Description
nos
Len
0.16
0.30
0.00
0.12
Bre
Dep
0.100
0.30
0.300
25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total
1.00
1.00
-1.00
1.00
1.00
0.16
0.30
0.00
0.12
0.14
0.100
0.30
0.300
1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total
Sand
Slab portion
Total
1.00
1.00
1.00
0.12
0.30
0.300
0.30
0.15
0.003
Joint grouting
Cement
Polyalk EP
1.00
1.00
-1.00
1.00
0.19
0.30
0.00
0.16
0.100
0.30
0.300
25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total
1.00
1.00
-1.00
1.00
1.00
0.19
0.30
0.00
0.16
0.15
0.100
0.30
0.300
1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total
Sand
Slab portion
Total
1.00
1.00
1.00
0.16
0.30
0.19
0.300
0.30
0.003
Qty
Unit
Rate
Amt
1.00
no
0.02
0.09
-0.00
0.04
0.14
1.50
0.06
Sqm
Sft
lit
493.50
29.68
0.02
0.09
-0.00
0.04
0.14
0.28
3.01
0.39
Sqm
Sft
Kg
800.01
312.82
0.04
0.09
0.13
1.36
1.49
Sqm
Sft
Sft
90.00
134.16
0.00
0.00
0.01
0.02
Cum
Cft
Cft
65.00
1.51
0.08
0.04
Kg
kg
5.50
210.00
0.45 Cement
8.63 Polyak
Total =
487 per no
1.00
no
0.02
0.09
-0.00
0.05
0.15
1.65
0.07
Sqm
Sft
lit
493.50
32.63
0.02
0.09
-0.00
0.05
0.15
0.31
3.31
0.43
Sqm
Sft
Kg
800.01
343.96
0.05
0.09
0.14
1.48
1.62
Sqm
Sft
Sft
90.00
146.11
0.00
0.00
0.02
0.03
Cum
Cft
Cft
65.00
1.87
Sr.no.
Description
nos
Len
Bre
Dep
Joint grouting
Cement
Polyalk EP
0.10
0.05
1.00
1.00
-1.00
1.00
0.27
0.30
0.01
0.24
0.100
0.30
0.300
25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total
1.00
1.00
-1.00
1.00
1.00
0.27
0.30
0.01
0.24
0.18
0.100
0.30
0.300
1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total
Sand
Slab portion
Total
1.00
1.00
1.00
0.24
0.30
0.300
0.30
0.27
0.003
Joint grouting
Cement
Polyalk EP
1.00
1.00
-1.00
1.00
0.35
0.30
0.01
0.31
0.100
0.30
0.300
25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total
1.00
1.00
-1.00
1.00
1.00
0.35
0.30
0.01
0.31
0.21
0.100
0.30
0.300
1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total
Sand
Qty
1.00
1.00
0.31
0.30
0.300
0.30
Unit
Rate
Amt
Kg
kg
5.50
210.00
0.57 Cement
10.95 Polyak
Total =
536 per no
1.00
no
0.03
0.09
-0.01
0.07
0.18
1.96
0.08
Sqm
Sft
lit
493.50
38.68
0.03
0.09
-0.01
0.07
0.18
0.36
3.92
0.51
Sqm
Sft
Kg
800.01
407.74
0.07
0.09
0.16
1.73
1.90
Sqm
Sft
Sft
90.00
171.21
0.00
0.00
0.02
0.04
Cum
Cft
Cft
65.00
2.64
0.15
0.08
Kg
kg
5.50
210.00
0.83 Cement
15.84 Polyak
Total =
637 per no
1.00
no
0.04
0.09
-0.01
0.09
0.21
2.26
0.09
Sqm
Sft
lit
493.50
44.52
0.04
0.09
-0.01
0.09
0.21
0.42
4.51
0.59
Sqm
Sft
Kg
800.01
469.33
0.09
0.09
0.18
1.98
2.18
Sqm
Sft
Sft
90.00
196.31
Sr.no.
Description
Slab portion
Total
nos
1.00
Len
Bre
0.35
Dep
0.003
Joint grouting
Cement
Polyalk EP
1.00
1.00
-1.00
1.00
0.51
0.30
0.02
0.47
0.100
0.30
0.300
25sft/lit
Flexiroof PU
Slab portion cut side
Slab top
Less
Pipe portion
2nd time coating
Total
1.00
1.00
-1.00
1.00
1.00
0.51
0.30
0.02
0.47
0.26
0.100
0.30
0.300
1.4kg/Sqm
Geo textile membrane
Pipe portion
Slab top
Total
Sand
Slab portion
Total
1.00
1.00
1.00
0.47
0.30
0.300
0.30
0.51
0.003
Joint grouting
Cement
Polyalk EP
Qty
Unit
0.00
0.00
0.03
0.05
Cum
Cft
Cft
0.20
0.10
Kg
kg
Rate
65.00
3.41
5.50
210.00
1.09 Cement
20.73 Polyak
Total =
735 per no
1.00
no
0.05
0.09
-0.02
0.14
0.26
2.82
0.11
Sqm
Sft
lit
493.50
55.58
0.05
0.09
-0.02
0.14
0.26
0.52
5.63
0.73
Sqm
Sft
Kg
800.01
585.91
0.14
0.09
0.23
2.49
2.74
Sqm
Sft
Sft
90.00
246.50
0.00
0.00
0.04
0.08
Cum
Cft
Cft
65.00
4.94
0.29
0.15
Kg
kg
5.50
210.00
1.60 Cement
30.51 Polyak
Total =
925 per no
2.50
1.50
3.75
40.37
11.12
13.91
Polyalk WP
Cement
Sqm
Sft
Kg
Kg
0.0038
225.75
5.50
Total =
7
Amt
2,511.24 Polyak
76.48 Cement
2,588 per no
64.10 per Sft
Polyalk WP
Cement
2.50
2.50
1.50
0.75
1.50
0.600
0.600
0.600
Data
3.00
1.80
-0.45
4.35
46.83
15.48
19.36
0.0044
Sft
Kg
Kg
225.75
5.50
Total =
3,495.65 Polyak
106.46 Cement
3,602 per no
76.92 per Sft
Sr.no.
8
Description
nos
Len
Bre
Dep
Qty
Unit
Data
5.00
3.00
-0.75
7.25
23.79
1.22
3.05
0.15
0.05
m
Rft
Kg
Kg
Cft
Cft
Rate
Polyalk EP
Cement
Sand
Metal
2.50
2.50
1.50
0.75
1.50
0.01
210.00
5.50
65.00
26.00
Total =
9
Amt
87.20
Sft
2.55
bag
17.44
Cft
2.55 pouch
275.00
65.00
40.00
Total =
256.61
16.80
9.83
1.17
Polyak
Cement
Sand
Metal
284 per no
11.96 per Rft
700.19
1,133.55
101.85
1,936 per no
22.20 per Sft
Project:
Aspiree
Structure: D bdg
Subject:
Chemical water proofing - Sunanda Chemicals
Sr.no.
Description
Nos
Len
65.00
Bre
Dep
Qty
Unit
Rate
Amt
2" dia
80.00
3" dia
Material
Base coat floor- 2 layer
Total =
7,929
Sft
64.10
508,254
9,979
Sft
76.92
767,621
4,589
Rft
11.96
54,872
17,908
Sft
22.20
397,521
285.00
nos
536.10
152,788
195.00
nos
636.95
124,205
330.00
nos
735.39
242,678
Labour
Chemical coating + plaster
2"x2" fillet
2" pipe sealing
3" pipe sealing
4" pipe sealing
17,908
4,589
285.00
195.00
330.00
Sft
Rft
nos
nos
nos
25.00
10.00
100.00
125.00
150.00
447,700
45,893
28,500
24,375
49,500
25.00
2.56
195.00
nos
6,572.03
11,411.44
Sft
Sft
14,584
11,528
3,056
110,080
25.83
134.57
134.57
884,430
1,535,692
2,420,121
99,988
24.20
per toilet
material per toilet
Labour per toilet
Sft
per Sft
Sft
per Sft
110.00
4" dia