Sr.no.

Description

nos

1.5" dia pipe water proofing in 4" slab thick


Flexiroof PU primer
Slab portion cut side
1.00
Slab top
1.00
Less
-1.00
Pipe portion
1.00
Total

Len

0.16
0.30
0.00
0.12

Bre

Dep

0.100
0.30
0.300

25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total

1.00
1.00
-1.00
1.00
1.00

0.16
0.30
0.00
0.12
0.14

0.100
0.30
0.300

1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total

Sand
Slab portion
Total

1.00
1.00

1.00

0.12
0.30

0.300
0.30

0.15

0.003

Joint grouting
Cement
Polyalk EP

2" dia pipe water proofing in 4" slab thick


Flexiroof PU primer
Slab portion cut side
Slab top
Less
Pipe portion
Total

1.00
1.00
-1.00
1.00

0.19
0.30
0.00
0.16

0.100
0.30
0.300

25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total

1.00
1.00
-1.00
1.00
1.00

0.19
0.30
0.00
0.16
0.15

0.100
0.30
0.300

1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total

Sand
Slab portion
Total

1.00
1.00

1.00

0.16
0.30

0.19

0.300
0.30

0.003

Qty

Unit

Rate

Amt

1.00

no

0.02
0.09
-0.00
0.04
0.14
1.50
0.06

Sqm
Sft
lit

493.50

29.68

0.02
0.09
-0.00
0.04
0.14
0.28
3.01
0.39

Sqm
Sft
Kg

800.01

312.82

0.04
0.09
0.13
1.36
1.49

Sqm
Sft
Sft

90.00

134.16

0.00
0.00
0.01
0.02

Cum
Cft
Cft

65.00

1.51

0.08
0.04

Kg
kg

5.50
210.00

0.45 Cement
8.63 Polyak

Total =

487 per no

1.00

no

0.02
0.09
-0.00
0.05
0.15
1.65
0.07

Sqm
Sft
lit

493.50

32.63

0.02
0.09
-0.00
0.05
0.15
0.31
3.31
0.43

Sqm
Sft
Kg

800.01

343.96

0.05
0.09
0.14
1.48
1.62

Sqm
Sft
Sft

90.00

146.11

0.00
0.00
0.02
0.03

Cum
Cft
Cft

65.00

1.87

Sr.no.

Description

nos

Len

Bre

Dep

Joint grouting
Cement
Polyalk EP

3" dia pipe water proofing in 4" slab thick


Flexiroof PU primer
Slab portion cut side
Slab top
Less
Pipe portion
Total

0.10
0.05

1.00
1.00
-1.00
1.00

0.27
0.30
0.01
0.24

0.100
0.30
0.300

25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total

1.00
1.00
-1.00
1.00
1.00

0.27
0.30
0.01
0.24
0.18

0.100
0.30
0.300

1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total

Sand
Slab portion
Total

1.00
1.00

1.00

0.24
0.30

0.300
0.30

0.27

0.003

Joint grouting
Cement
Polyalk EP

4" dia pipe water proofing in 4" slab thick


Flexiroof PU primer
Slab portion cut side
Slab top
Less
Pipe portion
Total

1.00
1.00
-1.00
1.00

0.35
0.30
0.01
0.31

0.100
0.30
0.300

25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total

1.00
1.00
-1.00
1.00
1.00

0.35
0.30
0.01
0.31
0.21

0.100
0.30
0.300

1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total

Sand

Qty

1.00
1.00

0.31
0.30

0.300
0.30

Unit

Rate

Amt

Kg
kg

5.50
210.00

0.57 Cement
10.95 Polyak

Total =

536 per no

1.00

no

0.03
0.09
-0.01
0.07
0.18
1.96
0.08

Sqm
Sft
lit

493.50

38.68

0.03
0.09
-0.01
0.07
0.18
0.36
3.92
0.51

Sqm
Sft
Kg

800.01

407.74

0.07
0.09
0.16
1.73
1.90

Sqm
Sft
Sft

90.00

171.21

0.00
0.00
0.02
0.04

Cum
Cft
Cft

65.00

2.64

0.15
0.08

Kg
kg

5.50
210.00

0.83 Cement
15.84 Polyak

Total =

637 per no

1.00

no

0.04
0.09
-0.01
0.09
0.21
2.26
0.09

Sqm
Sft
lit

493.50

44.52

0.04
0.09
-0.01
0.09
0.21
0.42
4.51
0.59

Sqm
Sft
Kg

800.01

469.33

0.09
0.09
0.18
1.98
2.18

Sqm
Sft
Sft

90.00

196.31

Sr.no.

Description
Slab portion
Total

nos
1.00

Len

Bre

0.35

Dep
0.003

Joint grouting
Cement
Polyalk EP

6" dia pipe water proofing in 4" slab thick


Flexiroof PU primer
Slab portion cut side
slab top
Less
Pipe portion
Total

1.00
1.00
-1.00
1.00

0.51
0.30
0.02
0.47

0.100
0.30
0.300

25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total

1.00
1.00
-1.00
1.00
1.00

0.51
0.30
0.02
0.47
0.26

0.100
0.30
0.300

1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total

Sand
Slab portion
Total

1.00
1.00

1.00

0.47
0.30

0.300
0.30

0.51

0.003

Joint grouting
Cement
Polyalk EP

Qty

Unit

0.00
0.00
0.03
0.05

Cum
Cft
Cft

0.20
0.10

Kg
kg

Rate

65.00

3.41

5.50
210.00

1.09 Cement
20.73 Polyak

Total =

735 per no

1.00

no

0.05
0.09
-0.02
0.14
0.26
2.82
0.11

Sqm
Sft
lit

493.50

55.58

0.05
0.09
-0.02
0.14
0.26
0.52
5.63
0.73

Sqm
Sft
Kg

800.01

585.91

0.14
0.09
0.23
2.49
2.74

Sqm
Sft
Sft

90.00

246.50

0.00
0.00
0.04
0.08

Cum
Cft
Cft

65.00

4.94

0.29
0.15

Kg
kg

5.50
210.00

1.60 Cement
30.51 Polyak

Total =

925 per no

Base coat 2 coats on floor


1.00

2.50

1.50

3.75
40.37
11.12
13.91

Polyalk WP
Cement

Sqm
Sft
Kg
Kg

0.0038
225.75
5.50

Total =
7

Amt

2,511.24 Polyak
76.48 Cement

2,588 per no
64.10 per Sft

Base coat 3 coats on siporex wall


1.00
2.00
2.00
-1.00

Polyalk WP
Cement

2.50
2.50
1.50
0.75

1.50
0.600
0.600
0.600

Data
3.00
1.80
-0.45
4.35
46.83
15.48
19.36

0.0044
Sft
Kg
Kg

225.75
5.50

Total =

3,495.65 Polyak
106.46 Cement

3,602 per no
76.92 per Sft

Sr.no.
8

Description

nos

Len

Bre

Dep

Qty

Unit

Data
5.00
3.00
-0.75
7.25
23.79
1.22
3.05
0.15
0.05

m
Rft
Kg
Kg
Cft
Cft

Rate

2" x 2" fillet for wata corner


1.00
2.00
2.00
-1.00

Polyalk EP
Cement
Sand
Metal

2.50
2.50
1.50
0.75

1.50

0.01
210.00
5.50
65.00
26.00

Total =
9

Amt

Water proof plaster 20mm thick


Cement
Sand
Sunplex

87.20
Sft
2.55
bag
17.44
Cft
2.55 pouch

275.00
65.00
40.00
Total =

256.61
16.80
9.83
1.17

Polyak
Cement
Sand
Metal

284 per no
11.96 per Rft
700.19
1,133.55
101.85
1,936 per no
22.20 per Sft

Project:
Aspiree
Structure: D bdg
Subject:
Chemical water proofing - Sunanda Chemicals
Sr.no.

Description

Nos

Len

65.00
Bre

Dep

Qty

Unit

Rate

Amt

2" dia

80.00
3" dia

Material
Base coat floor- 2 layer
Total =

7,929

Sft

64.10

508,254

Base coat sides- 3 layer


Total =

9,979

Sft

76.92

767,621

2"x2" fillet for wata


Total =

4,589

Rft

11.96

54,872

Water proof plaster


Total =

17,908

Sft

22.20

397,521

2" pipe water proofing


Total =

285.00

nos

536.10

152,788

3" pipe water proofing


Total =

195.00

nos

636.95

124,205

4" pipe water proofing


Total =

330.00

nos

735.39

242,678

Labour
Chemical coating + plaster
2"x2" fillet
2" pipe sealing
3" pipe sealing
4" pipe sealing

17,908
4,589
285.00
195.00
330.00

Sft
Rft
nos
nos
nos

25.00
10.00
100.00
125.00
150.00

447,700
45,893
28,500
24,375
49,500

25.00
2.56

Total = lab + mat 2,843,908


Toilets
Total =

195.00

nos

6,572.03
11,411.44

Sft
Sft

14,584
11,528
3,056
110,080
25.83

Salable area of bdg


Rate on salable
In estimate
Base water proofing
Wall water proofing
Total
Salable area of bdg
Rate on salable

134.57
134.57

884,430
1,535,692
2,420,121
99,988
24.20

per toilet
material per toilet
Labour per toilet
Sft
per Sft

Sft
per Sft

110.00
4" dia