by means of H.D.P.E. / P.V.C. pipes through filter media. A valve system shall be
provided to enable the first washings from roof or terrace catchments, as they would contain
undesirable dirt. The mouths of all pipes and opening shall be covered with mosquito (insect)
proof wire net. For the efficient discharge of rainwater, there shall be at least two rain water
pipes of 100 mm dia for a roof area of 100 sq m Rainwater harvesting structures shall be
sited as not to endanger the stability of building or earthwork. The structures shall be
designed such that o dampness is caused in any part of the walls or foundation of the
building or those of an adjacent building.
SCHEDULE - V
Facilities for physically handicapped persons
Sky Group
P a g e | 232
These byelaws shall apply to the physically handicapped persons having the
following disabilities.i.
ii.
iii.
iv.
a. Access Path/ Walk Way: The width of access path / walkway from plot entry and
surface parking to the building entry shall not be less than 1.80 m. It shall not have a
gradient exceeding 5%.
b. Surface Parking: At least two car spaces shall be provided at surface level near
entrance with maximum travel distance of 30.00 m from the building entrance.
c. Space for Wheel Chair Users: Adequate space shall be kept for the free movement
of wheel chairs. The standard size of wheel chairs shall be taken as 1050 mm x 750
mm the doors shall have a minimum width of 900 mm to facilitate the free movement
of wheel chairs.
d. Approval to Plinth Level: At least one entrance shall have approach through a
ramp. The ramp shall have a minimum width of 1.80 m with maximum gradient of
1:10.
e. Entrance Landing: Entrance landing shall be provided adjacent to ramp with the
minimum dimension of 1.80 m x 2.00 m.
f.
g. Staircase: The minimum width of staircase shall be 1.50 m. The minimum number of
risers on a flight shall be limited to 12. Size of treads shall not be less than 30 cm and
the height of risers shall not be more than 15 cm.
h. Lifts:
Sky Group
P a g e | 233
j)
ii) The lift lobby shall have a minimum inside measurement of (1.80 x 1.80) m.
j.
Toilets: One special water closet in a set of toilets shall be provided for the use of
handicapped persons with wash basin keeping in view the following provisions.i. The minimum size of toilet shall be 1.50 m x 1.75 m.
ii. The maximum height of the W.C. set shall be 0.50 m above the floor.
k. Hand Rails: Hand rails shall be provided for ramps, staircases, lifts and toilets. The
height of hand rails shall be normally 800 mm above the floor level. If the building is
meant for the predominant use of children, the height of hand rails may be suitably
altered.
l.
Guiding / Warning Floor Material: The floor material to guide or to warn the visually
impaired persons with a change of colour or material with conspicuously different
texture and easily distinguishable from the rest of the surrounding floor materials is
called guiding or warning floor material. The material with different texture shall give
audible signals with sensory warning when person moves on this surface with
walking stick. The guiding / warning floor material is meant to give the directional
effect or warn a person at critical places. This floor material shall be provided in the
following areas:
i. The access path to the building and to the parking area;
ii. The landing lobby towards the information board, reception, lifts, staircase and
toilets;
iii. At the beginning / end of walkway where there is vehicular traffic;
iv. At the location abruptly changing in level and at the beginning / end of ramp;
v. At the entrance / exit of the building.
m.
Sky Group
P a g e | 234
information board in Braille should be installed on the wall at a suitable height and it
should be possible to approach them closely. To ensure safe walking there should
not be any protruding sign, which creates obstruction in walking.
The symbols / illustrations should be in contrasting colour and properly illuminated so that
with limited vision one may be able to differentiate amongst primary colours.
Conversions
b. The government is the competent authority to permit change of land use under the
act. It is further classified that the permission accorded by high power
committee/government/single window shall be deemed to be given as, if planning
authority has provided its opinion to government under the procedure specified
under section 14-A of the KTCP Act 1961.
Sky Group
P a g e | 235
c. All layouts approved by the Authority Shall be deemed to have been reserved for the
purpose for which they are approved, provided they have been approved before the
approval of master plan
II.
a. The proposed land use indicated towards the roadside of a property shall be
the land use for the entire property (one property depth not exceeding 50 m)
without identifying it for different uses by measuring as per the scale of the
maps. This is applicable only to the built-up area as shown in the existing land
use map.
d. The proposed alignments of STRR, IRR, RR, TRR, Expressway etc., are to
be incorporated. In case of any changes in the alignment by the competent
Authority, the same would prevail over MP proposal.
Sky Group
P a g e | 236
h. If the alignment of the existing road is shifted in the MP, the existing road as
on ground reality/ cadastral map may be considered for the proposed road
widening. The higher land use abutting the shifted road shall be considered
accordingly.
III.
Setbacks
i.
The front and rear setbacks shall be with reference to depth of the site.
ii.
Left and right setbacks shall be with reference to width of the site.
iii.
iv.
The provision of setbacks should be read with tables prescribed for floor area
ratio, coverage etc., for different type of buildings.
v.
When the building lines are fixed, the front set back shall not be less than the
building line fixed or the minimum front set back prescribed whichever is
higher.
vi.
In the case of corner sites both the sides facing the road shall be treated as
front side and regulations applied accordingly to maintain the building line on
these two roads and to provide better visibility.
vii.
In case where the building line is not parallel to the property line, the front and
rear setbacks shall not be less than the specified setbacks at any point.
viii. In case of building sanctioned prior to coming into force of these rules which
are abutting other properties on one, two or more sides, upper floors may be
Sky Group
P a g e | 237
permitted, to utilize the available FAR except in the front to enable road
widening, if any.
ix. In case of irregular plots setbacks are to be calculated according to the depth
or width at the points where the depth or width are varying. In such cases,
average setbacks should not be fixed at as they may effect minimum set back
at any point.
Higher FAR should be permitted only within 200m radius of any transit hub or
major interchanges (Railway station , metro or BRT station ).
ii.
iii.
Foot path and utility services are provided on either sides roads for 18m &
above roads for minimum of 2.0m to 3.0m width.
iv.
Pedestrian only zones shall be identified and marked along with time bound
action plan for achieving the same.
v.
vi.
Bus- bays shall be indicated on the layout approval drawings within the
layouts at the time of approval (Above 18M).
vii.
The turning radii of roads at the junctions/ intersection designs shall be as per
the IRC code for intersection design for urban roads and shall include space
required for signals and utilities along with the signage.
viii.
The parking requirements shall be 50% of the parking shown against the uses
in case of commercial/ service industry are proposed to be developed in the
transit stations/ terminals / interchanges i.e. TTMCs IMTC.
Sky Group
P a g e | 238
ix.
Pedestrian sidewalk
Central Verge/median for pedestrian refuge
Cycle path
Plantation zone
Bus bay
xi. Carriageway
IV.
NOC
i.
For all the high-rise buildings NOC from the following departments shall be
obtained.
ii.
a.
b.
K.U.W.S.& D.B.
c.
K.P.T.C.L./BESCOM
d.
Telecommunication department
e.
A Traffic Impact Study shall be submitted along with other applicable documents
for permission where possible developable area is not less than 2000 sq. m. in
case of commercial or industrial uses. The authority may reject or accept or may
seek the opinion of Directorate of Urban Land Transport on the traffic impact
study and approve the development with or without such conditions as it deems
fit.
iii.
For all Development Plans, Apartment Buildings and Residential Layouts which
come under the category stipulated by the Karnataka State Pollution Control
Board (K.S.P.C.B.), necessary NOC from K.S.P.C.B. shall be furnished.
iv.
For Cinema theatres, the setbacks and other provisions shall be as per
Karnataka Cinematography Act and Rules.
V.
Road width
a) Road width means distance between the boundaries of a road including footways
and drains.
b) If the road width varies along the length of road, then the minimum width of the road
along 200 m stretch on either side, from the centre of the plot shall be considered.
c) In case of roads having service roads in addition to the main roads, the
Sky Group
width of
P a g e | 239
road shall be aggregate width of service roads and main roads for determining FAR
and number of floors.
d) When a portion of land is at different/split levels, then the width of the road to be
considered for determining F.A.R., shall be the aggregate width of the roads which
are at different levels.
VI.
Means of Access
The means of exclusive access, which would be other than through public roads and streets,
shall not be of more than 30 m length from the existing public roads and streets The
minimum width of such access shall be 3.5 m. FAR and height of buildings coming up on
such plots shall be regulated according to the width of public street or road. If the means of
access exceeds 30.0 m in length, FAR shall be regulated with reference to the width of such
access road. Construction of buildings on plots with common access/lanes from the public
road/street shall be regulated according to width of such common access roads/lanes.
VII.
Garages
a) For garages no side or rear setbacks are to be insisted. One upper floor not
exceeding 3.0 m. in height shall be permitted provided no openings are provided
towards neighboring buildings and at least one opening for light and ventilation is
provided towards the owners property.
b) Garages shall be permitted in the rear right hand corner of the plot. In cases of
buildings constructed or sanctioned prior to the enforcement of these regulations,
where space is not available on the right side, it may be permitted on the left side
provided minimum setback exists in the adjoining property of the left side.
c) In case of corner plots, the garage shall be located at the rear corner diagonally
opposite to the road intersection.
d) The maximum width of the garage shall not exceed 4 m and the depth should not
be more than 6.0m or 1/3 the depth of the plot, whichever is lower.
e) The garages shall not be constructed or reconstructed within 4.5m from road edge.
This may be relaxed in cases where the garage forms part of the main building with
minimum setback for the plot.
Sky Group
P a g e | 240
In case of a plot facing the road proposed for widening, the required land as
indicated in the master plan for road widening shall be handed over to the local
Authority free of cost by a Relinquishment deed by the owner of the land before
sanction is accorded to his plan;
a) The FAR shall be allowed as applicable to the total area of the site without
deducting the area to be taken over for road widening, provided at least 60% of the
site area is available for use as a building site after the proposed road widening;
and set back shall be determined for the remaining portion of the plot.
b) Existing road width abutting the site shall be considered for calculating the FAR.
Benefit of Development Rights shall be extended in such cases as per the
provisions of Section 14-B of KTCP Act 1961
d) Parking space: Adequate space for car parking shall be provided in the premises
as per standards in Table - 11.
Sky Group
P a g e | 241
X.
Water supply: Bore well shall be provided in all high rise buildings to provide
alternative source of water supply where the Karnataka Urban Water Supply and
Drainage Board so desires and the strata is capable of yielding water.
XI.
XII.
Road alignment: In case of buildings that have been permitted lawfully by Town
Municipal Council or Planning Authority and if such structures are obstruction to the
alignment of the proposed roads in the Master Plan, 2031, such road alignment shall
be re-looked into by the Authority and decision may be taken suitably.
XIII.
XIV.
upper floors may be permitted according to the existing coverage subject to limitation of
height, F.A.R., Building Line or any road widening proposals in accordance with present
regulations.
Sky Group
P a g e | 242
The Authority reserves the right to modify the layout submitted by the applicant / owner and
may impose any condition either from the planning point of view or in the interest of public.
A. Amalgamation:
i.
In the case of amalgamation, the proposed sites shall have the same land
use.
ii.
iii.
B. Bifurcation:
i.
In the case of all bifurcations, whether corner site or intermediate site, front
setback for the resulting site abutting the road shall be the same as that of the
original site and not that of the subdivided site.
ii.
iii.
Bifurcated plot shall not be less than 54 sq m. Bifurcated plot shall have a
minimum of 3.5 m access.
iv.
The bifurcated plot shall have a minimum of 4.5 m frontage. This condition
shall not apply to family partition sites.
a) Size of plot
No building plot resulting from a sub-division after these regulations come into force is
smaller in size than 54 sq m in residential zone. In specific cases of sites for housing
schemes for economically weaker sections, low income groups, slum clearance and Ashraya
housing, the authority may relax the above condition.
Sky Group
P a g e | 243
The minimum area for approval of a layout shall not be less than 1.0 ha provided that
if a single owner does not possess the entire 1.0ha, a group of owners may jointly
apply to the Authority.
ii.
In case of already land locked areas where the amalgamation of 1.0Ha. is not at all
possible, the Authority may consider lesser areas, provided minimum 10% of
Open space and 5% of Civic amenity space shall be reserved.
iii. The area earmarked for residential sites shall be a maximum of 55% of the total
extent.
iv. Balance area shall be earmarked for roads, parks, and playgrounds and civic
Amenities and the area under parks and playgrounds shall not be less than 10%
of the total extent.
v.
Areas covered under Park Zones, Valleys, lake/nalla buffer etc may be shown as
park in the layout plan.
vi. If by incorporating major roads proposed in the Master Plan, the area under roads
exceeds 45%, in such case the reservation under parks and civic amenities may
be relaxed.
vii. A maximum of 3% of the total area from out of the permissible residential area may
be earmarked for commercial uses.
viii. The area reserved for parks and open spaces, civic amenities and roads shall be
handed over to the Planning Authority free of cost through a registered
relinquishment deed before taking up development of the layout.
ix. Minimum width of road width shall not be less than 9.00 m. for plots upto 200 Sq M
and for bigger plots the road width shall not be less than 12.00 m.
x.
xi. The land in question shall be converted for non agricultural purpose.
Sky Group
P a g e | 244
xii. The land shall be access from public road and the use of land shall be in accordance
with the zonal regulations of master plan.
xiii. The necessary development charges shall be paid to the concerned UDA / Local
Authority. This fee is in addition to recovery of fee under Section 18 of K.T.C.P
Act and other fees/charges prescribed by the Government from time to time.
xiv.
Whenever the total area proposed for formation of layout exceeds 10acres, then
adequate extent of land may be earmarked for provision / installation of utilities like
transformer, sewage treatment plant, overhead water tank, bus bay / shelter, etc. this
area may be taken into calculation under either CA or Park as the case may be.
Decision of the Authority in this regard shall be final.
xv.
Landscaping on the streets/ sideways/ sidewalks for better green cover shall be
insisted for roads with road width of 15 m and above at the time of approval for
development (layouts/ Development Plan/ building plan).
xvi.
While developing a land, if for any reason, the road has to be stopped without
continuation, then cul-de-sac with turnaround area of 9 m radius of the end shall be
provided.
12.10.1B
Any extent of land can be approved as single plot subject to the following conditions:
i.
ii.
The land shall have access from the public road and the use of land shall be in
accordance with the Zonal Regulations of the Master Plan.
iii.
The Authority shall collect the fee under Section 18 of the K.T.C.P. Act and
development charges and any other fees and charges prescribed by the Government
from time to time. In addition, fee for Rejuvenation of lake/tank as per section 18(A)
of the K T C P Act, 1961 at the rate of Rs. 1,00,000/- per acre shall be levied and
collected as per the Government circular No. Na A Ee 90 BMR 2010 dated
29-9-
2010.
iv.
In case owner of any land who has obtained approval for single plot desires to subdivide his plot at a later stage, he shall obtain approval by the Authority treating it as
Sky Group
P a g e | 245
sub-division of land and the norms applies accordingly as prescribed in the Zoning
Regulations.
v.
If any roads proposed in master plan shall be incorporated in the plan and shall be
handed over to the authority free of cost.
vi.
The necessary development charges shall be paid to the concerned UDA / Local
Authority. This fee is in addition to recovery of fee under Section 18 of K.T.C.P Act
and other fees/charges prescribed by the Government from time to time.
12.10.1C
A. If the non-residential layout for approval consists of only one single unit,
approval shall be given subject to the following conditions:
I.
II.
III.
The land shall be access from public road and the use of land shall be in
accordance with the zonal regulations of master plan.
IV.
V.
A minimum 5% of the total extent of land shall be reserved for vehicle parking
and this shall be in addition to the parking space prescribed in the Zoning
Regulations as per the total floor area of the building.
VI.
A minimum 10% of the total extent shall be earmarked as park and open
space.
VII.
Areas covered under Parks Zones, Valleys, lake/nallah buffer etc may be
shown as park in the development plan.
VIII.
The area reserved for vehicle parking and open space shall be maintained by
the landowner and this land shall not be used for any other purpose by the
landowner.
IX.
The Planning Authority shall collect the fee under section 18 of K.T.C.P. Act
and development charges applicable and any other fees and charges
prescribed by the Government from time to time.
Sky Group
P a g e | 246
X.
In case owner of any land who obtained approval for single plot desires to
sub-divide his plot at later stage, he shall obtain approval of Authority for sub
division of plots as per prescribed norms.
this
prescribed in the Zoning Regulations as per the total floor area of the
building.
iv. A minimum 10% of the total extent of land shall be earmarked as park
and open space.
v. Minimum width of road shall not be less than 12.0m.
vi. The area earmarked for parking, park and open space and roads shall
be handed over to the local authority at free of cost for maintenance.
vii. The Planning Authority shall collect the fee under Section 18 of
K.T.C.P. Act and development charges and any other fees and
charges prescribed by the Government from time to time.
12.10.1D
TABLE-15
SI.
Sky Group
P a g e | 247
No.
1
Coverage
FAR
Up to 0.4
60%
3.0
6m
60%
3.0
0.8
7.5 m
Above 0.8
3
60%
3.0
12.0 m
9.0 m
Coverage
FAR
Less than 12
60%
2.00
Above 12 and Up to 18
55%
2.25
Above 18 and up to 24
55%
2.50
Above 24 and up to 30
50%
3.00
Above 30
50%
3.25
Set backs
As per Table 2 or 3 of
these Regulations
Commercial
2% of the total area may be reserved for Commercial use subject to fulfillment of
parking area.
Set-backs
As shown in item number 2 & 3
Sky Group
P a g e | 248
12.4.2
Standard of Roads
a) Layouts
Minimum Right of Way for streets proposed in layouts is as per Table 16.
Table-16
Standard of Roads/streets in layouts
Sl.
No
1
in m
Residential
a) Up to 180 m
9.00 m
b) Above180 m Up to 500m
12.00 m
c) Above 500 m
18.00 m
12.00 m
18.00 m
f) Arterial roads
2
18m,24m and 30 m
Commercial
a) Retail
12.00 m
b) Others
15.00 m
b)
Industrial
a) Up to 2.0 Hectare
12.00 m
15.00 m
Sky Group
P a g e | 249
Table-17
Standard of Roads/streets in layouts
Sl.
Extent of layout
No
1.00 to
2.00 to
Above
2.00 ha
5.00 ha
5.00 ha
Residential
9.00 m road
12.00 m road
18.00 m road
Commercial
12.00m road
18.00 m road
24.00 m road
12.00m road
18.00 m road
24.00 m road
12.4.3
Standards for Civic Amenities, Parks & Play Grounds regarding minimum area with respect
to population per unit of different facilities are presented in Table 18 and 19 respectively.
1. Civic Amenities
TABLE 18
Particulars
Population
per unit
Area in ha.
a) Educational Facilities:
i) Nursery School (age group 3 to 6 years)
ii) Basic primary and Higher primary school
(age group 6 to 14 years)
1,000
3,500 to 4,500
As per the Standards of
15,000
Respective Departments
50,000
b) Health Facilities:
i) Dispensary
5,000
20,000
Respective Departments
c) Other facilities:
Sky Group
P a g e | 250
10,000
10,000
3,000
Respective Departments
15,000
Sl. No.
Category
1.
Tot-lot
2.
Population Area in
per unit
hectares (min.)
500
0.05
Children park
2,000
0.20
3.
1,000
0.20
4.
Neighborhood park
5,000
0.80
12.4.4
Building Line
Building lines are prescribed for some important roads in Hosakote town as presented in
Table -20. Front setback is also prescribed separately for various types of buildings. The
higher of the two shall be the minimum open space in order to have better street architecture
and also to facilitate road widening proposal if any in future.
TABLE 20
Proposed Building Line
Sl.
No.
Proposed
right of way
(m)
Building line
from the edge of
ROW (m)
STRR
90.0
10.0
Sky Group
P a g e | 251
IRR
90.0
10.0
ITRR
90.0
10.0
RR
60
6.0
NOTE:
For National Highways, State highways, Major District roads, other district roads and village
roads standards specified (road width, building lines etc.,) by the Ministry of Surface
Transport, Government of India are to be followed vide Govt. Notification No: UDD 251 BMR
2005, dated 22-12-2005 and other circulars of Government of Karnataka)
For all existing roads of width more than 15m shall be provided minimum of 3m building line.
P a g e | 252
Fig 5- Collector road with centre bus lane cross- section- (RoW- 25m)
Sky Group
P a g e | 253
ANNEXURES
ANNEXURES
ANNEXURE 2
ii
ANNEXURES
iii
ANNEXURES
iv
ANNEXURES
ANNEXURES
vi
ANNEXURES
vii
ANNEXURES
viii
ANNEXURES
ix
ANNEXURES
Code
no.
of
No.
water- shed
Command
Type of rock
Averial
Remarks
non-command
formation
extent, Ha
4B3B5
NC
Gneiss
1,21,500
Kanakapura
4B3B6
NC
Gneiss
86,500
North
4B3B7
NC
Gneiss
52,000
4B3C1
NC
Gneiss
86,300
West side
4B3C2
NC
Gneiss
1,16,800
Details
4B3B6
4B3B7
4B3C1
4B3C2
3112
565
2021
1525
1474
3541
609
3369
2166
non-
1471
866
467
1177
1401
1083
683
969
531
1148
7140
5655
4066
5076
6241
357
283
203
254
312
6783
5372
3862
4823
5929
from
rainfall
during
season, Ham
Net ground water availability, Ham
ANNEXURES
4B3B5
4B3B6
4B3B7
4B3C1
Kanakapura
Bangalore
South
9383.61
6543.16
Recharge
2.
Net
annual
ground
water
6783
5371
3862.44
4822
8914.43
6216
12165
7647
6589.26
3612
14469.58
11262.10
723
509
208.13
443
890.79
594.52
12888
8156
6797.39
4055
15360.37
11856.63
1005
708
289.30
625
1240.30
834.08
584
116.88
190
151
175.99
84
of water levels
Yes
No
No
Yes
pre-monsoon
Yes
No
Yes
Yes
OE
OE
OE
Critical
9%Critical
OE
availability, Ham
3. Existing gross ground water
draft for irrigation, Ham
4. Existing gross ground water
draft for domestic and industrial
water supply, Ham
5. Existing gross ground water
draft for all uses, Ham
6.
Allocation
for
domestic
&
irrigation
development,
Ham
8. Existing stage of groundwater
development, %
9. Is there any significant decline
post-monsoon
10. Category
91%OE
11.
Average
crop
water
0.62
0.42
0.82
0.82
0.82
ground
water
715
142.91
requirement, m
12.
Balance
OE Over exploited
Only 34 MLD is available for entire taluk
xi
ANNEXURES
xii
ANNEXURES
xiii
ANNEXURES
xiv
ANNEXURES
Fig 5- Collector road with centre bus lane cross- section- (RoW- 25m)
xv
ANNEXURES
xvi
Annexures
ANNEXURE 9: CHANGES MADE FROM INTERIM MASTER PLAN TO MASTER PLAN 2031
CONURBATION 1 - KAGGALIPURA
SL.No
Village Name
Survey No
Existing Landuse
IMP Landuse
UTTARI
83
Tank
Residential
Tank
UTTARI
80
Agriculture
Residential
Park
UTTARI
31
Agriculture
Residential
Tank
UTTARI
31
Agriculture
Residential
Tank
UTTARI
31
Agriculture
Residential
Tank
UTTARI
113,150,158
Commercial
Park
Commercial
UTTARI
111
Tank
Residential
Tank
CHUDAHALLI_K
Park
PS
Park
CHUDAHALLI_K
Agriculture
Residential
Tank
10
CHUDAHALLI_K
Agriculture
Residential
Tank
11
KAGGALIPURA
31
Tank
Residential
Tank
12
KAGGALIPURA
38,39
PS
Residential
PS
13
KAGGALIPURA
50,53
Agriculture
Residential
Park
Sky Group
P a g e | xvii
Annexures
14
UTTARI
141,132
Residential
Commercial
Residential
15
UTTARI
64,141
Residential
Commercial
Residential
16
UTTARI
68
Agriculture
Residential
Tank
17
UTTARI
68
Residential
Residential
Tank
18
KAGGALIPURA
84
Agriculture
Tank
Residential
19
KAGGALIPURA
222
Agriculture
Residential
Tank
20
GULAKAMALE
99
Agriculture
Residential
Tank
21
GULAKAMALE
84
Tank
Residential
Tank
22
GULAKAMALE
109,116,121
PS
Residential
PS
23
GULAKAMALE
16,18
Agriculture
Residential
Park
24
GULAKAMALE
18,21,22,23
Agriculture
Residential
Park
25
GULAKAMALE
46
Tank
Residential
Tank
26
KAGGALIPURA
46,127
Industrial
Residential
Industrial
27
KAGGALIPURA
199
Industrial
Residential
Industrial
28
KAGGALIPURA
215
Industrial
Commercial
Industrial
29
UTTARI
25
Agriculture
Residential
Tank
Sky Group
P a g e | xviii
Annexures
30
KAGGALIPURA
136
Agriculture
Residential
Commercial
31
KAGGALIPURA
143
Industrial
Residential
Industrial
32
GULAKAMALE
20
Agriculture
Residential
Park
33
GULAKAMALE
118
PS
Residential
PS
34
KAGGALIPURA
58,67
PS
Residential
Park
35
KAGGALIPURA
324
Industrial
Residential
Industrial
36
KAGGALIPURA
312
Tank
Residential
Tank
37
KAGGALIPURA
298
Agriculture
Residential
Commercial
38
KAGGALIPURA
298
Agriculture
Park
Commercial
39
THARALU
Tank
Residential
Tank
40
SOMANAHALLI
229,230,231,253,239,2
40,241 & Surroundings
PU
PS
PU
41
SOMANAHALLI
225
Park
Commercial
Park
42
SOMANAHALLI
225
PS
Commercial
PS
43
SOMANAHALLI
225
PS
Commercial
PS
44
SOMANAHALLI
227
PS
Commercial
PS
45
SOMANAHALLI
212,213,217,218
PS
Residential
PS
Sky Group
P a g e | xix
Annexures
46
SOMANAHALLI
20,23
Industrial
Residential
Industrial
47
SOMANAHALLI
18,36
Industrial
Residential
Industrial
48
KAGGALIPURA
46,151,152
Commercial
Residential
Commercial
49
KAGGALIPURA
151
PS
Park
PS
50
KAGGALIPURA
173
PS
Residential
PS
51
KAGGALIPURA
174
PS
Residential
PS
CONURBATION 2 - HAROHALLI
SL.No
Village Name
Survey No
Existing Landuse
IMP Landuse
GABBADI
130
Tank
Residential
Tank
GABBADI
42,44,48
Park
Industrial
Park
GABBADI
Residential
Industrial
Residential
GABBADI
249,250
Agriculture
Agriculture
Residential
HOSAKOTE
33
Agriculture
Hillock
Park
GABBADIKAVAL
Industrial
Agriculture
Industrial
HOSAKOTE
Transport
Transport
Tank
Sky Group
P a g e | xx
Annexures
MARASANDRA
38
Tank
Residential
Tank
HAROHALLI
50
Tank
Residential
Tank
10
HAROHALLI
244
Tank
Park
Tank
11
HAROHALLI
Residential
Park
Residential
12
MEDAMARANAHALLI
Residential
Agriculture
Residential
13
MEDAMARANAHALLI
Residential
Industrial
Residential
14
MEDAMARANAHALLI
56
Industrial
Industrial
Tank
15
MEDAMARANAHALLI
72,94,95,96
Residential
Industrial
Residential
16
HAROHALLI
478,493,501,502,503
Residential
PU
Residential
17
HAROHALLI
444
Tank
Agriculture
Tank
18
HAROHALLI
Tank
Industrial
Tank
19
HAROHALLI
Tank
Industrial
Tank
20
HAROHALLI
529
Tank
Residential
Tank
21
GABBADI
42
Agriculture
Industrial
Tank
22
GABBADI
161
Tank
Agriculture
Tank
23
HAROHALLI
Tank
Residential
Tank
Sky Group
P a g e | xxi
Annexures
24
HAROHALLI
377
Agriculture
Tank
Park
25
HAROHALLI
467,469,470,471
Agriculture
Tank
Park
26
HAROHALLI
291
Tank
Agriculture
Tank
27
HAROHALLI
Agriculture
Park
Agriculture
28
HAROHALLI
Agriculture
Park
Agriculture
29
HAROHALLI
Agriculture
Agriculture
Park
30
GABBADI
Agriculture
Agriculture
Park
224,225,238,242,243,2
48,785,793 &
Surroundings
110,111,117,116,115,3
22,325& Surroundings
600,672,680,689,690&
Surroundings
118,119,120,121,122,1
23,124 & Surroundings
CONURBATION 3 - KANKAPURA
SL.No
Village Name
Survey No
Existing Landuse
IMP Landuse
KANAKAPURA
34,35,48,49,50,54,709,
& Surroundings
PU
Residential
PU
KANAKAPURA
19,20
Industrial
PS
Industrial
KANAKAPURA
665,670
PS
Residential
PS
KANAKAPURA
269,273
PS
Agriculture
PS
KANAKAPURA
Commercial
Residential
Commercial
Sky Group
P a g e | xxii
Annexures
KANAKAPURA
563,564,565,566,571 &
Surroundings
Agriculture
Agriculture
Residential
KANAKAPURA
541
Tank
Residential
Tank
THAMMASANDRA
192
Agriculture
Residential
Tank
AGRAHARA
45,69
Industrial
Residential
Industrial
10
KANAKAPURA
446
Agriculture
Residential
Tank
11
KANAKAPURA
428,435,436
PS
Residential
PS
12
KANAKAPURA
505
Agriculture
Agriculture
Tank
13
KANAKAPURA
448
Agriculture
Agriculture
Tank
14
ARALALU
157,176
Industrial
Residential
Industrial
15
ARALALU
118
Agriculture
Residential
Tank
16
ARALALU
141
Agriculture
Residential
Tank
17
ARALALU
125
Agriculture
Residential
Tank
18
ARALALU
209,137
Agriculture
Residential
Tank
19
BEKUPPE
Tank
Residential
Tank
20
CHOKASANDRA
1,2,3 etc
Residential
Agriculture
Residential
21
ARALALU
Tank
Transport
Tank
Sky Group
P a g e | xxiii
Annexures
22
SHIVANAHALLI
Agriculture
Residential
Tank
23
KALLAHALLI
135
Agriculture
PS
Tank
CONURBATION 4 - SATHANUR
SL.No
Village Name
Survey No
Existing Landuse
IMP Landuse
ANAMANAHALLI
41,42,159,160
Industrial
Residential
Industrial
ANAMANAHALLI
138,139
Agriculture
Residential
Tank
ANAMANAHALLI
85
Agriculture
Residential
Tank
ANAMANAHALLI
10
Agriculture
Residential
Tank
ANAMANAHALLI
Tank
Residential
Tank
SATHANUR
256
Tank
Residential
Tank
SATHANUR
207
Agriculture
Residential
Tank
SATHANUR
335
Tank
Park
Tank
SATHANUR
184
Tank
Residential
Tank
10
SATHANUR
227
Tank
Residential
Tank
11
SATHANUR
Tank
Residential
Tank
Sky Group
P a g e | xxiv
Annexures
12
SATHANUR
170
Park
Residential
Park
13
SATHANUR
83
Tank
Industrial
Tank
14
SATHANUR
52
Tank
Park
Tank
15
DESHOHALLI
37
Agriculture
Residential
Tank
16
SATHANUR
312
Tank
Park
Tank
17
YADUGOWDANAHALLI
21
Agriculture
Residential
Tank
18
SATHANUR
297
Tank
Residential
Tank
19
SATHANUR
295,316
Agriculture
Residential
Tank
20
ANAMANAHALLI
69,86
Residential
PS
Residential
Sky Group
P a g e | xxv