Sand (filling)
Sand (Mortor)
Chips 12mm
Chips 6mm
Metal 40mm
Cement
Sand for filling
Rod
Brick(25x12x8cm)
Brick Khoa
R.R. Stone
Tranportation
39.00
44.00
640.00
42.00
1092.00
Hish Skilled
Skilled
Semi-skilled
Un-skilled
Nut Bolt
Fire Wood
Labour rate
205.00
190.00
170.00
150.00
70.00
415.00
Description of items
Qnty
Rate
a)
b)
2
Supplying all labour, T&P and
Earthwork in excavation in Ordinary
Soil including dressing, breaking
clods & laying in layers not
exceeding 30cum in depth leveling
the bed & depositing the soil with in
initial lead of50m. & initial lift of
1.50m.
,
including
sundries,
supervision charges etc & as per
the direction of engineer- in-charge.
Data for 100 cum
Man Mulia (Un-skilled)
Women Mulia (Un-skilled)
c)
d)
Add O.H.C. @
Add Contractor Profit@
e)
Add foundation@
20 %
1%
a)
b)
16 nos
16 nos
32 nos
0%
0%
Each
150.00
Each
150.00
c)
d)
Add O.H.C. @
Add Contractor Profit@
e)
Add foundation@
Add Labour Cess
Total for
21.5 nos
21.5 nos
43 nos
0%
0%
20 %
1%
100 cum
SL No.
Description of items
Qnty
Rate
a)
b)
c)
d)
Add O.H.C. @
Add Contractor Profit@
e)
Add foundation@
Add Labour Cess
Total for
a)
b)
c)
33.53 nos
33.53 nos
67.06 nos
0%
0%
Each
200.00
Each
150.00
20 %
1%
100 cum
21 nos
23 nos
44 nos
0%
SL No.
1
d)
e)
Description of items
2
Add contractor profit
Qnty
Rate
3
0%
a)
b)
5760.00
7740.00
16094.40
7920.00
37514.40 /
4
Add 1% Labour Cess
Say
55 nos
54 nos
9472.40
SL No.
Description of items
c)
d)
Add O.H.C. @
Add contractor Profit@
e)
Qnty
Rate
3
109 nos
0%
0%
20.00 %
4
150.00
Each
16350.00
1.00 %
i)
Supplying all
labour, T&P and
Blasting hard and compacted sheet
rock
excluding
sand
stone
measured in solid including jumping
holes cost of explosive fuse,
detonator, etc and stacking the
blasted debris clear of work within
Data lead.
for 2.83 cum
50m
Blaster
Man Mulia
Stone cutter
Sangi Mulia
ii)
III)
IV)
v)
Overhead Charges @
Add Contractor Profit @
Total (i + ii+ iii+iv)
For 1 cum =
i)
ii)
iii)
1 no
2 nos
2 nos
2 nos
Each
Each
Each
Each
205.00
150.00
190.00
170.00
L.S.
0.00 %
0.00 %
on(i+ii)
on(i+ii)
1305.60
1305.60
1305.60 /
2.83 cum
Add Labour Cess @ 1.00 %
5.68 nos
0.00 % on (i+ii)
0.00 % on (i+ii)
Add Labour cess
Each
150.00
852.00
852.00
1.00
SL No.
Description of items
Qnty
Rate
2
Supplying all labour, T&P and
Excavation of founation in laterite
rock or any hard rock (other than
granite
or
disintigrated
rock)
removed by chiselling including
dressing and levelling the bed not
exceeding 1.5m in depth and
depositing the soil within initial lead
of 50m and as per specification
approved by the Department
i)
ii)
iii)
3.74 nos
Each
0.00 % on (i+ii)
0.00 % on (i+ii)
561.00
561.00
10
i)
ii)
iii)
150.00
1.00
0.50
nos
Each
0.00 % on(i+ii)
0.00 % on(i+ii)
190.00
95.00
95.00
11
a)
5760.00 x
1.00 %
2 / 3
SL No.
Description of items
Qnty
Rate
b)
6450.00 x
1.00 %
2 / 3
c)
13412.00 x
1.00 %
2 / 3
d)
In Slushy Soil
6600.00 x
1.00 %
2 / 3
e)
3840.00
4300.00
8941.33
4400.00
21481.33 / 4
1%
Say
12
i)
ii)
iii)
Labour
Man Mulia (Unskilled)
Overhead Charges @
Add Contractor Profit@
4.10
nos
0.00 % on(i+ii)
0.00 % on(i+ii)
Each
150.00
615.00
615.00
SL No.
Description of items
Qnty
Rate
1
Total (i + ii+ iii)
1%
Amount in
Rs.
5
4800.00
0.00
0.00
4800.00
Say
6450.00
0.00
0.00
6450.00
Say
Remarks
6
4800.00
960.00
5760.00
57.60
5817.60
5817.60
6450.00
1290.00
7740.00
77.40
7817.40
7817.40
Amount in
Rs.
5
13412.00
0.00
0.00
13412.00
Say
6600.00
0.00
Remarks
6
13412.00
2682.40
16094.40
160.94
16255.34
16255.30
16094.40
615.00
16709.40
167.0940
16876.49
Amount in
Rs.
5
0.00
6600.00
Say
Remarks
6
6600.00
1320.00
7920.00
79.20
7999.20
7999.20
9378.60
93.79
9472.39 /100cum
Amount in
Rs.
5
16350.00
0.00
0.00
16350.00
Say
205.00
300.00
380.00
340.00
1225.00
80.60
1305.60
852.00
852.00
%
Say
Remarks
6
16350.00
3270.00
19620.00
196.20
19816.20
19816.20
1305.60
0.00
0.00
1305.60
461.34
4.61
465.96
466.00 /Cum
852.00
0.00
0.00
852.00
8.52
860.52
860.50 /cum
Amount in
Rs.
5
561.00
561.00
95.00
95.00
Say
3840.00
38.40
3878.40
Remarks
6
561.00
0.00
0.00
561.00
5.61
566.61 /cum
95.00
0.00
0.00
95.00
0.95
95.95 /Sqm
96.00 /Sqm
3878.40 /100cum
Amount in
Rs.
5
Remarks
6
4300.00
43.00
4343.00
4343.00 /100cum
8941.33
89.41
9030.75
9030.70 /100cum
4400.00
44.00
4444.00
4444.00 /100cum
5370.33
53.70
5424.04
5424.00 /100cum
615.00
615.00
615.00
0.00
0.00
Amount in
Rs.
5
Remarks
6
615.00
6.15
621.15
621.20
Say
100cum
9993.60
99.936
10093.54
10092.35
10193.2735
Sand filling
SL No.
Description of items
Qnty
Unit
a)
i)
Materials
Sand ffor filling
Labour charges
Man Mulia (Unskilled)
12.36 nos
O.H.C. @
Add Contractor Profit@
C)
Each
0.00 %
0.00 %
6054.00 /
100
Description of items
Qnty
2
Supplying all materials, labour, T&P and filling with
Granite stone screening (Passing through 2.36mm
sieve & retained on 180 micron sieve) watered and
rammed including conveyance of all materials to
work site, payment of royalty , taxes ,contractor profit
& labour cess etc all complete as per specification
and direction of Engineer-in-charge.
Unit
Labour charges
Man Mulia (Unskilled)
12.36 nos
O.H.C. @
Add Contractor Profit@
(B)
C)
Each
0.00 %
0.00 %
1854.00 /
100
Rate
4
Amount in
Rs.
5.00
42.00
4200.00
4200.00
150.00
1854.00
1854.00
6054.00
6054.00
cum
356.00
Labour Cess
Say
Remarks
6.00
4200.00
1854.00
6054.00
0.00
0.00
6054.00
60.54
356.00
416.54
4.17
420.71
420.70
60.54
42.07054
Rate
4
Amount in
Rs.
5.00
150.00
1854.00
1854.00
cum
Remarks
6.00
1854.00
0.00
0.00
1854.00
18.54
18.54
578.00
Labour Cess
Say
311.80
908.34
9.08
917.42
917.40
18.54
18.73
a)
b)
c)
d)
e)
f)
O.H. charges @ 12 %
Watering charges @ 1%
Sundries @ 8%
0.17 nos
0.17 nos
1.33 nos
b)
Unit
a)
Qnty
Each
Each
Each
316.75 /
1.61 Qntl
99.22 /
Add Labour cess@
2.05 Qntl
126.33 /
5.14
Per Qntl
10
1%
Per Qntl
10
1%
c)
3.33 Qntl
205.21 /
d)
4.86 Qntl
299.50 /
e)
6.56 Qntl
404.26 /
f)
8.47 Qntl
521.96 /
Per Qntl
10
1%
Per Qntl
10
1%
Per Qntl
10
1%
Per Qntl
10
g)
1%
10.66 Qntl
656.92 /
10
h)
1%
12.95 Qntl
798.04 /
1%
15.63 Qntl
963.19
Per Qntl
10
h)
Per Qntl
Per Qntl
10
1%
i)
18.33 Qntl
1129.58 /
j)
24.43 Qntl
1505.49 /
j)
31.5 Qntl
1941.18 /
Per Qntl
10
1%
Per Qntl
10
1%
Per Qntl
10
Rate in Rs
Amount in
Rs.
190.00
170.00
150.00
32.30
28.90
199.50
260.70
Remarks
7
61.62 /Qntl
61.62
Say
61.62
Say
99.22
99.22
9.92
0.10
10.02 / Mtr
/ Mtr
126.33
126.33
12.63
6.67
19.30
0.19
19.49 / Mtr
19.50 / Mtr
260.70
32.59
2.61
20.86
316.75
61.62
205.21
205.21
20.52
10.91
31.43
0.31
31.74 / Mtr
61.62
299.50
299.50
29.95
17.14
47.09
0.47
47.56 / Mtr
47.60
Say
61.62
404.26
404.26
40.43
24.00
64.43
0.64
65.07 / Mtr
61.62
521.96
521.96
52.20
30.00
82.20
0.82
83.02 / Mtr
61.62
656.92
656.92
65.69
40.00
105.69
1.06
106.75 / Mtr
61.62
798.04
798.04
79.80
40.00
119.80
1.20
121.00 / Mtr
61.62
963.19
963.19
96.32
60.00
156.32
1.56
157.88 / Mtr
61.62
1129.58
1129.58
112.96
60.00
172.96
1.73
174.69 / Mtr
61.62
1505.49
1505.49
150.55
80.00
230.55
2.31
232.85 / Mtr
61.62
1941.18
1941.18
194.12
194.12
1.94
196.06 / Mtr
225.90 / Mtr
Qnty
Unit
A)
Within 5.00 Km
110mm O.D.PVC pipe
Rate for Mtr
1200.00 /
685.00 mtr /
1200.00 /
325.00 mtr /
1200.00 /
Per Truck
Per Truck
685.00
Per Truck
325.00
Rate in Rs
5
Amount in
Rs.
Remarks
1.75 mtr
=
Say
3.69 mtr
3.70
Qnty
Unit
a)
b)
c)
d)
e)
f)
g)
h)
i)
1200.00
Per Truck
70.00
50.00
40.00
30.00
20.00
20.00
15.00
600mm dia
A)
Within 5.00 Km
110mm O.D.PVC pipe
Rate for Mtr
1200.00 /
685.00 mtr /
1200.00 /
325.00 mtr /
1200.00 /
Per Truck
Per Truck
685.00
Per Truck
325.00
Rate in Rs
5
Amount in
Rs.
Remarks
6.67 mtr
10.91 mtr
17.14 mtr
24.00 mtr
30.00 mtr
40.00 mtr
60.00 mtr
60.00 mtr
80.00 mtr
1.75 mtr
=
Say
3.69 mtr
3.70
a)
a)
b)
c)
d)
e)
2
Supplying all materials,labour,T&P and laying in
trenches unplastised PVC pipes and specials
(class-II) of the following outer diameter
(4kg/cm2) including jointing with supply of
approved solvent cement by non-heat application
method including testing as per specification, all
complete (earth work in trenches, cost of PVC
pipe &
specials fittings to be measured
separately) as per the direction of Engineer-incharge.
g)
h)
i)
Jointing materials
Cost of solvent cement =30 grammes or
kg.
Watering Charges
Sundries
0.03
Qnty
Unit
Rate in Rs
5
0.12 nos
0.24 nos
Each
Each
190.00
150.00
0.22 nos
0.83 nos
0.12 nos
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
12.50 %
0.03 kg
1%
8%
321.54 /
10
1.00 mtr
Labour cost
1%
1 mtr
1 mtr
mtr
mtr
84.96
%
Say
a)
a)
b)
c)
d)
e)
g)
h)
i)
Jointing materials
Cost of solvent cement =30 grammes or
kg.
Watering Charges
Sundries
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
0.056 kg
c)
d)
0.31 nos
1.33 nos
0.18 nos
0.03
a)
b)
190.00
150.00
12.50 %
Each
Each
O.H.C.
a)
0.18 nos
0.35 nos
1%
8%
495.62 /
1.00 mtr
10
1%
121.75
1%
0.25 nos
0.50 nos
Each
Each
190.00
150.00
0.46 nos
1.92 nos
Each
Each
190.00
170.00
e)
g)
h)
i)
0.25 nos
Jointing materials
Cost of solvent cement =30 grammes or
kg.
Watering Charges
Sundries
O.H.C.
12.50 %
0.03
0.133 kg
Each
150.00
Per kg
200.00
1%
8%
723.77 /
1.00 mtr
10
1%
1.00 mtr
1.00 mtr
257.42
1%
Say
Amount in
Rs.
6
Remarks
7
22.80
36.00
41.80
141.10
18.00
259.70
32.46
292.16
292.16
6.00
2.60
20.78
29.37
29.37
321.54
32.15
1.75
33.91
0.34
34.24 /mtr(Labour)
84.96
33.91
118.87
1.19
120.05
119.90 /mtr
34.20
52.50
58.90
226.10
27.00
398.70
49.84
448.54
448.54
11.20
3.99
31.90
47.08
49.56
1.75
51.31
0.51
51.83
121.75
51.31
173.06
1.73
174.79
47.50
75.00
87.40
326.40
47.08
495.62
37.50
573.80
71.73
645.53
645.53
26.60
5.74
45.90
78.24
78.24
723.77
72.38
3.69
76.07
0.76
76.83
257.42
76.07
333.49
3.33
336.82
336.50 / Mtr
76.50 /mtr
Labour Charge
a)
a)
b)
c)
d)
e)
2
Supplying all labour,T&P and laying in trenches
unplastised PVC pipes and specials (class-III) of the
following outer diameter (6kg/cm2) including jointing
with supply of approved solvent cement by non-heat
application method including testing as per
specification, all complete (earth work in trenches,
cost of PVC pipe & specials fittings to be measured
separately) as per the direction of Engineer-in-charge.
Qnty
Unit
Rate in Rs
5
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.
g)
Jointing materials
Cost of solvent cement =30 grammes or
h)
i)
Watering Charges
Sundries
0.03 kg.
0.18 nos
0.35 nos
Each
Each
190.00
150.00
0.31 nos
1.33 nos
0.18 nos
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
12.50 %
0.056 kg
1%
8%
495.62 /
10
1.00 mtr
1%
a)
a)
b)
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
0.25 nos
0.5 nos
Each
Each
190.00
150.00
c)
d)
e)
0.46 nos
1.92 nos
0.25 nos
O.H.C.
g)
Jointing materials
Cost of solvent cement =30 grammes or
h)
i)
Watering Charges
Sundries
0.03 kg.
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
12.50 %
0.133 kg
1%
8%
723.77 /
10
1.00 mtr
1%
Say
a)
a)
b)
c)
d)
e)
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.
g)
Jointing materials
Cost of solvent cement =30 grammes or
h)
i)
Watering Charges
Sundries
0.03 kg.
0.32 nos
0.64 nos
Each
Each
190.00
150.00
0.74 nos
2.58 nos
0.32 nos
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
12.50 %
0.133 kg
1%
8%
979.16 /
1.00 mtr
10
1%
Say
34.20
52.50
58.90
226.10
27.00
398.70
49.84
448.54
448.54
11.20
3.99
31.90
47.08
47.08
495.62
49.56
1.75
51.31
0.51
51.83
270.76
2.71
273.47
51.80
47.50
75.00
87.40
326.40
37.50
573.80
71.73
645.53
645.53
26.60
5.74
45.90
78.24
78.24
723.77
72.38
3.70
76.08
0.76
76.84
76.80 / Mtr
60.80
96.00
140.60
438.60
48.00
784.00
98.00
882.00
882.00
26.60
7.84
62.72
97.16
97.92
0.00
97.92
0.98
98.90
84.80 / Mtr
97.16
979.16
a)
a)
b)
c)
d)
e)
2
Supplying all labour,T&P and laying in trenches
unplastised PVC pipes and specials (class-III) of the
following outer diameter (6kg/cm2) including jointing
with supply of approved solvent cement by non-heat
application method including testing as per
specification, all complete (earth work in trenches,
cost of PVC pipe & specials fittings to be measured
separately) as per the direction of Engineer-in-charge.
Qnty
Unit
Rate in Rs
5
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.
g)
Jointing materials
Cost of solvent cement =30 grammes or
h)
i)
Watering Charges
Sundries
0.03 kg.
0.12 nos
0.24 nos
Each
Each
190.00
150.00
0.22 nos
0.83 nos
0.12 nos
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
12.50 %
0.03 kg
1%
8%
321.54 /
1%
10
Say
a)
a)
b)
c)
d)
e)
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.
g)
Jointing materials
Cost of solvent cement =30 grammes or
h)
i)
Watering Charges
Sundries
0.03 kg.
0.14 nos
0.28 nos
Each
Each
190.00
150.00
0.29 nos
1.00 nos
0.14 nos
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
12.50 %
0.04 kg
1%
8%
390.36 /
1.00 mtr
10
1%
Say
a)
a)
b)
c)
d)
e)
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.
g)
Jointing materials
Cost of solvent cement =30 grammes or
h)
i)
Watering Charges
Sundries
0.03 kg.
0.18 nos
0.35 nos
Each
Each
190.00
150.00
0.31 nos
1.33 nos
0.18 nos
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
12.50 %
0.056 kg
1%
8%
495.62 /
10
a)
a)
b)
c)
d)
e)
1.00 mtr
1%
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.
g)
Jointing materials
Cost of solvent cement =30 grammes or
h)
i)
Watering Charges
Sundries
0.03 kg.
0.25 nos
0.5 nos
Each
Each
190.00
150.00
0.46 nos
1.92 nos
0.25 nos
Each
Each
Each
190.00
170.00
150.00
Per kg
200.00
12.50 %
0.133 kg
1%
8%
723.77 /
10
1.00 mtr
1.00 mtr
1%
Say
a)
a)
b)
c)
d)
e)
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.
0.32 nos
0.64 nos
Each
Each
190.00
150.00
0.74 nos
2.58 nos
0.32 nos
Each
Each
Each
190.00
170.00
150.00
12.50 %
g)
Jointing materials
Cost of solvent cement =30 grammes or
h)
i)
Watering Charges
Sundries
0.03 kg.
0.133 kg
Per kg
200.00
1%
8%
979.16 /
1.00 mtr
10
1%
Say
22.80
36.00
41.80
141.10
18.00
259.70
32.46
292.16
292.16
6.00
2.60
20.78
29.37
32.15
0.32
32.48
27.80 / Mtr
29.37
321.54
26.60
42.00
55.10
170.00
21.00
314.70
39.34
354.04
354.04
8.00
3.15
25.18
36.32
36.32
390.36
39.04
1.30
40.34
0.40
40.74
35.10 / Mtr
34.20
52.50
58.90
226.10
27.00
398.70
49.84
448.54
448.54
11.20
3.99
31.90
47.08
49.56
47.08
495.62
1.75
51.31
0.51
51.83
51.80
47.50
75.00
87.40
326.40
37.50
573.80
71.73
645.53
645.53
26.60
5.74
45.90
78.24
72.38
3.70
76.08
370.00
446.08
4.46
450.54
450.50 / Mtr
60.80
96.00
140.60
438.60
48.00
784.00
98.00
78.24
723.77
882.00
882.00
26.60
7.84
62.72
97.16
97.92
0.00
97.92
0.98
98.90
84.80 / Mtr
97.16
979.16
SL
No.
1
Description of items
(i)
Unit
O.H. charge @
Watering charges @
Sundries @
For 1no joint
Add Labour Cess @
(ii)
Qnty
5/ 6
2/ 3
1 2/
nos
nos
Each
Each
nos
Each
12.50
% on
1 % on
6 % on
For 10 nos Joints
623.39 / 10
1%
521.67
521.67
521.67
1 No
Each
1%
1 1/
2/
3
3
nos
nos
Each
Each
2 5/
12
nos
Each
O.H. charge @
Watering charges @
Sundries
12.50
729.17
729.17
729.17
1 no
Each
% on
1 % on
6 % on
For 10 nos joints
For 1no joint
871.35 / 10
Add Labour Cess @
1%
1%
(ii)
1 1/
3
1
nos
nos
Each
Each
nos
Each
% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1043.63 / 10
Add Labour Cess @
1%
(ii)
12.50
1 1/
3
1
nos
nos
Each
Each
nos
Each
% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1043.63 / 10
(ii)
12.50
873.33
873.33
873.33
1%
1 1/
3.33
12.50
3
1
nos
nos
Each
Each
nos
Each
% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1102.79 / 10
Add Labour Cess @
1%
(ii)
873.33
873.33
873.33
922.83
922.83
922.83
Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)
1 1/
4 1/
O.H. charge @
Watering charges @
Sundries
2
2
2
nos
nos
nos
% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1553.50 / 10
Add Labour Cess @
1%
(ii)
12.50
1 1/
4 1/
2
2
2
nos
nos
nos
% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1553.50 / 10
Add Labour Cess @
1%
(ii)
12.50
2
2
5
nos
nos
nos
% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1756.65 / 10
Add Labour Cess @
1%
(ii)
12.50
2
2
5
nos
nos
nos
Each
Each
Each
1300.00
1300.00
1300.00
Each
Each
Each
1300.00
1300.00
1300.00
Each
Each
Each
1470.00
1470.00
1470.00
Each
Each
Each
O.H. charge @
Watering charges @
Sundries
12.50
% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1756.65 / 10
Add Labour Cess @
1%
1470.00
1470.00
1470.00
Say
Say
190.00
170.00
158.33
113.33
150.00
250.00
521.67
45
62.34
0.62
62.96
63.00 Labour Ch
45.00
107.34
1.07
108.41
108.40
190.00
170.00
253.33
113.33
150.00
362.50
729.17
55
521.67
65.21
5.22
31.30
623.39
87.14
0.87
88.01
88.00 /Each
55.00
142.14
1.42
729.17
91.15
7.29
43.75
871.35
0.63
63.63
143.56
190.00
170.00
253.33
170.00
150.00
450.00
873.33
104.36
1.04
105.41
190.00
170.00
253.33
170.00
150.00
450.00
873.33
143.60
873.33
109.17
8.73
52.40
1043.63
105.40
873.33
109.17
8.73
52.40
1043.63
104.36
104.36
1.04
105.41
190.00
170.00
253.33
170.00
150.00
499.50
922.83
110.28
1.10
111.38
105.41
922.83
115.35
9.23
55.37
1102.79
111.38
63
190.00
170.00
150.00
285.00
340.00
675.00
1300.00
155.35
1.55
156.90
190.00
170.00
150.00
285.00
340.00
675.00
1300.00
155.35
1.55
156.90
190.00
170.00
150.00
190.00
170.00
150.00
380.00
340.00
750.00
1470.00
1300.00
162.50
13.00
78.00
1553.50
156.90
1300.00
162.50
13.00
78.00
1553.50
156.90
1470.00
183.75
14.70
88.20
1756.65
175.67
1.76
177.42
177.42
380.00
340.00
750.00
1470.00
1470.00
183.75
14.70
88.20
1756.65
175.67
1.76
177.42
177.42
Lead Joint
SL No. Description of items
1
1)
a)
I)
ii)
ii)
0.28 qntl
0.38 ltrs
Qntl
Lits
1 nos
1 nos
2 nos
Each
Each
Each
12.5 %
1%
8%
on
on
on
929.50 /
2.20 kg
0.18 kg
I)
Unit
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
b)
Qnty
10
kg
kg
1%
0.42 qntl
0.76 ltrs
Qntl
Lits
1.5 nos
1.5 nos
3 nos
Each
Each
Each
12.5 %
1%
on
on
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket
I)
ii)
3.40 kg
0.23 kg
I)
ii)
Qntl
Lits
2 nos
2 nos
4 nos
Each
Each
Each
12.5 %
1%
8%
on
on
on
10
5.00 kg
0.30 kg
kg
kg
0.56 qntl
0.76 ltrs
1859.00 /
10
1%
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
d)
on
1399.95 /
c)
8%
kg
kg
1%
0.65 qntl
1.14 ltrs
Qntl
Lits
2.5 nos
2.5 nos
5 nos
Each
Each
Each
12.5 %
1%
on
on
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket
2308.70 /
I)
ii)
ii)
Qntl
Lits
3 nos
3 nos
6 nos
Each
Each
Each
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
12.5 %
1%
8%
on
on
on
10
7.20 kg
0.48 kg
kg
kg
0.75 qntl
1.52 ltrs
2762.55 /
I)
10
1%
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
f)
on
6.10 kg
0.35 kg
e)
8%
kg
kg
1%
0.93 qntl
1.7 ltrs
Qntl
Lits
3 nos
3 nos
6 nos
Each
Each
Each
O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket
2842.65 /
I)
ii)
10
1.12 qntl
1.7 ltrs
Qntl
Lits
4 nos
4 nos
8 nos
Each
Each
Each
12.5 %
1%
8%
3723.40 /
on
on
on
10
9.50 kg
0.75 kg
kg
kg
1%
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
h)
on
on
on
8.40 kg
0.60 kg
g)
12.5 %
1%
8%
1%
kg
kg
I)
ii)
Material
Fire wood
Kerosene Oil
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket
I)
ii)
4.5 nos
4.5 nos
9 nos
Each
Each
Each
12.5 %
1%
8%
on
on
on
10
14.00 kg
0.95 kg
Qntl
Lits
4178.80 /
i)
1.21 qntl
2.27 ltrs
kg
kg
1%
1.31 qntl
2.27 ltrs
Qntl
Lits
4.75 nos
4.75 nos
9.5 nos
Each
Each
Each
12.5 %
1%
8%
4420.78 /
on
on
on
10
15.00 kg
1.00 kg
kg
kg
J)
I)
ii)
I)
ii)
1.68 qntl
2.84 ltrs
Qntl
Lits
6.5 nos
6.5 nos
13 nos
Each
Each
Each
12.5 %
1%
8%
5994.75 /
K)
1%
on
on
on
10
kg
kg
kg
kg
1%
2.14 qntl
3.41 ltrs
Qntl
Lits
7.7 nos
7.7 nos
Each
Each
15.4 nos
O.H. charge @
Watering charges @
Sundries @
7165.03 /
L)
I)
ii)
on
on
on
10
kg
kg
kg
kg
1%
2.24 qntl
3.41 ltrs
Qntl
Lits
8.1 nos
8.1 nos
16.2 nos
Each
Each
Each
12.5 %
1%
8%
7527.29 /
L)
12.5 %
1%
8%
Each
1%
on
on
on
10
kg
kg
kg
kg
I)
Fire wood
Kerosene Oil
ii)
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket
I)
ii)
Qntl
Lits
8.5 nos
8.5 nos
17 nos
Each
Each
Each
12.5 %
1%
8%
7885.40 /
L)
2.33 qntl
3.41 ltrs
10
kg
kg
2.80 qntl
4.55 ltrs
Qntl
Lits
10 nos
10 nos
20 nos
Each
Each
Each
12.5 %
1%
8%
9317.50 /
kg
kg
1%
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
on
on
on
1%
on
on
on
10
kg
kg
kg
kg
Rate in Rs
5
415.00
30.00
190.00
170.00
150.00
660.00
660.00
660.00
170.00
60.00
Say
415.00
30.00
190.00
170.00
150.00
990.00
990.00
Amount in
Rs.
6
Remarks
116.20
11.40
127.60
190.00
170.00
300.00
660.00
82.50
6.60
52.80
801.90
127.60
801.90
929.50
92.95
374.00
10.80
477.75
4.78
482.53
482.50 /Each
174.30
22.80
197.10
285.00
255.00
450.00
990.00
123.75
9.90
88
197.10
92.8295
93.8795
990.00
170.00
60.00
Say
415.00
30.00
190.00
170.00
150.00
1320.00
1320.00
1320.00
170.00
60.00
415.00
30.00
190.00
170.00
150.00
1650.00
1650.00
79.20
1202.85
1202.85
1399.95
140.00
578.00
13.80
731.80
7.32
739.11
739.10
232.40
22.80
255.20
380.00
340.00
600.00
1320.00
165.00
13.20
105.60
1603.80
255.20
1603.80
1859.00
185.90
850.00
18.00
1053.90
10.54
1064.44
269.75
34.20
303.95
475.00
425.00
750.00
1650.00
206.25
16.50
303.95
1650.00
170.00
60.00
Say
415.00
30.00
190.00
170.00
150.00
1980.00
1980.00
1980.00
170.00
60.00
415.00
30.00
190.00
170.00
150.00
132.00
2004.75
2004.75
2308.70
230.87
1037.00
21.00
1288.87
12.89
1301.76
1301.80
311.25
45.60
356.85
570.00
510.00
900.00
1980.00
247.50
19.80
158.40
2405.70
356.85
2405.70
2762.55
276.26
1224.00
28.80
1529.06
15.29
1544.35
385.95
51.00
436.95
570.00
510.00
900.00
1980.00
436.95
1980.00
1980.00
1980.00
170.00
60.00
415.00
30.00
190.00
170.00
150.00
2640.00
2640.00
2640.00
170.00
60.00
247.50
19.80
158.40
2405.70
2405.70
2842.65
284.27
1428.00
36.00
1748.27
17.48
1765.75
464.80
51.00
515.80
760.00
680.00
1200.00
2640.00
330.00
26.40
211.20
3207.60
372.34
1615.00
45.00
2032.34
20.32
2052.66
515.80
3207.60
3723.40
415.00
30.00
190.00
170.00
150.00
2970.00
2970.00
2970.00
170.00
60.00
Say
415.00
30.00
190.00
170.00
150.00
3135.00
3135.00
3135.00
170.00
60.00
502.15
68.10
570.25
855.00
765.00
1350.00
2970.00
371.25
29.70
237.60
3608.55
570.25
3608.55
4178.80
417.88
2380.00
57.00
2854.88
28.55
2883.43
2883.40
543.65
68.10
611.75
902.50
807.50
1425.00
3135.00
391.88
31.35
250.80
3809.03
442.08
2550.00
60.00
611.75
3809.03
4420.78
446.49828
3052.08
30.52
3082.60
3082.60
Say
415.00
30.00
190.00
170.00
150.00
4290.00
4290.00
4290.00
170.00
60.00
415.00
30.00
190.00
170.00
697.20
85.20
782.40
1235.00
1105.00
1950.00
4290.00
536.25
42.90
343.20
5212.35
782.40
5212.35
5994.75
599.48
0.00
0.00
599.48
5.99
605.47
888.10
102.30
990.40
1463.00
1309.00
990.40
150.00
5082.00
5082.00
5082.00
170.00
60.00
415.00
30.00
190.00
170.00
150.00
5346.00
5346.00
5346.00
170.00
60.00
2310.00
5082.00
635.25
50.82
406.56
6174.63
6174.63
7165.03
716.50
0.00
0.00
716.50
7.17
723.67
929.60
102.30
1031.90
1539.00
1377.00
2430.00
5346.00
668.25
53.46
427.68
6495.39
752.73
0.00
0.00
752.73
7.53
760.26
1031.90
6495.39
7527.29
415.00
30.00
190.00
170.00
150.00
5610.00
5610.00
5610.00
170.00
60.00
415.00
30.00
190.00
170.00
150.00
6600.00
6600.00
6600.00
170.00
60.00
966.95
102.30
1069.25
1615.00
1445.00
2550.00
5610.00
701.25
56.10
448.80
6816.15
1069.25
6816.15
7885.40
788.54
0.00
0.00
788.54
7.89
796.43
1162.00
136.50
1298.50
1900.00
1700.00
3000.00
6600.00
825.00
66.00
528.00
8019.00
931.75
0.00
0.00
931.75
9.32
941.07
1298.50
8019.00
9317.50
SL
No.
1
Description of items
Qnty
Unit
3
(i)
ii)
146.32 cm
Per cm
141.30 cm
146.32 cm
60.00 cm
347.62 cm
Add Labour Cess @
1%
Per cm
7.00
1024.24
11.60
4032.39
5056.63
5056.63
50.57
5107.20
a
b
c
2
Fixing Ferrule of the following nominal bore
including drilling the water main( cast iron pipes
or pipes with the metal strap) As per
specification complete
( excluding cost of ferrule)
10mm to 25mm bore
Labour for laying
Plumber ( fitter)
Helper to plumber or Helper
Male worker (U/S)-
d
e
f
g
Unit
0.25 nos
0.50 nos
0.50 nos
Add O.H.C.@
jointing materials etc @
Watering charges @
sundries @
ADD 15mm dia Brass Ferrule cock
Add Labour Cess
Qnty
12.5 %
17 %
1%
8%
Each
Each
Each
on
on
on
1 no
207.50
207.50
207.50
207.50
Each
1%
a)
b)
c)
d)
e)
Labour Charges
Plumber ( Fitter)
male worker (U/S)-
0.33 nos
0.33 nos
Add O.H.C. @
Watering charges @
sundries @
Add Labour Cess
12.50 %
1%
8%
1%
Each
Each
on
on
on
112.20
112.20
112.20
a)
b)
c)
d)
e)
Labour Charges
Plumber ( Fitter)
male worker (U/S)-
0.45 nos
0.45 nos
Add O.H.C. @
Watering charges @
sundries @
Add Labour Cess
a)
b)
c)
d)
e)
(i)
12.50 %
1%
8%
Each
Each
on
on
on
153.00
153.00
153.00
1%
0.25 nos
0.50 nos
12.50 %
1.00 %
7.00 %
1 set
Each
Each
on
on
on
132.50
132.50
132.50
Set
(ii)
1%
1 no
1%
Each
Rate in Rs Amount in
Rs.
5
6
190.00
170.00
150.00
350.00
190.00
150.00
47.50
85.00
75.00
207.50
25.94
35.28
2.08
16.60
287.39
350.00
62.70
49.50
112.20
14.03
1.12
8.98
136.32
1.36
137.69
Remarks
7
287.39
350.00
637.39
6.37
643.76
190.00
150.00
85.50
67.50
153.00
19.13
1.53
12.24
185.90
1.86
187.75
190.00
170.00
47.50
85.00
132.50
16.56
1.33
9.28
159.66
94.40
94.40
159.66
94.40
254.06
2.54
256.60
179.30
159.66
179.30
338.96
3.39
342.35
Qnty
Unit
0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%
Each
Each
Each
on
on
on
654.10
654.10
654.10
7.40
4.43 Qntl
Qntl
0.25 nos
0.25 nos
1.00 nos
Each
Each
Each
12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
289.20 /
b)
240.00
240.00
240.00
10
20 nos
Each
10 nos
Each
46 kg
7.00 kg
Kg
Rate for 10 nos Valves
5079.16
Kg
10
1%
0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%
Each
Each
Each
on
on
on
654.10
654.10
654.10
7.40
7.13 Qntl
Qntl
0.30 nos
0.30 nos
1.10 nos
Each
Each
Each
12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
328.97 /
b)
273.00
273.00
273.00
10
20 nos
Each
10 nos
74.28 kg
Each
Kg
11.20 kg
Kg
7911.26
10
1%
Say
0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%
Each
Each
Each
on
on
on
654.10
654.10
654.10
7.40
12.15 Qntl
Qntl
0.30 nos
0.30 nos
1.10 nos
Each
Each
Each
12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
328.97 /
b)
20 nos
273.00
273.00
273.00
10
Each
10 nos
Each
76.00 kg
Kg
16.24 kg
Kg
9150.39
10
1%
0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%
Each
Each
Each
on
on
on
654.10
654.10
654.10
7.40
17.69 Qntl
Qntl
Labour
Pl. Fitter (S)
Helper to plumber
Male worker
0.40 nos
0.40 nos
1.30 nos
Each
Each
Each
12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
408.50 /
b)
20 nos
10 nos
kg
339.00
339.00
339.00
10
Each
Each
Kg
sqm
sqm
Rate for 10 nos Valves
2716.83
10
1%
0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%
Each
Each
Each
on
on
on
654.10
654.10
654.10
7.40
a)
24.24 Qntl
Qntl
0.40 nos
0.40 nos
1.30 nos
Each
Each
Each
12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
408.50 /
b)
20 nos
10 nos
kg
339.00
339.00
339.00
10
Each
Each
Kg
sqm
sqm
Rate for 10 nos Valves
3420.27
10
1%
0.93 nos
0.62 nos
Each
Each
Male worker
2.48 nos
Add O.H. charges. @
Watering @
Sundries @
12.5 %
1%
8%
Each
on
on
on
a)
654.10
654.10
654.10
7.40
32.58 Qntl
Qntl
0.50 nos
0.50 nos
1.50 nos
Each
Each
Each
12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
488.03 /
b)
20 nos
10 nos
kg
405.00
405.00
405.00
10
Each
Each
Kg
sqm
sqm
Rate for 10 nos Valves
4475.02
1%
10
0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%
Each
Each
Each
on
on
on
a)
654.10
654.10
654.10
7.40
42.12 Qntl
Qntl
0.50 nos
0.50 nos
1.50 nos
Each
Each
Each
12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
488.03 /
b)
20 nos
10 nos
kg
405.00
405.00
405.00
10
Each
Each
Kg
sqm
sqm
Rate for 10 nos Valves
5499.58
1%
10
0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%
Each
Each
Each
on
on
on
a)
Qntl
654.10
654.10
654.10
7.40
Qntl
0.50 nos
0.50 nos
1.50 nos
Each
Each
Each
12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
488.03 /
b)
20 nos
10 nos
kg
405.00
405.00
405.00
10
Each
Each
Kg
sqm
sqm
Rate for 10 nos Valves
976.05
10
1%
Rate in Rs
5
190.00
170.00
150.00
Amount in
Rs.
6
Remarks
7
176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40
107.40
475.76
475.76
190.00
170.00
150.00
47.50
42.50
150.00
240.00
30.00
2.40
16.80
289.20
28.92
28.92
578.40
0.00
475.76
578.40
1054.16
70.00
3220.00
115.00
805.00
4025.00
507.92
5.08
513.00 Say
190.00
170.00
150.00
4025.00
5079.16
513.00
176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40
107.40
765.73
765.73
190.00
170.00
150.00
57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97
32.90
32.90
657.93
0.00
70.00
0.00
5199.60
115.00
1288.00
765.73
120.8
657.93
1423.66
11.2
1.6
11.2
6487.60
791.13
7.91
799.04
799.00
190.00
170.00
150.00
6487.60
7911.26
241.22
176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40
107.40
1304.86
1304.86
190.00
170.00
150.00
57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97
32.90
32.90
657.93
1304.86
657.93
1962.79
746.83
0.00
0.00
70.00
5320.00
76
115.00
1867.60
2.32
7187.60
924.20
176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40
107.40
16.24
0.812
7187.60
9150.39
915.04
9.15
924.19 Say
190.00
170.00
150.00
74.68293
1899.84
1899.84
1899.84
313.87
190.00
170.00
150.00
76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50
40.85
40.85
816.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1500.86
150.0864
0.00
2716.83
271.68
2.72
274.40
190.00
170.00
150.00
816.99
2716.83
-335.92
176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40
107.40
2603.28
2603.28
190.00
170.00
150.00
76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50
40.85
40.85
816.99
0.00
0.00
0.00
0.00
816.99
3420.27
0.00
0.00
0.00
2204.31
220.4309
0.00
3420.27
342.03
3.42
345.45
190.00
170.00
2603.28
-264.87
176.70
105.40
150.00
372.00
654.10
81.76
6.54
52.33
794.73
107.40
107.40
3498.97
3498.97
190.00
170.00
150.00
95.00
85.00
225.00
405.00
50.63
4.05
28.35
488.03
48.80
48.80
976.05
0.00
0.00
0.00
0.00
0.00
976.05
4475.02
0.00
0.00
447.50
4.48
451.98
3498.97
3259.05
325.9053
0.00
4475.02
-158.34
190.00
170.00
150.00
176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40
107.40
4523.53
4523.53
190.00
170.00
150.00
95.00
85.00
225.00
405.00
50.63
4.05
28.35
488.03
48.80
48.80
976.05
0.00
0.00
0.00
0.00
976.05
5499.58
0.00
0.00
0.00
549.96
5.50
555.46
4523.53
4283.61
428.3612
0.00
5499.58
-54.86
190.00
170.00
150.00
176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40
107.40
0.00
0.00
190.00
170.00
150.00
95.00
85.00
225.00
405.00
50.63
4.05
28.35
488.03
48.80
48.80
976.05
0.00
0.00
0.00
0.00
0.00
976.05
976.05
0.00
0.00
97.61
0.00
0.00
976.05
-239.91
-23.99139
0.98
98.58
-511.74
Qnty
A)
a)
b)
c)
d)
e)
0.15 nos
0.15 nos
0.80 nos
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg
100mm dia
a)
b)
c)
d)
e)
on
on
on
2.80 Kg
11.50 Kg
For 1 joint
Add Labour cess
b)
12.50 %
1%
7%
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.05 sqm/e =0.50 sqm @ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg
0.25 nos
0.25 nos
1.00 nos
12.50 %
1%
7%
3.50 Kg
on
on
on
23.00 Kg
For 1 joint
Add Labour cess
c)
150mm dia
a)
b)
c)
d)
e)
0.30 nos
0.30 nos
1.10 nos
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.08sqm /E =0.80 sqm@ 7.00 kg/sqm
12.50 %
1%
7%
on
on
on
5.60 Kg
37.14 Kg
For 1 joint
Add Labour cess
d)
200mm dia
a)
b)
c)
d)
e)
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.116 sqm/e =1.16 sqm @ 7.00 kg/sqm
0.30 nos
0.30 nos
1.10 nos
12.50 %
1%
7%
8.12 Kg
38.00 Kg
on
on
on
For 1 joint
Add Labour cess
d)
250mm dia
a)
b)
c)
d)
e)
0.40 nos
0.40 nos
1.30 nos
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.156 sqm/e =1.56 sqm @ 7.00 kg/sqm
12.50 %
1%
7%
on
on
on
10.92 Kg
39.14 Kg
For 1 joint
Add Labour cess
d)
300mm dia
a)
b)
c)
d)
e)
0.40 nos
0.40 nos
1.30 nos
O.H.C @
Watering charges @
12.50 %
1%
on
on
7%
on
14.00 Kg
58.70 Kg
For 1 joint
Add Labour cess
A)
75mm dia
a)
b)
c)
d)
e)
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg
0.15 nos
0.15 nos
0.80 nos
12.50 %
1%
7%
2.80 Kg
11.50 Kg
on
on
on
For 1 joint
Add Labour cess
b)
90mm dia
a)
b)
c)
d)
e)
0.15 nos
0.15 nos
0.80 nos
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg
12.50 %
1%
7%
on
on
on
2.80 Kg
11.50 Kg
C)
110mm dia
a)
b)
c)
d)
e)
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.050 sqm /E = 0.50 sqm@ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg
0.25 nos
0.25 nos
1.00 nos
12.50 %
1%
7%
3.50 Kg
23.00 Kg
on
on
on
For 1 joint
Add Labour cess
c)
160mm dia
a)
b)
c)
d)
e)
0.30 nos
0.30 nos
1.10 nos
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.08sqm /E =0.80 sqm@ 7.00 kg/sqm
12.50 %
1%
7%
on
on
on
5.60 Kg
37.14 Kg
For 10 nos joints
For 1 joint
3424.21 /
Add Labour cess
d)
200mm dia
a)
b)
c)
d)
e)
0.30 nos
0.30 nos
1.10 nos
O.H.C @
Watering charges @
12.50 %
1%
on
on
7%
on
8.12 Kg
38.00 Kg
For 1 joint
Add Labour cess
d)
250mm dia
a)
b)
c)
d)
e)
0.40 nos
0.40 nos
1.30 nos
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.156 sqm/e =1.56 sqm @ 7.00 kg/sqm
12.50 %
1%
7%
on
on
on
10.92 Kg
39.14 Kg
For 1 joint
Add Labour cess
d)
315mm dia
a)
b)
c)
d)
e)
0.40 nos
0.40 nos
1.30 nos
O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.20 sqm/e =2.00 sqm @ 7.00 kg/sqm
12.50 %
1%
7%
on
on
on
14.00 Kg
58.70 Kg
For 10 nos joints
For 1 joint
5892.70 /
Add Labour cess
Unit
Each
Each
Each
190.00
170.00
150.00
174.00
174.00
174.00
28.50
25.50
120.00
174.00
21.75
1.74
12.18
209.67
Kg
115.00
322.00
Kg
66.00
759.00
1081.00
0.4
2.8
1081.00
1290.67
10
%
129.07
1.29
130.36
130.40 /Each
Joint
Say
Each
Each
Each
190.00
170.00
150.00
240.00
240.00
240.00
Kg
209.67
115.00
47.50
42.50
150.00
240.00
30.00
2.40
16.80
289.20
402.50
289.20
0.5
3.5
Kg
66.00
Say
190.00
170.00
150.00
273.00
273.00
273.00
57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97
Kg
115.00
644.00
Kg
66.00
2451.24
3095.24
328.97
0.8
5.6
3095.24
3424.21
342.42
3.42
345.84
345.80 /Each
Joint
10
%
Say
Each
Each
Each
1920.50
2209.70
220.97
2.21
223.18
223.20 /Each
Joint
10
%
Each
Each
Each
1518.00
1920.50
190.00
170.00
150.00
273.00
273.00
273.00
57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97
Kg
115.00
933.80
Kg
66.00
2508.00
3441.80
328.97
1.16
8.12
3441.80
38
3770.77
377.08
3.77
380.85
380.80 /Each
Joint
10
%
Say
Each
Each
Each
190.00
170.00
150.00
339.00
339.00
339.00
76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50
Kg
115.00
1255.80
Kg
66.00
2583.24
3839.04
Say
339.00
339.00
1.16
10.92
3839.04
4247.54
424.75
4.25
429.00
429.00 /Each
Joint
10
%
Each
Each
Each
408.50
190.00
170.00
150.00
76.00
68.00
195.00
339.00
42.38
3.39
39.136
339.00
23.73
408.50
Kg
115.00
1610.00
Kg
66.00
3874.20
5484.20
1.16
14
5484.20
58.704
5892.70
589.27
5.89
595.16
595.20 /Each
Joint
10
%
Say
Each
Each
Each
408.50
190.00
170.00
150.00
174.00
174.00
174.00
28.50
25.50
120.00
174.00
21.75
1.74
12.18
209.67
Kg
115.00
322.00
Kg
66.00
759.00
1081.00
209.67
0.4
2.8
1081.00
1290.67
129.07
1.29
130.36
130.40 /Each
Joint
10
%
Say
Each
Each
Each
190.00
170.00
150.00
174.00
174.00
174.00
28.50
25.50
120.00
174.00
21.75
1.74
12.18
209.67
Kg
115.00
322.00
Kg
66.00
759.00
1081.00
209.67
0.4
2.8
1081.00
1290.67
10
%
129.07
1.29
130.36
130.40 /Each
Joint
Say
Each
Each
Each
190.00
170.00
150.00
240.00
240.00
240.00
47.50
42.50
150.00
240.00
30.00
2.40
16.80
289.20
Kg
115.00
402.50
Kg
66.00
1518.00
1920.50
289.20
0.4
2.8
1920.50
2209.70
220.97
2.21
223.18
223.20 /Each
Joint
10
%
Say
Each
Each
Each
190.00
170.00
150.00
273.00
273.00
273.00
57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97
Kg
115.00
644.00
Kg
66.00
2451.24
3095.24
328.97
0.8
5.6
3095.24
3424.21
10
%
342.42
3.42
345.84
345.80 /Each
Joint
Say
Each
Each
Each
273.00
273.00
190.00
170.00
150.00
57.00
51.00
165.00
273.00
34.13
2.73
273.00
19.11
328.97
Kg
115.00
933.80
Kg
66.00
2508.00
3441.80
Say
190.00
170.00
150.00
339.00
339.00
339.00
76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50
Kg
115.00
1255.80
Kg
66.00
2583.24
3839.04
10
%
Say
1.16
8.12
3441.80
38
3770.77
377.08
3.77
380.85
380.80 /Each
Joint
10
%
Each
Each
Each
328.97
408.50
1.16
10.92
3839.04
4247.54
424.75
4.25
429.00
429.00 /Each
Joint
39.136
Each
Each
Each
190.00
170.00
150.00
339.00
339.00
339.00
76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50
Kg
115.00
1610.00
Kg
66.00
3874.20
5484.20
408.50
1.16
14
5484.20
5892.70
10
%
Say
589.27
5.89
595.16
595.20 /Each
Joint
58.704
2
Supplying all labour, T&P and fixing Single Air
valves for Water Works purposes for the following
dismeter,including drilling the water main (Cast
Iron or pipe with metal straps) But excluding cost
of Air Valve and metal straps as per specification
complete and direction of Engineer-in-charge.
Qnty
Unit
(a)
(b)
c)
0.25 nos
0.50 nos
0.50 nos
d)
e)
f)
g)
O.H. Charges @
Jointing materials etc @
Water Charges @
Sundries @
(A)
a)
12.5 %
17 %
1%
8%
Cost of One No
Add Labour Cess
1%
Each
Each
Each
on
on
on
on
0.93 nos
0.62 nos
2.48 nos
Add O.H. charges. @
Watering @
12.5 %
1%
207.50
207.50
207.50
207.50
Each
Each
Each
on
on
654.10
654.10
Sundries @
8%
on
Rate for 7.40 Qntl
Rate for 1 Qntl
794.73 /
Rate of laying of C.I. D/F Air valve
=10 nos =0.713 qntl
0.713 Qntl
654.10
7.40
Qntl
6.00
190.00
170.00
150.00
47.50
85.00
75.00
207.50
25.94
35.28
2.08
16.60
287.39
2.87
290.26
190.00
170.00
150.00
176.70
105.40
372.00
654.10
81.76
6.54
7.00
107.40
107.40
52.33
794.73
76.57