Provisional Approval

Bangalore Metropolitan Region Development Authority


No 1, Ali Askar Road, Bangalore-560052
www.bmrda.kar.in

CONTENTS
Topic

Pg No

List of Figures
List of Tables
List of Maps
PREFACE

EXECUTIVE SUMMARY

Salient Features of Kanakapura LPA


PART 1
1. INTRODUCTION

1.1 BACKGROUND

1.2 REGIONAL SETTING

1.3 PHYSIOGRAPHY AND CLIMATE

1.4 HISTORICAL PERSPECTIVE

10

1.5 INTRODUCTION TO LPA

16

1.6 SCOPE AND LIMITATION

20

2. DEMOGRAPHIC PROFILE AND ECONOMIC


BASE

21

2.1 DEMOGRAPHIC CHARACTER

21

2.2 ECONOMIC BASE

31

2.3 HERITAGE AND TOURISM

51

3. HOUSING AND URBAN POOR

58

3.1 HOUSING

58

3.2 HOUSING SHORTAGE / DEMAND

67

3.3 URBAN POOR AND SLUMS

68

4. EXISTING LANDUSE AND TRANSPORTATION

70

4.1 EXISTING LAND UTILISATION

70

4.2 TRAFFIC AND TRANSPORTATION

77

5. INFRASTRUCTURE

89

5.1 PHYSICAL INFRASTRUCTURE

89

5.2 SOCIAL INFRASTRUCTURE

107

6. ENVIRONMENTAL ISSUES

117

6.1 POLLUTION: GENERATION AND CONSEQUENCES

117

6.2 RAIN WATER HARVESTING

117

6.3 DISASTER MITIGATION AND MANAGEMENT ISSUES

118

7. PROBLEMS

119

8. VISUALISING THE FUTURE

121

8.1 INTERIM MASTER PLAN PROJECTIONS- 2021

121

8.2 POPULATION GROWTH TREND IN KANAKAPURA LPA

122

8.3 FACTORS AIDING POPULATION GROWTH

124

8.4. POPULATION PROJECTION

125

8.5 AREA REQUIREMENT

130

8.6 POPULATION DENSITY 2031

131

8.7 HOUSING REQUIREMENT

132

8.8 PHYSICAL INFRASTRUCTURE REQUIREMENT

133

8.9 SOCIAL INFRASTRUCTURE REQUIREMENT

134

8.10 PARTICIPATORY APPROACH

137

8.11 S.W.O.T ANALYSIS

137

8.12 VISION 2031

137

9. MASTER PLAN PROPOSALS

138

9.1 COMPONENTS OF THE MASTER PLAN

138

9.2 MASTER PLAN OBJECTIVES

139

9.3 DENSITY

139

9.4 STRATEGY FOR OBTAINING LAND FOR PUBLIC PURPOSES

140

9.5 BASIC CONSIDERATION FOR PROPOSAL

140

9.6 PROPOSALS

141

9.6.1 PROPOSED LANDUSE PLAN 2031

141

9.6.2 PROPOSED TRAFFIC AND TRANSPORTATION PLAN 2031

145

9.6.3 ROAD WIDENING AND BUILDING LINES

149

9.6.4 REVISED STRUCTURE PLAN 2031 POLICIES AND


PROPOSALS

150

9.6.5

158

SECTORAL PROPOSALS

10. PHASING OF DEVELOPMENT

176

11. ENFORCEMENT, IMPLEMENTATION, MONITORING AND


EVALUATION

180

11.1 ACTIONS

180

11.2 MONITORING AND EVALUATION

182

11.3 FISCAL PLAN FOR 2031

183
PART II

12. ZONING REGULATIONS

185

12.1 INTRODUCTION

185

12.2 ZONING OF LAND USE

199

12.3 ZONING REGULATIONS: REGULATIONS FOR DIFFERENT USES


OF BUILDINGS

218

12.4. SUB-DIVISION REGULATIONS

242

ANNEXURES

LIST OF FIGURES
Figure No

Title

Pg No

1.1

Kanakapura LPA in the context of BMR

1.2

Annual Direction of the Wind 1980-1997

1.3

Average annual rainfall 2000 - 2010

1.4

Monthly mean and mean maximum temperature in the LPA

1.5

Monthly mean relative humidity in Kanakapura LPA

2.1

Population in Kanakapura Town

23

2.2

Population in Kanakapura LPA

24

2.3

Population growth rate in Kanakapura LPA

25

2.4

Comparison of population growth

25

2.5

Population density in Kanakapura LPA

26

2.6

Urban rural population distribution in the LPA

27

2.7

Literacy rate in Kanakapura Taluk

29

2.8

Workforce distribution in the Kanakapura LPA

32

2.9

Gender wise distribution of workers

32

2.10

Gender wise distribution of workers in each category

33

2.11

Distribution of workforce in Kanakapura TMC

33

2.12

Gender wise distribution of workforce in Kanakapura TMC

34

2.13

Gender wise distribution of workforce in each category

34

2.14

Workforce distribution in rural areas of Kanakapura LPA

35

2.15

Workforce distribution in Economic Activities in Kanakapura Taluk

35

2.16

Gender wise Workforce distribution Kanakapura Taluk

36

2.17

Worker distribution in Economic Activities: Kanakapura TMC

36

2.18

Land utilization in Kanakapura Taluk

37

2.19

Agricultural Land holdings in Kanakapura Taluk

37

2.20

Distribution of small scale industries in Kanakapura LPA

42

2.21

Completed works under MGNREGA in Kanakapura Taluk

47

2.22

Works in progress MGNREGA in Kanakapura Taluk

47

2.23

Financial Institutions in the LPA

48

3.1

Distribution of Household size in Ramanagara district

59

3.2

Distribution of households by habitable room

60

3.3

Distribution of households by flooring material

60

3.4

Distribution of households by wall material

61

3.5

Distribution of households by roofing material

61

3.6

Distribution of households by availability of facilities

62

4.1

Land ownership in the LPA

76

4.2

Vehicles in Kanakapura Taluk

86

5.1

Distribution of households by availability of drinking water source

90

5.2

Distribution of households by location of drinking water source

90

5.3

Domestic Water Supply Gap in Kanakapura LPA

92

5.4

Availability of sanitation facilities in Ramanagara district

98

5.5

Availability of toilet and bathroom facility in Kanakapura Taluk

99

5.6

Electricity consumption in Kanakapura Taluk (in lakh units)

106

5.7

Management wise distribution of schools

108

5.8

Infrastructure facilities in schools in Ramanagara district

108

5.9

Literacy rate in Kanakapura Taluk

109

5.10

Literacy rate in Ramanagara district

110

5.11
5.12

Comparison of Literacy rate in Ramanagara and Bangalore district


Enrolment rate in primary and secondary classes in Bangalore rural district

110
111

5.13

Distribution of school children in age group 6-14

111

5.14

No of hosital bed per 1000 population

114

6.1

Disaster management continuum

118

8.1

Population growth in the LPA till 2011

122

8.2

Population growth in Kanakpura TMC

123

8.3

Projected urban population in Kanakpura LPA

130

8.4

Water Supply gap in Kanakapura LPA

133

LIST OF TABLES
Table No

Title

Pg No

1.1

Physiography and soil types

1.2

Mean temperature and wind speed in the LPA

1.3

List of villages and population in the Kanakapura LPA

17

1.4

TMC data in the LPA

20

2.1

Population Statistics In Karnataka

22

2.2

Comparitive table of Sex Ratio

28

2.3

Comparative list of 0-6 years population

28

2.4

HDI composition

30

2.5

Principal crops in Kanakapura Taluk

38

2.6

Production of major crops in Kanakapura Taluk

38

2.7

Sericulture statistics of Kanakapura Taluk

39

2.8

Sericulture programs in Kanakapura Taluk

39

2.9

Mulberry and Sericulture Infrastructure in Kanakapura Taluk

40

2.10

Artisan Base in the LPA

42

2.11

Commercial activities in Kanakapura Town

44

2.12

Details of PMRY Scheme

45

2.13

No of people benefitted by Swarnajayanthi Shahari Rozgar Yojna

46

2.14

No of people benefitted by MGNREGS

46

2.15

List of tourism spots in Harohalli

51

2.16

List of tourism spots in Sathanur

53

2.17

List of tourism spots in Kasaba

54

2.18

List of tourism spots in Uttarahalli

56

3.1

Existing area under residential land use in major settlements in the


Kanakapura LPA

59

3.2

Organizational setup in the housing sector

63

3.3

Housing sites allotted under Ashraya Scheme in 2010-11

64

3.4

Houses constructed under Ashraya Scheme in 2010-11

64

3.5

Houses constructed under IAY in 2010-2011

65

3.6

Houses constructed under special scheme in 2010-2011

65

3.7

Houses constructed under special scheme in 2010-2011

66

3.8

Features of IHSDP

66

3.9

houses Constructed under IHSDP

66

3.10

Declared slums in Kanakapura TMC

68

4.1

Existing land utilization in the LPA, 2012

70

4.1 A

Existing land use in the LPA, 2012

70

4.2

Existing Land use distribution in Kanakapura Town

71

4.3

Existing Land use distribution in Harohalli

73

4.4

Existing Land use pattern Sathanur

74

4.5

Existing Land use distribution in Kaggalipura

75

4.6

Road category in Kanakapura Taluk

80

4.7

Road inventory, Kaggalipura town

80

4.8

Road inventory, Harohalli town

81

4.9

Road inventory, Kanakapura town

82

4.10

Road inventory, Sathanur town

83

4.11

Vehicle distribution in Kanakapura Taluk

85

5.1

Water supply source for Kanakapura TMC

91

5.2

Water Supply standards CPHEEO

91

5.3

Present Domestic water requirement in Kanakapura LPA

92

5.4

Details of existing storage reservoirs

93

5.5

Municipal water supply source in Kanakapura Town

94

5.6

Sewage generation in the LPA,2011

98

5.7

Solid Waste generation in the LPA

103

5.8

Municipal Solid waste management data

103

5.9

Tools and Equipment procurement under SWM Action Plan

104

5.10

Distribution of Educational facilities in Kanakapura Taluk

107

5.11

Health care facilities in Kanakapura Taluk

113

5.13

List of healthcare programs in Kanakapura Taluk

116

8.1

IMP land use analysis- Kaggalipura and Harohalli-2021

121

8.2

IMP land use analysis- Kanakpura and Sathanur- 2021

121

8.3

Population growth rate in Kanakpura LPA

122

8.4

Population growth rate in Kanakpura TMC

123

8.5

125
Natural growth of population calculated through various statistical methods

8.6

Population projection of the LPA villages

125

8.7

Projected population in Kanakpura LPA 2031

129

8.8

Population in the Growth nodes in 2031

129

8.9

Urbanisable area required in Kanakpura LPA in 2031

130

8.9

Conurbation area statistics- 2031

131

8.10

Distribution of population in the four growth nodes

131

8.11

Residential Area requirement for the LPA

132

8.12

Residential Area requirement for the LPA for the Conurbations

132

8.13

Landfill Area Requirement in the LPA

133

8.14

Educational facility Requirement in the LPA

134

8.15

Medical facility Requirement in the LPA

135

9.1

Density in the Growth Nodes of Kanakapura LPA

139

9.1 A

Conurbation area statistics-2031

141

9.1 B

Proposed Landuse 2031, LPA

141

9.1 C

Proposed land utilisation LPA, 2031

142

9.2

Kanakapura proposed landuse statistics

142

9.3

Harohalli Proposed land use statistics

143

9.4

Kaggalipura proposed landuse statistics

141

9.5

Sathanur proposed landuse statistics

144

9.6

Road Inventory of Kanakapura LPA.

148

9.7

Road Inventory of BMR proposed roads

148

9.8

Inventory of Roads proposed to be widened in the Master plan 2031

149

9.9

Building Line proposed for major roads

149

9.9

Structure Plan proposals land Utilisation and Environment

150

9.10

Structure Plan proposals Economy

151

9.11

Structure Plan proposals Transport

152

9.12

Structure Plan proposals Housing

154

9.13

Structure Plan proposals Water Supply

155

9.14

Structure Plan proposals Sanitation

155

9.15

Structure Plan proposals Power

155

9.16

Structure Plan proposals telecom

156

9.17

Structure Plan proposals Soild Waste Management

156

9.18

Structure Plan proposals Education

157

9.19

Structure Plan proposals health

158

10.1

Phasing of development

177

10.2

Phasing of development: Kaggalipura

177

10.3

Phasing of development: Harohalli

177

10.4

Phasing of development: Sathanur

177

10.5

Phasing of development: Kanakapura

177

10.6

Land use analysis for phase-I: Kaggalipura

178

10.7

Land use analysis for phase-I: Harohalli

178

10.8

Land use analysis for phase-I: Kanakpura

179

10.9

Land use analysis for phase-I: Sathanur

179

11.1

Financial Proposal

183

LIST OF MAPS
Sl.No

Title

Map No.

Drawing
1

Location

01

Administrative Boundary

02

Study Maps
3

Regional Setting

03

Climatological Studies

04

Forest, Drainage & Water Bodies

05

Ground Water Potential

06

Soil Classification

07

Demographic Studies

08

Civic Amenities And Facilities - Local Planning Area

9A

10

Civic Amenities And Facilities - Settlemet Wise

9B

11

Problem Map

10

Existing Land Use Maps


12

Existing Land Utilisation - Local Planning Area

11

13

Kaggalipura Existing Land Use

12

14

Harohalli Existing Land Use

13

15

Kanakapura Town Existing Land Use

14

16

Sathanur Existing Land Use

15

Proposed Land Use Maps


17

Proposed Land Utilisation - Local Planning Area

16

18

Kaggalipura Proposed Land Use - Overall

17

19

Kaggalipura Proposed Land Use

20

Harohalli Proposed Land Use - Overall

18

Harohalli Proposed Land Use (Grid A)

18A

Harohalli Proposed Land Use (Grid B)

18B

21

Harohalli Proposed Land Use

18C

22

Kanakapura Proposed Land Use - Overall

19

Kanakapura Proposed Land Use (Grid A)

19A

Kanakapura Proposed Land Use (Grid B)

19B

23

Kanakapura Town Proposed Land Use

19C

17A

24

Sathanur Proposed Land Use - Overall

25

Sathanur Proposed Land Use

20
20A

Circulation Pattern Maps


26

Kaggalipura Circulation Pattern

21

27

Harohalli Circulation Pattern

22

28

Kanakapura Circulation Pattern

23

29

Sathanur Circulation Pattern

24

Changes From IMP to MP - 2031


30

Landuse Changes Effected From IMP to MP - 2031

25

31

Circulation Pattern Changes Effected From IMP to MP - 2031

26

Phasing of Development
32

Phasing Of Development LPA

27

33

Kanakapura Phasing of Development

28

34

Kanakapura Phasing of Development Grid 1

29

35

Kaggalipura Phasing of Development

30

36

Kaggalipura Phasing of Development Grid 1

31

37

Kaggalipura Phasing of Development Grid 2

32

38

Harohalli Phasing of Development

33

39

Harohalli Phasing of Development Grid 1

34

40

Harohalli Phasing of Development Grid 2

35

41

Sathanur Phasing of Development

36

42

Sathanur Phasing of Development Grid 1

37

Kanakapura LPA Master Plan 2031

Preface

PREFACE
Bangalore Metropolitan Region Development Authority prepared the Structure Plan (SP) for
Bangalore Metropolitan Region (BMR) with an inductive approach with the prime objective of
decentralising growth away from Bangalore to harness and constrain its increasing primacy in the
region, lessen the regional disparities and in the process relieve the developmental pressure within the
conurbation. The strategic issues considered to be key determinants to future growth patterns were
studies and summed up as follows:
How effectively the strategic intervention combinations would compliment the
achievement of the induced population growth targets and developmental interventions of
the preferred growth strategy.
How effectively they would counter anomalies and negative development trends identified
in the BMR.
The structure plan was intended to provide a generic model for formulation of such plans for other
regions in Karnataka besides providing a strategic policy framework for planning & development
control locally to ensure that provision of development is realistic and complements with national state
& regional policy guidance and securing consistency between local plans for contiguous or
neighbouring areas.
Structure Plan has proposed five Area Planning Zones and Interstitial zones in the entire
Bangalore Metropolitan Region. For the purpose of planning and development of important and
potential zones, Karnataka Town and Country Planning Act, 1961 has been extended to various Area
Planning Zones and Planning Authorities have been constituted for controlling and regulating the
developments in these Local Planning Areas. With the increase of Bangalores population and spatial
spread in the last 2 decades owing to its increasing global recognition as a preferred IT destination.

Sky Group

Page |A

Kanakapura LPA Master Plan 2031

Preface

With increasing outgrowth of Bangalore and the proposed population influx into the
Kanakapura Local Planning Area, BMRDA has rightly taken the preparation of Interim Master
Plan to dovetail the regional policies of development the local requirements of the ever-increasing
population and as a result guide & regulate urban growth for a planned & compatiable physical
development of the region. The preparation of Interim Master Plan started during 2006 and the govt.
have approved the five IMPs provisionally in 2007 and finally approved them during 2009.
A Master Plan (MP) is defined as A plan for the development and re-development of the
area within the jurisdiction of the planning authority. The Master Plan has to be prepared not
later than 2 years from the declaration of the LPA as per Sec 9 of The KT & CP Act. According to the
Act the contents of a Master Plan are defined as follows.
Zoning of land use
Street pattern i.e. Circulation pattern
Area reservation for Parks/Playgrounds/Open Spaces
Area reservation for future developments
Reservation of land for the purposes of Central Govt., State Govt etc.
Declaring and framing regulations for areas of special control
Phasing of development
BMRDA prepared scientific base maps for the Local Planning Area by acquiring Quick Bird
data based on 2009 data as there were no proper base maps. The Planning Authorities incorporated all
approved lay outs and were finalised during 2012.
Government constituted a committee vides its G.O. dated 28-11-2012 under the chairmanship of
Metropolitan Commissioner to finalise the Master Plans for five Local Planning Areas and along with
some guidelines. The following were the members of the committee.

Sky Group

Page |B

Kanakapura LPA Master Plan 2031

Preface

1. Metropolitan Commissioner

Chairman

2. Commissioner, DULT, Govt. of Karnataka

Member

3. Director of Town Planning,

Member

4. Additional Director of Town Planning, BMRDA

Member

5. Joint Secretary / Dy. Secretary, UD

Member

6. Shri Sitaram, Cistup, IISc., Bangalore

Member

7. Member-Secretaries of concerned P.A.

Member

Meanwhile there was a petition in High court of Karnataka for delayed preparation of Master
Plans for BMRDA submitted an affidavit saying that the plans would be finalised by June 2012 and
subsequently another affidavit that it would be finalised on 31-1-2013. But, we could not finalise the
plans within date and immediately the committee met on 24-1-2013 and reviewed the progress made
in the preparation of Master Plans. During the discussion it was also observed that notification under
section 10/1 of Karnataka Town and Country Planning Act, 1961 was not declared so far and it would
be further delayed if we notify it now (2 months) and therefore, it was decided that If BMRDA is to
prepare the Master Plans, then the notification under section 10/1 is not required. However, it was
opined that in one case law the govt. has to delegate/empower the preparation of Master Plans under
section 9/2 of Karnataka Town and Country Planning Act, 1961. Accordingly, BMRDA requested the
govt. and govt. have empowered the preparation of Master Plans for five Local Planning Areas to
BMRDA under section 9/2 Karnataka Town and Country Planning Act, 1961 on 4-3-2013.
The committee formulated broad guidelines for the preparation of Master Plans and directed
the Authorities to work out the proposals based on:
1. Existing developments
2. Approved IMP
3. Change of land uses approved by the govt. and P.A. under section 14-A (3)

Sky Group

Page |C

Kanakapura LPA Master Plan 2031

Executive Summary

EXECUTIVE SUMMARY
The Kanakapura Local Planning Area was declared by the BMRDA in 2006. It is located in the southwest part of the Bangalore Metropolitan Region (BMR). The total extent of the LPA is 412.78 sqkm
and consists of 86 settlements consisting of 85 villages and Kanakapura TMC. The LPA is well
connected by the NH-206, connecting Bangalore with Mysore via Kanakapura LPA. The Interim
Master Plan of the LPA was commissioned in 2007. It was provisionally approved in April 2007 and
finally approved by the BMRDA in May 2009. The process of Master Plan preparation started with the
preparation of the Basemap and Existing Landuse Map which were prepared by Pixel using 0.6 m
resolution Quickbird satellite Image. The maps were scrutinised by the KSRAC and submitted to the
BMRDA in 2012.
The Master Plan of Kanakapura was prepared with to promote the LPAs role as a counter magnet to
Bangalore. The Bangalore Mysore Infrastructure Corridor passes in close proximity to the LPA on the
north-east which increases its development potential. There are four important growth nodes in the
LPA Kaggalipura, Harohalli, Kanakapura and Sathanur. Likewise all Master plan Proposals have
made as per the four conurbations Kaggalipura, Harohalli, Kanakapura and Sathanur.
Kaggalipura is located along the NH 206 and is closest to Bangalore. There is rapid urbanization in
the area with the construction of residential apartments. International schools and spiritual institutions
have come up in the area. Harohalli is characterized by the KIADB industrial estate which has few
industries at present. Kanakapura is the Taluk headquarter of the Kanakapura Taluk and is also a
Town Municipal Council as per Census. The area is mainly residential with few institutional buildings
to cater to the civic needs. Sathanur is the southern-most settlement in the LPA. It consists of
residential areas as few commercial and institutional setups. A township of 65 sqkm has been
proposed at Sathanur by the BMRDA to form a hub of agro processing industries with work-homeplay concept. The township would further increase the development potential of the LPA.

Sky Group

Page |E

Kanakapura LPA Master Plan 2031

Executive Summary

The river Arkavathi flows through the LPA and is the only perennial source of water. Depletion of
ground water is a major concern of development.

The Master Plan 2031 has been prepared to uphold the potential of the areas. There have been
some changes in landuse in the LPA under KTCP Act. All changes and approved layouts have been
retained in the Master Plan proposal. Guidelines and standards have been followed and additional
landuse has been assigned scientifically.

The concept of phasing of development has been introduced as required under section 12 (g) of
Karnataka Town and Country Planning Act, 1861 to bring about gradual and compact development in
the Local Planning Area. The primary objective of act is to guide and regulate the developments
within the Local Planning Area in a phased manner so as to facilitate planning for the provision of
infrastructure services like water supply, sanitation, drainage, transport and social infrastructure.

Sky Group

Page |F

Kanakapura LPA Master Plan 2031

Salient Features of Kanakapura

SALIENT FEATURES OF KANAKAPURA LPA


1

Total Area of LPA

LPA notification date

Total no of villages in LPA

Total no of urban areas in LPA

Total no of settlements in LPA

86

District

Urban areas in the LPA

Major growth nodes

Initiation of IMP preparation

June 2006

10

Date of IMP provisional approval

April 2007

11

Date of IMP final approval

May 2009

12

Total existing developed area, 2012

13

Existing population 2011

14

Existing gross density

15

Total urbanisable area proposed in IMP 2021

16

Projected population as per IMP 2021

8 lakhs

17

Proposed density as per IMP

80 pph

18

Total urbanisable area proposed in MP 2031

19

Projected urban population as per MP 2031

6 lakhs

20

Proposed urban density as per MP 2031

67 pph

21

Proposed residential density as per 2031

167 pph

22

Urbanisable area in Phase 1

23

Density Phase 1

24

Urbanisable area phase 2

25

Density phase 2

Sky Group

412.78 sqkm
2006
85

Ramanagara
Kanakapura TMC
Kaggalipura, Harohalli, Kanakapura & Sathanur

25.65 sqkm
1.80 lakhs
70 pph
101.66 sqkm

90.75 sqkm

3137.62 Ha
115 pph
5938.03 Ha
67 pph

PART I
MASTER PLAN PROPOSALS

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

CHAPTER 1

INTRODUCTION
1.1 BACKGROUND
Karnataka is one of the fastest growing states in India. It is the 9 th largest state in India in terms of
population with a decadal growth rate of 15.67%1. 38.57% of the state is urbanised with a growth rate
of 31.27%. The BMR has an area of 8005 sq km and a population of 10.57 lakhs as per census 2011.
The decadal population growth rate in the BMR is 25.68%. Needless to say, this fast growth calls for
a strategic planning to sustain the additional pressure on services and maintain the quality of life.
The BMR at present faces the challenges of a rapidly urbanising region on the verge of becoming an
international metropolis. While the strategic location, economic potential and an efficient workforce of
the area provides impetus to the process of globalization, lack of perennial water availability, rising
pressure on infrastructure in core are inevitable constraints in the process of the same. Hence a
policy of decentralisation advocates spatial distribution of population from the core to the outer less
congested areas.
Planning in India, traditionally had been largely socio-economic, restricted to a few urban centres.
The three tier planning system was often overridden by state agenda. The 73rd and 74th
Constitutional Amendment Acts, implemented in the year 1992, provide a spatial framework for
integration between all levels of planning. Known as the decentralisation agenda, the aim was to
facilitate a gradual shift in power to the grass root levels. As a part of the functional devolution, the
local bodies (LB) are now expected to perform urban planning including town planning, regulation of
land use and construction of buildings, planning for economic and social development, planning for
the poor in the society, slum improvement and up gradation and urban poverty alleviation.
The Master Plan for Kanakapura Local Planning Area has been prepared in the context of the BMR
to redefine its role for the future within the overall framework of Structure Plan 2031.

Census 2011

Sky Group

Page |1

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

1.2 REGIONAL SETTING


The BMR is disaggregated into six local planning areas and the Bangalore Metropolitan area which
more or less coincides with the limits of the BBMP. In order to provide sectoral and spatial synergy a
Structure Plan had been formulated for the BMR which is more or less a regional perspective plan.
The Structural Plan provides a framework for the master plan of the Kanakapura LPA.

The Structure Plan (SP) 2011 had an inductive approach to planning since it was governed by the
decentralisation policy in the BMR. Hence, the SP 2011 proposed a targeted induced population
distribution of over 7.4 lakhs in the south Karnataka Region, of which 4.9 lakhs were to be
accommodated in the BMR. The Interim Master Plan (IMP) prepared for the Kanakapura LPA for the
plan period 2021 envisaged a population of 11.22 lakhs in the LPA by the year 2021 also prepared by
an inductive approach.

The vision and the growth directions stated in the SP 2011 had not been able to live up to the pace of
growth in the BMR. Hence a Revised Structure Plan (RSP) has been prepared for the region for the
year 2031, to provide strategic policy framework for planning, ensure sectoral development and
coordination and securing consistency between the various local plans.

The Kanakapura LPA (K-LPA) Master Plan 2031


articulates a multi-year vision and plan for the LPAs
growth and development, driven by institutions that
reflect the citizens values. The master plan provides
contours of a shared vision and identification of key
issues facing the LPA in the short, medium and long
term.

It

identifies

the

development

patterns,

KANAKAPURA

infrastructure gaps and deficiencies, project and


reform priorities in the LPA in tandem with the
sectoral visions of the draft Revised Structure Plan
2031.

Fig 1.1: Kanakapura LPA in the


context of BMR

Sky Group

Page |2

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

1.3 PHYSIOGRAPHY AND CLIMATE

LAND

Land being a limited and fixed resource, there is competing demand on agriculture and allied
activities, non-agriculture sectors like industries, communication systems, buildings, and power
projects, new townships, mining and so on.

Demand for land from both agriculture and non-agricultural sectors are exerting a great pressure on
land resources. The demand for firewood, timber and fodder for livestock has resulted in excessive
pressure on forest and pasture lands which has progressively affected the grass and tree cover
resulting in accelerated forest and greenery (pasture) degradation leading to ecological imbalance
and environmental problems.

Pasture lands have to be provided to facilitate grazing of animals and also fodder augmentation in
community/government lands. In the LPA the pasture land appears to be significant contributor to live
stock. In the LPA special efforts have to be made to develop pasture lands to encourage animal
husbandry.

PHYSIOGRAPHY

The elevation falls from 833 m to 620 m from north of the LPA to the south up to Arkavathy valley and
increases in elevation generally towards the south-west. Terrain shows undulating topography with
varying elevation between 833 meters to 620 meters above MSL. The lowest elevation being 620 m
is found around Kanakapura town in the valley portion. The slopes vary from 20-150
metres/kilometre.

The Kanakapura LPA lies in the Cauvery basin. The main tributary of Cauvery, river Arkavathy, flows
in the LPA. LPA is covered by the sub basin of Arkavathy and drains southwards. The drainage
density and stream frequency are moderate to high (hilly zone, in northern, eastern and western part)
and medium to low in central part. Drainage map shows the drainage network is integrated with
surface water body within the LPA. The drainage pattern is dendratic and parallel. It encourages for
infiltration than runoff, as the stream frequency and density are medium to low and have good
constant channel maintenance. These drainages are controlled by structures and lithology.
Sky Group

Page |3

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

GEOMORPHOLOGY

Kanakapura LPA lies predominantly in Pedi plain geomorphic unit. Small patches of Structural and
Denudational hills are also traced in north eastern and southern part. The figure shows geomorphic
pattern within the LPA. This map clearly indicates that, infiltration zones are larger in area than runoff
and are suitable for ground water recharge. The potentiality will also be moderate to good.

Apart from the structural valleys, supported by the surface water bodies as showing better prospects
for ground water developments.Ground water potential clearly shows that the ground water prospects
in the valley portion is good and in majority area of the LPA, it is moderate. This can be converted as
good potential zone by adopting artificial recharge techniques.

GEOLOGY AND SOILS

The area is underlain with grey and pink granites and granite gneisses and intruded by dolomatic
pegmatite and quartz veins. The map shows the general lithological units in and around Kanakapura
LPA. The inclusions of dolorate and amphibolite dykes are also traced. The general trend of the
peninsular genesis is North West South East to North East South West. These show a steep dip
of about 70 to 80 degrees due South East. According to the Earthquake Map of Karnataka, the LPA
belongs to very low damage risk zone and is in stable belt.

Major portion of the LPA consists of red loamy sandy soils, which is moderately porous and medium
permeability. The patches of loamy, loamy clayey, sandy type of soils are noticed within the LPA.
The clayey and loamy types of soils are more in area extent in southern part than in the rest of the
LPA. Uplands show these types of soils. The map shows the soil types in and around the LPA.

The soils are favourable zones for ground water recharge. As permeability and porosity for the soils
are medium, the infiltration rates will be medium to high. Since, the characteristics are almost uniform
across the LPA; it is advisable to avoid the water polluting industries in the entire LPA to avoid
contamination of water.
There is a need for striking a balance between the competing claims of different sectors. It is
imperative to think of a systematic and scientific long range plan to harness the land resources not
only for satisfying the competing demands from various sectors, but also for ensuring sustainability
of the systems.

Sky Group

Page |4

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

The soils belong to the Alifisols order. Red soils are predominant. These soils have developed on
gneisses and granites and up to little extent on metamorphic rocks. These soils occur on hills, ridges,
rolling to undulating and gently sloping lands of LPA.

Table 1.1: Physiography and soil types


Physiography

Soils

Rolling lands

Deep, red gravelly clay soils

Undulating lands

Moderately deep, red clay soils


Moderately deep, red gravelly clay soils

Gently sloping lands

Deep, red clay soils

Valleys

Very deep, clayey alluvial soils with saline-sodic in patches

These are moderately eroded and severely eroded lands, which need appropriate soil, and water
conservation measures for both agricultural and non-agricultural areas for preventing further
degradation of soils.

CLIMATE

The climate in the region is hot, moist, semi-arid Ecological Sub Region with length of growing period
of 150-180 days.2 The Kanakapura Local Planning Area belongs to the Eastern Dry Agro-Climatic
Zone. The LPA experiences pleasant weather almost all throughout the year. March, April and May
are the predominant summer months while December and January constitute winter.

The nearest IMD station giving the rainfall, humidity, temperature and wind is at Bangalore. Hence,
the data was collected from the IMD station from 1998 to 2008 for the mentioned parameters to
understand the climate in the area.

Agro-ecological sub regions of India. Bull. No. 35.NBSS&LUP, Nagpur 1993.

Sky Group

Page |5

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

WIND DIRECTIONS

It is seen from the wind roses collected from the Indian Meteorological Department (IMD) at
Bangalore that the wind direction is mostly east to west. In the morning i.e., 0830 hrs, the wind is
towards west during May to September and east during November to February. Whereas, in the
evening i.e., 17:30hrs, the wind blows towards west during June to September and east in November
to March. Hence, it can be taken that the wind generally blows towards west. The strongest winds
(>19 kmph) are observed in the months from June to August.
N
2.1%
8.6%

8.0%

KLPA

28.0%

14.0%

26.9%

10.6%
1.6%
S

Figure1.2: Annual Direction of the Wind 1980-1997


Source: www.imdbangalore.gov.in
It is also observed from figure 2.1 that the annual analysis of the wind direction indicates west and
east winds. The percentage wind from the north, however, slightly outweighs the one blowing from
south.

It is seen from the IMD data from 1951-80, that the mean wind speeds are greatest in the months of
June and July .According to the Wind Map of Karnataka, the LPA belongs to Low Damage Risk Zone.
Hence, the structure design of infrastructure in the LPA with respect to wind, loading may be taken
into consideration while planning and constructing high rise structures only. Further, the location of

Sky Group

Page |6

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

industry, generally, should be located in a direction where wind force is going away from the human
habitation.

RAINFALL

Bangalore IMD station recorded an average rainfall of around 875 mm over the years 1998-2010. It is
observed from the IMD data provided that there are two peaks in the rainfall in Bangalore namely
May and September months. But the highest rainfall months are mainly August, September and
October.

Avg Annual Rainfall ( in mm)

KANAKAPURA TALUK AVG ANNUAL RAINFALL (MM)


1400
1200
1000
800
600
400
200
0

2000
Kanakapura Taluk avg annual
1056
rainfall

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

554

413

510

938

1261

494

635

640

807

975

Figure1.3: Averageannual rainfall 2000 - 2010


Source: www.imdbangalore.gov.in
The average rainfall is around 665.5 mm for Kanakapura. There are 11 raingauge stations in the
Kanakapura Taluk.

TEMPERATURE

The annual temperature in the LPA is around 24-25oC. Generally the mean minimum (January) is 1418 oC and the mean Maximum (May) is 32-35oC. The maximum temperature recorded is around 34oC
and the minimum temperature is around 14.1oC. The most appropriate building materials with respect
to temperature in the LPA are bricks and stones which are locally available.
Sky Group

Page |7

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

Monthly mean and maximum temperature

40
35
30
25
20
15
10
5
0
JAN

FEB

MAR

APR

MAY

JUNE

JULY

Monthly mean maximum temperature (0C)

AUG

SEPT

OCT

NOV

DEC

Monthly mean minimum temperature (0C)

Figure1.4: Monthly mean and mean maximum temperature in the LPA


Source: www.imdbangalore.gov.in
The table below shows the mean temperature and mean wind speed for the LPA.

It is observed

from table, that the temperature peaks around 350C in April and May months. The lowest
temperatures (15-17 oC) are observed in months of November and December.

Table 1.2: Mean temperature and wind speed in the LPA


Mean Temperature

Sky Group

Wind

Month

Daily Max.
0
C

Daily Min.
0
C

Mean wind speed in


Kmph

January

27.0

15.1

9.5

February

29.6

16.6

9.2

March

32.4

19.2

8.5

April

33.6

21.5

7.5

May

32.7

21.2

9.4

June

29.2

19.9

13.6

July

27.5

19.5

13.8

August

27.4

19.4

12.3

September

28.0

19.3

9.5

October

27.7

19.1

7.1

November

26.6

17.2

7.7
Page |8

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

December

25.9

15.6

9.0

Annual

28.97

18.63

9.76

Source: www.imdbangalore.gov.in

HUMIDITY

The relative humidity is generally 86% during monsoon months and 63% during dry months. It can be
seen from the Figure below that, that the mornings have exhibited more humidity mean relative than
67 per cent with the highest in the months of July and August (around 87 per cent) and the lowest
humidity in the month of March. The evenings have exhibited humidity more than 31 per cent with the
highest in the months of August and October (around 69 per cent) and the lowest in the month of
March. Generally nearly 25 per cent difference is observed from mornings to evenings with the
highest differences seen in the months of January, February and March (> 35 per cent).

Monthly Mean and Relative Humidity in Kanakapura LPA

100
90
80
70
60
50
40
30
20
10
0
JAN

FEB

MAR

APR

MAY

JUNE JULY

AUG

SEPT

OCT

NOV

DEC

Monthly mean relative humidity at 0830 hrs (%)


Monthly mean relative humidity at 1730 hrs (%)

Figure 1.5: Monthly mean relative humidity in Kanakapura LPA


Source: www.imdbangalore.gov.in

Sky Group

Page |9

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

1.4 HISTORICAL PERSPECTIVE

KANAKAPURA

Situated to the (56 km from Bangalore) South of Bangalore is on the right bank of the river Arkavathy.
The place was originally under the Gangas and later under the Cholas, who administered it as a part
of Kilalainad.

Later, the Hoysalas made it a major headquarters of province (sime). Its name was

changed as Kanakapura from its original Kanakanahalli.

But earlier it is mentioned as

Kanikaranahalli in two Hoysala records dated 1319 and 1317 A.D. from Hachchalu and Nyakanahalli
(Kanakapura tq) villages respectively. Even a recent record dated 1662 A.D by Mysore rulers from
Malagala also mention the place as Kanikaranahalli being the headquarters of a sime. The local
people universally call it as Kanikaranahalli, which is otherwise corrupted as Kankanahalli, says
Buchanan. He further says Kanikaranahalli has a Tamil origin Kani + Karna or Kanikara signifies
a proprietor of land. Kanikara literally means an accountant (Karanika) or a teller of fortune. The
fort here is said to have been erected by Jagadeva Raya, the chief of Channapatna. The remains of
the fort can be now seen near the Arkavathy bridge. The town was twice burnt or laid waste by Tipu
Sultan to prevent its being of use to the British army on their march to Shrirangapattana. The place
was conquered by Mysore rulers in 1630 A.D.

The place has temples dedicated to Ranganatha, Valakotamma, Kodandarama, Anjaneya (two), etc.
The Ranganatha temple is a huge structure with a spacious inner Prakara and a gateway having a
Rayagopura. Over the Mukhamantapa along the hara are niches enshrining are in Vijayanagara
style with a cell to the right having images of Rama, Lakshmana and Seetha. Facing this is a shrine
with a seated image of Anjaneya. The Navaranga has a seated image of Vishnu with attributes like
Shankha, Chakra, Gada and Abhaya. Perhaps, this must have been the main deity as it is locally
said that the present image of Srinivasa was installed as the original image was broken. The central
garbhagriha has a ShalaShikhara.

There is an Ardhamantapa having niches without images.

Besides the main sanctum is another cell outside to the right having a recent image of Ranganatha.
To the left of the main temple is another shrine of a Padmavati with a small Ardhamantapa and a
Navaranga.
The annual Jatra is held for a span of nine days beginning from Ugadi, when a cattle fair is also held.
The Ganesha temple is an ordinary square structure having an image in Vijayanagara style. In front
of this is a modern Kalyanamantapa. The Kodandarama temple is also an ordinary structure in
Vijayanagar style.

The Garbhagriha has a brick and mortar shikara.

There is an open

Mukhamantapa in front of the spacious Navaranga. Facing this temple is the KoteAnjaneya, a small
structure. The Kenkeramma temple is about 200 years old with a huge compound. The deity is
Sky Group

P a g e | 10

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

regarded as Gramadevata, will have special attraction for the devotees during its Jatra held for a
week after Ugadi when about 5000 people assemble. Nearby is another Anjaneya temple whose
image is believed to have been installed by Vyasateertha.

The Valakotamma, another temple of the village deity has an image resembling Durga. The place
has one VeerashaivaMatha called DegulaMatha.

It has a stone inscription dated 1667 of

DevarajaWodeyar of Mysore, announcing certain grants made in the Virupasamudra village by one
Timmamma, mother of a Dalavayi to the Matha.
The place has three mosques and the Jamia mosque inside the town is old, perhaps of Tipus time.
There are three Dargahs one ascribed to Hazrath Syed Yakhub Ali, who is said to have lived here
about 200 years ago.

The Urus is held at this Dargah during the month of Bakrid when more than

5,000 people assemble. The second Dargah one ascribed to Kambli Peer and the Urus is held
during Ramzan. There is also one more Dargah ascribed to Khan Khan Sab, an official perhaps of
Tipus time and the Urus is held here during Ramzan.

The place has a Roman Catholic church locally called the St. Rita built in 1964. Tippu was running a
huge workshop at Kanakapura with a steel foundry. The place has a Government Silk Filature
Factory founded in 1943. The Rural College here is a good memorial to noted Gandhian constructive
worker S Kariyappa. Malagala (two km from Kanakapura) situated across the Arkavati river (now
within Municipal limits) has a huge temple of Mahadeshwara with a spacious Navaranaga, two
Ardhamantapas and a Garbhagriha. Over the Garbhagriha is a brick and mortar Shikhara with many
stucco images. The pillars of the Navaranga are in later Vijayanagara style. This temple is older
than those in Kanakapura proper. To the left of the main temple is a separate modern shrine of
Parvati.
Outside the temple are two inscriptions. One damaged record dated 1375 A.D. of BukkarayaOdeyas
son HariharaOdeya announces one MahasamantaDoddaKallimayaNayaka making some grants to
the temple. The second record dated 1662 of DevarajaWodeyar of Mysore records rich grants for the
maintenance and car festival at the temple of Mahadeshwara and it also mentions Kanikaianahalli,
obviously referring to Kanakapura. The annual Jatra and the car festival are held during Chaitra.
There is also a Sidikamba in wood. Other temples of the place are Morasandamma (Gramadevata)
and one more small shrine of Mahadeshwara.

Kallahalli (five km from Kanakapura) is to be

approached by a deviation road to the left from the Kanakapura-Bangalore road. The place is noted
for its huge Srinivasa temple built in Vijayanagara style. The Garbhagriha has a standing image of
Srinivasa (about two meters tall). There is a brick and mortar Shikhara over it. There is a spacious
Navaranga in front of the Ardhamantapa with plain Vijayanagarapillas. The annual Jatraand car
Sky Group

P a g e | 11

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

festival is held during MaghaPoornima when more than 15 to 20,000 people assemble. The village
also has an Anjaneya temple. There is also a choultry managed by the Dharmasthala trust.

HAROHALLI

Located on the main road (16 km from Kanakapura) appears to have gained prominence under the
Vijayanagara rulers. The place name is referred as Haruvahalli in a record dated 1532 A.D. from the
same place. This must have been an old Agrahara granted to the Brahmanas. The place has
temples dedicated to Arunachaleshwara, Krishnaswami, Basaveshwara (old), Anjaneya, etc. The
Arunachaleshwara temple is a huge structure with a spacious inner Prakara having many small
shrines such as Someshwara, Narayana, Lakshmi and Subrahmanya.

The Garbhagriha has a

Shivalingaperphas of the Hoysala times and also has a Shikhara in Dravidian style. The Navaranga
has four Vijayanagara pillars and all of them have fine relief sculptures. There is an outer Mantapa
said to have been added by the Subedars of Haider and Tippu, SuryanarayanaIyer and
VenkateshIyer respectively.

Inside the Prakara, there are a few broken images of Hoysala

workmanship. To the left of the main temple is the shrine of Ammanavaru (Parvati). The entrance to
the temple is from the south which has a tall brick Rayagopura in Vijayanagara style and has many
stucco sculptures on Shiava themes. This temple is in an area described as fort built or expanded
during Tipus times.
The Krishnaswamy temple seen in the fort area has been totally renovated. The Garbhagriha and
the Ardhamantapa have some later Vijayanagara features. There are two cells on either sides of the
Garbhagriha and one to its right has an image of Lakshmi in it. The other to the left has an image of
Venkatesha standing with Shridevi and Bhudevi. This must be the image referred to a Vijayanagara
record found at the western wasteweir of Vengallayyanakere (outskirts) and is dated 1532 A.D.
issued by ViraPratapaAchutaraya. It states that God Tiruvengadanatha was brought to Haruvahalli
by an official VaradaTimmaya who also made land grants to the deity. In the outskirts of the village,
amidst fields is an old Bhimeshwara temple of later Vijayanagara times. The pillars of the Navaranga
have no sculptures but are square with Vijayanagara brackets atop.
Dwarapalas in relief at the entrance of the Garbhagriha.

There are impressive

The shining Shivalinga rises above the

ground level from the centre of a circular hidden (underground) Panipeetha. To the left of the main
temple is the small shrine of Ammanavaru. The village proper has two mosques in recent style .

Sky Group

P a g e | 12

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

SATHANUR

Situated at a distance of 10 km from Magadi has been mentioned as Sathanur in a record dated
1497 A.D. from the same place.

The place has temples dedicated to Kabbalamma, Maruti,

Svayambeshwara, VithalaGopalaswami, Shanidevaru, etc. Kabbalamma temple has a deity made


out of clay. The temple is built in Vijayanagara style with octagonal as well as square pillars. The
image of Maruti, about two meters tall, is associated with noted theorist on Hindustani Music
PundarikaVithala, the celebrated author of Ragamala, Ragamanjari, SadragaChandrodaya, etc., who
hailed from this place. The Svayambeshwara temple outside the village amidst fields is perhaps the
earliest monument built in early Vijayanagara style. Interestingly there are a few cylindrical pillars
with cushions atop in typical Ganga style. Inside the temple are placed images of Vishnu (two)
Ganapati and Durga (small). The Garbhagriha has a brick mortar Shikhara in Vijayanagara style.
One inscription stone lying to the south-east corner of the temple is badly damaged but mentions one
official Manchayya, son of Chandra Suri (perhaps a JainaPandita) granting lands to one individual
HiriyaMallinatha of Satanur in the originally of Lakshmi.
One of the striking monuments of the place is the VithalaGopalaswamy with an ordinary structure but,
an impresiveHoysala image. The black stone image of the deity is about one metre tall with two
hands, both placed on the waist. The right hand holds a mouth tied with a rope. The god is flanked
by consorts who hold a Chauri in one hand and a lotus in the other. The Prabhavali or halo has in the
upper portion well curved Dashavatara in relief amidst MakaraTorana. The inside wall of the temple
has a Nagari inscription dated 1497, which announces certain grants made by the children of one
official TirumalaSomayaji of Kaliyuru to God Vithala of Sathanur. Apparently PundarikaVithala might
have been named after this deity. Hujigallu, an interior place situated on a deviation road (four km)
from the Sathanur-Magadi road, is a place with pre-historic antiquities. There is an irregular country
road to reach the place. The place is full of dolmens situated on the verge of a hill. The hill has many
inaccesible caves. On some of the boulders at the foot of the hill there are some Jaina images and
inscriptions not so legible and they must be Nishidhi memorials. The place is fit for pre-historic
excavations.

ACHCHALU

Situated 10 km from Kanakapura and can be approached form a deviation road before Sathanur from
Kanakapura. The place name is found mentioned as Achala, headquarters of a nadu in a hoysala
record of 1318 A.D. (of Ballala III) from the same place. The village has a tall hillock having an
Sky Group

P a g e | 13

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

ordinary cave on in enshrining a Shivalinga called locally as the GaviMuneshwara temple. The annual
Jatra here is held during MakaraSankranti. The village proper has interesting antiquities all over and
particularly within the precincts of the Hanumantha temple. The Hanumantha image in profile is about
one meter tall and the god holds a branch of a tree in one of his hands. Nearby is a Basaveshwara
temple over a small hillock, below which is many hero-stones. There are in all, three inscriptions in
the area around the Anjanaya temple. One lying in a field is illegible but refers to the rule of
HoysalaNarasimha. The second inscription, also found in a field, states that when HoysalaBallal III
was ruling (1318 A.D.), one Maradeva of Sigalanadu made some grants to one Allappanayaka, son
of Madappa of Kanikaranahalli (modern Kanakapura) for the maintenance of a temple at Achalanadu.
The last record also found in a field is damaged, but tries to say that under Ballala III one
Mahapradhana Someyas son Javideva made certain grants to Pattanaswamy Setti, etc.

ARALALU

Situated on the banks of the Arkavathi (3 km from Kanakapura) appears to be an ancient place with
political importance especially in early Vijayanagara times when nearly a dozen hero-stones in the
places are taken into account. In a record from Nayakanahalli dated 1295 AD of HoysalaBallala II the
place is mentioned as Arulahalu under Singalanadu in a later record dated 1312 AD from the same
village. The place was the headquarters of Singalanada Prabhus. One record (Kn 97) also speaks of
Arulahalu Rajya. All the hero-stones are found in fields around the village and of these one in the
field of one Chikkamarigowda has a horse rider wielding a javelin, beautifully wrought in relief. In
same field remains of an ancient Shiva temple have been unearthed with a huge Shivalinga, perhaps
of the Ganga times. The Narayanaswamy temple here is a considerably big and its outer Mantapa
has fine pillars in Vijayanagara style with relief sculptures on them.
NarayanswamyKodugeJameenu is an inscription dated 1393 AD.

In a field called

This states that under King

ShangaAppa of Sigalanadu one ArulahalaMaragudanas son ChikkaAyivanna made certain land


grants to God Narayana (Kn 100). The annual Jatra is held here in Phalguna. The Venkataswamy
temple here is considerably big and old, and a Jatra is also held here. The Basaveswara, Maramma
and the Kollapuramma are the other temples and shrines of the place, and behind the last named are
two hero stones in a field. There is one more hero stone enshrined in a slab Mantapa across the
river, and two more hero stones in a nearby field. There is also a Basavanna shrine there.

In the Harijana colony is a hero stone illustrating a terrible war scene. Of the other two inscriptions
from the place, the one in the Agrahara to the north-east of the village is dated 1400 AD speaking of
the strengthening the sluice of the local Marasamudra Tank by a Minister Channa Vodeyar under
Hariahara II of the Vijayanagar when Malla Rayas son Narayanadeva was ruling at Arulahala. The
Sky Group

P a g e | 14

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

other inscriptions at the same village on a stone in the yard of Muddamma Ganiga dated 1390 AD
states that Siddaya, the Minister of Bukka Rayas Son ChannaVodeyar accepted the rules of
Arulahala in the Sigalanadu and further states that Marappa, son of AralahalaSiddaya, was wounded
in the Hegabe hill. The place also has a Gadduge of Manteswamy.

KABBAL

A border village in the taluk (14 km from Kanakapura) is noted for a vertical steep hill resembling a
Shivalinga. The place is mentioned as Kabbahala in Hoysala record by Ballala III from the same
place. At the foot of the hill is the village with a temple locally called Kabbalamma. It appears to have
been a flourishing marketing centre in that time. The deity here is referred as Kalikadevi in a
Vijayanagara record from the same place. This temple is an ordinary structure in Vijayanagara style
with square pillars without any figures. The Garbhagriha is an ordinary brick and mortar Shikara of
recent times. Besides this is a Basaveswara temple (modern). The Jatra of Kabbalamma is held
during Shivaratri for a span of one week and more than 20000 people assembled. Special poojas are
offered on every Tuesday and Friday when on an average, 500 people visit the temple. Facing the
temple is a long Konda (pit) where fire walking ritual is held during the Jatra Adjacent to this in an
enclosure having two hero stones, also being worshipped by devotees and both have inscriptions.

On the first hero stone is a record dated 1291AD by Ballala-III which states that one Sahuranna, son
of Somagunda ofKabbala died while fighting with robber son his return from HanikyurJatra. The
second hero stone has an inscription which announces several grants made by PratapaDevaraya of
Vijayanagara before goddess Kalikadevi to Veerapanchalas belonging to different crafts. To the north
of the temple is Bhairava shrine which has two masks described as of Kenchanna and Kariyanna. It
has a Prakara and a small Mukhamantapa. Above the tall vertical hill are located an old Bhimeshwara
temple, a granary, Magazine house, a small pond, etc. To climb the hill one can use the regular steps
as well as footpath having severe gradient. In the middle of the hill is a small cavern being converted
into a temple enshrining an image of god Srinivasa, measuring about half meter in height. Above the
rocky ceiling is a Shikara and there are two ponds within the precincts of this temple. The top most
portion of the hill has one more pond. The hill has fortifications all around. It was used as a durgeon
for political prisoners by Mysore rulers and Prince Chamaraja VII was confined to this place by
DalvayiDevarajayya and the Prince died here in 1734. Hyder too had confined many prisoners here
and MurarraoGorpade of Gutti was also confined to this place and was killed in 1779. Tipu changed
the name of the place as Jafferabad. Viewing from this hill in the evening, one can undergo sublime
experience of enjoying the enchanting scenes including green fields, the gold coated horizon, etc. If
necessary, amenities are further provided; this can become a lovely hill station in the district.
Sky Group

P a g e | 15

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

1.5 INTRODUCTION TO LPA


The K-LPA had been declared by the Govt. of Karnataka vide notification no BMRDA/KTA/2006-07,
with effect from 29.4.2006. The LPA is located in the south-eastern part of the BMR between 1223N
7741E and 1251N 7731E and spans over Ramanagara and Bangalore Urban district. It is located
at an average distance of 30km from Bangalore city. The major town in the LPA is Kanakapura which
is a Town Municipal Council.

The NH 209 is the major connector that passes through the LPA linking the LPA to Bangalore city
and Mysore. There is no railway connectivity in the LPA.

The area of the LPA is 412.78 sq. km. It comprises of parts of the Kanakapura Taluk and the
Bangalore South Taluk. It consists of 86 villages and one TMC and has a total population of 1.81
lakhs. The total urban population in the LPA is 54,021 while the rural population in 1.27 lakhs. The list
of the villages and the town are given in the table below.

Table 1.3: List of villages and population in the Kanakapura LPA


HOBLI

Sky Group

Gram Panchayat

VILLAGE NAME

CENSUS
AREA
(Ha)

POPULATION
2011
P a g e | 16

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

Doddamaralawadi

Cheeluru

Cheeluru

1040

3144

Doddamaralawadi

T.Hosahalli

Chikkadevarahalli

106

374

Doddamaralawadi

Cheeluru

Jakkasandra

340

1772

Doddamaralawadi

T.Hosahalli

Keeranagere

340

718

Doddamaralawadi

T.Hosahalli

T.Hosahalli

555

723

Harohalli

Doddamuduwadi

Bandiganahalli

268

517

Harohalli

Cheelur

Bannikuppe

601

1340

Harohalli

Kaggalahalli

BettahalliKaval

247

518

Harohalli

Yalachavadi

Bheemasandra

157

318

10

Harohalli

Dyavasandra

ChulakanakereKava
l

43

153

11

Harohalli

Cheelur

Devarakaggalahalli

244

557

12

Harohalli

Doddamuduwadi

Doddamuduwadi

651

1068

13

Harohalli

Dyavasandra

Dyavasandra

331

575

14

Harohalli

Hunusanahalli

Gabbadi

633

1867

15

Harohalli

Kaggalahalli

Gabbadi Kaval

90

74

16

Harohalli

Harohalli

Harohalli

1675

12988

17

Harohalli

Kaggalahalli

Hosakote

18

Harohalli

Kolliganahalli

Hulugondanahalli

552

1923

19

Harohalli

Kaggalahalli

Kaggalahalli

358

1164

20

Harohalli

T.Hosahalli

Maralagere

204

239

21

Harohalli

Harohalli

Marasandra

258

712

22

Harohalli

Kolliganahalli

Medamaranahalli

315

1519

23

Harohalli

Kaggalahalli

Mudenahalli

380

1143

24

Harohalli

Doddamuduwadi

Singasandra

362

1003

25

Harohalli

Kaggalahalli

Vaderahalli

390

1287

26

Harohalli

Kaggalahalli

Yadamadu

307

871

27

Kasaba

Tungani

Agrahara

138

476

28

Kasaba

Allimaranahalli

Allimaranahalli

402

1939

29

Kasaba

Chikkamuduwadi

Anajawadi

526

2165

30

Kasaba

Shivanahalli

Aralalu

663

1790

31

Kasaba

Tungani

Aralalusandra

582

1318

Sky Group

733

P a g e | 17

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

32

Kasaba

Kallahalli

Aranakuppe

178

832

33

Kasaba

Budiguppe

Baradanahalli

266

882

34

Kasaba

T.Bekuppe

Bekuppe

480

1308

35

Kasaba

Chakanahalli

Cheeranakuppe

173

821

36

Kasaba

Chikkamuduwadi

Chikkamuduwadi

567

3445

37

Kasaba

T.Bekuppe

Chokasandra

209

1205

38

Kasaba

Allimaranahalli

Ganalu

301

1353

39

Kasaba

Shivanahalli

Hanumanahalli

594

1022

40

Kasaba

Kallahalli

Kallahalli

200

1891

41

Kasaba

Kabbalu

Kanakapura (Rural)

1075

631

42

Kasaba

Tungani

Ramapura

534

1073

43

Kasaba

Tungani

Rayasandra

1178

1727

44

Kasaba

Shivanahalli

Seegekote

479

1551

45

Kasaba

Shivanahalli

Shivanahalli

1250

1799

46

Kasaba

Kallahalli

Thammasandra

674

989

47

Kasaba

Kallahalli

Tigalarahalli

73

680

48

Kasaba

T.Bekuppe

Tigalarahosahalli

482

1255

49

Kasaba

Tungani

Tungani

404

1717

50

Kasaba

Allimaranahalli

Vadedoddi

410

1265

51

Kasaba

Chakanahalli

Virupasandra

361

1812

52

Sathanur

Achalu

Achalu

1601

2498

53

Sathanur

Kabbalu

Alur

215

531

54

Sathanur

Arekattedoddi

Anamanahalli

519

599

55

Sathanur

Achalu

Bommanahalli

189

1084

56

Sathanur

Arekattedoddi

Dalimba

233

1056

57

Sathanur

Sathanur

Deshohalli

243

58

Sathanur

Honniganahalli

Halasinamaradahalli

88

361

59

Sathanur

Honniganahalli

Honniganahalli

212

959

60

Sathanur

Arekattedoddi

Hosahalli

353

115

61

Sathanur

Kabbalu

Kabbal

550

1160

62

Sathanur

Arekattedoddi

Kachavanahalli

312

1678

Sky Group

P a g e | 18

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

63

Sathanur

Kadahalli

Kadahalli

420

1099

64

Sathanur

Kabbalu

Kambasagara

326

805

65

Sathanur

Honniganahalli

Kemmale

362

1117

66

Sathanur

Arekattedoddi

Mudalaswamikuppe

124

18

67

Sathanur

Arekattedoddi

Naripura

108

68

Sathanur

Honniganahalli

Sasalapura

841

1595

69

Sathanur

Sathanur

Sathanur

587

4968

70

Sathanur

Kabbalu

Tailuru Forest

3478

427

71

Sathanur

Achalu

Thotahalli

292

1325

72

Sathanur

Yadugowdanahalli

84

73

Uttarahalli

Taralu

Alakabelalu

70

62

74

Uttarahalli

Taralu

Gulakamale

485

2288

75

Uttarahalli

Somanahalli

K. Chudahalli

389

1371

76

Uttarahalli

Kaggalipura

Kaggalipura

939

12070

77

Uttarahalli

Somanahalli

Naganayakanahalli

168

776

78

Uttarahalli

Somanahalli

Nelaguli

375

1189

79

Uttarahalli

Somanahalli

Nettigere

472

1846

80

Uttarahalli

Somanahalli

Ravugodlu

389

1370

81

Uttarahalli

Somanahalli

Somanahalli

540

4657

82

Uttarahalli

Somanahalli

Sunkadakatte

254

433

83

Uttarahalli

Taralu

Tharalu

601

1502

84

Uttarahalli

Taralu

Thattaguppe

383

2528

85

Uttarahalli

Kaggalipura

Uttari

496

1454

86

Uttarahalli

Somanahalli

Vaddarapalya

613

1729

The LPA also consists of a class III census town, Kanakapura, with an area of 3.71 sq. km and a
population of 54,021.

Table 1.4: TMC data in the LPA

Sky Group

P a g e | 19

Kanakapura LPA Master Plan 2031

Chapter 1 | Introduction

SL

TMC

AREA (Ha)

POPULATION3

Kanakapura

371

54,021

OVERLAPPING VILLAGES WITH BMICA(Bangalore-Mysore Infrastructure Corridor Area)

The KPA has been declared as per the government order Number

Na Aa E: 496: MIB: 1998 dated 12-07-1999 &


Na Aa E: 62: BemRupra: 2006,

87 villages has been declared as per section 4a of KTCP act 1961, were in the villages Uttari,
Naganayakanahalli & K.Choodalli of Bangalore South Taluk have also been notified by the
government for BMICAPA. These three villages are overlapping in both the planning authorities & in
this regard correspondence with BMICAPA has been made requesting their opinion to delete these
villages from BMICAPA as for these three villages, the IMP has been prepared & as per that the KPA
has issued many planning permissions but BMICAPA has opined that they will retain three villages as
their notification was made quite earlier to KPA. With all these details KPA submitted a proposal to
BMRDA & In turn BMRDA already requested the government to take immediate decision in respect of
these three villages. However KPA is preparing the master plan as per the earlier notification & delete
the said villages after the government approval & the same will be rectified during the final approval
of the master plan.

1.6 SCOPE AND LIMITATION


The Master Plan provides scope to redefine circulation pattern and landuse of the LPA in accordance
with the present trend of development. Existing problems of the study area has been addressed and
best possible solution has been provided for them.

The Limitations of the Master Plan process is the lack of primary household data and primary traffic
survey data.

Census 2011

Sky Group

P a g e | 20

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

CHAPTER 2

DEMOGRAPHIC PROFILE AND ECONOMIC BASE


2.1 DEMOGRAPHIC CHARACTER
Demography is the study of human population with respect to size, composition, spatial distribution,
and changes in the populationthat occur over time. Future growth scenarios, infrastructure
requirements and utilisation of human resource for different sectors depend on the population of an
area. Hence study of population size, composition and distribution is important to Planning.

Size of the population gives an overall dimension of the physical environment and supplies a basic
yardstick for the estimation of space requirements for various categories of land use.

Studies of population composition extend this analysis to qualitative considerations like age groups,
household sizes, income levels, and needs of each segment of the life cycle. They can be used to
assist in determining the space required for facilities for all segments of the population.

Analysis of population distribution provides clues as to how these various land uses and facilities
should be located in the urban area.

The population of Kanakapura LPA, as per census 2011 and other thematic data from census 2001
has been studied and analysed to arrive at future growth scenarios and determination of
infrastructural requirements.

KARNATAKA and BMR: FACTS and FIGURES


Karnataka States population according to 2011 Census is 6.11 crores (Table 1). It is observed that
(a) the percentage growth in population has reduced from 17.25% in 1991-2001 to 15.67% in 20012011. (b) the urban percentage growth in population has increased from 29 per cent in 1991-2001 to
31.27% in 2001-2011, and (c) the urban population in Bangalore Urban District has increased from
88 per cent in 2001 to 90.94% in 2011.

Sky Group

P a g e | 21

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

The BMRDA area includes Bangalore Urban and Rural Districts. As per census 2011, the population
is around 105, 76,167 (105 lakhs). The percentage rural population in the area has reduced from 27
per cent in 2001 to 15.02% in 2011 and the percentage urban population has increased from 73% in
2001 to 84.98% in 2011. Hence, the area has gone through a great deal of urbanization.
Population of the BMRDA area represented 16% of Karnatakas population in 2001 and represents
17.3% of Karnatakas population in 2011. The rural population of BMR has decreased from 7% of
total rural population of Karnataka in 2001 to 4.2% of total rural population of Karnataka in 2011.
Whereas, urban population which was 34 per cent of Karnatakas total urban population in 2001 is
now 8.11%. The growth of the rural and urban population in 2011 is 7.63% and 31.27% respectively.

The urban and rural population figures of Karnataka, Bangalore Urban District, Bangalore Rural
District and BMRDA area are presented in the table below.

Table 2.1: Population Statistics in Karnataka


YEARS
AREA ( sq.
km)

1971

1981

1991

2001

2011

29,299,014

37,135,714

44,977,201

52,850,562

61,130,704

22,176,921

26,406,108

31,069,413

34,889,033

37,552,529

7,122,093

10,729,606

13,907,788

17,961,529

23,578,175

3,365,515

4,947,610

4,839,162

6,537,124

9,588,910

1,499,761

1,754,394

669,409

777,137

868,971

1,865,754

3,193,216

4,169,253

5,759,987

8,719,939

1,673,194

1,877,416

987,257

1,369,908

1,470,542

719,564

303,286

406,874

267,693

Karnataka

Karnataka
Rural

1,91,791

Urban
Bangalore Urban District

Total
Rural

2,190

Urban
Bangalore Rural District

Total
Rural
Urban

2,260

Ramanagara District

Sky Group

P a g e | 22

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Total

1,082,739

Rural

3,555

815,368

Urban

267,353

BMR
Total
Rural

8,005

Urban

3,365,515

4,947,610

6,512,356

8,414,540

10,576,167

1,499,761

1,754,394

2,039,317

2,247,679

1,588,535

1,865,754

3,193,216

4,472,539

6,166,861

8,987,632

Source: Census 2011


KANAKAPURA LPA: GROWTH TREND

POPULATION DISTRIBUTION IN KANAKAPURA TOWN

Kanakapura Town or TMC is the only urban settlement in the Kanakapura LPA. It has an area of 7.31
sq. km1. The table below shows population in Kanakapura TMC from 1961 to 2011. The present
population of the TMC is 54,021.
Population in Kanakapura Town
60000

POpulation

50000
40000
30000
20000
10000
0
Kanakapura

1961
15000

1971
20000

1981
29000

1991
38000

2001
47000

2011
54021

Figure 2.1: Population in Kanakapura Town;


Source: Census 2011

Present municipal limits

Sky Group

P a g e | 23

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

It can be noted that the population growth in the town is less which can be attributed to lack of
economic activity and growth generators in the LPA.

POPULATION DISTRIBUTION IN KANAKAPURA LPA

The Kanakapura LPA is composed of 86 villages and 1 town. The present population of the LPA
villages (census 2011) is 126,916. Total population of the LPA, including Kanakapura TMC is
180,931. Figure 2 below shows the population growth in the LPA from1961 to 2011.

Population in Kanakapura LPA


200000
180000
160000

Population

140000
120000
100000
80000
60000
40000
20000
0
Kanakapura LPA

1961
83194

1971
95887

1981
125993

1991
151998

2001
170278

2011
180937

Figure2.2: Population in Kanakapura LPA


Source: Census 2011
It can be seen that the increase in population in the LPA over the years have been extremely less.
The figure below shows the growth rate from 1971 to 2011.

Sky Group

P a g e | 24

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Population Growth Rate in Kanakapura LPA


35%
31%

30%
25%

21%

20%

growth rate

15%
12%

10%

6%

5%
0%
1971

1981

1991

2001

2011

Figure2.3: Population growth rate in Kanakapura LPA ; Source: Census


It can be seen that there is a negative growth rate in the LPA. The trend suggests out-migration which
can be attributed to the lack of economic activities in the area.
The table below shows a comparison between the population growth in the BMR, the Bangalore
urban, Bangalore Rural+ Ramanagara and the Kanakapura LPA.

POPULATION GROWTH IN BMR, BANGALORE URBAN, BANAGLORE URBAN


DISTRICT, BANAGLORE URBAN & RAMANAGARA
10,576,167
10000000
9,588,910

8000000

Kanakapura LPA
6000000

BMR

4000000
2,069,996
2000000
180937
0
1971

1981

1991

2001

Bangalore rural +
Ramanagara
bangalore urban
district

2011

Figure2.4: Comparison of population growth,


Source: Census
It can be seen that the growth of population in the Kanakapura LPA has not been significant as
compared to the other areas of the BMR. The decadal growth rate of Kanakapura LPA is 6.25%. The
slow growth rate may be attributed to the slow pace of industrial development in the LPA. The LPA is
Sky Group

P a g e | 25

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

rich in agricultural produce but the agro-industry has not been supported. Migration has been a major
trend in many villages in the LPA

POPULATION DENSITY IN THE LPA

The total area of the Kanakapura LPA is 412 sq. km (approx.). The figure below shows the population
density in the Kanakapura LPA.
Population density in Kanakapura LPA
160.00
140.00

Gross density

120.00
100.00
80.00
60.00
40.00
20.00
0.00
Series1

Doddamaralawadi

Harohalli

Kasaba

Sathanur

Uttarahalli

kanakapura TMC

3.04

2.82

3.79

2.63

4.46

145.61

Figure 2.5: Population density 2 in Kanakapura LPA; Source: Census


It can be seen that Kanakapura TMC has a high density of 145 persons/ Ha 3 while the population
density in rest of the LPA, expressed in Hoblis is extremely low, ranging in the order of 3 to 5 persons
per hectare. The population density of the Ramanagara district is 30 persons per Hectare. The low
density is attributed to the clustered growth in the outer BMR.

The Structure Plan 2031 advocates clustered growth around exiting growth nodes; hence the future
scenario for the LPA would also follow the present trend of concentrated growth. However, new
growth centres would be promoted in the LPA around Harohalli and Sathanur to create a spur of
economic activities.

Analysis is done Hobli wise, taking average value of individual village, municipal boundary has been considered for Kanakapura TMC
Census of India and Analysis

Sky Group

P a g e | 26

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

URBAN AND RURAL POPULATION IN THE LPA

The urban and rural population distribution can be seen in the figure below. The urban population is
contributed by the Kanakapura TMC while the population in the villages constitute the rural
population. It can be seen that 30% of the population lives the urban areas while rural population
constitute 70% of the total population in the LPA.

Urban-Rural population distribution in the LPA


URBAN

RURAL

30%

70%

Figure2.6: Urban rural population distribution in the LPA


SOURCE: census 2011
The share of population in the LPA having access to urban facilities should be increased, especially
around the future growth nodes Harohalli and Sathanur.

SEX RATIO

Sex ratio is defined as number of females per 1000 males. The sex ratio of the Kanakapura LPA has
been shown in context of the larger framework. It can be seen that the sex ratio in Karnataka is 968 4
females per 1000 males, while that of the BMR is 935. Sex ratio is alarmingly low in the Kanakapura
Town where it is 923 females per 1000 males. The table below shows a comparative list of sex ratios
according to census 2011. Ramanagara ranks 18th among the 30 districts of Karnataka in terms of
sex ratio.

Census 2011

Sky Group

P a g e | 27

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Table 2.2: Comparative table: sex ratio


AREA

Karnataka

SEX RATIO

968

Ramanagara

Kanakapura
5

Kanakapura

District

Taluk

TMC6

976

941

923

SOURCE: census 2011, 2001


The reasons behind low sex ratio in the urban areas may be the influx of male workers from the
surrounding areas in search of job. However, the ratio is also skewed in the overall Kanakapura
Taluk, indicating poor development.

CHILD POPULATION(0-6 years)

The proportion of child population in an area determines the educational infrastructure demand.
According to census 2011 data the 9.38% of the total population of the Ramanagara district belongs
to age group 0-6 years. The table below shows a comparative table of the child population proportion
in Bangalore, Bangalore rural and Ramanagara.

Table 2.3: Comparative list population under of 0-6 years,


AREA
Percentage

Bangalore

Bangalore Rural

9,88,482 (10.31%)

1,02,019 (10.33%)

Ramanagara

Kanakapura

district

Taluk

1,01,565 (9.38%)

31,868 (9.1%)

of

population in age
group 0-6 years

SOURCE: census 2011


It can be seen that the proportion of population in the 0-6 year category is almost similar in all the
three areas, though actual population count is much higher in Bangalore district. Hence the education
sector needs to be promoted in the LPA.

LITERACY RATE
According to census data 2011, the literacy rate in Ramanagara district is 69.2% which is 9% higher
than that of 2001. Literacy rate among men is 76.92% compared to 69.88% in 2001 an that among
5

Census of India 2001


Census of India 2001

Sky Group

P a g e | 28

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

women is 61.33% compared to 51.22% in 2001. The average literacy rate of Kanakapura Taluk is
65.1, while that in urban areas in 80.5% and in rural areas is 62.5%. Though there has been
considerable increase in the literacy rate in the region, it is abysmally poor compared to the rest of
BMR. The literacy rate of Bangalore is 88.48% the figures below show the comparative data for the
literacy rates in the district.
90

LITERACY RATE

80.5
80

73.9
66.7

70

65.1

62.5

60

56

53.1

50

43.1

46.3

40
30
20
10
0
KANAKAPURA URBAN
AVERAGE LITERACY RATE

KANAKAPURA RURAL
MALE LITERACY RATE

TOTAL
FEMALE LITERACY RATE

Figure2.7: Literacy rate in Kanakapura Taluk


Source: Census 2001

HUMAN DEVELOPMENT INDEX

The human development index data, according to Karnataka Human Development Report 2005
shows that Bangalore Rural district has a human development index of 0.653 7 . The table below
shows the composition of HD8I in Bangalore Urban and Bangalore Rural district.
7
8

Karnataka Human Development Report 2005


The HDI for districts is computed on the basis of the methodology used in UNDP Human Development Report 1999. Due to the non-

availability of data on adult literacy rates for 2001, literacy rates for 7 years plus, the combined gross enrolment ratios of primary and
secondary level education (class I-XII) have been substituted. Hence, there is element of double counting in the age group 6-18 years for
educational status. It may be noted that due to changes in methodology, i.e. adopting the logarithm method in computation, there has been
a sudden increase in the values of the income index. Another important factor is that changing the base year from 1980-81 to 1993-94 for
estimation of GDP at constant prices for India and the states (introduced by the CSO) has contributed to higher values of income indices for
1991-92 and 2001-02. In Karnataka, the estimates of life expectancy at birth for districts and the state have been made on the basis of the
regression method involving the crude birth rate, the crude death rate, the rate of natural increase in population and the infant mortality rate

Sky Group

P a g e | 29

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Table 4: HDI composition


Area

Health

Education

Income

HDI

Bangalore Rural

0.692

0.662

0.605

0.653

Bangalore Urban

0.705

0.887

0.666

0.753

SOURCE: Human Development Report, Karnataka 2005

It is noted that the HDI of the Bangalore Rural district is poor compared to Bangalore Urban district. It
is however higher than the national HDI of 0.621. Care should be taken at policy and proposal level to
augment the HDI status of the area and bring it at par with that of the Bangalore Urban District.

for 2001. In order to enable for the districts and the state are higher than the HDI values in KHDR I. The GDI values have also been revised
for 27 districts for 1991, so as to facilitate a comparison of GDI estimates for 1991 with those of 2001.

Sky Group

P a g e | 30

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

2.2 ECONOMIC BASE: INTRODUCTION


Kanakapura Taluk has been classified as Most backward Taluk in the BMR 9. The population of
Kanakapura LPA has grown from 1.7 lakhs in 2001 to 1.8 lakhs in 2011. The net growth in population
over the last decade is ten thousand, the decadal growth rate being 6.25% and the annual growth
rate being 0.58%. The annual growth rate of Bangalore urban district however is 5.1% 10. Needless to
say, the growth of the LPA has been slow. It is evident that the intensity and scale of economic
activities in the LPA are in tandem with this pace of growth.

Under the framework of the draft RSP 2031, a scenario of 75-25 population sharing between the core
and the outside is being aimed for. Since this includes inducing a considerable amount of population
from the core to the outside, there is a need to provide an economic impetus to the LPA.

Bangalore has been experiencing rapid development because of accelerated industries and
economic activities. This has resulted in growth of congestion of Bangalore, because of which there is
tremendous pressure on infrastructure. Land is becoming scarce and hence costly day by day.

Investors are opting to move outwards from Bangalore to the nearest town. Investors prefer
Kanakapura Taluk as their investment destination.

Since Harohalli is nearer to Bangalore and

already has a developed industrial base, more and more projects are proposed in this location. Thus
Kanakapura Taluk is expected to register faster economic growth.

These initiatives taken viz, development of infrastructure & housing facilities in mega scale have
enthused major investors to opt Kanakapura taluk for their investments.

WORKFORCE PARTICIPATION
The BMR RSP 2031 states the work participation rate of the BMR as a little over 41%. The workforce
participation rate of the Kanakapura town is however 17.5%11. The industrial work participation rate of
the BMR is considered to be 21%12.WPR13 of Kanakapura Taluk is 49%.

NewIndustrial Policy 2006-2011 report, Karnataka Industrial Policy 2009-2014


According to Census 2011 data
11
BMR Revised Structure Plan 2031
12
Interim master Plan 2011, Kanakapura LPA
13
Work Participation rate
10

Sky Group

P a g e | 31

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

WORKFORCE DISTRIBUTION
Workforce Distribution in Kanakapura Taluk

The total no of workers in a


society is comprised of the main
workers

MAIN
38%

and

the

marginal

workers. Main workers are those

NONWORKERS
51%

who have more than 100 days of


work in a year and marginal

MARGINAL
11%

workers are those who work less


than 100 days in a year. Non-

Figure 2.8: Workforce distribution in the


Kanakapura LPA, Source: census 2001

workers are those who fall in the


working age group, mainly the

unemployed and the housewives. In 2001 the percentage of main workers in the Kanakapura Taluk
was 38.1%, while the percentage of marginal workers was 11.1%. Non-workers constituted 50.9% of
the total population. The figure shows the workforce distribution in the Kanakapura Taluk.

Performance of the government employment programmes such as the PMRY, MGNREGA etc should
be analysed in the LPA to uncover the cause of unemployment in the LPA. Economic activities
should be introduced to combat unemployment and reduce out-migration.

DISTRIBUTION OF MALE AND FEMALE WORKERS


The figure below shows the gender wise distribution of the total workforce in the Kanakapura Taluk. It
can be observed that 62% of the total workforce is composed of males while the female share is
much lower comprising of just 38%
The gender wide distribution of the workers in
Gender wise distribution of workforce in
Kanakapura Taluk

each worker category can also be analysed. It


can be seen that the males constitute almost two

FEMALE
38%

third of the main workers, while in the marginal


category
MALE
62%

females

workers

constitute

the

majority. In the non-worker category, we can see


that there are much more unemployed males in
the Taluk than females. The figure below shows
the gender wise distribution of workers in each
category.

Figure 2.9: Gender wise distribution of workers; Source: census 2001


Sky Group

P a g e | 32

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Gender wise distribution of Workforce in Kanakapura Taluk


120000

PERSONS

100000
80000
60000
40000
20000
0
MALE

MAIN
90598

MARGINAL
12,709

NON-WORKERS
70,413

FEMALE

37,741

24,660

101,087

Figure 2.10: Gender wise distribution of workers in each category,


Source: census 2001
As seen in the chart above, the proportion of male main workers is almost double that of the female
main workers. Women are more marginally employed or unemployed than their male counterparts.

Measures should hence be taken at policy and proposal level to augment the share of female
workforce in the economy.

DISTRIBUTION OF WORKFORCE IN URBAN AREAS: KANAKAPURA TMC


The Kanakapura TMC constitutes the urban area in the LPA. The figure below shows the workforce
distribution in the TMC. It can be seen that 35% of the total workers are main workers, 2% are
marginal workers and 63% are nonWorkforce Distribution in Kanakapura TMC

workers.
The Kanakapura town has negligible
industries at present. The livelihood of the

MAIN
35%

people is majorly sustained by the local

NONWORKERS
63%

economy and the service sector. It can be


seen that non-worker category in the
urban area is higher than the average LPA
MARGINAL
2%

value.Increase in economic activity in the


LPA is necessary to decrease the share of
non-workers.

Figure 2.11: Distribution of workforce in Kanakapura TMC; Source:


census 2001

Sky Group

P a g e | 33

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

GENDER WISE DISTRIBUTION OF WORKFORCE IN URBAN AREAS: KANAKAPURA TMC

It can be seen that 24% of the total


GENDER WISE DISTRIBUTION OF WORKFORCE IN
KANAKAPURA TMC

workers are women while 76% are men.


The participation of women, as evident

FEMALE
24%

from the figure below is extremely low.

Measures should be taken to increase


MALE
76%

the work participation rate of women in


the LPA by introducing women friendly
employment schemes and improving
child care facilities and connectivity to
work centres.

Figure 2.12: Gender wise distribution of workforce in Kanakapura TMC


Source: Census 2001
GENDER WISE DISTRIBUTION OF WORKFORCE IN KANAKAPURA TMC

20,000

PERSONS

16,000
12,000
8,000
4,000
0
MALE
FEMALE

MAIN
12,727
3,935

MARGINAL
579
372

NON-WORKERS
11,311
18,136

Figure 2.13: Gender wise distribution of workforce in each category


Source: Census 2001
The gender wise distribution of workers in each category shows that, male workers constitute the
majority among Main workers. In the marginal worker category, the population of men is slightly
higher than that of women. There is a huge population in the non-worker category; clearly depicting
that unemployment rate is high among both men and women.

Sky Group

P a g e | 34

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

WORKFORCE DISTRIBUTION IN RURAL AREAS


It is interesting to note that total workers constitute 48% of the total population, higher than that of the
urban areas (37% in Kanakapura TMC).
WORKFORCE DISTRIBUTION IN RURAL AREAS OF
KANAKAPURA LPA

38% of the population is main workers


while 10% are marginal workers. The
figure

MAIN
38%

below

shows

the

workforce

distribution in the rural areas of the

NONWORKERS
52%

Kanakapura LPA.
MARGINAL
10%

Figure 2.14: Workforce distribution in rural


areas of Kanakapura LPA; Source: census
2001

Sustenance
activities

through
attributes

agricultural
to

higher

employment rate in the rural areas.

Nevertheless, the share of non-workers is high. The LPA falls under SEZ for agricultural facilities and
has high potential for sericulture. The opportunities should be explored in order to develop the rural
areas.

WORKFORCE DISTRIBUTION BY ECONOMIC ACTIVITY: KANAKAPURA TALUK

Worker distribution in Economic Activities

The worker distribution in


Kanakapura

Taluk

shows

that 53% of the total workers


HOUSEHOLD
INDUSTRY
WORKERS
2%

OTHER
WORKERS
22%

CULTIVATORS
53%

are cultivators while 23% are


agricultural labourers. 2% of
the

total

workers

household
AGRICULTURAL
LABOURERS
23%

are

industry

in

while

22% are other sectors. It can


be seen that

Figure 2.15: Workforce distribution in Economic Activities in Kanakapura


Taluk; Source: census 2001

Sky Group

P a g e | 35

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

GENDER WISE WORKER DISTRIBUTION IN ECONOMIC ACTIVITIES


60,000

PERSONS

50,000
40,000
30,000
20,000
10,000
0
MALE

52,461

AGRICULTURAL
LABOURERS
14,953

FEMALE

25,953

19,673

CULTIVATORS

HOUSEHOLD
INDUSTRY WORKERS
1,619
1,504

OTHER WORKERS
20,968
10,964

Figure 2.16: Gender wise Workforce distribution Kanakapura Taluk,


Source: census 2001
Gender wise distribution of workers shows that men constitute the majority of the cultivators and
other workers while women appear more as agricultural labourers. In the household industry, their
composition is more or less equal.

WORKFORCE DISTRIBUTION BY ECONOMIC ACTIVITY: KANAKAPURA TMC

W O R K E R D I S T R I B U T I O N I N E C O N O M I C AC T I V I T I E S :
K AN A K A P U R A T M C
CULTIVATORS
3%

AGRICULTURAL
LABOURERS
2%

It can be seen from the figure that


3%

of

the

total

workers

are

cultivators, 2% are agricultural


HOUSEHOLD
INDUSTRY
WORKERS
9%

labourers,

9%

are

household

industry workers and 86% workers


fall in the other workers category.

OTHER
WORKERS
86%

It is evident that majority of the


workforce

are

engaged

in

secondary sector in the urban


areas of the LPA.

Figure 2.17: Worker


distribution in Economic
Activities: Kanakapura TMC
Source: Census 2001

Sky Group

P a g e | 36

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

OCCUPATIONAL STRUCTURE
PRIMARY SECTOR
AGRICULTURAL LAND HOLDINGS

The total area in the Kanakapura

L AND U T I L IS AT ION I N KA N A KA P U RA T A L U K
Forest area
28%

Net area
sown
40%

Taluk is 159426 Ha out of which


45263 Ha lies under forests. Total
area not available for cultivation is
22000 Ha. Other uncultivable lands
amount to 13144 Ha. Fallow land in

Other
uncultivable
land
8%

Fallow land
10%

Land not
available for
cultivation
14%

the Taluk is 15272 Ha and net sown


area is 63744 Ha 14 . The figure
shows the land utilisation pattern in
Kanakapura Taluk.

Figure 2.18: Land utilization in Kanakapura Taluk. Source: Agricultural


census 2005

AGRICULTURAL LAND HOLDINGS IN KANAKAPURA TALUK

Number of holdings

Area (Ha)

44330

20448

19805

18930

14218
7150

4398
314

Marginal farmer land


holdings

Small Agricultural land


holdings ( 1-2 Ha )

Medium agricultural land


holder ( 2-4 Ha)

large agricultural land


holder (10 Ha and above)

Figure 2.19: Agricultural Land holdings in Kanakapura Taluk.


Source: Agricultural census 2005

14

Agricultural Census 2005

Sky Group

P a g e | 37

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

The figure above shows the agricultural land holdings in Kanakapura Taluk. 43133 Ha is the total
land under agricultural land holdings. 10.2% of the land is under large holdings, 43.88% under
medium land holdings and rest under marginal farmer held lands. It is noted that the largest
proportion of agricultural land falls under small holdings. While 14 Ha is the average size of large land
holdings, 2.64 Ha is the average medium holding size and 1.4 is the average plot size for small
landholders.

PRINCIPAL CROPS

Kanakapura LPA falls in the eastern dry agricultural zone. It consists of red loamy soil in major areas
and clay lateritic soil in other areas. Ragi, Avare, Ground nut and Niger are important Kharif crops in
the area. Major Rabi crops are paddy, horse gram, maize and castor. The table below shows the
important crop types in each category.
Table2.5: Principal crops in Kanakapura Taluk.

CATEGORY

PRINCIPAL CROPS

Principal cereal crops

paddy, jowar, bajra, maize, ragi, wheat

Principal pulses

tur, horse gram, black gram, green gram, avare, cow pea

Principal oil seeds

ground nut, sun flower, castor, sesame, niger seeds etc


cotton, sugar cane, tobacco, castor seeds, linseed, soya bean, sun

Principal commercial crops

flower

Principal vegetable crops

tomato, brinjal, beans, cluster beans, onion

Principal horticulture crops

coconut, areca nut, .mango, banana, guava etc

Source: Agricultural census 2005

Table2.6: Production of major crops in Kanakapura Taluk


SL

CROP

PRODUCTION (MT)

Coconut

631.5

Arecanut

130

Banana

Mango

2.1

Sapota

2.05

The State and Central Government have signed a MoU


for establishment of Agri Export Zones (AEZ)
covering gherkins, rose-onion and flowers. Bangalore

Sky Group

Rural District including the Taluk is covered under AEZ


for gherkins and flowers. The climate of the Taluk suits
the cultivation of these commodities.

P a g e | 38

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Source: Agricultural census 2005

Pisciculture is also practiced in small scale in the Taluk. There are about 145 tanks in the Taluk
belonging to Panchayat and minor irrigation. There are almost 430 families that depend on
pisciculture for their livelihood. The no of beneficiaries in the Taluk under The Mahasasraya
Schemeare 17015. There are no fish markets in the Taluk.

SERICULTURE

Sericulture forms an important activity in the Kanakapura LPA as well as in the BMR. Government
has set up 10 silk exchanges in the region to facilitate trading of silk. One of the silk exchanges is
located in Kanakapura Town.
Table 2.7: Sericulture statistics of Kanakapura Taluk .
Sericulture in Kanakapura Taluk

Statistics

Area under mulberry production ( Ha )

5945.25

Cocoon Production ( in tonnes)

6591.21

No of villages engaged on mulberry

614

No of farmers engaged in occupation

13527

Value of silk produced ( in lakhs)

15315.792

No of cocoon markets in the LPA

Source: Ramanagara District book


Table 2.8: sericulture programs in Kanakapura Taluk.
Area

No of farmers under Catalytic


Development Program

Kanakapura

1278

No
under

of

farmers
Vandana

Yojna

Beneficiaries

under

Special component and


tribal sub plan.

69

66

Source: Ramanagara District book

The National Research and Development Corporation (NRDC) through CSB and in turn NSSO, in
Bangalore and CSR&TI, in Mysore had drawn schemes to identify and support financially and
technologically the sericulturists of Kanakapura area. The components are as follows:

15

Ramanagara District Book 2011-2012

Sky Group

P a g e | 39

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Establishment of Chawki Rearing Centre (CRC)


Establishment of Farmers Field School (FFS) and 'on farm' training.
To sustain the sericulture industry NRDC proposed the said scheme and implemented it in the
Kanakapura Taluk.

The Chawki Rearing Centre has shown improvement in yield and also adoption of better methods of
sericulture farming in and around 20 villages of Kanakapura Taluk. The training program to the
farmers drawn from the villages is continuing batch wise at CSR&TI, Mysore. The table below shows
the infrastructure facilities available in the Taluk for sericulture.
Table 2.9: Mulberry and Sericulture Infrastructure in Kanakapura Taluk

Description

Kanakapura Taluk

Chawki Rearing Centres

21

Seeds Storage centres

48

Mulberry cultivated area (Ha)

4551

Cocoon Production (MT)

3896

No. Farmers engaged in this activity

12291

Value of silk produced ( Lakhs)

39

Source: District at a G lance, Bangalore rural, 2004 -05

Kanakapura Taluk is classified in Zone 2 i.e. potential taluks for textile development, under the
Karnataka Suvarna Vastra Neethi- 2008-2013 (Textile policy), which entitles it to receive normal
incentives for textile development. Hence, sericulture can be developed as a foremost sector using
the incentives of this scheme.
At present however there exists a cocoon market and an area earmarked for Silk industries in the
Kanakapura TMC. Industrial activity is however extremely meagre.

Sky Group

P a g e | 40

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Plate: Cocoon market in Kanakapura town.


Food Park has been proposed at Harohalli by the department of Horticulture/ Food Karnataka Ltd.
QUARRYING

Kanakapura is known for its granite quarrying potential and its products are known for their export
potential.

SECONDARY SECTOR

Existing Industrial Activities in the LPA is concentrated mainly in the Harohalli region. The KIADB
Industrial Estate stage 1 and 2 host a number of small scale and medium scale industries.

TINY AND SSI SECTOR

According to the Industrial Perspective Plan of Kanakapura Taluk, the Taluk has potential for
investment of around Rs. 176 crores in 794 units in tiny & SSI sector including services. These units
are expected to generate employment opportunities for about 9000 persons. The investment
opportunities have been identified mainly in the following relatively more potential sectors:

Precision Engineering & Machine Tools


Tourism
Printing & Stationery
Textiles
Plastic & Rubber
Agro & Food Based Industries

Sky Group

P a g e | 41

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Apart from these relatively more potential sectors, there are other segments, which also have
potential which include electrical, information technology, construction materials, services,
metallurgical, chemicals & pharmaceuticals and other industries have also been identified and
presented.
DISTRIBUTION OF UNITS & WORKERS IN SMALL SCALE INDUSTRIES

310
200
1
0

104

87
15
1

17

165

11

1
1

19
4

95

16
32

30
11

NO OF UNITS

NO OF WORKERS

Figure 2.20: Distribution of small scale industries in Kanakapura LPA


Source: Ramanagara District Book, 2010 -2011

It is evident from records that most of the tiny and SSI units in Kanakapura Taluk have been
registered in the District Industries Centre. However, there are few un-registered units in the Taluk. It
is estimated that, un-registered units are in the range of 350 to 450 units and are mainly tailoring,
carpentry, pottery, bamboo, masonry, jelly crushing units. An estimated investment from these units
is in the range of Rs. 350 lakhs to Rs. 400 lakhs. The employment generated from these units is in
the range of 1000 to 1100 nos.
Details of proposals in the Tiny and SSI Sector are given in Annexure 5.

Artisans

There are about 5910 artisans working on different artisans based crafts in the Taluk. The major
artisans are tailors, carpenters, Handloom weavers, masons, etc. The details are furnished in the
Table.

Table2.10: Artisan Base in the LPA


Sl.
No.
1.

Sky Group

Category

No. of Artisans

Tailors

2000

P a g e | 42

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

2.

Carpenters

1000

3.

Handloom weavers

1000

4.

Masons

350

5.

Blacksmiths

200

6.

Leather workers

200

7.

Bamboo workers

200

8.

Dhobi

200

9.

Stone crushers

200

10. Others

200

11. Gold smiths

100

12. Potters

100

13. Electricians

60

14. Mat weavers

50

15. TV Repairers

50

Total

5910

Source: DIC, Bangalore (R) Dist.

MEDIUM & LARGE SCALE

The Taluk has potential for investment of the order of Rs.1250 crores in 168 units in Large & Medium
Scale. These units are expected to generate employment opportunities for about 50,000 persons.
The investment opportunities have been identified mainly in the following relatively more potential
sectors:

Information Technology
Textiles
Precision Engineering & Machine Tools
Infrastructure
Plastic & Rubber
Tourism
Construction Materials
There exist 4 medium scale industries in the Kanakapura LPA 16 at present. Details of proposals for
Medium and Small Scale Industries is given in Annexure 5.

16

Ramanagara District Book, 2010-2011

Sky Group

P a g e | 43

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

COMMERCE AND RETAIL


Trade and commerce is mainly concentrated along the major roads of the town. Dense commercial
establishments exist along the NH 209 near the KSRTC bus stand and also along the State Highway
in parts. Commercial activities mainly consist of retail activities and few whole sale activities. There
exists an Agricultural Produce market along the NH 209 which is a daily market used for exchange of
farm produce.

A commercial centre is absent in Kanakapura town.Since Kanakapura is the only town with urban
facilities in the LPA; a regional commercial centre should be located which can amalgamate functions
of a retail as well as a wholesale market.
Table 2.11: Commercial activities in Kanakapura Town
SL

MARKET NAME

LOCATION

CHARACTERISTICS

City Market

NH 209

Daily Market, mixed goods

Minor commercial establishments

SH 3 in parts

Daily Market, mixed goods

Agricultural Produce Market

NH 209

Farm produce

Source: Primary Survey

Plate: Commercial Activities in Kanakapura Town

Sky Group

P a g e | 44

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

EMPLOYMENT PROGRAMMES
Prime Minister Rozgar Yojana (PMRY)

The District Industries Center (DIC) is conducting self-employment programmes in the Taluk mainly
to provide self-employment opportunities to unemployed educated persons. In the recent times,
Under PMRY scheme, the number of persons seeking assistance has increased substantially. During
the year 2003-04, 237 cases were recommended to Banks, of which only 106 cases were
sanctioned.

During 2005-06, 211 persons received assistance out of 439 cases recommended. There is a need
to encourage more number of persons to take up self-employment activities under the scheme by
increasing the allocation of funds. The details are furnished in the Table

Table2.12: Details of PMRY Scheme


Details of PMRY Scheme

Year

Target

No. of cases
Recommended to
banks

2003-04

102

237

106

2005-06

401

439

211

Cases
Sanctioned(Nos
.)

Source : DIC, Bangalore (R) Dist.


Swarnajayanthi Shahari Rozgar Yojna
The program was started in 1997 with the objectives of Addressing urban poverty alleviation through
gainful employment to the urban unemployed or underemployed poor; Supporting skill development
and training to enable the urban poor have access to employment opportunities provided by the
market or undertake self-employment and Empowering the community to tackle the issues of urban
poverty through suitable self-managed community structures and capacity building programmes17.

Swarnajayanthi Shahari Rozgar Yojna (SJSRY) has benefitted more than 250 people in the
Kanakapura LPA. Almost 125 people are engaged in wage employment and 40 people are self

17

Swarnajayanthi Shahari Rozgar Yojna Website

Sky Group

P a g e | 45

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

employed. There exist 57 groups who are benefitted under this scheme. 57 women groups have also
been taken up by SJSRY.
Table2.13: No of people benefitted by Swarnajayanthi Shahari Rozgar Yojna
Kanakapura Taluk

Swarnajayanthi Shahari Rozgar Yojna (SJSRY)

Employment Type

Self-employment

No of people in employment program

40

Wage
employment
125

Groups

Women groups

57

57

Source: Ramanagara district book, 2011


Mahatma Gandhi National Rural Employment Guarantee Act

The Mahatma Gandhi National Rural Employment Guarantee Act aims at enhancing the livelihood
security of people in rural areas by guaranteeing hundred days of wage-employment in a financial
year to a rural household whose adult members volunteer to do unskilled manual work 18. The table
below shows a list of benefitted people under MGNREGA.
Table2.14: No of people benefitted by MGNREGS
Mahatma Gandhi national Rural Employment Guarantee Scheme ( MGNREGS)

Kanakapura Taluk
No of people in employment
program

No of persons/households working

No of families availing 100

under MGNREGS

days of employment

20098

1647

Source: Ramanagara district book ,2011

18

MGNREGA website

Sky Group

P a g e | 46

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Plate: Work done under MGNREGA scheme.


COMPLETED WORKS UNDER MGNREGA IN
K AN AK A P U R A T AL U K
Water
conservationan
d water
harvesting; 5%

Renovation of
traditional water
bodies; 3%

Drought
proofing; 4%
irrigation canals;
2% irrigation
facilities; 8%

Flood controll;
33%

land
development;
18%

Work related to rural connectivity


enhancement,

flood

control,

water conservation and water


harvesting,

renovation

of

traditional water bodies, drought


proofing,

irrigation

canals,

irrigationfacilities,

land

development have been carried


Rural
connectivity;
24%

out under the MGNREGA. The


other works; 3%
Rajiv gandhi
Seva Kendra;
0%

table below shows the details of


works

complete

in

the

Kanakapura taluk in the financial


year 2011-2012.
Figure 2.21: Completed works under MGNREGA in Kanakapura Taluk
Source: mgnrega.nic.in; work status report
WORK IN-PROGRESS UNDER MGNREGA IN
K AN AK A P U R A T AL U K

irrigation canals
1%

land
development
11%

irrigation
facilities
26%

conservationan
d water
harvesting
10%

completed under the MGNREGA


scheme in Kanakapura Taluk. It
can be seen from the figure above
that 33% of the completed works

Drought
proofing
14%
Renovation
of traditional
water
bodies
4%
Water

A total of 923 works have been

were flood control works, 24% for

other works
12%

Flood controll
11%

rural

Rural
connectivity
10%

connectivity

enhancement

and 18% for land development.


Rajiv gandhi
Seva Kendra
1%

The

figure

below

shows

the

distribution of in-progress works in


the Taluk.

Figur2.22: Works in-progress under MGNREGA in Kanakapura Taluk ;Source: mgnrega.nic.in; work status report
Sky Group

P a g e | 47

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

The figure shows a more uniform distribution of works in the various sectors. Majority of the works are
for development of irrigation facilities. Land development, rural connectivity enhancement, flood
control, water conservation and water harvesting, drought proofing and renovation of traditional water
bodies constituted the other major works.

PUBLIC AND SEMI-PUBLIC OFFICES


Kanakapura is a class II town so public and semi-public buildings are few and dispersed. The Taluk
office forms a central node around which schools, colleges, hospitals and commercial activities are
centred. The BWSSB office and the BESCOM electric substation and office are the major public and
semi pubic offices in Kanakapura Town.

FINANCIAL INSTITUTIONS
Banks are important financial institutions that are indispensible for economic growth. Kanakapura
has fairly good banking network. There are 21 nationalised banks, 5 grameen banks, one DCC and
one KSCARD bank, 22 credit cooperatives and one non-credit cooperative in the LPA.

Fig2.23: Financial Institutions in the LPA


BANKS AND COOPERATIVES

No of institutions

25
20
15
10
5
0

Kanakapura taluk

Nationalised
banks

Grameen
banks

DCC Banks

KSCARD
Banks

21

Credit co
operative
societies
22

Non credit co
operative
societies
1

Source: Ramanagara District book, 2011

Sky Group

P a g e | 48

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

CREDIT FACILITIES

NABARD, the apex Development Bank, has been preparing District-wise Potential linked Credit
plans (PLPs), with a view to bringing about a qualitative improvement in the credit planning exercise
undertaken annually by banks.

The Potential Linked Credit Plan looks at the resource endowments of the District, the present stage
of development in Agriculture & Rural sectors and estimates the potentials for rural economic
activities both in physical and financial terms. It also takes into consideration the present state of the
infrastructure of the District, institutional support available, the policy/thrust being given to various
sectors of the economy, etc. while estimating the realizable potential for various sectors.

Potential linked plan (PLP), prepared by NABARD for Bangalore Rural District projects a credit
requirement of Rs.462.48 crores of which Rs.41.36 crores (9%) were for non farm sector and balance
amount for other sectors.

OPPORTUNITIES FOR ECONOMIC DEVELOPMENT

Major strength of Ramanagara District in general, and Kanakapura taluk in particular, is


derived from the reputation of Bangalore as a preferred global destination, particularly for hitech, knowledge industries and land-intensive industrial projects.
The erstwhile Bangalore houses a substantial percentage of Fortune 500 Companies and
other MNCs in diverse sectors such as apparel, automobile, food processing, machine tools,
precision engineering, software, IT enabled services, etc.
The State Cabinet has approved the Mega Plan envisaged by Bangalore Metropolitan
Regional Development Authority (BMRDA) for infrastructure development of Bangalore Urban
& Rural and Ramanagara Districts. Some industry groups are expected to be re-located from
Bangalore (Urban) to the outskirts.
The Mega Plan proposes a network of 8-lane / 6-lane 734 km. roads comprising 284 km.
Satellite Towns Ring Road (STRR), 188 km. Intermediate Ring Road (IRR) and 262 km.
Radial Roads, to improve connectivity to all the taluks of outer BMR.

Sky Group

P a g e | 49

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

The existing Bangalore Dindigal Road which passes through the Taluk has been upgraded
to National Highway (NH 209) by the National Highway Authority of India and has potential for
investment in industry and tourism related projects.
The Bangalore International Airport is about 75 km from Kanakapura, is likely to provide a vital
link to international destinations enhancing the overall economic development.
The existing domestic Airport at HAL, Bangalore is 45 km away.
The flow of investment into Bangalore (Urban) will be constrained due to non-availability /
expensive land.
Ramanagara District will be the emerging investment destination for industrial segments such
as pharmaceuticals, automobiles & auto components, aerospace, apparel, food
processing, machine tools, floriculture, precision components, tooling, etc., because of
the proximity to Bangalore and due to the constraint on the availability of land in Bangalore
Urban District.
Kanakapura is known for Granite quarrying and processing and the products have export
potential.
Ramanagara District is covered under Agri Export Zone (AEZ) for gherkins, rose onion and
flowers. The climate of the Taluk suits for cultivation of these commodities.
Ramanagara District including the Taluk ranks third in milk production in the State.
Continuous market availability for milk products in Bangalore
Kanakapura Taluk is rich in attractive tourist spots viz, Sangama and Makedatu.
Scope for improvements at Sangama and Chunche falls, construction of hanging bridge at
Makedatu.
Opportunity for attracting investment in good holiday resorts, recreation clubs, hotels,
ethnic food courts, community / convention centers, nursing homes etc.
Scope for commercial exploitation of biotechnology.

Sky Group

P a g e | 50

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

ISSUES
Agriculture is the primary activity in the LPA and the yield is high, but in order to induce
population industrial base has to be created. Care has to be taken in the process to conserve
precious agricultural land.
Industrial activity is concentrated in the Harohalli region while activity in the rest of the LPA is
extremely low.
Even though earmarked provision for sericulture industries exists in Kanakapura town, its
growth and productivity is slow

The Kanakapura Town lacks a commercial centre.


There is a inadequate power infrastructure in the LPA for large industrial setup.
Local entrepreneurship is lagging in the LPA.
There is no perennial water source in the LPA. Ground water sources are depleting fast hence water availability is a major constraint of development.
Transport infrastructure in the LPA is poor with poor maintenance of major arterial roads.

2.3 HERITAGE AND TOURISM


The following table gives a list of tourism spots in the LPA.

HAROHALLI

Table 2.15: List of tourism spots in Harohalli


Hobli

GP

Village

Identified cultural sites


Anjaneya temple

Doddamuduwadi

Singasandra

Adishakti temple
Maramma temple

Harohalli

Anjaneya temple
Bandiganahalli

Sky Group

Maramma temple

P a g e | 51

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Basappa temple
Anjeneya temple
Dodamuduwadi

Adishakti temple
Mugamaramma temple
Venugopal temple

Kaggalahalli

Gabbadi Kaval

Sri Maruthi temple


Veerabhadra temple
Maruthi temple

Mudenahalli

Muguthamma temple
Adishakti temple
Basaveswar temple (Pyramid spiritual

Hosakote

temple)
Muthurayanaswamy temple

Kaggalahalli

Church
Bisilmaramma temple
Maruthi temple
Basaveswara temple

Gabbadi

Gabbalamma temple
Maramma temple
Basaveswsara temple
Maramma temple

Vaderahalli

SidiKambaDoddamma temple
Kollapuradamma temple

Dyavasandra

Kolliganahali

Dyavasandra

Maramma temple

ChulaknakereKaval

Baireswara temple (Chulakanabetta)

Hulugondahalli

Basaveswara temple
Muthuraya temple,
Cave (Hulugavi, Kardigavi)

Yadumodu

Maruthi temple
Maramma temple
Sri Maruthi temple

Medamaranahalli

Basaveswara temple
Arunachala temple (1/1)

Harohalli

Harohalli

Hanuman temple
Gopalkrishna temple

Sky Group

P a g e | 52

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Maramma temple
Byrappa temple
Marasandra

Hill stations
Chulakanabetta
Byrappabetta

SATHANUR

Table 2.16: List of tourism spots in Sathanur


Hobli

Gram Panchayat

Identified heritage sites

Village
Yadugowdanahalli

Basaveswara temple
Maruthi temple

Kachavanahalli

Mahadeswara temple
Maladevaralinga temple

Arekattedoddi
Dalimba

Basaveswara temple

Hosahalli

Anjaneya temple
Dandinadevi temple

Kadahalli

Kadahalli

Basaveswara temple
Basaveswara temple

Honniganahalli

Uttarayana temple
Darga

Sathanur
Honniganahalli

Basaveswara temple
Saslapura

Maremma temple
Valamahadeswara temple
Siddapajiswamy Temple

Bommanahalli

Muneswara temple
Basaveswara temple
Anjaneya temple

Achalu

Thotahalli

Ramadevi temple
Kardimaremma temple
Muneswara temple

Achalu

Basaveswara temple
Gurumalleshana cave

Sky Group

P a g e | 53

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Narayanaswamy cave
Maruthi temple
Dhabaleswara temple
Maremma temple
Ram temple
Parangi (British) bungalow
Darga
Sathnur

Jama masjid

Sathnur

Laxmi temple
Siddappaji temple
Ashur Khan (Allabigudi)
Shanidevar temple
Kabbalamma temple
Basavanna temple
Kabbalu

Kabbal

Basaveswara temple
KabbalammaDurga

KASABA

Table 2.17: List of tourism spots in Kasaba


Hobli

GP

Village

Budiguppe

Baradanahalli

Identified cultural sites


Basaveswara temple
Narasimhaswamybetta
Someswara temple

Chikkamuduwadi

Chikkamuduwadi

Basaveswara temple
Gangaleswara temple

Anjanawadi

Someswara temple

Chakanahalli

Cheeranakoppe

Basaveswara temple

Kallahalli

Aranakuppe

Veerabhadreswara temple

Kasaba

Maramma temple
Shivanahalli

Seegekote

Basaveswara temple
Anjaneya temple

Sky Group

P a g e | 54

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

Narayanaswamy temple
Chikkammana temple
Aralalu

Venkataramana temple
Mahadeswara temple
Veerabhadraswamy temple
Anjaneyaswamy temple

Shivanahalli

Kyathammana temple
Dabbagulappa temple
Venkataramaswamy temple

Hanumanahalli

Maramma temple

Tigalarahalli

Muttappa temple

Thammasandra

Basaveswara temple

Kallahalli

Venkteshwar temple

T.Bekuppe

Chokkasandra

Kalmath cave

Allimaranahalli

Ganalu

Anjaneya temple

Kallahalli

Doddamana temple
Tungani

Aralalusandra

Basaveswara temple
Masavamma temple
Anjaneya temple

Rayasandra

Gavigangadharayya temple
Maruthi temple
Benati temple
Someswara temple
Maramma temple

Tungani

Gopalswamy temple
Telamangalamma temple
Shanimahatma temple
Arasamma temple
Anganaya temple
Basaveshwar temple

Ramapura

Mahadeshwar temple
Dandinmaramma temple

Sky Group

P a g e | 55

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

UTTARAHALLI

Table 2.18: List of tourism spots in Uttarahalli


Hobli

GP

Villages

Identified Cultural Heritages


Patalammatemple 19
Anjaneyatemple (GramaTana)

Kaggalipura

Kaggalipura
Basaveswaratemple (18)
Anjaneyatemple
Anjaneyatemple
Uttari
Basaveswaratemple
Venkataramaswamytemple
Anjaneyatemple
Basavannatemple

Somanahalli

K.Chudahalli

Kabbalammatemple
Chellapuradammatemple
Marammatemple

Uttarahalli

Jeevalammatemple
Anjaneyatemple
Nelaguli

Muttalammatemple
Siddeswaratemple
Anjaneyatemple (GramaTana)
Maramma temple

Nettigere
Pattaladammatemple
Muneswaratemple - 103
Gundanjaneyatemple
Ravugodlu
Uttarayaswamitemple

Taralu

Sky Group

Somanahalli

Anjaneyatemple

Thattaguppe

CarmelMatheDevalaya (GramaTana)

P a g e | 56

Kanakapura LPA Master Plan 2031

Chapter 2 | Demographic and Economic Base

KONDHARAMAR TEMPLE

KABALAMMA TEMPLE

KABALAMMA TEMPLE

SANGAM

CHENNEKESAVA TEMPLE

Sky Group

P a g e | 57

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

CHAPTER 3

HOUSING AND URBAN POOR


3.1 HOUSING
INTRODUCTION
Housing comprises the largest land use component in any urban planning. Further, it is a multifaceted and multi-dimensional activity. Today it is understood that housing transcends much beyond
the concept of physical planning parameters and embraces socio-economic components as well.
Good housing is linked to good health and nutrition, better employment opportunity, better living and
quality of life.

Housing is certainly a basic human need. No single type of housing can serve the varied needs of
todays diverse households. Whether a home owner or renter, senior citizen, school aged child or
disabled adult, all residents need an affordable, comfortable and safe place to live. A place is better
to live and work when a variety of appealing and affordable housing options exist.

Affordable housing has a positive impact on educational outcomes, health, and wealth accumulation.
Hence housing initiatives must be viewed in the back ground of overall economic development and
the needs of the people. The State Housing Policy aims to provide Affordable Housing for All. The
poorer sections of the society often do not have access to formal land markets and access to
financial institutions. Supplementing the condition is the severe mismatch of demand and supply
arising from dynamic socio-economic conditions and inadequate land policies which make affordable
housing scarce.

Providing housing is not limited to provision of a built structure. The Karnataka Housing and Habitat
policy, 2009 therefore advocates a Habitat approach to housing, which translates into access to
basic services such as water, sanitation, clean fuel, electricity, healthcare, education and livelihood.
Hence the aspects of water supply, sanitation and waste disposal should be taken into account
during spatial planning of residential areas.

Sky Group

P a g e | 58

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

RESIDENTIAL LAND USE IN KANAKAPURA LPA


The area under residential land use in the major settlements in the Kanakapura LPA is shown in the
table below. The total area under residential Landuse in Kanakapura LPA is 550.87 Ha which is
approximately 1.34% of the total area. However, majority of the LPA is undeveloped; hence the
developed residential area forms 6.8% of the total developed area.

Table3.1: Existing area under residential land use in major settlements in


the Kanakapura LPA
Major settlements in
Kanakapura LPA

Area under Residential


land use (Ha)

Percentage of total land


under conurbation limit

Harohalli

172.94

3.78%

Kanakapura TMC

325.91

11.86%

Sathanur

92.31

4.68%

Kaggalipura

132.65

6.17%

Total

550.87

1.34%

Source: Landuse survey


HOUSING CHARACTERISTICS

HOUSEHOLD SIZE

Household size: Ramanagara District


9+ members 1 member
2 member
3%
5%
11%
6-8 member
17%
3 member
17%

5 member
17%
4 member
30%

It can be seen from the figure that the


average household size in the district is 4,
represented by 30% of the total households.
There are about 17% of 3 members, 6-8
member and 5 member households and 11%
of 2 member households. The average
household size in the district is 3.72.
It can be seen that 63% of the population

have household size of 4 and below, which might be a result of migration in the Bangalore Region
from other parts of the state.

Figure: Distribution of Household size in Ramanagara district; Source:


Census 2011
Sky Group

P a g e | 59

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

NUMBER OF HABITABLE ROOMS

The
No of habitable rooms: Ramanagara District
Four room Five
room
Three room 3%
1%
9%

figure

below

shows

the

distribution of houses by no of

Six rooms and


above
0%

habitable rooms 1 . It can be seen


that majority of the houses (40%)

No exclusive
room
21%

are one room houses. 26% of the


houses are two room houses while

Two room
26%

9% are three room houses. 21% of


the

One room
40%

houses

however

have

no

exclusive rooms.
60% of the population has one or no
exclusive rooms, which suggests

low habitable rooms per person. Habitable rooms per person is an important housing indicator, the
present data suggests poor housing condition.

Figure3.2: Distribution of households by habitable room


Source: census 2011

FLOOR MATERIAL
The distribution of households by

Flooring Material:Ramanagara DISTRICT

flooring material in Ramanagara


Mosaic floor
tiles
8%

Others
0%

district shows that 68% of the


Mud
22%

Wood/bamboo
0%

houses have cement floors, 22%

Burnt stick
1%
Stone
1%

Cement
68%

have mud flooring while 8% have


mosaic floor tiles. Stone, burnt stick,
wood and bamboo constitute minor
proportions of the flooring material.
Hence majority of the houses are of
pukka character.

Figure3.3: Distribution of households by flooring material ; Source: census


2011

Census 2011 data was available for Ramanagara District level only

Sky Group

P a g e | 60

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

WALL MATERIAL

The

Wall Material-RAMANAGARA DISTRICT


Others
0%

Concrete
5%

Plastic/Polythen
e
0%

Grass/Thatch
4%

figure

below

shows

the

distribution of houses by wall


material. It can be seen that 51%
of the houses have burnt bricks

Mud/Unburnt
brinks
29%
Burnt bricks
51%

as wall material while 29% have


mud/un-burnt bricks as the wall
material. 11% of the houses have

Stone
11%

Wood
0%
G.I.
sheets/metal/as
bestos sheets
0%

walls made of stone

Figure3.4: Distribution
of households by wall
material

Source: census 2011

ROOF MATERIAL

The major roofing materials in the district are grass/thatch, plastic/polythene, tiles, brick, stone/slate,
G.I. sheets/metal/asbestos sheets etc. It can be seen from the figure below that 49% of the houses
have
Roofing Material-RAMANAGARA DISTRICT
Others; 0% Grass/Thatch;
10%

Plastic/Polythen
e; 0%

Concrete; 16%
G.I.
sheets/metal/as
bestos sheets;
22%

tiles

materials,

their

while

roofing

22%

G.I./metal/asbestos
16%

of

the

have
sheets.

houses

have

concrete roofs, while 10% have


grass or thatch. Plastic, stone
Tiles; 49%

and slate also constitute the


roofing

Stone/slate; 3%

as

material

in

minor

proportion of the houses.

Brick; 0%

Figure3.5: Distribution of households by roofing material


Source: census 2011

Sky Group

P a g e | 61

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

AVAILABILITY OF FACILITIES

The figure below shows the distribution of houses in Ramanagara district by the availability of
facilities. It can be seen that 75.3% of the houses avail bathroom facility, 10.2 have bathroom
enclosure without roof and 14.5% have no bathroom. 54.6% of the houses have open drainage, 13.4
% have closed drainage while 32% houses have no drainage facility. Kitchen facility is available for
88.8% of the houses, 7.6% of the houses have no exclusive cooking space while 3.3% cook in open.

AVAILABILITY OF FACILITIES IN HOUSEHOLDS: RAMANAGARA DISTRICT


100

no of households

90
80
70
60
50
40
30
20
10
0
Bathroom
RAMANAGARA DISTRICT

Bathroom
no
enclosure
bathroom
without roof

75.3

10.2

14.5

closed
drainage

open
drainage

no drainage

kitchen
available

cooking
inside
house

13.4

54.6

32

88.8

7.6

cooking in
no cooking
open
3.3

0.3

Figure3.6: Distribution of households by availability of facilities


Source: census 2011
HOUSING TYPOLOGY
The houses in the LPA are predominantly of permanent nature. Single and double story houses are
predominant, though three and four story houses are also frequent in a few pockets. Most of the
houses are self-owned plotted developments. The plate below shows the major housing types in the
LPA.

Sky Group

P a g e | 62

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

Mud walled thatch roofed

Plotted developments

Mud walled tile roofed


Low rise
apartments
Mud walled tin roofed

Plate: Housing types in Kanakapura


ORGANISATIONAL SETUP
The principal housing supplier in Karnataka is the Department of Housing which consists of three
departments through which the various schemes are implemented. The table below shows the
institutional setup in the housing sector.

Table3.2: Organizational setup in the housing sector


Source: www.housing.kar.nic.in

Departments
Department of Housing,

Rajiv Gandhi Rural Housing

Govt. of Karnataka

Corporation Ltd (RGRHCL)

Sky Group

Housing Schemes

Rural Ashraya Housing Scheme including


Navagrama Housing Scheme and the Pilot

P a g e | 63

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

scheme of GPHP.
Urban Ashraya Housing Scheme.
Rural and Urban Ashraya Sites Schemes
Dr.Ambedkar Housing Scheme
Neralina Bhagya
Housing for Special occupational groups
Gram Panchayat Housing scheme
Navagrama Housing Scheme
Karnataka Housing Board

Hundred Housing Schemes programme

(KHB)

Chief Ministers Model town Housing programme


Slum Improvement

Karnataka Slum

Site and Services programme

Development Board (KSDB)

Nirmala Jyothi Scheme


Valmiki Ambedkar Awas Yojna

HOUSING SCHEMES IN KANAKAPURA LPA


ASHRAYA SITES SCHEME AND ASHRAYA HOUSING SCHEME

The Ashraya scheme is a housing scheme introduced by the Govt. of Karnataka to aid people in
economically weaker section, in both urban and rural areas to avail improved housing through
financial assistance in the form of loans and subsidies. The maximum value for financial assistance
including both loan and subsidy is 20,000 in rural areas and 25,000 in urban areas. Under the
Ashraya rural housing sites scheme free house sites may be distributed to the houseless
beneficiaries of the EWS in rural areas. The tables below shows a list of housing sites allotted and
houses constructed under Ashraya scheme in Kanakapura Taluk.

Table3.3: Housing sites allotted under Ashraya Scheme in 2010 -11


Kanakapura Taluk
Sites allotted

Scheduled

Scheduled

Caste

Tribe

174

119

Others

Total

769

1062

Source: Ramanagara District Book


Table3.4: Houses constructed under Ashraya Scheme in 2010 -11
Kanakapura Taluk

Sky Group

Scheduled

Scheduled

Caste

Tribe

Others

Total

P a g e | 64

Kanakapura LPA Master Plan 2031

Houses

Constructed Under

Chapter 3 | Housing and Urban poor

Ashraya

Scheme (2010-11)

153

12

452

617

Source: Ramanagara District Book


It can be observed that a total of 1062 sites have been allotted under the Ashraya scheme. 174 sites
have been allotted to scheduled castes and 119 to scheduled tribes, while the rest have been allotted
to other castes. 617 houses have also been constructed under these schemes. 153 houses have
been for scheduled castes, 12 for scheduled tribes and 452 for others.

INDIRA AWAS YOJANA

Indira Awaas Yojana (IAY) is a flagship scheme of the Ministry of Rural Development to provide
houses to the poor in the rural areas. The objective of the Indira Awaas Yojana is primarily to help
construction/up gradation of dwelling units of members of Scheduled Castes/Scheduled Tribes, freed
bonded labourers, minorities in the below poverty line category and other below poverty line nonSC/ST rural households by providing them a lump sum financial assistance.

Table: Houses constructed under IAY in 2010 -2011


Source3.5: Ramanagara district book
Kanakapura Taluk
Houses constructed under IAY
in Kanakapura Taluk

Scheduled

Scheduled

Caste

Tribe

487

133

Others

Total

428

1068

DR. B.R.AMBEDKAR SCHEME

Ambedkar Housing scheme is an initiative for providing housing to the economically weaker section
and the scheduled castes and scheduled tribes in rural areas. Under this scheme a maximum
financial assistance of 20,000 may be provided for construction of houses.

Table3.6: Houses constructed under special scheme in 2010 -2011

Houses

Constructed

B.R.Ambedkar Scheme

Under

Scheduled Caste

Scheduled Tribe

Total

45

52

Source: Ramanagara district book


Sky Group

P a g e | 65

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

SPECIAL HOUSING SCHEME FOR FISHERMEN


Houses have also been constructed under Special Housing Scheme for Fishermen in the LPA. A
total of 4 units have been constructed according to government data , hence it can be assumed that
the impact of the scheme in the LPA is considerably low.

Table3.7: Houses constructed under special scheme in 2010 -2011


Kanakapura Taluk
Houses Constructed Under Special Scheme
For Fishermen

Scheduled

Scheduled

Caste

Tribe

Total

Source: Ramanagara district book


INTEGRATED HOUSING AND SLUM DEVELOPMENT PROGRAMME

The basic objective of Integrated Housing and Slum Development programme is the holistic slum
development with a healthy and enabling urban environment by providing adequate shelter and basic
infrastructure facilities to the slum dwellers who do not possess adequate shelter and reside in
dilapidated conditions as identified by the Urban Local Body.

Table3.8: Features of IHSDP


Housing
Only

Physical Infrastructure

in-situ

housing

provision of 25 sq. m
Component

plinth

area

with

two

rooms, kitchen and toilet


at a cost of Rs.80,000/per unit

Social Infrastructure

Water Supply
Roads
Drains

Community

Seva

Community Toilet

Kendra

Community Bath

Community Centre

Street Light
SWM

It was decided that 20%


beneficiary contribution to
Contribution

be

considered

for

all

categories of population

20% contribution from


state /ULB

20%

contribution

from

state
/ULB

of all the towns.

The sharing of fund between Central Government and State Government/ ULB/ Parastatal is 80:20.
Under the ISHDP scheme, 720 units have been constructed in Kanakapura LPA.

Table3.9: houses Constructed under IHSDP

Sky Group

P a g e | 66

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

Town

No of units

Kanakapura

727

3.2 HOUSING SHORTAGE


The total no of census houses in Ramanagara district is 3,51,784 out of which 33,840 are vacant and
3,17,944 are occupied. The total population of Ramanagara district is 10,82,739 2. The number of
households in the district is 2,35,378 3. It can be seen that housing shortage does not exist in
terms of number of houses as per census data of Ramanagara District; hence primary housing
survey is required to estimate the housing shortage in the LPA.
However, census data suggests that the housing indicators performance (facilities in dwelling unit,
no of habitable rooms per person) in the LPA is poor, implying poor condition and congestion in
dwelling unit which is an indicator of housing shortage.
There is an increasing trend of township development in the LPA. Private developers have entered
the housing market with elaborate housing schemes. Residential townships are presently under
construction near Kaggalipura and Harohalli in properties abutting the NH 209 4. Needless to say,
industrial development and proximity to Bangalore will increase population in the LPA and would
augment the current trend of residential township development.

Plate: Upcoming housing projects in Kanakapura LPA

Census 2011, source census2011.co.in


Assuming a household size of 4.6 for Karnataka according to National Health Survey 2007
4
Primary Survey
3

Sky Group

P a g e | 67

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

3.3 URBAN POOR AND SLUMS


The total slum area in the Kanakapura LPA is 16 Acres and 31 gunta. There are 13 slums in total out
of which only 8 are registered. The ownership and the details of the declared slums are specified in
the table below.

Table3.10: Declared slums in Kanakapura TMC


Slum

Ward No

Status

Population

1. Kurupete

21

Declared

551

2. Budhigere

Declared

250

Declared

394

3. Kotehalla
4. Maharaja Katte

16

Declared

370

5. Mele Kote - Vinayaka Nagar

12

Declared

510

Declared

614

Declared

352

Declared

610

6. Jaya Prakash Nagar


7. Behind KSRTC Bus Stop

8. Megalu Harijana Colony


9. Degulamatha Road

Identified

350

10. Ajeez Nagar

16

Identified

2950

11. Behind IPP Hospital

10

Identified

1700

12. Indira Nagar

16

Identified

1350

13. Thotihola

16

Identified

435

TOTAL

10436

Source: Ramanagara District Book, 2010-2011

Plate: Kurupete slum, Kanakapura Town


Sky Group

P a g e | 68

Kanakapura LPA Master Plan 2031

Chapter 3 | Housing and Urban poor

ISSUES
1. PROVISION OF HOUSING FOR INDUCED POPULATION: Induced population constitute a
major proportion of the future population of the LPA. As such, the present housing supply is
inadequate for the future growth scenario.

2. CONDITION OF DWELLING UNITS: Condition of dwelling unit is poor in many parts of the
LPA. As such they would not contribute to the housing stock in future.
3. Low habitable rooms per person in the LPA suggesting housing shortage.

4. SLUM IMPROVEMENT: Slum Improvement Schemes have to be introduced in the LPA to


recognise the slums and provide for their upgradation.

Sky Group

P a g e | 69

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

CHAPTER 4

EXISTING LANDUSE AND TRANSPORTATION


4.1 EXISTING LAND UTILISATION
The Kanakapura LPA is comprised of part of the Kanakapura Taluk and the Bangalore South Taluk. It
is a part of the Ramanagara district. The major growth nodes in the LPA are Kanakapura town, which
is a class III census town, Harohalli which has been identified as an industrial growth node due to its
spatial proximity to Bidadi and Ramanagaram town, Sathanur which has been identified as a potential
growth centre and is the location of the upcoming township and Kaggalipura in the north, which has
the potential of being developed into the fourth node in the LPA. Besides these nodes the rest of the
LPA has sparse development, as their economic mainstay is agriculture.

Tables below show the existing land utilisation and landuse in the LPA.

Table 4.1: Existing land utilization in the LPA, 2012


LANDUSE

DEVELOPED/BUILT UP AREA
AGRICULTURE
WATER BODIES
FOREST
TOTAL

AREA
(IN HECTARES)

AREA
(IN SQ KM)

PERCENTAGE

2565.92
36517.12
1249.86
945.10
41278

25.66
365.17
12.50
9.45
412.78

6.22%
88.47%
3.03%
2.29%
100.00%

Table 4.1 A: Existing land use in the LPA, 2012


LANDUSE
RESIDENTIAL(including Gramthana)
COMMERCIAL
INDUSTRIAL
PUBLIC & SEMI PUBLIC
PARK & OPEN SPACE
PUBLIC UTILITY
TRANSPORTATION
VACANT LAND
SUB TOTAL
AGRICULTURE
WATER BODIES
FOREST
GRAND TOTAL

Sky Group

AREA
(IN HECTARES)

AREA
(IN SQ KM)

PERCENTAGE

2299.52
21.95
11.64
59.71
13.82
48.64
105.13
5.51
2565.92
36517.12
1249.86
945.10

23.00
0.22
0.12
0.60
0.14
0.49
1.05
0.06
25.66
365.17
12.50
9.45
412.78

89.62%
0.86%
0.45%
2.33%
0.54%
1.90%
4.10%
0.21%
100%
-

41278

P a g e | 70

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

EXISTING LAND USE PATTERN: KANAKAPURA TOWN


The total area of the Kanakapura Town developed area is 3.13 sqkm. The table below shows the
existing land use of Kanakapura is shown in the table below.

Table4.2: Existing Land use distribution in Kanakapura Town, 2012


LANDUSE

AREA
(IN HECTARES)

AREA
(IN SQ KM)

PERCENTAGE

RESIDENTIAL

216.31

2.16

68.90%

COMMERCIAL

14.92

0.14

4.75%

INDUSTRIAL

2.21

0.02

0.70%

PUBLIC & SEMI PUBLIC

22.44

0.22

7.15%

PARK & OPEN SPACE

5.58

0.05

1.78%

PUBLIC UTILITY

8.43

0.08

2.69%

TRANSPORTATION

43.83

0.43

13.96%

VACANT LAND

0.21

0.02

0.07%

313.94

3.13

100%

GRAND TOTAL

Residential land use

The Residential area contributes to around 68.90 per cent of the developed area. These are mainly
concentrated in wards 3 to 9. The older areas have higher density when compared to the new
extensions. These wards have organic growth pattern with irregular plot sizes and irregular pattern of
roads. The newer extension shows a regular grid iron pattern of growth.

Commercial Land Use


The Commercial area is only 4.75 per cent of Kanakapura; commercial activities are along the NH
and SH passing through the town. These commercial establishments cater to the day to day needs of

Sky Group

P a g e | 71

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

the people and mostly consist of petty shops. Other daily commercial setups are distributed sparsely
in various wards. Most of the main roads have developed mixed land use.

Industrial Land use


There is negligible (less than 1 per cent) industrial area in the town. This mostly includes the silk
industries, small scale industrial layout and granite industry. These are distributed along some main
roads of the town.

Public and semi-public Land use


Around 7.15 per cent of the area belongs to Public & Semi Public use, which mostly consists of
schools, rural college, temples, hospital and government department buildings. Most of the buildings
are located along the East-West axis abutting the main roads in the central portion of the town.
Smaller areas of public and semi-public use are found all along the residential areas in the form of
schools and temples.

Parks/Playgrounds/Open Spaces
Parks, Playgrounds & Open spaces is around 1.78percent of the total area. There are no organized
parks in Kanakapura. Hence the playgrounds and open spaces some of which are burial ground
contribute to the area. The area under play grounds is bare minimum. The old areas having high
density do not have lung spaces. Incidental open spaces are found due to the irregular growth pattern
of the town.

Utilities and services


Utilities and Services include water tank area, substation, etc., contributing to 2.69 per cent of the
town area.

Traffic and transportation


The area under this land use accounts to 13.96percent of the total area of the town. The NH 209 and
SH 92 form the main connectivity to the town. The road pattern shows a hierarchy of road widths
varying from less than 3m lanes to 9m cross roads and 12m main roads. The condition of the roads in
the old parts of the town is moderate. The location of the bus depot/terminal adds to the congestion
along the road. The NH and SH have high mixed traffic flow.

Sky Group

P a g e | 72

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

EXISTING LAND USE PATTERN: HAROHALLI


Harohalli is a village in the Kanakapura LPA, has a population of 12988 persons as per census 2011.
The land use distribution is shown in the table below:

Table4.3: Existing Land use distribution in Harohalli, 2012


LANDUSE

AREA
(IN HECTARES)

AREA
(IN SQ KM)

PERCENTAGE

RESIDENTIAL

74.91

0.74

69.13%

COMMERCIAL

3.60

0.03

3.32%

INDUSTRIAL

4.91

0.049

4.53%

PUBLIC & SEMI PUBLIC

4.98

0.049

4.60%

PARK & OPEN SPACE

1.54

0.015

1.42%

PUBLIC UTILITY

0.00

0%

TRANSPORTATION

18.42

0.18

17.00%

VACANT LAND

0.00

0%

108.37

1.08

100%

GRAND TOTAL

Residential
The above table indicates the existing land use of Harohalli conurbation area in Kanakapura LPA.
Out of the total area in Harohalli, residential forms the major land use and accounts to about 69.13
percent of the total area.
Transportation
17% of the land comes under traffic and transportation. The major connectivity is through the NH 209.
The road widths vary according to the levels of accessibility. The KSRTC bus stand is located at the
critical junction of the NH 209 and Maralwadi-Anekal road.
Public and Semi Public
4.60% of the land is under Public and Semi Public use and is located along the NH 209. This land
use consists of government schools, hospitals, religious buildings, hostel and gram Panchayat offices
and related buildings.

Sky Group

P a g e | 73

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

Commercial
Commercial accounts for 3.32% of the total land use and most of them are daily commercials in the
form of petty shops. These are mainly distributed linearly along the State Highway and the Maralwadi
Anekal road.

Parks and open spaces


The land under parks, playgrounds and open spaces accounts to 1.42%. Harohalli village does not
have any type of organized parks or open spaces.

EXISTING LAND USE PATTERN: SATHANUR


Sathanur conurbation area has a population of 4698 as per census 2011 and an area of 72.27
hectares. The land use distribution is shown in the table and figure below.

Table4.4:Existing Land use pattern Sathanur, 2012


LANDUSE

AREA
(IN HECTARES)

AREA
(IN SQ KM)

PERCENTAGE

RESIDENTIAL

47.86

0.48

66.22%

COMMERCIAL

1.43

0.14

1.98%

INDUSTRIAL

0.15

0.01

0.21%

PUBLIC & SEMI


PUBLIC

9.81

0.09

13.58%

PARK & OPEN SPACE

1.44

0.014

1.99%

PUBLIC UTILITY

0%

TRANSPORTATION

11.57

0.11

16.01%

VACANT LAND

0%

72.27

0.72

100%

GRAND TOTAL

The figure indicates the existing land use of Sathanur village. Out of the total area, 66.22% of land
use is under Residential. The residential density is very low and the households are sparsely

Sky Group

P a g e | 74

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

distributed. Parks, Playgrounds and open spaces account for 1.99% of the total land use. These are
located next to the public and semi-public uses.
16.01% of land is under Transportation and 13.58 % of land is under Public and semi-public use,
mostly concentrated along the south eastern end of the village. The public buildings include schools,
PHC, religious buildings and government offices.

EXISTING LAND USE PATTERN: KAGGALIPURA


Kaggalipura has a population of 12070 as per census 2011 and a developed area of 185.71 hectares.
The table below shows the distribution of land use in Kaggalipura.

Table 4.5: Existing Land use distribution in Kaggalipura, 2012

LANDUSE

AREA
(IN HECTARES)

AREA
(IN SQ KM)

PERCENTAGE

RESIDENTIAL

74.80

0.74

40.28%

COMMERCIAL

2.00

0.02

1.07%

INDUSTRIAL

4.37

0.04

2.35%

PUBLIC & SEMI PUBLIC

22.48

0.22

12.10%

PARK & OPEN SPACE

5.26

0.05

2.83%

PUBLIC UTILITY

40.21

0.40

21.65%

TRANSPORTATION

31.31

0.31

16.86%

VACANT LAND

5.30

0.05

2.85%

185.71

1.85

100%

GRAND TOTAL

The pie diagram indicates the existing land use of Kaggalipura village. Out of the total area, 40.28%
of land is under Residential land use. The residential density is very low and the households are
sparsely distributed. Parks, playgrounds and open spaces account for 2.83% of the total land use.
16.86% of land is under transportation and 12.10% of land is under public and semi-public mostly
distributed linearly along the Kanakapura Bangalore road passing through the village. These public

Sky Group

P a g e | 75

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

buildings include schools, PHCs, religious buildings and Government offices. Commercial accounts to
1.07% of the total developed area located along the Kanakapura road.

LAND OWNERSHIP PATTERN IN THE LPA


The total area of the Kanakapura LPA is 412 sq km or 101270 Acres approximately. The total govt.
land ownership is 19603 Acres. The distribution of government and private land in the LPA is shown
below.

Land ownership in the LPA

total govt land;


19%

total private
land; 81%

Figure4.1: Land ownership in the LPA.


Source: Ramanagara District handbook

Sky Group

P a g e | 76

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

4.2 TRAFFIC AND TRANSPORTATION: INTRODUCTION

This chapter presents the transportation scenario in Kanakapura Local Planning Area. Key issues like
road network and its characteristics, impact of enhanced regional connectivity due to formation of the
STRR, PRR, ITRR, its potentials and drawbacks have been discussed here. 2.23%of the total area in
the LPA is devoted to transportation.

REGIONAL LINKAGES
ROAD LINKAGE

The Kanakapura LPA is well connected to the various urban centres of the region. It is intercepted by
the NH 209 which connects Bangalore to Mysore. Traffic volume on this road is low as major traffic in
the Bangalore-Mysore corridor flows through SH 17 (Mysore road). The PRR, the STRR and the IRR
are proposed regional roads that pass through the LPA. The PRR is the northernmost road in the
LPA which connects to NICE corridor in the north-west and the Bannerghatta Main Road in the east.
The IRR connects Harohalli to Bidadi in the west and Anekal in the east. The STRR connects
Kanakapura town with Ramanagaram town in the west and Anekal in the east.

LINKAGE OF IMPORTANT GROWTH NODES IN THE KANAKAPURA LPA: HAROHALLI

Harohalli is intercepted by NH209, which connects the town to Bangalore in north and Kanakapura in
the south. Harohalli is connected to Bidadi by a regional road, which joins the Mysore Road (SH 17)
near Bidadi town. The Anekal-Harohalli road connects it to Anekal town in the east. The Maralwadi
road is another regional road in the town that connects Harohalli to Dhodda Maralwadi.

LINKAGE OF IMPORTANT GROWTH NODES IN THE KANAKAPURA LPA: KANAKAPURA TOWN

Kanakapura town is a class III census town. It is intercepted by the NH 209 which connects the town
to Harohalli in the north and Sathanur in the south. The SH 3 connects Kanakapura to Ramanagara
in the west and Hunasanahalli in the east. The SH-92 (Kanakapura-Sangam road) is another important
regional road.

Sky Group

P a g e | 77

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

LINKAGE OF IMPORTANT GROWTH NODES IN THE KANAKAPURA LPA: SATHANUR

Sathanur is a village that lies in the southern end of the LPA. The NH 209 connects it to Kanakapura
in the north and Malavalli in the south. Sathanur is connected to Channapatna in the north and to
Cauvery river valley and the elephant corridor in the south.

4.3 RAIL LINKAGE

There is no rail
linkage at present in
the LPA. The draft
RSP 2031 however
proposed a railway
corridor in the region,
connecting Sathanur,
Kanakapura and
Harohalli with
Bangalore.

SEAPORT

The nearest seaport is at Mangalore, which is about 380 km and Chennai Seaport is around 415 km
from Kanakapura Town. The existing Mangalore Port is an all-weather port-providing gateway for
exports & import trade throughout the year.

AIRPORT

The nearest airport at present is the Bengaluru International Airport, Bangalore at a distance of
about 90 kms from Kanakapura Town.

Sky Group

P a g e | 78

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

TRANSPORTATION SYSTEM IN KANAKAPURA LPA


BUS TRANSPORT SERVICE

Major travel demand between Bangalore and Kanakapura is catered by KSRTC buses which forms
the major mode of transport in the LPA. KSRTC bus stands are located in Kanakapura town,
Harohalli and Sathanur. Private bus service is also present in Kanakapura Town and Harohalli
connecting the villages and towns of the LPA with Bangalore.

Plate 7.1: KSRTC bus stand in Kanakapura


PARATRANSIT SERVICE

Para-transit or Intermediate-transit service like Auto-rickshaw service exists in Kanakapura Town and
Harohalli. Both intra-settlement and inter-settlement service is available. Organised auto stand is
located in Kanakapura town beside the KSRTC bus stand.

Plate7.2: Auto stand in Kanakapura and Harohalli


Sky Group

P a g e | 79

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

ROAD NETWORK AND ITS CHARACTERISTICS


The total area under the Kanakapura LPA is 412 sqkm. The total area under traffic and transportation
landuse is 2.23%. The table below gives a list of major road categories in the LPA.

Table4.6: Road category in Kanakapura Taluk

Sl

ROAD CATEGORY

ROAD LENGTH

MAINTAINED BY

National Highway

47

PWD

State Highway

78.5

PWD

Major District Roads

505.35

PWD

Other district roads

785.4

PWD

Forest roads

21

FOREST DEPT

Source: PWD, Forest Dept


Kaggalipura

The National Highway (NH) 209 runs from north to south forming the major arterial road in the
transport network in the LPA. The Bannerghatta Road is a major regional road that originates in
Kaggalipura and connects the town to Bangalore in the east. The Agara main Road connects the
town to Dinnepalya and further west. Local roads form the rest of the road network in the town.

Table4.7: Road inventory, Kaggalipura town


Sl

Name of
road

Hierarchy

RoW
(ft)

Carriag

Metalled/

eway

Non-

(ft)

metalled

No of

Street

lanes

Lights

Foo
Median

tpat
h

Yes
1

NH 209

NH

70

30

Metalled

Yes

(within
municip

No

al limits)
2

Bannerghatta

Arterial

Road

Road

Sky Group

30

21

Metalled

Partial

No

No

P a g e | 80

Kanakapura LPA Master Plan 2031

Agara Main

Sub-

Road

arterial

Chapter 4 : Existing landuse and Transportation

30

15

Partially
Metalled

No

No

No

Source: Primary Survey

Plate7.3: Road condition in Kaggalipura

Harohalli

The National Highway running North-South forms the arterial road in Harohalli town. The AnekalBidadi road forms a major link in east-west connectivity, connecting Anekal in the east and Bidadi in
the west. Local streets form the rest of the road network in the town.

Table 4.8: Road inventory, Harohalli town


Sl

Name of
road

Hierarchy

RoW

Carriageway

(ft)

(ft)

Metalled/
Nonmetalled

No of

Street

lanes

Lights

Median

Foot
path

Yes
1

NH 209

NH

70

30

Metalled

Yes

(within
municipal

No

limits)
Anekal2

Bidadi

Arterial

35

24

Metalled

Partial

No

No

Road

Source: Primary Survey

Sky Group

P a g e | 81

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

Plate7.4: Road condition in Harohalli


Kanakapura

Road network inventory has been carried along the major roads in the Kanakapura Town. After an
initial reconnaissance survey, the following roads have been shortlisted as major roads in the town.
All major roads are metalled and all roads besides the national Highway consist of two lanes. Median
is present on the National Highway within the municipal limits. Streetlights are present in almost all
major roads. Footpath is not present in any of the major roads in the town. The table below lists out
the inventory of the major roads in the LPA.

Table 4.9: Road inventory, Kanakapura town


Source: Primary Survey

Sl

Name of

Hierarch

RoW

road

(ft)

Carriagewa

Metalled/

Non-

(ft)

metalled

No of

Street

lanes

Lights

Median

Footpath

Yes
1

NH 209

National
Highway

70

30

Metalled

Yes

(within
municipal

No

limits)
2

SH 3
NH-SH link
road

SH

24

20

Metalled

Yes

No

No

Collector

26

20

Metalled

Yes

No

No

Collector

24

18

Metalled

Yes

No

No

Kanakapura
4

- Malagalu
Rd

Sky Group

P a g e | 82

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

Plate7.5: Road condition in Kanakapura


Sathanur

The major roads in Sathanur besides the NH 209 is the Sathanur Channapatna Road which connects
Channapatna to Sathanur and the Sathanur-Muthathi Road which connects Sathanur to the Cauvery
river valley and the Elephant Corridor in the south. The Road network in Sathanur is composed
mainly of local roads. The inventory of major roads is listed in the table below.

Table 4.10: Road inventory, Sathanur town

Sl

Name of

Hierarch

RoW

road

(ft)

Carriag

Metalled/

eway

Non-

(ft)

metalled

No of

Street

Media

Footpat

lanes

Lights

Yes
(within
1

NH 209

NH

70

30

Metalled

Yes

munici

No

pal
limits)
Sathanur2

Muthathi

Arterial

21

18

Metalled

No

No

No

Arterial

36

14

Metalled

No

No

No

Road
3

SathanurChannapatna

Source: Primary Survey


Sky Group

P a g e | 83

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

CONNECTIVITY, ACCESSIBILITY AND ROAD DENSITY


The connectivity of the region is measured in terms of length of roads in km per sq km of area. The
road density of the Planning area is 0.948 km per sq. km of area, compared to the national value of
.115 km of road per Sqkm1.

The World Bank report for Rural accessibility index says Rural access is measured in terms of no of
people within 2kms (walking distance of 20-25 min) of an all-weather road as a percentage of the
total rural population. An all-weather road is a road that is accessible all year round by the prevailing
means of rural transport (typically a pick-up or a truck which does not have four-wheel-drive).
Occasional interruptions of short duration during inclement weather (e.g., heavy rainfall) are
accepted, particularly on lightly trafficked roads.
The relationship between transport and poverty reduction is neither straightforward nor automatic.
However it is apparent that improvements in transport have the greatest impact on poor people when
made in concert with activities in other sectors. It is similarly apparent that development in other
sectors will be hampered without attention to transport issues.

Accessibility in urban areas can also be defined in terms of kilometres of road length per 1000
people. As per data, the accessibility index for Kanakapura Taluk is 4.47 km per 1000 population.

TRIP CHARACTERISTICS
There is no defined Central Business District or Commercial Area in the Kanakapura Town, though
commercial activities are concentrated mainly along the National Highway and the State Highway.
More over the entire town has a predominant residential land use. So deriving specific trip directions
is not possible. However, the KSRTC bus stand can be considered as the origin and destination of
major outstation trips in the peak hours.

(*Source World Bank report: India, Transport at a glance)

Sky Group

P a g e | 84

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

VEHICULAR GROWTH PATTERN


As per Ramanagara district statistics 2010-2011, there are approximately 23,000 registered vehicles
in Kanakapura Taluk. The table below shows the vehicular statistics of Kanakapura Taluk. The figure
below shows the share of the vehicle types in the Taluk.

Table4.11: Vehicle distribution in Kanakapura Taluk


SL

CATEGORY

NO OF VEHICLES

Goods Vehicles

1423

Buses

39

Motor Cabs

219

Maxi Cabs

197

Three Seated Vehicles

880

Four To Six Seated Vehicles

987

Two Wheelers

14212

Cars

2239

Jeeps

10

Omni Bus

45

11

Tractors

1251

12

Trailers

1237

13

Ambulance

14

Others

275

TOTAL

23008

Source: RTO

It can be seen from the figure below that, two wheelers constitute the largest share of the vehicles in
the Taluk followed by four wheelers.

Sky Group

P a g e | 85

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

Vehicles in Kanakapura

Goods vehicles
Buses
motor cabs

0%
0% 1%
0%
0%

6%

5%

maxi cabs

1% 1%
6%

three seated vehicles

4%
4%

10%

four to six seated vehicles


two wheelers
cars
jeeps
omni bus
tractors

62%
trailers
ambulance
others

Figure4.2: Vehicles in Kanakapura Taluk


Source: RTO

FREIGHT MOVEMENT
The KIADB industrial estate is the major industrial area in the Kanakapura LPA. Since the National
Highway 209 is the primary regional linkage, it forms the major corridor of freight movement. Phase 1
and 2 of the Industrial Estate has been commissioned presently and occupancy of the plots is
presently low2, hence the impact of freight movement on the traffic flow is not visible presently.
However, with increase in the number of industries in Harohalli and development of Harohalli-Bidadi
Industrial corridor, a separate freight route would be necessary, especially around the Kanakapura
Town, which sees heavy traffic on the NH 209.

Primary Survey observation

Sky Group

P a g e | 86

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

MAJOR ISSUES

Road hierarchy is non-existent in the road network of Kanakapura Town. As such all major
traffic flows through the NH 209 and SH 3. Proper segregation of intra-settlement and intersettlement traffic is essential to ensure unhindered flow to regional traffic.

Regional Freight route originating in the industrial areas should be delineated to avoid conflict
with normal traffic flow.

On street parking of two wheelers and four wheelers on NH 209, SH 3 and other major roads
cause hindrance to regional traffic flow. Adequate parking facility should be provided in the
commercial areas.

Sky Group

P a g e | 87

Kanakapura LPA Master Plan 2031

Chapter 4 : Existing landuse and Transportation

Plate 7.6: Issues in LPA: Parking situation in commercial areas,


inadequate road width

The regional roads in the LPA SH3, Bannerghatta main Road, and Anekal-Bidadi Road
have inadequate carriageway width and are ill maintained3. Initiative should be taken to
improve the existing regional linkages of the LPA.

The National Highway has given rise to major commercial activities in the adjacent properties
in Kanakapura Town. Pedestrian-vehicular traffic movement conflict is hence a major problem.
Footpaths and adequate pedestrian transfer facilities are required in the areas.

Primary Survey observation

Sky Group

P a g e | 88

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

CHAPTER 5

INFRASTRUCTURE
5.1 PHYSICAL INFRASTRUCTURE
WATER SUPPLY
Water supply is related to the main themes in the development agenda poverty alleviation,
environment protection, private sector led growth, participatory development and good governance.
The growth process and the expansion of economic activities inevitably lead to increasing demands
for water for diverse purposes of which drinking and domestic needs attains paramount importance.
However this essential commodity for sustenance of life is not adequately available to a large number
of people especially in the rural areas and even in parts of urban settlements. Domestic and industrial
water needs have largely been concentrated in and around principal cities but with steep population
hike, demand for water is increasing at a superfast pace. As a result water, which is already a scarce
commodity, is going to become a scarcer commodity in future.
Water quality deterioration has also set in and maintaining water quality is a foremost requirement. It
is one of the most crucial elements in planning. Efforts to develop, conserve, utilize and manage this
immensely important resource have to be whole heartedly made keeping the National perspectives in
view. AT the same time a strong database needs to be prepared to monitor and integrate the water
based activities like city planning, industrial planning and development etc. Serious wastage of water,
water loss in transmission, wastage by public are also issues that need to be addressed.

SITUATION APPRAISAL: RAMANAGARA DISTRICT


The figure below shows the distribution of households in Ramanagara district by the source of
drinking water. According to census 2011, 80% of the households are supplied by tap water and 16%
by tube wells. Smaller number of households is supplied by wells (0.7%), hand pumps (1.6%) and
spring water (0.1%).

Sky Group

P a g e | 89

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

AVAILABILITY OF DRINKING WATER SOURCE


Tap-From Treated Source
Tap- From Untreated source
WELL- covered
WELL uncovered
Handpump
Tube well
Spring
River, canal
Tanks, pond, Lake
Any other source

Figure5.1: Distribution of households by availability of drinking water


source; Source: HH series data, census 2011

LOCATION OF DRINKING WATER SOURCE

It can also be seen from the figure


AWAY
14%

above that only 29% of the households


WITHIN THE
PREMISES
29%

have a drinking water source in the


house

premises.

Majority

of

the

households (57%) avail drinking water


NEAR THE
PREMISES
57%

from a source near premises, while


14% of the households avail water from
a source away from premise.

Figure 5.2: Distribution of households by location of drinking water


source; Source: HH series data, census 2011

SOURCE: URBAN AREAS

BWSSB supplies water to Kanakapura Town along with Bangalore. Hence there are no town level
pumping, distribution and treatment facilities for the surface water source. Cauvery is the surface

Sky Group

P a g e | 90

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

water source to the LPA. The surface sourceis Cauvery River at a distance of 10km from the town.
An average of2.5 MLD of water is drawn from thesource through BWSSB pipelines.

SOI maps followed by field observations supplemented by WRDO reports, indicates that there exists
many lakes and tanks network systems in the conurbation area and neighbouring villages. The
ground water source includes134 borewells out of which 74 borewells are fitted with power pumpand
the remaining bore wells arefitted with handpumps. A total of 1.5MLD of water is extracted from
borewell sources. The present water supply to thetown is 4.8 MLD 1 with per capita rate of water
supply being 75-80 lpcd.

Table 5.1: Water supply source for Kanakapura TMC


SL

SOURCE OF WATER

YEILD

Cauvery River

2.5 MLD

Ground Water Source

1.5 MLD

Source: CIP for Kanakapura TMC, 2007

WATER SUPPLY NORMS PRESCRIBED BY CPHEEO

The per capita domestic requirements as per norms prescribed by Central Public Health and
Environmental Engineering Organization (CPHEEO), Ministry of Urban Development, and Govt. of
India are as under:

Table 5.2: Water Supply standards CPHEEO


Sl

Category

Towns provided with piped supply but without sewerage system

Norms for W/S (litres per


capita per day)

70

Cities provided with piped supply for which sewerage system is


2

existing/ contemplated

135

Metropolitan and Mega cities provided with piped water supply


3

where sewerage system is existing / contemplated

150

Kanakapura Town Municipal Council website: www.kanakapuratown.gov.in

Sky Group

P a g e | 91

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

DOMESTIC WATER DEMAND IN THE KANAKAPURA LPA

The present water demand in the Kanakapura LPA has been calculated as follows:

Table 5.3: Present Domestic water requirement in Kanakapura LPA


SL

AREA

POPULATION

PER CAPITA
WATER
CONSUMPTION
PER DAY (litres)

WATER DEMAND
(MLD)

Kanakapura TMC

54021

135

7.3

Villages in LPA

126916

552

6.9

TOTAL

14.27

The domestic water requirement of the Kanakapura TMC @ 135 lpcd is calculated to be 7.3 million
litres per day, while that of the villages is 6.9 million litres per day.

GAP IN DOMESTIC WATER SUPPLY


The present supply of water in Kanakapura town is 4.8 MLD while the present demand calculated
according to CPHEEO norms is 7.3 MLD. As such there is a deficit in supply

DOMESTIC WATER SUPPLY GAP IN KANAKAPURA TMC 2011


8
7
6
5
4

VOLUME (Mld)

3
2
1
0
PRESENT DEMAND

PRESENT SUPPLY

Fig5.3: Domestic Water Supply Gap in Kanakapura LPA

CPHEEO norms

Sky Group

P a g e | 92

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

INDUSTRIAL WATER DEMAND

724 acres of industrial area have been proposed in the Landuse Plan of the LPA. According to the
Industrial Perspective Plan, 794 Tiny and SSI Units have been proposed and 168 Large and Medium
Industries have been planned. The water requirement is calculated (from existing supply at Bidadi
cluster) to be 3.3 MLD for the industrial area,

WATER TREATMENT AND TRANSMISSION: URBAN AREAS

There is no water treatment plant in Kanakapura Town. The head works are located at
Jakkegowdnadoddi constructed on banks of River Cauvery at a distance of about 10 KM from the
town. The town doesnot have separate town level water pumping and raw water storage system for
the surface water source.The BWSSB which provides water to Bangalore city also provideswater to
the Kanakapura town. The treated water is distributed through the BWSSBpipelines to the service
reservoirs.The borewell water is pumped by pumping stations located at Malagala road and Rural
police station. The pump house at Malagala road is situated on the banks of Arkavati River. It pumps
water from 3 borewells and supplies to a 75 KL sump.From there it is pumped to OHT at
Chamundeshwara choultry using submersible25HP pump with 100% standby. The pump house at
rural police station also has asump of 75KL and pumps water from 3 borewells by 25 HP pump with
100% standby. It is further pumped to the service reservoir.

EXISTING STORAGE CAPACITY: KANAKAPURA

There are 4 Over Head Tanks (OHTs) and 2 Ground Level Storage Reservoirs (GLSR) in the town.
The total storage capacity of the reservoirs in the town is 3.05ML (2.45 ML in OHT and 1.5ML in the
GLSR). The details of the service reservoirs in the town are listed in the table below.

Table 5.4: Details of existing storage reservoirs


SL

LOCATION of OHT

CAPACITY (in Lakh Litres)

OHT
1

Near rural police station / Raghavendra tent house

Sky Group

10.00

P a g e | 93

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

Near IB

10.00

Near rural police stn / Raghavendra tent house

4.50

Chamundershwari choultry

4.50

GLSR
1

Malagala pump house

0.75

Near rural police stn / Raghavendra tent house

0.75

TOTAL

30.5

Source: CIP for Kanakapura TMC

WATER SUPPLY COVERAGE: KANAKAPURA TOWN

The total length of existing distribution network in the city is 50 km. The distribution network coverage
is 75% with comparison to existing road length of 67 km. The status of water supply in Kanakapura
Town is shown in the table below:

Table5.5: Municipal water supply source in Kanakapura Town


Source of Water

No of existing units

No of bore wells fitted with hand pumps

54

No of bore well with power pump

89

No of domestic water supply connections

5159

No of commercial water supply connections

151

No of public taps

1563

Source: www.kanakapuratown.gov.in

WATER SOURCE: VILLAGES

Surface water, tanks and ground water are the primary sources of drinking water in rural Kanakapura.
The Major and Medium irrigation projects are potential sources for drinking water supplies in their
respective command areas. Cauvery if the major source of drinking water in the urban areas though

Sky Group

P a g e | 94

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

rural areas are excluded from its coverage. There is a recorded history of providing priority to tank
development in each village. They were primarily meant for irrigation and as a source of drinking
water. Their development was mostly done on a aquifer basis and was in a networked and cascading
manner i.e. over-flow of upper (higher elevation) tank used to reach the next tank and so on until the
last tank (lower most elevation) was filled. Their capacity was decided more on the basis of local
needs. Geology and soil type make ground water recharge favourable in the LPA. Hence ground
water is a major source of drinking water.

WATER QUALITY

With increasing industrialization, urbanization and deforestation, the quality of water resources
available to mankind is deteriorating day by day. The supply of drinking water in terms of both quality
and quantity is a major concern now. Out of many chemical and biological contaminants in drinking
water, excess Fluoride and arsenic are of the utmost concern due to their serious health impacts. The
study conducted by Rajiv Gandhi National Drinking Water Mission during 1990-1992 has reported 15
States (including Karnataka) endemic for the Fluorosis. Therefore, effective surveillance and
monitoring of water quality becomes very important in the state of Karnataka.

The quality of drinking water affects health of the consumers because certain bacteria and microbial
diseases, toxic chemical compounds etc. can be transmitted to the human body through water.
Experience has shown that community health and water quality is directly related to each other and
that an improvement in the quality of drinking water supply is followed by an improvement in
community's health. The Karnataka Ground Water Quality Data report3 says that out of 612 villages
in the Kanakapura Taluk, 16 villages were affected with excess fluoride in drinking water while 4
villages were affected with excess Iron.

ISSUES

1. The per capita water supplied to Kanakapura Town at present is 75-80 lpcd, which is
considerably lower than the 135 lpcd stipulated by the CPHEEO norms. As such there is
water scarcity in the LPA. The gap between supply and demand would increase in future as
shown in figure 9.3.

Prepared by Karnataka Rural Water Supply and Sanitation Agency

Sky Group

P a g e | 95

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

2. At present only 75% of the Kanakapura TMC is covered by the water supply network,
whereas ideally the entire town should have access to potable water.
3. Excess fluoride (above 1.5 ppm)4 and iron in drinking water has been reported in the villages
of Kanakapura posing serious threat to health.
4. Brackishness in water has also been reported in ground water in rural areas. Such
characteristics of water are highly harmful for public health and should be removed by
treatment.
5. Only 20% of the total population get treated water from taps. Water treatment is an important
aspect of water supply
6. 14% of the population avail water from a source away from their dwelling unit. Care should be
taken to provide potable water within or near the dwelling unit for the entire population.
7. Water supply system should be designed in consideration with the natural topography of the
land, to assure adequate water pressure in all areas.

Karnataka Rural Water Supply and Sanitation Agency report

Sky Group

P a g e | 96

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

DRAINAGE AND SANITATION


CPHEEO suggests standards for physical level of sanitation services according to population of
urban and rural centres. For sanitation, it is envisaged to achieve 100% of population coverage for
Class I urban areas (population 1 lac and above), 80% of population coverage in other urban centres
with provision for sewerage, sewage treatment facilities and low cost sanitation methods. However
the shortfall in achieving the target is significant. According to projection of Census of India 2001, only
73.7% of the urban population has access to latrine facilities of various types and it is estimated that
by the year 2025, more than 50% of the countrys population will settle in urban areas when issue
related to sanitation in urban areas will assume a very serious dimension. Needless will be to
mention, sanitation has a close and direct link with environment, water supply and its cleanliness,
health and hygiene. The problem of sanitation, associated with steep influx of population in urban
areas, therefore needs to be addressed forth with, debated and deliberated at length, by the policy
planners for the development of urban/city areas. The capital-intensive nature of sewerage system
has put many roadblocks in urban planning primarily due to weak financial positions of most of the
ULBs

INTRODUCTION

Efficient sewerage and sanitation system is a pre requisite for maintaining health and hygiene in
society. Diseases, especially water borne diseases spread due to unsanitary conditions. Due to rapid
growth of population in Kanakapura LPA, additional pressure would be created in the existing
network. Hence, upgradation and extension of the system is necessary.

DRAINAGE NETWORK

The general topography of the town slopes towards the River Arkavathy which flows adjacent to the
town. The total length of drains in the town is approximately 55km out of which 8km of drains is in
major valley portions. 33 km of the total drains is of pukka type and 13km is kachha type. The storm
water drains also receive partial sullage since the town is only partially covered by underground
drainage system.

With respect to the existing road network, there is 70% coverage of storm water drains in the town.

Sky Group

P a g e | 97

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

SEWERAGE GENERATION IN THE LPA

The sewage generation is approximately assumed to be 80 % of total net water supply has
beenconsidered out of which water supplied for green areas, washing streets, Horticulture, Fire
fighting would cover the ground water infiltration. Present sewage generation in the LPA is calculated
as shown in the table below.

Table 5.6: Sewage generation in the LPA,2011


SL

AREA

POPULATION

Water consumption (Mld)

Sewerage generation
(Mld)

Kanakapura TMC

54021

7.29

5.83

Villages in LPA

126916

6.98

5.58

14.27

11.42

TOTAL

*Calculated @ 80% of total water supply as sewage .

UNDERGROUND SEWERAGE SYSTEM

Kanakapura Town is only partially covered by underground sewerage system. A total of 71.6 km of
sewerage network is proposed to be laid to cover the entire town area. 19.28 Ha land has been
acquired in Aralalu village for construction of Sewage Treatment Plant (STP).

DISTRIBUTION OF SANITATION FACILITIES

Availability of toilet facilities in Ramanagara district


Toilet facility
present within
premises
42%

The

figure

below

shows

the

availability of toilet facilities in the


Ramanagara district. It can be seen
that only 42% of the households
have toilet facility present within

Open
defecation
56%

their premises. 1.8% uses the


community toilet while 42% go for
open defecation.
Community
Toilet
2%

Sky Group

P a g e | 98

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

Figure 5.4: Availability of sanitation facilities in Ramanagara district,


Source: census 2011

Percentage of households

Availability of Toilet Facility Kanakapura taluk


100
90
80
70
60
50
40
30
20
10
0

Bathroom
facility Kanakapura
Taluk
Percentage
53.4

Bathroom
facility-Rural
Areas
48.1

Bathroom
Toilet faciltyToilet facilty- Toilet faciltyfacilityKanakapura
Rural Areas Urban Areas
Urban Areas
Taluk
87.4

24.8

15.6

83.6

Figure 5.5: Availability of toilet and bathroom facility in Kanakapura


Taluk
Source: District statistical Handbook, census 2001
It can be seen from the statistics of the Kanakapura Taluk that, 53.4% of the households in the Taluk
have access to bathroom facility while only 24.8% had access to a toilet. Thus more than half the
population in the LPA lives without a toilet facility. In urban areas however, 87.4% of the households
have access to a bathroom and 83.6% have access to a toilet. The situation is alarming in the rural
areas where only 15.6% of the households have access to a toilet.

RURAL SANITATION

Promotion of rural sanitation is being carried out through the implementation of Nirmala Grama
Yojane. Providing toilet facilities to primary schools with water supply facility is also a component of
the programme. Efforts have also been made to create awareness among the people on hygiene and
cleanliness through the Total Sanitation Campaign (TSC).

ISSUES

The critical issues for sewerage and sanitation in the Kanakapura LPA are as follows:
Sky Group

P a g e | 99

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

1. Access to toilets in rural areas is alarmingly poor (15.6%). Abandoning of open defecation is
needed not only for human health but also for economic and social development. It pollutes
ground water, contaminates ground water and spreads diseases like diarrhoea and cholera.
2. Underground sewerage system has only partial coverage in Kanakapura town whereas ideally
the entire town limits should be under coverage.
3. In majority of the urban area surface drains are either absent, improperly constructed and
maintained or are blocked.
4. There is lack of municipal maintenance of the drainage system.
5. Total coverage of the town area is absent.

Plate 9.1: Drainage network in Kanakapura LPA

Sky Group

P a g e | 100

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

SOLID WASTE MANAGEMENT

INTRODUCTION

Solid waste can be defined as material that no longer has any value to the person who is responsible
for it, and is not intended to be discharged through a pipe. It is generated by domestic, commercial,
industrial, healthcare, agricultural and mineral extraction activities and accumulates in streets and
public places.
The production of solid waste in an urban area is an attribute of the socio economic profile of the
population and activities in the area. More the city is developed; more is the generation of wastes.
Again, the pre dominance of the industrial and commercial land use in the city increases the
generation of wastes.
It is estimated that about 1, 00,000 MT of Municipal Solid Waste isgenerated daily in the country. Per
capita waste generation in major cities rangesfrom 0.20 Kg to 0.6 Kg. Generally the collection
efficiency ranges between 70 to90% in major metro cities whereas in several smaller cities the
collectionefficiency is below 50%. It is also estimated that the Urban Local Bodies spendabout Rs.500
to Rs.1500 per tonne on solid waste for collection, transportation, treatment and disposal. About 6070% of this amount is spent on street sweepingof waste collection, 20 to 30% on transportation and
less than 5% on final disposalof waste, which shows that hardly any attention is given to scientific and
safedisposal of waste.

MUNICIPAL SOLID WASTE MANAGEMENT

Waste generated in a society can be classified, as per CPHEEO as follows:


Residential waste:This category of waste comprises the solid wastes that originate from single and
multi-family household units. These wastes are generated as a consequence of household activities
such as cooking, cleaning, repairs, hobbies, redecoration, empty containers, packaging, clothing, old
books, writing/new paper, and old furnishings etc
Commercial waste:Included in this category are solid wastes that originate in offices, wholesale and
retail stores, restaurants, hotels, markets, warehouses and other commercial establishments. Some
of these wastes are further classified as garbage and others as rubbish.

Sky Group

P a g e | 101

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

Municipal Waste:Municipal wastes include wastes resulting from municipal activities and services
such as street waste, dead animals, market waste and abandoned vehicles. However, the term is
commonly applied in a wider sense to incorporate domestic wastes, institutional wastes and
commercial wastes.
Industrial Waste:In the category are the discarded solid material of manufacturing processesand
industrial operations. They cover a vast range of substances which are uniqueto each industry. For
this reason they are considered separately from municipalwastes. It should be noted, however, that
solid wastes from small industrial plantsand ash from power plants are frequently disposed of at
municipal landfills.

Municipal Solid Waste Management (MSWM) involves management of activities associated with
generation, storage, collection, transfer and transport, processing and disposal of solid waste.

INDUSTRIAL SOLID WASTE MANAGEMENT

Management of Industrial Solid Waste (ISW) is not the responsibility oflocal bodies. Industries
generating solid waste have to manage such waste bythemselves and are required to seek
authorizations from respective State PollutionControl Boards (SPCBs) under relevant rules. However,
through joint efforts ofSPCBs, local bodies and the industries, a mechanism could be evolved for
bettermanagement.

Assessment of industrial solid waste management problem greatly variesdepending on the nature of
the industry, their location and mode of disposal ofwaste. Further, for arriving at an appropriate
solution for better management ofindustrial solid waste, assessment of nature of waste generated is
also essential.

Industries are required to collect and dispose of their waste at specificdisposal sites and such
collection, treatment and disposal is required to bemonitored by the concerned State Pollution Control
Board (SPCB) or PollutionControl Committee (PCC) in Union Territory. The following problems
aregenerally encountered in cities and towns while dealing with industrial solid waste

There are no specific disposal sites where industries can dispose their waste;
Mostly, industries generating solid waste in city and town limits are ofsmall scale nature and
even do not seek consents of SPCBs/PCCs ;

Sky Group

P a g e | 102

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

Industries are located in non-conforming areas and as a result they causewater and air
pollution problems besides disposing solid waste.
Industrial estates located in city limits do not have adequate facilities so thatindustries can
organize their collection, treatment and disposal of liquid andsolid waste;
There is no regular interaction between urban local bodies andSPCBs/PCCs to deal such
issues relating to treatment and disposal of waste
and issuance of licenses in non-conforming areas.

SOLID WASTE GENERATION

By comparing the per capita waste generation in different Indian cities, CPHEEO has suggested
norm for solid waste generation according to different activities.

Residential refuse: 0.3 to 0.6 kg/cap/day

Commercial refuse: 0.1 to 0.2 kg/cap/day

Street sweepings: 0.05 to 0.2 kg/cap/day

Institutional refuse: 0.05 to 0.2 kg/cap/day

Hence the total waste generated in the LPA can be computed as follows:

Table5.7: Solid Waste generation in the LPA


Domestic Waste
generated (in ton)

Non-domestic Solid
waste generated
(in ton)

Total waste
generated
(in ton)

Land fill area


required 2011
(acres)

Sl.

Area

Population

Urban area

54021

27.01

5.40

32.41

1.97

Rural Area

126916

38.07

12.70

50.77

3.08

TOTAL

83.18

5.05

*Calculated @ .5 kg domestic waste for urban areas, @.3 kg domestic


waste for rural areas and 0.1 kg non-domestic waste for the LPA
The solid waste generation details of Kanakapura Municipal area at present as per Kanakapura TMC
are as under

Table9.8: Municipal Solid waste management data


Total Solid Waste
Generation per day
(in ton)

Sky Group

Total MSW
collected (in ton)

No of vehicles for
Transport and
Disposal

Area of Land fill


site (acres)

Percentage of houses
covered under door-todoor collection

P a g e | 103

Kanakapura LPA Master Plan 2031

19

16

Chapter 5 : Infrastructure

05

10.01

45%

Source: www.kanakapuratown.gov.in

COLLECTION, STORAGE, TRANSPORT, PROCESSING AND DISPOSAL OF SOLID WASTE

Action plan for Solid Waste Management in the Kanakapura town has been approved and is currently
in the state of implementation. Tools, equipment and vehicles have been procured as seen in the
table below.

Table5.9: Tools and Equipment procurement under SWM Acti on Plan


Tools, equipment, vehicle

Numbers

Tractor placers

02

60 HP tractor with dozer and backhoe

01

40 HP tractor with hydraulic trailer

01

Push cart

26

Dumper placer container

12

Long Handle brooms

640

Metal Scrapper

160

Metal Tray

160

Litter bins

10

Ghamela

32

Source: www.kanakapuratown.gov.in
Information, Education, Communication (IEC) activities are carried out the TMC by engaging the Self
Help Groups5.
Collection: Door-to-door collection is carried out in 21 out of 27 wards. Manual scavenging does not
exist in the TMC area.
Secondary Collection and Transportation: Metal containers of dimension 3 cum are being used for
secondary storage which is handled mechanically through tractor placers.

Policy on Integrated Solid Waste Management, Government of Karnataka as prescribed by the Karnataka Urban Infrastructure Corporation
KUIDC for compliance by the local bodies.l

Sky Group

P a g e | 104

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

ISSUES

1.

INADEQUATE LANDFILL SITES FOR FUTURE SCENARIO

A landfill site of 10 acres has been allocated in Kanakapura TMC. Even though it is adequate for
2011, it would be inadequate for 2031. Provision for landfill sites is also required at Harohalli,
Kaggalipura and Sathanur.
2.

INADEQUATE RESOURCE

There is inadequacy of resource in terms of municipal workers, solid waste management tools and
equipment in the municipality.
3.

NO WASTE SEGREGATION

Concept of segregation of waste is largely absent and people are totally ignorant about the
significance and necessity of segregation of Solid waste
4.

ABSENCE OF PROPER COLLECTION AND TRANSPORT:

The process of collection, which requires substantial man and logistics management, is very poor.
This coupled with lack of proper transportation has resulted in a situation wherein 50-70% of the
waste is not collected at all.
5.

LACK OF AWARENESS IN GENERAL PUBLIC

There is no awareness among the general public about the solid waste management. People are not
aware of the way to dispose the waste. Careless disposal of waste on streets has resulted in littering
of waste.

Sky Group

P a g e | 105

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

POWER AND TELECOMMUNICATION

INTRODUCTION

The power supply is an important component of physical infrastructure for any city or town to work
efficiently. Efficient supply of power ensures proper working of all other infrastructure facilities like
water supply, sanitation etc.
Based on the estimated requirements of power supply in urban area as per the new master plan of
Delhi, the consumption works out to be about 2kw per household/day. The allocation of electric substations is to be done as per the population that is one 11 kV of sub-station for every 15000
population. (UDPFI guidelines) It is the general standard for all categories of towns/ cities.

DEMAND AND SUPPLY

There
Kanakapura Taluk

7330

domestic

consumers in Kanakapura Taluk as

Commercial
consumption
3%
Industrial
consumption
3%
Domestic
consumption
13%

are

compared
consumers.
I P sets
75%

to

4612

15605

commercial
IP

sets

are

currently present in the Taluk. The


figure below shows the electricity
consumption rate in lakh units in

Others
5%

Kanakapura Taluk.

Street Light
installations
1%

Figure5.6: Electricity consumption in Kanakapura Taluk (in lakh units)


Source: Ramanagara district book

Sky Group

P a g e | 106

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

5.2 SOCIAL INFRASTRUCTURE


EDUCATION

INTRODUCTION

Education is recognised as a fundamental human right, along with other necessities, such as food,
shelter and water in The Universal Declaration on Human Rights (1948). The advantages it confers
on individuals and nations are multi-dimensional and multi-faceted. It sustains economic growth by
providing basic as well as specialised skills that ensure increased productivity and higher per capita
incomes.

Achievements in education in Karnataka have been quite remarkable, and the state is moving
towards universal literacy at a steady pace. The literacy rate increased from 56.04 per cent in 1991 to
66.64 per cent in 2001

EDUCATION INFRASTRUCTURE IN THE LPA

According to Department of Public Instruction, Govt. of Karnataka there exist 324 primary schools
and 185 higher secondary schoolsin Kanakapura Taluk. The table below shows the distribution of
educational facilities in the Taluk.

Table5.10: Distribution of Educational facilities in Kanakapura Taluk


Source:
Educational Facility

No of units in Kanakapura Taluk

Lower primary schools

324

Upper primary schools

185

High schools

74

PU colleges

15

General degree colleges (govt.)

General degree colleges (private)

Engineering Colleges

Sky Group

P a g e | 107

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

The distribution of schools according to management is shown in the figure below.


Distribution of schools by Management

NO OF SCHOOLS

1400
1200
1000
800
600
400
200
0

Govt Schools
1424
123

Primary
Secondary

Govt aided schools


31
58

Unaided schools
171
102

Figure5.7: Management wise distribution of schools


Source: Department of public Instruction, Govt. of Karnataka
The Department of Public Instruction, Govt. of Karnataka lists out the infrastructure provision in the
schools in the districts. There are 946 lower primary schools, 455 upper primary schools and 106
high schools. It can be seen from the figure below that almost 80% of the schools have drinking water
facility, 80% of upper primary and almost 60% of the primary and high schools have a separate girls
toilet. 80% of lower and upper primary schools and 60% of high schools have electricity supply. The
details of the facilities can be seen from the figure below.
Infrastructure Facilities in schools in Ramanagara district
1000
900
800
no of schools

700
600
500
400
300
200
100
0

RAMANA
GARA
Lower primary
946

Common
toilet
875

625

891

Play
ground
205

396

923

Compoun
d walls
533

Upper primary

455

447

417

445

217

339

454

342

447

High schools

106

80

74

66

71

17

103

67

89

Girls toilet

Electricity

Ramps

Library

Drinking
water
883

Figure5.8 : Infrastructure facilities in schools in Ramanagara district.


Source: Department of Public Instruction, Govt. of Karnataka
Sky Group

P a g e | 108

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

There are 324 lower primary schools and 185 higher primary schools in Kanakapura Taluk, while the
number of high schools is 74.

EDUCATION LEVEL: INDICATORS

LITERACY RATE

According to census data 2011, the literacy rate in Ramanagara district is 69.2% which is 9% higher
than that of 2001. Literacy rate among men is 76.92% compared to 69.88% in 2001 an that among
women is 61.33% compared to 51.22% in 2001. The average literacy rate of Kanakapura Taluk is
65.1, while that in urban areas in 80.5% and in rural areas is 62.5%. Though there has been
considerable increase in the literacy rate in the region, it is abysmally poor compared to the rest of
BMR. The literacy rate of Bangalore is 88.48% the figures below show the comparative data for the

Percentage of Literates

literacy rates in the district.

LITERACY RATE KANAKAPURA TALUK


100
80
60
40
20
0

KANAKAPURA URBAN

KANAKAPURA RURAL

TOTAL

AVERAGE LITERACY RATE

80.5

62.5

65.1

MALE LITERACY RATE

66.7

43.1

46.3

FEMALE LITERACY RATE

73.9

53.1

56

Figure 5.9: Literacy rate in Kanakapura Taluk


Source: Census 2001

Sky Group

P a g e | 109

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

Percentage of literates

LITERACY RATE
100
80
60
40
20
0

Total

Male

Female

Ramanagara literacy rate 2001

60.71

69.88

51.22

Ramanagara literacy rate 2011

69.2

76.92

61.3

Figure5.10: Literacy rate in Ramanagara district


Source: Census 2011

Percentage of literates

COMPARATIVE LITERACY RATES: RAMANAGARA & BANGALORE

100
90
80
70
60
50
40
30
20
10
0

Total

Male

Female

literacy rate Ramanagara

69.2

76.92

61.3

literacy rate Banaglore

88.48

91.82

84.8

Figure5.11 :Comparison of Literacy rate in Ramanagara and Bangalore


district
Source: Census 2011
ENROLLMENT

According to Department of Public Instruction, Govt. of Karnataka there exist 504 primary schools in
Kanakapura Taluk and 74 higher secondary schools. The enrolment rate for 2009-2010 for
Ramanagara District for 1st to 10th grade is shown below.

Sky Group

P a g e | 110

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

ENROLMENT IN RAMANAGARA DISTRICT- 2009-10

NO OF STUDENTS

17,500
17,000
16,500
16,000
15,500
15,000
14,500
14,000
13,500
13,000
12,500
ENROLMENT 2009-10

CLASS 1

CLASS 2

CLASS 3

CLASS 4

CLASS 5

CLASS 6

CLASS 7

CLASS 8

CLASS 9

CLASS
10

15,546

15,813

15,543

16,093

16,464

15,910

16,642

16,403

16,963

14,152

Figure5.12 : Enrolment rate in primary and secondary classes in Bangalore


rural district
Source: Department of Public Instruction, Karnataka.
It can be seen that the enrolment after 9th grade shows a sharp decrease. The reason for such high
dropout rate should be investigated. It can be absence of senior secondary schools in the villages
which makes commuting an obstacle for education. It can also be absence of proper incentives which
make literacy difficult.

DROPOUT RATE ( age group 6-14)

According to the Ramanagara District


DROP OUTS IN KANAKAPURA LPA

book, there are 40061 students in


age group 6-14 in the Kanakapura
No of out
children out of
school
1%

LPA. 417 of them were found to be


out of school. The dropout rate in the
LPA is 1.04%. The figure below

No of children
in school
99%

shows the distribution of school


children in age group 6-14 during
2010-11.

Figure9.11: Distribution of
school children in age
group 6-14
Source: Ramanagara District Book, 2010-11
Sky Group

P a g e | 111

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

PUPIL TEACHER RATIO ( 1 to 10)

The total no of students in the LPA is 54,359 while the total no of teachers is 2124. Hence the student
teacher ratio is 26:1. The Right Of Children To Free And Compulsory Education Act 2009 states the
student teacher ratio in 1st to 5th standard as 1:30 and that from 6th to 10th as 1:35. Segregated class
wise and school wise data is not available, but the aggregate data meets the national standards of
education.

EDUCATION SCHEMES

Akshara Dasoha Program

The Akshara Dasoha program is an initiative to provide free food to school children and improve their
health and nutrition. It is anticipated that improvement of health and nutrition would automatically
improve the education level and would also support the education objectives of the state.
Akshara Dasoha program aims at providing hot cooked meals to all the children studying in 1 st to 5th
standard in all the Government Primary Schools of the State. The Mission of the program is to free all
the primary school children from hunger, improve their learning abilities and bring about equity.

Sky Group

P a g e | 112

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

HEALTH

INTRODUCTION

Health status is an important indicator of the socio economic conditions of a society since it has far
reaching effects across all socio economic strata. Hence commitment to improvement of health status
especially among women, children and vulnerable population such as schedule casts and scheduled
tribes, is an important goal of any planning process. Efficient planning requires an appraisal of the
current infrastructure and policies, assessment of progress, identification of gaps and proposals to
mitigate the condition.

HEALTHCARE INFRASTRUCTURE IN THE LPA

Health care infrastructure in Kanakapura Taluk consists of one Taluk headquarter hospital, 22 govt.
hospitals, one nursing home and 22 clinics. The table below shows the distribution of healthcare
facilities in the Taluk.

Table: Health care facilities in Kanakapura Taluk.


Source: Ramanagara district book

Health Infrastructure Facilities

No of Units in Kanakapura Taluk

No of Beds

Taluk Headquarter Hospitals

50

Govt. Hospitals

22

224

Nursing Homes

20

Clinics

22

Allopathic Hospitals

50

Private Hospitals

20

Primary Health Centres

19

114

Sky Group

P a g e | 113

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

Community Health Centres

60

Family Welfare Centres

19

Family Welfare Sub-Centres

72

TOTAL

538

Population of Kanakapura Taluk as per census 2001 is 3, 37,208. Hence the no of hospital seats per
1000 population is less than 2, which is much less than the standard value of 4 seats per 1000
population.

Table5.12: No of hospital beds per 1000 population


Source: Ramanagara District handbook
NO OF HOSPITAL BEDS PER 1000 POPULATION

5
4

4
3
2

NO OF SEATS PER 1000


POPULATION

1.59

1
0
KANAKAPURA Taluk

Sky Group

STANDARD

P a g e | 114

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

HEALTH SCHEMES

The National Rural health mission has been introduced to provide universal access to equitable,
affordable and quality healthcare which is responsive to the needs of the people. Initiatives for
reducing child and maternal mortality, stabilising population along with gender and demographic
balance have been taken.

The key features for delivery of NRHM in Karnataka includes making public health delivery system
fully functional and accountable to the community, working in a mission mode, decentralised
planning, delegation of power, human resource management, community involvement, rigorous
monitoring and evaluation against standards, convergence of health related programs and flexible
financing.

The NRHM program has five distinct agenda

Promotion of maternal and child health: Maternal ill health and death impacts families, communities
and societies and has far reaching impacts across all socio-economic strata. Promotion of maternal
and child health is an important objective of NRHM, since mother hood encompasses reproductive
health, family planning, pregnancy, childbirth, infant and maternal mortality.

In view of the above goals, an umbrella scheme has been initiated called the Thayi Bhagya
scheme which consists of three sub schemes Janani Suraksha Yojna, Prasooti Araike and Madilu.

Under Janani Suraksha scheme, poor pregnant women are given financial and institutional
assistance through a decentralised medical infrastructure system. Prasooti Araike is also a part of the
maternal healthcare program in which health care and check up facilities are provided to women.
Madilu is another scheme that was devised to encourage women to deliver in hospitals for which they
would be entitled to medical kit for the baby and the mother.
Sky Group

P a g e | 115

Kanakapura LPA Master Plan 2031

Chapter 5 : Infrastructure

Child health care: Health and well being of children during their intra-uterine period, toddler years,
school age and adolescence needs intervention which is reached out through Maternal and child care
programs and the public delivery system, Anganawadis, ASHAs and schools.
Immunisation: It is the most cost-effective and effective intervention in public health system. Polio,
DTP, BCG, Measles, TB and Hepatitis B vaccines are administered through the various PHCs and
FRUs. Beside this childhood diseases and neonatal illnesses are taken care of through IMNCI
(Integrated Management of Neonatal and childhood illnesses) program.
Disease control program: In order to provide health care facilities to patients with diseases like AIDS,
Leprosy, Tuberculosis and terminal diseases like cancer, several programs have been introduced at
the Taluk level, like AIDS control program, Leprosy control program, TB control program and Cancer
control program, vector disease control program etc.
Inter-sectoral convergence: In additional to the above, facilities like ambulance service have also
been introduced. One ambulance per 1.1 lakh population has been provided for rural areas with a
maximum reaching time of 25.5 minutes.
The table below shows a list of health programs in Kanakapura Taluk

Table5.13: List of healthcare programs in Kanakapura Taluk


Source:Ramanagara district book

Sky Group

Sl

Health care programmes in Kanakapura Taluk

Immunisation program

Family planning Initiative

Aids control Program

Leprosy control program

TB Control program

Cancer Control Program

Janani Suraksha Yojna

Madilu Yojna

P a g e | 116

Kanakapura LPA Master Plan 2031

Chapter 6 : Environmental Issues

CHAPTER 6

ENVIRONMENTAL ISSUES
6.1 POLLUTION: GENERATION AND CONSEQUENCES
AIR POLLUTION

There is no formal report on air quality in Kanakapura. However approximately 6000 Ha of industrial
area has been proposed in the master plan 2031 out of which manufacturing consist of almost fifty
per cent. Hence, air pollution might be a reality in the area in near future. Proposals have been made
in the master plan for action for prevention of industrial pollution.

SOIL EROSION

Kanakapura has good quality agricultural land within its limits which would transform into urbanised
land due to growth pressure. Sustainable agricultural practices should therefore be adopted in the
remaining agricultural land form maximising and sustaining productivity.

6.2 RAIN WATER HARVESTING


Rainwater system is an alternative plumbing system that helps to conserve our limited water
supply. Currently, most of us use clean drinking water straight from the tap to water our gardens.
Rainwater system gives another water choice for irrigating and can save money. Using non-potable
water to irrigate your gar-den can also help replenish local aquifers.

Rainwater harvesting is collected precipitation from rooftops and other above-ground impervious
surfaces that is stored in catchment tanks for later use. Rainwater harvesting systems can range from
a simple barrel at the bottom of a downspout to multiple cisterns with pumps and filtration. The
harvested rainwater is low in sodium and chloramine and fluoride free.

There are two main types of rainwater harvesting systems that vary in complexity, volume of water
stored and permitting requirements.

Sky Group

P a g e | 117

Kanakapura LPA Master Plan 2031

Chapter 6 : Environmental Issues

Rain Barrel A rain barrel system is a simple rainwater collector that captures and stores a portion of
the runoff from a roof downspout. A hose attached to the bottom of the rain barrel can be used to
irrigate your garden. A rain barrel will only capture a small fraction of the rainwater that flows off your
roof, the rest of the runoff will still need to drain to a safe overflow location.

Cisterns Cisterns are larger systems that can hold much more water and may include pumps to move
the rainwater to the garden. More complex systems can involve plumbing and electrical work, soil
excavation or other structural work. For rainwater collection projects of this scale, consult a
professional to review design, construction and safety considerations. Permits and zoning certificates
are required for cistern systems.

Proposal has been forwarded in the Master Plan 2031 for rainwater harvesting techniques in the LPA.

6.3 DISASTER MITIGATION AND MANAGEMENT ISSUES


Till recently, the approach to Disaster Management have been reactive and relief centric. A paradigm
shift has now taken place at the national level from the relief centric syndrome to holistic and
integrated approach with emphasis on prevention, mitigation and preparedness. These efforts are
aimed to conserve developmental gains as also minimize losses to lives, livelihood and property.
A typical Disaster Management continuum as shown below, comprising of six elements i.e.,
Prevention, Mitigation and Preparedness in pre-disaster phase, and Response, Rehabilitation and
Reconstruction in post-disaster phase, defines the complete approach to Disaster Management.

Industrial hazards leading to chemical and


biological disasters and fire hazard are the
most prominent hazards that the LPA
faces.

The

master

plan

proposes

guidelines for undertaking detail studies at


the

micro

level

for

equipping

the

authorities for the same.

Fig 6.1: Disaster Management


Continuum

Sky Group

P a g e | 118

Kanakapura LPA Master Plan 2031

Chapter 7| Problems

CHAPTER 7

PROBLEMS
The following issues have been identified in the Kanakapura Conurbation Area

1. Lack of commercial center at Kanakapura Town. Commercial activities spread along NH


2. No segregation of inter settlement and intra settlement traffic.
3. Congestion on the NH, especially along the Bus Stand.
4. Lack of road hierarchy.
5. Inadequate connectivity.
6. No separate freight route.
7. Presence of slums within town municipal limit.
8. Requirement of additional Residential area for population in 2031. Presently 11% residential
area exists.
9. Landfill site of 5 Ha required for 2031.
10. P&SP area of 90 Ha required for 2031.
11. Protection of valley area of Arkhavathy river is required.
12. Lack of Park and Open Spaces in the urbanised area. Presently 0.24% park and open space
exists.

The following issues have been identified in the Harohalli Conurbation Area

1. Lack of commercial center. No segregation of inter settlement and intra settlement traffic.
2. Lack of road hierarchy.
3. Inadequate connectivity.
4. No separate freight route.
5. Requirement of additional Residential area for population in 2031. Presently 4.29% residential
area exists.

Sky Group

P a g e | 119

Kanakapura LPA Master Plan 2031

Chapter 7| Problems

6. Landfill site of 6 Ha required for 2031.


7. P&SP area of 60 Ha required for 2031.
8. Lack of Park and Open Spaces in the urbanised area. Presently 0.13% park and open space
exists.

The following issues have been identified in the Kaggalipura Conurbation Area

1. Lack of commercial center.


2. No segregation of inter settlement and intra settlement traffic.
3. Lack of road hierarchy.
4. No separate freight route.
5. Requirement of additional Residential area for population in 2031. Presently 5.9% residential
area exists.
6. Landfill site of 6 Ha required for 2031.
7. P&SP area of 40 Ha required for 2031.
8. Lack of Park and Open Spaces. Presently 0.43% park and open space exists.

The following issues have been identified in the Sathanur Conurbation Area

1. Lack of commercial center.


2. No segregation of inter settlement and intra settlement traffic.
3. Lack of road hierarchy.
4. No separate freight route.
5. Requirement of additional Residential area for population in 2031. Presently 4.26% residential
area exists.
6. Landfill site of 10 Ha required for 2031.
7. P&SP area of 40 Ha required for 2031.
8. Lack of Park and Open Spaces. Presently 0.13% park and open space exists.

Sky Group

P a g e | 120

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

CHAPTER 8

VISUALISING THE FUTURE


8.1. INTERIM MASTER PLAN POPULATION PROJECTION - 2021
As per the approved Interim Master Plan 2021, the total population in the LPA as projected at 11.22
lakhs. However the projection has been based on the census 2001 data. The population for Master
Plan 2031 has been estimated using census 2011 data. It also takes into account the growth trends
in the region.
The IMP recognises four important growth nodes in the LPA Kaggalipura, Harohalli, Kanakapura
and Sathanur. The following are the landuse statistics of the four conurbations in the Interim master
Plan 2021.

Table 8.1: IMP landuse analysis Kaggalipura and Harohalli - 2021


LANDUSE

KAGGALIPURA
AREA (sqkm)
PERCENTAGE

HAROHALLI
AREA (sqkm)
PERCENTAGE

RESIDENTIAL

12.31

56.9

10.68

32.0%

COMMERCIAL

1.19

5.5

0.68

2.0%
21.4%

INDUSTRIAL

0.21

1.0

7.14

PUBLIC/SEMI PUBLIC

3.78

17.5

0.85

2.5%

PARKS/ PLAYGROUNDS

1.53

7.1

4.70

14.1%
2.1%

UTILITY AND SERVICES

0.19

0.9

0.69

TRANSPORTATION

2.01

9.3

2.96

8.9%

QUARRIES

0.00

0.0

0.44

1.3%

LAKES/TANKS/RIVER

0.40

1.9

1.53

4.6%

0.0

3.68

11.0%

AGRICULTURE

0.00

TOTAL

21.62

33.35

Table 8.2: IMP landuse analysis Kanakapura and Sathanur - 2021


LANDUSE

KANAKAPURA
AREA (sq km)
PERCENTAGE

RESIDENTIAL

10.82

COMMERCIAL
INDUSTRIAL

SATHANUR
AREA (sq km)
PERCENTAGE

43.0%

7.18

0.56

2.2%

0.68

3.6

3.82

15.2%

7.81

41.3

PUBLIC/SEMI PUBLIC

1.27

5.1%

0.68

3.6

PARKS/ PLAYGROUNDS

4.27

17.0%

1.02

5.4

UTILITY AND SERVICES

0.23

0.9%

0.06

0.4

TRANSPORTATION

2.92

11.6%

1.38

7.3

QUARRIES

0.55

2.2%

0.00

0.0

LAKES/TANKS/RIVER

0.71

2.8%

0.07

0.4

AGRICULTURE

2.34

8.5%

0.00

0.0

TOTAL

27.49

Sky Group

38.0

18.90

P a g e | 121

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

8.2. POPULATION GROWTH TREND IN KANAKAPURA LPA


POPULATION GROWTH IN KANAKAPURA LPA

The Kanakapura LPA is composed of 85 villages and 1 town. The present population of the LPA
villages (census 2011) is 126,916. Total population of the LPA, including Kanakapura TMC is
180,931. The figure below shows the population growth in the LPA from 1961 to 2011.

Population growth in Kanakapura LPA


200000
180000
160000

Population

140000
120000
100000
80000
60000
40000
20000
0
Kanakapura LPA

1961
83194

1971
95887

1981
125993

1991
151998

2001
170278

2011
180937

Figure 8.1 : Population in Kanakapura LPA


Source: Census 2011
Table 8.3: Population growth rate in Kanakapura LPA
Year

Decadal growth rate

Annual growth rate

1991-2001

12%

1.2%

2001-2011

6.25%

0.6%

Sky Group

P a g e | 122

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

POPULATION GROWTH IN KANAKAPURA TMC

Kanakapura Town or TMC is the only urban settlement in the Kanakapura LPA. It has an area of 7.31
sq. km1. The table below shows population in Kanakapura TMC from 1961 to 2011. The present
population of the TMC is 54,021.
Population growth in Kanakapura TMC
60000
50000
POpulation

40000
30000
20000
10000
0
Kanakapura

1961
15000

1971
20000

1981
29000

1991
38000

2001
47000

2011
54021

Figure 8.2: Population in Kanakapura Town;


Source: Census 2011
It can be noted that the population growth in the town is less which can be attributed to lack of
economic activity and growth generators in the LPA
.

Table 8.4: Population Growth rate in Kanakapura TMC


Year

Decadal growth rate

Annual growth

1991-2001

23.6%

2.36%

2001-2011

14.9%

1.49%

Present municipal limits

Sky Group

P a g e | 123

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

8.3. FACTORS AIDING POPULATION GROWTH


The growth of the LPA would largely be dependent upon the industrial proposals in the region.
However, this may not be the sole contributing factor. The other factors that are expected to affect
population dispersal to the Kanakapura LPA are as follows:

Its proximity to Bangalore


Development of Major roads near and passing through the LPA like the IRR passing through
Harohalli, STRR ( approximately coinciding with SH3) connecting Anekal and Ramnagaram,
via Kanakapura, proposed Ring road around Kanakapura, PRR passing through Kaggalipura
and Uttari, Bangalore-Mysore Infrastructure Corridor to the north of LPA and NH 209 passing
right through the LPA by 2021.
KIADB industrial estates in Harohalli-Bidadi area: The industrial estates would

create

employment opportunities for people in and around the region and spur development and
growth in eth LPA.
Availability of ground water in the region as compared to the others: The Kanakapura LPA has
a higher availability of ground water as compared to the rest of the BMR since it is closer to
the Cauvery region. Hence developments are more sustainable and feasible in the LPA.

The Taluk Industrial Plan for the Kanakapura Taluk envisages promoting around 800 tiny & SSI
units including services. The Taluk also has potential for promotion of 168 units in large & medium
sector spread over five years. These investments are likely to generate direct employment for about
60,000 persons and indirect employment to about 24,000 persons.

Sky Group

P a g e | 124

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

8.4. POPULATION PROJECTION


There are two components of projected population
-

Natural Growth of the LPA

Inmigrating population

NATURAL GROWTH OF POPULATION IN THE LPA

The natural increase in the population has been calculated through statistical methods like arithmetic
progression, geometric progression and ANGM (annual national growth method). It has been
observed from the data that many of the villages have a negative growth rate while some of the
villages have compounding positive growth rates. The growth of the population calculated through
various statistical methods is as follows:

Table 8.5: Natural growth of population calculated through various


statistical methods.
Statistical method used

Projected population

Arithmetic Progression

2.75 lakhs

Geometric Progression

2.72 lakhs

Annual National Growth Rate Method

2.82 lakhs

All the statistical methods adopted for projection of population in the LPA yield more or less similar
results.

Table 8.6: Population projection of the villages of LPA

Sky Group

SL

VILLAGE NAME

2021

2031

Cheeluru

3543

3992

Chikkadevarahalli

379

385

Jakkasandra

1741

1710

Keeranagere

817

930

P a g e | 125

Kanakapura LPA Master Plan 2031

Sky Group

Chapter 8 |Visualising the Future

T.Hosahalli

695

668

Bandiganahalli

445

383

Bannikuppe

1374

1408

Bettahalli Kaval

661

844

Bheemasandra

345

374

10

Chulakanakere Kaval

183

219

11

Devarakaggalahalli

699

876

12

Doddamuduwadi

1151

1241

13

Dyavasandra

547

520

14

Gabbadi

2015

2174

15

Gabbadi Kaval

84

96

16

Harohalli

15628

18804

17

Hosakote

863

1017

18

Hulugondanahalli

2305

2764

19

Kaggalahalli

1269

1383

20

Maralagere

263

290

21

Marasandra

768

828

22

Medamaranahalli

1820

2181

23

Mudenahalli

1213

1286

24

Singasandra

1083

1170

25

Vaderahalli

1574

1924

26

Yadamadu

1059

1288

27

Agrahara

639

857

28

Allimaranahalli

2159

2404

29

Anajawadi

2410

2682

30

Aralalu

2042

2330

31

Aralalusandra

1396

1479

32

Aranakuppe

921

1019

33

Baradanahalli

914

947

34

Bekuppe

1321

1333

35

Cheeranakuppe

791

761

36

Chikkamuduwadi

3683

3936

37

Chokasandra

1637

2223

38

Ganalu

1444

1541

39

Hanumanahalli

1481

2146

40

Kallahalli

2148

2440

P a g e | 126

Kanakapura LPA Master Plan 2031

Sky Group

Chapter 8 |Visualising the Future

41

Kanakapura (Rural)

512

416

42

Ramapura

1214

1374

43

Rayasandra

1944

2189

44

Seegekote

1650

1756

45

Shivanahalli

1845

1892

46

Thammasandra

1006

1024

47

Tigalarahalli

692

704

48

Tigalarahosahalli

1337

1424

49

Tungani

1828

1946

50

Vadedoddi

1504

1787

51

Virupasandra

2096

2424

52

Achalu

2772

3077

53

Alur

730

1004

54

Anamanahalli

726

880

55

Bommanahalli

1175

1273

56

Dalimba

1082

1108

57

Deshohalli

58

Halasinamaradahalli

405

454

59

Honniganahalli

973

986

60

Hosahalli

116

117

61

Kabbal

1144

1129

62

Kachavanahalli

1753

1832

63

Kadahalli

1149

1201

64

Kambasagara

855

909

65

Kemmale

1196

1281

66

Mudalaswamikuppe

17

16

67

Naripura

68

Sasalapura

1848

2142

69

Sathanur

5371

5806

70

Tailuru Forest

457

489

71

Thotahalli

1396

1470

72

Yadugowdanahalli

73

Alakabelalu

81

107

74

Gulakamale

2800

3427

75

K. Chudahalli

1698

2104

76

Kaggalipura

17337

24903

P a g e | 127

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

77

Naganayakanahalli

973

1219

78

Nelaguli

1471

1821

79

Nettigere

2391

3096

80

Ravugodlu

1705

2123

81

Somanahalli

5578

6682

82

Sunkadakatte

86

17

83

Tharalu

1692

1906

84

Thattaguppe

3079

3749

85

Uttari

1869

2402

86

Vaddarapalya

1998

2308

87

Kanakpura TMC

78000

100100

TOTAL

225061

272932

2.8 lakhs has been considered as the natural growth in the LPA till the year 2031.

INMIGRATING POPULATION IN THE LPA

The Revised Structure Plan 2031 envisages a 70%-30% population distribution between the core and
the outside by 2031. Hence the local planning areas must be planned to create job opportunities to
realize the regional vision.
The Kanakapura LPA has about 450 tiny and SSI unit at present. KIADB industrial area also exists in
Harohalli area. As such the Industrial Perspective Plan for the Kanakapura Taluk envisaged
promoting around 800 tiny & SSI units including services till 2011. The Taluk also has potential for
promotion of 168 units in large & medium sector spread over five years. These investments are
likely to generate direct employment for about 60,000 persons and indirect employment to about
24,000 persons by 2011.
Since, maximum potential of job creation has not been reached presently; it has been assumed that
the LPA has the potential to create 80,000 jobs by the year 2031. Hence an additional 3.2 lakhs
population will be inmigrating in the LPA by the 2031, out of which 1.25 lakhs is envisaged to be
migrating in 2021 and rest by 2031.
Hence the total projected population in the LPA till the year 2031 is as follows.

Sky Group

P a g e | 128

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

Table 8.6: Projected population in Kanakapura LPA 2031


POPULATION 2031
Natural Increase in the LPA in 2031

2.8LAKHS

In migrating population in the LPA in 2031

3.2 LAKHS

PROJECTED POPULATION 2031

6LAKHS

Hence 6 lakhs has been taken as the projected urban population in the LPA till the year 2031.

DISTRIBUTION ION OF POPULATION


There are four important growth centres in the LPA Kanakapura, Kaggalipura, Harohalli and
Sathanur. The urban population in the LPA has been distributed in these growth centres which
includes natural growth and inmigrating population. The table below show the distribution of
population in the four growth nodes and the villages of the LPA.

Table 8.7: Distribution of population in the four growth nodes


AREA

POPULATION IN 2031

Kaggalipura

1,50,000

Harohalli

1,80,000

Sathanur

90,000

Kanakapura

1,80,000

TOTAL URBAN POPULATION 2031

6,00,000

IMP 2021

8,00,000

A population 6lakh will be accommodated in the four urban areas and a population90,000 will be
accommodated in the villages in the agricultural zone.

A township has been proposed at Sathanur by the BMRDA to host textile and apparel industries. The
township would accommodate a population of 3.2 lakhs. The master plan proposals do not take into
account the population of the township since facilities would be planned separately for it.

Sky Group

P a g e | 129

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

PROJECTED POPULATION IN KANAKAPURA LPA


700000
600000
600000
500000
400000

350000

300000

280000
151998

200000
100000

83194

95887

125993

170278
225000

180937

0
1961

1971

EXISTING POPULATION

1981

1991

2001

2011

PROJECTED URBAN POPULATION

2021

2031

NATURAL GROWTH

Figure 8.3: Projected urban population in Kanakapura LPA


8.5 AREA REQUIREMENT
The requirement of area is calculated on the basis of 67 pph gross density to accommodate the
projected population of 6 lakhs in the four conurbations.

Table 8.8: Population in Kanakapura LPA 2021, 2031


YEAR

POPULATION

TOTAL URBANISABLE AREA


(@67 pph)

2031

6,00,000

9000 Ha

The total urbanisable land required by the year 2031 is 9000 Ha (@ 67 persons per Ha gross density)

PROPOSED LAND UTILISATION STATISTICS

The overall statistics of the LPA as per proposal of Master Plan 2031 is given in the table below. The
total conurbation area is 9075.65 Ha excluding water bodies, agricultural land, forests and hillocks as
shown in the table below.

Sky Group

P a g e | 130

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

Table 8.9:Conurbation area statistics-2031


Category

AREA (In Ha)

TOTAL URBANISABLE AREA IN THE LPA*

9075.65

AREA BEYOND CONURBATION

31125.77

TOTAL LPA

41277.99

*Excluding water bodies, agricultural land, forests and hillocks and quarries

8.6 POPULATION DENSITY 2031


There are four important growth centres in the LPA Kanakapura, Kaggalipura, Harohalli and
Sathanur. The urban population in the LPA has been calculated for these growth centres which
includes natural growth and inmigrating population. The table below show the distribution of
population and the density in the four growth nodes.

Table 8.10: Distribution of population in the four growth nodes


POPULATION IN
2031

Conurbation
area (Ha)*

Gross Density
(pph)

Kaggalipura

1,50,000

2109

72

Harohalli

1,80,000

2721

66

Sathanur

90,000

1858

50

Kanakapura

1,80,000

2386

75

TOTAL URBAN
POPULATION 2031

6,00,000

9075.65

67

AREA

IMP 2021

8,00,000
@ 88 pph

*Excluding water bodies, agricultural land, forests and hillocks and quarries

Sky Group

P a g e | 131

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

8.7 HOUSING REQUIREMENT


The requirement of housing for the LPA for the year 2031 has been calculated as shown in the table
below. The housing requirement of the LPA has been calculated by considering 4.5 persons per
households. The total number of houses required for the LPA is 2 lakhs. The required residential area
is 3500 Ha @40dwelling unit/Ha. The detail housing requirement for each conurbation has been
shown in the table below.

Table 8.11: Residential Area requirement for the LPA


YEAR

TOTAL
POPULATION

TOTAL HOUSES
REQUIRED

TOTAL RESIDENTIAL AREA


REQUIRED ( 40dwelling unit/Ha)

By 2021

3,50,000

80,000

2000

By 2031

6,00,000

1,40,000

3500

Table 8.12: Residential Area requirement in the LPA for the Conurbations
CONURBATION

RESIDENTIAL AREA
2011-2021 ( 40
houses/Ha)

RESIDENTIAL AREA
2021-2031 ( 40
houses/Ha)

TOTAL RESIDENTIAL
AREA
Till 2031

Kaggallipura

400

400

800

Harohalli

550

550

1100

Sathanur

350

350

700

Kanakapura

400

600

1000

TOTAL

1700

1900

3600

Sky Group

P a g e | 132

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

8.8 PHYSICAL INFRASTRUCTURE REQUIREMENT

a.

WATER SUPPLY

The total requirement of the LPA has been calculated using CPHEEO standards for domestic water
supply. Total domestic water requirement in the LPA in the year 2031 is 81 Mld

WATER SUPPLY GAP IN KANAKAPURA LPA


WATER DEMAND IN MLD

90
80
70
60
50
40
30
20
10
0

2011

2021

2031

DEMAND

4.8

47.25

81.00

SUPPLY

4.8

4.8

4.8

Fig 8.4: Water Supply gap in Kanakapura LPA

b. SOLID WASTE MANAGEMENT

The total area required for solid waste management has been calculated based on CPHEEO norms
for Municipal Waste Management. Total area requires for landfill management in the LPA till 2031 is
30 acres.

Table 8.13: Landfill Area Requirement in the LPA


Category
Projected Population 2031

2031
600000

Domestic Waste generated (in kg) @ 0.3 kg per capita per day

180 tonne

Non-domestic Solid waste generated (in kg) @ 0.1 kg per capita per day

60 tonne

Total waste generated (in kg)

240 tonne

Sky Group

P a g e | 133

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

Volume of solid waste (cu m)

269 cu m

Volume of land fill required (cu m)

323 cu m

area of land fill required per day (sq. m)(20 m depth)

17 sq m

Area of land fill required per year ( in acres)

1.48 acres

Area required till 2031

30 acres

8.9 SOCIAL INFRASTRUCTURE REQUIREMENT

a. EDUCATION

Requirement for educational facilities have been calculated using UDPFI guidelines for urban areas.
The total area required for educational facilities in each of the conurbations have been tabulated in
the table below.

Table 8.14: Educational facility Requirement in the LPA


Educational
facility
requirement

UNITS REQUIRED

AREA REQUIRED (Ha)

Educational
facility

Kanakapura

Harohalli

Kaggalipura

Sathanu
r

Nursery school
@ 1/2500
population

72

66

66

Basic primary
school @ 1/
2500 population

72

66

Higher
secondary
school @
1/7500
population

24

Colleges @
1/1.25 lakh
population
Technical
institutions @ 1/
1000000

Sky Group

Kanakapur
a

Harohalli

Kaggalipura

Sathanur

36

66

36

44

27

38

35

35

20

P a g e | 134

Kanakapura LPA Master Plan 2031

Chapter 8 |Visualising the Future

ITI @ 1 /
1000000

1.4

1.4

Engineering
Colleges @ 2 in
urban extension

60

60

medical
Colleges @ 2 in
urban extension

15

15

136.4

52

127

30

TOTAL

b. HEALTH

Requirement for healthcare facilities have been calculated using UDPFI guidelines for urban areas.
The total area required for educational facilities in each of the conurbations have been tabulated in
the table below.

Table 8.15: Medical facility Requirement in the LPA


UNITS REQUIRED
Medical
facility
General
Hospital @ 1
per 2.5 lakh
population500 beds
Intermediate
Hospital (
category A) @
1 per 1 lakh
population 200 beds
Intermediate
Hospital (
category B) @
1 per 1 lakh
population 50-80 beds
polyclinic @ 1
per lakh
population
Dispensary @
1per 0.15 lakh
population

Sky Group

AREA REQUIRED (Ha)

Kanakapura
Town

Harohalli

Kaggalipura

Kanakapura
Town

Harohalli

Kaggalipura

Sathanur

.6

.6

.3

.3

10

10

10

1.2

1.2

1.2

.6

Sathanur

P a g e | 135

Kanakapura LPA Master Plan 2031

Nursing Home
@ 1 per .45 to
1 lakh
population-25
to 30 beds
Child Welfare
& Maternity
Centre@ 1 per
.45 to 1 lakh
population- 25
to 30 beds

TOTAL

Sky Group

Chapter 8 |Visualising the Future

.6

.6

.3

.3

20

25

15

15

P a g e | 136

Kanakapura LPA Master Plan 2031

8.10

Chapter 8 |Visualising the Future

PARTICIPATORY APPROACH

As per the provisions of KTCP Act 1961, the Master Plan would be put up for public display after
provisional approval of the plan by the government. The issues and objection raised by the public
would be then considered and included in the proposal if found feasible and for the greater good.

The RTI Act provides scope for gaining information by the public. The Disclosure Act also provides
scope for discussion on the Master Plan.

8.11

S.W.O.T ANALYSIS

The SWOT analysis of the LPA has been shown below.

WEAKNESS

STRENGTH

1. High Potential for Sericulture

1. Low Ground Water Potential


2. Lack of Mass Transit System.

1. Ground Water pollution due to


industrial development
2. Damage to Sericulture due to
Industrial Development.

1. Industrial Incentives as per the


Industrial Policy 2009-14
2. Sericulture

Incentives

per

Karnataka Vastra Neethi

THREAT

8.12

as

OPPORTUNITY

VISION 2031

The vision of the Master Plan 2031 is as follows;


1. To develop the LPA as a self-sufficient counter magnet to Bangalore.
2. To develop industrial base in the LPA for employment in the region.

Sky Group

P a g e | 137

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

CHAPTER 9

MASTER PLAN PROPOSALS


9.1 COMPONENTS OF THE MASTER PLAN
The contents of a Master Plan are elaborated in Section 12 of the Karnataka Town and Country
Planning Act 1961.
As per the act, the Master Plan should contain a series of maps and documents indicating the
manner in which the development and improvement of the entire planning area within the jurisdiction
of the Planning Authority are to be carried out and regulated, such plan shall include proposals for the
following, namely
a. Zoning of land use for residential, commercial, industrial, agricultural, recreational, educational
and other purposes together with Zoning Regulations.
b. A complete street pattern, indicating major and minor roads, national highways and state
highways and traffic circulation pattern, for meeting the immediate and future requirements
with proposals for improvement;
c. Areas for parks, playgrounds and other recreational uses public open spaces, public buildings
and institutions and area reserved for such purposes as may be expedient for new civic
developments;
d. Areas earmarked for future development and expansion;
e. Reservation of land for the purposes of central Government, the State Government, Planning
Authority or public utility undertaking or any other authority established by Law, and the
designation of lands being subject to acquisition for public purposes or as specified in the
master plan or securing the use of the landing in the manner provided by or under this Act;
f.

Declaring certain areas, as areas of special control and development in such areas being
subject to such regulations as may be made in regard to building line, height of the building,
floor area ratio, architectural features and such other particulars as may be prescribed;

g. Stages by which the plan is to be carried out.

Sky Group

P a g e | 138

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

9.2 MASTER PLAN OBJECTIVES


The objectives of the Master Plan can be stated as follows:
1. To provide growth direction in the LPA
2. To promote industrial development in the LPA
3. To enhance linkage between the LPA with other areas of the BMR.
4. To plan for population in 2031.

9.3 DENSITY
There are four important growth centres in the LPA Kanakapura, Kaggalipura, Harohalli and
Sathanur. The urban population in the LPA has been calculated for these growth centres which
includes natural growth and inmigrating population. The table below show the distribution of
population and the density in the four growth nodes.

Table-9.1: Density in the Growth Nodes of Kanakapura LPA


Conurbation

TOTAL POPULATION

CONURBATION AREA
(Ha)*

DENSITY (PPH)

Kaggallipura

1,50,000

2109

72

Harohalli

1,80,000

2721

66

Sathanur

90,000

1858

50

Kanakapura

1,80,000

2386

75

TOTAL URBAN POPULATION 2031

6,00,000

9075.65

67

*Excluding water bodies, agricultural land, forests and hillocks and quarries

Sky Group

P a g e | 139

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

9.4 STRATEGY FOR OBTAINING LAND FOR PUBLIC PURPOSES


Development of public infrastructure like parks and playgrounds, roads and institutions require land
acquisition. A conventional mode of land acquisition has been through the The Land Acquisition Act
of 1894. Since the process lacks definite benefits to the landowner, it has faced considerable protest
in recent past. Consequently, a more democratic way of land pooling has been adopted in many of
the Indian states called Town Planning Schemes.
Since the process of land pooling through Town Planning Schemes present definite advantages to all
stakeholders, it should be adopted as a means to develop infrastructure in the LPA.
Town Planning Schemes could be adopted for pooling land for development of the major roads
STRR, IRR, ITRR and RR.

9.5 BASIC CONSIDERATION FOR PROPOSAL


The basic considerations for the Master Plan 2031 proposals were as follows:
1. Existing development in the area: The existing developments have been given priority in
determining the proposed landuse of the Master Plan 2031. In most of the cases the existing
landuse has been retained to minimise public distress and loss of property.
2. IMP Proposals: IMP proposals for landuse have been retained in all places barring places
where it conflicts with the existing landuse.
3. Scientific landuse allocation: New areas have been brought under the proposed land use to
integrate the existing and IMP proposed landuse judiciously. New areas have also been brought
under proposals to satisfy the requirements of the population in 2031.
4. All the directions of government.
5. Identification of water bodies and natural drains and their protection
6. Structure Plan directives
7. Change of land uses approved by the govt. and P.A. under section 14-A (3)

Sky Group

P a g e | 140

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

9.6 PROPOSALS

9.6.1

PROPOSED LANDUSE PLAN 2031

KANAKAPURA LPA

The overall statistics of the LPA as per proposal of Master Plan 2031 is given in the table below. The
total conurbation area is 10152.22 Ha as shown in the table below.

Table 9.1 A: Conurbation area statistics-2031


Category

AREA (In Ha)

Percentage

TOTAL CONURBATION AREA

10152.22

24.59%

AREA BEYOND CONURBATION


(agricultural zone)

31125.77

75.04%

TOTAL LPA

41277.99

100%

The overall statistics of the four conurbations is given in the table below. Residential area forms
39.25% of the total combined conurbation limit, commercial, industrial, public and semi-public and
and transportation forms, 3.15%, 16.40%, 6.12%, 9.88%,2.37% and 12.24% respectively.

Table 9.1 B: Proposed Landuse 2031, LPA


LANDUSE

AREA ( IN HA)

AREA ( IN SQKM)

PERCENTAGE

RESIDENTIAL

3984.26

39.84

43.89%

COMMERCIAL

319.61

3.20

3.53%

INDUSTRIAL

1664.62

16.65

18.34%

PUBLIC & SEMI PUBLIC

620.87

6.21

6.84%

PARK & OPEN SPACE

1002.72

10.03

11.05%

PUBLIC UTILITY

240.87

2.41

2.66%

TRANSPORTATION

1242.70

12.43

13.69%

TOTAL

9075.65

90.77

100.00%

AGRICULTURE

514.02

5.14

WATER BODIES

478.19

4.78

HILLOCK'S/QUARRY'S

84.35

0.84

10152.22

101.52

GRAND TOTAL

Sky Group

P a g e | 141

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

The statistics of the agricultural zone (area beyond the fourconurbation limit) is as follows

Table 9.1 C: Landuse statistics of the agricultural zone


LANDUSE

AREA ( IN HA)

AREA ( IN SQKM)

PERCENTAGE

BUILT-UP *

1314.3368

13.14

4.22%

AGRICULTURE

28095.53

280.96

90.26%

WATER BODIES

770.8053

7.71

2.48%

FOREST

945.0991

9.45

3.04%

GRAND TOTAL

31125.7755

311.26

100%

*Total area of villagegramthana and settlements outside the conurbation area.

KANAKAPURA CONURBATION AREA


Kanakapura is the Taluk headquarters of Kanakapura Taluk as well as the only TMC in the LPA. As
such it is a node of prime importance owing to already superior administrative stature. The town has
Landuse

Area (Ha)

Area (Sq km)

Percentage

RESIDENTIAL

1084.72

10.84

45.51%

COMMERCIAL

84.31

84.31

3.53%

INDUSTRIAL

322.92

3.22

13.52%

PUBLIC & SEMI PUBLIC

132.97

1.32

5.54%

PARK & OPEN SPACE

379.18

3.79

15.91%

PUBLIC UTILITY

43.88

0.43

1.81%

TRANSPORTATION

338.89

3.38

14.19%

TOTAL

2386.87

23.82

100.00%

AGRICULTURE

163.60

1.63

WATER BODIES

144.24

1.44

HILLOCK'S/QUARRY'S

54.68

.54

2749.39

27.49

enormous
economic potential
in

terms

of

agriculture,
sericulture
other

GRAND TOTAL

and

small

scale

industrial activities.
The Landuse of the
town

has

proposed

been
as

to

boost its economic


potential

and

supplement
hierarchy

its
in

the

region.

Table 9.2: Kanakapura proposed landuse statistics -2031


The total urbanisable area of the town is 27.49 sqkm and more than 1.5 lakhs population is proposed
in the town by 2031. 11.74% of the total area is proposed for industrial use while whereas 4.84% of
the total area is dedicated to public and semi-public uses. 39.45% of the total area is reserved for
residential purposes. 3.07% of the total area is commercial and 13.79% is under parks and open
spaces. The rest of the area is comprised of quarries, water bodies and agricultural landuse as
shown in the table below.
Sky Group

P a g e | 142

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

HAROHALLI CONURBATION AREA

Harohalli is one of the most significant nodes of the Kanakapura LPA and a growing industrial cluster.
It is proposed to host more than 2 lakh population by 2031. The total area proposed as the
conurbation limit of Harohalli is 33.34sqkm (3334 ha).

Table 9.3: Harohalli Proposed land use statistics-2031


Landuse

Area (Ha)

Area (sq km)

RESIDENTIAL

1049.06

10.49

38.55%

COMMERCIAL

55.82

0.56

2.05%

INDUSTRIAL

661.16

6.61

24.30%

PUBLIC & SEMI PUBLIC

85.07

0.85

3.13%

PARK & OPEN SPACE

399.44

3.99

14.68%

PUBLIC UTILITY

89.82

0.90

3.30%

TRANSPORTATION

380.7

3.81

13.99%

TOTAL

2721.07

27.21

100.00%

AGRICULTURE

350.33

3.5

WATER BODIES

233.7

2.33

HILLOCK'S/QUARRY'S

29.67

0.29

3334.76

33.34

GRAND TOTAL

Percentage

19.83 % of the area has been dedicated to industries, since it is the future economic mainstay of the
town. 31.46% of the total area is reserved for residential purposes where as 11.42% of the area is
devoted to transportation. 1.67% of the area is reserved for commercial purposes to serve the future
population. 11.98% of the area is park and open space to maintain adequate balance with the
anticipated built up area in the town. 2.55% of the area is proposed to be under public and semipublic use while utility and services take up 2.69% of the area. The rest of the land use is under
quarries, water bodies and agriculture as shown in the table below.

KAGGALIPURA CONURBATION AREA

Kaggalipura is also recognized as an important growth node of the LPA and approximately 56,000 of
the future population of 2031 is distributed in this town. Industrial area on the cue to 21 Ha have been
proposed in the area for form the future economic base. The town has been proposed primarily as an
institutional hub for the LPA.

Sky Group

P a g e | 143

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

51.66% of area has been proposed for residential use while 5.01% of area is under commercial use.
15.43% is devoted to public and semi-public use. 13.06% of the area is dedicated to transportation
and 6.91% of the area is under parks and other open spaces. The rest of the area is comprised of
quarries, water bodies and agriculture as shown in the table below.

Table 9.4: Kaggalipura proposed landuse statistics-2031


Landuse

Area (Ha)

RESIDENTIAL

1120.76

11.21

53.13%

COMMERCIAL

108.64

1.09

5.15%

INDUSTRIAL

23

0.23

1.09%

PUBLIC & SEMI PUBLIC

334.82

3.35

15.87%

PARK & OPEN SPACE

149.94

1.50

7.11%

PUBLIC UTILITY

88.84

0.89

4.21%

TRANSPORTATION

283.41

2.83

13.44%

TOTAL

2109.41

21.09

100.00%

AGRICULTURE

0.1

0.001

WATER BODIES

60.13

0.6

2169.64

21.69

GRAND TOTAL

Area (sq km)

Percentage

SATHANUR CONURBATION AREA

Sathanur has been proposed as a major growth node in the LPA in future. Almost 2 lakh population
has been distributed in Sathanur. The total proposed conurbation area is 18.98 sqkm.38.44% to the
total area has been reserved for residential purposes while 34.64% has been reserved for industrial
use. 3.73 % of the land is proposed to be under commercial use while another 3.58% has been
reserved for public and semi-public use. 3.91% of the area is under parks and open spaces. The rest
of the area has been dedicated to quarries, water bodies and agriculture as seen in the table below.

Table 9.5: Sathanur proposed landuse statistics-2031

Sky Group

Landuse

Area (Ha)

Area (sq km)

Percentage

RESIDENTIAL

729.72

7.30

39.27%

COMMERCIAL

70.84

0.71

3.81%

INDUSTRIAL

657.54

6.58

35.38%

PUBLIC & SEMI PUBLIC

68.01

0.68

3.66%

PARK & OPEN SPACE

74.17

0.74

3.99%

P a g e | 144

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

PUBLIC UTILITY

18.33

0.18

0.99%

TRANSPORTATION

239.7

2.40

12.90%

TOTAL

1858.31

18.58

100.00%

WATER BODIES

40.12

0.4

1898.45

18.98

GRAND TOTAL

Sathanur has been proposed as a major growth node in the LPA in future. Almost 2 lakh population
has been distributed in Sathanur. The total proposed conurbation area is 18.98 sqkm.38.44% to the
total area has been reserved for residential purposes while 34.64% has been reserved for industrial
use. 3.73 % of the land is proposed to be under commercial use while another 3.58% has been
reserved for public and semi-public use. 3.91% of the area is under parks and open spaces. The rest
of the area has been dedicated to quarries, water bodies and agriculture as seen in the table.

9.6.2

PROPOSED TRAFFIC AND TRANSPORTATION PLAN 2031

Progress follows the lines of transportation. Transportation Corridors are generally considered as
lifelines of any town / city. An efficient Traffic and Transportation system promotes socio - economic
activities. Kanakapura LPA hasone National Highway (NH-206), one State Highway (SH 3), four
Major District Roads with good network of roads. One of the major objectives of MP is to provide
broader roads within Kanakapura LPA with good hierarchy of roads. Its aim is to provide an efficient
and feasible circulation plan for the entire LPA.
The total area covered by traffic and transportation use in the conurbation area is 105 ha,
constituting 4.1% of developed area. By and large the inter town traffic movement is convenient. But
due to very narrow road network in the town area, there are many intra town traffic problems and
proposals for the same are to be made.
Some general guidelines for better connectivity are addressed:
All village roads within LPA having width less than 18 m are proposed for widening to 18 m
Right of Way (ROW).
Within the Town limits, Major roads are proposed for widening to ease out the traffic
movement vide
o
o
o

Budikere Main Road


Pipeline Road
Sangama Road

Parking space is proposed along commercial access roads and around bus-stand areas.
Sky Group

P a g e | 145

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

Improvements of major intersections. Sufficient space for pedestrians, signals and utilities will
be taken separately with wide footpath and cycle tracks are provided along main market,
shopping/commercial street.
Wherever feasible cycle tracks are separately provided.
Buffer zones/green spaces are proposed for NMT.
Pedestrian Refugee islands are proposed for road width above 18 m ROW.
Any road development/ redevelopment/ widening proposal shall be done only if the road
sections annexed (Annexure 8) are implemented.

City Traffic and Transportation Studies (CTTS) are made for BMR, 2031. This CTTS is
referred for provision of Traffic Management proposals in the Kanakapura LPA. However
road circulation plan for the entire LPA is prepared showing the alignment and pattern of all
existing and proposed roads in the LPA.
PROPOSALS
1. Widening of Village Roads:
All village roads within LPA which are less than 18 m are proposed for widening to 18 m.

2. Segregation Of Regional And Intra-Settlement Traffic


Town Ring road has been proposed around Kanakapura which is the major growth node of
the LPA. It would act as a conurbation boundary as well as serve the purpose of diverting
traffic from the centre of the town.

3. Segregation Of Freight Traffic


Since major industrial areas have been proposed in the LPA a separate freight corridor is
required separating the intra settlement traffic and freight traffic. Presently the NH 206form the
routes for both freight as well as normal traffic. TRR (town ring road) has been proposed so
serve the purpose by diverting heavy traffic away from the town Centre.

4. Proposal Of New Roads To Increase Connectivity


New roads have been proposed to increase the connectivity to developed areas in the LPA.
New roads are also proposed for better zoning and guide future developments.

5.

Planning For Non Motorized Traffic (NMT) And Pedestrian Facilities

Sky Group

P a g e | 146

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

Kanakapura town and all the major settlements in the LPA have to be planned for NMT and
easy pedestrian movement. Studies should be taken up at the town level to arrive at detailed
planning proposals for NMT mainly for cycling and pedestrian friendly circulation pattern. Old
market area is proposed for Pedestrian Zone by restricting the traffic movement during
specified hours. This can be achieved besides other measures that will be adopted Buffer
zones/green spaces under HT lines, along major drainage lines and area surrounding
lakes/ponds/tanks will be explored for NMT infrastructure for better NMT accessibility as per
DULT recommendations.

6. Planning For Parking Facilities


Parking facilities is completely absent in the LPA. With the growth of the population in the LPA
and the consequent vehicular growth, proper planned parking facilities are indispensible part
of the development. Studies will be taken up at LPA level to recognize inherent problems and
to arrive at detailed proposals for parking in the district/town level.

7. Planning for Public Mass Transit


The public mass transit is meant to take on maximum number of repeat trips hence major
terminals of passenger transit should be located at high density work place and high density
residential areas.

8. Planning for Multimodal Transit


To encourage multimodal transit integration, it is desirable to have the terminals located
wherever more than one mode like rail and road are present and they can be integrated e.g.
Bangalore City railway station and the Kempegowda bus terminal. The bus terminal is being
redeveloped to accommodate the metro station and intra city bus terminal as well as a few
intercity bus terminals, thereby ensuring seamless physical multimodal integration.
9. Location of Bus Stands, Bus depots and Bus Bays
Within the town limits, bus stands/stops are proposed for every 250-300 m with suitable
shelter facility. In all layouts with more than 10 ha extent, bus bays shall be indicated as a part
of the layout within the property boundary of the layout. The existing properties of
BMTC/KSRTC are reserved for traffic and transport use.

10. Truck Terminals/ freight complex/ logistics hub and Provision of Infrastructure near
Truck Terminals/ freight complex/ logistics hub

Sky Group

P a g e | 147

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

As far as possible the traffic and transportation use should be located as per the envisaged
activity. It is desirable to have truck terminal/ freight complex/ logistics hub next to or along the
side of the industrial use/ KIADB industrial areas.
Map no 27 shows the proposed Circulation Pattern in the Kanakapura LPA. The following tables
show the statistics of the roads in the LPA.

Table 9.6: Road Inventory of Kanakapura LPA.


Road Width

Length (in km)

Area (sq m)

18

67.88

1221.86

24

75.02

1800.39

30

56.08

1682.25

80

12.74

1018.95

90

32.11

2890.13

243.82

8613.59

Total

Besides the roads proposed by the Master plan there exists BMR proposed roads in the LPA (IRR,
STRR, TRR). The statistics of the roads are given in the table below.

Table 9.7: Road Inventory of BMR proposed roads


Type

Road Width (m)

Length (km)

Area (sqkm)

IRR

90

8.06

0.73

PRR

100

5.30

0.53

RR

90

5.69

0.51

TRR

90

24.65

2.22

STRR

90

1.72

0.15

45.42

4.14

Total

Sky Group

P a g e | 148

Kanakapura LPA Master Plan 2031

9.6.3

Chapter 9|Master Plan Proposals

ROAD WIDENING AND BUILDING LINE

The following roads have been identified in the LPA for widening.

Table 9.8: Inventory of Roads proposed to be widened in the Master plan


2031
SL

ROAD NAME

EXISTING WIDTH (m)

PROPOSED WIDTH(m)

NH 209

20

30

SH3

12

18

BUDIKERE MAIN ROAD

12

30

PIPELINE ROAD

20

SANGAMA ROAD

12

30

The Proposed building line from the major roads has been listed in the table below.

Table 9.10: Building Line proposed for major roads


Sl.
No.

Name of the Road

Proposed right of way


(m)

Building line from the edge


of ROW (m)

STRR

90.0

10.0

IRR

90.0

10.0

TRR

90.0

10.0

RR

60.0

6.0

NOTE:
For National Highways, State highways, Major District roads, other district roads and village roads
standards specified (road width, building lines etc.,) by the Ministry of Surface Transport, Government
of India are to be followed vide Govt. Notification No: UDD 251 BMR 2005, dated 22-12-2005 and
other circulars of Government of Karnataka)
For all existing roads of width more than 15m shall be provided minimum of 3m building line.

Sky Group

P a g e | 149

Kanakapura LPA Master Plan 2031

9.6.4

Chapter 9|Master Plan Proposals

STRUCTURE PLAN POLICIES AND PROPOSALS

LAND UTILISATION AND ENVIRONMENT


The land utilization study along with the LCA lead to the formation of the following policy sets. The
policy set in the BMR RSP 2031 is universally applicable to all LPAs. The table below lists the
policies and their recommendations.

Table 9.9: Structure Plan proposals land Utilization and Environment


SL

POLICY

RECOMMENDATIONS

LU1

Land allocation strategy to promote compact development

LU2

Designating urban areas that serve as urban reserves or transition zones

LU3

Decentralization and relocation of congestion generating uses from BBMP

LU4

LU5

Development framework to integrate proposed industrial estates

LU6

Minimizing conflicts between the proposed industrial estates and ecologically sensitive areas.

LU7

Environmental impacts of industrial estates

LU8

Green belt management and inclusion in the conservation zone

LU9

Assessment of the proposed conurbations of the Interim Master Plans

10

EV1

Conservation of productive agricultural lands

11

EV2

Promote sustainable agricultural practices

12

EV3

Protection of Surface water Bodies

13

EV4

Active rejuvenation of lakes and tanks

14

EV5

Water demand based land use

15

EV6

Strict control on Ground water extraction

16

EV7

Integrated Water shed management

Sky Group

Urban agriculture should be encouraged to achieve urban food security and local employment
generation

P a g e | 150

Kanakapura LPA Master Plan 2031

17

EV8

Protection of Environmentally Sensitive Areas

18

GEV 9

Active Integration of Wastelands in the development strategy

19

GEV 10

Chapter 9|Master Plan Proposals

All mining and quarrying activities should be strictly monitored and controlled to effectively
address development and environmental issues in a balanced manner.

ECONOMY
The existing situation shows that the major industrial locations are concentrated on the North-West
part of the region, starting from Peenya and extending towards Nelamangala and beyond. The rest of
the region dominated by textiles and agro industries are concentrated in and around the existing
towns. An analysis of the present investment trend, as depicted by the BMR RSP 2031, however
shows the presence of major investment attraction potential along Kanakapura road, Mysore road
and BMIC. The national and state level strategies have spurred economic growth in the regions in the
post 2000 period. The emergence of the SMEs and creation of major infrastructural facilities like the
BIA have given rise to a major growth to the Bangalore region. However, basic infrastructure like
power, transport and water are still concerns for sustained economic growth. High land prices have
lead to a shortage of affordable housing leading to increasing informality in housing and longer travel
hours. In view of the above economic situation the draft BMR RSP 2031 proposes the following
economic policies as listed in the table below.

Table 9.10: Structure Plan proposals Economy


SL

POLICY

RECOMMENDATION

E1

A comprehensive and elaborate land allocation strategy should be formulated for BMR

E2

Industrial and any other economic locations should be identified based on land capability.

E3

Spatial spread of economic activities should be planned

E4

Growth of service sector in the BMR should be encouraged.

E5

Encouraging SMEs in the region

E6

Sky Group

BMR should be developed as a nodal area for locating educational, healthcare facilities
and research institutions

P a g e | 151

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

E7

BMR should be developed as centre for high-end scientific and engineering industries.

E8

BMR should be developed as business tourism destination


Spatial developed initiatives like new townships / residential areas outside BBMP should

E9

be made integral with the local economy of existing settlement and in conjunction with
larger hinterland.

10

E 10

11

E 11

Small scale and medium scale polluting industries should be located outside the BBMP
Settlements in BMR should be made economically sustainable by clustering of economic
activities.
The areas within the city and emerging investment destinations across BKR and existing

12

E 12

towns (cluster and growth nodes) should be connected with efficient public transport
system.

13

E 13

14

E 14

15

E 15

16

E 16

Local Economic Development (LED) policy should be developed at each town level as a
part of the Local Area Development Plan to boost employment in the surrounding towns.
Special hawking zones within the Bangalore city and in identified locations in each zone
should be earmarked.
Environment impact of industrial estates
Proposed industrial estates and large investment destinations should be so developed to
integrate with local economy and livelihood.

TRANSPORT
The BMR draft RSP 2031 compliments the policy recommendations of the SP 2011 for a balanced
regional growth. The policies are hence aligned towards removing the regional imbalances and
increasing the efficiency of the transport systems. The table below highlights the policies of the draft
RSP 2031 for transport sector.

Table 9.11: Structure Plan proposals Transport


SL

POLICY

RECOMMENDATION

T1

Support and Enable the sustained growth of regional business

T2

Increasing the share of public transport systems

T3

Rail based transport systems and networks

Sky Group

P a g e | 152

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

T4

Road based transport systems and networks

T5

T6

Interrelationships between transport policy and housing and labour markets.

T7

Linking the new international airport to the major urban centers

T8

Promote urbanization and us of NMV

T9

Expansion of Bangalore Metropolitan Land Transport Authority (BMLTA)

10

T10

Public Transport be developed taking into account the size of the urban settlement
i.e. smaller towns vis a vis the core

Transport proposals be within the larger framework of a Comprehensive Regional


Traffic and Transport Study

Overview of the Transport Recommendations of BMR 2031 for Kanakapura LPA

Road Transport Recommendations:


The Intermediate Ring Road (IRR) and the Peripheral Ring Road (PRR) should be realigned
in locations where they intersect ecologically sensitive areas and in areas where there are
existing major roads nearby.
The right of way (RoW) of the major roads, i.e. arterial road ( 55m) , sub-arterial roads (35m)
and other major roads (25m), have been specified. Exclusive bus lanes have been suggested
for the arterial roads and the sub-arterial roads. Access from arterial roads shall be only
through service roads whose access would be controlled. Sub-arterial roads shall have
access to adjoining properties but interval for median opening and intersections should at
least be one kilometre.
Freight Transport Recommendations:
There is a proposal for development of integrated freight hub at Kanakapura near Harohalli.

HOUSING
The draft Revised Structure Plan 2031 makes policy recommendations for reducing the demandsupply gap in the housing sector and to reduce the regional imbalance in terms of housing types. The
RSP recommends provision of serviced land with transport and employment facilities to give the
Sky Group

P a g e | 153

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

growth nodes and the clusters a spur of development. It also suggests about shifting the role of the
KHB from housing builder to more of a housing facilitator and providing housing to the poor at
subsidized rates. In-situ up gradation programmes of the slum areas should be undertaken and
housing needs of the urban poor should be addressed as a part of the housing strategy. The table
below lists out the housing policy of the draft RSP 2031 which remains same in aggregate as the SP
2011.

Table 9.12: Structure Plan proposals Housing


SL

POLICY

H1

RECOMMENDATIONS

Government land should be provided within the priority growth centres and new urbanisable
blocks for composite and joint venture
A policy to restructure the functions, roles and operations of the Karnataka Housing Board (

H2

KHB), through innovatory changes in the regulatory framework, should be implemented to


shift focus from house builder to land assembler and infrastructure facilitator as a joint
venture partner with the private sector for the provision of housing

H3

H4

H5

Measures are required to be taken to provide land for group housing for the urban poor at
subsidized or controlled prices
The main focus of the Karnataka Slum Clearance Board ( KSCB) should be on in-situ upgradation through self help processes incorporating the participation of appropriate NGOs.
A range of innovative housing supply solutions, including rental housing, should be
encouraged to help meet the housing needs of the urban poor.
A programme to carry out regular housing needs surveys and to maintain an appropriate

H6

housing management information system in support of the formulation of effective housing


policy and supply targets.

H7

Unauthorized layouts to be regularized within the overall strategic intent of the BMR RSP
2031

WATER SUPPLY AND SANITATION


The RSP 2031 has the following recommendations for water supply and sanitation.

Sky Group

P a g e | 154

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

Table 9.13: Structure Plan proposals Water Supply


SL

POLICY

RECOMMENDATIONS

W1

Adequate measures to augment supply from surface water source in the BMR

W2

Ensure quality supply in the BMR

W3

Improve efficiency of utilization

W4

Advocate better waste management and conservation measures

W5

Implement measures to protect water bodies and tanks

Table 9.14: Structure Plan proposals Sanitation


SL

POLICY

RECOMMENDATIONS

S1

Maximise the utility and efficiency of the existing sewerage systems in the BMR

S2

Measures to be taken for augmentation of sewer network

S3

S4

Encourage waste water treatment using appropriate technology to protect


environment and promote the reuse of treated water for non-potable uses
Enforce vigilance against uncontrolled discharge into network.

POWER
The BMR RSP 2031 proposed increase in power generation in the region by using alternative and
ecologically friendly sources and municipal wastes. It also envisages private players on the power
generation region. It strives to ensure quality supply of power by use of clean coal technology and
renovation of the old power plants in the region. Stringent efficiency standards and emission norms
on vehicles to reduce demand of conventional fuels is also proposed. Operational and financial
performance of distribution network should be improved and demand may be reduced by replacing
power intensive industries through R&D.

Table 9.15: Structure Plan proposals Power


SL

POLICY

RECOMMENDATIONS

P1

Enhance power generation capacity with optimum utilization of source

Sky Group

P a g e | 155

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

P2

Ensure quality supply of power to the BMR region

P3

Improve operational and financial performance of the distribution sector company

P4

Introduce improved mechanisms for demand side management so as to reduce the


demand for energy

TELECOM

Table 9.16: Structure Plan proposals telecom


SL

POLICY

RECOMMENDATIONS

TC1

Improve telecom connectivity in the rural districts of BMR

TC2

Provide fair and transparent policy environment forth e telecom market

TC3

Enhance capacities of telephone exchanges

SOLID WASTE MANAGEMENT


The BMR draft RSP 2031 provides policy guidelines for the up gradation of the solid waste
management process in the BMR. It proposes the setting up of an integrated solid waste
management facility in the region and utilization of advanced technology to make solid waste disposal
a safe and profitable affair. It also proposed involvement of people for better facilitation of MSW
management by creating awareness through concepts like concepts of source segregation. The
table below lists out the policy guidelines.

Table 9.17: Structure Plan proposals Solid Waste Management


SL

POLICY

RECOMMENDATIONS

SWM 1

Integrated solid waste management in the region

SWM 2

Sky Group

Advanced technologies and practices are to be developed to treat the waste


before final disposal and create new economic opportunities

P a g e | 156

Kanakapura LPA Master Plan 2031

SWM 3

Chapter 9|Master Plan Proposals

Stakeholder involvement in solid waste management


Encourage decentralized small waste treatment and disposal facilities with the

SWM 4

support of community based organizations to reduce pressure on the


centralized facilities and to extend the life of the centralized facilities

SWM 5

Private public participation in waste treatment and disposal

SWM 7

Mandate segregation of waste at household level

The RSP 2031 proposed the establishment of integrated solid waste management facility at
Kanakapura. These facilities are proposed to be centres for waste storage, processing and disposal
in the area. A buffer zone of 500 m should be created around the site as no development zone by
notifying the prohibition of development in a buffer zone.

EDUCATION
The draft RSP envisages removing the regional disparity in education level and raising the general
education level in the region. It also provides policies to create a workforce more apt to the
requirements of the region.

Table 9.18: Structure Plan proposals Education


SL

POLICY

RECOMMENDATIONS

ED1

Mandate minimum standard for all the schools

ED2

ED3

Enhance capacity of vocational education courses so as to match the


employment potentials of the region
Improve access and availability of quality education in the rural areas

HEALTH
There exists regional disparity in terms of health status as in reported by the Task Force on Health
and Family Welfare 2001. The high level of privatization in the health sector in the Bangalore Urban
district creates a sophisticated pool of medical resource which is absent in the surrounding Bangalore

Sky Group

P a g e | 157

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

rural and Ramanagara district. The heath policies of the draft RSP hence aims at up grading the
health scenario in the region.

Table 9.19: Structure Plan proposals health


SL

POLICY

RECOMMENDATIONS

HE1

Improved access and availability of quality healthcare in Bangalore rural district

HE2

Use of technology to improve accessibility and availability of health services

HE3

Decentralised and participatory process in health planning and monitoring

9.6.5

SECTORAL PROPOSALS

ECONOMY

INCREASING WORK PARTICIPATION IN THE LPA

The work participation rate in the LPA (Kanakapura Taluk) is 38% that of Kanakapura Town is 17.5%,
whereas that in Karnataka is 41% and at the national level it is 39%1. An increased work participation
rate of 40% should be targeted for the entire LPA (including Kanakapura Town) till the horizon year
2031.
Government

employment programmes such as

Prime

Minister Rozgar Yojana (PMRY),

Swarnajayanthi Shahari Rozgar Yojna, and Mahatma Gandhi National Rural Employment Guarantee
Act should be enforced efficiently to increase work participation.
The industrial potential of the area should also be used to generate employment for local people.
Industrial estates and large investment destinations should be so developed as to integrate with the
local economy. Open settlements should be preferred over closed or gated communities.

PROMOTING SMALL SCALE, TINY AMD COTTAGE INDUSTRIES

Small scale, tiny and cottage industries should be promoted through proper financial, marketing and
distribution schemes. Small scale and cottage industries requires less start-up capital, are labour
intensive, offer better employment opportunities to women and are often better platforms for local
1

Census 2011

Sky Group

P a g e | 158

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

craftsmanship. Hence promotion of such industries serves the purposes of employment generation,
preserving local craft and empowering women.

IMPACT OF INDUSTRIES ON GROUND WATER

The industrial perspective plan for Kanakapura Taluk lists a range of industries in small scale and
medium scale sector as potential investment options. However, the LPA along with the entire BMR
region is under a threat of water scarcity. Hence proper water management plan should be prepared
before commencement of industrial activities to address issues like ground water depletion, ground
water recharge through water treatment, ground water pollution etc.

RELOCATION OF INDUSTRIES FROM BANGALORE

The RSP 2031 specifies relocation of industries from BBMP limits to outer BMR as one of the
economic strategies. Viability of relocating these industries in the LPA may be looked into, to
introduce industries with established markets into the area.

DEVELOPMENT OF LOCAL ECONOMY

Local economy should be strengthened in the entire LPA. Planned commercial centers should be
introduced at the major growth nodes in the LPA Kanakapura, Harohalli-Kanakapura and Sathanur.
The influx of population in the LPA would demand a proper commercial network within the LPA for
basic service delivery. Regularization of Delivery chains and markets should be taken up as a major
project

SERICULTURE TO BE GIVEN A BOOST

The provisions of the Suvarna Vastra Neethi 2008-1013 should be utilised to develop sericulture as
the prime activity in the LPA.
The centrally sponsored Catalytic Development Programme" should be implemented with the
assistance of Central Silk Board. Schemes under Catalytic Development Programme like Drip
irrigation, construction of rearing houses, raising of mulberry saplings, Installation of multi end reeling
machines, Incentive for Bivoltine Silk etc. are very popular. In order to ensure production of better
quality cocoons and silk with increased productivity, these programmes under Catalytic Development
Programme should be stepped up for which adequate funds will be made available under the State
and Central sector.

Sky Group

P a g e | 159

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

The initiatives of The National Research and Development Corporation (NRDC) should be supported
and expanded to establish Chawki Rearing Centre (CRC) and for capacity building and skill
development of the local farmers.
Detailed study should be undertaken to investigate the cause of slow development of sericulture
despite high potential and necessary investment plan for the sector. Kanakapura Town should be
used as the focal center for the LPA for development of capacity building, processing and marketing
facilities subject to its viability during the detailed study.

INTEGRATION OF LARGE INDUSTRIAL ESTATES WITH LOCAL ECONOMY & LIVELIHOOD

Large industrial units have been planned in the Harohalli Bidadi Cluster. Precision Engineering and
Machine Tools, Textiles, Plastics, Construction Material and Rubber and Agro and Food based
Industries have been proposed in the Taluk Industrial development Plan.
These are some of the sectors with highest backward and forward linkages. Forward and backward
linkage of these units should be analyzed in detail to boost the local economy. Art silk, Synthetic
textile manufacturing, Land based Transport, Petroleum products, retail, rubber tyre manufacturing,
recycling industries, Real estate should be used as key industries for boosting the local economy.
Detail studies should be carried out for estimating the quantum of forward and backward linkage and
the investments required.

AGRICULTURE

Food Park has been proposed at Harohalli by the department of Horticulture/ Food Karnataka Ltd.
Agro and Food Industries have been proposed as primary industries in the Taluk Industrial Plan. The
Taluk is also an AEZ for Gerkins and Rose onions. Processing industries should be promoted for
value addition.
Capacity building of the farmers in terms of knowledge development and awareness of latest
technologies, soil health improvement (by crop rotation etc.), water conservation and micro irrigation,
integrated post-harvest processing, crop insurance and credit facilities should be undertaken.
Soil moisture conservation and soil fertility improvement program through watershed approach.
Composting/green manuring/ tank silt recycling should be promoted.
Promoting alternate land use systems like Agri-horti system for arable lands (mango, sapota,
tamarind, jack fruit etc.) and Horti-silvi system (mango, sapota + silver oak, casurina, teak),

Sky Group

P a g e | 160

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

Silvipasture (block plantation of acacia, silver oak, casurina, D.Sisso, Meliaazardicta, cassia and
muthuga + S.hamata, S.scabra, calaproimum, anjan, Guinea macuaena, etc.) for non-arable lands.
Dryland vegetables (chilli, beans, brinjal, tomato, cluster bean, gourds etc.), Floriculture
(chrysanthemum, jasmine, crossandra marigold, roses etc.) fruits (guava, papaya, banana),
sericulture and coconut plantations should be promoted.
Livestock component (local draught animals, dairy, sheep, piggery, rabbit, apiculture) should be
developed.

COMMERCIAL CENTRE AT KANAKAPURA

There is an absence of a commercial center in the LPA. Since Kanakapura is the Taluk headquarters,
a regional commercial level should be planned in the town. The proposed landuse plan hence shows
a large area dedicated for commercial activities.

TRANSPORT

SEGREGATION OF REGIONAL AND INTRA-SETTLEMENT TRAFFIC

Town Ring road has been proposed around Kanakapura which is the major growth node of the LPA.
It would act as a conurbation boundary as well as serve the purpose of diverting traffic from the
centre of the town.

SEGREGATION OF FREIGHT TRAFFIC

Since major industrial areas have been proposed in the LPA a separate freight corridor is requires
separating the intra settlement traffic and freight traffic. Presently the NH 209 forms the route for both
freight as well as normal traffic. The TRR (town ring road) has been proposed so serve the purpose
by diverting heavy traffic away from the town Centre.

WIDENING OF EXISTING MAJOR ROADS

Sky Group

P a g e | 161

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

Existing roads in the LPA have been proposed to be widened to accommodate the excess traffic. The
table of roads to be widened is included later in the proposal.

PLANNING FOR PEDESTRIAN FACILITIES

All the major settlements in the LPA and specially Kanakapura town have to be planned for easy
pedestrian movement. Studies should be taken up in the town level to arrive at detailed planning
proposal for pedestrian friendly circulation pattern.

PLANNING FOR PARKING FACILITIES

Parking facilities is completely absent in the LPA. With the growth of the population in the LPA and
the consequent vehicular growth proper planned parking facilities are indispensible part of the
development. Studies should be taken up at town level to recognize inherent problems and arrive at
detail proposals for parking in the towns.

HOUSING

AUGMENTATION OF HOUSING SUPPLY

Housing Stock for both affordable and other categories has to be augmented to support the induced
population in the LPA.
Private real estate development should be encouraged and properly planned along with other models
of housing for viability and utilization of common delivery chains.
Composite and Joint venture housing schemes of the government along with private sector should be
encouraged.
25% of proposed industrial area2 should be used or housing workers and model of housing should be
subsidized by the industrial authority.

According to Industrial Policy 2009-14

Sky Group

P a g e | 162

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

Housing Schemes such as Indira Awas Yojna, Dr.Ambedkar Housing Scheme, Ashraya Schemes
should be promoted to increase its reach among people.

SLUM IMPROVEMENT

Detail exercise of slum identification should be carried out in the LPA.


Slum development should be brought under National Programmes such as the Rajiv Awas Yojna.
Internal ear-marking of local body funds should be carried out for provision of basic services to the
poor. Security of tenure at affordable prices, improved housing, water supply, sanitation and ensuring
delivery of other already existing universal services of the government for education, health and
social security should be planned for. Earmarking at least 20-25% of developed land in all housing
projects (both public and private agencies) for EWS/LIG category with a system of crosssubsidization should be carried out.
Development programmes for Slums should also be carried out under the programmes funded by
The Karnataka Slum Development Board.

ENVIRONMENT

CONSERVATION OF PRODUCTIVE AGRICULTURAL LANDS

The Kanakapura LPA has some of the most fertile agricultural land in the BMR and has been
designated as an Agri Export Zone (AEZ). Hence all new developments and landuses have been
planned protecting the productive agricultural lands in the LPA.

PROMOTING SUSTAINABLE AGRICULTURAL PRACTICES

Sustainable agricultural practices should be followed in the LPA. Soil health should be continuously
monitored and programmes such as "Bhumi-TayiyaArogya" should be promoted to recover soil
quality and fertility. Drip Irrigation should be introduced for crops which do not require flooded fields.
Crop rotation practices should be introduced into the cropping practice to ensure soil fertility and
productivity.

INTEGRATED MANAGEMENT OF WATER RESOURCES

Sky Group

P a g e | 163

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

Integrated Water management programmes should be adopted by the municipalities and urban local
bodies to ensure sustained supply of water to the LPA. Incessant digging of bore well should be
controlled and water loss during transmission and distribution should be minimized. Waste water
treatment should be introduced to recycle and reuse waste water. All surface water bodies should be
protected, maintained and enhanced for long term ecological well-being and water supply.

MINING AND QUARRYING

Uncontrolled mining and quarrying activities should be stopped. Mining and Quarrying activities
should run with proper licensing along with detailed survey and inspection of potential damage to
natural resources, human settlements and otherwise.

PHYSICAL INFRASTRUCTURE

WATER SUPPLY

Any plan on water supply must be preceded by a land use plan. New water treatment should be
planned to serve principally first to serve new development areas and then to serve the deficit areas.
Dead end system of distribution of water supply should be adopted as the network system due to its
cost advantage. Minimum capacity for water purification system must be for 1 MGD from economic
point of view, below which it is not recommended.

PROPOSALS

AUGMENTATION OF WATER AVAILABILITY FOR DOMESTIC AND INDUSTRIAL NEEDS

The area experiences shortage of water and wells are the main modes of sustenance in rural areas
as well as part of urban areas. Ground water in this area is fast depleting. The water supply demand
for future has been discussed above. Hence supply of tap water to the LPA needs to be augmented
for both domestic and industrial use.

AUGMENTATION OF WATER QUALITY

Sky Group

P a g e | 164

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

It has been shown in the study that at present only 20% of the population in the LPA avails treated
tap water supply. At present there are no treatment plants in the LPA. Water treatment has to be
made an integral part of the water supply scheme to supply water free of iron and fluoride.
NEW WATER SUPPLY SCHEMES

The study shows that 14% of the population avail water away from their dwelling unit. Water source
close to dwelling unit should be provided in all areas urban and rural. New water supply schemes
should be introduces to make drinking water available to all.

CREATION OF WATER TREATMENT PLANTS

Water treatment plants need to be created in the LPA for providing clean drinking water. 0.22 sq. km
area has been assigned for utilities in the proposed Landuse plan of the Kanakapura LPA while
Harohalli and Kaggalipura have 0.69 and 0.19 sq. km of area assigned for utilities and services.
Treatment plants can be setup centrally for the entire LPA or decentralised in north and south zones.

OPERATION AND MAINTENANCE

Operation and maintenance of water supply pipes and water treatment

plant is necessary to meet

the future demand of water. All the above strategy will fail if there is no proper maintenance. All
pipeline leakages need to be identified to prevent loss of water. While ULBs shall enhance the tariff
base over a period of time to ensure that O&M is payable from the revenues, there is an immediate
requirement of O&M funds so as to ensure that the assets created under the scheme are properly
maintained.

REDUCTION IN LOSSES IN WATER SUPPLY BY PUBLIC AWARENESS

A series of workshops should be organised across the region to create public awareness on the
importance of water as a national resource and the severe consequences of wasting and polluting
water. Industrial clusters are a source of severe water loss which can pose a serious threat in future.
The State Government along with NGOs should come forward for campaigning.

STRUCTURED PUBLIC-PRIVATE PARTICIPATION

Private sector participation is desirable in the PPP format in the sector so that there is a balance
between risks and responsibilities between the government Agencies and the Private Sector.
In view of the same, private Sector Participants shall be invited to leverage on the following possible
benefits:

Sky Group

P a g e | 165

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

Reduction of involvements of Public finance or redirecting them to the poor;


Induction of greater technical and management expertise;
Provision of a more responsive service to the customers;
Sourcing of additional financing;

IMPROVEMENT OF GROUND WATER SITUATION

1. Industrial growth should be effected in a planned manner and it will be mandatory for the
units to allow periodical monitoring of water quality from nearby wells on a regular basis by
agencies like SPB/PHE and should be open for cross checking;
2. For ground water based industries, regular water level and quality monitoring have to be
made compulsory;
3. Rain water harvesting measures have to be adopted by all the industrial establishments
where the water level is not shallow;

DRAINAGE AND SANITATION

Considering that there is virtually no systematic drainage system, it is felt necessary for each city to
draw up an integrated drainage and sewerage system for the entire area. Accordingly it will be the
endeavours of the city to design and implement an integrated system on a phase wise basis. The
drainage system will be set up initially in Kanakapura and then extended to the other areas of the
region. The drainage plan shall be worked out on the basis of Master Plan, GIS, Land Use & Control
Plan and the existing Drainage Channels. Generally, drains shall be provided along the existing
roads, existing rails and proposed roads and rails. The cost of the Integrated Drainage System shall
be worked out through Detailed Studies and Assessment and will be taken up for implementation
thereafter.
However, the present situation merits urgent attention and requires implementation of immediate
improvement schemes. In view of the same, immediate action plans have been worked out for
implementation.

Sky Group

P a g e | 166

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

OBJECTIVES

To develop and improve the storm water drainage in KLPA and the new developing areas by
2031.
To solve the water logging problems in the urban areas with better networking of drains.
To cover all existing drains after their repairing by 2021.
To achieve complete coverage of sewer network in newly developing areas along with
progress of development.
To provide total sanitation to major rural areas by 2021.
To achieve complete coverage of sewerage network by 2031, since laying of sewer lines in
already developed and congested areas would be difficult.
To make KLPA free from open defecation by 2031 as per Government of Indias total
sanitary campaign.
The Industrial waste generation has not been considered in the above calculation. Industrial waste
has to be treated separately before releasing into the network. The tolerance limit of the of the
release fluids must conform with the standards prescribed in IS:3306-1974. The volume of industrial
waste would depend on the type of industrial units proposed.
The design volume of the sewerage system would therefore be calculated on the basis of domestic
and industrial waste generated in the LPA.

PROPOSALS

IMPROVEMENT OF DRAINAGE NETWORK

The surface drains do not have total coverage in the LPA. Kanakapura town has surface drainage
system in the 5 percent of the total area. In rural areas surface drains are absent. Surface drains
have to be constructedto cover all settlement areas. Drain covers to be provided to all new and
existing drains.

COMPLETE COVERAGE OF SEWER NETWORK

Sky Group

P a g e | 167

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

The sewerage system has to be extended to cover all settlements in Kanakapura LPA. 71.6 km of
sewerage system is already under proposal to be constructed in Kanakapura town. The total area
proposed to be developed in the LPA is 27 sqkm and the total length of road network proposed is
10152 km.
Hence an additional 10125 km of sewerage network has to be constructed in order to bring the
coverage up to 100 percent. The design period of the sewerage system should at least be 30 years.
The trunk sewer line from the sources to STPs shall be laid along the contour. The advantage of
natural slopes along the streams, rivers and road network should be adopted while designing the
trunk sewer line.

TOTAL SANITATION TO RURAL AREAS: SANITARY TOILETS

Provision has to be made for assistance to BPL households to build sanitary toilets and upgrade their
septic tanks and construct soak pits, to extend sanitation facilities in the entire LPA.

CONSTRUCTION OF SEWAGE TREATMENT PLANTS

Sewage treatment plants have to be constructed in the LPA for treating sewage. Tertiary treatment of
sewage can be used as a strategy for ground water recharge through reclaimed sewage, since water
scarcity is a major issue in the LPA. For treated industrial wastes to be released for irrigation
purposes, the final fluid must conform with BIS code IS: 3307-1965.The STPs shall be accessible for
ease in construction and repairing of plant and machineries.

COMMUNITY AWARENESS CAMPAIGN

A community awareness campaign is needed to make people aware about the benefit of sewer
connections and how it can enhance the present living conditions and environmental quality in their
areas.

SAFE DISPOSAL OF WASTES AND UTILISATION

Appropriate measures have to be taken for safe disposal of septic tank and other wastes. Detachable
dumping chutes should be constructed at selected points in the sewerage system for disposing of the
night soil collected from individual houses. The sewage after treatment should be disposed of either
into a water body like lake, stream, river, ocean or into the land.

Sky Group

P a g e | 168

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

The sewage may be utilised for several purposes such as (i) Industrial reuse or reclaimed sewage
effluent in cooling systems, boiler feed, process water etc, (ii) Reuse in agriculture and horticulture,
watering of laws, golf courses etc. (iii) Ground water recharge for augmenting ground water
resources.

PUBLIC TOILETS

Provision of public toilets in the market areas and in the LIG areas.

CONSTRUCTION OF COMMON EFFLUENT TREATMENT PLANTS IN THE INDUSTRIAL AREAS

Construction of common effluent treatment plants (CETP) must be made mandatory in the industrial
areas for treatment of industrial wastes before release into the sewerage network.

MUNICIPAL OPERATION AND MAINTENANCE

Proper fund allocation must be made for operation and maintenance of the sewage system.
Appropriate organisational/ institutional framework must be provided in the newly developed areas of
Harohalli, Kaggalipura and Sathanur for operation and maintenance of sewage network.

Sky Group

P a g e | 169

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

SOLID WASTE MANAGEMENT

In, India municipal wastes have to be managed as per the provisions of Municipal Solid Wastes
(Management and Handling) Rules, 2000 promulgated under Environment Protection Act, 1986. As
per these rules, all the biodegradable municipal solid wastes shall be required to be processed by
appropriate biological processing method.
Municipal Solid Waste (Management and Handling) Rules 2000 has made MSWM the Litigation
responsibility of Urban Local Bodies (City Corporations and Municipal Corporations), which asks for
source segregation of waste for cleaner composting and recycling. Further, the Supreme Court of
India, acting on Public interest Litigation directed all urban local governments to install scientific solid
waste treatment plants before a set deadline. Thus the installation of a scientific solid waste
management system, though a costly proposition for most of the urban bodies, has become an
imminent necessity. Also the Ministry of Environment and Forest (MOEF), Government of India, has
issued the Municipal Solid Wastes (management and handling) Rules in the year 2000, which identify
the CPCB (Central Pollution Control Board) as the agency to monitor the implementation of these
rules.

PROPOSALS

INTEGRATED SOLID WASTE MANAGEMENT

In view of the projected growth in population and absence of any MSW facilities it is proposed to have
Integrated Solid Waste Management (ISWM) complex.

MANAGING MUNICIPAL SOLID WASTE

Existing municipal solid waste management system would follow the following strategies for efficient
management in the future.

COLLECTION OF WASTE

Increasing the coverage and efficiency of collection mechanism would help in better management
and in reducing the formation of unhygienic and open dump sites. Segregation of waste into
biodegradable and non-biodegradable Components shall be carried at source or at primary collection
centres.

Sky Group

P a g e | 170

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

TREATMENT AND DISPOSAL OF WASTES

On the basis of availability of land and financial resources with the service provider, either of the
methods aerobic composting, anaerobic Digestion or sanitary land filling could be adopted for
treatment and disposal of waste. However, since it appears that land filling would continue to be the
most widely Adopted practice in India in the coming few years, in which case certain Improvements
need to be done to ensure sanitary land filling and not mere dumping of Waste.

AWARENESS CAMPAIGN

Awareness Campaign shall be carried out in order to educate the general public about the disposal of
solid waste at the right place. Awareness campaign shall also be carried out to show and illustrate the
segregation of solid waste. Benefits about cleanliness and hygienic environment should be taught.

LANDFILL FACILITY

Landfill facility is present for Kanakapura town, though it is not adequate for horizon year 2031. Land
has been allocated for utilities and services in the Landuse plan of Harohalli, Kaggalipura and
Sathanur. Land fill facilities should be located within those areas after proper design considerations.

INSTITUTIONAL AND REGULATORY REFORM

Strengthening urban local bodies to perform efficiently in managing the waste and ensuring
strict enforcement of the recently introduced municipal solid waste (Management and
handling) rules.
It is also imperative to harness and integrate the role of three emerging actors in this field
the private sector, NGOs, and rag pickers into the overall institutional Framework.

MANAGEMENT OF INDUSTRIAL WASTES


WASTE SEGREGATION

Many wastes are mixtures of hazardous and non-hazardous wastes. Much of their contents may
even be water. By segregating key toxic constituents, isolating liquid fraction, keeping hazardous
streams away from non-hazardous wastes, generator can save substantial amounts of money on
disposal or find new opportunities for recycling and reuse of wastes. The Ministry of Environment,
Government of India, had identified toxicity of different chemicals, through the Manufacture, Storage
and Import of Hazardous Chemicals Rules, 1989 in exercise of power conferred by Section 6, 8 and
Sky Group

P a g e | 171

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

25 of Environment Protection (E.P). Act, 1986, and had notified mandatory requirements for its
management. In India quantum of generation of wastes (solid/liquid and hazardous/non-hazardous)
for different industry has not been detailed, which is necessary for wastes exchange system or for
adopting treatment/ disposal alternatives for different wastes segregated.

COLLECTION, STORAGE AND TRANSPORT

The unsatisfactory state of storage of hazardous wastes can be remedied to alarge degree by such
low-cost measures as restricting access, fencing off the storagearea to minimize any wind-blown
nuisance, providing separate covered storage forputrifiable of hazardous wastes, and ensuring
regular and frequent collection.There are certain measures a municipal authority can take to control
thetransportation of industrial wastes, even if it does not want to become actuallyinvolved itself. For
instance, contractors should be licensed after ensuring that theyare technically competent and
environmentally aware and should be allowed tohandle industrial wastes. Labelling and coding of
hazardous waste load can be mademandatory so that in the event of an accident, the emergency
services know how tohandle a spillage. Municipal authorities can be given the responsibility to
monitorthe contractors to minimize cases of fly-tipping and ensure that industrial wastes aredisposed
at the appropriate sites. If a municipal authority can also collect industrialwaste; industries must pay
the charge which will be based on the quantity and natureof the waste. This might minimize the
quantity of waste produced by industry and atthe same time the programme will become financially
viable and self-sustaining. Theprinciple the polluter pays should be adhered to in all such cases.

COMBINED TREATMENT FACILITIES

Small-scale industries, which contribute about more than half of the totalproduction, also generate
huge quantity of wastes. The small-scale industries are notin a position to treat their solid wastes or
liquid effluent because of space, technicalknow-how and financial constraints. It is, therefore, deemed
that in a cluster ofsmall-scale industries the different wastes are characterized, identified,
quantifiedand stored for treatment through a combination of recycling, recovery and reuse
ofresources such as, raw material, bio-gas, steam and manure, besides providing anefficient service
facility, to make the system less expensive. The combined effluenttreatment plants (CETP) are to be
operated by the local bodies, where the cost ofconstruction, operation and maintenance need to be
shared by individual industriesdepending upon the quality and quantity of wastes generated.
However, suchcommon treatment facility may require pre-treatment at individual industry to theextent
specified by the State Pollution Control Board. With regard to availability ofwastes along with their
identification, quantum of waste generated should also beascertained so that technology
development/adoption can be considered oneconomic grounds for a small-scale or organised sector
Sky Group

P a g e | 172

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

of industry. If economicsjustify movement of wastes over longer distances for a centralised plant,
specificsubsidies for storage, collection and transportation could be considered. CETPs are being
successfully operated in Gujarat and Andhra Pradesh andsuch facilities should be promoted in other
States. Small scale industries having waste characteristics similar to those of nearbylarge industry
having waste treatment facilities can take help in treating their wasteson payment basis.

DISPOSAL METHODS

Depending upon the characteristics of the wastes, different types of disposalmethods can be used for
hazardous and non-hazardous industrial wastes. The mostpredominant and widely practiced
methods for wastes disposal are: (a) Landfill, (b)Incineration and (c) Composting.
Landfilling is still the major disposal method in many countries. Yet in manyinstances landfilling sites
are not properly chosen in terms of geophysical soilproperties, hydrogeology, topography and
climate. On a proposed site there is aneed to carefully consider the potential for ground or surface
water contaminationfrom pollution by leachate migration or surface run-off from the site.Nonetheless,
even when a site appears to have the right geophysical properties, itsselection and use are not an
absolute guarantee that contamination of groundwatercan be avoided. Hence, continuous
surveillance of the site and its surroundings mustbe maintained to check that the disposal of
hazardous wastes can continue withoutposing a threat to the environment and to the general public.
To reduce this threatlandfill sites have been lined, for example with plastic materials, in order to
preventleaching into groundwater supplies.
Landfill sites for industries should be proposed in the industrial Landuse area after proper
consideration of contours and design specifications of the industrial park.

Sky Group

P a g e | 173

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

SOCIAL INFRASTRUCTURE

The pivotal role of social infrastructure in development has been recognized in the various national
and state level planning policies. In conformation with the national and state agenda, healthcare has
been given prime importance during the master planning process. A stock of existing facilities has
been taken and the deficiencies and requirements for year 2031 have been calculated. The existing
indicators of the health have been analysed and targets have been set till the year 2031.

HEALTH

INCREASING HEALTHCARE INSTITUTIONS

Healthcare facilities need to be augmented as per the requirement of the LPA.


INCREASING ACCESSIBILITY TO HEALTHCARE

Healthcare facilities should be set up for every village, cluster and major town so that basic
healthcare is accessible to all people. Regulatory and administrative framework should be
strengthened to ensure availability of medical professionals in all healthcare institutions.
Mobile health clinics can be introduced to improve accessibility in remote areas. Healthcare should
also be made a part of corporate social responsibility (CSR) for the industries that would be set up in
the region.
Technology like telemedicine should be used to make healthcare accessible in remote corners of the
LPA.
HEALTHCARE MONITORING

Regular monitoring of health statistics should be undertaken in the LPA to prepare a database and
monitor increase or decrease in health status. Monitoring should be specially undertaken in and
around industrial areas to analyse the impact of industries on public health.

INSTITUTIONAL FRAMEWORK

Institutional and administrative framework should be strengthened and organized to ensure swift
service delivery and strict monitoring and operation of healthcare services. Decentralization of
healthcare service should also be accomplished at LPA level, wherein monitoring can be done
through Panchayats and Civil Societies.

Sky Group

P a g e | 174

Kanakapura LPA Master Plan 2031

Chapter 9|Master Plan Proposals

EDUCATION

EDUCATIONAL FACILITY REQUIREMENT

The following table shows the requirement of educational facilities in the LPA. Basic education would
be strengthened by providing primary and secondary schools at settlement level ensuring proper
accessibility and connectivity from all areas of the LPA. Colleges would be provided at the three
major clusters i.e. Kanakapura, Harohalli Kaggalipura and Sathanur. Technical Institutions,
Engineering colleges and Medical colleges would be planned across the LPA to increase technical
capacity in the workforce to match the employment potential of the region.

INCREASE LITERACY RATE IN THE LPA

The literacy rate of Kanakapura Taluk is 65.1%, whereas that in Karnataka is 75% and the national
literacy rate is 74.5%. Basic education facilities need to be strengthened to increase the literacy rate.
Education programmes such as mid-day meals, free bicycles, free uniforms and bags should be
promoted in order to achieve the goal.

INCREASE ENROLMENT RATIO IN THE LPAAND DECREASE DROPOUT RATE

There is a sharp decrease in enrolment rates in the LPA in secondary schools. Schools should be set
up within communicable distances from villages so that education is accessible to everyone.
Incentives should be provided so that students do not have to leave education to support their
families economically.

STUDENT TEACHER RATIO

Student teacher ration should meet the standards prescribed by the Right of Children to Free and
Compulsory Education Act 2009. A ratio of 1:30 should be maintained in primary schools and 1:35
should be maintained in secondary schools.

INFRASTRUCTURE FACILITIES IN SCHOOLS

Infrastructure facilities should be improved in schools across the LPA. Separate girls toilet should be
provided in every unit. Drinking water facility and play grounds should be made compulsory in all
schools. Universally accessible design of structures should be followed for all units.

Sky Group

P a g e | 175

Kanakapura LPA Master Plan 2031

Chapter 10 : Phasing of development

CHAPTER 10

PHASING OF DEVELOPMENT
The Master Plan has been prepared for a plan period of 20 years. Since the area proposed is far
more than the requirement of the near future, uncontrolled and sparse development may take place
in absence of a regulating mechanism for the immediate future. Hence the concept of phasing of
development has been introduced as required under section 12 (g) of Karnataka Town and Country
Planning Act, 1861 to bring about gradual and compact development in the Local Planning Area. The
primary objective of act is to guide and regulate the developments within the Local Planning Area in a
phased manner so as to facilitate planning for the provision of infrastructure services like water
supply, sanitation, drainage, transport and social infrastructure.

The projected population in the Local Planning Area is proposed to be accommodated in a phased
manner from 2011-2021 and 2021-2031 as proposed in the phasing map.

No approvals for development/ No Objection Certificate for conversion to non-agricultural use or


change of land use are permissible in the Phase II (i.e., 2021 2031) of urbanizable area. Now the
land uses suggested for the urbanizable area identified for 20212031 are only for the purposes of
planning and these urbanizable areas are not marked for any development during

phase I.

However, if any development was initiated in pursuance of earlier No Objection Certificate given by
this Authority for conversion to non-agriculture use/ change of land use by the Authority, the same
would be allowed as per rules, though such developments are not in line with the policy of ensuring
compact and planned development.

The stages by which the plan is to be carried out in phased manner has been prepared based on:
-

Present growth trend: the area adjacent to present developed areas have been given priority
for development in the first phase.

The area required to accommodate the projected population in 2021 and 2031.

Sky Group

P a g e | 176

Kanakapura LPA Master Plan 2031

Chapter 10 : Phasing of development

The total population in the LPA in 2021 is 3.5 lakhs and that in 2031 is 6 Lakhs. The area requirement
of the two phases has been calculated to accommodate a population of 6 lakhs @ 67pph by the year
2031.
Table 10.1: Phasing of development
Area to be developed*

YEAR

TOTAL URBAN POPULATION

2011

180000

2011-2021

180000

3137.62(including existing)

2021-2031

240000

5938.03

Total

600000

9075

*Area exclusive of water bodies, forests, agricultural lands and hillocks


The urbanisable area requirement for each phase for the four conurbations has been calculated as
follows:
Table 10.2: Phasing of development: Kaggalipura
AREA

POPULATION

Urbanisable area (Ha)*

2011

20000

2011-2021

45000

903.57 (including existing development)

2021-2031

85000

1205.84

1,50,000

2109.41

AREA

POPULATION

Urbanisable area (Ha)*

2011

20000

2011-2021

60000

1349.06(including existing development)

2021-2031

100000

1372.01

Total

1,80,000

2721.07

AREA

POPULATION

Urbanisable area (Ha)*

2011

5000

Total
Table 10.3: Phasing of development: Harohalli

Table 10.4: Phasing of development: Sathanur

2011-2021

30000

291.58(including existing development)

2021-2031

55000

1566.73

Total

90,000

1858.31

AREA

POPULATION

Urbanisable area (Ha)*

2011

60000

2011-2021

60000

Table 10.5: Phasing of development: Kanakapura

Sky Group

593.41(including existing development)


P a g e | 177

Kanakapura LPA Master Plan 2031

2021-2031
Total

Chapter 10 : Phasing of development

60000

1793.45

1,80,000

2386.87

*Area exclusive of water bodies, forests, agricultural lands and hillocks

The land use analysis for phase-I to be carried out during 2011-21 is detailed below.
Table 10.6: Land use analysis for phase-I: Kaggalipura
KAGGALIPURA

AREA (Ha)

PERCENTAGE

RESIDENTIAL

509.95

53.99%

COMMERCIAL

57.35

6.35%

INDUSTRIAL

16.64

1.84%

PARK & OPENSPACE

75.21

8.32%

PUBLIC & SEMIPUBLIC

97.90

10.83%

TRANSPORTATION

146.51

16.21%

URBANISABLE AREA - PHASE 1

903.57

100.00%

URBANISABLE AREA - PHASE 2

1205.84

TOTAL URBANISABLE AREA

2109.41

LANDUSE

Table 10.7: Land use analysis for phase-I: Harohalli


HAROHALLI

LANDUSE
RESIDENTIAL
COMMERCIAL
INDUSTRIAL
PARK & OPEN SPACES
PUBLIC & SEMI PUBLIC
PUBLIC UTIITY
TRANSPORTATION
URBANISABLE AREA - PHASE 1
URBANISABLE AREA - PHASE 2
TOTAL URBANISABLE AREA

Sky Group

AREA (Ha)

PERCENTAGE

479.45
33.10
468.14
57.05
34.05
47.43
229.85
1349.06
1372.01
2721.07

35.54%
2.45%
34.70%
4.23%
2.52%
3.52%
17.04%
100.00%

P a g e | 178

Kanakapura LPA Master Plan 2031

Chapter 10 : Phasing of development

Table 10.8: Land use analysis for phase-I: Kanakapura


KANAKAPURA

LANDUSE
RESIDENTIAL
COMMERCIAL
INDUSTRIAL
PARK & OPEN SPACES
PUBLIC & SEMI PUBLIC
PUBLIC UTIITY
TRANSPORTATION
URBANISABLE AREA - PHASE 1
URBANISABLE AREA - PHASE 2
TOTAL URBANISABLE AREA

AREA (Ha)

PERCENTAGE

378.90
20.59
3.39
68.17
32.28
13.66
76.40
593.41
1793.46
2386.87

63.85%
3.47%
0.57%
11.49%
5.44%
2.30%
12.88%
100.00%

Table 10.9: Land use analysis for phase-I: Sathanur


SATHANUR

LANDUSE
RESIDENTIAL
COMMERCIAL
INDUSTRIAL
PARK & OPEN SPACES
PUBLIC & SEMI PUBLIC
PUBLIC UTIITY
TRANSPORTATION
URBANISABLE AREA - PHASE 1
URBANISABLE AREA - PHASE 2
TOTAL URBANISABLE AREA

Sky Group

AREA (Ha)
139.71
23.45
7.55
20.51
25.49
13.44
61.43
291.58
1566.73
1858.31

PERCENTAGE
47.91%
8.04%
2.59%
7.04%
8.74%
4.61%
21.07%
100.00%

P a g e | 179

Kanakapura LPA Master Plan 2031

Chapter 11|Financial Implication

CHAPTER 11

ENFORCEMENT, IMPLEMENTATION, MONITORING AND


EVALUATION
As per Karnataka Town and Country Planning Act, 1961, Master plan is prepared to guide and
regulate the growth of dynamic urban areas; Master Plan is a physical development plan or land use
plan and is prepared taking into account the land requirement for various uses for a growing
community.
In many ways, Master plan lays down the blueprint for the development of a region and direction in
which growth of the region must be shaped. The proposals of Master Plan have to be implemented
by all concerned stakeholders for it to be an effective instrument for urban planning. The
implementation of Master plan proposals must be reviewed on a periodic basis and a mechanism
must be in place for evaluation of the extent to which identified actions are successfully
accomplished.

11.1 ACTIONS

The identified actions for monitoring can be summarized broadly as follows:


1)

To develop compact and complete urban communities

Compact community is a high density urban settlement and is the most sustainable urban form.
Compactness has many advantages, less cost of providing services, less carbon footprint, forging
strong community links being the foremost. A complete urban form has a well-defined and developed
street network with equitable allocation of road space for all modes; mixed land use that reduces the
need and length of a trip; focus on public transport and walking and cycling.
Parameters for review:
Density of development; Completeness of street network with specific focus on completion of missing
links; width and quality of footpaths; creation of bus-bays; development of bus terminals; priority to
public transport by providing dedicated lanes for buses; development of cycle tracks etc.

Sky Group

P a g e | 180

Kanakapura LPA Master Plan 2031

2)

Chapter 11|Financial Implication

To enhance the character and quality of public realm to suit the varied requirements of

the community.
What makes an urban community liveable? Historically, many towns/cities always had a main market
streets, public plazas etc. where people could congregate and interact. The public realm comprises of
the places where the children could play; the old could meet and chat and the young could hang-out,
and the people in other age-groups could catch up with their friends after work or exercise in the
mornings or do their shopping without the threat of being run over by a passing vehicle. Public realm
must have something for every age group. Well-developed Parks, play grounds, pedestrianized
areas etc. enhance the quality of public realm.
Parameters for review: Development of parks on hierarchical basis (neighbourhood/ city /town
level); Networking of green spaces along nalas, lakes, rivers etc./ buffer spaces to form a network of
green links for walking/cycling; Pedestrianization of market streets, temple streets, heritage areas etc.

3)

To

proactively encourage

the

development of a

sustainable

community by

discouraging use of personal vehicles and thereby, reduce the carbon footprint of the
community.
Unbridled growth of personal vehicles adds to congestion, air-pollution and increase in unproductive
time spent in commuting for the community. Many indirect costs like parking costs are not considered
when people make a choice to buy a two-wheeler or a car as parking is free in many of our
cities/towns. Parking on streets also reduces the road width available for movement of
people/vehicles and further causes congestion problems. Like good habits that need to be inculcated
from childhood, paid parking has to be implemented irrespective of the fact that the city/town has
manageable traffic.
Parameters for review: Implementation of parking policy with parking pricing; demarcation of areas
where vehicles can be parked and where they cannot be parked; enforcement measures;
Provision of cycle parking etc.
4) To facilitate seamless freight movement while ensuring that the ambience of the city is not
affected due to movement of trucks etc. through the city.
Parameters for review:Development of designated parking areas for heavy goods vehicles/logistic
hubs.

Sky Group

P a g e | 181

Kanakapura LPA Master Plan 2031

Chapter 11|Financial Implication

5) To preserve historically and culturally important landmarks, and to ensure that public
infrastructure and facilities within the city/town are aesthetically designed and
constructed from architectural and functional point of view, and contribute to
enhancing the ethos of the city/town.

Parameters for review: Identification of historically and culturally important buildings and
development of plans for their preservation; developing design guidelines for new public
buildings.

6) To enhance the per-capita green space in the city/town with attention to protection of
local bio-diversity.

Parameters for review: Development of guidelines for city plantation; extent of plantation proposed
during the year etc.

11.2MONITORING AND EVALUATION


Master plan for the plan period 2031 will be successful only if the objectives listed above are
implemented in co-ordination with all implementing agencies. It is necessary to put in a mechanism
to ensure that implementation of master plan proposals are periodically reviewed.
A master plan review committee is set up under the Deputy Commissioner of the district as follows,
for this purpose.

Sl.

Members

Deputy Commissioner of concerned District

Chairman

Representative of B.M.R.D.A not below the rank of Deputy Director

Member

Executive engineer, P.W.D.

Member

Representative of Zilla Panchayat

Member

Commissioner/ Chief Officer of respective Municipality

Member

Member Secretary of Local Planning Authority

Member-Convener

Representative of BWSSB,BESCOM ,KAIDB & KHB( invitees as and when


required)

Member

Sky Group

P a g e | 182

Kanakapura LPA Master Plan 2031

Chapter 11|Financial Implication

The committee is expected to meet every quarter to review the performance with respect to specific
targets that must be identified in the first meeting of the committee. All the proposals/ projects/
schemes identified for implementation or enforcement are prioritised to be developed in phases over
the plan period of 20 years depending on the mode of development and funding.
An independent evaluation of master plan will be done by BMRDA every five years to gauge
the effectiveness of the implementation of the Master plan proposals.

11.3 FISCAL PLAN FOR 2031


The fiscal requirement for infrastructure provision based on the proposals of the Master Plan 203,
have been calculated as shown in the table below. Unit prices have been considered from similar
projects elsewhere.
Table 11.1: Financial proposals

ROADS
SL

CATEGORY

WIDTH
(m)

LENGTH (km)

90

8.06

90

5.3

90

5.69

60

24.65

LAND
ACQUISITION
COST (CRORE)

DEVELOPMENT
COST

694.06

64.48

758.54

456.39

4.24

460.63

489.98

4.552

494.53

1910.39

17.748

1928.14

81.456

1133.61

90.024

1640.45

67.296

1516.04

329.796

7931.95

STRR

ITRR

IRR

RR

MASTER PLAN
PROPOSED ROADS

18

67.88

1052.15

MASTER PLAN
PROPOSED ROADS

24

75.02

1550.43

MASTER PLAN
PROPOSED ROADS

30

56.08

1448.75

6
7

TOTAL

7602.16

TOTAL
FINANCIAL
REQUIREMENT

PARKS AND PUBLIC & SEMI PUBLIC PLACES


AREA
PROPOSED IN
MASTER PLAN
(Ha)

SL
9

PARKS AND OPEN SPACES

Sky Group

10.02

LAND
ACQUISITION
COST (CRORE)
8628.42

DEVELOPMENT
COST
10.02

TOTAL
FINANCIAL
REQUIREMENT
8638.44

P a g e | 183

Kanakapura LPA Master Plan 2031

10

PUBLIC AND SEMI PUBLIC USES

Chapter 11|Financial Implication

6.20

5338.94

6.2

5345.14

13983.59

TOTAL FINANCIAL OVERLAY

21915.54

The total cost of provision of transport infrastructure including the BMR proposed roads (STRR, IRR,
RR, ITRR) is 7931 crores. Provision public amenities in the LPA till 2031 would require a capital sum
of 13983 crores. The total capital required is 21, 915 crores.

Sky Group

P a g e | 184

PART II
ZONING REGULATIONS

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

CHAPTER 12

ZONING REGULATIONS

12.1 INTRODUCTION
In order to promote public health, safety and the general social welfare of the community, it is
necessary to apply control and reasonable limitation on the development of land and buildings.
This is to ensure that most appropriate, economical and healthy development of the entire
Kanakapura Local Planning Area including Kanakapura Town takes place in accordance
with the land use plan, and its continued maintenance over the years. For this purpose, the LPA
is divided into number of use zones, such as Residential, Commercial, Industrial, Public and
Semi Public, Park and Open Space etc. Each zone has its own regulations, as the same set of
regulations cannot be applied to the entire area.

Zonal Regulations protects residential areas from the harmful invasions of commercial and
industrial uses and at the same time promotes the orderly development of industrial and
commercial areas, by suitable regulations on spacing of buildings to provide adequate light, air,
protection from fire, etc. It prevents overcrowding in buildings and on land to ensure adequate
facilities and services.

Zoning is not retrospective. It does not prohibit the uses of land and buildings that are lawfully
established prior to the coming into effect of these Zonal Regulations. If these uses are contrary
to the newly proposed uses, they are termed non-conforming uses and are gradually eliminated
over years without inflicting unreasonable hardship upon the property owner.

The Zonal Regulations and its enforcement ensure proper land use and development and form
an integral part of the Master Plan. It also ensures solutions to problems of development underlocal conditions.

The Zonal Regulations for Kanakapura Local Planning Area prepared under the clause (a) of
sub-section (1) of section 12 of the Karnataka Town and Country Planning Act, 1961 are
detailed below:

Sky Group

P a g e | 185

Kanakapura LPA Master Plan 2031

12.1. 1

Chapter 12|Zoning Regulations

Establishment of Zones and Zonal Maps

The local planning area is divided into use zones such as Residential, Commercial,
Industrial etc., as shown in the enclosed maps.

12.1.2

Zonal boundaries and interpretations of Zonal Regulations.

These regulations set out the various uses of land:

a.

Those are permitted.

b.

Those may be permitted under special circumstances by the Authority in


different zones.

The regulations governing minimum size of plot, maximum plot coverage, minimum front, rear
and side setbacks, minimum road widths and maximum number of floors and height of
structures are set out in these regulations.

NOTE:
a.

Where there is uncertainty as regards to the boundary of the zones in the approved
maps, it shall be referred to the Authority and the decision of the Authority in this regard
shall be final.

b.

For any doubt that may arise in interpretation of the provisions of the Zonal Regulations,
the Authority shall consult BMRDA or the Director of Town & Country Planning,
Government of Karnataka, Bangalore.

c.

Where there is uncertainty in identifying alignment of nala, canal, river, existing public
road, railway line, high-tension line and any religious building position and also survey
number boundaries in the approved maps, it shall be referred to the actual position on
ground and decision taken by the Authority in this regard shall be final.

d.

Change of Land Use from Approved Master Plan


No change of land use cases shall be entertained by the Authority under section 14-A of
Karnataka Town and Country Planning Act (K.T.C.P. Act), 1961 in the Agricultural
Zone as such changes contravene the provisions of Master Plan.

Sky Group

P a g e | 186

Kanakapura LPA Master Plan 2031

e.

Chapter 12|Zoning Regulations

Phasing and Compact Development


The projected population in the Local Planning Area is proposed to be accommodated in
a phased manner from 2011-2021 and 2021-2031 as proposed in the phasing map.
However no approvals for development/ No Objection Certificate for conversion to nonagricultural use or change of land use are permissible in the Phase II (i.e., 2021
2031) of urbanizable area. Now the land uses suggested for the urbanizable area
identified for 2021 2031 are only for the purposes of planning and these urbanizable
areas are not marked for any development during phase I.
However if any development was initiated in pursuance of earlier No Objection
Certificate given by this Authority for conversion to non-agriculture use/ change of land
use by the Authority, the same would be allowed as per rules, though such
developments are not in line with the policy of ensuring compact and planned
development.

12.1.3

Definitions

In these Zonal Regulations, unless the context otherwise requires, the expressions given below
shall have the meaning indicated against each of them.
1.

Act means the Karnataka Town and Country Planning Act (K.T.C.P. Act), 1961.

2.

Addition or Alteration means a structural change including an addition to the area

or change in height or the removal of part of building, or any change to the structure, such
as the construction or removal or cutting of any wall or part of a wall, partition, column,
beam, joist, floor including a mezzanine floor or other support, or a change to or closing of
any required means of access ingress or egress or a change to fixtures or equipment as
provided in these Zonal Regulations.
3. Amalgamation means clubbing of two or more authorized plots.
4. Amenity

includes roads, street, open spaces, parks, recreational grounds,

playgrounds, gardens, water supply, electric supply, street lighting, sewerage,


drainage, public works and other utilities, services and conveniences.
5. Apartment means a room or suite or rooms, which are occupied or which is intended

or designed to be occupied by one family for living purpose.


6. Apartment building / multi dwelling Unit means a building containing four or more

dwelling units, or two buildings blocks, each containing two or more dwelling units on a
given property. This word is synonymous with residential flat.
Sky Group

P a g e | 187

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

7. "Applicant means any person who gives notice to the Authority for any approval with

an intention to take up any development work.


8. Auditorium means Premises having an enclosed space to seat audience and stage

for various performances such as concerts, plays, music etc.


9. Authority means Planning Authority constituted for Kanakapura Local Planning area

under the Karnataka Town and Country Planning Act, 1961.


10. Balcony means a horizontal cantilever projection including a handrail or balustrade, to

serve as passage or sit out place.


11. Basement storey or cellar means any storey, which is partly / wholly below the

ground

level. The basement height should not project more than 1.2 m above the

average ground level.


12. Bifurcation means bifurcation of a plot into two.
13. Building includes;

a. A house, out-house, stable, privy, shed, well, verandah, fixed platform, plinth, door
step and any other such structure whether of masonry, bricks, wood, mud, metal or
any other material whatsoever;
b. A structure on wheels simply resting on the ground without foundation;
c. A ship, vessel, boat, tent and any other structure used for human habitation or used
for keeping animals or storing any article or goods on land.
14. Building Line means the line up to which the plinth of buildings may lawfully extend

within the plot on a street or an extension of a street and includes the line prescribed, if
any, or in any scheme.
15. Building Set Back is the minimum distance between any building or structure from the

boundary line of the plot.


16. Bus Depot means premises used by public transport agency or any other agency for

parking, maintenance and repair of buses. These may include the workshop.
17. Bus Terminal means a premises used by public transport agency to park the buses

for short duration to serve the public. It may include the related facilities for
passengers.
18. Carriageway means the clear motorable width within the road right of way without any

obstructions such as drains, trees, electric poles, etc. The carriageway surface may be
or may not be paved. Width of the carriage way or the width of the pavement depends
on the width of the traffic lane and number of lanes.

Sky Group

P a g e | 188

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

19. Chajja means a continuous sloping or horizontal cantilever projection provided over

an opening or external wall to provide protection from sun and rain.


20. Chimney means a structure usually vertical containing a passage or flue by which the

smoke, gas, etc., of a fire or furnace are carried off and by means of which a draught is
created.
21. Civic Amenity" means a market, a post office, a bank, a bus stand or a bus depot, a

fair price shop, a milk booth, a school, a dispensary, a maternity home, a child care
centre, a library, a gymnasium, a recreation centre run by the Government or Local
Authority, a centre for educational, religious, social or cultural activities or philanthropic
service run by a co-operative society or society registered under the Karnataka
Societies Registration Act, 1960 (Karnataka Act 17 of 1960) or by a trust created wholly
for charitable, educational or religious purposes, a police station, fire station, an area
office or a service station of the Local Authority or the Karnataka Urban Water Supply
and Drainage Board or the Karnataka Electricity Supply Companies, State and Central
Govt. offices and such other amenity as the Government may by notification specify.
22. Clinic: A premises used for treatment of outpatients by a doctor.
23. Clinical Laboratory: A premises used for carrying out tests for diagnosis of ailments.
24. Commercial Building means a building or part of a building, which is used as shops,

and/or market for display and sale of merchandise either wholesale or retail, building
used for transaction of business or the keeping of accounts & records for similar
purpose; professional service facilities, corporate offices, software services, offices of
commercial undertakings and companies, petrol bunk, restaurants, lodges, nursing
homes, cinema theatres, multiplex, kalyana mantapa, banks ,community hall and clubs
run on commercial basis.

Storage and service facilities incidental to the sale of

merchandise and located in the same building shall be included under this group,
except where exempted.
25. Common Wall means a wall built on land belonging to two adjoining owners, the wall

being the joint property of both owners.


a)

If two adjoining owners build a dividing wall on their property, they are not common
walls and no part of the footings of either wall shall project on to the land of the
adjoining owner, except by legal agreement between the owners.

b)

Any such common or dividing wall shall be considered for the purpose of these
byelaws, as being equivalent to an external wall as far as the thickness and height
are concerned.

Sky Group

P a g e | 189

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

26. Community Hall means congregational place to be developed by Government or

Local Bodies, Trust, Society, etc., and having a Hall without separate kitchen and
dining. No upper floor shall be permitted.
27. Convention Centre means premises having enclosed space for conducting seminars,

conferences and exhibitions without cooking facilities.


28. Corner Plot/ Corner Site means a plot facing two or more intersecting

Streets/Roads.
29. Corridor means a common passage or circulation space including a common

entrance hall.
30. Court yard means a space permanently open to the sky either in the interior or

exterior of a building within the site around a structure.


31. Covered Area means area covered by building / buildings immediately above the

plinth level, but does not include the space covered by;
a. Court yard at the ground level, garden, rocky area, well and well structures, plant,
nursery, water pool, swimming pool (if uncovered) platform around a tree, tank,
fountain, bench with open top and unenclosed sides by walls and the like;
b. Drainage, culvert, conduit, catch-pit, gully-pit, chamber gutter and the like;
c. Compound or boundary wall, gate, un-storied porch and portico, chajja, slide, swing,
uncovered staircase, watchman booth including toilet. The area covered by
watchman booth or pump house shall not exceed 15 sq m depending on the size of
the plot and its requirement.
d. Sump tank and electric transformer.
32. Cross Wall means an internal wall within the building up to the roof level or lintel

level.
33. Cultural Building means a building built by a Trust, Society, Government or Local

body for cultural activities.


34. Density means concentration of population expressed in terms of number of persons

per hectare in a particular area.


35. Detached Building means a building, the walls and roof of which are independent of

any other building in the same plot with open spaces on all sides, except the portion
covered by the garage.
36. Duplex means a residential apartment in two levels connected with an internal

staircase.
37. Drains means natural valleys intended for flow of storm water /rain water.
38. Drainage means the removal of any waste liquid by a system constructed for this

purpose.
Sky Group

P a g e | 190

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

39. Dwelling Unit /Tenement means an independent housing unit with separate facility

for living, cooking and sanitary requirements.


40. Exit means a passage, channel or means of egress from any floor to a street or other

open space of safety.


41. External Wall means the outer wall of the building not being a partition wall even

though adjoining a wall of another building and also a wall abutting on an interior open
space of any building.
42. First Floor means the floor immediately above the ground floor or stilt, on which

second and other floors follow subsequently.


43. Flatted Factory means a premises having group of non-hazardous small industrial

units as given in Schedule I having not more than 50 workers and these units may be
located in multi-storeyed industrial buildings.
44. Floor means the lower surface in a storey on which one normally walks in a building.

The general term floor does not refer basement or cellar floor and mezzanine.
45. Floor Area Ratio(FAR) means the quotient of the ratio of the combined gross area of

all floors, except the areas specifically exempted under these regulations, to the total
area of the plot, viz.
Floor Area Ratio =

Total floor area of all the floors


---------------------------------------------Plot Area

46. Footing means the projecting courses at the base of a wall to spread the weight over a

large area.
47. "Foundation means that part of structure which is below the lowest floor and which

provides support for the superstructure and which transmits the load of the
superstructure to the bearing strata.
48. Frontage means the width of any site/land abutting the access/public road.
49. Garage means a structure designed or used for the parking of vehicles.
50. Government means the Government of Karnataka.
51. Ground Floor means immediately above the level of the adjoining ground level on all

sides or above the basement floor.


52. Guidance Value is the value fixed by the Sub-Registrar for the land/building as per

The Karnataka Stamp Act -1957.


53. Gas go down means premises where LPG cylinders are stored.

Sky Group

P a g e | 191

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

54. Ground Coverage means the total area covered by building immediately above the

plinth level. Swimming pool, sump tank, pump house and electric substation, utilities are
not included.
55. Group Housing means apartments or group of apartments on a minimum plot size of

1 hectare or more with one or more floors and with one or more dwelling units in each
floor. They are connected by an access of not less than 3.5 m in width, if they are not
approachable directly from the road.
56. Habitable Room means a room occupied or designed for occupancy by one or more

persons for study, living, sleeping, Eating, cooking but does not include bathrooms
water closet compartments, laundries serving and storage pantries, corridors , cellars,
attics and spaces that are not used frequently or during extended periods.
57. Hazardous Building means a building or part thereof used for:

a. Storage handling, manufacture of processing of radioactive substances or of highly


combustible or explosive materials or of products which are liable to burnwith
extreme rapidity and/or producing poisonous fumes or explosive emanations;
b. Storage, handling, manufacture or processing of which involves highly corrosive,
toxic or noxious alkalis, acids, or other liquids, gases or chemicals producing flame,
fumes and explosive mixtures, etc. or which result in division of matter into fine
particles capable of spontaneous ignition.
58. Head Room where a finished ceiling is not provided the lower side of the Joists or

beams

or tie beams shall determine the clear headroom.


59. Height of Building means the vertical distance measured in the case of flat roofs from

the average road level of the site to the top of the roof and in the case of pitched roofs
up to the point where the external surface of the outer wall intersects a finished surface
of the sloping roof and in case of gable facing the street, the midpoint between the eavelevel and the ridge. Architectural features, service no other function except that of
decoration shall be excluded for the purpose of measuring height. Water tank,
chimneys, lift room, stair case room, and parapet are also excluded for the purpose of
measuring height. The aggregate area of such structures shall not exceed 1/10th of the
roof area of the building upon which they are erected.
60. Heritage Building means a building possessing architectural, aesthetic, historic or

cultural values, which is declared as Heritage building by the Planning Authority,


Kanakapura or any other Competent Authority within whose jurisdiction such building is
situated.

Sky Group

P a g e | 192

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

61. Heritage Precinct means an area comprising heritage building or buildings and

precincts there of or related places which is declared as such by the Planning Authority,
or any other Competent Authority within whose jurisdiction such building is situated.
62. High Density Development means development which include star hotels, shopping

malls, multiplexes, commercial complexes, IT and BT.


63. High-rise Building means a building of height of G+4 or 15 m or more above the

average ground level. However, chimneys, cooling towers, boiler, rooms/ lift machine
rooms, cold storage and other not-working areas in case of industrial buildings and
water tanks, and architectural features in respect of other buildings may be permitted
without reckoning for height.
64. Hospital is premises providing medical facilities of general or specialized

nature for

treatment of indoor and outdoor patients.


65. Hotels: A premises used for lodging or payment with or without boarding facilities.
66. Integrated Residential Schools: A premises having educational and playing facilities

for students up to XII standard and also having boarding facilities for students and
faculty members.
67. Industrial Building means a building wholly or partly used as a factory, for the

manufacture of products of all kinds and related activities (including fabrication and
assembly, power plant, refinery, gas plant distillery, brewery, dairy, factory, workshop
etc.)
68. IT Infrastructure companies means the real estate Infrastructure developer or a

builder, registered under Indian Companies Act, 1956, having core competency in
constructing IT office space for sale or for lease cum sale to IT Industry for the purpose
of IT activities by the IT industry.
69. IT/ITES Park is defined as exclusively delineated or earmarked site/area of 2000 sq m

land and above managed and developed/ to be developed with IT office space and
other amenities and made available on lease basis for IT industry, to provide plug and
play facilities as per the stipulations contained herein.
70. IT/ ITES Campus is defined as IT office space and other amenities developed by an

IT Company on its own land and for its own use.


71. IT/ITES Special Economic Zone (SEZ) is notified by government of India as IT/ITES

SEZ developed in an area of 25 acres and above to be developed by a developer or codeveloper, according to the provisions of The SEZ Act, 2005.
72. Junk Yard means premises for covered semi covered or open storage including sale

and purchase of waste goods, commodities and materials.

Sky Group

P a g e | 193

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

73. Kalyana Mantapa means premises where marriages, social and religious functions

are conducted with cooking facilities.


74. Land Use includes the purpose to which the site or part of the site or the building or

part of the building is in use or permitted to be used by the Authority on any specified
date. Land use includes zoning of land use as stipulated in the Master Plan and the
Zonal regulations.
75. Layout means any subdivision of land with the formation of a new road or an access

road. It may consist of single or multiple sites.


76. Layout Plan means sub division of plot (residential or non residential) with proposed

road network and provision for Parks and Civic Amenities.


77. License means an authorization or permission in writing by the ULB to carry out any

building construction.
78. Lodging is a premises used for lodging on payment.
79. Loft means a residual space above normal floor level which may be constructed or

adopted for storage purposes.


80. Lift means an appliance designed to transport persons or materials between two or

more levels in a vertical direction by means of a guided car platform.


81. Master Plan means Master Plan, 2031 prepared for the Local Planning Area of

Kanakapura approved by the Government under the Karnataka Town and Country
Planning Act, 1961.
82. Mezzanine Floor means an intermediate floor between Ground floor and First floor

only, with area of mezzanine floor restricted to 1/3 of the area of that floor and with a
minimum height of 2.20m. Mezzanine floor is permitted on commercial uses only. Such
Mezzanine floor shall be accessible only from the Ground floor.
83. Multilevel Car Parking (MLCP) means multilevel R.C.C. structure used for vehicle

parking connected to all floors by means of ramps or ramps with mechanical elevators.
MLCP can be an independent structure or part of a building with other land uses.

Sky Group

P a g e | 194

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

84. Multiplex means, a building housing an entertainment and cultural centre including

cinema theatres, restaurants, food courts, shops etc.


85. Nursing Home means, a premises having medical facility for in-patient and out-patient

patients, providing up to 30 beds.


86. Open Space means an area forming an integral part of the plot, left open to sky in a

building.
87. Parapet means a low wall or railing built along the edge of a roof or balcony.
88. Parking Space means an area enclosed or unenclosed, covered or open sufficient in

size to park vehicles together with a drive-way connecting the parking space with a
street or any public area and permitting the ingress and egress of the vehicles.
89. Park: An area used for leisure, recreational activities, it may have related landscaping,

public toilet and fence.


90. Playground: An area used for outdoor games, it may have on it landscaping, parking

facilities and public toilet.


91. Penthouse means a covered space not exceeding 10 sq m on the roof of a building,

which shall have at least one side completely open.


92. Plinth means the portion of a structure between the surface of the surrounding ground

and surface of the floor immediately above the ground.


93. Plinth Area means the built up covered area of the building.
94. Plinth Level means the level of the floor of a building immediately above the

surrounding ground.
95. Plot or Site: A parcel of land enclosed by definite boundaries and held in one

ownership.
96. Porch or Portico means a roof cover supported on pillars or cantilevered projection

for the purpose of pedestrian or vehicular approach to a building.


97. Public and Semi-Public Building means a building used or intended to be used

either ordinarily or occasionally by the public and owned by State or Central


Government or Quasi Government or Local Authorities such as offices, religious
Sky Group

P a g e | 195

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

institutions (a church, temple, chapel, mosque or any place of public worship),


educational institutions (college, school), health institutions, library, cultural and
recreational institutions/theatres of non commercial nature, public concert room, public
hall, hospital run by public institutions, public exhibition hall, lecture room or any other
place of public assembly, Dharmashala.
98. Pump Room means a room provided below ground level adjacent to sump tank to

house various types of pumps with self priming mechanism however the entrance shaft
of the pump room of a maximum of 2Mx2M may be permitted above the ground level.
99. Recreational Club is a premises used for assembly of a group of persons for social

and recreational purposes with all related facilities.


100. Repair Shop is a premises similar to retail shop for carrying out repair of house hold
goods, electronic gadgets, automobiles, cycles etc.,
101.Residential Building means a building used or constructed or adopted to be used
wholly for human habitation and includes garden, ground, garages, stables, and other
out-houses if any, necessary for the normal use of the building as a residence.
102. Restaurant is a premise used for serving food items on commercial basis including
cooking facilities, with covered or open space or both having seating facilities.
103.Retail Shop is a premise for sale of commodities directly to the Consumer with
necessary storage.
104. Right of way (ROW) is the width of land acquired for the Road, along its alignment.
It should be adequate to accommodate all the cross sectional elements of the
highway

and

may

reasonably

provide

for

future development. To prevent

development along highways, control lines and building lines shall be provided. Control
line is a line which represents the nearest limits of future uncontrolled building activity in
relation to a road. Building line represents a line on either side of the road; between
which and the road no building activity is permitted at all.
100. Road Level is the level of the road at the access to the property or in the event of

more than one entrance to the property the road level considered shall be at the centre
of the property frontage. The level of the road shall be taken at the centre of the carriage
way.
101. Road Width means the distance between the boundaries of a road including footways

and drains measured at right angles to the centre of the plot.


Note: In case of sites at T junction or at the intersection of multiple roads, the width of the
road parallel to the site shall be considered.
107. Room Height means the vertical distance measured between the finished floor
surface and the finished ceiling surface where a finished ceiling is not provided, the
Sky Group

P a g e | 196

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

underside of the joist or beams or tie beams shall determine the upper point of
measurement. The minimum height of the room shall be 2.75 m.
108. Row Housing means more than one residential buildings in a row attached to each
other with only front, rear and interior open spaces.
109. Semi-detached Building means a building detached on three sides with open
spaces as specified in these regulations.
110. Service Apartment means fully furnished room or suite or rooms with kitchen, which
is intended to be used on rental basis.
111. Service Road means a road / lane provided adjacent to a plots(s) for access or
service purposes as the case may be.
112. Services means activities incidental to the land use of the building such as electrical
sub-station, electrical panel room, generators, HVAC (Heating, Ventilation & Air
conditioning) facilities, plumbing and sanitary facilities, STP, refrigeration and cold
storage, fire fighting facilities, building management systems, car park management
facilities and similar such activities.
113. Service Industry means an industry where services are offered with or without
power. If power is used, aggregate installed capacity shall not exceed 5 HP. The site
area shall not exceed 240 sq m.

Service industries shall be permitted in the

residential and commercial zone under special circumstances and in the light
industries zone of the Master Plan as given in Schedule I.
114. Set back means the open space prescribed under these Zonal

Regulations

between the plot boundary and the plinth of the building.


115. Stilt Floor means a floor consisting of columns, used only for vehicle parking It
may also be open parking area provided at ground level and not be covered by
enclosures and shutters. The height of the stilt floor shall be a minimum of 2.4m and
shall not exceed 3.0m. The height shall be considered for calculating the total height
of the building. In case of mechanical or multi level parking the maximum height shall
be 3.6 m.
116. Storey means the space between the surface of one floor and the surface of the
other floor vertically above or below.
117. Staircase Room means a room accommodating the stairs and for purpose of
providing protection from weather and not used for human habitation.
118. Town Municipality means the Town Municipal Council of Kanakapura established
under the Karnataka Municipality Act.
119. Villa An independent house/dwelling on a given plot.

Sky Group

P a g e | 197

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

120. Wholesale An area where goods and commodities are sold or, delivered to retailers,
the premises include storage/ go down, loading and unloading facilities.
121. Zonal Regulations mean the Regulations governing land use made under the
Karnataka Town and Country Planning Act, 1961.

Note: 1. The words and expressions not defined in these regulations shall have the same
meaning as in the Karnataka Town and Country Planning Act, 1961 and Rules, the
Building Bye Laws of Bangalore Mahanagara Palike and National Building Code of India
2005.

2. All permissions accorded by Kanakapura Planning Authority or BMRDA or Government


prior to coming into force of these Zonal Regulations shall be treated as conforming uses
irrespective of the classification made in the Master Plan 2031. This is to be allowed on a
case by case basis only.

3. Any other unforeseen situations that arise during implementation of this Zonal
Regulations for which provisions are not found in this, the Authority may take decision in
consultation with the BMRDA or Director of Town & Country Planning.

4. The Authority till the framing of its own Building Byelaws under Section 75 of the KTCP
Act 1961 shall adopt the relevant portions of the Building Byelaws of the Bangalore
Mahanagara Palike not covered under these Regulations in respect of size of drawings,
qualifications of persons drawing the plans, size of habitable rooms, ventilation, facilities
for physically handicapped persons, fire safety requirements, staircase details, etc. in a
building

5. Safety measures against earthquake in building construction:


Buildings shall be designed and constructed adopting the norms prescribed in the
National Building Code and in the criteria for earthquake resistant design of structures
bearing No. IS 1893-2002 published by the Bureau of Indian Standards, making the
buildings resistant to earthquake.

Sky Group

P a g e | 198

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

12.2 ZONING OF LAND USE


For the purpose of these regulations, the planning area of the town is divided into following
use zones.

1. Residential
2. Commercial
3. Industrial
4. Public and Semi-Public
5. Public Utilities
6. Open Spaces, Parks, Playgrounds, Buffer along River and Burial Ground
7. Transport and Communication
8. Agricultural Use
9. Areas of special control

NOTE:
i.

Uses permissible under special circumstances by the Authority in different


zones provided that:a) All changes are in public interest;
b) The proposal for all such changes are displayed in the notice board of the
Planning Authority, inviting objections from the public within a period of not
less than fifteen days from the date of display as may be specified by the
Planning Authority.

ii.

Roads are permitted in all the zones.

iii.

Prior to giving permission for religious use and school or college buildings in
different zones either under uses permissible or under special circumstances by
the Authority, instructions given in Government Circular No. Na A E 237 Be Ma
Praa 2009 dated 19-09-2009 is to be followed.

iv.

Uses permitted in all the above category of zones are subject to space standards
as given in Table-1.

Sky Group

P a g e | 199

Kanakapura LPA Master Plan 2031

v.

Chapter 12|Zoning Regulations

Space standards for various buildings/ uses in different zones are strictly adhered
to while giving permission for change of land use / alienation as prescribed in
Table 1.

Uses of land that are permitted and those that may be permitted under special
circumstances by the Kanakapura Planning Authority in different zones of the local planning
area shall be as follows:

12.2.1 RESIDENTIAL ZONE:


a. Uses permitted:

Dwellings units/tenements, plotted residential developments, villas, semi


detached houses apartments, multi dwelling housing, service apartments, group
housing, hostels including working women and gents hostels, old age homes,
Dharmashala, orphanages, places of public worship, schools offering higher primary
school courses, kinder garden/kids play area,Daycare, crche (with a minimum site
area of 500 sq. m for nursery schools and 1000 sq. m for lower primary schools) public
libraries, post and telegraph offices, telephone exchange, Karnataka Power
Transmission Corporation Limited Counters, milk booths, HOPCOM centres, STD
booths, mobile phone service repairs, computer institutes.

b. Uses that are permitted under special circumstances by the Authority:

Municipal, state and central government offices, public utility buildings,


cemeteries, golf clubs, banks, nursing homes, higher primary schools with minimum
site area of 2000 sq m, hospitals, (with a minimum site area of 750 sq. m and the site is
abutting a road of minimum 12 m width), philanthropic uses, fuel storage depots, filling
stations, service industries with noc from KSPCB(for all the above industries and those
as per the list given in Schedule-I, power required for air conditioning, lifts and
computers are excluded from HP specified above), power loom for silk twisting
provided the noise generated shall be within the limit prescribed by the Ministry of
Environment and Forest, Government of India / gas cylinder storage provided it
satisfies all required norms of safety, neighbourhood or convenience shops limited to
20 sq. m., internet caf centres, doctors consulting, Room, not exceeding 20.00 sq m.

Sky Group

P a g e | 200

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

pay & use toilets and service apartments, vehicle parking including multilevel car
parking.

Note:
a) Diesel generators equivalent to the quantity of power supplied by the Karnataka Power
Transmission Corporation Limited (KPTCL) may be permitted as substitute to power
cut and power failures in any zone after obtaining information on the quantity of power
supplied to a premises and the capacity of generator required from KPTCL. However,
in residential zone installation of diesel generators be discouraged and shall be given
in exceptional cases after spot verification and obtaining No Objection Certificate from
the KSPCB.

b) Where service apartments are permitted, fee under section 18 of KTCP Act, 1961 for
commercial use shall be levied.

12.2.2 COMMERCIAL ZONE:


a. Uses permitted:

All uses that are permitted in residential zone ,traffic & transportation and public/semi
public zones subjected to statutary NOC S like FIRE,KSPCB 7 etc, petty shops/ retail
shops & hardware shops, job typing / computer training institutes, cyber caf, and
internet browsing, departmental stores, grocery/ HOPCOMS, vegetable shops,
newspaper, stationery and milk booth, commercial and corporate offices / clinics
belonging to professional services like advocates and doctors, architects and selfowned, shopping/ commercial complexes and service establishments like hair dressing
saloons, massage centers, laundries, dry cleaning and tailoring shops, restaurants and
hotels, eateries such as darshinis, tea stalls, and take aways, bakery and sweet stalls ,
mutton and poultry stalls, cold storages, clubs, hostels, newspaper or job printing, all
types of offices, STD/FAX/internet center/ ATM centers/ banks, insurance and consulting
and business offices, places of amusement or assembly, microwave towers and stations,
advertising signs conforming to relevant building byelaws, photo studio, church, temple
and other places of worship and assembly, educational, medical/engineering/ technical
and research institutions,(on the sites having minimum 2 ha with a minimum of 12m wide
approach road), financial institutions, education coaching centers, nursing homes and
speciality hospitals, pathological labs, hostels, libraries, any retail business or services
Sky Group

P a g e | 201

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

not specifically restricted or prohibited therein, filling stations (Fuel stations and pumps,
LPG storage, gas retail outlets), neighborhood shops, nursing homes, service industries
listed in Schedule I (power up to 10HP). Uses for small repair centers (electronic,
mechanical, automobile), vulcanizing shops, printing press, residential buildings
including orphanages and old age homes, gyms, clinics and yoga center, warehouses,
storage areas for goods and kalyana mantapas, cinema theatres, multiplexes,
auditoriums, community centers, recreational /social clubs and amenities, exhibitions
centers, entertainment and amusement centers, convention centers and banquet halls,
hard and software computer offices and information technology related activities (Power
required for air conditioners, lifts and computers are excluded from the HP specified
above), flour mill up to 10 HP
b. Uses that are permitted under special circumstances by the Authority:

Automobile workshop, manufacturing establishments employing not more than ten


workers and uses permitted or permissible on appeal in the residential zone other than
those specifically prohibited therein. Heavy goods markets, storage of inflammable
materials, sale of second hand junk goods, junk yards & agro mandis junkyard, truck
terminals, weigh bridges, cold storage, fruit and vegetable markets,

meat and fish

markets, wholesale business, trading & warehouses, flour mill up to 20 HP

Note:
I

Commercial complexes / office complexes/ neighborhood shops should have


sufficient provision for toilet for visitors in each floor and should be shown on
plan. It shall have waste disposal arrangements.

12.2.3 INDUSTRIAL ZONE:


a.

Uses that are permissible:

All uses that are permissible under special circumstances in Residential and Commercial
zone & traffic & transportation use, all industries like IT and BT industries, microwave
towers, power plants, filling stations, parking lot (including multi-level), bus and truck
terminals, loading and unloading facilities, warehouses, public utilities like garbage and
sewage disposal, municipal and Government offices, dwellings for manager, watch and
ward staff in an area not exceeding 1000 sq m or 10% of the total area, whichever is
Sky Group

P a g e | 202

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

lower, canteen and recreation facilities, kalyana mantapa, office, shops, clubs, job
printing, banks, restaurants, dispensary and automobile service stations.
All uses as per the categorization of light industries, medium industries and heavy
industries defined by Department of Industries and Commerce (schedule I) except
Obnoxious and hazardous industries. There is no power limitation for industries to be
permitted in this zone.
b. Uses that are permissible under special circumstances by the Authority:
Obnoxious and hazardous industries are subject to clearance from the State Pollution
Control Board, junk yards, dairy and poultry farms, slaughter house and meat processing
unit, ice and freezing plants with power, sports and recreation uses, resorts and
amusement parks.

Note:
i.

To encourage work-home relationship, 40 % of the available land area for development


of residential use for providing quarters to the employees of that particular industry,
subject to clearance from the KSPCB in an area of 10 hectares and above.

ii. Wherever IT and BT industries are permitted in area of 5 hectares and above, 30% of
the area may be allowed for residential apartment for the convenience of the employees
subject to clearance from the KSPCB
iii. Residential regulations shall be followed for approval of residential development within
the premises of industrial/ I.T. and B.T. area.
Schedule I
1. Illustrative list of household and service industries permitted in Residential and
Commercial Zone:

Sl.

Description

No.
1.

Bread and bakeries

2.

Confectionary, candies and sweets

3.

Biscuit Making

4.

Ice, ice-Cream

5.

Cold Storage (small scale)

6.

Aerated water and fruit beverages

Sky Group

P a g e | 203

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

7.

Huller and flour Mills

8.

Automobile, scooter and cycle service and repair workshop

9.

Furniture (Wooden and Steel)

10.

Printing, book binding, embossing, etc.

11.

Laundry, dry Cleaning and dyeing facilities

12.

General jobbing and machine shops

13.

Household utensil repairs, welding, soldering, patching and polishing.

14.

Photography, printing (including sign board printing)

15.

Vulcanizing

16.

Tailoring

17.

Hand looms

18.

Velvet embroidery shops

19.

Art weavers and silk sarees, printing and batik works

20.

Jewellery, gold ornaments and silver wares

21.

Mirror and photo frames

22.

Umbrella assembly

23.

Bamboo and cane products

24.

Sport goods and repair shops

25.

Musical instrument repair shops

26.

Optical lens grinding, watch, pen repairs

27.

Radio and T.V. repair shops

28.

Electric lamp fittings

29.

Shoe making and repairs

30.

Audio / Video libraries

31.

STD / ISD counters

32.

R&D Labs, test centres, IT, BT, BPO activities

33.

Rubber stamps

34.

Card board box and paper products including paper (manual only)

35.

Cotton and silk printing/ screen printing

36.

Webbing (narrow, fabrics, embroidery, lace manufacturing)

37

Ivory, wood carving and small stone carving

38

Coffee curing units

39

Candles and wax products

40

Household kitchen appliances

41

Washing soaps small scale only

Sky Group

P a g e | 204

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

42

Fruit canning and preservation

43

Electric lamp fitting / Assembly of bakelite switches, shoe making, repairing

44

Power looms (silk reeling unit up to 10 HP)

45

Areca nut processing unit

46

Beedi rolling

47

Agarbathi rolling

48

Assembly and repair of measuring instruments(excluding handling of mercury and


hazardous materials)

49

Clay & modelling with plaster of paris.

50

Diary products Example: cream, ghee, paneer, etc.

51

Enamelling vitreous (without use of coal)

52

Milk cream separation

53

Manufacture of jute products

54

Manufacture of bindi

55

Photo copying of drawings including enlargement of drawings and designs

56

Packaging of shampoos

57

Packaging of hair oil

58

Utensil washing powder (only mixing and packaging)

2.

Illustrative list of Light Industries:

Sl.

Description

No.
1.

Bread and bakeries

2.

Confectionery, candies and sweets

3.

Biscuit making

4.

Ice, ice cream

5.

Cold storage (small scale)

6.

Aerated water and fruit beverages

7.

Flour mills with power up to 20HP

8.

Hats, caps, turbans including garments

9.

Hosiery including knitted garments

10.

Gold and silver thread

11.

Shoe lace making

Sky Group

P a g e | 205

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

12.

Toy making (earthen, paper, wooden, plastic metal and tin)

13.

Cotton and silk cordages, twine thread and thread ball making

14.

Velvet embroidered shoes

15.

Art wares and silk screen printing and batik works

16.

Jewellery, gold ornaments and silver wares

17.

Wood and stone carving

18.

Electroplating, mica plating, engraving

19.

Photographs, printing (including sign board and printing)

20.

Stone carving

21.

Mirrors and photo frames

22.

Umbrella assembly

23.

Bamboo and cane products

24.

Sports goods

25.

Card board box and paper products including paper

26.

Stationery items including educational and school drawing instruments

27.

Furniture making (wooden and steel)

28.

Musical instruments

29.

Printing, book binding, embossing, photograph, etc.

30.

Optical lens grinding, watch and pen repairing

31.

Steel wire products

32.

Sheet metal works

33.

Metal polishing

34.

Laboratory porcelene wares

35.

Radio assembly and parts TV, mobile phones, air conditioner, fridge assembly parts
(small scale)

36.

Electric lamps, fittings, shades, fixtures, etc.

37.

Automobiles, scooters, cycle service and repair workshop

38.

Laundry and dry cleaners

39.

General jobbing machine

40.

Iron foundries (only when related to other industries using electricity)

41.

Brushes (household, sanitary and toilet)

42.

Shoe making and repairing

43.

Leather goods

44.

Black smithy

45.

Household utensils, repair, welding, soldering, patching, and polish (kalai)

Sky Group

P a g e | 206

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

46.

Vulcanising and tyre re-treading

47.

Cement products

48.

Chalk, crayon, artists colour

49.

Tobacco products (cigarettes and beedies)

50.

Cosmetics and hair oils

51.

Cutlery

52.

Cycle parts and accessories

53.

Door and window fittings

54.

Drugs and medicines

55.

Lantern, torches and flash lights

56.

Aluminium wires, cake and pastry moulds.

57.

Padlocks and pressed locks

58.

Rope making (vegetable fibre)

59.

Mathematical instruments

60.

Builders hard wares

61.

Tin products

62.

Optical frames

63.

Button clips

64.

Wax polishing

65.

Upholstery springs and other springs

66.

Precision instrument of all kinds

67.

Safety pins

68.

Screws, bolts, nuts, pulleys, chains, gears

69.

Conduit pipes fabrication (not exceeding 2" diameter)

70.

Buckets and metal containers, plastic jugs and fixtures metal embossing.

71.

Oil stoves and pressure lamps

72.

Paper mill (small scale) hand made

73.

Washing soaps

74.

Hand tools

75.

Electric industries, computer and software

76.

Ice and freezing plants

77.

Information Technology & Bio Technology

Sky Group

P a g e | 207

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

3. Illustrative list of Medium Industries:

Sl.

Description

No.
1.

Small domestic appliances and gadgets (room heaters, coolers, hot plates,
iron lamps, etc.)

2.

Manufacturing of trunks and metal boxes, suit cases, small containers

3.

Scientific, educational and industrial precision instruments.

4.

Clocks and watches, photographic equipments

5.

Typewriters, Radios, TVs, air conditioner, fridges, STD/mobile sets.

6.

Electrical instruments (including transistors)

7.

Calculating machines (small machines only)

8.

Copper wire and utensils

9.

Sewing machines

10.

Sanitary fittings (excluding sanitary wares)

11.

Electrical appliances (room heaters, iron and room air coolers, small transformers,
electric fans, fractional HP motors, cooking ranges, water heaters, etc.) computers and
electric goods.

12.

Electrical fans and industries permitted in light industrial zone.

4. Illustrative list of Heavy Industries:

Sl.

Description

No.
1.

Hazardous and heavy manufacturing industries

2.

All types of heavy industries

12.2.4 PUBLIC AND SEMI-PUBLIC USES


a) Uses permitted:

All Central, State and Quasi Government offices/ owned complexes, and centres and
institutional office, educational, college campus including hostel facilities for students,
integrated residential schools/colleges, higher educational Institutions, colleges, cultural
Sky Group

P a g e | 208

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

and religious institutions including libraries, reading rooms and clubs, medical and health
institutions, cultural institutions like community halls, opera houses, clubs, auditoriums,
cultural complexes predominantly non commercial in nature, exclusive places of
worship/congregation, public toilets, nursery creches, civic amenities and large
infrastructure facilities of health, education, sports, cultural and social institutions, utilities
and services, offices/ sub offices of utilities, water supply installations including disposal
works, electric power plants, high tension and low tension transmission lines, sub
stations, gas installation and gas works, fire fighting stations, spastic rehabilitation
centers,

orphanages,

Govt.

dispensaries,

police

stations,

post

offices,

telecommunication/microwave tower, filling stations, fire stations, broadcasting &


transmission stations, banks, and quarters for essential staff and all uses permitted
under parks and playgrounds, traffic and transport related facilities, Public Transport
terminals and interchanges public distribution system shops, bill collection centers, dobhi
ghat, dharma shala and research institutions.

Note:
Retail shops, restaurants, filling stations, clubs, banks, canteens, dwellings required for
power maintenance and functioning of public and semi-public uses in the zone may be
permitted when they are run on non-commercial basis in their own premises and
ancillary to the respective institutions.
b) Uses that are permitted under special circumstances by the Authority:

Parking lot, repair shops, parks, play grounds, maidens and stadiums (no area limit) and
recreational uses, stadium, cemeteries, crematorium, clubs, canteen, libraries, aquarium,
planetarium, museum, horticultural nursery and swimming pool, orphanages and old age
homes, airport related ancillary uses

Note:-

i.

In case any private property is included within the boundary of any existing Public
and Semi Public building and if the owner can establish the ownership of such
property vests with him/her, then the land use adjoining the Public & Semi Public
building may be assigned to such private property by the Authority.

Sky Group

P a g e | 209

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

12.2.5 PUBLIC UTILITIES


a) Uses permitted:
Public utilities include energy, water, telecommunication sub stations/ service
stations/supply and pumping stations, high and low tension transmission lines and power
stations/ sub-stations, electric power plants, installations, storage reservoirs OHT,
treatment plants, storage and dumping yards, gas and gas lines, gas installations and
gas works, electric towers, transformers and microwave towers, telecom towers and
drainage and sanitary installations including solid waste management facilities such as
land fill sites, garbage dumping yard, treatment plants and disposal works, drying beds,
micro-wave towers, fire stations, milk dairies, wind mills.
b)

Uses that are permitted under special circumstances by the Authority:

Shops, canteens, offices, banking counter, dwellings required for proper maintenance
and functioning of public utility and other ancillary users, in their own premises as an
ancillary to the respective institutions not exceeding 5% of the total area.
Note:
i.

ii.
iii.

iv.

The buffer created for accommodating the utilities such as power, water, pipeline,
oil pipelines and high voltage lines, gas lines and any other utilities. Each buffer
is dictated by technical standards specified by the competent Authority.
The regulations for the above will be decided by the Authority.
In case of new developments, these shall remain as non buildable areas and
remain as reservations and marked for the purpose intended.
For electrical networks, KPTCL standards are followed.

12.2.6 PARKS, PLAYGROUNDS AND OPEN SPACES


a) Uses permitted:
Parks, play grounds, stadia, NMT infrastructural facilities, sports complexes, childrens
play land inclusive of amusement parks such as disney land type, toy trains, parkways,
boulevards, cemeteries and crematoria, burial grounds, public toilets, parking, sewage
treatment plants, water storage, sewage treatment plants, public use ancillary to park
and open space and open space, parking and playground. The area of such ancillary
use shall not exceed 5% of total area.

Sky Group

P a g e | 210

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

b) Uses that are permitted under special circumstances by the Authority:


Clubs (non-commercial nature and run by residents association), canteens, libraries,
aquarium, planetarium, museum, bala bhavan, art gallery, open air theaters, water sports
and amusement theme parks, recreational clubs (Non-commercial nature), public
libraries, horticulture/nursery, transportation terminals and swimming pool, milk booths,
HOPCOMS centres and Uses ancillary to the above such as canteens, may be permitted
not exceeding 5% of total area limited to ground plus one floor only.

12.2.7 TRANSPORTATION AND COMMUNICATION


a) Uses permitted:

Railway lines, railway yards, railway stations, railway workshops, airport roads, road
transport depot, storage depots, bus stations, bus stands and bus shelter, bus bays,
auto stand, parking areas, multi level car parking information, kiosk Integrated, bus
terminals, TTMC & metro stations, truck terminals, MRTS terminals, workshop and
garages for two wheelers/ LMV/ HMV and filling stations, service stations, airports and
helipad, post offices, telegraph offices, telephones and telephone exchanges, television
telecasting and radio broadcasting stations, Transport offices, microwave stations and
offices in their own premises and residential quarters for watch and ward, filling
stations, loading and unloading platforms (with/without cold storage facility), weigh
bridges, cargo terminals and transfer of cargo between different types of transport (rail,
road, air), Automobile spares and services. Automobile spares and services. transport
depot, storage depots, bus stations, bus stands and bus shelter, commercial, office
use shall be permitted & encouraged in all transport hubs & interchanges like TTMC &
IMTH etc. Provided that the biuilt up area for such use does not exceed 25% of
developable

area.

Traffic

and

Transportation

Management

Centres,

Transit

Interchange terminals/ Transit Terminals up to 50 % of the permissible developable


area.
b) Uses that are permitted under special circumstances by the Authority:
Hotels, motels, clubs, go downs, special warehousing and indoor recreational uses,
shops, canteens, restaurants, banks, dwellings required for proper maintenance of the
transport and communication services in their own premises as an ancillary to the
respective institutions not exceeding 25% of the total developable area.

Sky Group

P a g e | 211

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

Note
1. Regulations for transit oriented development:
1. In case of development for any use abutting road with ROW/Road width of 60 m
and above additional FAR of 0.5 over and above the FAR provided against the
said use shall be allowed within the 150 m radius of any transit hub/ major
interchanges (railway station, B.R.T. and metro) in Zonal Regulations of
Kanakapura Master plan, on payment of fee at twice the applicable prescribed
rates of Betterment levy subject to statutory clearances viz. fire, Airport etc
2. In case of development around Railway station/Metro Station/any other
Mass Rapid Transport System:
Station in the radius of 150 m from the boundary of the same an additional FAR of
0.5 over and above FAR provided against the said use in Zonal Regulations of
Kanakapura Master Plan, on Payment of fee at twice the applicable prescribed rates
of betterment levy subject to statutory clearances e.g. Airport, Fire safety, Pollution
control etc.,
3. Minimum Foot path width shall be 2.0m to 3.0m based on the Road width as
indicated in road cross sections ( refer Annexure ).
4. As far as possible the traffic and transportation use should be located as per the
envisaged activity. It is desirable to have truck terminal/ freight complex/ logistics
hub next to or alongside the industrial use. Similarly the public mass transit is
meant to take on maximum number of repeat trips hence major terminals of
passenger transit should be located at high density work place and high density
residential areas.
To encourage multimodal transit integration, it is desirable to have the terminals located
wherever more than one mode like rail and road are present and they can be integrated.
The bus terminal is being redeveloped to accommodate the metro station and intra city
bus terminal as well as few inter-city bus terminal, there by ensuring seamless physical
multimodal integration.

12.2.8 AGRICULTURAL ZONE


a) Uses Permitted:
Agriculture and horticulture, childrens play land inclusive of amusement parks, such as
disney land type, eco-tourism activities, toy trains, dairy and poultry farming, pisciculture,
Piggeries farms, livestock rearing milk chilling centers, cold storage, farm houses and
Sky Group

P a g e | 212

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

their accessory building and uses not exceeding 200 sq. m. of plinth area for the farmers
own use within the limitation of minimum plot area of 1.20 hectares. Not exceeding 250
sq m of plinth area within the plot area limitation of 1.2 ha limited to G+ 1 floor. Uses
specifically shown as stated in the land use plan like urban village, brick kilns, rice mills,
sugar mills, jaggery mills, gardens, orchards, nurseries and other stable crops, grazing
pastures, forest lands, marshy land, barren land and water sheet, highway amenities
viz., filling stations, weigh bridges and check posts.
b) Uses that are permitted under special circumstances by the Authority:

Agro processing units (as defined by C & I Dept.), Urban amenities such as burial
grounds, sports grounds, clubs/ sports clubs, stadiums, playgrounds, parks and garden
land, water sports, golf centers, race course, race / driving testing tracks, cultural
buildings, places of worship, air terminal and helipads, educational and health
institutions,

hospitals,

libraries,

exhibition

centers,

park

and

open

spaces,

graveyards/burial grounds, rehabilitated schemes of government, institutions relating to


agriculture, research centres, LPG bottling plant (min. 500 m away from human
habitation), ware house, storage and sale of farm products locally produced, provided
the Ground Coverage does not exceed 15 % and subject to a maximum of Ground+ First
floor only. Service and repairs of farm machinery and agricultural supplies, old age and
orphanage homes, Public utilities such as solid waste landfills, water treatment plants,
power plants, fuel stations and other highway amenities such as weigh bridges, check
posts and toll gates having access to major roads, truck terminals, quarrying and
removal of clay and stone up to 3.0 m. depth and crushing, wind mills, solar energy
stations, residential developments within the area reserved for natural expansion of
villages and buildings in such areas should not exceed two floors (Ground + one).

Note:

i.

Coverage:

15 % of the site area of the land may be used for educational and health

purposes and a building height of G+1 floor only shall be permitted.


ii.

For all uses permitted under this zone, regulations for rural development are to be followed.

12.2.8A Regulations for Rural Development

Within 150 m radius from the existing gramathana (as defined in the note below), for those
Sky Group

P a g e | 213

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

villages having a population up to 1000 as per 2011 census, and for every additional 1000
population additional 50 m for uses permitted under residential and agricultural zone may be
permitted with the following conditions.
1) FAR: 1.0
2) Maximum no of floors: G+1
3) Setbacks and coverage for the respective uses: As per Table no 8

NOTE:
Gramathana: means old village settlement as earmarked in the revenue survey map
(village map). Any addition already made to the gramathana in any form shall not be
considered while measuring the distance between land in question and gramathana.

12.2.9

AREAS OF SPECIAL CONTROL

12.2.9A

Solid Waste Management (SWM) Area/ site

For efficient and scientific management and disposal of solid waste generated within Bruhat
Bangalore Mahanagara Palike limits, certain areas lying within Kanakapura Local Planning Area
have been identified. Following regulations are laid out in order to restrict development around
these areas as per Government Order No. Na A E 325 MNU 2007 dated 06-10-2007:
a.

Area within a distance of 50 m from the premises of the SWM area/ site is
declared as Buffer Zone and No development or construction is permitted in this
zone. However set back and tree plantation may be allowed in this zone.

b.

Area within a distance of 200 m from the premises of the SWM area/ site is
declared as Sensitive Zone and developments or construction may be permitted
without affecting solid waste management area / site.

c.

If approval of layout in the Sensitive Zone is sought then existence of SWM


area/ site/ unit for 48 years is to be written in the layout plan while approving the
layout and when sale of sites in such a layout is done then the same is to be
written in the sale deed also for the knowledge of applicant/ owner / purchaser of
the land/ site.

d.

Permissions in the sensitive zone will be as per the land use specified in Master
Plan. The Authority may impose certain conditions (about the existence of the
site etc.,) that may protect the Solid waste management site and sensitive zone

Sky Group

P a g e | 214

Kanakapura LPA Master Plan 2031

12.2.9B

Chapter 12|Zoning Regulations

Archeological/ Historical Monuments and Precincts

The historical monuments in any city reflect the past glory of the city. As they attract
tourists both from inside and outside the country. While permitting developments around
historical monuments, care has to be taken to see that their aesthetic environs are not affected.
In order to preserve aesthetic environs around these monuments it is necessary to declare the
areas surrounding these monuments as zones of special control and impose the special
regulations around these monuments.

The Archeological Survey of India has not yet declared any of the monuments in the
Kanakapura town and the State Archeological Department has also not identified any of the
monuments in the Kanakapura town.

If the Planning Authority observes any Heritage structures, precincts of historic and/or aesthetic
and/or Architectural and/or cultural or environmental significance and natural features and sites
of scenic beauty, then Authority may demarcate special Development control areas for
regulation of development around these areas, to preserve the importance of the concerned
heritage structure and also to control the surrounding developments so that they do not mar the
grandeur or beauty or view of the heritage structure for the purposes of implementation.

A special Heritage committee may be constituted with the prior approval of the Government to
examine the proposals of development or any matter related to development, in the various
regulation areas, if received by the Authority, under the provisions of special Regulations and to
make recommendations to this Authority for consideration.

a)

Building up to and inclusive of first floor or up to a height of 7 m from ground level,


whichever is less, is permissible within a distance of 100 m distance from the premises
of the monuments.

b)

Buildings up to and inclusive of second floor or up to a height of 10.5 m from ground


level, whichever is less are only permissible between 100 m and 200 m distance from
the premises of the monuments.

c)

Building up to and inclusive of third floor or up to a height of 14 m from ground level,


whichever is less are only permissible between 200 m and 400 m distance from the
premises of the monuments.

Sky Group

P a g e | 215

Kanakapura LPA Master Plan 2031

d)

Chapter 12|Zoning Regulations

In any case no building shall be permitted within 400 m above the height of the declared
monument.

Note:
i.

No permission for any development around notified historical monument, shall be


accorded unless concurrence/ No Objection Certificate is received from the competent
authority i.e. Archaeological Survey of India, State Archaeology Department.

ii.

Any subsequent amendments to the Archaeology Act concerned regarding prohibited


area such amendments shall mutatis mutandis apply to these regulations.

iii.

In case of change of land use from the approved Master Plan to other use, the setbacks
shall be the higher of the two uses.

Table- 1
Space Standards for various Buildings /Uses

Sl.

Buildings / Uses

No
1

Conference halls, Community halls &

Min. road

Min. size of

width in m

plot in Sq m

12.0

500

Social clubs
2

Cold storage

12.0

1000

Indoor games

15.0

2000

Hotels / lodges

12.0

500

Kalyana Mantapas

12.0

1000

LPG storage & Fuel Filling stations

15.0

500

Nursing homes/polyclinics

12.0

500

Service Apartments

12.0

500

Nursery School

12.0

10

Lower Primary schools

12.0

11

Higher Primary schools

12.0

12

High schools with play ground,

12.0

13

Integrated Residential Schools

15.0

14

Colleges

15.0

15

Star hotels (up to 3 star)

15.0

Sky Group

As prescribed by the
competent Authority

As prescribed by

P a g e | 216

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

16

Star hotels (above 3 star)

18.0

the competent

17

Convention centres

15.0

Authority

18

Cinema, Multiplex, Convention Center

18.0

2000

19

R&D Lab

12.0

1500

NOTE:
1.

A buffer of 45 m is assumed all along the flow of the river on both banks, which shall be

treated as no development zone.


2.

In case of change of land use from the approved Master Plan to other use, the setbacks

shall be the higher of the two uses.

Sky Group

P a g e | 217

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

12.3 ZONING REGULATIONS: REGULATIONS FOR DIFFERENT USES OF BUILDINGS


The minimum set back required on all the sides of a building, maximum FAR, maximum height of building that are permissible for different
dimensions of sites and width of roads are set out for residential, commercial, public and semi-public, traffic and transportation, public utility
buildings up to 10.0 m in height in Table -2 and 3 given below:

Table 2
Exterior open spaces / setbacks in percentage (minimum) for residential, commercial, public and

semi-public, traffic and

transportation, public utility buildings up to 10.0 m in height.

Depth of
site in M.

1.
Up to 6
Over 6
Up to 9
Over 9
Up to 12
Over 12
Up to 18
Over 18
Up to 24
Over 24

Sky Group

Residential
Minimum in m.

Commercial

Traffic &
Transportation,
Public Utility & public
& semi Public

Front

Rear

Front

Rear

Front

Rear

2.
1.00

3.
0

4.
1.00

5.
0

6.
1.50

7.
0

1.00

1.00

1.50

1.50

1.50

1.00

1.00

1.50

1.00

2.00

1.50

1.50

1.50

2.50

1.50

2.50

1.50

2.50

2.00

3.00

2.00

3.00

2.00

3.50

3.00

3.50

2.50

4.00

3.00

Width of
site in M

8.
Up to 6
Over 6
Up to 9
Over 9
Up to 12
Over 12
Up to 18
Over 18
Up to 24
Over 24

Residential
Minimum in m.

Commercial

Traffic &
Transportation,
Public Utility & public
& semi Public

Left

Right

Left

Right

Left

Right

9.
0

10.
0

11.
0

12.
0

13.
0

14.
1.00

1.00

1.00

1.00

1.00

1.50

1.00

1.00

1.00

1.00

1.50

1.75

1.50

2.00

1.50

2.00

1.75

2.50

2.00

3.00

2.00

2.50

2.50

3.00

2.00

3.00

2.00

3.00

3.00

4.00

P a g e | 218

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

Note:
i.

When car garage is proposed on the right side rear corner, the minimum front
setbacks shall be 3.0 m;

ii.

For residential, commercial, public and semi-public, traffic and transportation,


public utility buildings, above 10 m in height, the setbacks shall be insisted as
per Table - 3;

iii.

For residential sites up to 120 sq m;


a. Open staircase shall be permitted in the side setbacks, but there shall be
a minimum open space of 0.50 m from the side boundary and 1.0 m from
the front and rear boundary of the site.
b. Toilets minimum of 1 m x 1.5 m and not exceeding 1.4 % of the plot area
permissible in rear set back only;
c. When minimum set back of 1.5 m is left on the right side, a scooter
garage may be permitted at the back side limiting the depth of the garage
to 3.0 m;
Table 3

Exterior open spaces / setbacks for residential, commercial, public and


Semi-public, traffic and transportation, public utility buildings
exceeding 10.00 meters in height.

Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12

Sky Group

Height of building in meters


Above 10.0 Up to 12.0
Above 12.0 Up to 15.0
Above 15.0 Up to 18.0
Above 18.0 Up to 21.0
Above 21.0 Up to 24.0
Above 24.0 Up to 27.0
Above 27.0 Up to 30.0
Above 30.0 Up to 35.0
Above 35.0 Up to 40.0
Above 40.0 Up to 45.0
Above 45.0 Up to 50.0
Above 50.0

Minimum Exterior open spaces


setbacks
to be left on all sides
(in m)
4.5
5.0
6.0
7.0
8.0
9.0
10.0
11.0
12.0
13.0
14.0
16.0

P a g e | 219

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

TABLE 4
Maximum Floor Area Ratio & Road Widths for Different uses

Road width in
m

Public & Semi-public,


Residential

Commercial

Traffic&Transportation,
Public utility

Upto 9

1.50

1.50

1.25

Over 9 to 12

1.75

1.75

1.50

Over 12 to 18

2.00

2.00

1.75

Over 18 to 24

2.25

2.25

1.75

Over 24

2.50

2.50

2.00

Note:
Only effluent treatment plant, open to sky swimming pool, car parking are excluded from
FAR computations.

12.3.1 Regulations for Group Housing Project


The following norms shall be adopted while approving building plans for group housing;
a) The approach road to a group housing project must have a minimum width of 12
m;
b) The minimum area for group housing shall be 1.00 ha or more.
c) An apartment Building on a plot of 1 hectare or more shall also be treated as
group housing and norms are applied accordingly.
d) A development plan showing the general arrangement of residential building
blocks, and dimensions of the plots earmarked for each building block, access
roads to abutting lands, parks, open spaces and civic amenity areas, shall be
obtained prior to according approval to the building plan;
e) Setbacks should be provided with reference to the depth and width of total plot
area;
f)

The floor area ratio (FAR) shall be with reference to the width of the public road
abutting

the property and the FAR shall be calculated for the net area of

the plot as prescribed in Table 4 after deducting the area reserved for civic
amenities.
Sky Group

P a g e | 220

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

g) The coverage shall be with reference to the total area of the development plan.
h) The distance between any two buildings shall not be less than half the height of
the taller building.
I)

15% of the total area to be reserved for civic amenity, parks and open spaces,
subject to a minimum of 10% for parks and open spaces and 5% for Civic
Amenity.
TABLE 6

Maximum plot coverage, FAR, minimum setbacks and minimum


road width for group housing.

Plot area

Minimum road width

Maximum

in m

Plot coverage

Between 1.00 to 2.00 ha


Between 2.00 to 3.00 ha
Above 3.00 ha

12
12
15

Maximum FAR

60%

1.50

50%

2.00

40%

2.25

Note:
a) Approval of development plan showing the general arrangement of residential
building blocks, and dimensions of plot earmarked for each building blocks, means of
access roads and civic amenity areas, should precede the approval to building plan.
b) In case, the height of group housing building exceeds 10.0 m, then setback to be left
all-round the premises shall be as per Table 2.
c)

Parking requirement shall be as per Table 9. In addition, 10% of the total parking
shall be reserved for visitors parking separately.

d) Internal roads and park area shall be developed by the owner / developer himself for
the specified purpose only.
e) C.A. sites and park area reserved in the development plan shall be handed over free
of cost to the Authority by a relinquishment deed. Preference may be given to the
owner/developer of the respective project for lease of C.A. area reserved in the
Group Housing project.

Sky Group

P a g e | 221

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

12.3.2 Regulations for Semi detached houses


The following norms shall be adopted while approving semi detached houses as given in
Table 7.
Table 7
Regulations for Semi-detached houses

1.

Minimum

combined

area

of

the

140 sq m

neighboring plots

2. Building coverage
3. Floor area ratio
As applicable to individual plots
4. Maximum number of floors
5. Minimum road width
6. Front setback for back to back plots

Shall be equal to the sum of front and rear


setbacks of individual plots.
On a plot on which a semi-detached building is

7.

Side setbacks for plots joined at the proposed, the side set back for each unit shall be
side.

the total of the left and right setbacks to be left in


case of individual plots.

12.3.3

Row housing

The following norms shall be adopted while approving row houses as given in Table 8.
TABLE 8
Row Housing (Maximum 12 units, minimum 3 units)

1 Minimum combined area of plot

210 sq m

2 Maximum area of each plot

108 sq m

3 Building coverage
4 Floor area ratio
As applicable to individual plots
5 Number of floors
6 Minimum road width
7 Setbacks minimum

Sky Group

Front: 2.00 m
Rear: 1.50 m
P a g e | 222

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

Side: 2.00 m only for end units

12.3.4

Flatted factories

The following norms shall be adopted while approving flatted factories as given in Table
9.
TABLE - 9
Regulations for Flatted Factories
1. Minimum plot area

1,000 sq m

2. Maximum plot coverage

40 %
1.50 up to 12.0 m road width

3. FAR

and 1.75 above 12.0 m road width.


a. Front 8.00 m
b. Rear

4. Minimum setbacks

4.50 m.

c. Sides 4.50 m.

12.3.5

Industrial buildings

Coverage, Floor Area Ratio and Open space for Industrial buildings are as given in Table
10 below:

TABLE 10
Coverage, Floor Area Ratio and Open space for Industrial buildings

Minimum

Minimum

Other

Minimum

Frontage

Front setback in

sides

road width

in m.

in m

in m

1.00

3.0

1.00

1.00

60%

1.25

12.0

4.50

3.00

1000 to 2000

50%

1.25

24.0

6.00

5.00

Over 12

2001 to 4000

40%

1.25

28.0

8.00

5.00

Over 12

4001 to 8000

35%

1.00

32.0

8.00

6.00

Over 15

Above 8000

30%

0.50

42.0

15.00

12.00

Over 15

Plot area in

Max. plot

Floor area

sq m

coverage

Ratio

Up to 230

80%

231 to 1000

Sky Group

P a g e | 223

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

Note: whenever the plot of the minimum size prescribed is not facing the required width of
road, permission shall be granted to the maximum extent of built up area allowable to
that particular road width.

12.3.6

Regulations for IT and BT related Activities

FAR and Ground Coverage in Industrial Zone for IT related activities to be followed as per
table 10 A below
Table -10 A
SL
NO

SIZE OF PLOT (
sq m)

GROUND
COVERAGE

PERMISSIBLE
FAR

ROAD WIDTH (m)

Upto 1000

55%

1.50

Above 9m upto 12m

50 %

1.75

Above 12.0m upto 18.0

50%

2.00

Above 18.0 upto 24.0

45%

2.25

Above 24.0 upto 30.0

45%

2.50

Above 30.0

2
3
4
5

Above 1000 upto


2000
Above 2000 upto
4000
Above 4000 upto
6000
Above 6000

Note: whenever the plot of the minimum size prescribed is not facing the required width of
road, permission shall be granted to the maximum extent of built up area allowable to
that particular road width.

Parking regulations for IT and BT related buildings


Each off-street parking space provided for motor vehicles shall not be less than (2.5
m x 5.0 m) 12.50 sq m area and for scooter and cycle parking spaces provided shall
not be less than 3 sq m and 1.4 sq m respectively and it shall be 25% of the car
parking space.

For building of different uses, off-street parking spaces for vehicles shall be provided
as stipulated the Table - 11

Sky Group

P a g e | 224

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

Exterior open spaces / setbacks in percentage (minimum) for IT and BT related


buildings to be followed as per table 10 B below.

Table 10 B
SL
NO

SIZE OF PLOT (sq m)

GROUND

MIN FRONT

MIN ALL AROUND

COVERAGE

SETBACKS (m)

SETBACKS (m)

Upto 1000

55%

Above 1000 upto 2000

50 %

Above 2000 upto 4000

50%

Above 4000 upto 6000

45

Above 6000

45

15

12

12.3.7

Parking Regulations

Parking space standards to be adopted are as follows:

a) Each off-street parking space provided for motor vehicles shall not be less than
(2.5 m x 5.0 m) 12.50 sq m area and for scooter and cycle parking spaces provided
shall not be less than 3 sq m and 1.4 sq m respectively and it shall be 25% of the
car parking space.

b) For building of different uses, off-street parking spaces for vehicles shall be
provided as stipulated in the Table - 11below:
TABLE 11
Off-street parking spaces
Sky Group

P a g e | 225

Kanakapura LPA Master Plan 2031

Sl.
No.

Category
Single dwelling unit

1.

Chapter 12|Zoning Regulations

Minimum one car parking space of


2.50 m x 5.00 m for every
A dwelling unit measuring more than 50 sq m upto
150 sq m of the floor area. A additional one car
park for part thereof, when it is more than 50% of
the prescribed limit.
a.
2 tenements each having area less than 50

Multi-family residential

sq m
b.

1 tenement exceeding area of 50 sq

Lodging establishments, tourist homes

6 guest rooms

and hotels

200 m floor area

Educational
a. Hospital

a. 100 sq m floor area subject to minimum 20


spaces

b. Nursing homes

b. 75 sq m floor area subject to minimum 10


spaces

Assembly/Auditorium

25 seats

Government or Semi public buildings

100 sq m floor area

Retail business

75 sq m floor area

Industrial

10

Storage

100 sq m floor area

11

Kalyana Mantapa

75 sq m floor area

12

Private Offices

75 sq m floor area

13

Restaurant/Pubs/Bars/Coffee Parlours

75sq m of floor area

14

Students Hostels

15 rooms

15

Working Persons Hostel

5 rooms

100 sq m floor area plus 1 lorry space measuring


3.5m x 7.5m for every 1000 sqm or part thereof.

Additional parking or part thereof shall be provided when the part area exceeds 50%
of the prescribed limits/ standards
Note:

Sky Group

P a g e | 226

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

(a) Parking space shall be with reference to total floor area after deducting space covered
by lift room, stair case, open balcony and ducts open to sky in addition to the area
deducted for the purpose of calculating the F.A.R.
(b) Up to 50 sq m in the case of shops, parking spaces need not be insisted.
(c) Off-street parking space shall be provided with adequate vehicular access to a
Street and the area of drive aisles subject to a minimum of 3.50 m and such other
provision required for adequate maneuvering of vehicles shall be exclusive of the
parking spaces stipulated in these Zonal Regulations.

(d) The parking spaces shall be provided in:

(a) First basement for plots up to 1000 sq m and second basement shall be
Permissible for plots more than 1000 sq m.

(b) Stilt floor or in upper floors (at any level.)

(c) Car parking can be provided in the set back areas provided; a minimum of 3.0 m is
left free from the building.

(d) The other aspects for providing parking spaces are:

i. Common and continuous cellar parking floors between adjoining blocks would be
allowed depending upon structural safety aspects.

ii. The parking spaces should be efficiently designed and clearly marked and
provided with adequate access, aisle, drives and ramps required for maneuvering
of vehicles.

iii. Stilt floor/Cellar parking floor shall be used only for parking and not for any
habitation purpose. Misuse of the area specified for parking of vehicles for any
other use shall be summarily demolished / removed by the Enforcement
Authority.

Sky Group

P a g e | 227

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

iv. For parking spaces in second basement and upper storeys of parking floors, at
least two ramps of minimum 3.5 m width or one ramp of minimum 5.4 m width
and maximum slope of 1:8 shall be provided.

i.

Basement / cellar shall be permitted to extend in the setback area except the
front setback after leaving a minimum of 1.5 m from the property line.

ii. A maximum of three basements in the case of 3-Star Hotels and above can be
permitted for parking and services

iii. Every basement storey shall be at least 2.4 m in height from the floor to the
bottom of the roof slab / beam / ceiling (whichever is less) and this height of
basement floor shall not exceed 2.75 m

iv. The basement storey shall not be projected more than 1.20 m above the average
ground level

12.3.8

Corridor

The minimum widths of corridor for different uses of building are as given in the Table
12.
TABLE 12
Minimum Width of Corridors
Sl.

Building use or type

No.
1

Minimum width of the


corridor in m

Residential building

1.0

Apartment building

2.0

Assembly buildings such as auditorium, Kalyana Mantapa, cinema


2

theatre, religious building, temple, mosque or church and other

2.0

buildings of public assembly or conference.


3

Institutional buildings such as:


a. Government office

2.0

b. Government Hospitals

2.4

c. Educational Buildings such as Schools, Colleges, Research


Institutions.

Sky Group

2.0

P a g e | 228

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

d. Commercial buildings such as private office, nursing homes,


lodges, etc.
e. All other buildings

12.3.9

2.0
1.5

Restrictions of Building Activity in Vicinity of Certain

Areas:
a) No building/ development activity shall be allowed in the bed of water bodies like
nala, and in the Full Tank Level (FTL) of any lake, pond etc,.
b) The above water bodies and courses shall be maintained as recreational/Green
buffer zone, and no building activity other than recreational use shall be carried out
within.
i)

30 meters from the boundary of Lake of 40.00 ha. and 10 m. for others.

ii) 9 meters from the boundaries of Canal / Raj Kaluve.


iii) 3 meters from the boundary of field natural drains as defined in the RS map /
topo sheets.
iv) The above shall be in addition to the mandatory setbacks. Unless and otherwise
stated, the area and the Full Tank Level (FTL) of a lake shall be reckoned as
measured or given in the Survey of India topographical maps/Irrigation Dept.

12.3.10 Distance of Building from Electrical Lines


No building shall be erected below an electrical line, as well as within the horizontal distance
from the electrical line indicated in the Table - 13. The vertical distance below the level of the
electrical line and the topmost surface of the building corresponding to the minimum
horizontal distance shall be as indicated in Table - 13. The minimum vertical clearance is not
applicable if the horizontal distance exceeds the minimum prescribed.
TABLE 13
Distance of buildings from electrical lines

Sky Group

P a g e | 229

Kanakapura LPA Master Plan 2031

Sl.
No.
1
2
3

Chapter 12|Zoning Regulations

Electrical lines

Vertical clearance
in m

Horizontal
clearance
in m

2.5

6.0

3.7

6.0

3.7

6.0

Low and medium voltage lines


up to 11 KV
High voltage lines up to and
including 11 KV
High voltage line above 11 and up to and including
33 KV

12.3.11 Solar Water Heater Requirements


Solar water heaters shall be provided as per the table for different categories of buildings.
TABLE 14
Solar lighting and water heater requirements

Sl.

Type of use

No.
1

100 litres per day shall be


provided for every unit

Restaurants service food and drinks with seating / 40 sq m of seating or serving


serving area of more than 100 sq m and above.

area

Lodging establishments and tourist homes

3 rooms

Hostel and guest houses

6 beds / persons capacity

Industrial canteens

50 workers

Nursing homes and hospitals

4 beds

Kalyana Mantapas, community hall and convention hall


(with dining hall and kitchen)

Recreational clubs

Residential buildings:

30 sq m of floor area
100 sq m of floor area

(a) Single dwelling unit measuring 200 sq m of floor area or site area of more than 400
sq m whichever is more.
(b) 500 lpcd for multi dwelling unit / apartments for every 5 units and multiples thereof.
Solar photovoltaic lighting systems shall be installed in multi unit residential buildings
9

(with more than five units) for lighting the set back areas, drive ways, and internal
corridors.

Sky Group

P a g e | 230

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

12.3.12 Rain Water Harvesting


Rain water harvesting is compulsory in all buildings of plots of size (9X12m) and
above, it includes storage or recharging into ground of rainwater falling on the terrace or on
any paved or unpaved surface within the building site.

The following systems may be adopted for harvesting the rainwater drawn from
terrace and the paved surface.

1.

Open well of a minimum of 1.00 m dia. and 6.00 m in depth into which rainwater may
be channeled and allowed after filtration for removing silt and floating material. The
well shall be provided with ventilating covers. The water from the open well may be
used for non-potable domestic purposes such as washing, flushing and for watering
the garden, etc.

2.

Rainwater harvesting for recharge of ground water may be done through a bore well
around which a pit of one meter width may be excavated up to a depth of at least 3.00
m and refilled with stone aggregate and sand. The filtered rainwater may be
channeled to the refilled pit for recharging the bore well.

3.

An impervious storage tank of required capacity may be constructed in the setback or


other than, space and the rainwater may be channeled to the storage tank. The
storage tank may be raised to a convenient height above the surface and shall always
be provided with ventilating the surface and shall always be provided with ventilating
covers and shall have draw off taps suitably place so that the rain water may be
drawn off for domestic, washing, gardening and such other purposes. The storage
tanks shall be provided with an overflow.

4.

The surplus rainwater after storage may be recharged into ground through percolation
pits, trenches, or combination of pits and trenches. Depending on the geomorphologic
and topographical condition, the pits may be of the size of 1.20 m width x 1.20 m
length x 2.00 m to 2.50 m depth. The trenches can be or 0.60 m width x 2.00 m to
6.00 m length x 1.50 m to 2.00 depth. Terrace water shall be channeled to pits or
trenches. Such pits or trenches shall be backfilled with filter media comprising the
following materials.

Sky Group

P a g e | 231

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

i)

40 mm stone aggregate as bottom layer up to 50% of the depth;

ii)

20 mm stone aggregate as lower middle layer up to 20% of the depth;

iii)

Course sand as upper middle layer up to 20% of the depth;

iv)

A thin layer of fine sand as top layer;

v)

Top 10% of the pits / trenches will be empty and a splash is to be provided in
this portion in such a way that roof top water falls on the splash pad;

vi)

Brick masonry wall is to be constructed on the exposed surface of pits /


trenches and the cement mortar plastered;

vii)

The depth of wall below ground shall be such that the wall prevents lose soil
entering into pits / trenches. The projection of the wall above ground shall at
least be 15 cm;

viii) Perforated concrete slabs shall be provided on the pits / trenches.

5. If the open space surrounding the building is not paved, the top layer up to a sufficient
depth shall be removed land refilled with course sand to allow percolation of rainwater
into ground.

The terrace shall be connected to the open well / bore well / storage tank /recharge pit
/trench by means of H.D.P.E. / P.V.C. pipes through filter media. A valve system shall be
provided to enable the first washings from roof or terrace catchments, as they would contain
undesirable dirt. The mouths of all pipes and opening shall be covered with mosquito (insect)
proof wire net. For the efficient discharge of rainwater, there shall be at least two rain water
pipes of 100 mm dia for a roof area of 100 sq m Rainwater harvesting structures shall be
sited as not to endanger the stability of building or earthwork. The structures shall be
designed such that o dampness is caused in any part of the walls or foundation of the
building or those of an adjacent building.

12.3.13 Facilities for Physically Handicapped Persons


Public and semi public buildings having covered area of 300 sq m and above shall be
designed and constructed to provide facilities to the physically handicapped persons as
prescribed in the Schedule-V of these Zoning Regulations.

SCHEDULE - V
Facilities for physically handicapped persons

Sky Group

P a g e | 232

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

These byelaws shall apply to the physically handicapped persons having the
following disabilities.i.

Non-ambulatory disabilities: Impairments that regardless of cause or


manifestation, for all practical purposes, confine individuals to wheelchairs;

ii.

Semi-ambulatory disabilities: Impairments that cause individuals to walk


difficulty or insecurity. Individuals using braces or crutches, amputees,
arthritics, spastics, and those with pulmonary land cardiac ills may be sent
ambulatory.

iii.

Hearing disabilities: Deafness or hearing handicaps that make an individual


insecure in public areas because he is unable to communicate or hear
warning signals.

iv.

Sight disabilities: Total blindness or impairments affecting sight to the extent


that the individual functioning in public areas is insecure or exposed to
danger.

a. Access Path/ Walk Way: The width of access path / walkway from plot entry and
surface parking to the building entry shall not be less than 1.80 m. It shall not have a
gradient exceeding 5%.
b. Surface Parking: At least two car spaces shall be provided at surface level near
entrance with maximum travel distance of 30.00 m from the building entrance.
c. Space for Wheel Chair Users: Adequate space shall be kept for the free movement
of wheel chairs. The standard size of wheel chairs shall be taken as 1050 mm x 750
mm the doors shall have a minimum width of 900 mm to facilitate the free movement
of wheel chairs.
d. Approval to Plinth Level: At least one entrance shall have approach through a
ramp. The ramp shall have a minimum width of 1.80 m with maximum gradient of
1:10.
e. Entrance Landing: Entrance landing shall be provided adjacent to ramp with the
minimum dimension of 1.80 m x 2.00 m.
f.

Corridors: The minimum width of corridors shall be 1.80 m.

g. Staircase: The minimum width of staircase shall be 1.50 m. The minimum number of
risers on a flight shall be limited to 12. Size of treads shall not be less than 30 cm and
the height of risers shall not be more than 15 cm.

h. Lifts:

Sky Group

P a g e | 233

Kanakapura LPA Master Plan 2031

j)

Chapter 12|Zoning Regulations

Wherever lifts are required to be installed as per bye-laws, provision of at least


one lift shall be made for the wheel chair users with the following cage
dimensions recommended for passenger lifts of 13 persons capacity by Bureau
of Indian Standards.
Clear internal depth 1100 mm (1.10 m)
Clear internal width 2000 m (2.00 m)
Entrance door width 900 mm (0.90)

ii) The lift lobby shall have a minimum inside measurement of (1.80 x 1.80) m.
j.

Toilets: One special water closet in a set of toilets shall be provided for the use of
handicapped persons with wash basin keeping in view the following provisions.i. The minimum size of toilet shall be 1.50 m x 1.75 m.
ii. The maximum height of the W.C. set shall be 0.50 m above the floor.

k. Hand Rails: Hand rails shall be provided for ramps, staircases, lifts and toilets. The
height of hand rails shall be normally 800 mm above the floor level. If the building is
meant for the predominant use of children, the height of hand rails may be suitably
altered.
l.

Guiding / Warning Floor Material: The floor material to guide or to warn the visually
impaired persons with a change of colour or material with conspicuously different
texture and easily distinguishable from the rest of the surrounding floor materials is
called guiding or warning floor material. The material with different texture shall give
audible signals with sensory warning when person moves on this surface with
walking stick. The guiding / warning floor material is meant to give the directional
effect or warn a person at critical places. This floor material shall be provided in the
following areas:
i. The access path to the building and to the parking area;
ii. The landing lobby towards the information board, reception, lifts, staircase and
toilets;
iii. At the beginning / end of walkway where there is vehicular traffic;
iv. At the location abruptly changing in level and at the beginning / end of ramp;
v. At the entrance / exit of the building.

m.

Proper Signage: Appropriate identification of specific facilities within a building for


the handicapped persons should be done with proper signage. Visually impaired
persons make use of other senses such as hearing and touch to compensate for the
lack of vision; whereas visual signals shall benefit those with hearing disabilities.
Signs should be designed and located such that they are easily legible by using
suitable letter size (not less than 20 mm size). For visually impaired persons,

Sky Group

P a g e | 234

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

information board in Braille should be installed on the wall at a suitable height and it
should be possible to approach them closely. To ensure safe walking there should
not be any protruding sign, which creates obstruction in walking.
The symbols / illustrations should be in contrasting colour and properly illuminated so that
with limited vision one may be able to differentiate amongst primary colours.

12.3.14 Security Deposit


The applicant shall deposit a sum of Rs. 50/- per sq m of floor area as refundable
non-earning deposit for the following categories of buildings namely:
a) Residential Buildings/ Group Housing/Multi-Dwellings/Apartments with 5 units or
more.
b) Commercial Buildings exceeding 300 sq m of floor area. The security deposit
shall be refunded after one year of completion of the building as per approved
plan certified by Development or Local Authority. If the construction is not as per
the approved plan, the deposit would be forfeited.

12.3.15 General Rules


The following shall be considered while enforcing the zoning regulations for all types of
developments:
I.

Conversions

a. Conversions prior to the provisional approval of Interim Master Plans (28.4.2007) as


per GO dated 12.12.2008 are to be honored irrespective of the land use proposed in
the Master Plan except in cases of road alignment, natural drains and water bodies.

b. The government is the competent authority to permit change of land use under the
act. It is further classified that the permission accorded by high power
committee/government/single window shall be deemed to be given as, if planning
authority has provided its opinion to government under the procedure specified
under section 14-A of the KTCP Act 1961.

Sky Group

P a g e | 235

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

c. All layouts approved by the Authority Shall be deemed to have been reserved for the
purpose for which they are approved, provided they have been approved before the
approval of master plan

II.

Application of land use:

a. The proposed land use indicated towards the roadside of a property shall be
the land use for the entire property (one property depth not exceeding 50 m)
without identifying it for different uses by measuring as per the scale of the
maps. This is applicable only to the built-up area as shown in the existing land
use map.

b. Different uses permitted in a given zone may be allowed in different floors of


the building. In such cases, the regulations applicable to the use of the
ground floor of the building shall apply to the entire building.

c. In case of uses granted under special circumstances/change of land use, as


the case may be, the higher of the setback and the lower of the FAR
applicable to the original land use /change of land use as the case may be
shall be applicable.

d. The proposed alignments of STRR, IRR, RR, TRR, Expressway etc., are to
be incorporated. In case of any changes in the alignment by the competent
Authority, the same would prevail over MP proposal.

e. Any discrepancies with respect of revenue survey numbers, actual alignment


of HT lines, existing roads, nala alignment and water bodies in the MP shall
be resolved by field and documentary verification by the Authority and also in
comparison with the ground reality/cadastral map

f. In case of change in alignment of roads, H T line or nala indicated in the MP,


the adjacent higher land use abutting the alignment before change shall be
considered.

Sky Group

P a g e | 236

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

g. The Government directions for considering the approval of layouts are


protected under special circumstances.

h. If the alignment of the existing road is shifted in the MP, the existing road as
on ground reality/ cadastral map may be considered for the proposed road
widening. The higher land use abutting the shifted road shall be considered
accordingly.

III.

Setbacks
i.

The front and rear setbacks shall be with reference to depth of the site.

ii.

Left and right setbacks shall be with reference to width of the site.

iii.

No side setbacks shall be insisted upon only in the case of reconstruction of


existing building where traditional row housing type of development exists and
in areas specifically provided under the Zonal Regulations.

iv.

The provision of setbacks should be read with tables prescribed for floor area
ratio, coverage etc., for different type of buildings.

v.

When the building lines are fixed, the front set back shall not be less than the
building line fixed or the minimum front set back prescribed whichever is
higher.

vi.

In the case of corner sites both the sides facing the road shall be treated as
front side and regulations applied accordingly to maintain the building line on
these two roads and to provide better visibility.

vii.

In case where the building line is not parallel to the property line, the front and
rear setbacks shall not be less than the specified setbacks at any point.

viii. In case of building sanctioned prior to coming into force of these rules which
are abutting other properties on one, two or more sides, upper floors may be

Sky Group

P a g e | 237

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

permitted, to utilize the available FAR except in the front to enable road
widening, if any.

ix. In case of irregular plots setbacks are to be calculated according to the depth
or width at the points where the depth or width are varying. In such cases,
average setbacks should not be fixed at as they may effect minimum set back
at any point.

x. The left and right set-backs may be interchanged by the Authority in


exceptional cases due to existing structures like: open well and also
considering the topography of the land.
i.

Higher FAR should be permitted only within 200m radius of any transit hub or
major interchanges (Railway station , metro or BRT station ).

ii.

In case of sites availing additional FAR / FSI, the permissible ground


coverage should be reduced by 20% for the area above 500sqm.This shall be
limited to a minimum coverage of 15%.

iii.

Foot path and utility services are provided on either sides roads for 18m &
above roads for minimum of 2.0m to 3.0m width.

iv.

Pedestrian only zones shall be identified and marked along with time bound
action plan for achieving the same.

v.

Commercial, office use shall be permitted and even encouraged in all


transport hubs and interchanges like TTMC, IMTH etc.

vi.

Bus- bays shall be indicated on the layout approval drawings within the
layouts at the time of approval (Above 18M).

vii.

The turning radii of roads at the junctions/ intersection designs shall be as per
the IRC code for intersection design for urban roads and shall include space
required for signals and utilities along with the signage.

viii.

The parking requirements shall be 50% of the parking shown against the uses
in case of commercial/ service industry are proposed to be developed in the
transit stations/ terminals / interchanges i.e. TTMCs IMTC.

Sky Group

P a g e | 238

Kanakapura LPA Master Plan 2031

ix.

Chapter 12|Zoning Regulations

The cross-sections in the annexure shall be applicable in case of


development of the road of applicable classification. In case additional Row is
available the order of priority for the space allocation shall be as below:

Pedestrian sidewalk
Central Verge/median for pedestrian refuge
Cycle path
Plantation zone
Bus bay
xi. Carriageway

IV.

NOC

i.

For all the high-rise buildings NOC from the following departments shall be
obtained.

ii.

a.

Fire force department.

b.

K.U.W.S.& D.B.

c.

K.P.T.C.L./BESCOM

d.

Telecommunication department

e.

Karnataka State Pollution Control Board

A Traffic Impact Study shall be submitted along with other applicable documents
for permission where possible developable area is not less than 2000 sq. m. in
case of commercial or industrial uses. The authority may reject or accept or may
seek the opinion of Directorate of Urban Land Transport on the traffic impact
study and approve the development with or without such conditions as it deems
fit.

iii.

For all Development Plans, Apartment Buildings and Residential Layouts which
come under the category stipulated by the Karnataka State Pollution Control
Board (K.S.P.C.B.), necessary NOC from K.S.P.C.B. shall be furnished.

iv.

For Cinema theatres, the setbacks and other provisions shall be as per
Karnataka Cinematography Act and Rules.

V.

Road width

a) Road width means distance between the boundaries of a road including footways
and drains.
b) If the road width varies along the length of road, then the minimum width of the road
along 200 m stretch on either side, from the centre of the plot shall be considered.
c) In case of roads having service roads in addition to the main roads, the

Sky Group

width of

P a g e | 239

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

road shall be aggregate width of service roads and main roads for determining FAR
and number of floors.
d) When a portion of land is at different/split levels, then the width of the road to be
considered for determining F.A.R., shall be the aggregate width of the roads which
are at different levels.

VI.

Means of Access

The means of exclusive access, which would be other than through public roads and streets,
shall not be of more than 30 m length from the existing public roads and streets The
minimum width of such access shall be 3.5 m. FAR and height of buildings coming up on
such plots shall be regulated according to the width of public street or road. If the means of
access exceeds 30.0 m in length, FAR shall be regulated with reference to the width of such
access road. Construction of buildings on plots with common access/lanes from the public
road/street shall be regulated according to width of such common access roads/lanes.

VII.

Garages

a) For garages no side or rear setbacks are to be insisted. One upper floor not
exceeding 3.0 m. in height shall be permitted provided no openings are provided
towards neighboring buildings and at least one opening for light and ventilation is
provided towards the owners property.

b) Garages shall be permitted in the rear right hand corner of the plot. In cases of
buildings constructed or sanctioned prior to the enforcement of these regulations,
where space is not available on the right side, it may be permitted on the left side
provided minimum setback exists in the adjoining property of the left side.

c) In case of corner plots, the garage shall be located at the rear corner diagonally
opposite to the road intersection.

d) The maximum width of the garage shall not exceed 4 m and the depth should not
be more than 6.0m or 1/3 the depth of the plot, whichever is lower.

e) The garages shall not be constructed or reconstructed within 4.5m from road edge.
This may be relaxed in cases where the garage forms part of the main building with
minimum setback for the plot.

Sky Group

P a g e | 240

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

VIII. Plots facing the roads proposed for widening:

In case of a plot facing the road proposed for widening, the required land as
indicated in the master plan for road widening shall be handed over to the local
Authority free of cost by a Relinquishment deed by the owner of the land before
sanction is accorded to his plan;

a) The FAR shall be allowed as applicable to the total area of the site without
deducting the area to be taken over for road widening, provided at least 60% of the
site area is available for use as a building site after the proposed road widening;
and set back shall be determined for the remaining portion of the plot.
b) Existing road width abutting the site shall be considered for calculating the FAR.
Benefit of Development Rights shall be extended in such cases as per the
provisions of Section 14-B of KTCP Act 1961

IX. Exemption in open space:

The following exemptions in open space shall be permitted


a) Cantilever Portico: A cantilever portico of 3.0 m width (maximum) and 4.5 m length
(maximum) may be permitted in the ground floor within the side set back. No access
is permitted to the top of the portico for using it as a sit out. Height of the portico
shall be open to sky. The portico when allowed shall have a clear open space of one
meter from the boundary of the property.
b) Balcony: The projection of the balcony shall be measured perpendicular to the
building up to the outermost edge of the balcony. Cantilever projection of the
balcony shall be permitted not exceeding 1/3 of the setback subject to a maximum
of 1.1 m in the first floor and 1.75 m in and above the second floor. No balcony is
allowed within the minimum setback area at the ground floor level. The length of the
balcony shall be limited to 1/3 of the length of each side of the building.
c) Lifts: Lifts shall be provided for buildings with ground plus three floors and above.

d) Parking space: Adequate space for car parking shall be provided in the premises
as per standards in Table - 11.

Sky Group

P a g e | 241

Kanakapura LPA Master Plan 2031

X.

Chapter 12|Zoning Regulations

Water supply: Bore well shall be provided in all high rise buildings to provide
alternative source of water supply where the Karnataka Urban Water Supply and
Drainage Board so desires and the strata is capable of yielding water.

XI.

Height of building: In the reckoning of height of buildings, headroom, lift room,


water tanks on terrace, penthouse may be excluded.

XII.

Road alignment: In case of buildings that have been permitted lawfully by Town
Municipal Council or Planning Authority and if such structures are obstruction to the
alignment of the proposed roads in the Master Plan, 2031, such road alignment shall
be re-looked into by the Authority and decision may be taken suitably.

XIII.

Permissions: All permissions accorded by Govt. or by the Planning Authority shall


be treated as conforming uses irrespective of the classification made in the Master
Plan, 2031. This is to be allowed on a case by case basis only.

XIV.

New additions to existing buildings:


In case of buildings which are existing prior to coming into force of these regulations,

upper floors may be permitted according to the existing coverage subject to limitation of
height, F.A.R., Building Line or any road widening proposals in accordance with present
regulations.

12.4. SUB-DIVISION REGULATIONS


The purpose of these regulations is to guide the development of new areas in accordance
with the land use plan. As long as this is done on sound planning principles with adequate
space standards, the future of the Town is assured.

This will not necessitate costly

corrective measures, which would become necessary, if sub-standard growth is allowed to


take place. These sub-division regulations are confined to standards of size of plots, street
widths and community facilities.
In sanctioning the sub-division of a plot under section 17 of the Karnataka Town and Country
Planning Act, 1961, the Planning Authority shall among other things see that the following
planning standards are followed for sub-division of plot.

Sky Group

P a g e | 242

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

The Authority reserves the right to modify the layout submitted by the applicant / owner and
may impose any condition either from the planning point of view or in the interest of public.

A. Amalgamation:
i.

In the case of amalgamation, the proposed sites shall have the same land
use.

ii.

Ownership of the amalgamated plot could be in a single or multiple


names/family members/ company. But, amalgamation shall not be considered
if the plots are under lease agreement.

iii.

Development controls for the amalgamated plot shall be with reference to


new dimensions.

B. Bifurcation:
i.

In the case of all bifurcations, whether corner site or intermediate site, front
setback for the resulting site abutting the road shall be the same as that of the
original site and not that of the subdivided site.

ii.

A Plot/ Site which is a part of the Sub division plan/layout/scheme duly


approved by the Authority may be further bifurcated with prior permission of
Authority and the sub divided plot shall not be less than the prescribed size of
the plot.

iii.

Bifurcated plot shall not be less than 54 sq m. Bifurcated plot shall have a
minimum of 3.5 m access.

iv.

The bifurcated plot shall have a minimum of 4.5 m frontage. This condition
shall not apply to family partition sites.

12.4.1 Norms for Approval of Sub-division of plot or Layout Plan


12.10.1A

Approval of residential layout:

a) Size of plot
No building plot resulting from a sub-division after these regulations come into force is
smaller in size than 54 sq m in residential zone. In specific cases of sites for housing
schemes for economically weaker sections, low income groups, slum clearance and Ashraya
housing, the authority may relax the above condition.

Sky Group

P a g e | 243

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

b) Areas for open spaces and civic amenities


The minimum area, areas for open space and civic amenities and roads while sanctioning of
layout for residential purpose shall be subject to the following conditions:
i.

The minimum area for approval of a layout shall not be less than 1.0 ha provided that
if a single owner does not possess the entire 1.0ha, a group of owners may jointly
apply to the Authority.

ii.

In case of already land locked areas where the amalgamation of 1.0Ha. is not at all
possible, the Authority may consider lesser areas, provided minimum 10% of
Open space and 5% of Civic amenity space shall be reserved.

iii. The area earmarked for residential sites shall be a maximum of 55% of the total
extent.
iv. Balance area shall be earmarked for roads, parks, and playgrounds and civic
Amenities and the area under parks and playgrounds shall not be less than 10%
of the total extent.
v.

Areas covered under Park Zones, Valleys, lake/nalla buffer etc may be shown as
park in the layout plan.

vi. If by incorporating major roads proposed in the Master Plan, the area under roads
exceeds 45%, in such case the reservation under parks and civic amenities may
be relaxed.
vii. A maximum of 3% of the total area from out of the permissible residential area may
be earmarked for commercial uses.
viii. The area reserved for parks and open spaces, civic amenities and roads shall be
handed over to the Planning Authority free of cost through a registered
relinquishment deed before taking up development of the layout.
ix. Minimum width of road width shall not be less than 9.00 m. for plots upto 200 Sq M
and for bigger plots the road width shall not be less than 12.00 m.
x.

In case of EWS sites the minimum road width may be 7.5m

xi. The land in question shall be converted for non agricultural purpose.

Sky Group

P a g e | 244

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

xii. The land shall be access from public road and the use of land shall be in accordance
with the zonal regulations of master plan.
xiii. The necessary development charges shall be paid to the concerned UDA / Local
Authority. This fee is in addition to recovery of fee under Section 18 of K.T.C.P
Act and other fees/charges prescribed by the Government from time to time.

xiv.

Whenever the total area proposed for formation of layout exceeds 10acres, then
adequate extent of land may be earmarked for provision / installation of utilities like
transformer, sewage treatment plant, overhead water tank, bus bay / shelter, etc. this
area may be taken into calculation under either CA or Park as the case may be.
Decision of the Authority in this regard shall be final.

xv.

Landscaping on the streets/ sideways/ sidewalks for better green cover shall be
insisted for roads with road width of 15 m and above at the time of approval for
development (layouts/ Development Plan/ building plan).

xvi.

While developing a land, if for any reason, the road has to be stopped without
continuation, then cul-de-sac with turnaround area of 9 m radius of the end shall be
provided.

12.10.1B

Approval of single plot for residential purpose.

Any extent of land can be approved as single plot subject to the following conditions:

i.

The land in question is converted for residential purpose.

ii.

The land shall have access from the public road and the use of land shall be in
accordance with the Zonal Regulations of the Master Plan.

iii.

The Authority shall collect the fee under Section 18 of the K.T.C.P. Act and
development charges and any other fees and charges prescribed by the Government
from time to time. In addition, fee for Rejuvenation of lake/tank as per section 18(A)
of the K T C P Act, 1961 at the rate of Rs. 1,00,000/- per acre shall be levied and
collected as per the Government circular No. Na A Ee 90 BMR 2010 dated

29-9-

2010.

iv.

In case owner of any land who has obtained approval for single plot desires to subdivide his plot at a later stage, he shall obtain approval by the Authority treating it as

Sky Group

P a g e | 245

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

sub-division of land and the norms applies accordingly as prescribed in the Zoning
Regulations.

v.

If any roads proposed in master plan shall be incorporated in the plan and shall be
handed over to the authority free of cost.

vi.

The necessary development charges shall be paid to the concerned UDA / Local
Authority. This fee is in addition to recovery of fee under Section 18 of K.T.C.P Act
and other fees/charges prescribed by the Government from time to time.

12.10.1C

Approval of Non-Residential layouts.

A. If the non-residential layout for approval consists of only one single unit,
approval shall be given subject to the following conditions:
I.

The land in question shall be converted for non-agricultural purpose.

II.

Any extent of land can be approved as single plot.

III.

The land shall be access from public road and the use of land shall be in
accordance with the zonal regulations of master plan.

IV.

The minimum road width shall be 12m.

V.

A minimum 5% of the total extent of land shall be reserved for vehicle parking
and this shall be in addition to the parking space prescribed in the Zoning
Regulations as per the total floor area of the building.

VI.

A minimum 10% of the total extent shall be earmarked as park and open
space.

VII.

Areas covered under Parks Zones, Valleys, lake/nallah buffer etc may be
shown as park in the development plan.

VIII.

The area reserved for vehicle parking and open space shall be maintained by
the landowner and this land shall not be used for any other purpose by the
landowner.

IX.

The Planning Authority shall collect the fee under section 18 of K.T.C.P. Act
and development charges applicable and any other fees and charges
prescribed by the Government from time to time.

Sky Group

P a g e | 246

Kanakapura LPA Master Plan 2031

X.

Chapter 12|Zoning Regulations

In case owner of any land who obtained approval for single plot desires to
sub-divide his plot at later stage, he shall obtain approval of Authority for sub
division of plots as per prescribed norms.

B. If the non-residential layout for approval consists of two or more number of


plots, the following conditions shall apply:
i. The land in question shall be converted for non-agricultural purpose.
ii. The land shall be access from public road and the use of land shall be
in accordance with the zonal regulations of master plan.
iii. A minimum 5% of the total extent of land shall be reserved for vehicle
parking and

this

shall be in addition to the parking space

prescribed in the Zoning Regulations as per the total floor area of the
building.
iv. A minimum 10% of the total extent of land shall be earmarked as park
and open space.
v. Minimum width of road shall not be less than 12.0m.
vi. The area earmarked for parking, park and open space and roads shall
be handed over to the local authority at free of cost for maintenance.
vii. The Planning Authority shall collect the fee under Section 18 of
K.T.C.P. Act and development charges and any other fees and
charges prescribed by the Government from time to time.

12.10.1D

Regulations for Redevelopment Schemes

In case of Slum Redevelopment Scheme, taken up by the Karnataka Housing Board


and Karnataka Slum Clearance Board, the following regulations given in the table
15 below shall be applicable.

TABLE-15

SI.

Sky Group

Regulations for Slum Redevelopment Scheme

P a g e | 247

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

No.
1

Land Use Allocation


For rehabilitation scheme, procedure as per Section 14 A of Karnataka Town &
Country Planning Act may be dispensed with in agricultural zone of approved Master
Plan after consultation with the Director of Town and Country Planning and for redevelopment within the conurbation area shall be as per the Zonal Regulation and
Master Plan proposals.

FAR & Ground Coverage taken up in the same location.


Extent in Ha

Coverage

FAR

Min. Road width

Min. allround set


back

Up to 0.4

60%

3.0

6m for buildings < 15m

6m

height and 9m for > 15 m


height
Above 0.4 up to

60%

3.0

0.8

7.5 m

and 12 m for > 15 m ht

Above 0.8
3

9m for buildings< 15m ht

60%

3.0

12.0 m

9.0 m

FAR & Ground Coverage for a relocation scheme.


Road width in m.

Coverage

FAR

Less than 12

60%

2.00

Above 12 and Up to 18

55%

2.25

Above 18 and up to 24

55%

2.50

Above 24 and up to 30

50%

3.00

Above 30

50%

3.25

Set backs

As per Table 2 or 3 of
these Regulations

Minimum Open space and Civic Amenity area


Open space and Civic Amenity area shall be 15% of total sital area. Out of 15%, not
less than 10% shall be reserved for park area and the rest reserved for Civic Amenity
area. Such areas need not be handed over free of cost to the Authority

Commercial
2% of the total area may be reserved for Commercial use subject to fulfillment of
parking area.

Set-backs
As shown in item number 2 & 3

Sky Group

P a g e | 248

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

Distance between the blocks


Up to 15 m height 6.0 m minimum & Above 15m height 9.Om minimum shall be

12.4.2

Standard of Roads

a) Layouts

Minimum Right of Way for streets proposed in layouts is as per Table 16.

Table-16
Standard of Roads/streets in layouts

Sl.

Length and category of streets

No
1

in m
Residential

a) Up to 180 m

9.00 m

b) Above180 m Up to 500m

12.00 m

c) Above 500 m

18.00 m

d) Collector street (minor roads)

12.00 m

e) Major collector roads (feeder streets)

18.00 m

f) Arterial roads
2

18m,24m and 30 m

Commercial

a) Retail

12.00 m

b) Others

15.00 m

b)

Minimum right of way

Industrial

a) Up to 2.0 Hectare

12.00 m

b) Above 2.0 Hectare

15.00 m

Single Plot Layouts


One public through fare road shall be provided at the edges of the property as per
the extent of land as shown in the Table 17 below.

Sky Group

P a g e | 249

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

Table-17
Standard of Roads/streets in layouts

Sl.

Single plot layout for

Extent of layout

No

1.00 to

2.00 to

Above

2.00 ha

5.00 ha

5.00 ha

Residential

9.00 m road

12.00 m road

18.00 m road

Commercial

12.00m road

18.00 m road

24.00 m road

Industrial and other uses

12.00m road

18.00 m road

24.00 m road

12.4.3

Standards for Civic Amenities, Parks & Play Grounds

Standards for Civic Amenities, Parks & Play Grounds regarding minimum area with respect
to population per unit of different facilities are presented in Table 18 and 19 respectively.

1. Civic Amenities
TABLE 18

Standards for Civic Amenities

Particulars

Population
per unit

Area in ha.

a) Educational Facilities:
i) Nursery School (age group 3 to 6 years)
ii) Basic primary and Higher primary school
(age group 6 to 14 years)

1,000
3,500 to 4,500
As per the Standards of

iii) Higher secondary school (age group 14 to


17 years)
iv) College

15,000

Respective Departments

50,000

b) Health Facilities:
i) Dispensary

5,000

As per the Standards of

ii) Health Centre

20,000

Respective Departments

c) Other facilities:
Sky Group

P a g e | 250

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

i) Post and Telegraph

10,000

ii) Police Station

10,000

As per the Standards of

iii) Religious Building

3,000

Respective Departments

iv) Filling Station

15,000

2.Parks, play ground and open spaces


The area standards and population benchmarks to be followed for providing parks,
playground and open spaces are given in Table 15 below.
TABLE 19
Standards for Parks, play ground and open spaces

Sl. No.

Category

1.

Tot-lot

2.

Population Area in
per unit

hectares (min.)

500

0.05

Children park

2,000

0.20

3.

Neighborhood play ground

1,000

0.20

4.

Neighborhood park

5,000

0.80

12.4.4

Building Line

Building lines are prescribed for some important roads in Hosakote town as presented in
Table -20. Front setback is also prescribed separately for various types of buildings. The
higher of the two shall be the minimum open space in order to have better street architecture
and also to facilitate road widening proposal if any in future.
TABLE 20
Proposed Building Line

Sl.
No.

Name of the Road

Proposed
right of way
(m)

Building line
from the edge of
ROW (m)

STRR

90.0

10.0

Sky Group

P a g e | 251

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

IRR

90.0

10.0

ITRR

90.0

10.0

RR

60

6.0

NOTE:
For National Highways, State highways, Major District roads, other district roads and village
roads standards specified (road width, building lines etc.,) by the Ministry of Surface
Transport, Government of India are to be followed vide Govt. Notification No: UDD 251 BMR
2005, dated 22-12-2005 and other circulars of Government of Karnataka)
For all existing roads of width more than 15m shall be provided minimum of 3m building line.

ANNEXURE I- Road Cross- Section

Fig 1- Arterial Road Cross- Section (RoW- 45m)

Fig 2- Sub- Arterial Road Cross- Section (RoW- 35m)


Sky Group

P a g e | 252

Kanakapura LPA Master Plan 2031

Chapter 12|Zoning Regulations

Fig 3- Sub- Arterial Road Cross- Section (RoW- 27m)

Fig 4- Collector road cross- section- (RoW- 24m)

Fig 5- Collector road with centre bus lane cross- section- (RoW- 25m)

Sky Group

P a g e | 253

ANNEXURES

ANNEXURE 1: NOTIFICATION OF THE KANAKAPURA LPA

ANNEXURES

ANNEXURE 2

ii

ANNEXURES

iii

ANNEXURES

ANNEXURE 3: GOVERNMENT NOTIFICATION FOR PREPARATION OF INTERIM


MASTER PLAN

iv

ANNEXURES

ANNEXURES

vi

ANNEXURES

vii

ANNEXURES

ANNEXURE 4: GOVERNMENT NOTIFICATION

viii

ANNEXURES

ix

ANNEXURES

ANNEXURE 5: GROUNDWATER DEVELOPMENT


General description of groundwater assessment unit in Kanakapura region and surroundings
Sl.

Code

no.

of

No.

water- shed

Command

Type of rock

Averial

Remarks

non-command

formation

extent, Ha

4B3B5

NC

Gneiss

1,21,500

Kanakapura

4B3B6

NC

Gneiss

86,500

North

4B3B7

NC

Gneiss

52,000

North west side

4B3C1

NC

Gneiss

86,300

West side

4B3C2

NC

Gneiss

1,16,800

North west corner

Source: Report on dynamic groundwater resources of Karnataka, March 2004

Ground water resources potential in Kanakapura region and surroundings

Details

Code No. of water shed


4B3B5

4B3B6

4B3B7

4B3C1

4B3C2

3112

565

2021

1525

1474

3541

609

3369

2166

non-

1471

866

467

1177

1401

Recharge from other sources during non-

1083

683

969

531

1148

Total annual ground water recharge, Ham

7140

5655

4066

5076

6241

Natural discharge during non-monsoon

357

283

203

254

312

6783

5372

3862

4823

5929

Recharge from rain fall during monsoon


season, Ham
Recharge from other sources during
monsoon season, Ham
Recharge

from

rainfall

during

monsoon season, Ham

monsoon season, Ham

season, Ham
Net ground water availability, Ham

Source: Report on dynamic groundwater resources of Karnataka, March 2004

ANNEXURES

ANNEXURE 6: STAGE OF GROUND WATER DEVELOPMENT OF WATERSHED


ZONES IN KANAKAPURA TALUK AND BANGALORE SOUTH Taluk
Parameter

4B3B5

4B3B6

4B3B7

4B3C1

Kanakapura

Bangalore
South

1. Total Annual Ground water

9383.61

6543.16

Recharge
2.

Net

annual

ground

water

6783

5371

3862.44

4822

8914.43

6216

12165

7647

6589.26

3612

14469.58

11262.10

723

509

208.13

443

890.79

594.52

12888

8156

6797.39

4055

15360.37

11856.63

1005

708

289.30

625

1240.30

834.08

584

116.88

190

151

175.99

84

of water levels

Yes

No

No

Yes

pre-monsoon

Yes

No

Yes

Yes

OE

OE

OE

Critical

9%Critical

OE

availability, Ham
3. Existing gross ground water
draft for irrigation, Ham
4. Existing gross ground water
draft for domestic and industrial
water supply, Ham
5. Existing gross ground water
draft for all uses, Ham
6.

Allocation

for

domestic

&

industrial use for the next 25


years, Ham
7. Net ground water availability for
future

irrigation

development,

Ham
8. Existing stage of groundwater
development, %
9. Is there any significant decline

post-monsoon
10. Category

91%OE
11.

Average

crop

water

0.62

0.42

0.82

0.82

0.82

ground

water

715

142.91

requirement, m
12.

Balance

irrigation potential available, Ha


Source: Report on dynamic ground water resources of Karnataka as on March-2004

OE Over exploited
Only 34 MLD is available for entire taluk

xi

ANNEXURES

ANNEXURE 6: STATUS OF GROUNDWATER UTILIZATION LOWER CAUVERY


CATCHMENT (4B3)

xii

ANNEXURES

ANNEXURE 7: STATUS OF GROUNDWATER UTILIZATION BANGALORE


RURAL DISTRICT

xiii

ANNEXURES

ANNEXURE 8: ROAD SECTIONS

Fig 1- Arterial Road Cross- Section (RoW- 45m)

Fig 2- Sub- Arterial Road Cross- Section (RoW- 35m)

xiv

ANNEXURES

Fig 3- Sub- Arterial Road Cross- Section (RoW- 27m)

Fig 4- Collector road cross- section- (RoW- 24m)

Fig 5- Collector road with centre bus lane cross- section- (RoW- 25m)

xv

ANNEXURES

Fig 6- Local street cross- section- (RoW- 11m)

xvi

Kanakapura LPA Master Plan 2031

Annexures

ANNEXURE 9: CHANGES MADE FROM INTERIM MASTER PLAN TO MASTER PLAN 2031

CONURBATION 1 - KAGGALIPURA
SL.No

Village Name

Survey No

Existing Landuse

IMP Landuse

Master Plan Landuse

Reason for Change in Landuse

UTTARI

83

Tank

Residential

Tank

Changed as per cadastral Tank

UTTARI

80

Agriculture

Residential

Park

Changed as per Approved Layout

UTTARI

31

Agriculture

Residential

Tank

Changed as per cadastral Tank

UTTARI

31

Agriculture

Residential

Tank

Changed as per cadastral Tank

UTTARI

31

Agriculture

Residential

Tank

Changed as per cadastral Tank

UTTARI

113,150,158

Commercial

Park

Commercial

Changed as per Existing Landuse

UTTARI

111

Tank

Residential

Tank

Changed as per cadastral Tank

CHUDAHALLI_K

Park

PS

Park

Changed as per Existing Park

CHUDAHALLI_K

Agriculture

Residential

Tank

Changed as per cadastral Tank

10

CHUDAHALLI_K

Agriculture

Residential

Tank

Changed as per cadastral Tank

11

KAGGALIPURA

31

Tank

Residential

Tank

Changed as per cadastral Tank

12

KAGGALIPURA

38,39

PS

Residential

PS

Changed as per Existing Landuse

13

KAGGALIPURA

50,53

Agriculture

Residential

Park

Changed as per Approved Layout

Sky Group

P a g e | xvii

Kanakapura LPA Master Plan 2031

Annexures

14

UTTARI

141,132

Residential

Commercial

Residential

Changed as per Existing Landuse

15

UTTARI

64,141

Residential

Commercial

Residential

Changed as per Existing Landuse

16

UTTARI

68

Agriculture

Residential

Tank

Changed as per cadastral Tank

17

UTTARI

68

Residential

Residential

Tank

Changed as per cadastral Tank

18

KAGGALIPURA

84

Agriculture

Tank

Residential

Changed as per Existing Landuse

19

KAGGALIPURA

222

Agriculture

Residential

Tank

Changed as per cadastral Tank

20

GULAKAMALE

99

Agriculture

Residential

Tank

Changed as per cadastral Tank

21

GULAKAMALE

84

Tank

Residential

Tank

Changed as per cadastral Tank

22

GULAKAMALE

109,116,121

PS

Residential

PS

Changed as per Existing Landuse

23

GULAKAMALE

16,18

Agriculture

Residential

Park

Changed as per Approved Layout

24

GULAKAMALE

18,21,22,23

Agriculture

Residential

Park

Changed as per Approved Layout

25

GULAKAMALE

46

Tank

Residential

Tank

Changed as per cadastral Tank

26

KAGGALIPURA

46,127

Industrial

Residential

Industrial

Changed as per Existing Landuse

27

KAGGALIPURA

199

Industrial

Residential

Industrial

Changed as per Existing Landuse

28

KAGGALIPURA

215

Industrial

Commercial

Industrial

Changed as per Existing Landuse

29

UTTARI

25

Agriculture

Residential

Tank

Changed as per cadastral Tank

Sky Group

P a g e | xviii

Kanakapura LPA Master Plan 2031

Annexures

30

KAGGALIPURA

136

Agriculture

Residential

Commercial

Changed as per Existing Landuse

31

KAGGALIPURA

143

Industrial

Residential

Industrial

Changed as per Existing Landuse

32

GULAKAMALE

20

Agriculture

Residential

Park

Changed as per Approved Layout

33

GULAKAMALE

118

PS

Residential

PS

Changed as per Existing Landuse

34

KAGGALIPURA

58,67

PS

Residential

Park

Changed as per Existing Landuse

35

KAGGALIPURA

324

Industrial

Residential

Industrial

Changed as per Existing Landuse

36

KAGGALIPURA

312

Tank

Residential

Tank

Changed as per cadastral Tank

37

KAGGALIPURA

298

Agriculture

Residential

Commercial

38

KAGGALIPURA

298

Agriculture

Park

Commercial

39

THARALU

Tank

Residential

Tank

Changed as per cadastral Tank

40

SOMANAHALLI

229,230,231,253,239,2
40,241 & Surroundings

PU

PS

PU

Changed as per Existing Landuse

41

SOMANAHALLI

225

Park

Commercial

Park

Changed as per Existing Landuse

42

SOMANAHALLI

225

PS

Commercial

PS

Changed as per Existing Landuse

43

SOMANAHALLI

225

PS

Commercial

PS

Changed as per Existing Landuse

44

SOMANAHALLI

227

PS

Commercial

PS

Changed as per Existing Landuse

45

SOMANAHALLI

212,213,217,218

PS

Residential

PS

Changed as per Existing Landuse

Sky Group

Change of Landuse Made by Govt


Change of Landuse Made by Govt

P a g e | xix

Kanakapura LPA Master Plan 2031

Annexures

46

SOMANAHALLI

20,23

Industrial

Residential

Industrial

Changed as per Existing Landuse

47

SOMANAHALLI

18,36

Industrial

Residential

Industrial

Changed as per Existing Landuse

48

KAGGALIPURA

46,151,152

Commercial

Residential

Commercial

Changed as per Existing Landuse

49

KAGGALIPURA

151

PS

Park

PS

Changed as per Existing Landuse

50

KAGGALIPURA

173

PS

Residential

PS

Changed as per Existing Landuse

51

KAGGALIPURA

174

PS

Residential

PS

Changed as per Existing Landuse

CONURBATION 2 - HAROHALLI
SL.No

Village Name

Survey No

Existing Landuse

IMP Landuse

Master Plan Landuse

Reason for Change in Landuse

GABBADI

130

Tank

Residential

Tank

Changed as per cadastral Tank

GABBADI

42,44,48

Park

Industrial

Park

Changed as per Existing Park

GABBADI

Residential

Industrial

Residential

Changed as per Existing Landuse

GABBADI

249,250

Agriculture

Agriculture

Residential

Changed as per Master Plan

HOSAKOTE

33

Agriculture

Hillock

Park

Changed as per Master Plan

GABBADIKAVAL

Industrial

Agriculture

Industrial

Changed as per Existing Landuse

HOSAKOTE

Transport

Transport

Tank

Changed as per cadastral Tank

Sky Group

P a g e | xx

Kanakapura LPA Master Plan 2031

Annexures

MARASANDRA

38

Tank

Residential

Tank

Changed as per cadastral Tank

HAROHALLI

50

Tank

Residential

Tank

Changed as per cadastral Tank

10

HAROHALLI

244

Tank

Park

Tank

Changed as per cadastral Tank

11

HAROHALLI

Residential

Park

Residential

Changed as per Existing Landuse

12

MEDAMARANAHALLI

Residential

Agriculture

Residential

Changed as per Existing Landuse

13

MEDAMARANAHALLI

Residential

Industrial

Residential

Changed as per Existing Landuse

14

MEDAMARANAHALLI

56

Industrial

Industrial

Tank

Changed as per cadastral Tank

15

MEDAMARANAHALLI

72,94,95,96

Residential

Industrial

Residential

Changed as per Existing Landuse

16

HAROHALLI

478,493,501,502,503

Residential

PU

Residential

Changed as per Existing Landuse

17

HAROHALLI

444

Tank

Agriculture

Tank

Changed as per cadastral Tank

18

HAROHALLI

Tank

Industrial

Tank

Changed as per cadastral Tank

19

HAROHALLI

Tank

Industrial

Tank

Changed as per cadastral Tank

20

HAROHALLI

529

Tank

Residential

Tank

Changed as per cadastral Tank

21

GABBADI

42

Agriculture

Industrial

Tank

Changed as per cadastral Tank

22

GABBADI

161

Tank

Agriculture

Tank

Changed as per cadastral Tank

23

HAROHALLI

Tank

Residential

Tank

Changed as per cadastral Tank

Sky Group

P a g e | xxi

Kanakapura LPA Master Plan 2031

Annexures

24

HAROHALLI

377

Agriculture

Tank

Park

Changed as per Master Plan

25

HAROHALLI

467,469,470,471

Agriculture

Tank

Park

Changed as per Master Plan

26

HAROHALLI

291

Tank

Agriculture

Tank

Changed as per cadastral Tank

27

HAROHALLI

Agriculture

Park

Agriculture

Changed as per Existing Landuse

28

HAROHALLI

Agriculture

Park

Agriculture

Changed as per Existing Landuse

29

HAROHALLI

Agriculture

Agriculture

Park

Changed as per Master Plan

30

GABBADI

Agriculture

Agriculture

Park

Changed as per Master Plan

224,225,238,242,243,2
48,785,793 &
Surroundings
110,111,117,116,115,3
22,325& Surroundings
600,672,680,689,690&
Surroundings
118,119,120,121,122,1
23,124 & Surroundings

CONURBATION 3 - KANKAPURA
SL.No

Village Name

Survey No

Existing Landuse

IMP Landuse

Master Plan Landuse

Reason for Change in Landuse

KANAKAPURA

34,35,48,49,50,54,709,
& Surroundings

PU

Residential

PU

Changed as per Existing Landuse

KANAKAPURA

19,20

Industrial

PS

Industrial

Changed as per Existing Landuse

KANAKAPURA

665,670

PS

Residential

PS

Changed as per Existing Landuse

KANAKAPURA

269,273

PS

Agriculture

PS

Changed as per Existing Landuse

KANAKAPURA

Commercial

Residential

Commercial

Changed as per cadastral Landuse

Sky Group

P a g e | xxii

Kanakapura LPA Master Plan 2031

Annexures

KANAKAPURA

563,564,565,566,571 &
Surroundings

Agriculture

Agriculture

Residential

Changed as per Existing Landuse

KANAKAPURA

541

Tank

Residential

Tank

Changed as per cadastral Tank

THAMMASANDRA

192

Agriculture

Residential

Tank

Changed as per cadastral Tank

AGRAHARA

45,69

Industrial

Residential

Industrial

Changed as per Existing Landuse

10

KANAKAPURA

446

Agriculture

Residential

Tank

Changed as per cadastral Tank

11

KANAKAPURA

428,435,436

PS

Residential

PS

Changed as per Existing Landuse

12

KANAKAPURA

505

Agriculture

Agriculture

Tank

Changed as per cadastral Tank

13

KANAKAPURA

448

Agriculture

Agriculture

Tank

Changed as per cadastral Tank

14

ARALALU

157,176

Industrial

Residential

Industrial

Changed as per Existing Landuse

15

ARALALU

118

Agriculture

Residential

Tank

Changed as per cadastral Tank

16

ARALALU

141

Agriculture

Residential

Tank

Changed as per cadastral Tank

17

ARALALU

125

Agriculture

Residential

Tank

Changed as per cadastral Tank

18

ARALALU

209,137

Agriculture

Residential

Tank

Changed as per cadastral Tank

19

BEKUPPE

Tank

Residential

Tank

Changed as per cadastral Tank

20

CHOKASANDRA

1,2,3 etc

Residential

Agriculture

Residential

Changed as per Existing Landuse

21

ARALALU

Tank

Transport

Tank

Changed as per cadastral Tank

Sky Group

P a g e | xxiii

Kanakapura LPA Master Plan 2031

Annexures

22

SHIVANAHALLI

Agriculture

Residential

Tank

Changed as per cadastral Tank

23

KALLAHALLI

135

Agriculture

PS

Tank

Changed as per cadastral Tank

CONURBATION 4 - SATHANUR
SL.No

Village Name

Survey No

Existing Landuse

IMP Landuse

Master Plan Landuse

Reason for Change in Landuse

ANAMANAHALLI

41,42,159,160

Industrial

Residential

Industrial

Changed as per Existing Landuse

ANAMANAHALLI

138,139

Agriculture

Residential

Tank

Changed as per cadastral Tank

ANAMANAHALLI

85

Agriculture

Residential

Tank

Changed as per cadastral Tank

ANAMANAHALLI

10

Agriculture

Residential

Tank

Changed as per cadastral Tank

ANAMANAHALLI

Tank

Residential

Tank

Changed as per cadastral Tank

SATHANUR

256

Tank

Residential

Tank

Changed as per cadastral Tank

SATHANUR

207

Agriculture

Residential

Tank

Changed as per cadastral Tank

SATHANUR

335

Tank

Park

Tank

Changed as per cadastral Tank

SATHANUR

184

Tank

Residential

Tank

Changed as per cadastral Tank

10

SATHANUR

227

Tank

Residential

Tank

Changed as per cadastral Tank

11

SATHANUR

Tank

Residential

Tank

Changed as per cadastral Tank

Sky Group

P a g e | xxiv

Kanakapura LPA Master Plan 2031

Annexures

12

SATHANUR

170

Park

Residential

Park

Changed as per Existing Landuse

13

SATHANUR

83

Tank

Industrial

Tank

Changed as per cadastral Tank

14

SATHANUR

52

Tank

Park

Tank

Changed as per cadastral Tank

15

DESHOHALLI

37

Agriculture

Residential

Tank

Changed as per cadastral Tank

16

SATHANUR

312

Tank

Park

Tank

Changed as per cadastral Tank

17

YADUGOWDANAHALLI

21

Agriculture

Residential

Tank

Changed as per cadastral Tank

18

SATHANUR

297

Tank

Residential

Tank

Changed as per cadastral Tank

19

SATHANUR

295,316

Agriculture

Residential

Tank

Changed as per cadastral Tank

20

ANAMANAHALLI

69,86

Residential

PS

Residential

Changed as per Existing Landuse

Sky Group

P a g e | xxv

Kanakapura Planning Authority


Municipal Khata .No.297/271,
Ranganatha Swamy Devasthana Road,
Kanakapura-562117, Ramanagara District
Email: member_plan2009@bsnl.in
Phone NO -27526208
Web: www.kanakapura-pa.in