Вы находитесь на странице: 1из 4

UNAM

Facultad De Estudios Superiores Acatlan


Divisin De Matemticas e Ingeniera
Programa De Ingeniera Civil
Asignatura. Mecnica de suelos (laboratorio)
Lpez Prez Luis Antonio
Titulo.- proyecto
Fecha 28/11/12
Profesor. Alejandro Ortega

Clculos de las presiones para cada estrato.


Presiones verticales.

Pv=q+ z
Pv0= 1.5 T/m2

Pv1= 1.5 T/m2 + (1.417 T/m3) (1 m) = 2.917 T/m2


Pv2= 1.5 T/m2 + (1.417 T/m3) (1 m) + (1.418 T/m3)(1 m)= 4.33 T/m2
Pv3= 4.33 T/m2 + (1.4 T/m3) (2 m) = 7.13 T/m2
Pv4= 7.13 T/m2 + (1.583 T/m3) (1 m) = 8.713 T/m2
Pv5= 8.713 T/m2 + (1.65 T/m3) (2 m)= 12.013 T/m2
Pv= 8.713 T/m2 + (1.65 T/m3) (0.25 m)= 9.13 T/m2 Presin vertical a una
z=5.25 m
Presiones activas de sobrecarga.
Pa= Pv (ka)
Z=0 m Pa= (1.5 T/m2) (0.6)= 0.9 T/m2
Z=1 m
Pa= (2.917 T/m2) (0.6)= 1.75 T/m2
T/m2) (0.5)= 1.4585 T/m2
Z=2 m
Pa= (4.33 T/m2) (0.5)= 2.16 T/m2
T/m2) (0.65)= 2.81 T/m2
Z=4 m
Pa= (7.13 T/m2) (0.65)= 4.638 T/m2
T/m2) (0.6)= 4.281 T/m2
Z=5 m
Pa= (8.713 T/m2) (0.6)= 5.2278 T/m2
T/m2) (0.33)= 2.8753 T/m2
Z=7 m
Pa= (12.013 T/m2) (0.33)= 3.964 T/m2
Z=5.25 m
Pa= (9.13 T/m2)(0.33)= 3.01 T/m2

Pa= (2.917
Pa= (4.33
Pa= (7.13
Pa= (8.713

Presiones activas del suelo.

Pa=Ka z2 c Ka
Z= 0 m Pa= (0.6) (1.417 T/m2) (0 m) 2(1.803 T/m2)

0.6

Z= 1 m Pa= (0.6) (1.417 T/m2) (1 m) 2(1.803 T/m2)

0.6

Z= 2 m Pa= (0.5) (1.418 T/m2) (1 m) 2(3.527 T/m2)

0.5

Z= 4 m Pa= (0.65) (1.4 T/m2) (2 m) 2(5.367 T/m2)


Z= 5 m Pa= (0.6) (1.583 T/m2) (1 m) 2(6.4 T/m2)
Z= 7 m Pa= (0.33) (1.65 T/m2) (2 m) 2(6 T/m2)

Pt =
Pt =
Pt =
Pt =
Pt =
P t=
Pt =

Presiones totales.
0.9 T/m
- 2.7932 T/m = -1.8932 T/m2
1.75 T/m2 - 1.9430 T/m2) = -0.193 T/m2
1.4585 T/m2 - 1.9430 T/m2) = -0.4845 T/m2
2.16 T/m2 - 4.27 T/m2) =-2.11T/m2
2.81 T/m2 - 4.27 T/m2) =-1.46T/m2
4.638 T/m2- 6.834 T/m2) =-2.196 T/m2
4.281 T/m2 - 6.834 T/m2) =-2.553 T/m2
2

= -1.9430 T/m2
= -4.27 T/m2

0.65
0.6

0.33

Z= 5.25 m Pa= (0.33) (1.65 T/m2)(0.25 m) 2(6 T/m2)

2)

= -2.7932 T/m2

= -6.834 T/m2

= -8.965 T/m2
= -5.8045 T/m2

0.33

= -6.7574 T/m2

Pt
Pt
Pt
Pt

=
=
=
=

5.2278 T/m2 - 8.965 T/m2) =-3.7372 T/m2


2.8753 T/m2 - 8.965 T/m2) =-6.0897 T/m2
3.964 T/m2 - 5.8045 T/m2) =-18405 T/m2
3.01 T/m2 - 6.7574 T/m2) =-3.7474 T/m2
Crculos de Mohr

C1

C2

C 4-5

Вам также может понравиться