(MRS)
4th Quarter, 2011
(1st October to 31st December)
Government of the Punjab, Finance Department
haroon_01@hotmail.com
TABLE OF CONTENTS
Sr
No.
01.
02.
03.
04.
05.
06.
07.
08.
09.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Chapter
Page Nos
Carriage ... 02
Loading, Unloading & Stacking
22
Earthwork ( Excavation & Embankment) ..
25
Dismentling (Demolition) ...
33
Mortar . 38
Concrete ... 40
Brickwork ...51
Stone Masonary 57
Roofing ... 60
Flooring 66
Surface Rendering ... 72
Wood Work . 77
Painting & Varnishing .... 88
Lining of Canals ... 95
Sheet Piling 97
Protection & Diversion Work ....
99
Outlets . 110
Road & Road Structure .. 113
Plumbing, Sanitary Installation & Gas Fittings .
118
Surface Drainage .... 125
Sewerage 127
Sinking of Wells 132
Tubewell & Water Supply .. 135
Electric Installation .. 148
Iron Work 162
Miscellaneous ... 168
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
to
21
24
32
37
39
50
56
59
65
71
76
87
94
96
98
109
112
117
124
126
131
134
147
161
167
171
1. CARRIAGE
Note:
Note:
2 For hilly areas 25% above the rates in the plain areas shall be allowed for total mileage (Km) covered.
Note:
3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the
rate given in the Composite Schedule of Rates.
ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the
Composite Schedule of Rates.
The length measured shall not be the actual length, but the length of the form of consignment as actually
received.
Note:
4 The term 'mile' (Km) whenever used is to mean statute mile (Km).
Note:
5 The rates include loading and unloading of material from the conveyance and stacking as directed.
Note:
6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on lan
Description
Labour
Composite
Spec.
No.
Remarks
16.1
Chain
"
"
1000 ft.
79.75
14.70
9.15
89.45
1st Km
2nd Km
3rd Km
4th Km
5th Km
6th Km
7th Km
8th Km
9th Km
10th Km
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Kms
Carriage of 5 tons of all material like coal, stone lime
(unslaked), etc. B.G. Rail fastenings, points and crossing,
Bridge Girders, pipes, sheets, Rail, M.S. bars, etc. etc
30M
30M
30M
300 Metre
79.75
14.70
9.15
89.45
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
116.82
56.16
44.01
31.40
29.31
28.85
26.98
26.71
25.17
23.53
16.15
3.25
2.00
16.1
Chap-1 (Carriage)
Page 2
Description
Labour
Composite
Spec.
No.
Remarks
79.75
14.70
9.15
89.45
Mile
188.00
"
49.40
Mile
45.20
"
41.65
38.85
36.35
"
25.65
30M
30M
30M
300M
Km
Km
Km
Km
79.75
14.70
9.15
89.45
116.82
56.16
44.01
31.40
Km
29.31
Km
28.85
Km
26.98
Km
26.71
Km
25.17
Km
23.53
Km
Km
Km
16.15
3.25
2.00
16.1
Chain
"
"
1000 ft
79.75
14.70
9.15
89.45
Mile
188.00
"
49.40
"
45.20
"
41.65
"
38.85
"
36.35
"
25.65
30 M
30 M
30 M
300 M
Km
Km
Km
Km
79.75
14.70
9.15
89.45
116.82
56.16
44.01
31.40
Km
29.31
Km
28.85
Km
26.98
Km
26.71
Km
25.17
Km
23.53
Km
16.15
ditto
Chap-1 (Carriage)
Page 3
Description
Labour
Chain
"
"
1000 Ft
79.75
14.70
9.15
89.45
Mile
188.00
"
49.40
"
45.20
"
41.65
"
38.85
"
36.35
"
25.65
Chain
"
1000 Ft.
79.75
14.70
89.45
5 . 0
59.30
Composite
5 .05
36.35
25.65
Chain
"
0/00 Ft.
79.75
14.70
89.45
Chap-1 (Carriage)
79.75
14.70
9.15
89.45
116.82
56.16
44.01
31.40
Km
29.31
Km
28.85
Km
26.98
Km
26.71
Km
25.17
Km
23.53
Km
16.15
30 M
30 M
300 M
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
79.75
14.70
89.45
95.82
74.37
41.11
32.81
29.00
27.90
23.75
23.50
22.14
20.68
Km
Km
Km
15.96
3.25
2.00
30 M
30 M
300 M
Km
Km
Spec.
No.
Remarks
16.1
16.1
79.75
14.70
89.45
95.82
74.37
Page 4
Description
3rd Km
4th Km
5th Km
6th Km
3rd
mile and subsequent mile
7th mile
Km
4th
8th Km
9th Km
10th Km
q
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Km
Carriage of 100 maunds of fuel wood, by means o
material trolly.
1st chain (1st 30 m)
2nd chain (2nd 30 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile subsequent mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 1000 Nos. tiles 12"x6"x2" (300x150x50 mm),
by means of material trolly.
1st chain (1st 30 m)
2nd chain (2nd 30 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile subsequent miles
7th Km
4th mile
8th.
Labour
Composite
51.05
41.65
Chain
"
1000 Ft
Mile
79.75
14.7
89.45
Spec.
No.
Remarks
41.11
32.81
29.00
27.90
23.75
23.50
22.14
20.68
15.96
3.25
2.00
30 M
30 M
300 M
Km
Km
Km
Km
79.75
14.70
89.45
95.82
74.37
41.11
32.81
Km
29.00
Km
27.90
Km
23.75
Km
23.50
Km
22.14
Km
20.68
Km
15.96
ditto
ditto
154.20
"
59.30
"
51.05
41.65
38.85
36.35
25.65
Chain
"
0/00 Ft.
79.75
14.70
89.45
Mile
154.20
"
59.30
"
51.05
30 M
30 M
300 M
Km
Km
Km
Km
79.75
14.70
89.45
95.82
74.37
41.11
32.81
Km
29.00
Km
27.90
Km
23.75
Km
23.50
16.1
41.65
Chap-1 (Carriage)
Page 5
10
Description
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 1000 No. bricks, 9"x4"x3"
(225x113x75 mm) or 8"x4"x4" (200x100x100
mm) (nominal)
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent mile
11th & subsequent Km
Carriage of 1000 No. tiles 9"x4"x1"
(225x113x38 mm).
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
Labour
Composite
Spec.
No.
Remarks
38.85
Km
22.14
Km
20.68
Km
15.96
36.35
25.65
ditto
Chain
"
"
0/00 Ft.
65.34
13.25
7.51
73.23
Mile
154.10
"
40.50
"
38.25
"
34.15
"
31.80
"
29.75
"
21.05
30 M
30 M
30 M
300 M
Km
Km
Km
Km
65.34
13.25
7.51
73.23
95.76
45.93
36.06
25.92
Km
24.74
Km
24.22
Km
22.11
Km
21.88
Km
20.60
Km
19.25
Km
13.12
16.1
Chain
"
"
0/00 Ft.
39.44
7.26
4.49
44.24
Mile
93.00
"
24.45
"
22.20
"
20.60
"
19.20
"
18.00
Chap-1 (Carriage)
30 M
30 M
30 M
300 M
Km
Km
Km
Km
39.44
7.26
4.49
44.24
57.79
27.79
21.78
15.52
Km
14.40
Km
14.19
Km
13.34
Km
13.20
Km
12.44
16.1
Page 6
11
12
Description
10th Km
7th mile and subsequent mile
11th & subsequent Km
Carriage of 1 Cwt. (50 Kg) cement in bags
"
Labour
Composite
11.68
Km
7.97
1.50
0.18
0.09
30 M
30 M
30 M
1.50
0.18
0.09
0/00 Ft.
0.88
300 M
0.88
Km
1.43
Mile
2.30
Km
0.99
"
0.75
Km
0.44
"
0.40
Km
0.27
1st Km
1st mile
2nd Km
2nd mile to 6th mile
3rd Km
7th mile and subsequent miles
4th Km & subsequent Kms
Carriage of 100 (2.83 cu.m) cft. of Sarkanda or pilchi, frash
or brushwood, by boat or road :-
16.1
0/00 Ft.
"
21.94
2.73
Mile
5.65
Mile
1.95
"
3.10
300 M
300 M
21.94
2.73
Km
3.51
Km
3.64
Km
1.92
Km
1.78
ditto
Chain
"
"
32.63
14.70
4.49
30 M
30 M
30 M
32.63
14.70
4.49
0/00 Ft.
36.75
300 M
36.75
Km
51.79
Mile
82.70
Km
27.79
"
69.05
Km
21.78
"
58.70
Km
15.52
"
43.75
Km
14.40
"
36.85
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
Remarks
ditto
Chain
"
"
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile subsequent mile
4th Km and subsequent kilometers.
Carriage of 100 Nos. empty cement bags including
bundling.
Spec.
No.
12.65
13
Chap-1 (Carriage)
Page 7
Description
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km
9th Km
10th Km
11th Km & subsequent
14
15
Composite
Km
14.19
Km
13.34
Km
Km
Km
Km
13.20
12.44
11.68
7.97
Tonne
300 M
"
265.88
64.42
Km
114.93
Km
54.53
Km
37.95
Km
25.50
Km
24.16
Km
23.25
Km
20.41
Km
Km
Km
Km
20.05
19.69
15.69
12.39
Spec.
No.
Remarks
29.75
21.05
Ton
0/00 ft.
1000 ft.
265.88
64.42
Mile
184.95
"
39.05
"
37.55
"
30.65
"
31.60
"
24.70
"
20.05
ditto
16
Labour
16.1
Consigment/
1000 ft.
1000 ft.
Consignment/Mile
"
21.59
14.81
Consignment/
300 M
28.95
Consignment/ Km
21.59
14.81
17.99
11.42
6.05
"
"
3.98
Each
Chap-1 (Carriage)
Page 8
Description
ii)
37.60
96.10
Consignment
"
37.60
96.10
Each
Consignment
"
"
"
"
"
10.85
16.45
20.80
26.00
45.95
82.25
Each
Consignment
"
"
"
"
"
10.85
16.45
20.80
26.00
45.95
82.25
Each
Consignment
"
"
89.85
163.55
Each
Consignment
"
"
89.85
163.55
"
"
66.45
100.75
"
"
66.45
100.75
ii)
19
Spec.
No.
Per
day
"
"
2000.00
9760.00
Per
day
"
1000.00
9760.00
"
800.00
1st Km
1st mile
2nd Km
2nd mile
3rd Km & subsequent Kms
3rd mile
Carriage of Asbestos cement pipes BSS Class 'B" with
comet joint and rubber ring, including loading, unloading
and stacking (rate per 100 Rft. (30 m pipes):3" (75 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2000.00
i)
Remarks
18
Composite
Consignment
"
Labour
a) Upto 5 Km
b) Above 5 to 13 Km
17
16.1
Per
Ton
"
"
30.85
Per
Tonne
"
19.17
13.51
"
5.79
30 M
30 M
30 M
300 M
Km
3.15
0.60
0.35
3.55
4.60
5.75
9.40
Chain
"
"
0/00 Ft.
3.15
0.60
0.35
3.55
Chap-1 (Carriage)
Page 9
Description
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
Labour
Mile
7.40
"
1.95
"
1.80
"
1.65
"
1.55
"
1.45
"
1.00
Composite
2.18
1.71
Km
1.21
Km
1.14
Km
1.12
Km
1.04
Km
1.03
Km
0.98
Km
0.91
Km
0.88
Spec.
No.
Remarks
Chain
"
"
4.10
0.75
0.45
30 M
30 M
30 M
4.10
0.75
0.45
0/00 Ft.
4.65
300 M
4.65
Km
6.03
Mile
9.70
Km
2.87
"
2.55
Km
2.24
"
2.35
Km
1.59
"
2.15
Km
1.49
"
2.00
Km
1.46
"
1.90
Km
1.36
"
1.35
Km
Km
Km
Km
1.34
1.26
1.20
1.16
30 M
30 M
30 M
6.20
1.15
0.70
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km
9th Km
10th Km
11th Km & subsequent Km
iii) 6" (150 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
Chain
"
"
6.20
1.15
0.70
Chap-1 (Carriage)
Page 10
Description
iv)
v)
Labour
0/00 Ft.
6.95
Mile
14.60
"
3.85
"
3.50
"
3.25
"
3.00
"
2.80
"
2.00
Chain
"
"
0/00 Ft.
10.45
1.95
1.20
11.75
Mile
24.65
"
6.50
"
5.95
"
5.45
"
5.10
"
4.75
"
3.35
Chain
"
"
0/00 Ft.
14.05
2.60
1.60
15.80
Mile
33.15
Composite
Chap-1 (Carriage)
6.95
9.07
4.34
3.40
Km
2.42
Km
2.25
Km
2.22
Km
2.08
Km
2.06
Km
1.92
Km
Km
1.77
1.46
30 M
30 M
30 M
300 M
Km
Km
Km
10.45
1.95
1.20
11.75
15.32
7.51
5.87
Km
4.15
Km
3.88
Km
3.82
Km
3.56
Km
3.40
Km
3.18
Km
Km
2.45
1.71
30 M
30 M
30 M
300 M
Km
Km
Km
14.05
2.60
1.60
15.80
20.60
9.78
7.64
Spec.
No.
Remarks
Page 11
Description
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
vi)
Labour
"
8.70
"
7.95
Mile
7.35
"
6.85
"
6.40
"
4.50
Chain
"
"
0/00 Ft.
18.30
3.35
2.10
20.50
Mile
43.10
"
11.35
"
10.35
"
9.55
"
8.90
"
8.35
"
5.90
Chain
"
"
0/00 Ft.
30.00
5.55
3.45
33.65
Mile
70.70
"
18.55
Composite
Chap-1 (Carriage)
5.41
Km
5.04
Km
4.96
Km
4.89
Km
4.84
Km
4.57
Km
Km
4.27
2.90
30 M
30 M
30 M
300 M
Km
Km
Km
Km
18.30
3.35
2.10
20.50
26.78
13.73
10.35
7.06
Km
6.56
Km
6.45
Km
6.03
Km
5.97
Km
5.61
Km
5.25
Km
3.69
30 M
30 M
30 M
300 M
Km
Km
Km
30.00
5.55
3.45
33.65
43.93
21.36
16.51
Km
11.77
Km
10.99
Spec.
No.
Remarks
Page 12
Description
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
viii) 18" (450 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
ix)
Labour
"
17.00
"
15.65
"
14.60
"
13.65
"
9.65
Chain
"
"
0/00 Ft.
38.55
7.10
4.40
43.20
Mile
90.80
"
23.85
"
21.85
"
20.10
"
18.75
"
17.55
"
12.40
Composite
10.82
Km
10.11
Km
10.00
Km
9.43
Km
Km
8.80
6.07
30 M
30 M
30 M
300 M
Km
Km
Km
38.55
7.10
4.40
43.20
56.42
27.14
21.26
Km
15.18
Km
14.18
Km
13.95
Km
13.03
Km
12.90
Km
12.16
Km
Km
11.37
7.73
30 M
30 M
30 M
300 M
Km
Km
Km
40.90
7.55
4.70
45.90
59.90
28.78
22.57
Km
16.11
Km
15.03
Km
14.79
Spec.
No.
Remarks
Chain
"
"
0/00 Ft.
40.90
7.55
4.70
45.90
Mile
96.40
"
25.35
"
23.20
Chap-1 (Carriage)
Page 13
Description
x)
20
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
24" (600 mm) i/d pipes:-
Labour
"
21.35
"
19.90
"
18.65
"
13.15
Chain
"
"
0/00 Ft.
45.30
8.35
5.20
50.85
Mile
106.80
"
28.05
"
25.70
Mile
23.65
"
22.05
"
20.65
"
14.55
Composite
13.82
Km
13.67
Km
12.88
Km
Km
12.06
8.39
30 M
30 M
30 M
300 M
Km
Km
Km
45.30
8.35
5.20
50.85
66.37
31.85
24.95
Km
18.32
Km
16.61
Km
16.34
Km
15.27
Km
15.11
Km
14.24
Km
Km
13.31
9.08
30 M
30 M
30 M
300 M
Km
Km
Km
6.15
1.15
0.70
6.95
9.04
4.34
3.38
Km
2.41
Km
2.26
Spec.
No.
Remarks
Chain
"
"
0/00 Ft.
6.15
1.15
0.70
6.95
Mile
14.55
"
3.80
"
3.50
Chap-1 (Carriage)
Page 14
Description
ii)
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
4" (100 mm) i/d pipes:-
Labour
"
3.20
Mile
3.00
"
2.80
"
2.00
Chain
"
"
0/00 Ft.
9.50
1.75
1.10
10.65
Mile
22.40
"
5.90
"
5.40
"
4.95
"
4.65
"
4.35
"
3.05
Chain
"
"
0/00 Ft.
12.95
2.40
1.50
14.55
Mile
30.60
"
8.05
"
7.35
Mile
6.75
Composite
Chap-1 (Carriage)
2.22
Km
2.06
Km
2.02
Km
1.91
Km
Km
1.78
1.41
30 M
30 M
30 M
300 M
Km
Km
Km
9.50
1.75
1.10
10.65
13.92
6.86
5.27
Km
3.67
Km
3.42
Km
3.36
Km
3.13
Km
3.10
Km
2.93
Km
Km
2.73
2.30
30 M
"
"
300 M
Km
"
"
12.95
2.40
1.50
14.55
19.01
9.28
7.31
"
5.26
Km.
4.70
"
4.62
Spec.
No.
Remarks
Page 15
Description
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
iv)
Composite
"
"
6.30
"
5.90
"
4.15
Spec.
No.
Remarks
4.30
4.26
4.01
3.75
2.60
v)
Labour
Chain
"
"
0/00 Ft.
17.90
3.30
2.05
20.05
Mile
42.15
"
11.10
"
10.15
"
9.35
"
8.70
"
8.15
"
5.75
30 M
30 M
30 M
300 M
Km.
Km.
Km.
17.90
3.30
2.05
20.05
26.19
12.59
9.88
Km.
7.06
Km.
6.58
Km.
6.48
Km.
6.05
Km.
5.99
Km.
5.64
Km.
Km.
5.27
3.62
30 M
30 M
30 M
300 M
Km
Km
Km
31.35
5.80
3.60
35.20
45.95
22.10
17.33
Km
12.38
Km
11.55
Km
11.36
Km
10.60
Chain
"
"
0/00 Ft.
31.35
5.80
3.60
35.20
Mile
73.95
"
19.45
Mile
17.80
"
16.35
"
15.25
Chap-1 (Carriage)
Page 16
Description
vi)
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
10" (250 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
Labour
"
14.30
"
10.10
Chain
"
"
0/00 Ft.
48.65
8.95
5.55
54.55
Mile
114.65
"
30.15
"
27.55
"
25.40
"
23.70
"
22.20
"
15.65
Composite
10.49
Km
9.89
Km
Km
9.23
6.32
30 M
30 M
30 M
300 M
Km
Km
Km
48.65
8.95
5.55
54.55
71.24
34.25
26.85
Km
19.16
Km
17.86
Km
17.58
Km
16.45
Km
16.28
Km
15.35
Km
Km
14.36
9.93
30 M
30 M
30 M
300 M
Km
Km
Km
68.45
12.60
7.85
76.80
100.26
48.20
37.78
Km
26.96
Km
25.16
Km
24.76
Km
23.15
Km
22.92
Spec.
No.
Remarks
Chain
"
"
0/00 Ft.
68.45
12.60
7.85
76.80
Mile
161.35
Mile
42.40
"
38.80
"
35.75
"
33.35
"
31.20
Chap-1 (Carriage)
Page 17
Description
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
"
Labour
Composite
21.60
Km
Km
20.16
13.91
30 M
30 M
30 M
300 M
Km
Km
Km
89.10
16.45
10.20
99.95
130.53
62.73
49.17
Km
35.08
Km
32.73
Km
32.21
Km
30.14
Km
29.82
Km
28.10
Km
Km
26.32
18.17
30 M
30 M
30 M
300 M
Km
Km
Km
4.50
0.85
0.50
5.05
6.62
3.19
2.50
Km
1.77
Km
1.65
Km
1.62
Km
1.54
Km
1.50
Spec.
No.
Remarks
22.00
Chain
"
"
0/00 Ft.
89.10
16.45
10.20
99.95
Mile
210.05
"
55.20
"
50.50
Mile
46.55
"
43.40
"
40.65
"
28.65
Chain
"
"
0/00 Ft.
4.50
0.85
0.50
5.05
Mile
10.65
"
2.80
"
2.55
"
2.35
"
2.20
Chap-1 (Carriage)
Page 18
Description
6th mile
9th Km
7th mile and subsequent miles
10Km
11th Km & subsequent Kms
ii)
Labour
"
2.05
"
1.45
Composite
1.42
Km
Km
1.32
0.94
30 M
30 M
30 M
300 M
Km
Km
Km
7.00
1.30
0.80
7.90
10.28
4.98
3.92
Km
2.81
Km
2.63
Km
2.59
Km
2.40
Km
2.18
Km
2.14
Km
Km
2.01
1.45
30 M
30 M
30 M
300 M
Km
Km
Km
9.75
1.80
1.10
10.90
14.26
6.88
5.40
Km
3.86
Km
3.59
Km
3.53
Km
3.32
Km
3.29
Km
3.00
Km
2.80
Spec.
No.
Remarks
Chain
"
"
0/00 Ft.
7.00
1.30
0.80
7.90
Mile
16.55
"
4.35
"
4.00
"
3.65
"
3.40
"
3.20
"
2.25
Chain
"
"
0/00 Ft.
9.75
1.80
1.10
10.90
Mile
22.95
"
6.05
"
5.50
"
5.10
Mile
4.75
"
4.45
"
3.15
Chap-1 (Carriage)
Page 19
Description
Labour
Composite
2.01
30 M
30 M
30 M
300 M
Km
Km
Km
16.10
2.95
1.85
18.05
23.58
11.34
8.90
Km
6.35
Km
5.93
Km
5.83
Km
5.51
Km
5.35
Km
5.05
Km
Km
4.67
3.38
30 M
30 M
30 M
300 M
Km
Km
Km
24.05
4.45
2.75
27.00
35.26
16.96
13.28
Km
9.48
Km
8.85
Km
8.71
Km
8.13
Remarks
Chain
"
"
0/00 Ft.
16.10
2.95
1.85
18.05
Mile
37.95
"
10.00
"
9.15
"
8.40
"
7.85
"
7.35
"
5.20
vi)
Km
Spec.
No.
v)
Chain
"
"
0/00 Ft.
24.05
4.45
2.75
27.00
Mile
56.75
"
14.90
"
13.65
"
12.55
"
11.70
10.95
7.75
Km
8.04
Km
7.58
Km
Km
6.99
4.98
Chap-1 (Carriage)
Page 20
Description
34.70
6.40
3.95
38.90
Mile
4th
2ndKm
mile
5th
3rd Km
mile
22
Composite
81.75
30 M
30 M
30 M
300 M
Km
Km
Km
34.70
6.40
3.95
38.90
50.80
24.42
19.14
21.50
Km
13.66
12.73
19.65
Km
6th
Km
4th mile
7th mile
Km
5th
18.10
Km
12.53
16.90
Km
11.72
8th mile
Km
6th
9th
Km and subsequent mile
7th mile
15.80
Km
11.60
11.15
Km
10.94
Km
Km
10.20
7.13
Each
No
"
"
Each
No/Km
107.35
194.30
262.35
312.20
Each
No.
"
"
Each
No/Km
62.25
103.15
136.05
163.30
10th Km
11th Km & subsequent Kms
Hand shunting loaded Railway wagons or
trucks:a)
b)
c)
d)
e)
23
Labour
Chain
"
"
0/00 Ft.
upto mile / Km
upto mile / Km
upto mile / Km
upto 1 (1.6 Km) mile
2nd mile and subsequent miles/
2nd and subsequent kilometres
Each
No
"
"
Each
No/Mile
171.75
310.90
419.75
499.50
Each
No.
"
"
Each
No/Mile
99.60
165.05
217.70
261.30
329.95
Spec.
No.
Remarks
206.20
upto mile / Km
upto mile / Km
upto mile / Km
upto 1 mile / 1 Km
2nd mile and subsequent miles/
2nd and subsequent kilometres
162.00
Chap-1 (Carriage)
101.25
Page 21
The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.
Description
Labour
Composite
Labour
100 Cft.
306.25
cu.m
108.15
1000 Nos.
382.80
1000 Nos.
382.80
ditto
306.25
ditto
306.25
Spec.
No.
Remarks
Composite
b)
100 Bags
382.80
100 Bags
382.80
100 Nos.
36.75
100 Nos.
36.75
100 Mds.
229.70
100 Kg
6.15
Per
Tonne
183.75
Per
Tonne
180.85
Each
22.95
Each
22.95
Each
11.50
Each
11.50
100 Nos.
765.60
100 Nos.
765.60
ditto
382.80
ditto
382.80
Per
Ton
95.70
Per
Tonne
94.20
10
a)
b)
Chap-2 (Loading/Unloading)
Page 22
Description
Labour
Composite
Labour
11
100 Mds.
918.70
100 Kg
24.60
12
Per
Ton
153.10
Per
Tonne
150.70
13
100 Cft.
113.30
cu.m
40.00
14
100 Cft.
147.00
cu.m
51.90
15
16
17
a)
1000
Gallon
382.80
100
litres
8.40
b)
1000
Gallon
382.80
100
litres
8.40
c)
100 Cft.
49.00
cu.m
17.30
d)
Per
Ton
136.10
Per
Tonne
133.95
e)
100 Nos.
192.95
100 Nos.
192.95
f)
Kerosine oil (4 gallon tin)
Removing and stacking within one chain
(30 m) lead:
100 Nos.
382.80
100 Nos.
382.80
a)
100 Cft.
153.10
cu.m
54.10
b)
Bricks.
1000 Nos.
408.30
1000 Nos.
408.30
c)
100 Nos.
245
100 Nos.
245
d)
100 Nos.
145.85
100 Nos.
145.85
e)
Per
Ton
68.05
Per
Tonne
67.00
f)
100 No.
816.65
100 No.
816.65
Per
Ton
153.10
Per
Tonne
150.70
Chap-2 (Loading/Unloading)
Spec.
No.
Remarks
Composite
Page 23
Description
Labour
Composite
Labour
Spec.
No.
Remarks
Composite
Per
Ton
87.50
Per
Tonne
86.10
19
100 Nos.
612.50
100 Nos.
612.50
20
100 Nos.
291.65
100 Nos.
291.65
21
100 Nos.
306.25
100 Nos.
306.25
22
100 Nos.
161.20
100 Nos.
161.20
23
100 Nos.
1224.95
100 Nos.
1224.95
100 Nos.
612.50
100 Nos.
612.50
Per
Ton
91.85
Per
Tonne
90.40
24
25
Chap-2 (Loading/Unloading)
Page 24
Special allowances for the hardness, wetness and slush:The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of such
allowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and of
which dry bulk density is not less than 1.5, will be treated as hard.
Deduction for shrinkage from bank measurements:The following allowances should be provided for material which is not rammed, or equally consolidated:a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%
b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%
Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractors.
Description
Labour
Composite
1000 Cft.
1000 Cft.
1,148.40
1,378.10
---
cu.m
cu.m
40.55
48.70
---
1000 Cft.
1,684.30
--
cu.m
59.50
--
1000 Cft.
1000 Cft.
2,143.70
2,317.90
---
cu.m
cu.m
75.70
81.85
---
1000 Cft.
1000 Cft.
2,143.70
2,633.65
---
cu.m
cu.m
75.70
93.00
---
6
7
Remarks
171 to 17.5
Spec.
No.
ditto
ditto
*411-1 to
411-13 and
301-1 &
202-3
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
2,338.85
2,338.85
2,338.85
1,575.75
3,206.85
3,093.05
2,979.25
--
cu.m
cu.m
cu.m
cu.m
82.60
82.60
82.60
55.65
113.25
109.25
105.25
--
*411-2
17.1 to
17.5
Chap-3 (Earthwork)
Page 25
Description
10
11
12
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
Labour
2,679.05
3,169.05
3,689.65
6,211.40
Composite
2,745.30
3,235.30
3,755.90
6,277.65
cu.m
cu.m
cu.m
cu.m
94.60
111.95
130.30
219.40
a)
Remarks
96.95
114.25
132.65
221.75
ditto
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
2,919.85
3,409.80
3,930.45
6,758.40
3,051.60
3,541.60
4,062.20
6,890.15
cu.m
cu.m
cu.m
cu.m
103.15
120.45
138.80
238.70
107.80
125.10
143.50
243.35
17.1 to 17.5
1000 Cft.
1000 Cft.
1000 Cft.
5,818.55
6,737.30
8,574.70
----
cu.m
cu.m
cu.m
205.50
237.95
302.85
----
Spec.
No.
ditto
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
2,460.50
2,950.45
3,471.05
6,145.90
-----
cu.m
cu.m
cu.m
cu.m
86.90
104.20
122.60
217.05
1000 Cft.
5,860.80
--
cu.m
207.00
1000 Cft.
9,203.35
9,779.35
cu.m
325.05
-345.40
Chap-3 (Earthwork)
Page 26
Description
Labour
Composite
Spec.
No.
Remarks
14
15
17
5,533.45
6,003.35
7,167.60
7,949.05
8,796.50
9,424.80
6,109.45
6,963.35
8,319.60
9,293.05
10,332.50
11,152.80
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
195.45
212.05
253.15
280.75
310.70
332.90
215.80
245.95
293.85
328.25
364.95
393.90
1000
1000
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
11,066.90
12,006.70
14,335.20
15,898.10
17,592.95
18,849.60
1000 Cft.
1000 Cft.
765.60
1,071.85
1000 Cft.
3,062.40
12,218.90
13,926.70
16,639.20
18,586.10
20,664.95
22,305.60
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
390.90
424.10
506.30
561.50
621.40
665.75
431.55
491.90
587.70
656.45
729.90
787.85
---
cu.m
cu.m
27.05
37.85
---
ditto
--
cu.m
108.15
--
17.1 to 17.5
Rehandling of earthwork:
a)
b)
16
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
13
1000
1000
1000
1000
1000
1000
ditto
1000 Cft.
1000 Cft.
i)
ii)
1000 Cft.
1000 Cft.
1,541.75
2,986.60
24.75
28.70
---
---
cu.m
cu.m
cu.m
cu.m
54.45
105.50
0.85
1.00
---
---
1000 Cft.
1,236.80
--
cu.m
43.70
--
1000 Cft.
53.60
--
cu.m
1.90
--
1000 Cft.
123.50
--
cu.m
4.35
--
Chap-3 (Earthwork)
Page 27
Description
d)
18
1000 Cft.
Labour
105.45
Composite
--
cu.m
3.75
Spec.
No.
Remarks
-17.10 to 17.5
1000 Cft.
1000 Cft.
1000 Cft.
100.10
195.15
459.35
----
cu.m
cu.m
cu.m
3.55
6.90
16.20
----
19
Dowel dressing.
Per
Chain
91.50
--
Metre
3.00
--
ditto
20
a)
100Sft.
40.85
--
sq.m
4.40
--
ditto
b)
100Sft.
72.60
--
sq.m
7.80
--
21
22
23
24
b)
17.1 to 17.5
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
2,766.70
3,231.35
3,616.80
22,471.70
---26,222.60
cu.m
cu.m
cu.m
cu.m
97.70
114.15
127.75
793.70
----
1000 Cft.
388.10
609.85
cu.m
13.70
1000 Cft.
366.20
--
cu.m
12.95
--
1000 Cft.
459.35
--
cu.m
16.20
--
Chap-3 (Earthwork)
Page 28
25
Description
Labour
Composite
1000 Cft.
535.90
--
cu.m
18.95
--
1000 Cft.
612.50
--
cu.m
21.65
--
1000 Cft.
689.05
--
cu.m
24.35
--
c)
1000 Cft.
459.35
--
cu.m
16.20
--
d)
1000 Cft.
612.50
--
cu.m
21.65
--
Spec.
No.
Remarks
17.1 (a)
*411-5 and The rate also includes hire charges of
202-3
machinery, cost of fuel, lubricant, pay
of driver and cleaner, etc.
i)
1000 Cft.
--
868.00
cu.m
30.65
ii)
1000 Cft.
--
754.20
cu.m
26.65
1000 Cft.
--
640.40
cu.m
22.60
26
1000 Cft.
1,071.85
--
cu.m
37.85
27
1000 Cft.
2,449.90
--
cu.m
86.55
28
1000 Cft.
1,914.00
--
cu.m
67.60
ditto
29
290.95
--
Metre
9.55
ditto
30
1000 Cft.
2,756.15
--
cu.m
97.35
--
17.1 to 17.5
31
Per mile
1,170.90
--
Per
Km
727.70
--
ditto
32
100Sft.
510.40
--
sq.m
54.90
--
ditto
33
Berm cutting:a)
b)
34
100 Rft.
17.1 to 17.5
1000 Cft.
1,378.10
--
cu.m
48.70
--
1000 Cft.
2,460.50
--
cu.m
86.90
--
17.1 to 17.5
Chap-3 (Earthwork)
Page 29
Description
a)
b)
c)
35
3,590.40
5,011.60
7,827.60
Composite
----
Per Km.
Per Km.
Per Km.
2244.00
3132.25
4892.25
ditto
Per Acre
Per Acre
765.60
1,531.20
---
Per Hect.
Per Hect.
1891.85
3783.65
Remarks
--ditto
in unploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide.
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide.
ii)
Spec.
No.
----
Per Chain
Per Chain
387.20
519.20
---
Metre
Metre
12.70
17.05
---
Per Chain
Per Chain
399.65
531.65
---
Metre
Metre
13.10
17.45
---
in ploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide.
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide.
37
Per Mile
Per Mile
Per Mile
Labour
36
2,296.80
579.80
61.25
----
cu.m
cu.m
cu.m
81.10
20.50
2.15
----
1000 Cft.
1,071.85
--
cu.m
37.85
--
38
1000 Cft.
918.70
--
cu.m
32.45
--
17.1 to 17.5
39
1000 Cft.
2,143.70
--
cu.m
75.70
--
17.1 to 17.5
40
1000 Cft.
1,722.60
--
cu.m
60.85
--
ditto
41
cu.m
105.60
42
100Cft.
299.00
319.00
112.65
ditto
Chap-3 (Earthwork)
Page 30
Description
Labour
Composite
1000 Cft.
1000 Cft.
1000 Cft.
2,494.80
4,231.65
5,456.60
2,821.10
4,716.30
5,941.25
cu.m
cu.m
cu.m
88.10
149.45
192.75
13.5
1000 Cft.
1000 Cft.
1000 Cft.
3,575.00
4,469.35
6,704.00
44
1000 Cft.
2,302.10
45
46
Uprooting stump and removing within 100 ft. (30 m) from 2 ft.
to 6 ft. (600 to 1800 mm) girth.
47
light
thick
99.65
166.60
209.85
17.1 to 17.5
**13.3 &
i)
0 ft. to 4.0 ft. (0 to 1.20 m) depth below SSWL.
ii) 4.01 ft. to 8.0 ft. (1.22 to 2.4 m) depth below SSWL.
iii) Exceeding 8 ft. (2.4 m) depth below SSWL.
Remarks
a)
b)
Spec.
No.
5,923.60
7,552.30
10,061.00
cu.m
cu.m
cu.m
126.25
157.85
236.80
--
cu.m
81.30
444.20
867.90
---
Each
Each
444.20
867.90
Each
574.20
--
Each
574.20
1000 Sft.
1000 Sft.
76.55
153.10
---
sq.m
sq.m
0.80
1.65
---
100Sft.
36.75
--
sq.m
3.95
--
Per
Acre
311.05
--
Per Hect.
768.55
--
209.20
266.75
355.35
--
48
49
Ploughing 3 times.
50
100Sft.
153.10
--
sq.m
16.45
--
51
100Sft.
127.60
--
sq.m
13.75
--
Chap-3 (Earthwork)
Page 31
52
*
**
Description
Labour
1000 Cft.
--
Composite
1875.00
cu.m
--
Spec.
No.
Remarks
66.25
Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".
Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).
Chap-3 (Earthwork)
Page 32
4. DISMANTLING (DEMOLITION)
1
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roo
supports such as beams and trusses.
Description
Labour
Composite
Labour
Spec.
No.
Remarks
Composite
Stone Work
1
100Cft.
260.30
cu.m
91.95
18.1
100Cft.
382.80
cu.m
135.20
ditto
100Cft.
918.70
cu.m
324.50
ditto
a)
100Cft.
459.35
cu.m
162.25
ditto
b)
100Cft.
581.85
cu.m
205.50
ditto
100Cft.
765.60
cu.m
270.40
ditto
100Cft.
1,224.95
cu.m
432.65
ditto
612.50
cu.m
216.35
ditto
765.60
ditto
270.40
100Cft.
428.75
cu.m
151.45
ditto
a)
wooden crates
b)
wire crates
Brick Work
9
100Cft.
153.10
cu.m
54.10
18.1
10
100Cft.
382.80
cu.m
135.20
ditto
11
100Cft.
260.30
cu.m
91.95
ditto
12
100Cft.
535.90
cu.m
189.30
18.1
13
100Cft.
1,301.50
cu.m
459.70
ditto
Chap-4 (Dismantling)
Page 33
Description
Labour
Composite
Labour
Spec.
No.
Remarks
Composite
14
100Cft.
1,148.40
cu.m
405.60
ditto
15
100Cft.
306.25
cu.m
108.15
ditto
ditto
Concrete
16
100Cft.
612.50
cu.m
216.35
17
100Cft.
842.15
cu.m
297.45
18
100Cft.
3,215.50
cu.m
1135.70
19
a)
100Cft.
1,684.30
cu.m
594.90
ditto
2,756.15
ditto
973.45
ditto
3,368.65
ditto
1189.80
ditto
918.70
ditto
324.50
ditto
459.35
ditto
162.25
100Cft.
5,512.30
cu.m
1946.95
ditto
18.1
b)
c)
d)
e)
20
Roofing
21
100Sft.
183.75
sq.m
19.75
22
a)
100Sft.
459.35
sq.m
49.45
b)
100Sft.
382.80
sq.m
41.20
ditto
232.30
sq.m
25.00
18.1
sq.m
20.2
ditto
sq.m
80.45
ditto
23
100Sft.
24
a)
100Sft.
b)
100Sft.
187.95
747.65
Chap-4 (Dismantling)
Page 34
Description
Labour
Composite
Labour
Spec.
No.
Remarks
Composite
100Sft.
612.50
sq.m
65.90
ditto
26
100Sft.
765.60
sq.m
82.40
ditto
27
a)
100Sft.
382.80
sq.m
41.20
b)
ditto
344.25
ditto
37.05
c)
ditto
403.90
ditto
43.45
100Sft.
612.50
sq.m
65.90
18.1
28
29
100Sft.
260.30
sq.m
28.00
18.1
30
100Sft.
382.80
sq.m
41.20
ditto
31
32
a)
b)
c)
d)
a)
WOOD WORK
Removing door with chowkat.
b)
11.40
17.55
20.65
29.20
Metre
Metre
ditto
ditto
37.40
57.55
67.75
95.80
Per
No.
ditto
143.90
Per
No.
ditto
143.90
111.55
Chap-4 (Dismantling)
111.55
18.1
Page 35
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
33
Per No.
60.30
Per No.
60.30
ditto
34
a)
Per No.
95.70
Per No.
95.70
ditto
b)
ditto
153.10
ditto
153.10
a)
100Sft.
167.85
sq.m
18.05
b)
100Kg
535.95
%Kg
535.95
Per Lft.
13.20
Metre
43.30
ditto
35
36
Remarks
ditto
Iron work
37
100Kg
511.00
%Kg
511.00
18.1
38
100Kg
251.30
%Kg
251.30
ditto
39
Per Unit/
2 Seats
541.20
Per Unit/
2 Seats
541.20
ditto
40
Each per
inch bore
10.80
Each per
cm bore
4.30
ditto
41
a)
Each
3,864.30
Each
3864.30
ditto
b)
Each
2,550.90
Each
2550.90
ditto
100Lft.
260.30
Metre
8.55
18.1
42
Miscellaneous
43
100Sft.
122.50
sq.m
13.20
18.1
44
100Sft.
229.70
sq.m
24.70
ditto
45
100Cft.
612.50
cu.m
216.35
ditto
46
100Cft.
817.65
cu.m
288.80
ditto
Chap-4 (Dismantling)
Page 36
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
(30 metre).
47
100Sft.
63.80
sq.m
6.85
ditto
48
100Sft.
127.60
sq.m
13.75
ditto
49
Scraping:-
18.1
a)
b)
100Sft.
76.55
sq.m
8.25
ditto
229.70
ditto
24.70
50
100Sft.
834.25
sq.m
89.75
18.1
51
Scraping boulders.
100Cft.
1,071.85
cu.m
378.60
18.1
52
100Cft.
535.90
cu.m
189.30
18.1
Electric Wiring
53
Per
point
20.00
20.40
Per
point
20.00
20.40
54
Per
point
17.15
17.50
Per
point
17.15
17.50
55
3.65
8.05
3.75
8.15
P.Mtr
P.Mtr
11.95
26.40
12.30
26.75
i)
ii)
on surface
recessed in wall
Chap-4 (Dismantling)
Page 37
5. MORTAR
MRS, 4th QUARTER OF 2011 ( OCT to DEC ) DISTRICT LAHORE
Dry Material Required for
100 Cft. Wet (Ready) Mortar
S. No.
Ratio of Mortar
1
1
Lime
Putty
Cft.
4
Sand
Cft.
5
Cement
(50 Kg.)
Bag.
6
82
85
90
90
100
100
100
11.83
8.16
6.49
5.19
4.81
4.12
3.61
15.0
13.1
11.5
10.44
9.4
22.5
20.0
18.8
15.66
23.0
20.1
17.7
7.0
90
92
92
94
94
90
90
94
94
92
94
94
85
4.33
3.78
3.32
3.00
2.71
3.25
2.88
2.71
2.26
2.21
1.93
1.70
8.16
43
31
86
93
Lime
Putty
Cum
7
Sand
Cum.
8
Cement : Sand
1
1
1
1
1
1
1
Cement
(50 Kg)
Bag
3
:
:
:
:
:
:
:
2
3
4
5
6
7
8
33.48
23.11
18.37
14.70
13.61
11.68
10.21
12.25
10.70
9.39
8.52
7.67
9.19
8.16
7.67
6.39
6.26
5.47
4.82
23.11
0.82
0.85
0.90
0.90
1.00
1.00
1.00
0.15
0.13
0.12
0.10
0.09
0.23
0.20
0.19
0.16
0.23
0.20
0.18
0.07
0.90
0.92
0.92
0.94
0.94
0.90
0.90
0.94
0.94
0.92
0.94
0.94
0.85
0.43
0.31
0.86
0.93
Lime : Sand
1 : 2
1 : 3
Chap-5 (Mortar)
Page 38
5. MORTAR
MRS, 4th QUARTER OF 2011 ( OCT to DEC ) DISTRICT LAHORE
S.
No.
Ratio of Mortar
Clay
Cft.
3
1
4
Mud
Lime : Surkhi
M3
3
49.00
40.75
30.30
73.5
81.5
91.0
0.49
0.41
0.30
0.74
0.82
0.91
40.50
40.5
40.5
0.41
0.41
0.41
0.57
57.0
57.0
M3
7
35.00
25.00
25.00
25.00
Cft
Cft
Cft
Cft
0.35
0.25
0.25
0.25
M3
M3
M3
M3
Stone Masonry :
a) Random rubble, uncoursed
i) Foundation and Plinth
ii) Superstructure
iii) Coursed
45.00
40.00
35.00
Cft
Cft
Cft
0.45
0.40
0.35
M3
M33
M
30.00
20.00
Cft
Cft
0.30
0.20
M3
M3
(1) Cement
(2) Unslaked lime
(3) Slaked lime
1 Cft.
1.7 Cft.
2.5 Cft.
40 Kg
0.57
Brick Masonry :
a) Mud Mortar
b) Cement, Sand
c) Cement, Lime (Putty) Sand
d) Lime (Putty) Sand
b)
c)
Notes :
Cft.
7
Cinder
1.35
Clay
Lime : Cinder
1 : 1
Cinder
135
2 : 3
1 : 2
1 : 3
6
= 40.8233 Kg
= 37.3242 Kg
= 37.3242 Kg
Will yield 2.6 Cft. lime putty.
Chap-5 (Mortar)
Page 39
6. CONCRETE
Notes
1 Notes (1) Rates for all finished works include the removal of surplus debris, unused material and by products.
2 If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including
depreciation will be recovered from the contractor.
Description
100Cft
Labour
1712.70
Composite
3452.70
Unit
cu.m
Labour
604.95
Spec.
No.
Remarks
Composite
1219.50
100Cft
1148.40
2798.40
cu.m
405.60
988.40
mm) gauge.
20.1
-do-
(a) Ratio 1: 3: 6
100Cft
2270.40
10605.60
cu.m
801.90
3745.90
(b) Ratio 1: 4: 8
ditto
2270.40
8998.10
"
801.90
3178.15
ditto
2270.40
8144.65
"
801.90
2876.70
ditto
2270.40
7498.80
"
801.90
2648.60
(e) Ratio 1: 6: 18
ditto
2270.40
6834.00
"
801.90
2413.75
ditto
2270.40
6522.10
"
801.90
2303.60
(a) in bed
100Cft
817.10
cu.m
288.60
(b) on slope
5
ditto
1234.20
"
435.90
Chap-6 (Concrete)
Page 40
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft
3186.50
23562.50
cu.m
1125.45
8322.30
(b) Ratio 1: 1: 1
ditto
3186.50
22663.70
"
1125.45
8004.80
(c) Ratio 1: 1: 3
ditto
3186.50
19454.90
"
1125.45
6871.45
(d) Ratio 1: 2: 3
ditto
3186.50
18486.50
"
1125.45
6529.45
(e) Ratio 1: 3: 3
ditto
3186.50
16286.15
"
1125.45
5752.25
(f) Ratio 1: 2: 4
100Cft
3186.50
17262.95
cu.m
1125.45
6097.25
(g) Ratio 1: 2: 6
ditto
3186.50
15990.25
"
1125.45
5647.75
(h) Ratio 1: 3: 6
ditto
3186.50
15220.10
"
1125.45
5375.75
(i) Ratio 1: 4: 8
ditto
3186.50
13773.35
"
1125.45
4864.75
20.4
extra.
Per Cft
70.40
322.75
cu.m
2486.55
11399.55
ditto
70.40
282.40
"
2486.55
9974.35
ditto
70.40
261
"
2486.55
9218.5
Chap-6 (Concrete)
Page 41
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Cft
41.60
266.05
cu.m
1469.30
9396.90
ditto
41.60
222.10
"
1469.30
7844.55
ditto
41.60
200.60
"
1469.30
7085.20
Per Cft
53.35
295.80
cu.m
1884.30
10447.65
ditto
53.35
255.20
"
1884.30
9013.65
ditto
53.35
234.05
"
1884.30
8266.65
Per Cft
25.75
37.40
cu.m
909.50
1320.95
Per Cft
11.50
cu.m
406.20
--
*851-1
to
cement in dry mix, and course sand, including all labour and
851-10
Per Rft
651.30
946.70
Metre
2136.25
3105.20
Per Rft
724.55
1089.05
Metre
2376.50
3572.10
Per Rft
845.9
1265.35
Metre
2774.55
4150.35
Per Rft
971.85
1497.10
Metre
3187.65
4910.55
*851-5
Chap-6 (Concrete)
Page 42
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Cwt.
785.40
4185.35
100 kg
1546.05
8238.90
ditto
785.40
5406.85
"
1546.05
10643.40
*851.5
Per Cwt.
198.00
3771.60
100 kg
389.75
7424.40
ditto
198.00
5091.60
"
389.75
10022.85
Per Cft
30.55
149.50
cu.m
1079.05
5280.35
20.2
Per Cft
68.10
146.40
cu.m
2405.30
5170.85
20.2
Per Sft
20.85
40.85
sq.m
224.35
439.55
20.1 to
12
Providing and fixing ornamental cement jali 2" (50 mm) thick
(1: 2: 4), without steel.
13
14
20.4
100Cft
1224.95
cu.m
432.65
100Cft
765.60
cu.m
270.40
Extra labour for work of weirs, rail or road bridges, syphons, and
100Cft
306.25
cu.m
108.15
concreting in superstructure
Chap-6 (Concrete)
Page 43
Description
15
Labour
Each
260.70
Per hole
625.70
100Cft
Composite
410.35
Unit
Labour
Spec.
No.
Remarks
Composite
Each
260.70
410.35
20.4
Each
625.70
20.1
1804.00
cu.m
637.15
20.1
100Sft
264.00
sq.m
28.40
ditto
87.10
"
9.35
100Sft
224.40
sq.m
24.15
ditto
340.55
"
36.65
ditto
104.30
"
11.20
100 Kg.
2540.80
Making holes upto 3"(75 mm) dia 18"(450 mm) depth in cement
concrete or stone masonry walls and repairing.
17
18
19
20
30143.35
100 Kg.
2540.80
30143.35
*811-1
to
drawing the H.T. wire through metal spacer plate, inserting in helix
811-11
100kg
1560.00
28216.95
%kg
1560.00
28216.95
providing M.S. shear bars, spacers and lift hooks, male and
Chap-6 (Concrete)
Page 44
Description
22
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
basis of payment.
*811-1
to
811-11
complete
23
i)
100Cft
1146.50
cu.m
404.95
ii)
593.25
100Cft
1679.66
cu.m
100Cft
2141.95
cu.m
756.55
iv)
100Cft
2737.50
cu.m
966.90
v)
100Cft
3302.10
cu.m
1166.30
48.00
sq.m.
Per Sft.
18.20
195.85
516.50
Per Rft.
12.05
38.55
Metre
39.50
126.45
Per Rft.
9.75
77.40
Metre
32.00
253.85
25
Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminium
strip on horizontal and vertical expansion joints in walls, columns,
ceilings and floors etc., including cost of clips/screws etc.,
complete in all respects:-
Chap-6 (Concrete)
Page 45
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Rft.
8.80
35.30
Metre
28.85
115.80
ditto
8.80
38.20
"
28.85
125.30
Per Sft.
7.90
89.30
Sq.m
85.00
960.85
Per Rft.
3.80
68.10
Metre
12.45
223.35
Per Rft.
16.50
58.50
Metre
54.10
191.85
6.25
55.45
28
29
Per Rft
ratio 1:2:2.
per inch
P.Metre/
1.90
16.90 Per 25 mm
width
Width
30
Per Rft.
26.60
Metre
87.25
31
Per Rft.
26.80
Metre
87.90
32
Per Sft.
4.15
8.85
Sq.m
44.65
95.25
ditto
4.15
12.95
"
44.65
139.35
33
a)
b)
Chap-6 (Concrete)
Page 46
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Sft
835.10
3525.75
sq.m
89.85
379.35
100Sft
835.10
3974.45
sq.m
89.85
427.65
100Sft
862.40
4974.90
sq.m
92.80
535.30
100Sft
835.10
3904.40
sq.m
89.85
420.10
100Sft
835.10
4352.45
sq.m
89.85
468.30
100Sft
862.40
5352.90
sq.m
92.80
575.95
100Sft
794.20
2278.40
sq.m
85.45
245.15
100Sft
794.20
2502.25
sq.m
85.45
269.25
100Sft
794.20
2350.40
sq.m
85.45
252.90
100Sft
794.20
2587.35
sq.m
85.45
278.40
100Sft
794.20
2434.60
sq.m
85.45
261.95
100Sft
794.20
2767.50
sq.m
85.45
297.80
100Sft
794.20
2512.10
sq.m
85.45
270.30
34
Chap-6 (Concrete)
Page 47
Description
100Sft
Labour
794.20
Composite
2736.20
Unit
sq.m
Labour
85.45
Spec.
No.
Remarks
Composite
294.40
100Sft
794.20
2585.20
sq.m
85.45
278.15
100Sft
794.20
2822.15
sq.m
85.45
303.65
35
100Sft
794.20
2764.70
sq.m
85.45
297.50
100Sft
794.20
3119.15
sq.m
85.45
335.60
100Sft
794.20
2182.65
sq.m
85.45
234.85
100Sft
794.20
2406.95
sq.m
85.45
259.00
100Sft
794.20
2255.10
sq.m
85.45
242.65
100Sft
794.20
2492.10
sq.m
85.45
268.15
100Sft
794.20
2434.60
sq.m
85.45
261.95
100Sft
794.20
2789.10
sq.m
85.45
300.10
100Sft
794.20
2512.00
sq.m
85.45
270.30
100Sft
794.20
2736.20
sq.m
85.45
294.40
Chap-6 (Concrete)
Page 48
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Sft
794.20
2584.35
sq.m
85.45
278.10
100Sft
794.20
2821.30
sq.m
85.45
303.55
100Sft
794.20
2763.95
sq.m
85.45
297.40
100Sft
794.20
3118.30
sq.m
85.45
335.55
100Cft
3821.40
cu.m.
1349.70
36
shuttering.
37
100Sft
145.20
sq.m
15.60
38
100Cft
1244.10
cu.m
439.40
39
per No.
44.55
per No.
44.55
40
41
100Cft.
957.00
cu.m
338.00
ditto
1071.85
"
378.60
ditto
1244.10
"
439.40
ditto
1435.50
"
507.00
metre
100.55
cu.m.
338.00
Per Rft
30.65
100Cft
957.00
73.55
241.25
Chap-6 (Concrete)
Page 49
Description
43
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Breaking stone ballast screened and stacked:(a) 2" ring (50 mm)
(b) 1 " ring (40 mm)
100Cft.
1071.85
cu.m.
378.60
ditto
1244.10
"
439.40
ditto
1435.50
"
507.00
ditto
1914.00
"
676.05
ditto
3253.80
"
1149.25
44
100Cft.
306.25
cu.m.
108.15
45
100Cft.
306.25
cu.m.
108.15
46
188.50
Each
188.50
Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"
Chap-6 (Concrete)
Page 50
7. BRICK WORK
1
2
Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.
The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Cft.
ditto
1750.55
2320.75
12772.55
13342.75
cu.m
ditto
Remarks
618.30
819.70
4511.25
4712.65
21.1
to
21.4
first floor
100Cft.
438.25
--
cu.m
154.80
ii)
second floor
ditto
1008.50
--
ditto
356.20
iii)
third floor
ditto
1578.70
--
ditto
557.60
iv)
ditto
2566.10
--
ditto
906.35
ii)
100Cft.
2382.00
ditto
438.25
13404.00
cu.m
841.30
--
ditto
154.80
21.1 to
21.4
ditto
21.1
4734.30
-
ii)
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
2305.45
2305.45
2305.45
2305.45
2305.45
2305.45
2305.45
17349.85
16383.25
15803.30
15416.65
15126.15
14936.05
14769.00
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
814.25
814.25
814.25
814.25
814.25
814.25
814.25
6127.95
5786.55
5581.75
5445.15
5342.55
5275.40
5216.40
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Cft.
ditto
ditto
ditto
ditto
2305.45
2305.45
2305.45
2305.45
2305.45
15438.40
15224.55
15051.75
14906.75
14798.10
chapter-7(Brickwork)
cu.m
ditto
ditto
ditto
ditto
814.25
814.25
814.25
814.25
814.25
5452.85
5377.30
5316.30
5265.05
5226.70
Page 51
Description
iii)
5
100Cft.
14666.40
Unit
cu.m
Labour
ii)
Remarks
ditto
ditto
Composite
814.25
5180.15
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
3028.80
3028.80
3028.80
3028.80
3028.80
3028.80
3028.80
18073.20
17106.60
16526.65
16140.00
15849.50
15659.40
15491.25
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
1069.75
1069.75
1069.75
1069.75
1069.75
1069.75
1069.75
6383.45
6042.05
5837.20
5700.65
5598.05
5530.90
5471.50
iii)
Spec.
No.
ditto
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Cft.
ditto
ditto
ditto
ditto
3028.80
3028.80
3028.80
3028.80
3028.80
16161.75
15950.60
15775.10
15630.10
15521.90
cu.m
ditto
ditto
ditto
ditto
1069.75
1069.75
1069.75
1069.75
1069.75
5708.35
5633.75
5571.75
5520.55
5482.35
100Cft.
3028.80
15389.75
cu.m
1069.75
5435.65
100Cft.
ditto
ditto
ditto
438.25
1008.50
1578.70
2566.10
-----
cu.m
ditto
ditto
ditto
154.80
356.20
557.60
906.35
2305.45
Composite
Labour
first floor
second floor
third floor
fourth & subsequent floors
21.1
to
21.5
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
2698.10
2698.10
2698.10
2698.10
2698.10
2698.10
2698.10
17742.50
16775.90
16195.90
15809.30
15518.75
15328.70
15161.60
chapter-7(Brickwork)
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
952.95
952.95
952.95
952.95
952.95
952.95
952.95
6266.65
5925.25
5720.40
5583.85
5481.20
5414.10
5355.10
Page 52
Description
ii)
Composite
Unit
Labour
Spec.
No.
100Cft.
ditto
ditto
ditto
ditto
2698.10
2698.10
2698.10
2698.10
2698.10
15831.00
15617.20
15444.40
15299.30
15190.75
cu.m
ditto
ditto
ditto
ditto
952.95
952.95
952.95
952.95
952.95
5591.50
5516.00
5454.95
5403.70
5365.35
100Cft.
2698.10
15059.00
cu.m
952.95
5318.85
100Cft.
438.25
--
cu.m
154.80
100Cft.
945.10
--
cu.m
333.80
10
100Cft.
660.00
cu.m
233.10
11
100Cft.
227.05
--
cu.m
80.20
12
216.50
438.25
---
cu.m
cu.m
76.45
154.80
i)
ii)
13
Extra for face work (half brick thick) using special bricks
instead of first class bricks.
100Cft.
14
Per Cft.
76.10
15
1688.10
844.05
a)
b)
16
1319.30
2269.15
cu.m
217.25
cu.m
2688.05
% Nos.
ditto
1688.10
844.05
mud mortar
ditto
21.5
466.00
21.1
to
21.4
801.45
21.1
to
21.4
100 Sft.
1158.85
3918.35
chapter-7(Brickwork)
Sqm.
124.70
7673.25
Remarks
Composite
iii)
Labour
421.60
Page 53
Description
ii)
17
Labour
Remarks
Composite
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto
1517.45
1517.45
1517.45
1517.45
1517.45
1517.45
1517.45
5282.60
5040.65
4895.95
4799.30
4731.35
4678.65
4639.90
sq.m.
ditto
ditto
ditto
ditto
ditto
ditto
163.30
163.30
163.30
163.30
163.30
163.30
163.30
568.40
542.35
526.80
516.40
509.10
503.40
499.25
The rate of lime mortar also
includes grinding of mortar.
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Sft.
100Sft.
100Sft.
100Sft.
100Sft.
1517.45
1517.45
1517.45
1517.45
1517.45
4804.75
4750.70
4710.75
4671.25
4648.20
sq.m
sq.m
sq.m
sq.m
sq.m
163.30
163.30
163.30
163.30
163.30
517.00
511.20
506.90
502.65
500.15
100Sft.
1517.45
4609.70
sq.m
163.30
496.00
100Sft.
ditto
ditto
ditto
221.75
501.60
792.00
1240.60
sq.m
ditto
ditto
ditto
23.85
53.95
85.20
133.50
ditto
Add extra labour on item No. 16 for pacca brick work in:i)
ii)
iii)
iv)
18
Unit
iv)
Composite
Spec.
No.
iii)
Labour
first floor
second floor
third floor
fourth & subsequent floors
mud mortar
ii)
iii)
1:2
1:3
1:4
1:5
1:6
1:7
1:8
21.1
to
21.4
100Sft.
1609.35
7120.35
sq.m
173.15
766.15
100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto
2283.30
2283.30
2283.30
2283.30
2283.30
2283.30
2283.30
9805.50
9322.20
9032.20
8838.90
8703.00
8597.30
8515.10
sq.m
ditto
ditto
ditto
ditto
ditto
ditto
245.70
245.70
245.70
245.70
245.70
245.70
245.70
1055.05
1003.05
971.85
951.05
936.45
925.05
916.25
100Sft.
ditto
ditto
2283.30
2283.30
2283.30
8849.75
8740.35
8656.50
sq.m
ditto
ditto
245.70
245.70
245.70
952.25
940.45
931.45
chapter-7(Brickwork)
Page 54
Description
Ratio 1:1:9
Ratio 1:1:10
iv)
19
21
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
ditto
ditto
2283.30
2283.30
8583.95
8531.00
ditto
ditto
245.70
245.70
923.65
917.95
100Sft.
2283.30
8462.50
sq.m
245.70
910.55
100Sft.
ditto
ditto
ditto
328.70
756.35
1184.05
1924.60
sq.m
ditto
ditto
ditto
116.10
267.15
418.20
679.75
ditto
20
Labour
first floor
second floor
third floor
fourth & subsequent floors
-----
Per Cft.
29.60
ii)
100Cft.
438.25
538.15
--
cu.m
1046.20
ditto
154.80
19006.85
-
4" (113 mm) thick walling with hoop iron, bonding 6"
(150 mm) apart.
4" (113 mm) thick walling with hoop iron, bonding
12" (300 mm) apart.
3" (75 mm) thick walling with hoop iron, bonding 6"
(150 mm) apart.
3" (75 mm) thick walling with hoop iron, bonding 12"
(300 mm) apart.
21.1
to
21.2
21.19
100Sft.
1295.60
7663.30
sq.m
139.40
824.55
100Sft.
1179.40
7118.35
sq.m
126.90
765.95
ditto
1015.75
5651.40
ditto
109.30
608.10
ditto
812.60
4971.95
ditto
87.45
535.00
22
100Cft.
2333.00
8576.00
cu.m
824.00
3029.05
21.18
23
100Cft.
1425.60
12279.60
cu.m
503.50
4337.15
21.1
24
100Cft.
1940.40
3404.40
cu.m
685.35
1202.45
21.16
25
100Cft.
939.85
cu.m
331.95
26
--
21.17
21.1 to 21.2
Rft.
ditto
ditto
15.35
17.45
11.40
42.35
89.05
105.50
chapter-7(Brickwork)
Metre
ditto
ditto
50.35
57.25
37.40
138.90
292.10
346.05
Page 55
Description
27
Labour
Composite
Unit
Labour
Spec.
No.
Composite
1 brick
2 bricks
3 bricks
4 bricks
21.1 to 21.2
Rft.
ditto
ditto
ditto
17.45
25.80
34.40
43.25
30.85
66.65
102.35
143.55
Metre
ditto
ditto
ditto
57.25
84.60
112.85
141.85
101.20
218.60
335.70
470.85
28
1,000
Nos
535.90
--
1,000
Nos
535.90
29
1,000
Nos
1010.60
--
1,000
Nos
1010.60
30
100Cft.
127.60
1207.60
cu.m
45.05
426.50
31
Providing and laying 2" (50 mm) thick and 15" (375 mm)
projected tile band, laid in 1:2 cement sand mortar, with
hoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"
apart.
Rft.
65.20
120.95
Metre
213.85
396.70
32
1:3
1:4
Remarks
100Sft.
ditto
1179.40
1179.40
Per Sft.
34.75
7908.40
7676.45
--
sq.m
ditto
126.90
126.90
sq.m
373.90
850.95
826.00
33
34
Each No.
28.40
35.15
Each
28.40
35.15
35
Each No.
173.80
244.50
Each
173.80
244.50
36
Per Lft.
16.50
--
Metre
54.10
37
Maroo corners
Each
Corner
105.60
--
Each
Corner
105.60
chapter-7(Brickwork)
Page 56
8. STONE MASONRY
1
The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means of
transport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.
The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of the
stone or spawl carried.
Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl is
supplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)
shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall form
the basis of laying.
Rates for all finished work include the removal of surplus debris, unused material and byproducts.
Description
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar
i) ratio 1:3
ii) ratio 1:4
iii) ratio 1:6
iv) ratio 1:8
Unit
Labour
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar:
i) ratio 1:3
ii) ratio 1:4
iii) ratio 1:6
iv) ratio 1:8
22.10,
22.11
100 Cft.
100 Cft.
100 Cft.
2468.40
3085.50
4745.40
3218.40
4051.50
7432.20
cu.m
cu.m
cu.m
871.85
1089.80
1676.10
1136.75
1431.00
2625.05
100 Cft.
100 Cft.
100 Cft.
100 Cft.
4745.40
4745.40
4745.40
4745.40
10331.10
9461.15
8465.50
7914.60
cu.m
cu.m
cu.m
cu.m
1676.10
1676.10
1676.10
1676.10
3648.95
3341.70
2990.00
2795.45
22.8
100 Cft.
100 Cft.
100 Cft.
3128.40
4362.60
5336.10
3878.40
5328.60
7806.95
cu.m
cu.m
cu.m
1104.95
1540.85
1884.70
1369.85
1882.05
2757.40
100 Cft.
100 Cft.
100 Cft.
100 Cft.
5336.10
5336.10
5336.10
5336.10
10654.50
9881.20
8995.85
8509.20
cu.m
cu.m
cu.m
cu.m
1884.70
1884.70
1884.70
1884.70
3763.15
3490.05
3177.35
3005.45
dry masonry
in mud mortar
Remarks
Composite
Composite
Spec.
No.
Labour
22.10
100 Cft.
100 Cft.
2798.40
3702.60
3548.40
4668.60
chapter-8(Stone masonary)
cu.m
cu.m
988.40
1307.75
1253.30
1648.95
Page 57
Description
c)
d)
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar:
i) ratio 1:3
ii) ratio 1:4
iii) ratio 1:6
iv) ratio 1:8
Remarks
Composite
100 Cft.
5171.10
7857.90
cu.m
1826.45
2775.40
100 Cft.
100 Cft.
100 Cft.
100 Cft.
5171.10
5171.10
5171.10
5171.10
10756.80
9886.85
8891.20
8340.30
cu.m
cu.m
cu.m
cu.m
1826.45
1826.45
1826.45
1826.45
3799.30
3492.05
3140.35
2945.80
22.8
100 Cft.
100 Cft.
100 Cft.
3649.80
5405.40
6022.50
4399.80
6361.80
8493.35
cu.m
cu.m
cu.m
1289.10
1909.20
2127.15
1554.00
2247.00
2999.85
100 Cft.
100 Cft.
100 Cft.
100 Cft.
6022.50
6022.50
6022.50
6022.50
11340.90
10567.60
9682.25
9195.60
cu.m
cu.m
cu.m
cu.m
2127.15
2127.15
2127.15
2127.15
4005.60
3732.50
3419.75
3247.90
22.5
&
22.6
100 Cft.
16222.80
18583.70
cu.m
5729.90
6563.75
100 Cft.
100 Cft.
100 Cft.
16222.80
16222.80
16222.80
20516.55
19936.60
19279.30
cu.m
cu.m
cu.m
5729.90
5729.90
5729.90
7246.45
7041.60
6809.45
100 Cft.
31033.20
33160.10
cu.m
10960.95
11712.15
100 Cft.
100 Cft.
100 Cft.
31033.20
31033.20
31033.20
34126.50
33836.10
33514.05
cu.m
cu.m
cu.m
10960.95
10960.95
10960.95
12053.50
11950.90
11837.15
100 Cft.
100 Cft.
100 Cft.
100 Cft.
624.65
1429.80
2250.35
3615.75
cu.m
cu.m
cu.m
cu.m
220.65
505.00
794.80
1277.10
100 Cft.
570.25
cu.m
201.40
22.3
(A) to
(C) &
22.4
Labour
Unit
Composite
Spec.
No.
Labour
first floor
second floor
third floor
fourth floor
chapter-8(Stone masonary)
Page 58
Description
10
11
100 Cft.
Labour
1741.70
Composite
Unit
cu.m
Labour
615.15
Spec.
No.
Composite
22.12
22.7
100 Cft.
100 Rft.
9504.00
9504.00
cu.m
Rm.
3356.80
311.75
Dressing stones:a)
b)
c)
d)
hammer dressed
rough tooled dressed
chisel dressed
fine dressed
Remarks
22.2
100 Sft.
100 Sft.
100 Sft.
100 Sft.
3405.60
6504.95
7867.20
16642.55
sq.m
sq.m
sq.m
sq.m
366.45
699.95
846.50
1790.75
12
100 Sft.
6171.30
11145.30
sq.m
664.05
1199.25
13
Per Cft.
244.95
271.30
cu.m
8651.65
9582.30
14
Per Cft.
141.00
170.35
cu.m
4980.10
6016.75
chapter-8(Stone masonary)
22.13
Page 59
9. ROOFING
Rates for all finished works include the removal of surplus debris unused material and byproducts.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Sft.
4147.45
9399.05
sq.m
446.25
1011.35
23.1
100Sft.
3157.45
6945.45
sq.m
339.75
747.35
23.2
100Sft.
174.90
930.05
sq.m
18.80
264.00
2309.00
sq.m
28.40
248.45
608.50
172.45
957.75
641.70
65.50
18.55
103.05
69.05
100Sft.
951.30
5303.55
102.35
570.65
a)
b)
c)
Jack arch roofing 4" (113 mm) thick laid in 1:5 cement
mortar, including an average depth of 4" (100 mm) cement
concrete in haunches and over crown, with 3" (75 mm)
sq.m
ditto
ditto
23.3 to
23.5
chapter-9(Roofing)
Remarks
ditto
Page 60
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
4461.60
4461.60
15083.85
16063.50
sq.m
ditto
480.05
480.05
1623.00
1728.45
Jack arch roofing 4" (113 mm) thick laid in 1:5 cement
mortar, including an average depth of 4" (100 mm) cement
concrete in haunches and over crown, with " (13 mm)
cement plaster 1:6 on top (except earth filling mud plaster
and gobri) soffit of arches cement plastered. The rate also
includes bitumen coating, centring, laying skew bricks in
cement sand mortar (1:3), and encasing exposed flanges
of the joints with fine cement concrete 1:2:4 using stone
aggregate:a)
b)
Remarks
23.3
to
23.5
100Sft.
ditto
3606.25
3606.25
100Sft.
855.35
100Sft.
4567.20
10
15080.50
15002.80
12407.50
sq.m
ditto
388.05
388.05
sq.m
92.05
sq.m
491.45
1622.65
1614.30
-
ditto
1335.05
23.3
to
23.5
23.1
to
23.3
a)
3" (75 mm) thick earth filling and 1" (25 mm) mud
plaster
100Sft.
406.35
653.25
sq.m
43.70
70.30
b)
100Sft.
530.90
825.80
sq.m
57.15
88.85
11
100Sft.
68.10
80.70
sq.m
7.35
8.70
ditto
12
100Sft.
306.25
1771.40
sq.m
32.95
190.60
23.1
chapter-9(Roofing)
ditto
ditto
Page 61
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
1.72 Kg per square metre over roof and blinded with sand
at one Cft. per %Sft. (0.003 cu.m per sq.m)
13
Providing & Fixing corrugated galvanized iron sheets with G.I. bolts,
nuts, limpet and bitumen washers, wind ties, complete in
all respects without valleys and ridges:a)
b)
c)
20 BWG
22 BWG
24 BWG
23.7
100Sft.
100Sft.
100Sft.
528.00
528.00
528.00
14564.20
12293.70
9879.40
sq.m
sq.m
sq.m
56.80
56.80
56.80
1567.10
1322.80
1063.00
14
Rft.
48.90
66.25
Metre
160.40
217.30
23.10
15
Each
182.15
356.45
Each
Each
356.45
23.10
16
Each
182.15
678.70
Each
182.15
678.70
23.10
17
Per Rft.
Per Rft.
34.85
34.85
140.40
164.40
Metre
Metre
114.30
114.30
460.50
539.25
a)
b)
18
Per Sft.
34.85
115.55
sq.m
375.00
1243.30
19
Providing and fixing 1/16" (1.5 mm) thick lead flashing over
roof expansion joint complete in all respects.
Per Sft.
8.20
69.60
Sq.m
88.25
748.90
20
Per Rft.
Per Rft.
34.75
34.75
180.20
154.85
Metre
Metre
114.00
114.00
591.05
507.90
21
Each
129.50
402.40
Each
129.50
402.40
22
Shoes, bends or offsets for cast iron rain water down pipe
Each
38.95
259.85
Each
38.95
259.85
chapter-9(Roofing)
23.11
Page 62
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
24
25
Each
145.20
263.85
Each
145.20
263.85
23.10
100Sft.
2785.20
18646.80
sq.m
299.70
2006.40
26.1
100Sft.
100Sft.
1696.20
1696.20
14861.65
13253.80
sq.m
sq.m
182.50
182.50
1599.10
1426.10
23.60
4743.60
sq.m
126.40
510.40
23.8
sq.m
15.45
Metre
45.25
26
100Sft.
1174.80
27
100Sft.
143.45
28
Per Rft.
13.80
29
--
59.25
23.6
194.35
23.8
23.6
Per Rft.
36.05
118.25
1303.80
Per Rft.
47.50
155.80
1256.75
Per Rft.
47.50
155.80
1483.85
77.90
471.35
695.20
1191.15
30
Per Rft.
23.75
31
Each
695.20
1191.15
chapter-9(Roofing)
Each
23.11
Page 63
Description
Unit
Labour
--
Each
208.55
33
Making drip course 2"x" (50x13 mm) under RCC slab edges
in outer opening, in cement, sand mortar 1:2.
Per Rft.
8.50
9.55
Metre
27.90
31.30
34
Per Sft.
20.15
312.95
sq.m
216.80
3367.35
35
1465.20
1465.20
1468.50
5864.35
5990.35
6119.65
sq.m
sq.m
sq.m
157.65
157.65
158.00
631.00
644.55
658.45
7.90
178.70
Metre
25.90
586.15
Providing and fixing AC rain water down pipe 4" (100 mm)
dia, with shoe, T-bend, clamp, etc.
37
38
39
Rft.
23.10
13.20
21.70
14.75
24.50
Metre
Metre
43.30
71.20
48.40
80.35
i)
Each
55.00
60.10
Each
55.00
60.10
ii)
Each
26.40
28.85
Each
26.40
28.85
Each
180.85
Each
180.85
Remarks
Composite
36
208.55
Composite
Spec.
No.
32
Each
Labour
chapter-9(Roofing)
Page 64
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
position.
40
41
42
Each
29.80
Each
Each
Each
Each
Each
25.85
36.15
45.20
60.30
72.35
Each
Each
Each
Each
Each
25.85
36.15
45.20
60.30
72.35
Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
72.35
90.40
120.55
139.10
150.70
164.40
180.85
200.95
258.35
278.20
301.40
Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
72.35
90.40
120.55
139.10
150.70
164.40
180.85
200.95
258.35
278.20
301.40
Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
54.80
121.75
146.10
182.60
199.20
219.10
273.90
438.25
Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
54.80
121.75
146.10
182.60
199.20
219.10
273.90
438.25
Each
278.10
Each
278.10
555.55
44
29.80
43
Each
555.55
chapter-9(Roofing)
Page 65
10. FLOORING
Rates for all finished works include the removal of surplus debris, unused material and byproducts
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100 Sft.
1669.80
2888.40
sq.m
179.65
310.80
100 Sft.
561.00
801.00
sq.m
60.35
86.20
100 Cft.
1224.95
2994.95
cum.
432.65
1057.80
100 Sft.
1026.30
1395.30
sq.m
110.45
150.15
24.2
100 Sft.
585.55
3482.35
sq.m
63.00
374.70
24.12
100 Sft.
1047.00
5361.60
sq.m
112.65
576.90
24.12
100 Sft.
570.25
966.60
sq.m
61.35
104.00
100 Sft.
1008.50
4576.30
sq.m
108.50
492.40
24.4
100 Sft.
1,293.60
6,514.45
sq.m
139.20
700.95
24.4
10
100 Sft.
1,260.60
3,279.50
sq.m
135.65
352.85
ditto
100 Sft.
1,425.60
4,518.70
sq.m
153.40
486.20
24.4
11
chapter-10(Flooring)
Remarks
24.1
Page 66
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
13
14
15
16
860.40
4,720.15
sq.m
92.60
507.90
24.7
24.8
100 Sft.
ditto
ditto
860.40
860.40
860.40
3,341.90
4,290.05
5,887.50
sq.m
ditto
ditto
92.60
92.60
92.60
359.60
461.60
633.50
100 Sft.
860.40
4,745.35
sq.m
92.60
510.60
100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
992.00
992.00
1,202.50
1,202.50
1,413.05
1,451.35
1,623.60
1,623.60
1,623.60
2,003.15
2,226.70
2,660.80
2,895.70
3,381.70
3,630.05
3,960.65
4,259.85
4,519.70
sq.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
106.75
106.75
129.40
129.40
152.05
156.15
174.70
174.70
174.70
100 Sft.
ditto
ditto
1,426.25
1,426.25
1,789.25
2,827.85
2,974.45
3,569.85
sq.m
ditto
ditto
153.45
153.45
192.50
304.30
320.05
384.10
100 Sft.
347.60
776.20
sq.m
37.40
83.50
chapter-10(Flooring)
24.7
24.9
24.10
215.55
239.60
286.30
311.60
363.85
390.60
426.15
458.35
486.30
17
100 Sft.
Page 67
Description
18
19
20
Unit
sq.m
Labour
24.70
24.5
100 Sft.
ditto
2,923.55
2,923.55
4,449.85
4,776.20
sq.m
ditto
314.55
314.55
478.80
513.90
24.10
100 Sft.
ditto
ditto
1,032.90
808.50
597.30
13,595.35
7,220.70
3,899.50
sq.m
ditto
ditto
111.15
87.00
64.25
1462.85
776.95
419.60
If glass or marble strips are used
for panelling, it will be paid extra as
per item No. 41 or 42.
100 Sft.
ditto
3,834.85
3,834.85
5,925.95
6,203.50
sq.m
ditto
412.65
412.65
637.65
667.50
Remarks
Composite
22
229.70
Composite
Spec.
No.
21
100 Sft
Labour
100 Sft.
ditto
3,834.85
3,834.85
6,076.70
6,635.05
sq.m
ditto
412.65
412.65
653.85
713.95
23
100 Sft.
2,416.40
5,920.35
sq.m
260.00
637.05
24.8
24
100 Sft.
3,042.60
7,779.05
sq.m
327.40
837.05
24.7
chapter-10(Flooring)
Page 68
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100 Sft.
3,042.60
8,068.85
sq.m
327.40
868.20
26
100 Sft.
710.15
830.60
sq.m
76.40
89.35
27
100 Sft.
756.10
878.15
sq.m
81.35
94.50
28
100 Sft.
140.60
182.35
sq.m
15.15
19.60
24.6
29
100 Sft.
2,046.00
33,561.45
sq.m
220.15
3611.20
24.13
30
100 Sft.
2,376.00
45,579.40
sq.m
255.65
4904.35
ditto
31
100 Sft.
2,002.00
44,893.40
sq.m
215.40
4830.55
ditto
32
100 Sft.
2,184.60
35,938.05
sq.m
235.05
3866.95
24.13
chapter-10(Flooring)
ditto
Page 69
Description
33
34
35
2,002.00
Composite
Unit
Labour
215.40
Spec.
No.
Remarks
Composite
72,873.15
sq.m
7841.15
159.10
159.10
2407.45
1288.75
ditto
ditto
100 Sft.
Per Inch
thickness
ditto
1,478.40
1,478.40
22,374.15
11,977.35
sq.m
per cm
thickness
ditto
100 Sft.
ditto
1,411.15
2,372.70
5,610.95
7,832.55
sq.m
ditto
151.85
255.30
603.75
842.80
100 Sft.
ditto
ditto
1,883.50
1,883.50
95.70
2,387.40
2,238.90
324.20
sq.m
ditto
ditto
202.65
202.65
10.30
256.90
240.90
34.90
36
100 Sft.
Labour
37
100 Sft.
3,755.40
8,491.85
sq.m
404.10
913.70
24.7
38
Coloured glazed tile dado (6"x6"") (6mm) thick in pigment over 1:2
cement, sand mortar 3/4"(20mm) thick, including finishing.
100 Sft.
3,755.40
8,766.90
sq.m
404.10
943.30
ditto
39
100 Sft.
ditto
4,514.40
4,514.40
5,575.15
6,261.00
sq.m
ditto
485.75
485.75
599.90
673.70
100 Sft.
4,514.40
6,361.10
sq.m
485.75
684.45
chapter-10(Flooring)
Page 70
Description
ditto
Labour
Composite
Unit
Labour
Spec.
No.
Composite
4,514.40
6,635.90
ditto
485.75
714.00
12.35
69.35
sq.m
132.90
746.20
40
Per Sft.
41
Per Rft.
3.95
Metre
12.95
42
5.30
3.70
Metre
ditto
17.40
12.15
chapter-10(Flooring)
Remarks
24.14
Page 71
Description
Unit
Labour
25.7
100 Sft.
ditto
258.20
356.70
323.00
486.30
sq.m
ditto
27.80
38.40
34.75
52.35
ditto
a)
100 Sft.
232.30
297.10
sq.m
25.00
31.95
b)
ditto
232.30
361.90
ditto
25.00
38.95
100 Sft.
778.80
935.05
sq.m
83.80
100.60
b)
ditto
778.80
1091.15
ditto
83.80
117.40
25.1 to 25.6
a)
Remarks
Composite
a)
b)
Composite
Spec.
No.
Labour
ditto
100 Sft.
ditto
778.80
778.80
1144.25
1367.05
sq.m
ditto
83.80
83.80
123.10
147.10
100 Sft.
1844.85
4095.90
sq.m
198.50
440.70
ditto
ditto
100 Sft.
ditto
ditto
730.45
730.45
730.45
2001.50
1899.60
1841.05
sq.m
ditto
ditto
78.60
78.60
78.60
215.35
204.40
198.10
25.1
chapter-11(Surface Rendering)
Page 72
Description
a)
b)
c)
8
sq.m
ditto
ditto
83.80
83.80
106.25
1:2
1:3
1:4
Remarks
Composite
138.00
154.10
214.70
to
25.6
ditto
100 Sft.
ditto
ditto
778.80
778.80
987.35
1134.25
1252.70
1698.20
sq.m
ditto
ditto
83.80
83.80
106.25
122.05
134.80
182.75
ditto
100 Sft.
ditto
ditto
778.80
778.80
987.35
1094.40
1180.35
1613.10
sq.m
ditto
ditto
83.80
83.80
106.25
117.75
127.00
173.55
ditto
100 Sft.
ditto
ditto
910.80
910.80
910.80
1514.65
1365.60
1325.75
sq.m
ditto
ditto
98.00
98.00
98.00
163.00
146.95
142.65
12
1282.75
1432.20
1995.20
Labour
a)
b)
c)
11
778.80
778.80
987.35
Unit
10
100 Sft.
ditto
ditto
Composite
Spec.
No.
Labour
25.1 to 25.6
100 Sft.
ditto
ditto
778.80
778.80
987.35
1059.60
1120.10
1548.95
sq.m
ditto
ditto
83.80
83.80
106.25
114.00
120.50
166.65
ditto
100 Sft.
ditto
ditto
778.80
778.80
987.35
1009.90
1085.30
1449.60
sq.m
ditto
ditto
83.80
83.80
106.25
13
100 Sft.
503.20
701.90
sq.m
54.15
14
100 Sft.
570.25
686.45
sq.m
61.35
73.85
chapter-11(Surface Rendering)
108.65
116.80
156.00
25.8
Page 73
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
16
ratio 1:2
ratio 1:3
17
18
19
ratio 1:2
ratio 1:3
100 Sft.
910.80
1027.00
sq.m
98.00
110.50
ditto
100 Sft.
ditto
778.80
778.80
1155.95
1068.65
sq.m
ditto
83.80
83.80
124.40
115.00
100 Sft.
570.25
947.40
sq.m
61.35
101.95
100 Sft.
ditto
910.80
910.80
1287.95
1200.65
sq.m
ditto
98.00
98.00
138.60
129.20
ditto
ditto
25.8
100 Sft.
ditto
757.70
757.70
913.65
1047.55
sq.m
ditto
81.55
81.55
98.30
112.70
100 Sft.
ditto
1438.80
1438.80
1594.75
1728.65
sq.m
ditto
154.80
154.80
171.60
186.00
20
100 Sft.
327.35
sq.m
35.20
ditto
21
100 Sft.
163.70
sq.m
17.60
ditto
22
100 Sft.
83.40
88.90
sq.m
8.95
23
Distempering:a)
b)
9.55
25.11
ditto
100 Sft.
ditto
ditto
68.30
101.00
133.75
142.60
197.85
253.10
sq.m
ditto
ditto
7.35
10.85
14.40
15.35
21.30
27.25
100 Sft.
ditto
62.65
101.00
114.45
152.85
sq.m
ditto
6.75
10.85
12.30
16.45
chapter-11(Surface Rendering)
Page 74
Description
24
b)
Unit
Labour
b)
25.10
100 Sft.
ditto
57.65
86.50
85.70
127.55
sq.m
ditto
6.20
9.30
9.20
13.70
100 Sft.
ditto
57.65
86.50
75.00
115.00
sq.m
ditto
6.20
9.30
8.05
12.35
25.9
100 Sft.
ditto
ditto
57.65
86.50
112.05
81.10
121.55
158.75
sq.m
ditto
ditto
6.20
9.30
12.05
8.75
13.10
17.10
100 Sft.
ditto
57.65
86.50
75.25
115.70
sq.m
ditto
6.20
9.30
8.10
12.45
Gobri leeping:a)
b)
on walls
over roofs
25.7
100 Sft.
ditto
97.55
81.75
101.15
85.35
sq.m
ditto
10.50
8.80
10.90
9.20
27
100 Sft.
132.00
sq.m
14.20
28
100 Sft.
139.90
sq.m
15.05
29
100 Sft.
316.80
749.30
sq.m
34.10
80.65
30
100 Sft.
316.80
339.60
sq.m
34.10
36.55
31
100 Sft.
102.30
194.70
sq.m
11.00
20.95
32
910.80
1266.25
sq.m
98.00
136.25
i)
Remarks
Composite
White washing:a)
26
Composite
Spec.
No.
Colour washing:a)
25
Labour
chapter-11(Surface Rendering)
25.8
Page 75
Description
ii)
33
34
Single
Double
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
ditto
910.80
1384.70
ditto
98.00
149.00
Rft.
4.85
30.30
Metre
15.90
99.40
Each
Each
146.00
292.00
187.85
375.65
Each
Each
146.00
292.00
187.85
375.65
Area above 100 Sft (10.76 sq.m)
35
Each
295.15
406.95
Each
295.15
406.95
36
Each
147.60
203.45
Each
147.60
203.45
37
Each
295.15
384.50
Each
295.15
384.50
38
sq.m
Per
coat
1.05
100 Sft.
Per
coat
9.60
chapter-11(Surface Rendering)
Page 76
No extra rate is to be paid for sawing as the rates are inclusive of these.
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
Sr.
No.
Deodar wood
Shisham wood
Deodar wood
Shisham wood
Labour
26.1
Per Cft.
ditto
360.10
409.20
3964.90
2496.35
cu.m
ditto
12718.75
14452.95
140040.25
88171.10
26.1
Per Cft.
ditto
233.25
233.25
3850.75
2372.35
cu.m
ditto
8238.40
8238.40
136008.50
83791.40
26.1
to
26.3
&
26.7
Per Sft.
ditto
ditto
63.20
63.20
63.20
1303.60
1214.00
1126.50
sq.m
ditto
ditto
680.05
680.05
680.05
14026.75
13062.65
12121.15
26.8
to
26.10
teak wood framing 1" (45 mm) thick with wire gauze
fixed in position:i) without springs or spring hinges.
ii) with springs or spring hinges.
Remarks
Composite
Unit
Composite
Spec.
No.
Labour
Per Sft.
11.35
538.20
sq.m
122.15
5791.05
ditto
11.35
541.80
ditto
122.15
5829.75
chapter-12(Wood Work)
Page 77
Description
b)
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
ditto
11.35
11.35
495.55
499.45
sq.m
ditto
122.15
122.15
5332.10
5374.10
c)
Per Sft.
20.45
149.80
sq.m
220.05
1611.85
d)
Per Sft.
19.20
508.55
sq.m
206.60
5472.00
Per Sft.
25.60
249.70
sq.m
275.45
2686.75
Per Sft.
25.60
378.10
sq.m
275.45
4068.35
26.1 to
26.3 & 26.7
Per Sft.
ditto
ditto
60.60
60.60
60.60
1097.00
1022.50
971.15
sq.m
ditto
ditto
652.05
652.05
652.05
11803.70
11002.20
10449.55
Remarks
26.1, 26.2
& 26.4
Per Sft.
68.20
716.70
sq.m
733.85
7711.70
ditto
62.95
615.60
ditto
677.35
6623.85
chapter-12(Wood Work)
Page 78
Description
10
11
a)
i)
ii)
b)
i)
ii)
12
Per Sft.
Per Sft.
Per Sft.
ditto
Labour
77.75
73.45
31.95
35.15
Composite
377.30
694.20
562.40
581.90
Unit
sq.m
sq.m
sq.m
ditto
Labour
Spec.
No.
Composite
836.60
4059.75
790.30
26.1, 26.2
26.4 to
7469.60
26.6
343.80
378.20
-ditto-
Per Sft.
ditto
31.95
35.15
194.90
214.40
sq.m
ditto
343.80
378.20
2097.10
2306.95
b)
c)
Remarks
26.8 to
26.10
Per Sft.
ditto
34.10
34.10
464.95
468.85
sq.m
ditto
366.90
366.90
5002.85
5044.85
Per Sft.
ditto
34.10
34.10
430.25
432.45
sq.m
ditto
366.90
366.90
4629.50
4653.15
Per Sft.
25.60
139.10
sq.m
275.45
1496.70
chapter-12(Wood Work)
Page 79
Description
d)
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
13
14
15
Labour
Per Sft.
38.35
387.55
sq.m
412.65
4170.05
Per Sft.
56.85
464.85
sq.m
611.70
5001.80
a)
Per Sft.
14.70
131.30
sq.m
158.15
1412.80
b)
Per Sft.
14.70
98.15
sq.m
158.15
1056.10
Per Sft.
ditto
21.45
25.10
116.70
133.20
sq.m
ditto
230.80
270.10
1255.70
1433.25
26.1
26.2
single rebate
double rebate
16
Per Sft.
door area
1.95
30.70
sq.m
door area
21.00
330.35
17
Each
40.90
160.90
Each
40.90
160.90
18
38.35
38.35
38.35
86.35
122.35
128.35
Each
ditto
ditto
38.35
38.35
38.35
86.35
122.35
128.35
i)
iron sliding bolt, 10" (250 mm) long
ii) iron sliding bolt, 12" (300 mm) long
iii) brass sliding bolt, 10" (250 mm) long
chapter-12(Wood Work)
26.2
Page 80
Description
iv)
19
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
38.35
290.35
ditto
38.35
290.35
Per Sft.
1.15
10.10
sq.m
12.35
108.70
ditto
1.15
7.45
ditto
12.35
80.15
20
Each
122.75
309.95
Each
122.75
309.95
21
Each
170.50
355.30
Each
170.50
355.30
22
25.60
224.50
sq.m
275.45
2415.60
ditto
25.60
328.60
ditto
275.45
3535.75
Per Sft.
81.85
1572.75
sq.m
880.60
16922.65
Per Sft.
61.40
530.60
sq.m
660.45
5709.05
Per Sft.
50.30
326.80
Sq.m
541.05
3516.35
a)
b)
23
a)
b)
24
Remarks
chapter-12(Wood Work)
Page 81
Description
25
ii)
27
Unit
Labour
Remarks
Composite
Per Sft.
94.45
643.80
sq.m
1016.10
6927.45
ditto
93.70
908.90
ditto
1008.45
9779.95
Per Sft.
36.65
528.15
Sq.m
394.15
5682.90
Per Sft.
ditto
ditto
18.20
11.35
13.65
448.60
370.45
153.85
Sq.m
ditto
ditto
195.70
122.30
146.75
4826.80
3985.85
1655.30
29
a)
b)
c)
28
Composite
Spec.
No.
26
Labour
26.1
26.2
Sft.
ditto
ditto
20.45
20.45
20.45
317.15
242.90
168.95
sq.m
ditto
ditto
220.15
220.15
220.15
3412.50
2613.50
1817.90
ditto
Sft.
ditto
ditto
20.45
20.45
20.45
317.15
465.35
613.55
chapter-12(Wood Work)
sq.m
ditto
ditto
220.15
220.15
220.15
3412.50
5007.15
6601.80
Page 82
Description
30
31
Composite
Unit
Labour
Spec.
No.
Each
24.55
101.10
Each
24.55
101.10
b)
Each
32.75
71.15
Each
32.75
71.15
c)
Each
3.40
46.90
Each
3.40
46.90
d)
Each
1.10
6.20
Each
1.10
6.20
32
33
Remarks
Composite
a)
a)
b)
34
Labour
26.1 and
26.2
ditto
Per Rft.
ditto
93.25
69.30
232.45
592.75
Metre
ditto
305.80
227.30
762.35
1944.20
Per Rft.
34.65
224.50
Metre
113.65
736.45
26.1
26.2
100Sft.
ditto
409.20
545.60
sq.m
ditto
44.05
58.70
100Sft.
ditto
241.43
362.80
sq.m
ditto
26.00
39.05
Per Sft.
28.65
381.90
sq.m
308.20
4109.50
26.1
Per Sft.
34.10
101.30
sq.m
366.90
1090.00
122.75
7951.55
Each
122.75
7951.55
--
Metre
28.75
Soft wood
Hard wood
35
36
Making and fixing 1" (25 mm) thick kail or chir wooden
notice board with frame.
ditto
37
Each
38
Per Rft.
8.75
chapter-12(Wood Work)
ditto
--
Page 83
Description
39
40
Composite
Per Rft.
135.95
2406.70
Metre
445.95
7894.05
100Sft.
ditto
ditto
639.40
639.40
639.40
12609.55
13869.55
14373.55
sq.m
ditto
ditto
68.80
68.80
68.80
1356.80
1492.35
1546.60
100Sft.
ditto
ditto
767.25
767.25
767.25
13767.00
24014.05
17295.00
sq.m
ditto
ditto
82.55
82.55
82.55
1481.35
2583.90
1860.95
Hard board
Chip board
Ply wood " (6 mm) thick
Masonite
100Sft.
ditto
ditto
ditto
1265.00
1265.00
1265.00
1265.00
7711.70
9751.70
9991.70
9631.70
sq.m
ditto
ditto
ditto
136.10
136.10
136.10
136.10
829.80
1049.30
1075.10
1036.35
26.1
b)
In case of acoustic
Thermopore sheet, the
composite rate will be
increased by Rs.9.00 per Sft.
100Sft.
ditto
1455.20
1455.20
8911.35
8991.50
sq.m
ditto
156.60
156.60
958.85
967.50
100Sft.
ditto
1455.20
1455.20
5086.35
5212.35
sq.m
ditto
156.60
156.60
547.30
560.85
43
Labour
42
Unit
Remarks
41
Composite
Spec.
No.
b)
Labour
a)
Each
260.70
Each
260.70
b)
ditto
130.35
ditto
130.35
chapter-12(Wood Work)
Page 84
Description
44
Labour
Composite
Unit
Labour
Spec.
No.
Composite
a)
Per Sft.
14.40
36.55
sq.m
154.70
393.05
b)
Per Sft.
18.20
68.50
sq.m
195.60
737.00
45
Per Sft.
27.25
73.35
sq.m
293.35
789.15
46
a)
Per Sft.
10.05
11.05
sq.m
108.05
119.10
b)
Per Sft.
15.20
35.60
sq.m
163.35
382.85
47
48
26.12
26.12
Glazing with plate glass 1/4" (6 mm) thick including the cost
of deodar wood fillets and putty:a)
Per Sft.
23.25
86.80
sq.m
250.15
933.85
b)
Per Sft.
23.25
87.00
sq.m
250.25
935.85
Per Sft.
87.95
642.35
sq.m
946.20
6911.95
Per Sft.
87.95
599.05
sq.m
946.20
6445.65
49
Remarks
Providing and fixing 1" (40 mm) thick hollow flush doors
and windows with commercial ply (3 ply) on both faces of
deodar wood shutter frame 1" (30 mm) thick and partal
wood braces at about 3" (75 mm) apart and deodar wood
lipping 1"x3/8" (40 mmx10 mm) fixed with M.S. chowkat
(frame) including chromium plated fittings, etc. complete
in all respects (without sliding bolt or lock):i)
Per Sft.
61.10
518.35
chapter-12(Wood Work)
sq.m
657.55
5577.35
Page 85
Description
ii)
50
Providing and fixing 1" (40mm) thick solid flush door shutter
(Approved Factory Manufactured) with commercial ply (5 mm thick)
on both sides double pressed and deodar wood lipping
1"x3/8" (40mm x 10mm) around shutter including
chromium plated fitting, iron hinges with aluminium kick
plate 22 SWG on both sides & finger plate complete in all
respect.
Per Sft.
Labour
61.10
Composite
485.25
Unit
sq.m
Labour
657.55
Spec.
No.
Composite
5221.10
Per Sft.
33.40
315.10
sq.m
359.45
3390.30
51
Per Sft.
60.25
315.70
sq.m
648.00
3396.85
52
Per Rft.
12.30
19.85
Metre
40.25
65.05
53
Per Rft.
5.10
122.95
Metre
16.80
403.30
54
Per Sft.
36.15
161.10
sq.m
388.75
1733.35
55
Per Sft.
10.40
43.90
sq.m
112.10
472.25
Remarks
Per Sft.
12.80
94.85
chapter-12(Wood Work)
sq.m
137.60
1020.60
Page 86
Description
b)
57
12.80
59.30
Unit
ditto
Labour
137.60
Remarks
Composite
637.95
Rate shall be paid as per surface area of
dolly frame e-g 0.75' x (3.5' + (2 x 7))
Per Sft.
ditto
31.50
31.50
317.45
309.40
sq.m
ditto
338.70
338.70
3415.55
3328.95
Per Sft.
ditto
5.85
5.85
60.35
36.05
sq.m
ditto
62.85
62.85
649.60
387.80
Per Sft
Per Sft
Per Sft
Per Sft
68.25
68.25
68.25
68.25
438.30
480.30
479.25
521.25
sq.m
sq.m
sq.m
sq.m
734.55
734.55
734.55
734.55
4716.25
5168.20
5156.90
5608.80
59
ditto
Composite
Spec.
No.
58
Labour
chapter-12(Wood Work)
Page 87
The rates for all finished works include the removal of surplus debris, unused material and by products
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
a)
100 Sft.
76.55
87.45
sq.m
8.25
9.40
b)
100 Sft.
51.05
90.65
sq.m
5.50
9.75
27.7
100 Sft.
153.10
--
sq.m
16.50
27.3
100 Sft.
612.50
--
sq.m
65.90
27.9
b)
e)
174.25
132.00
333.85
213.60
sq.m
ditto
18.75
14.20
35.90
23.00
100 Sft.
ditto
105.60
89.75
190.80
159.35
sq.m
ditto
11.35
9.65
20.55
17.15
100 Sft.
ditto
174.25
132.00
337.45
256.20
sq.m
ditto
18.75
14.20
36.30
27.55
100 Sft.
ditto
105.60
89.75
190.80
159.35
sq.m
ditto
11.35
9.65
20.55
17.15
d)
100 Sft.
ditto
c)
27.1
27.3 &
27.9
Remarks
Page 88
Description
i) first coat
ii) each subsequent coat
f)
Unit
100 Lft.
ditto
89.75
63.35
174.95
132.95
Metre
ditto
100 Nos.
ditto
252.45
230.05
412.05
315.25
100 Nos
ditto
577.05
343.20
1052.25
580.80
Labour
Composite
2.95
2.10
5.75
4.35
100 Nos.
ditto
252.45
230.05
412.05
315.25
100 Nos
ditto
577.05
343.20
1052.25
580.80
100 Sft.
ditto
250.55
88.60
423.35
287.20
sq.m
ditto
26.95
9.55
45.55
30.90
100 Sft.
ditto
106.35
76.05
250.05
188.85
sq.m
ditto
11.45
8.20
26.90
20.30
i) priming coat.
ii) each subsequent coat of paint.
100 Sft.
ditto
250.55
88.65
419.75
287.25
sq.m
ditto
26.95
9.55
45.15
30.90
100 Sft.
ditto
167.40
76.05
271.20
188.85
sq.m
ditto
18.00
8.20
29.20
20.30
c)
d)
27.1
27.2 &
27.9
b)
Remarks
Composite
Spec.
No.
g)
Labour
Page 89
Description
e)
h)
134.65
50.70
213.60
143.70
Metre
ditto
4.40
1.65
7.00
4.70
100 Nos.
ditto
396.00
193.35
890.70
586.95
100 Nos.
ditto
396.00
193.35
890.70
586.95
i) priming coat.
ii) each subsequent coat of paint.
100 Nos.
ditto
1098.90
332.20
1768.50
1037.80
100 Nos.
ditto
1098.90
332.20
1768.50
1037.80
100 Sft.
16.35
30.40
1.75
3.25
sq.m
first coat
second coat
27.10
100 Sft.
ditto
132.00
107.45
364.15
255.50
sq.m
ditto
14.20
11.55
39.20
27.50
on new work
on old work
27.6
100 Sft.
ditto
1270.95
686.40
1322.35
714.70
sq.m
ditto
136.75
73.85
142.30
76.90
100 Sft.
ditto
ditto
105.60
39.60
39.60
202.80
113.40
97.80
sq.m
ditto
ditto
11.35
4.25
4.25
21.80
12.20
10.50
Remarks
Composite
Labour
Unit
100 Lft.
ditto
i) priming coat.
ii) each subsequent coat of paint.
g)
Composite
Spec.
No.
f)
Labour
first coat
second coat
third coat
Page 90
Description
Labour
Composite
i)
20 lbs. per 100 Sft. (9.07 Kg per Sq.m)
ii) 14 lbs. per 100 Sft. (6.35 Kg per Sq.m)
iii) 10 lbs. per 100 Sft. (4.54 Kg per Sq.m)
100 Sft.
ditto
ditto
127.60
122.50
101.05
1002.15
568.75
547.30
10
Per No.
5.30
5.85
11
Per Letter
5.30
5.60
12
13
Coaltar painting:
a)
b)
14
13.75
13.20
10.85
107.85
61.20
58.90
Per No.
5.30
5.85
27.1
Per Letter
5.30
5.60
27.1
6.00
6.80
ditto
per 25 mm
height
height
100 Sft.
ditto
6.00
108.05
65.45
6.80
793.30
500.20
ditto
sq.m
ditto
11.60
7.05
85.35
53.80
27.8
to
27.11
27.8
100 Sft.
ditto
90.00
136.40
112.80
172.50
sq.m
ditto
9.70
14.70
12.15
18.55
Creosote painting:a)
b)
Remarks
Composite
sq.m
ditto
ditto
per inch
ditto
Labour
Solignum painting:a)
b)
15
Unit
Spec.
No.
ditto
100 Sft.
ditto
108.05
163.70
211.25
336.50
sq.m
ditto
11.60
17.60
22.75
36.20
16
100 Sft.
403.90
418.30
sq.m
43.45
45.00
27.3
17
100 Sft.
153.10
160.30
sq.m
16.50
17.25
ditto
18
Each
26.40
30.85
Each
26.40
30.85
27.1
19
Per Rft.
52.80
173.20
201.15
ditto
20
Per Lft.
26.40
86.60
95.45
27.1
Page 91
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
of a foot (metre)
21
22
a)
262.65
276.65
ditto
Each
ditto
56.55
99.00
87.45
147.00
Each
ditto
56.55
99.00
87.45
147.00
27.1
Each
ditto
7.55
13.20
11.10
19.50
Each
ditto
7.55
13.20
11.10
19.50
Each
ditto
63.35
104.55
83.15
138.15
Each
ditto
63.35
104.55
83.15
138.15
100 Sft.
306.25
sq.m
32.95
23
24
c)
80.10
b)
Per Lft.
27.12
27.1
Khanki paint
Aluminium paint
100 Sft.
ditto
612.50
612.50
sq.m
ditto
25
per letter
per inch
height
8.45
26
100 Sft.
459.35
495.35
27
100 Sft.
612.50
28
100 Sft.
29
30
65.90
65.90
8.45
8.45
27.1
sq.m
49.45
53.30
27.9
27.10
636.50
sq.m
65.90
68.50
27.12
510.40
520.40
sq.m
54.90
56.00
100 Sft.
153.10
194.00
sq.m
16.50
20.85
27.9
Each
102.30
109.60
Each
102.30
109.60
27.3
Page 92
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
hooks.
31
32
first coat
2nd and each subsequent coat
27.12
100 Sft.
ditto
126.40
97.15
269.55
210.30
sq.m
ditto
13.60
10.45
29.00
22.65
new surface:
i) 1st coat
ii) 2nd and subsequent coat
b)
27.12
100 Sft.
ditto
126.40
97.15
192.10
155.15
sq.m
ditto
13.60
10.45
20.65
16.70
100 Sft.
ditto
126.40
97.15
154.65
124.70
sq.m
ditto
13.60
10.45
16.65
13.40
i) 1st coat
ii) 2nd coat
%sft
%sft
469.90
255.40
763.10
375.20
sq.m
sq.m
50.55
27.50
82.10
40.35
old surface:
%sft
255.40
375.20
sq.m
27.50
40.35
old surface:
i) 1st coat
ii) 2nd and subsequent coat
b)
new surface:
33
Painting traffic lane 5" (125 mm) wide, with road marking
enamel.
Per Rft.
0.80
1.50
Metre
2.60
4.90
34
Per Rft.
1.05
8.10
Metre
3.45
26.60
Per Job
29.25
59.85
Job
29.25
59.85
Per Job
68.20
176.80
Job
68.20
176.80
35
36
AASHTO
M248-91
(2000)
Page 93
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Rft.
ditto
ditto
0.60
1.25
2.10
2.05
3.05
4.80
Metre
ditto
ditto
2.05
4.10
6.80
5.55
10.00
15.70
38
Per Job
13.50
57.40
Job
13.50
57.40
39
100 Sft.
per coat
49.00
sq.m
5.25
Page 94
Rates for all finished works include the removal of surplus debris, unused material and byproducts
The rates also include curing for specified period wherever necessary.
Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment
Description
in bed
on slope
in bed
on slope
in bed
on slope
in bed
on slope
in bed
on slope
28.1 to 28.3
100Sft.
ditto
340.35
464.65
sq.m
ditto
36.60
50.00
100Sft.
876.50
1319.30
sq.m
94.30
141.95
in bed
b)
on slope
ditto
ditto
100Sft.
ditto
633.60
799.90
847.85
1014.20
sq.m
ditto
68.20
86.05
91.25
109.15
ditto
100Sft.
ditto
633.60
799.90
1008.35
1174.70
sq.m
ditto
68.20
86.05
108.50
126.40
ditto
100Sft.
ditto
799.90
1008.50
1701.30
1909.85
sq.m
ditto
86.05
108.50
183.05
205.50
100Cft.
ditto
3851.10
4398.90
13757.65
14305.45
cu.m
ditto
1360.20
1553.70
100Cft.
3851.10
14994.90
cu.m
1360.20
5296.20
ditto
4398.90
15542.70
ditto
1553.70
5489.70
chapter-14(Lining of canal)
28.2 to 28.3
28.2 to 28.3
4859.20
5052.70
Remarks
Composite
Labour
Unit
Composite
Spec.
No.
Labour
Page 95
Description
Unit
Labour
in bed
on slope
100Cft.
ditto
3851.10
4398.90
16691.65
17239.45
cu.m
ditto
1360.20
1553.70
in bed
on slope
100Cft.
ditto
3851.10
4398.90
17928.90
18476.70
cu.m
ditto
1360.20
1553.70
ditto
6332.50
6525.95
20.1, 28.1
& 28.3
b)
28.2
5895.50
6089.00
Remarks
Composite
10
Composite
Spec.
No.
Labour
100Cft.
ditto
ditto
3186.50
3186.50
3186.50
17262.95
15220.10
13773.35
cu.m
ditto
ditto
1125.45
1125.45
1125.45
6097.30
5375.75
4864.75
100Cft.
ditto
ditto
3696.00
3696.00
3696.00
17772.50
15729.60
14282.90
cu.m
ditto
ditto
1305.45
1305.45
1305.45
6277.25
5555.70
5044.70
chapter-14(Lining of canal)
Page 96
Description
2
3
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per
cut
81.85
Per
cut
81.85
29.129.3
Per cut
121.10
Per cut
121.10
ditto
100Sft.
2003.75
sq.m
215.60
ditto
Driving steel piles,more than 15' (4.6 m) and less than 25'
(7.5 m).
100Sft.
1921.90
sq.m
206.80
ditto
ditto
100Sft.
1430.90
sq.m
153.95
ditto
ditto
Dolleying piles.
Each
126.70
Each
126.70
ditto
Each
11.25
Each
11.25
ditto
Per Ft.
1865.60
Metre
6119.15
ditto
o.
Turning Machine, 90
Per
Job
2830.10
Per
Job
2830.10
29.1 to
29.3
10
Per
Job
3484.80
Per
Job
3484.80
ditto
11
Per
Job
4752.00
Per
Job
4752.00
29.1 to
29.3
chapter-15(Sheet piling)
Page 97
Description
12
13
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per
Chain
5617.90
30 M.
5617.90
ditto
Ton
113.30
Tonne
111.50
ditto
14
Each
11400.40
Each
11400.40
ditto
15
Each
13154.30
Each
13154.30
ditto
16
per
chain
2283.60
30 M
2283.60
ditto
chapter-15(Sheet piling)
Remarks
Page 98
3
4
Rates for all finished works include the removal of surplus debris, unused material and byproducts
The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage
of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport is
adopted. The supply and carriage to site of work of all other material required in the item, is included in the
composite rates.
The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reduction
factor) of the stone, boulders, shingle or spawl carried.
Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/or labour only;
or where such stone product is supplied, carried or handled by the contractor in which no laying is required,
the actual stack measurement (without any reduction factor) shall from the basis of payment of supply or
carriage of the stone, boulder or spawl, etc. The quantity of finished and completed item of work shall form the
basis of laying.
In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. within
one mile (1.6 Km.)
i)
the cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafter
from the point of supply.
ii)
if the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collected
and measured at site of work and no extra carriage would be admissible in such cases.
iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the point
of supply will be fixed carefully by the Engineer-in-charge in such a way that the carriage charges would
be arrived at, most economically. Extra carriage will be admissible from the place of supply of the
material which will be considered its starting point. The demarcation of the place of supply will be
pre-determined before calling the tenders.
Sr.
No.
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Cft.
581.85
cu.m
205.50
Weaving matresses.
100Cft.
1102.45
cu.m
389.35
a)
Per
Bag
17.25
29.60
Per Baq
17.25
29.6
b)
ditto
26.80
39.15
Per Baq
26.80
39.15
a)
Per
Bag
41.25
88.05
Per
Bag
41.25
88.05
Remarks
Page 99
Description
b)
ditto
58.90
Composite
105.70
Unit
Labour
ditto
58.90
% Nos
153.10
Per 30 m
55.10
Spec.
No.
Remarks
Composite
105.7
-ditto-
100 Nos
153.10
b)
Per chain
per 100
Nos
55.10
ditto
21.45
100 Nos
612.50
% Nos
612.50
per chain
per 100Nos
214.35
Per 30 m
per %Nos
214.35
ditto
82.70
ditto
82.70
c)
Labour
ditto
21.45
a)
b)
c)
100Sft.
344.50
sq.m
37.05
b)
100Sft.
574.20
sq.m
61.80
c)
ditto
669.90
ditto
72.10
100 Nos
535.90
% Nos
535.90
563.90
563.9
Page 100
Description
Labour
100Cft.
746.45
100Cft.
Composite
818.70
Unit
Labour
cu.m
263.65
367.50
cu.m
129.80
100Cft.
1108.60
cu.m
391.50
Spec.
No.
Remarks
Composite
289.15
b)
ditto
741.10
ditto
261.70
c)
ditto
878.90
ditto
310.40
Each
47.85
79.25
Each
47.85
79.25
100Sft.
ditto
ditto
554.40
594.00
594.00
813.10
1434.00
1911.10
sq.m
ditto
ditto
59.65
63.90
63.90
87.50
154.30
205.65
100Sft.
ditto
ditto
712.80
792.00
792.00
1101.70
2049.50
2763.50
sq.m
ditto
ditto
76.70
85.20
85.20
118.55
220.50
297.35
100Cft.
382.80
673.20
cu.m
135.20
237.75
100Cft.
ditto
ditto
669.90
669.90
516.80
1065.90
960.30
1440.80
cu.m
ditto
ditto
236.60
236.60
182.55
376.4
339.15
508.90
b)
stone or boulder
shingle or spawl
brick bats
stone or boulder
shingle or spawl
100Cft.
ditto
1201.20
1201.20
1597.20
1491.60
cu.m
ditto
424.25
424.25
564.15
526.85
Page 101
Description
c)
brick bats
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
ditto
1048.10
1972.10
ditto
370.20
696.55
100Cft.
906.85
1830.85
cu.m
320.30
646.65
100Cft.
1098.25
13158.25
cu.m
387.90
4647.5
100Cft.
ditto
1251.35
1251.35
1647.35
1541.75
cu.m
ditto
442.00
442.00
581.85
544.55
100Cft.
134.75
cu.m
47.60
100Cft.
673.75
cu.m
237.95
100Sft.
382.80
782.80
sq.m
41.20
84.25
30.1
100Sft.
957.00
997.00
sq.m
102.95
107.30
ditto
100Sft.
2192.75
3123.70
sq.m
235.95
336.10
100Sft.
730.60
792.10
sq.m
78.60
85.25
100Sft.
1256.65
1330.05
sq.m
135.20
143.1
100Cft.
792.00
1464.30
cu.m
279.75
517.2
100Cft.
2633.40
3231.00
cu.m
930.10
1141.2
stone or boulder
shingle or spawl
Page 102
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
one slope
on level
100Cft.
ditto
2138.40
1947.00
2736.00
2544.60
cu.m
ditto
755.30
687.70
966.35
898.75
on level
100Cft.
547.80
811.80
cu.m
193.50
286.75
b)
on slope
ditto
699.60
963.60
ditto
247.10
340.35
100Cft.
ditto
ditto
2905.60
2714.20
1540.85
5129.65
4938.25
3839.60
cu.m
ditto
ditto
1026.25
958.65
544.20
1811.80
1744.20
1356.15
100Sft.
ditto
938.65
808.50
4160.30
2435.00
sq.m
ditto
101.00
87.00
447.65
262.00
100Sft.
323.40
863.40
sq.m
34.80
92.90
100Cft.
478.50
1414.50
cu.m
169.00
499.6
100Cft.
1971.00
cu.m
696.15
100Cft.
612.50
cu.m
216.35
100Cft.
547.80
1483.80
cu.m
193.50
524.10
100Cft.
547.80
1171.80
cu.m
193.50
413.90
100Cft.
459.35
cu.m
162.25
Page 103
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
15.50
Each
15.50
b)
ditto
17.40
ditto
17.40
c)
Each
23.25
ditto
23.25
d)
ditto
58.10
ditto
58.10
100 Nos
765.60
% Nos
765.60
793.60
100 Nos
316.80
100 Nos
316.80
iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).
100 Nos
458.30
100 Nos
458.30
Per Chain
of One
Row
38.30
60.10
Per 30
Metre
of one
row
38.30
60.10
ditto
582.90
733.30
ditto
582.90
733.30
100 Nos
79.65
111.50
100 Nos
79.65
111.50
100 Nos
316.80
100 Nos
316.80
iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).
100 Nos
550.90
100 Nos
550.90
b)
793.60
Page 104
Description
ditto
Composite
38.30
100 Nos
99.65
100 Nos
333.15
iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.5' (450 mm) below the available bed
or ground (average).
100 Nos
633.60
Per
Chain of
one row
38.30
Per chain
of one row
Unit
Per
30 M of
one row
1366.20
ditto
38.30
1366.20
100 Nos
333.15
100 Nos
633.60
60.15
Per
30 M
of one
row
38.30
60.15
613.80
824.20
Per 30 M
of one row
613.80
824.20
100 Nos
1531.20
1579.05
100 Nos
1531.20
1579.05
100 Nos
396.55
100 Nos
396.55
iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.75' (530 mm) below the available
bed or ground (average).
100 Nos
760.30
100 Nos
760.30
Per
Remarks
Composite
99.65
139.50
Labour
Spec.
No.
100 Nos
Per
Chain of
one row
Labour
139.50
Per Chain
Page 105
Description
Chain of
one row
Labour
Composite
38.30
Unit
Labour
Spec.
No.
Composite
38.30
60.10
ditto
1557.60
1813.10
ditto
1557.60
1813.10
100 Nos
1148.40
1247.60
100 Nos
1148.40
1247.60
100 Nos
506.90
100 Nos
506.90
100 Nos
839.00
100 Nos
839.00
Per chain
of one row
38.30
50.40 Per 30 M
of one row
Remarks
38.30
50.4
Per 30 M
of one row
1762.20
2062.80
Per
Chain of
one row
1762.20
2062.80
100 Nos
6600.00
100 Nos
6600.00
100 Nos
443.50
100 Nos
443.50
100 Nos
918.70
100 Nos
918.70
Page 106
Description
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
Munj, Patha Ban, two lines, including tying around
the Bamboos.
v) Cutting and supplying brushwood from canal
plantation or private source, lead within one mile
(1.6 Km), and wattling between stakes and
intertwining (thickness of wattled brushwood 1.0'
(300 mm) average).
b)
c)
Labour
Per
Chain of
one row
ditto
Composite
Unit
Per 30 M
of one
Row
57.40
91.70
2158.20
2548.60
ditto
10200.00
100 Nos
Labour
Spec.
No.
Composite
57.40
91.70
2158.20
2548.60
100 Nos
100 Nos
506.90
100 Nos
506.90
100 Nos
997.40
100 Nos
997.40
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per chain
of one
row
191.40
191.40
802.10
ditto
2643.30
2643.30
3139.30
3139.30
ditto
10800.00
100 Nos
100 Nos
100 Nos
570.25
100 Nos
570.25
100 Nos
1140.50
100 Nos
1140.50
Per chain
of one row
191.40
ditto
3128.40
Per 30 M
802.10 of one row
3699.60
ditto
10200
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per 30 M
802.10 of one Row
Remarks
10800.00
191.40
802.10
3128.40
3699.60
Page 107
Description
Spec.
No.
Unit
Labour
100 Nos
100 Nos
633.60
100 Nos
633.60
100 Nos
1267.20
100 Nos
1267.20
Per Chain
of one
Row
191.40
802.10
Per 30 M
of one
Row
191.40
802.10
ditto
3600.95
4262.30
ditto
3600.95
4262.30
12600.00
100 Nos
Composite
Unit
Labour
100 Nos
Remarks
Composite
100 Nos
100 Nos
760.30
100 Nos
760.30
100 Nos
1520.65
100 Nos
1520.65
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per Chain
of one
row
191.40
802.10
Per 30 M
of one
row
191.40
802.10
ditto
4507.80
5349.40
ditto
4507.80
5349.40
100Cft.
191.40
251.40
cu.m
67.60
88.80
12000.00
12000.00
12600.00
Page 108
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Cft.
153.10
cu.m
54.10
Per
Chain
367.50
Per
30 M
367.50
46 a)
b)
100Sft.
100Sft.
1990.55
1684.30
Sq.m
Sq.m
214.20
181.25
Remarks
Page 109
17. OUTLETS
Rates for all finished works include the removal of surplus debris, unused material and byproducts
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Job
638.00
Job
638.00
b)
Job
842.15
Job
842.15
c)
Job
1276.00
Job
1276.00
d)
Job
1722.60
Job
1722.60
e)
Job
2552.00
Job
2552.00
Dismantling outlets:-
17.1
to
17.5
18.1
a)
Each
638.00
Each
638.00
b)
ditto
957.00
ditto
957.00
c)
ditto
1276.00
ditto
1276.00
d)
ditto
1595.00
ditto
1595.00
e)
ditto
957.00
ditto
957.00
f)
ditto
1276.00
ditto
1276.00
g)
ditto
1595.00
ditto
1595.00
Each
344.10
Each
344.10
Job
702.25
Job
702.25
639.90
-
chapter-17(Outlet)
Remarks
18.1, 21.1
& 21.2
Page 110
Description
Each
Labour
702.25
Composite
Unit
Each
Labour
702.25
Spec.
No.
Composite
18.1, 21.1
& 21.2
17.1
to
17.2
Each
ditto
1531.20
2067.10
Each
ditto
1531.20
2067.10
Each
367.40
779.25
Each
367.40
779.25
18.1, 21.1
& 21.2
Each
712.80
1384.80
Each
712.80
1384.80
ditto
834.25
625.70
500.55
417.10
333.70
944.40
735.90
610.70
502.40
394.20
Each
ditto
ditto
ditto
ditto
834.25
625.70
500.55
417.10
333.70
944.40
735.90
610.70
502.40
394.20
Each
344.10
534.30
Each
344.10
534.30
Per Lft.
16.70
Metre
54.75
Each
311.35
to
638.00
Each
253.90
10
11
12
Each
311.35
to
638.00
13
Each
253.90
14
Remarks
21.1, 21.2
& 17.1 to
17.5
At the discretion of the
Engineer-in-charge depending upon
the distance and source of supply.
17.1 to 17.5
& 21.1 to
21.2
Rft.
ditto
62.05
27.95
69.40
35.30
chapter-17(Outlet)
Metre
ditto
203.55
91.65
227.65
115.75
Page 111
Description
15
Composite
Unit
Labour
Spec.
No.
Rft.
ditto
51.05
19.15
Rft.
ditto
72.60
36.30
Metre
ditto
167.45
62.80
Metre
ditto
238.20
119.10
Remarks
Composite
16
Labour
17.1
to
17.5
79.95
43.65
chapter-17(Outlet)
262.3
143.2
Page 112
Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 1971".
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft.
2276.95
13770.55
cu.m
804.20
4863.75
521-1
to
521-6
100Cft.
1818.15
2736.15
cu.m
642.15
966.40
501-1
to
501-6
a)
i)
ii)
ditto
100Cft.
100Cft.
1818.15
1818.15
2250.15
2466.15
100Cft. of
consolidated
sub-base
cu.m
cu.m
642.15
642.15
794.75
871.05
1) The carriage of the whole distance
to the site of work shall be
calculated on the basis of the rates
of the actual means of transport
used in carriage, i.e. road and/or rail,
as the case may be.
Page 113
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
aggregate for payment of carriage shall
be taken as per actual loose volume but
not more than 120 Cft.
a)
b)
100Cft.
2022.75
4081.95
cu.m
714.45
1441.75
501-1
to
501-6
100Cft. of
consoledated
base
Providing and laying road edging of 3" (75 mm) wide and
9" (225 mm) deep brick on end, complete in all respects.
Per Rft.
5.35
28.50
Metre
17.55
93.50
552-1 to
552-5
100Sft.
76.55
962.10
sq.m
8.25
103.50
601-1 to
601-6
100Sft.
76.55
490.05
sq.m
8.25
52.75
611-1 to
611-5
a)
612-1 to
612-6
Page 114
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
1) 1st coat:i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25
100Sft.
81.30
2024.60
Sq.m
8.75
217.85
100Sft.
81.30
1768.40
Sq.m
8.75
190.30
100Sft.
62.55
1265.65
Sq.m
6.75
136.20
100Sft.
62.55
929.20
Sq.m
6.75
100.00
100Sft.
42.80
715.55
sq.m
4.60
77.00
sq.metre.
ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8"
(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metre
b)
100Cft.
cu.m
Page 115
Description
a)
11
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
612-1
to
612-6
100Sft.
54.20
1114.20
sq.m
5.85
119.90
ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8"
(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006
cu.metre bajri per sq.metre.
100Sft.
54.20
1012.00
sq.m
5.85
108.90
100Cft.
cu.m
per inch
thickness
per 100Sft.
-do-do-do-do-do-do-do-
958.10
958.10
958.10
958.10
958.10
958.10
958.10
3048.05
3301.30
3554.55
3807.75
4060.85
4314.25
4567.45
per 25mm
thickness
per Sq.m
-do-do-do-do-do-do-do-
103.15
103.15
103.15
103.15
103.15
103.15
103.15
100Sft.
127.60
Sq.m
13.75
Per Rft.
67.70
790.20
Metre
222.05
2592.50
901-1
to
901-4
Per Rft. of
50.25
630.45
Metre
164.85
2068.40
ditto
b)
10
Labour
641-1 to
642-6
328.10
355.35
382.60
409.85
437.10
464.40
491.65
-
Incidental Construction
12
13
Page 116
Description
Labour
Composite
Spec.
No.
Unit
Labour
Each set
of one
end
2184.00
0.95
Composite
standard drawing.
3 rows of
Pipes
14
Each Set
of one
end
2184.00
15
Per
Cu. Inch
15.60
cu.cm
16
Per Rft.
40.90
159.35
Metre
134.25
522.80
921-1 to
921-4
17
Each
20.45
197.05
Each
20.45
197.05
931-1 to
933-4
18
19
Each
Each
Each
1300.55
65.25
124.05
3275.00
262.70
460.70
Each
Each
Each
1300.55
65.25
124.05
3275.00
262.70
460.70
a) Mandatory.
b) Warning/Direction/Informatory.
Each
Each
420.30
407.60
3754.05
3513.90
Each
Each
420.30
407.60
3754.05
3513.90
100Cft.
1605.10
13098.70
cu.m
566.95
4626.45
Remarks
911-1 to
911-6
ditto
Page 117
Rates for all finished works include the removal of surplus debris, unused material & by products.
The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of
Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,
Vol II, 1966 (Public Health Works).
The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.
Sr.
No.
Unit
Labour
Composite
Remarks
white
coloured
Each
Each
204.60
204.60
1,830.80
1,982.00
Each
Each
204.60
204.60
1,830.80
1,982.00
Each
Each
2.15
2.15
302.15
206.15
Each
Each
2.15
2.15
302.15
206.15
Each
Each
150.15
150.15
1,001.20
1,181.20
Each
Each
150.15
150.15
1,001.20
1,181.20
Composite
Spec.
No.
Labour
bakelite
plastic
white
coloured
Each
150.15
1,791.75
Each
150.15
1,791.75
Each
150.15
461.20
Each
150.15
461.20
Each
Each
Each
Each
198.00
198.00
174.10
174.10
2,170.80
2,317.20
1,462.90
1,520.50
Each
Each
Each
Each
198.00
198.00
174.10
174.10
2,170.80
2,317.20
1,462.90
1,520.50
Providing and fixing stainless steel sink with drain board, size
120x60 cm (48"x24") including bracket set, waste pipe and
waste coupling.
Each
174.10
4,001.55
Each
174.10
4,001.55
Each
174.10
895.60
Each
174.10
895.60
Page 118
Description
Labour
Composite
Unit
Labour
Composite
Spec.
No.
Remarks
60x45 cm (24"x18")
37.5x45 cm (15"x18")
10
11
12
white
coloured
Each
Each
174.10
174.10
1,427.15
1,247.15
Each
Each
174.10
174.10
1,427.15
1,247.15
Each
102.30
765.90
Each
102.30
765.90
Each
Each
174.10
174.10
1,114.45
1,185.25
Each
Each
174.10
174.10
1,114.45
1,185.25
Each
Each
174.10
174.10
940.45
940.45
Each
Each
174.10
174.10
940.45
940.45
Each
174.10
1,121.10
Each
174.10
1,121.10
Each
Each
184.30
184.30
2,199.35
1,419.35
Each
Each
184.30
184.30
2,199.35
1,419.35
Each
10.25
168.65
Each
10.25
168.65
Each
Each
10.25
10.25
432.65
192.65
Each
Each
10.25
10.25
432.65
192.65
Each
13.65
358.85
Each
13.65
358.85
white
coloured
13
Providing and fixing white enameled cast iron low down flushing
cistern 13.63 litres (3 gallons) capacity, including bracket
set, copper connection, etc.
14
15
16
white
coloured
17
18
Page 119
Description
i)
ii)
19
20
21
Composite
Each
Each
13.65
13.65
317.25
257.25
Each
Each
13.65
13.65
317.25
257.25
Each
25.60
330.40
Each
25.60
330.40
Each
Each
31.95
20.45
311.20
62.45
Each
Each
31.95
20.45
311.20
62.45
White
Coloured
Each
Each
31.95
31.95
821.20
941.20
Each
Each
31.95
31.95
821.20
941.20
Each
Each
Each
Each
10.25
13.65
13.65
13.65
135.45
187.25
205.25
381.85
Each
Each
Each
Each
10.25
13.65
13.65
13.65
135.45
187.25
205.25
381.85
2 cm (")
1.5 cm (")
Each
Each
13.65
13.65
493.65
650.85
Each
Each
13.65
13.65
493.65
650.85
Each
Each
13.65
13.65
247.65
161.25
Each
Each
13.65
13.65
247.65
161.25
Each
20.25
437.95
Each
20.25
437.95
Each
Each
13.65
13.65
313.65
293.25
Each
Each
13.65
13.65
313.65
293.25
Each
13.65
426.45
Each
13.65
426.45
2 cm (")
1.5 cm (")
25
26
27
Labour
24
Unit
Remarks
23
Composite
Spec.
No.
22
Labour
Page 120
Description
28
1.5x10 cm ("x4")
2x15 cm ("x6")
29
30
30 mm (1") dia
40 mm(1") dia
50 mm(2") dia
65 mm(2") dia
80 mm(3") dia
Composite
Each
Each
13.65
13.65
307.65
373.65
Each
Each
13.65
13.65
307.65
373.65
Each
17.05
1,448.65
Each
17.05
1,448.65
Each
Each
Each
Each
Each
20.45
20.45
20.45
20.45
20.45
399.65
548.45
746.45
1,196.45
1,772.45
Each
Each
Each
Each
Each
20.45
20.45
20.45
20.45
20.45
399.65
548.45
746.45
1,196.45
1,772.45
Each
Each
Each
13.65
20.45
27.30
343.65
590.45
717.30
Each
Each
Each
13.65
20.45
27.30
343.65
590.45
717.30
Each
Each
13.65
13.65
115.65
193.65
Each
Each
13.65
13.65
115.65
193.65
Each
Each
40.90
40.90
332.05
332.05
Each
Each
40.90
40.90
332.05
332.05
Each
Each
34.10
34.10
400.95
94.95
Each
Each
34.10
34.10
400.95
94.95
Each
51.15
578.95
Each
51.15
578.95
13 mm (") dia
20 mm (") dia
34
Labour
33
Unit
Remarks
32
Composite
Spec.
No.
31
Labour
10x5 cm (4"x2")
10x7.5 cm (4"x3")
35
36
Page 121
Description
a) 10 cm (4") i/d
b) 5 cm (2") i/d
ii)
Labour
Composite
Per foot
Per foot
17.90
7.15
183.60
86.70
Metre
Metre
58.75
23.50
602.15
284.45
Per foot
Per foot
3.85
1.55
116.75
75.55
Metre
Metre
12.60
5.05
382.90
247.80
60 (2)" mm i/d
80 (3") mm i/d
100 (4") mm i/d
150 (6") mm i/d
Per foot
Per foot
Per foot
Per foot
3.10
3.40
3.85
5.15
25.30
61.85
96.35
120.95
Metre
Metre
Metre
Metre
10.10
11.20
12.60
16.85
82.95
202.85
316.10
396.70
14.50
8.80
135.50
101.10
Each
Each
Each
20.45
20.45
33.65
Per foot
i)
single way
ii) two way
iii) three way
42
43
39
Unit
Remarks
38
Composite
Spec.
No.
37
Labour
Kg
Kg
14.50
8.80
135.50
101.10
157.25
800.45
1,353.65
Each
Each
Each
20.45
20.45
33.65
157.25
800.45
1,353.65
8.95
32.95
Metre
29.35
108.10
Each
Each
Each
13.65
20.45
27.30
175.65
260.45
447.30
Each
Each
Each
13.65
20.45
27.30
175.65
260.45
447.30
Each
10.25
22.25
Each
10.25
22.25
Each
Each
2.15
77.50
74.15
92.15
Each
Each
2.15
77.50
74.15
92.15
40
41
a)
b)
15 mm (") dia
20 mm (") dia
Page 122
Description
44
Composite
Spec.
No.
Unit
Labour
Composite
69.40
105.40
Each
Each
3.40
3.40
69.40
105.40
Remarks
45
Labour
15 mm (") dia
20 mm (") dia
Each
Each
3.40
3.40
Each
204.60
Each
204.60
Each
Each
20.45
20.45
98.45
104.45
Each
Each
20.45
20.45
98.45
104.45
Each
Each
0.80
0.80
42.80
48.80
Each
Each
0.80
0.80
42.80
48.80
Each
Each
10.25
10.25
34.25
40.25
Each
Each
10.25
10.25
34.25
40.25
Each
Each
9.10
9.10
33.10
39.10
Each
Each
9.10
9.10
33.10
39.10
Each
Each
20.45
20.45
500.45
620.45
Each
Each
20.45
20.45
500.45
620.45
Each
Each
20.45
20.45
133.25
145.25
Each
Each
20.45
20.45
133.25
145.25
Each
Each
8.20
8.20
38.20
74.20
Each
Each
8.20
8.20
38.20
74.20
Replacement
1
3 cm (1") i/d
4 cm (1")
3 cm (1")
4 cm (1")
3 cm (1")
4 cm (1")
3 cm (1")
4 cm (1")
3 cm (1")
4 cm (1")
Page 123
Description
Labour
Composite
Unit
Labour
Composite
197.05
257.05
317.05
341.05
485.05
839.05
Each
Each
Each
Each
Each
Each
17.05
17.05
17.05
17.05
17.05
17.05
197.05
257.05
317.05
341.05
485.05
839.05
Spec.
No.
Remarks
Each
Each
Each
Each
Each
Each
17.05
17.05
17.05
17.05
17.05
17.05
Page 124
Specification No. correspond to Book of Specification (B & R Department ) Vol. 11, 1966 (public Health Works).
2.
Rates for all finished works include the removal of surplus debris, unused material and by products
Description
B)
Labour
Composite
17.1
100Rft
ditto
736.55
736.55
3,338.45
3,188.10
Metre
ditto
24.15
24.15
109.50
104.55
100Rft
ditto
1,103.75
1,103.75
4,855.55
4,627.45
ditto
ditto
36.20
36.20
159.25
151.80
ratio 1:3
ratio 1:5
ratio 1:6
17.1
100Sft.
ditto
ditto
1,088.40
1,088.40
1,088.40
4,708.10
4,466.70
4,398.80
Sqm.
ditto
ditto
117.10
117.10
117.10
506.60
480.60
473.30
Unit
Remarks
Composite
Spec.
No.
Labour
ratio 1:3
ratio 1:5
ratio 1:6
17.1
100Sft.
ditto
ditto
1,557.60
1,557.60
1,557.60
7,013.60
6,626.40
6,530.05
Sqm.
ditto
ditto
167.60
167.60
167.60
754.65
713.00
702.65
17.2
chapter-20(Surface Drainage)
Page 125
Description
a)
b)
c)
5
1,008.50
1,008.50
1,008.50
Composite
Unit
Labour
Composite
4,628.15
4,386.80
4,318.85
Sqm.
ditto
ditto
108.50
108.50
108.50
498.00
472.00
464.70
ratio 1:3
ratio 1:5
ratio 1:6
Type I
Type II
Type III
Type IV
Type V
Type VI
Type VII
Type VIII
Type IX
Type X
Type XI
Type XII
Laying R.C.C hume pipes in position, including jointing:a) 6" to 12" (150 mm to 300 mm ) dia
b) 12" to 24" (300 mm to 600 mm) dia
c) 24" to 36" (600 mm to 900 mm) dia
Remarks
17.2
100Sft.
ditto
ditto
1,538.60
1,538.60
1,538.60
6,994.55
6,607.40
6,511.05
Sqm.
ditto
ditto
165.55
165.55
165.55
752.60
710.95
700.60
100Sft.
ditto
ditto
Spec.
No.
ratio 1:3
ratio 1:5
ratio 1:6
Labour
17.1
Per Rft
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
24.25
48.50
61.40
73.15
96.05
110.40
122.40
136.70
181.55
199.45
223.10
237.80
78.50
140.15
179.85
213.90
292.15
334.15
367.15
412.50
589.25
645.50
717.75
760.35
Metre
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
79.55
159.10
201.40
239.85
315.10
362.15
401.40
448.35
595.45
654.20
731.75
780.05
257.55
459.65
590.00
701.65
958.20
1,095.95
1,204.25
1,352.95
1,932.75
2,117.25
2,354.20
2,493.85
Per Lft.
ditto
ditto
43.80
66.80
87.65
46.55
72.30
95.90
Metre
ditto
ditto
143.75
219.10
287.50
152.75
237.05
314.60
chapter-20(Surface Drainage)
Page 126
21. SEWERAGE
1
2
Specification No. correspond to Book of Specification of B&R Department Vol. II, 1966 (Public Health Works).
Rate for all finished works include the removal of surplus debris, unused material and byproducts
Description
Composite
Unit
Labour
Spec.
No.
Chapter - 8
Rft.
Rft.
Rft.
10.40
12.65
24.50
62.85
100.50
260.30
Metre
Metre
Metre
34.10
41.50
80.35
206.15
329.65
853.80
ditto
Rft.
Rft.
Rft.
Rft.
Rft.
7.80
9.45
15.20
16.55
16.90
31.00
44.85
61.60
78.95
87.85
Metre
Metre
Metre
Metre
Metre
25.60
31.00
49.85
54.30
55.45
101.70
147.10
202.05
258.95
288.15
ditto
Remarks
Composite
Labour
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
25.60
32.20
38.90
48.80
56.40
82.70
99.10
123.20
151.65
197.35
368.45
504.90
648.95
332.95
407.85
440.30
567.60
681.45
951.30
1013.00
1183.25
1606.95
2092.50
2748.70
3428.20
3897.05
chapter-21(Sewerage)
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
83.95
105.60
127.60
160.05
185.00
271.25
325.05
404.10
497.40
647.30
1208.50
1656.05
2128.55
1092.10
1337.75
1444.20
1861.75
2235.15
3120.25
3322.65
3881.05
5270.80
6863.40
9015.75
11244.50
12782.30
Page 127
Description
1005.30
1242.55
Composite
4578.20
5140.25
Unit
Metre
Metre
Labour
3297.40
4075.55
Remarks
15016.50
16860.00
Chapter-8
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
25.60
32.20
38.90
48.80
56.40
82.70
99.10
123.20
151.65
197.35
374.05
512.75
658.75
1021.00
1262.10
403.25
496.60
626.80
766.25
891.25
1059.35
1278.85
1420.90
1914.95
2489.10
2993.20
3763.55
4652.20
5995.80
7395.80
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
83.95
105.60
127.60
160.00
184.95
271.15
325.10
404.10
497.40
647.30
1226.85
1681.80
2160.65
3348.80
4139.70
1322.65
1628.85
2055.90
2513.30
2923.30
3474.65
4194.65
4660.55
6281.05
8164.25
9817.70
12344.45
15259.20
19666.20
24258.20
Chapter - 8
Spec.
No.
Composite
Rft.
Rft.
Labour
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
25.60
32.20
38.90
48.80
56.40
82.70
99.10
123.20
151.65
197.35
374.05
512.75
658.75
1021.00
1262.10
504.20
630.45
756.85
886.35
1013.65
1334.75
1535.80
1703.65
2422.90
2966.45
3538.65
4779.50
6029.20
5995.80
7395.80
chapter-21(Sewerage)
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
83.95
105.60
127.60
160.00
184.95
271.15
325.10
404.10
497.40
647.30
1226.60
1682.00
2160.65
3348.80
4139.70
1653.85
2067.90
2482.40
2907.30
3324.70
4378.00
5037.65
5587.95
7947.10
9730.00
11606.85
15676.70
19775.85
19666.25
24258.15
Page 128
Description
Composite
Unit
Labour
Spec.
No.
Rft of
laid sewer
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
Metre of
168.10 laid sewer
324.55
ditto
549.55
ditto
791.30
ditto
1097.20
ditto
1357.95
ditto
1621.60
ditto
1862.20
ditto
2024.25
ditto
2330.35
ditto
2589.35
ditto
2868.65
ditto
Remarks
Composite
Labour
551.40
1064.50
1802.45
2595.45
3598.80
4454.15
5318.75
6108.05
6639.55
7643.45
8493.00
9409.10
16.2
a)
Each
499.45
2542.65
Each
499.45
2542.65
b)
ditto
499.45
2322.65
ditto
499.45
2322.65
Each
1505.45
7235.75
Each
1505.45
7235.75
ditto
100Sft.
675.45
1087.80
Sq.m
72.70
117.05
14.4
10
100Sft.
938.10
2525.50
Sq.m
100.95
271.75
13.1
11
100Sft.
570.25
1691.30
Sq.m
61.35
182.00
13.1
12
13.1
a)
Carpetted road, with 2" (50 mm) carpet and 10" (250
mm) depth of stone metal for sub-base and base
100Sft.
2416.20
8234.30
Sq.m
260.00
886.00
b)
Carpeted road, with 1" (38 mm) carpet and 6" (150
mm) depth of stone metal, for sub-base and base
100Sft.
1740.80
6087.45
Sq.m
187.30
655.00
chapter-21(Sewerage)
Page 129
Description
c)
13
Labour
Composite
Unit
648.95
3902.55
Sq.m
69.85
419.90
Each
67.30
218.10
Each
67.30
218.10
Per
set
165.15
14.7
Per
set
165.15
15
Per
set
96.25
2656.50
Per
set
Per
set
189.25
3826.05
ditto
96.25
2656.50
ditto
Per
set
189.25
3826.05
16
Per
set
171.30
2339.35
Per
set
171.30
2339.35
ditto
17
Per
set
146.10
3761.10
Per
set
146.10
3761.10
ditto
18
100Cft.
437.50
491.75
cum
154.50
173.70
16.2
19
14.6
b)
Remarks
Composite
100Sft.
14
Labour
Spec.
No.
Per Cwt
ditto
ditto
ditto
120.45
133.85
144.55
151.25
2152.00
2171.00
2180.35
2187.40
%kg
ditto
ditto
ditto
237.10
263.45
284.55
297.70
4236.25
4273.60
4292.05
4305.90
chapter-21(Sewerage)
Page 130
Description
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Cwt
ditto
ditto
ditto
107.70
116.05
124.30
149.60
2135.55
2143.40
2152.05
2177.20
%kg
ditto
ditto
ditto
212.05
228.50
244.65
294.50
4203.80
4219.30
4236.35
4285.85
Per Cwt
ditto
ditto
96.05
123.50
144.10
2125.00
2149.80
2169.75
%kg
ditto
ditto
189.10
243.15
283.65
4183.10
4231.90
4271.15
Per well
Per well
3333.00
6639.60
Per well
Per well
3333.00
6639.60
20
Labour
chapter-21(Sewerage)
Page 131
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
Well curbs to be laid at spring level or as deep as possible.
Description
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
b)
c)
1000 Cft.
cu.m
ditto
ditto
ditto
ditto
2275.35
2376.40
2673.50
3068.55
ditto
ditto
ditto
ditto
80.35
83.95
94.45
108.40
1000 Cft.
ditto
ditto
ditto
2771.45
2897.05
3166.50
3561.55
cu.m
ditto
ditto
ditto
97.90
102.30
111.85
125.80
1000 Cft.
ditto
ditto
ditto
5977.80
6192.15
6455.55
6930.20
cu.m
ditto
ditto
ditto
211.15
218.70
228.00
244.80
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
12249.60
15312.00
18374.40
21436.80
24499.20
27561.60
30624.00
33686.40
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
432.65
540.80
649.00
757.15
865.30
973.50
1081.65
1189.80
1000 Cft.
16843.20
cu.m
594.90
in hard soil
i) from 0' to 5'(0 to 1.5 metre) depth
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth
iv) from 15.1' to 20'(4.5 to 6.0 metre) depth
in hard strata, such as shingle, gravel, etc.
i) from 0' to 5'(0 to 1.5 metre) depth
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth
iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth
Labour
b)
chapter-22(Sinking of Wells)
Page 132
Description
Unit
Labour
ditto
ditto
ditto
ditto
ditto
ditto
ditto
19905.60
22968.00
26030.40
29092.80
32155.20
35217.60
38280.00
ditto
ditto
ditto
ditto
ditto
ditto
ditto
703.05
811.25
919.40
1027.55
1135.70
1243.90
1352.05
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
22968.00
26030.40
29092.80
29475.60
35217.60
38280.00
41342.40
44404.80
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
811.25
919.40
1027.55
1041.10
1243.90
1352.05
1460.20
1568.40
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
18324.70
38940.00
47926.15
62304.00
69226.65
77880.00
79876.90
81978.95
89005.70
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
647.25
1375.35
1692.75
2200.60
2445.10
2750.70
2821.25
2895.50
3143.70
1000 Cft.
ditto
ditto
ditto
29416.55
36770.70
44124.85
58833.15
cu.m
ditto
ditto
ditto
chapter-22(Sinking of Wells)
*841-1
to
841-9
*841-1
to
841-9
Remarks
Composite
Composite
Spec.
No.
Labour
1039.00
1298.75
1558.50
2078.00
Page 133
Description
v)
vi)
vii)
viii)
ix)
5
Ratio 1:1:3
ratio 1:2:4
Labour
ditto
ditto
ditto
ditto
ditto
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
Composite
67884.40
73541.45
80227.00
83254.45
88249.70
Unit
Labour
ditto
ditto
ditto
ditto
ditto
2397.70
2597.50
2833.60
2940.55
3117.00
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
1416.80
1731.65
2078.00
2833.60
3117.00
3463.30
3624.40
3710.70
4101.30
64347.80
506.20
1821.85
cu.m
17878.50
Each
163.70
Each
163.70
Per Cft.
ditto
125.40
125.40
327.95
306.65
Remarks
Composite
40113.50
49027.60
58833.15
80227.00
88249.70
98055.25
102615.95
105059.20
116118.05
Per Cft.
Spec.
No.
*841-1
to
841-9
*841-1
to
841-9
cu.m
ditto
4429.15
4429.15
11582.55
10831.30
100Kg
389.40
10099.65
100Kg
389.40
10099.65
10
100Cft.
4073.10
15692.60
cu.m
1438.60
5542.65
841-1 to
841-9
21.1 to
The rate includes dismantling of false
21.5 & 18.1 masonry, scraping bricks obtained
from dismantling and credit of
byproducts.
Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".
chapter-22(Sinking of Wells)
Page 134
Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".
Rates for all finished works include the removal of surplus debris, unused material and byproduct
Description
Unit
Labour
Chap. 2
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
ditto
ditto
33.75
46.95
84.85
129.10
168.30
212.60
231.95
344.15
366.45
Per Metre
of bore
ditto
ditto
ditto
ditto
ditto
ditto
ditto
110.75
154.00
278.30
423.40
551.95
697.40
760.75
1128.85
1201.90
ditto
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
143.80
201.60
227.30
260.35
287.45
403.75
426.00
Per Metre
of bore
ditto
ditto
ditto
ditto
ditto
471.75
661.20
745.50
853.95
942.85
1324.25
1397.25
Remarks
Composite
Composite
Spec.
No.
Labour
ditto
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
200.40
258.15
286.30
323.20
343.10
443.45
466.90
Per Metre
of bore
ditto
ditto
ditto
ditto
ditto
657.25
846.75
939.05
1060.05
1125.35
1454.55
1531.45
Chap. 2
chapter-23(Tubewell)
Page 135
Description
a)
b)
c)
d)
e)
5
Rft of bore
ditto
ditto
ditto
ditto
Composite
345.30
386.05
408.35
541.55
545.75
Unit
Labour
Per Metre
of bore
ditto
ditto
ditto
Spec.
No.
1132.60
1266.15
1339.35
1776.25
1790.00
ditto
Per Rft.
of bore
ditto
351.15
505.00
Per Metre
of bore
ditto
1151.75
1656.40
Rft
of bore
ditto
351.15
505.00
Per Metre
of bore
ditto
1151.75
1656.40
ditto
Remarks
Composite
Labour
Per Rft.
of bore
ditto
791.95
1071.05
Per Metre
of bore
ditto
2597.55
3513.10
ditto
ditto
791.95
1071.05
ditto
ditto
2597.55
3513.10
Job for
complete bore
410.40
12453.60
Job for
complete bore
410.40
12453.60
Per Set
of 2
bottles
108.00
156.00
Per Set
of 2
bottles
108.00
156.00
ditto
Chap. 2
ditto
chapter-23(Tubewell)
Page 136
Description
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
10
16.40
16.40
21.65
24.55
27.50
32.20
39.80
39.80
44.80
44.80
46.00
52.65
52.65
61.95
63.15
638.00
961.40
1176.65
1389.55
1497.50
1764.70
2244.80
2297.30
2354.80
2984.80
3406.00
4252.65
4761.90
5248.95
6069.15
Unit
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Labour
53.80
53.75
71.05
80.45
90.25
105.55
130.50
130.50
146.85
146.85
150.80
172.65
172.65
203.25
207.20
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
73.50
73.50
122.70
122.70
165.65
165.65
204.15
204.15
204.15
245.05
245.05
294.75
320.55
320.55
430.25
582.35
1177.40
1499.60
1897.55
2195.85
2436.90
2713.20
3521.30
4236.25
5230.20
5947.30
6629.40
7293.75
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
73.50
73.50
122.70
122.70
165.65
165.65
204.15
204.15
204.15
245.05
245.05
294.75
320.55
320.55
Remarks
Composite
2092.60
3153.35
3859.45
4557.65
4911.85
5788.15
7362.90
7535.10
7723.65
9790.05
11171.60
13948.65
15619.00
17216.60
19906.85
In the case of increase or decrease
in the length of Bail plug, the rates
will be increased or decreased as
per rates given in serial No. 14 of
this chapter for the respective
diameter.
430.25
582.35
1177.40
1499.60
1897.55
2195.85
2436.90
2713.20
3521.30
4236.25
5230.20
5947.30
6629.40
7293.75
12
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Composite
Spec.
No.
11
Labour
Chap. 2
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
11.90
13.55
14.40
17.10
23.40
24.00
24.00
99.30
145.60
202.05
266.75
646.00
966.40
1290.90
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
39.00
44.45
47.20
56.10
76.85
78.65
78.65
325.70
477.60
662.80
874.95
2118.85
3169.80
4234.15
chapter-23(Tubewell)
Page 137
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
complete:a)
b)
c)
d)
e)
f)
g)
13
14
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
7.95
8.25
8.35
11.90
13.65
14.70
26.25
41.15
48.25
73.80
154.20
246.10
360.50
513.95
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
26.05
27.00
27.40
39.05
44.80
48.30
86.15
134.9
158.2
242.05
505.7
807.15
1182.5
1685.7
Each
Each
Each
Each
Each
Each
Each
Each
6.25
7.15
7.95
9.90
12.25
12.90
14.80
14.80
54.25
73.15
111.15
159.90
312.25
440.10
590.80
622.00
Each
Each
Each
Each
Each
Each
Each
Each
6.25
7.15
7.95
9.90
12.25
12.90
14.80
14.80
54.25
73.15
111.15
159.90
312.25
440.10
590.80
622.00
Each
Each
Each
Each
Each
Each
Each
4.05
4.40
4.60
6.25
7.15
8.00
9.9
28.05
40.40
58.60
78.25
103.15
146.00
189.9
Each
Each
Each
Each
Each
Each
Each
4.05
4.40
4.60
6.25
7.15
8.00
9.9
28.05
40.40
58.60
78.25
103.15
146.00
189.9
a)
b)
c)
d)
e)
f)
g)
h)
ii)
a)
b)
c)
d)
e)
f)
g)
Chap.
2
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
44.40
44.40
55.55
55.55
79.25
79.25
92.45
92.45
92.45
111.00
225.30
304.20
400.90
743.75
892.85
1028.45
1269.85
1443.65
1864.85
2196.00
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
145.65
145.65
182.20
182.20
259.95
259.95
303.25
303.25
303.25
364.10
739.05
997.80
1314.95
2439.55
2928.55
3373.30
4165.15
4735.15
6116.70
7202.85
Page 138
Description
k)
l)
m)
n)
15
Per Rft.
Per Rft.
Per Rft.
Per Rft.
111.00
135.80
146.40
146.40
2717.25
3376.15
3746.80
4106.80
Unit
Per Metre
Per Metre
Per Metre
Per Metre
Labour
364.10
445.40
480.20
480.20
Remarks
Composite
8912.55
11073.75
12289.45
13470.35
ditto
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
15.45
17.50
18.35
22.45
29.70
31.05
36.90
34.50
109.55
159.55
212.25
297.00
452.10
746.25
1035.30
1234.50
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
50.70
57.35
60.10
72.15
97.50
101.75
121.00
113.15
359.25
523.40
696.20
972.75
1482.95
2447.60
3395.75
4049.15
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
9.40
9.65
10.30
13.40
17.65
18.65
22.50
43.00
52.85
77.50
157.40
259.55
378.65
545.70
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
30.75
31.70
33.80
43.95
57.85
61.20
73.75
140.95
173.40
254.20
516.30
851.35
1242.00
1789.85
942.60
1133.45
Per
Hour
ditto
93.00
cu.m
17
Composite
Spec.
No.
16
15"
18"
20"
22"
Labour
ii)
18
19
a)
b)
c)
Per
Hour
ditto
Per Cft.
17.40
942.60
1133.45
614.55
3284.75
Chap.
2
Per Rft.
Per Rft.
Per Rft.
36.25
45.15
56.30
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
118.85
148.05
184.65
Page 139
Description
d)
e)
f)
g)
h)
i)
20
67.05
82.65
122.95
144.00
186.70
248.30
Unit
Labour
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
15.35
17.10
26.20
28.75
33.90
47.95
55.85
76.25
94.45
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
7.75
8.95
11.55
13.05
17.70
22.50
27.00
41.35
49.55
Remarks
Composite
219.85
271.15
403.30
472.35
612.35
814.40
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
ditto
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
Chap. 2
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
50.40
56.10
86.00
94.20
111.10
157.25
183.20
250.00
309.75
22
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Composite
Spec.
No.
21
Labour
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
25.40
29.45
37.80
42.80
58.05
73.80
88.55
135.55
162.60
Chap.
2
i) Light Quality
a)
b)
c)
d)
e)
f)
g)
h)
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
4.35
4.85
5.70
5.80
5.95
6.70
7.05
8.10
50.70
71.30
100.65
130.45
163.45
204.25
278.40
326.30
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
14.25
15.95
18.75
19.10
19.45
21.95
23.10
26.55
166.35
233.80
330.15
427.90
536.10
669.85
913.10
1070.25
Page 140
Description
i)
Per Rft.
Labour
9.00
Composite
458.30
Unit
Per Metre
Labour
29.55
Spec.
No.
Composite
1503.30
Remarks
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
4.35
4.85
5.70
5.80
6.00
6.70
7.05
8.10
9.00
10.35
10.65
60.20
76.80
116.60
149.50
170.00
234.95
300.10
378.10
540.30
742.00
865.90
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
14.25
15.95
18.75
19.10
19.65
21.95
23.10
26.55
29.55
34.05
35.00
197.55
251.85
382.40
490.30
557.55
770.65
984.30
1240.20
1772.25
2433.70
2840.15
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
4.35
4.85
5.70
5.80
6.00
6.70
7.05
8.10
9.00
10.35
10.65
86.25
112.80
167.90
217.10
246.85
339.60
426.35
548.55
748.40
926.00
1094.80
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
14.25
15.95
18.75
19.10
19.65
21.95
23.10
26.55
29.55
34.05
35.00
282.9
369.95
550.65
712.05
809.65
1113.9
1398.45
1799.3
2454.75
3037.25
3590.95
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
23
PS 428 &
ISO 160
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
7.40
7.85
10.70
14.75
19.30
24.65
28.65
32.45
38.35
45.10
54.60
139.90
182.40
288.70
483.45
658.25
869.35
1116.90
1418.05
1767.70
2174.10
2999.00
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
24.25
25.65
35.10
48.40
63.30
80.80
94.05
106.50
125.80
148.00
179.10
458.95
598.20
946.90
1585.75
2159.00
2851.45
3663.45
4651.25
5798.00
7131.00
9836.75
Page 141
Description
24
25
26
28
Composite
Unit
Labour
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
7.40
7.85
10.70
14.75
19.30
24.65
28.65
32.45
38.35
45.10
55.25
139.90
199.60
344.70
545.95
761.65
1060.00
1627.45
2078.35
2548.60
3033.65
4271.75
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
24.25
25.65
35.10
48.40
63.30
80.80
94.05
106.50
125.80
148.00
181.25
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
7.40
7.85
10.70
14.75
19.30
24.65
28.65
32.45
38.35
45.10
139.90
227.60
414.70
731.20
1079.40
1574.85
2344.80
3028.35
3646.20
4448.95
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
24.25
25.65
35.10
48.40
63.30
80.80
94.05
106.50
125.80
148.00
Spec.
No.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
2.45
3.10
3.80
4.10
5.80
7.50
9.25
11.70
2.05
2.45
3.10
3.80
4.10
98.45
148.00
201.60
284.15
436.65
737.00
1027.60
1235.70
70.60
149.35
249.85
371.00
537.80
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
8.10
10.15
12.50
13.50
19.05
24.55
30.30
38.40
6.75
8.10
10.15
12.50
13.50
Remarks
Composite
PS 428 &
458.95 ISO 160
654.70
1130.65
1790.65
2498.15
3476.80
5338.05
6816.95
8359.40
9950.30
14011.35
PS 428 &
458.95 ISO 160
746.60
1360.25
2398.30
3540.40
5165.55
7691.00
9933.05
11959.45
14592.60
27
Labour
Chap
2
ditto
9.1
322.85
485.50
661.25
932.05
1432.20
2417.35
3370.55
4053.15
231.60
489.85
819.50
1216.90
1763.90
Page 142
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
b)
30
31
13.80
7.70
4.40
91.75
85.65
82.35
Per Kg
Per Kg
Per Kg
13.80
7.70
4.40
91.75
85.65
82.35
Per Kg
Per Kg
Per Kg
6.45
2.25
2.85
84.40
80.20
80.20
Per Kg
Per Kg
Per Kg
6.45
2.25
2.85
84.40
80.20
80.20
Per Kg
Per Kg
Per Kg
6.40
6.40
6.40
84.35
84.35
84.35
Per Kg
Per Kg
Per Kg
6.40
6.40
6.40
84.35
84.35
84.35
C.I. Specials, with tyton joints:i) 3" to 6" (75 to 150 mm) i/d
ii) 8" to 12" (200 to 300 mm) i/d
iii) 15" to 18" (375 to 450 mm) i/d
29
Per Kg.
Per Kg.
Per Kg.
c)
Remarks
9.1
Per Kg
Per Kg
Per Kg
10.35
5.50
4.40
88.30
83.45
82.35
Per Kg
Per Kg
Per Kg
10.35
5.50
4.40
88.30
83.45
82.35
9.1
Each
Each
Each
Each
Each
Each
Each
Each
Each
417.40
454.20
817.60
871.60
1017.70
1771.95
1991.20
2641.00
3039.65
5697.40
6694.20
8017.60
11071.60
19617.70
25171.95
32591.20
60241.00
106239.65
Each
Each
Each
Each
Each
Each
Each
Each
Each
417.40
454.20
817.60
871.60
1017.70
1771.95
1991.20
2641.00
3039.65
329.80
407.70
4649.80
5447.70
chapter-23(Tubewell)
Each
Each
329.80
407.70
5697.40
6694.20
8017.60
11071.60
19617.70
25171.95
32591.20
60241.00
106239.65
9.1
Each
Each
4649.80
5447.70
Page 143
Description
c)
d)
e)
f)
g)
h)
32
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
Each
Each
Each
Each
Each
518.60
865.90
1114.30
1287.60
1526.75
1844.85
9158.60
16705.90
20794.30
25767.60
49526.75
88244.85
Each
Each
Each
Each
Each
Each
518.60
865.90
1114.30
1287.60
1526.75
1844.85
9158.60
16705.90
20794.30
25767.60
49526.75
88244.85
Each
48.70
4008.70
Each
48.70
4008.70
9.1
33
34
35
single
Each
98.40
2978.40
Each
98.40
2978.40
b)
double
Each
98.40
6458.40
Each
98.40
6458.40
ditto
a)
Per Kg
18.25
87.15
Per Kg
18.25
87.15
b)
Per Kg
11.40
80.30
Per Kg
11.40
80.30
c)
Per Kg
9.75
78.65
Per Kg
9.75
78.65
35.05
42.50
39.55
Per cm i/d
of pipe
ditto
ditto
36
ditto
Per Inch
i/d of pipe
ditto
ditto
14.05
17.00
15.80
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
8.85
8.85
9.30
9.35
11.10
236.65
328.85
418.80
545.00
771.85
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
29.00
29.00
30.45
30.70
36.45
776.20
1078.65
1373.65
1787.55
2531.60
Page 144
Description
Unit
Labour
Remarks
Composite
12.85
12.85
951.20
1127.50
Per Metre
Per Metre
42.10
42.25
3119.85
3698.15
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
10.15
9.45
10.60
10.65
12.55
14.35
14.45
171.40
231.25
289.30
369.75
538.05
730.35
860.50
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
33.35
31.05
34.75
35.00
41.10
47.05
47.40
562.25
758.55
948.85
1212.80
1764.75
2395.60
2822.50
Each
Each
Each
Each
63.35
74.85
93.55
97.25
176.15
316.05
562.75
789.65
Each
Each
Each
Each
63.35
74.85
93.55
97.25
176.15
316.05
562.75
789.65
Each
Each
Each
Each
Each
Each
Each
39.25
43.15
47.60
63.35
74.85
93.55
97.25
69.25
75.55
111.20
231.35
469.65
1005.55
1377.65
Each
Each
Each
Each
Each
Each
Each
39.25
43.15
47.60
63.35
74.85
93.55
97.25
69.25
75.55
111.20
231.35
469.65
1005.55
1377.65
Each
Each
Each
Each
95.00
114.00
137.85
145.90
511.40
957.60
1826.25
1885.90
Each
Each
Each
Each
95.00
114.00
137.85
145.90
511.40
957.60
1826.25
1885.90
Each
Each
Each
Each
Each
Each
Each
60.25
65.00
70.95
95.00
114.00
137.85
145.90
175.45
206.60
259.35
511.40
957.60
1826.25
1885.90
Each
Each
Each
Each
Each
Each
Each
60.25
65.00
70.95
95.00
114.00
137.85
145.90
175.45
206.60
259.35
511.40
957.60
1826.25
1885.90
ii)
38
Composite
Spec.
No.
Per Rft.
Per Rft.
Labour
ii)
chapter-23(Tubewell)
Page 145
Description
39
ii)
Unit
Labour
Remarks
Composite
Each
Each
Each
Each
Each
Each
Each
Each
48.10
59.65
74.55
78.25
114.20
136.40
157.30
178.45
122.50
192.85
254.55
331.45
699.80
1720.40
3831.70
3058.45
Each
Each
Each
Each
Each
Each
Each
Each
48.10
59.65
74.55
78.25
114.20
136.40
157.30
178.45
122.50
192.85
254.55
331.45
699.80
1720.40
3831.70
3058.45
Each
Each
Each
Each
Each
Each
Each
26.55
30.45
34.90
48.10
59.65
74.55
78.25
46.95
58.05
79.30
190.90
323.65
554.55
918.25
Each
Each
Each
Each
Each
Each
Each
26.55
30.45
34.90
48.10
59.65
74.55
78.25
46.95
58.05
79.30
190.90
323.65
554.55
918.25
Each
Each
Each
Each
Each
Each
Each
Each
63.35
74.85
93.55
97.25
139.55
161.75
187.75
208.90
99.35
122.85
153.55
169.25
259.55
317.75
379.75
448.90
Each
Each
Each
Each
Each
Each
Each
Each
63.35
74.85
93.55
97.25
139.55
161.75
187.75
208.90
99.35
122.85
153.55
169.25
259.55
317.75
379.75
448.90
Each
Each
Each
39.25
43.15
47.60
57.25
67.15
77.60
Each
Each
Each
39.25
43.15
47.60
57.25
67.15
77.60
ii)
41
Composite
Spec.
No.
40
Labour
Connection
ditto
ction
Per
867.90
1097.60
1544.40
chapter-23(Tubewell)
Connection
ditto
ction
867.90
1097.60
1544.40
Page 146
Description
iv)
v)
vi)
vii)
ditto
ditto
ditto
ditto
Labour
Composite
2118.60
2594.15
3369.30
4045.80
chapter-23(Tubewell)
Labour
Spec.
No.
Remarks
Composite
2118.60
2594.15
3369.30
4045.80
Page 147
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
15 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.4
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
10.00
10.00
10.00
12.50
12.50
14.85
18.90
53.30
67.80
90.40
115.75
143.35
179.25
282.80
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
32.75
32.75
32.75
40.90
40.90
48.70
62.00
174.75
222.40
296.45
379.75
470.25
587.95
927.60
Remarks
15 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.3
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
14.95
14.95
15.60
15.60
17.00
23.40
37.45
57.30
72.80
96.50
119.70
148.55
188.45
302.80
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
49.10
49.10
51.15
51.15
55.80
76.75
122.75
187.85
238.75
316.55
392.60
487.20
618.10
993.25
16 mm i/d
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
6.95
6.95
6.95
6.95
7.80
9.60
24.20
29.15
35.50
38.90
50.05
61.35
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
22.75
22.75
22.75
22.75
25.60
31.50
79.35
95.65
116.45
127.60
164.20
201.30
38.3 &
38.7
Per Rft.
13.35
32.25
Per Metre
chapter-24(Electric Installation)
43.85
105.80
Page 148
Description
ii)
iii)
iv)
v)
vi)
3
36.95
44.40
48.90
59.10
71.15
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Labour
43.85
49.10
51.15
53.35
55.80
Composite
121.25
145.65
160.45
193.85
233.40
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
38.3 &
38.5
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
12.05
12.50
13.85
14.95
15.60
16.25
21.55
25.35
30.60
38.55
47.70
59.50
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
39.60
40.90
45.45
49.10
51.15
53.35
70.60
83.15
100.35
126.45
156.40
195.15
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
3.10
3.10
3.10
3.55
3.55
4.30
12.10
15.35
19.90
27.50
37.00
52.00
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
10.25
10.25
10.25
11.70
11.70
14.10
39.75
50.40
65.30
90.20
121.35
170.50
13.35
14.95
15.60
16.25
17.00
Unit
Remarks
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Composite
Spec.
No.
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
Labour
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.4
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
8.20
8.70
9.00
10.90
11.90
13.10
17.45
34.50
43.10
57.30
76.00
93.85
129.05
285.25
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
26.80
28.60
29.60
35.75
39.00
42.90
57.20
113.20
141.40
188.00
249.35
307.80
423.30
935.60
Supply and erection PVC pipe for recessed wiring (main and
sub-main) purpose, including bends, specials, etc. in floor,
wall or trenches:i)
ii)
iii)
50 mm i/d
80 mm i/d
100 mm i/d
38.2 &
38.3
Per Rft.
Per Rft.
Per Rft.
16.25
18.70
18.70
60.95
80.80
105.65
Per Metre
Per Metre
Per Metre
chapter-24(Electric Installation)
53.35
61.40
61.40
199.95
265.00
346.45
Page 149
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Supply and erection of PVC pipe for surface wiring (main and
sub-main) including clamps, inspection boxes, pull boxes
bends etc., complete with all specials:i)
ii)
iii)
50 mm i/d
80 mm i/d
100 mm i/d
Per Rft.
Per Rft.
Per Rft.
4.30
6.25
7.15
48.35
80.30
101.00
Per Metre
Per Metre
Per Metre
14.10
20.45
23.40
158.55
263.35
331.35
Per Rft.
1.25
2.90
Per Metre
4.10
9.60
38.8
Per Rft.
1.25
10.55
Per Metre
4.10
34.55
38.8
10
b)
38.1
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
2.50
2.50
2.50
2.75
3.10
3.85
8.90
10.40
8.75
9.15
12.90
19.40
28.05
69.50
111.35
153.15
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
8.20
8.20
8.20
9.10
10.25
12.60
29.25
34.10
28.60
30.00
42.25
63.60
92.00
227.90
365.25
502.35
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
2.75
2.75
2.75
2.95
3.30
3.80
9.00
9.40
13.15
19.55
28.20
69.40
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
9.10
9.10
9.10
9.65
10.75
12.40
29.55
30.90
43.15
64.15
92.55
227.70
11
Remarks
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
chapter-24(Electric Installation)
Page 150
Description
i)
ii)
iii)
iv)
v)
vi)
12
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
2.50
2.50
2.50
2.75
3.10
3.85
Composite
8.30
11.20
15.35
22.30
31.80
63.25
Unit
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Labour
8.20
8.20
8.20
9.10
10.25
12.60
Spec.
No.
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
19/2.11 mm (19/0.083")
37//1.83 mm (37/0.072")
37/2.11 mm (37/0.083")
37/2.62 mm (37/0.103")
27.25
36.80
50.45
73.15
104.25
207.45
38.1 to
38.7
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
3.80
4.15
4.55
5.00
8.60
10.40
14.70
71.65
121.40
164.60
315.60
437.70
549.35
843.30
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
12.40
13.65
14.90
16.35
28.20
34.10
48.15
235.05
398.25
539.80
1,035.20
1,435.70
1,801.90
2,765.95
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
2.75
2.75
2.75
2.95
3.30
3.80
15.65
22.30
30.60
44.90
63.95
128.05
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
9.10
9.10
9.10
9.65
10.75
12.40
51.35
73.15
100.40
147.25
209.70
419.95
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
2.95
2.95
2.95
3.30
3.45
3.95
23.70
34.10
46.55
68.30
97.70
198.55
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
9.65
9.65
9.65
10.75
11.35
13.00
77.75
111.85
152.70
224.00
320.40
651.30
Per Rft.
3.10
30.55
Per Metre
10.25
100.15
c)
ditto
b)
Remarks
Composite
13
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
Labour
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
3/0.74 mm (3/0.029")
chapter-24(Electric Installation)
Page 151
Description
ii)
iii)
iv)
v)
vi)
vii)
d)
3.10
3.30
3.30
3.45
3.95
5.55
43.00
59.25
88.05
126.90
259.05
484.05
Unit
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Labour
10.25
10.75
10.75
11.35
13.00
18.20
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
19/1.83 mm (19/0.072")
19/2.11 mm (19/0.083")
37//1.83 mm (37/0.072")
37/2.11 mm (37/0.083")
37/2.36 mm (37/0.093")
37/2.62 mm (37/0.103")
10 x 10 cm (4"x4")
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")
15
16
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")
Remarks
Composite
141.05
194.30
288.75
416.20
849.65
1,587.60
Cost of trenches where necessary
is included in the rates.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.55
5.95
6.25
6.75
6.95
8.30
10.00
12.50
540.00
722.20
978.85
1,370.60
1,867.80
2,361.25
2,878.00
3,581.95
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
18.20
19.50
20.45
22.10
22.75
27.30
32.75
40.90
1,771.15
2,368.90
3,210.60
4,495.60
6,126.35
7,744.85
9,439.80
11,748.85
17
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Composite
Spec.
No.
14
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
Labour
38.1
to
38.7
Each
Each
Each
Each
Each
Each
40.90
51.15
68.20
81.85
102.30
136.40
94.20
131.05
162.95
245.35
331.30
434.20
Each
Each
Each
Each
Each
Each
40.90
51.15
68.20
81.85
102.30
136.40
94.20
131.05
162.95
245.35
331.30
434.20
Each
11.70
21.35
Each
11.70
21.35
38.1
38.1
Each
Each
Each
Each
Each
16.35
16.35
18.20
20.45
23.40
67.95
79.95
93.80
126.05
177.00
Each
Each
Each
Each
Each
16.35
16.35
18.20
20.45
23.40
67.95
79.95
93.80
126.05
177.00
Each
Each
Each
Each
16.35
16.35
18.20
20.45
47.55
64.35
79.40
96.05
Each
Each
Each
Each
16.35
16.35
18.20
20.45
47.55
64.35
79.40
96.05
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
chapter-24(Electric Installation)
Page 152
Description
v)
18
x 35 cm (12"x14")
23.40
112.20
Unit
Each
Labour
23.40
b)
112.20
38.1
Each
Each
Each
Each
272.80
272.80
409.20
409.20
1,075.55
1,339.55
1,793.95
2,305.15
Each
Each
Each
Each
272.80
272.80
409.20
409.20
1,075.55
1,339.55
1,793.95
2,305.15
Each
Each
409.20
272.80
1,513.15
1,753.55
Each
Each
409.20
272.80
1,513.15
1,753.55
Each
Each
Each
272.80
409.20
536.05
1,873.55
2,389.40
3,020.25
Each
Each
Each
272.80
409.20
536.05
1,873.55
2,389.40
3,020.25
15/20 Amp.
30/35 Amp.
30/35 Amp.
60/65 Amp.
100 Amp.
38.1
Each
Each
Each
Each
Each
Each
Each
409.20
536.05
536.05
1,227.60
1,227.60
1,739.10
1,841.40
2,454.00
3,530.05
4,970.05
7,872.00
9,124.80
12,244.50
15,620.95
Each
Each
Each
Each
Each
Each
Each
409.20
536.05
536.05
1,227.60
1,227.60
1,739.10
1,841.40
2
3
4
5
6
ditto
Each
Each
Each
Each
Each
136.40
136.40
136.40
136.40
136.40
456.80
456.80
522.80
576.80
618.80
Each
Each
Each
Each
Each
chapter-24(Electric Installation)
136.40
136.40
136.40
136.40
136.40
2,454.00
3,530.05
4,970.05
7,872.00
9,124.80
12,244.50
15,620.95
triple pole:
i)
ii)
c)
15/20 Amp.
30/35 Amp.
60/65 Amp.
100 Amp.
Remarks
Composite
double pole:
i)
ii)
iii)
iv)
20
Each
Composite
Spec.
No.
19
30
Labour
456.80
456.80
522.80
576.80
618.80
Page 153
Description
136.40
136.40
136.40
136.40
136.40
136.40
204.60
204.60
204.60
204.60
204.60
204.60
204.60
204.60
204.60
Composite
666.80
714.80
762.80
834.80
882.80
936.80
525.00
531.00
585.00
645.00
687.00
747.00
795.00
843.00
915.00
Unit
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Labour
136.40
136.40
136.40
136.40
136.40
136.40
204.60
204.60
204.60
204.60
204.60
204.60
204.60
204.60
204.60
Spec.
No.
ii)
iii)
iv)
v)
i)
ii)
666.80
714.80
762.80
834.80
882.80
936.80
525.00
531.00
585.00
645.00
687.00
747.00
795.00
843.00
915.00
38.1
Each
498.30
2,319.55
Each
498.30
2,319.55
Each
498.30
2,319.55
Each
498.30
2,319.55
Each
792.00
2,733.25
Each
792.00
2,733.25
Each
920.70
2,861.95
Each
920.70
2,861.95
Each
600.60
3,056.90
Each
600.60
3,056.90
Each
8.55
89.55
Each
8.55
89.55
1.65
Per Metre
Per Rft.
--
--
38.1
5.45
23
Each
17.05
205.80
Each
17.05
205.80
38.1
24
Each
26.40
355.05
Each
26.40
355.05
ditto
chapter-24(Electric Installation)
Remarks
Composite
Supply and erection of bus bars, for 500 volts 3 phase A.C.
supply with four copper bars, including glazed porcelain
bridges, on angle iron board, fixed with rag bolts and M.S.
sheet box 1.5 mm thick, etc. complete:i)
22
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Labour
Page 154
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
(3/0.029").
25
Each
27.30
68.95
Each
27.30
68.95
ditto
26
Each
37.70
373.25
Each
37.70
373.25
ditto
27
Each
6.00
33.65
Each
6.00
33.65
ditto
28
Each
26.40
189.70
Each
26.40
189.70
38.1
29
Each
5.10
193.30
Each
5.10
193.30
38.1
30
Each
8.55
19.05
Each
8.55
19.05
ditto
31
8.20
8.20
8.20
8.20
11.50
11.50
11.50
19.90
19.90
15.40
40.30
29.50
30.70
27.10
Each
Each
Each
Each
Each
Each
Each
8.20
8.20
8.20
8.20
11.50
11.50
11.50
19.90
19.90
15.40
40.30
29.50
30.70
27.10
ditto
i)
ii)
iii)
iv)
v)
vi)
vii)
32
open type
piano type
ring type, recessed
plate type, recessed
double control, open type
double control, ring type recessed
double control, piano type
open type
recessed type
ditto
Each
Each
8.20
8.20
31.00
39.40
Each
Each
8.20
8.20
31.00
39.40
33
Each
8.20
61.00
Each
8.20
61.00
ditto
34
Each
8.20
45.40
Each
8.20
45.40
ditto
35
36
open type
recessed type
ditto
Each
Each
8.20
8.20
39.40
75.40
Each
Each
8.20
8.20
39.40
75.40
5 Amp
ditto
Each
8.20
58.60
Each
chapter-24(Electric Installation)
8.20
58.60
Page 155
Description
ii)
10/15 Amp
37
Supply and erection of 3 pin 10/15 Amp. wall socket with shoe,
open type.
38
39
open type
recessed type
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Each
8.20
83.20
Each
8.20
83.20
Each
8.20
118.60
Each
8.20
118.60
Each
Each
4.55
4.55
23.75
29.75
Each
Each
4.55
4.55
23.75
29.75
ditto
ditto
38.1
Each
Each
5.10
5.10
20.70
20.70
Each
Each
5.10
5.10
20.70
20.70
40
Each
6.80
22.40
Each
6.80
22.40
ditto
41
Each
4.55
15.35
Each
4.55
15.35
ditto
42
43
44
15/20 Amp
30/35 Amp
60/65 Amp
100 Amp
200 Amp
300 Amp
400 Amp
500 Amp
Remarks
ditto
Each
Each
Each
Each
Each
Each
Each
Each
8.40
9.20
14.05
15.80
18.05
18.05
24.00
24.00
33.60
34.40
54.25
89.60
130.25
277.85
348.60
498.00
Each
Each
Each
Each
Each
Each
Each
Each
8.40
9.20
14.05
15.80
18.05
18.05
24.00
24.00
33.60
34.40
54.25
89.60
130.25
277.85
348.60
498.00
38.1
i)
Per set
150.15
946.05
Per set
150.15
946.05
ii)
single rod (40 watts) with one choke and one starter.
ditto
120.10
478.00
ditto
120.10
478.00
iii)
Each
120.10
540.40
Each
120.10
540.40
iv)
round tube, 32 watt with one chock and one starter, with
cover.
ditto
100.10
640.40
ditto
100.10
640.40
Providing and fixing M.S. iron box for housing main switches,
made of 1.5 mm (1/16") thick M.S. sheet, with locking
ditto
chapter-24(Electric Installation)
Page 156
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
60x35x15 cm (24"x14"x6")
95x40x20 cm (38"x16"x8")
105x52.5x22.5 cm (42"x21"x9")
135x70x27.5 cm (54"x28"x11")
Each
Each
Each
Each
313.10
451.55
686.55
754.05
2,254.25
2,817.60
3,877.85
5,821.20
Each
Each
Each
Each
313.10
451.55
686.55
754.05
2,254.25
2,817.60
3,877.85
5,821.20
45
Each
20.00
125.60
Each
20.00
125.60
38.1
&
38.10
46
Each
26.40
718.40
Each
26.40
718.40
ditto
47
Each
28.30
1,161.70
Each
28.30
1,161.70
38.1
48
Each
37.70
458.65
Each
37.70
458.65
49
Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook,
placed at the time of casting of slab.
Each
10.50
24.90
Each
10.50
24.90
ditto
50
Each
355.40
2,249.65
Each
355.40
2,249.65
38.12
51
73.05
85.25
504.30
1,037.90
Each
Each
73.05
85.25
504.30
1,037.90
i)
ii)
52
Per Rft.
5.10
17.15
Per Metre
16.80
56.20
38.14
53
Per Rft.
7.15
26.25
Per Metre
23.40
86.10
ditto
54
Per Rft.
31.20
227.20
Per Metre
102.30
745.30
chapter-24(Electric Installation)
Page 157
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
insulated wire and straining devices for bearer wire and other
accessories etc., complete.
55
Per Rft.
29.85
224.25
Per Metre
97.90
735.55
56
Each
158.40
2,078.40
Each
158.40
2,078.40
57
Each
19.30
169.30
Each
19.30
169.30
38.12
58
Each
19.30
61.30
Each
19.30
61.30
ditto
59
Per Kg
10.05
1,146.85
Per Kg
10.05
1,146.85
38.1
60
Per Kg
10.05
96.85
Per Kg
10.05
96.85
ditto
61
3/0.74 mm (3/0.029")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
Per Rft.
ditto
ditto
ditto
2.70
2.70
2.70
2.70
9.90
17.95
24.55
33.45
Per Metre
ditto
ditto
ditto
8.80
8.80
8.80
8.80
32.45
58.80
80.60
109.70
Per Rft.
4.80
17.70
Per Metre
15.75
58.10
Each
132.00
859.90
Each
132.00
859.90
Each
ditto
264.00
264.00
2,508.00
2,934.00
Each
ditto
264.00
264.00
2,508.00
2,934.00
Each
ditto
100.10
120.10
940.10
1,740.10
Each
ditto
100.10
120.10
940.10
1,740.10
Each
4,502.20
19,906.15
Each
4,502.20
19,906.15
62
63
64
65
66
38.12
G.E.C. design
Philips design
chapter-24(Electric Installation)
38.1
38.13
Page 158
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
67
Each
68
Job
69
70
4,366.90
31,158.60
Each
587.40
3,186.85
Job
4,366.90
31,158.60
587.40
3,186.85
Per Rft.
ditto
6.05
14.35
49.05
58.60
Per Metre
ditto
19.80
47.00
160.85
192.30
ditto
G.I. wire:
i)
ii)
b)
38.13
38.11
Remarks
8 SWG
16 SWG
Per Rft.
ditto
2.50
2.50
7.60
3.90
Per Metre
ditto
8.20
8.20
25.00
12.70
Per Rft.
2.50
9.95
Per Metre
8.20
32.70
Copper wire:
i)
16 SWG
chapter-24(Electric Installation)
Page 159
Description
ii)
20 SWG
Labour
Composite
5.20
ditto
8.20
17.00
9.65
13.30
Per Metre
31.70
43.55
38.11
Each
391.60
3,875.70
ditto
Per Metre
ditto
47.00
47.00
801.20
958.85
Job
264.00
2,154.00
Per Rft.
72
Each
391.60
3,875.70
73
14.35
14.35
244.25
292.35
Job
264.00
2,154.00
74
75
Each
ditto
102.30
102.30
1,866.30
1,866.30
Each
ditto
102.30
102.30
1,866.30
1,866.30
Each
ditto
ditto
204.60
300.30
300.30
5,322.60
5,418.30
5,418.30
Each
ditto
ditto
204.60
300.30
300.30
5,322.60
5,418.30
5,418.30
201.30
225.25
794.00
909.05
Each
ditto
201.30
225.25
794.00
909.05
78
77
38.1
76
single phase:
i)
ii)
b)
Remarks
Composite
2.50
Labour
ditto
71
i)
ii)
Unit
Spec.
No.
136.40
136.40
547.50
620.65
Each
ditto
136.40
136.40
547.50
620.65
Each
163.70
724.00
Each
163.70
724.00
chapter-24(Electric Installation)
Page 160
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
the rate.
79
Each
25.60
85.60
Each
25.60
85.60
38.1
80
Each
20.45
44.45
Each
20.45
44.45
ditto
81
Each
25.60
133.60
Each
25.60
133.60
ditto
82
Each
51.15
159.25
Each
51.15
159.25
83
Each
106.40
143.45
Each
106.40
143.45
chapter-24(Electric Installation)
Page 161
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Lft.
995.65
Metre
32.65
100Lft.
330.95
Metre
10.85
100Lft.
2585.00
Metre
84.80
Each
2508.00
Each
2508.00
Each
Point
273.25
Each
Point
273.25
Each
325.40
Each
325.40
100 Nos
2993.10
100 Nos
2993.10
100 Nos
383.70
100 Nos
383.70
IRON WORK
9
Per Cwt
1570.80
6737.90
100 Kg
3092.15
13263.60
10
Per Cwt
561.00
5476.90
100 Kg
1104.35
10781.35
11
Per Cwt
173.05
100 Kg
340.70
12
100 Sft.
633.60
sq.m
68.20
13
Per Cwt
312.65
100 Kg
615.40
chapter-25(Iron work)
Page 162
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
(6 m) height.
14
Per Cwt
191.85
100 Kg
377.65
15
Per Cwt
92.95
100 Kg
182.95
16
Per Cwt
1197.90
100 Kg
2358.05
17
Cutting rails, rolled steel joists and beams, with hacksaw:Per Cut
Per Cut
116.80
171.60
Per Cut
Per Cut
116.80
171.60
Per
Cut
55.65
Per Cwt
Cut
55.65
Per
Bend
60.40
a)
b)
6888.70
18
19
Per
Bend
60.40
20
Drilling holes, in plates upto " (13 mm) thick, per inch
dia, (25mm) or part thereof.
Per
Hole
24.10
Per
Hole
24.10
21
Extra for drilling holes in plates over " (13 mm) thick, per
inch dia, (25 mm) or part thereof.
Per
Hole
13.60
Per
Hole
13.60
22
100 Nos
357.50
100 Nos
357.50
23
100 Nos
990.00
100 Nos
990.00
24
Per Lft.
42.45
Metre
139.30
25
Per bar
22.45
Per bar
22.45
26
Each
Cut
12.20
Each
Cut
12.20
27
268.40
15.60
Per
Notch
sq.m
268.40
28
Per
Notch
Per Sft.
29
Per Sft.
9.30
sq.m
100.25
30
Per Sft.
99.00
sq.m
1065.25
261.90
402.80
629.45
chapter-25(Iron work)
13560.40
261.90
402.80
167.60
6773.00
Page 163
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
31
Per Sft.
102.65
775.10
sq.m
1104.55
8340.25
32
Per Sft.
39.50
313.45
sq.m
425.20
3372.50
33
Per Rft.
207.05
669.20
Metre
679.25
2195.55
34
Per Rft.
95.30
461.20
Metre
312.70
1513.15
35
Per Rft.
69.35
504.00
Metre
227.53
1653.54
36
Per Sft.
142.70
544.55
sq.m
1535.35
5859.55
37
Per Sft.
32.65
206.50
sq.m
351.15
2222.20
38
Per Rft.
14.85
122.10
Metre
48.65
400.65
chapter-25(Iron work)
Remarks
-do-
Page 164
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Providing and fixing stair railing of 2" (63 mm) i/d G.I.
pipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars
2'-9" (838 mm) high, fixed in each step, complete in all
respects, including painting, polishing three coats.
Per Rft.
96.10
603.05
Metre
315.25
1978.45
40
Per Sft.
13.65
43.85
sq.m
146.75
472.00
41
42
a)
38.25
38.25
38.25
38.25
38.25
248.90
251.30
256.10
258.50
260.90
sq.m
ditto
ditto
ditto
ditto
411.70
411.70
411.70
411.70
411.70
2678.20
2704.00
2755.65
2781.50
2807.30
b)
Per Sft.
ditto
ditto
ditto
ditto
51.30
51.30
51.30
51.30
51.30
288.45
290.85
295.65
298.05
300.45
sq.m
ditto
ditto
ditto
ditto
551.85
551.85
551.85
551.85
551.85
3103.70
3129.55
3181.20
3207.00
3232.85
chapter-25(Iron work)
Page 165
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
40.00
237.05
Sq.m
430.20
2550.85
ditto
38.95
133.00
ditto
419.20
1430.90
43
Per Sft.
39.55
294.90
Sq.m
425.80
3173.00
44
Per Sft.
49.05
350.00
Per Sft.
527.85
3765.75
45
Each
297.00
330.60
Each
297.00
330.60
46
Per Sft.
85.15
181.15
sq.m
916.10
1949.05
47
Per Lft.
26.40
Metre
86.60
48
Per Rft.
45.00
Metre
147.65
732.90
chapter-25(Iron work)
Remarks
2404.45
Page 166
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
49
100Rft.
988.30
8941.45
Metre
32.40
293.35
50
100Rft.
1603.60
11241.55
Metre
52.60
368.80
51
52
Remarks
Per Sft
56.45
394.85
sq. m
607.40
4248.60
Per Sft
81.70
301.65
sq. m
879.10
3245.75
chapter-25(Iron work)
Page 167
26. MISCELLANEOUS
Rates for all finished works include the removal of surplus debris, unused material and byproduct
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
43.90
52.00
Per
sq.m
472.25
559.40
Each
42.65
Each
42.65
100Lft.
Remarks
3,709.40
20,734.20
L.m.
121.70
680.25
Each
24.30
116.70
Each
24.30
116.70
100Nos.
68.20
83.80
100Nos.
68.20
83.80
Supplying wooden pegs for levelling, 1" (40 mm) dia, 6"
(150mm) long.
6
100Nos.
163.70
343.70
100Nos.
163.70
343.70
Per Lft.
52.15
59.35
Per
L.M.
171.05
194.70
Each
34.75
cost of hooks.
8
Each
34.75
Each
142.55
313.80
Each
142.55
313.80
Per cut
26.40
Per cut
26.40
chapter-26( Misc)
Page 168
Description
11
12
Threading pipe ends, 1" (40 mm) to 4" (100 mm) dia.
13
14
a)
b)
c)
in ordinary soil
in clay
in shingle
15
16
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per cut
47.80
Per cut
47.80
Each
End
33.20
Each
End
33.20
100Lft.
121.30
Per Metre
4.00
Per Lft.
Per Lft.
Per Lft.
43.40
86.45
129.53
Per Metre
Per Metre
Per Metre
142.35
283.65
424.95
Per Lft.
19.40
Per Metre
63.65
Each
81.85
Each
81.85
Per bed
287.10
307.25
Per bed
287.10
307.25
18
Washing Durries.
100Sft.
382.80
430.80
sq.m
41.20
46.35
19
Recaning chairs:
office chairs, single caning seat only.
office chairs, double canning seat only.
office chairs, single caning back only.
office chairs, double caning back only.
easy chairs, single caning seat only.
easy chairs, double caning seat only.
easy chairs, single caning only, back and seat in one
piece.
viii) easy chairs, double caning back & seat in one piece
or couches with caned area about 16 Sft (1.5 Sqm).
Each
Each
Each
Each
Each
Each
Each
143.20
184.15
102.30
163.70
102.30
286.45
409.20
173.80
227.35
104.25
180.25
143.35
347.65
661.20
Each
Each
Each
Each
Each
Each
Each
143.20
184.15
102.30
163.70
102.30
286.45
409.20
173.80
227.35
104.25
180.25
143.35
347.65
661.20
Each
613.80
1,225.80
Each
613.80
1,225.80
20
Each
73.65
394.05
Each
73.65
394.05
21
Weaving charpoy.
Each
266.00
Each
266.00
22
Sweeping chimney
Each
63.80
65.00
Each
63.80
65.00
23
Per Lft.
21.05
100.80
Per LM
69.15
330.75
24
100Kg
85.45
100Kg
85.45
25
100Kg
178.95
100Kg
178.95
i)
ii)
iii)
iv)
v)
vi)
vii)
chapter-26( Misc)
Page 169
Description
26
27
28
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Kg of
Charcoal
290.05
100Kg of
Charcoal
290.05
100Cft.
784.75
787.60
cu.m
277.15
278.20
Supplying manure.
Cart
Load
95.70
215.70
Cart
Load
95.70
215.70
29
Each
81.85
Each
81.85
30
Washing:Each
Each
20.45
13.65
Each
Each
20.45
13.65
a)
b)
table cloth
napkins, dusters, etc.
31
Each
No.
36.95
Each
No.
36.95
32
Each
No.
38.60
Each
No.
38.60
33
Dredging Sumps.
Per
Shift
1,435.50
Per
Shift
1,435.50
34
Each
121.00
Each
121.00
35
cu.m
ditto
40.55
4.35
8.85
Per Nos.
66.00
a)
b)
by hand
by pump
36
37
38
Laying 2" (50 mm) thick sand and bitumen carpet, on top
of foundation of oil tank.
39
1000 Cft.
1000 Cft.
1,148.40
123.75
Per Nos.
66.00
Remarks
Per Sft.
Per Sft.
0.60
1.25
1.75
2.15
sq.m
sq.m
6.60
13.20
18.65
23.30
100Sft.
865.20
5,627.05
sq.m
93.10
605.45
Per
Hole
148.95
Per
Hole
148.95
chapter-26( Misc)
Page 170
Description
Labour
Composite
Unit
Labour
Per
Plank
130.35
Per hole
per c.m
depth
15.30
sq.m of
each
spray
4.40
18.50
144.55
159.35
672.40
731.15
40
Per
Plank
130.35
41
Per hole
per inch
depth
38.30
42
100Sft. of
each
spray
40.90
171.70
43
20,500.50
22,290.75
i)
ii)
100Rft.
100Rft.
Spec.
No.
chapter-26( Misc)
Per Metre
Per Metre
Remarks
Composite
Page 171