Fwd: - Project - ECM-800159 Offer requested for Mill


head/Shaft/Pinion/Girth Gear
Inbox

x
Jul 11 (2

Raghavendra Sahu <raghavendra.sahu@gmail.com>

days ago)

to me
With Best Regards
Raghavendra Kumar Sahu (+919999948417)
Deputy Manager - Procurement - Mechanical Engineering
OAK ENERGY INDIA PVT. LTD.- ARVOS GROUP
1st floor Advant Tower - Sector - 142 Noida- 201301
---------- Forwarded message ---------From: Raghavendra Sahu <raghavendra.sahu@gmail.com>
Date: Wed, Jul 6, 2016 at 2:28 PM
Subject: Fwd: - Project - ECM-800159 Offer requested for Mill head/Shaft/Pinion/Girth Gear
To: SAHU Raghavendra <raghavendra.sahu@arvos-group.com>

With Best Regards


Raghavendra Kumar Sahu (+919999948417)
Asst. Manager - Procurement - Mechanical Engineering
OAK ENERGY INDIA PVT. LTD.- ARVOS GROUP

1st floor Advant Tower - Sector - 142 Noida- 201301


---------- Forwarded message ---------From: Sunita Yadav <sales@ashokamachines.com>
Date: Tue, Jul 5, 2016 at 12:58 PM
Subject: RE: - Project - ECM-800159 Offer requested for Mill head/Shaft/Pinion/Girth Gear
To: raghavendra.sahu@gmail.com
Dear Mr. Sahu,

Please find attached herewith signed following documents

1.

Drawings

2.

QAP

3.

Manufacturing specification.

4.

GTC General Terms and condition.

Regards

Sunita Yadav

SUNITA YADAV | Sales Coordinator


ASHOKA
MACHINE
CORPORATION

TOOLS

Ph: 91-120-2340031-32 | Fax: 120-2340033


Email: sales@ashokamachines.com

Web: www.ashokamachines.com

From: SAHU Raghavendra [mailto:raghavendra.sahu@arvos-group.com]


Sent: Thursday, June 30, 2016 10:30 AM
To: Sunita Yadav; gkhanna@ashokamachines.com
Subject: Ref:- Project - ECM-800159 Offer requested for Mill head/Shaft/Pinion/Girth Gear
Importance: High

Project :- ECM 800159 ( Export Job)

Dear sir,

Referring to our Project no. :- ECM 800159 ( Export Job), and your valuable offer submitted
during budgetary stage - enclosed.

Request your final non-negotiable offer for following items,

Item

English
Translated
Drg. No.

QAP NO.

Mill
Head

1.B053 C288
rev.A

QAP/ECM800159/5,
Rev-00

Material
(As Per Material
specification provided by
Engg.)

IS 1030 Grd. 280-520 W

Qty.

Weight
KG

4,744

Download - Drawing / QAP

https://www.dropbox.com/s/2mpn
800159-Mill%20Head.zip?dl=0

Pinion

2.B053 C331
rev.A

QAP/ECM800159/2,
Rev-00

IS 4367 Grd.
40Ni2Cr1Mo28-1967
Equivalent to IS 4367 Gr.
40Ni6Cr4Mo3 - 1991
OR
BS 970 pt-2 EN24

Girth
Gear

0.B053 C330
rev.B

QAP/ECM800159/1,
Rev-00

IS 2644 Grd. 3 CS840

1.B053 C328
rev.C

QAP/ECM800159/3,
Rev-00

IS 4367 Gr. 40Cr1Mo28


- 1967
Equivalent to IS 4367
Gr.40Cr4Mo3 - 1991 OR
BS 970 pt-2 EN19

Shaft

1,12
8

https://www.dropbox.com/s/66snv
800159-Pinion.zip?dl=0

21,980

https://www.dropbox.com/s/dmw
800159-Girth%20Gear.zip?dl=0

1,716

https://www.dropbox.com/s/oqhp
800159-Shaft.zip?dl=0

Summited offer should content following points Mandatory.

1- Unit Price as per FOT works basis :2- Net Price as per FOT works basis :3- Packing and forwarding :- (normal packing) should be included in offered price.

4- L/D Clause :- Liquidated Damages ("LD") for late delivery, a sum equivalent to 0.5 % of
the total order value for the delay in delivery for each week or part thereof until actual
satisfactory delivery subject to a maximum deduction of 5% of the total order value.
It has to be accepted by vendor-Must. Accordingly request you to please confirm delivery
time.

5- Delivery :- Best Despatch Delivery (considering QAP - Inspection witness point timing)

6- Warranty :- Supplier/vendor shall guarantee that all the items supplied by them shall
be new and free from all defects arising due to defective material or manufacturing defects. Items
supplied shall be of first class workman ship. The supplier shall warranty to replace, rectify or
repair free of cost at the factory site/client Place, the component or part of item proved to have
become unserviceable due to any of the above defects within a period of 18 months from the date
of use of the material or 24 months from the date of dispatch of item, whichever is Earlier. In the
event of the suppliers/Vendors not complying with the above within a reasonable time the OEIPL
will have the option to rectify or replace the defective parts/component after 3 weeks notice to
the supplier/vender and recover the cost from the supplier/vendor.

7- Painting :- Standard painting scheme shall be followed. Machined surface face to be


protected with rust preventive tactile coating. And un-machined surface to be surface clear
( free from rust and oil, dust) and coated with Min. 2 coat of red oxide primer.

Along with following documents to submitted dully signed and accepted Mandatory.
1- Drawings
2- QAP
3- Manufacturing specification.
4- GTC General Terms and condition.
Regards

Raghavendra Kumar Sahu

OAK ENERGY INDIA PVT. LTD.

Deputy Manager
Procurment and Logistics

Phone +91 120 2459968 (Direct) 1st Floor, Tower A, Advant Navis Business Park,
Mobile +91 9999948417

Sector-142, Noida 201305 (Uttar Pradesh), India 201305

raghavendra.sahu@arvos-group
www.arvos-group.com

13 Attachments
Click here to Reply or Forward
0.52 GB (3%) of 15 GB used
Manage
Terms - Privacy
Last account activity: 1 minute ago
Details
Show details

Raghavendra Sahu

Вам также может понравиться