Material

Sand (filling)
Sand (Mortor)
Chips 12mm
Chips 6mm
Metal 40mm
Cement
Sand for filling
Rod
Brick(25x12x8cm)
Brick Khoa
R.R. Stone
Tranportation

39.00
44.00

640.00
42.00

1092.00

Hish Skilled
Skilled
Semi-skilled
Un-skilled

Nut Bolt
Fire Wood

Labour rate

205.00
190.00
170.00
150.00

70.00
415.00

Earth work portion


SL No.

Description of items

Qnty

Rate

a)
b)

2
Supplying all labour, T&P and
Earthwork in excavation in Ordinary
Soil including dressing, breaking
clods & laying in layers not
exceeding 30cum in depth leveling
the bed & depositing the soil with in
initial lead of50m. & initial lift of
1.50m.
,
including
sundries,
supervision charges etc & as per
the direction of engineer- in-charge.
Data for 100 cum
Man Mulia (Un-skilled)
Women Mulia (Un-skilled)

c)
d)

Add O.H.C. @
Add Contractor Profit@

e)

Add foundation@

20 %

Add Labour Cess


Total for 100 cum

1%

a)
b)

16 nos
16 nos
32 nos
0%
0%

Each

150.00

Each

150.00

Supplying all labour, T&P and


Earthwork in excavation in Hard Soil
or Gravelly Soil with in 50 m. initial
lead & 1.50m. initial lift including
Rough dressing, breaking clods, &
laying in layers not exceeding 0.30m
in depth, leveling the bed &
including sundries , supervision
charges etc, & as per the direction
of engineer- in-charge.
Data for 100 cum
Man Mulia (Un-skilled)
Women Mulia (Un-skilled)

c)
d)

Add O.H.C. @
Add Contractor Profit@

e)

Add foundation@
Add Labour Cess
Total for

21.5 nos
21.5 nos
43 nos
0%
0%
20 %
1%
100 cum

SL No.

Description of items

Qnty

Rate

a)
b)

Supplying all labour, T&P and


Earthwork in excavation in Stony
earth and gravels mixed with stone
& boulders not exceeding 0.014
cum in volume with in 50mtr. Initial
lead & 1.50m. initial lift including
rough dressing, breaking clods &
laying in layers not exceeding 0.30m
In depth, leveling the bed &
including sundries , supervision
charges etc, & as per the direction
of Engineer- in-charge.

Data for 100 cum


Man Mulia (Un-skilled)
Women Mulia (Un-skilled)

c)
d)

Add O.H.C. @
Add Contractor Profit@

e)

Add foundation@
Add Labour Cess
Total for

a)
b)
c)

33.53 nos
33.53 nos
67.06 nos
0%
0%

Each

200.00

Each

150.00

20 %
1%
100 cum

Supplying all labour, T&P and


Earthwork in excavation in Slushy
Soil (in water up to 0.6m depth
requiring the aids of pans &Vassals)
with in 50m. initials lift including
leveling the bed ,rough dressing,
including sundries , supervision
charges etc, & as per the direction
of engineer- in-charge.
Data for 100 cum
Man Mulia (Un-skilled)
Women Mulia (Un-skilled)
Add O.H.C. @

21 nos
23 nos
44 nos
0%

SL No.
1
d)
e)

Description of items
2
Add contractor profit

Qnty

Rate

3
0%

Add 20% for foundation


Add 1 % Labour Cess
Total for 100 cum

a)
b)

Supplying all labour, T&P and earth


work in excavation in all kinds of soil
within initial
lead of 50m lead &
initial lift of 1.50m. including rough
dressing breaking clods & laying in
layers not
exceeding 0.30m. In
depth, leveling the bed, using pans,
vessels for slushy soil & including
sundries supervision charges &
labour cess etc, as per the direction
of Engineer-in-charge.
Data for 100 cum
In Ordinary Soil
In Hard Soil /Gravelly Soil
In Stoney Earth &Gravel
In Slushy Soil

Cutting in disintegrated rock not


requiring blasting to be removed by
pick axes and crow bars and
depositing materials within 50m
initial lead and 1.5m initial lift
including rough dressing as per
direction and specification of the
department including stacking the
useful materials separately as
Data
for 100 cum
ordered.
Data for 100 cum
Man Mulia (Un-skilled)
Women Mulia (Un-skilled)

5760.00
7740.00
16094.40
7920.00
37514.40 /
4
Add 1% Labour Cess
Say

55 nos
54 nos

9472.40

SL No.

Description of items

c)
d)

Add O.H.C. @
Add contractor Profit@

e)

Add for foundation

Qnty

Rate

3
109 nos
0%
0%
20.00 %

4
150.00

Each

16350.00

Add Labour Cess

1.00 %

Total for 100 cum


7

i)

Supplying all
labour, T&P and
Blasting hard and compacted sheet
rock
excluding
sand
stone
measured in solid including jumping
holes cost of explosive fuse,
detonator, etc and stacking the
blasted debris clear of work within
Data lead.
for 2.83 cum
50m
Blaster
Man Mulia
Stone cutter
Sangi Mulia

ii)

cost of explosive fuse, detonator

III)
IV)
v)

Overhead Charges @
Add Contractor Profit @
Total (i + ii+ iii+iv)
For 1 cum =

i)
ii)
iii)

1 no
2 nos
2 nos
2 nos

Each
Each
Each
Each

205.00
150.00
190.00
170.00
L.S.

0.00 %
0.00 %

on(i+ii)
on(i+ii)

1305.60
1305.60

1305.60 /
2.83 cum
Add Labour Cess @ 1.00 %

Supplying all labour, T&P and


Excavation of founation in hard rock
(granite) removed
by chiselling
including dressing and levelling the
bed not exceeding 1.5m in depth
and depositing the soil within initial
lead of 50m and as per specification
approved by the Department
Data for 1 Cum
Labour
Man Mulia (Un-skilled)
Overhead Charges @
Add Contractor fit. @
Total (i + ii+ iii)

5.68 nos
0.00 % on (i+ii)
0.00 % on (i+ii)
Add Labour cess

Each

150.00
852.00
852.00
1.00

SL No.

Description of items

Qnty

Rate

2
Supplying all labour, T&P and
Excavation of founation in laterite
rock or any hard rock (other than
granite
or
disintigrated
rock)
removed by chiselling including
dressing and levelling the bed not
exceeding 1.5m in depth and
depositing the soil within initial lead
of 50m and as per specification
approved by the Department

i)
ii)
iii)

Data for 1 Cum


Labour
Man Mulia (Un-skilled)
Overhead Charges @
Add Contractor Profit@
Total (i + ii+ iii)

3.74 nos

Each

0.00 % on (i+ii)
0.00 % on (i+ii)

561.00
561.00

Add Labour cess@

10

i)
ii)
iii)

150.00

1.00

Supplying all labour, T&P and


Shoring and shuttering foundation
trenches, pits etc.with close wooden
planks
or
sheets
shuttering
etc.excluding cost of planks and
sheets (labour only)
Data for 1 Sqm
Labour
Carpenter ( 2nd class)
Overhead Charges @
Add Contractor Profit@
Total (i + ii+ iii)

0.50

nos

Each

0.00 % on(i+ii)
0.00 % on(i+ii)

190.00
95.00
95.00

Add 1% Labour Cess

11

a)

Supplying all labour, T&P and Filling


in foundation and plinth with
excavated
materials
including
watering and ramming as directed
by the Engineer-in-charge
Data for 100 cum
In Ordinary Sail
Add Labour Cess @

5760.00 x
1.00 %

2 / 3

SL No.

Description of items

Qnty

Rate

b)

In Hard Soil /Gravelly Soil


Add Labour cess@

6450.00 x
1.00 %

2 / 3

c)

In Stoney Earth &Gravel


Add Labour cess@

13412.00 x
1.00 %

2 / 3

d)

In Slushy Soil

6600.00 x
1.00 %

2 / 3

Add Labour cess@

e)

In all kinds of soil


In Ordinary soil
In Hard Soil /Gravelly Soil
In Stoney Earth &Gravel
In Slushy Soil
Add Labour Cess @

3840.00
4300.00
8941.33
4400.00
21481.33 / 4
1%
Say

12

Extra lift of 1.5m or part there of


over the initial lift of 1.5m in all kinds
of embankments and road works
and ordinary earth work in general.
1st Extra lift of 1.5m (upto 7.5m)
Data for 100 cum

i)
ii)
iii)

Labour
Man Mulia (Unskilled)
Overhead Charges @
Add Contractor Profit@

4.10

nos

0.00 % on(i+ii)
0.00 % on(i+ii)

Each

150.00
615.00
615.00

SL No.

Description of items

Qnty

Rate

1
Total (i + ii+ iii)

Add Labour Cess @

1%

Amount in
Rs.
5

4800.00
0.00
0.00
4800.00

Say

6450.00
0.00
0.00
6450.00

Say

Remarks
6

4800.00
960.00
5760.00
57.60
5817.60
5817.60

6450.00
1290.00
7740.00
77.40
7817.40
7817.40

Amount in
Rs.
5

13412.00
0.00
0.00
13412.00

Say

6600.00
0.00

Remarks
6

13412.00
2682.40
16094.40
160.94
16255.34
16255.30

16094.40
615.00
16709.40
167.0940
16876.49

Amount in
Rs.
5
0.00
6600.00

Say

Remarks
6
6600.00
1320.00
7920.00
79.20
7999.20
7999.20

9378.60
93.79
9472.39 /100cum

Amount in
Rs.
5
16350.00
0.00
0.00
16350.00

Say

205.00
300.00
380.00
340.00
1225.00
80.60
1305.60

852.00
852.00

%
Say

Remarks
6

16350.00
3270.00
19620.00
196.20
19816.20
19816.20

1305.60
0.00
0.00
1305.60
461.34
4.61
465.96
466.00 /Cum

852.00
0.00
0.00
852.00
8.52
860.52
860.50 /cum

Amount in
Rs.
5

561.00
561.00

95.00
95.00

Say

3840.00
38.40
3878.40

Remarks
6

561.00
0.00
0.00
561.00
5.61
566.61 /cum

95.00
0.00
0.00
95.00
0.95
95.95 /Sqm
96.00 /Sqm

3878.40 /100cum

Amount in
Rs.
5

Remarks
6

4300.00
43.00
4343.00

4343.00 /100cum

8941.33
89.41
9030.75

9030.70 /100cum

4400.00
44.00
4444.00

4444.00 /100cum

5370.33
53.70
5424.04
5424.00 /100cum

615.00
615.00

615.00
0.00
0.00

Amount in
Rs.
5

Remarks
6
615.00
6.15
621.15
621.20

Say
100cum

9993.60
99.936
10093.54
10092.35
10193.2735

Sand filling
SL No.

Description of items

Qnty

Unit

Supplying all materials, labour, T&P and filling in


foundation and plinth with sand well watered and
rammed including conveyance of all materials to
work site, payment of royalty , taxes & labour cess
etc all complete as per specification and direction of
Engineer-in-charge.

Data for Per Cum


a)

a)
i)

Materials
Sand ffor filling

100 cum cum

Labour charges
Man Mulia (Unskilled)

12.36 nos

O.H.C. @
Add Contractor Profit@

C)

Cost of 100 cum


Cost for 1 cum =
Lead & Royalty of Sand
Total (A+B+C)

Each

0.00 %
0.00 %
6054.00 /

100

Add 1 % Labour Cess

Crusher Dust filling


SL No.

Description of items

Qnty

2
Supplying all materials, labour, T&P and filling with
Granite stone screening (Passing through 2.36mm
sieve & retained on 180 micron sieve) watered and
rammed including conveyance of all materials to
work site, payment of royalty , taxes ,contractor profit
& labour cess etc all complete as per specification
and direction of Engineer-in-charge.

Unit

Data for Per Cum


a)
i)

Labour charges
Man Mulia (Unskilled)

12.36 nos
O.H.C. @
Add Contractor Profit@

(B)

C)

Cost of 100 cum


Cost for 1 cum =
Material Cost & carriage & Royalty
Cost of Granite stone screening (Passing through
2.36mm sieve & retained on 180 micron sieve)(one
cum)

Each

0.00 %
0.00 %
1854.00 /

100

Lead & Royalty of Granite stone


Total (A+B+C)
Add 1 % Labour Cess

Rate
4

Amount in
Rs.
5.00

42.00

4200.00
4200.00

150.00

1854.00
1854.00

6054.00
6054.00
cum
356.00

Labour Cess
Say

Remarks
6.00

4200.00

1854.00
6054.00
0.00
0.00
6054.00
60.54
356.00
416.54
4.17
420.71
420.70

60.54

42.07054

Rate
4

Amount in
Rs.
5.00

150.00

1854.00
1854.00

cum

Remarks
6.00

1854.00
0.00
0.00
1854.00
18.54

18.54

578.00

Labour Cess
Say

311.80
908.34
9.08
917.42
917.40

18.54

18.73

SL No. Description of items


1
1

a)
b)
c)
d)
e)
f)

O.H. charges @ 12 %
Watering charges @ 1%
Sundries @ 8%

0.17 nos
0.17 nos
1.33 nos

Rate for 100 kg =


Say

b)

Unit

Supplying all labour, T&P and laying in trenches


centrifugally cost ( spun) Iron Pressure pipes S/S and
specials class-LA conforming to IS- 1536 of following
nominal diameter as per specification all complete
excluding joints ( Earth work to be measured
separately )
Vide- AR- 2.2.1 (a) ( Page-43)
Taking an average of 10m of 200mm dia CL- A
Data for 2 x 257 kg - = 514 kg.
Plumber ( Fitter ) (S)
Helper to Plumber/Filter
Male Worker ( Unskilled

a)

Qnty

90mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr
( 0.75Q/ 3.66 m) x 10 = 2.05 QH
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr

Each
Each
Each

316.75 /

1.61 Qntl
99.22 /
Add Labour cess@

100 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr
( 0.75Q/ 3.66 m) x 10 = 2.05 QH
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
within 5.00 KM Lead.

2.05 Qntl
126.33 /

Add Labour cess

5.14

Per Qntl
10
1%

Per Qntl
10

1%

c)

150 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =3.33 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
within 5.00 KM Lead.

3.33 Qntl
205.21 /

Add Labour cess@

d)

200 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =4.86 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
within 5.00 KM Lead.

4.86 Qntl
299.50 /

Add Labour cess@

e)

250 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =6.56 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
within 5.00 KM Lead.

6.56 Qntl
404.26 /

Add Labour cess@

f)

300 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =8.47 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr

8.47 Qntl
521.96 /

Per Qntl
10

1%

Per Qntl
10

1%

Per Qntl
10

1%

Per Qntl
10

Add carriage of C.I. pipe from store to work site


within 5.00 KM Lead.
Add Labour cess@

g)

350 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =10.66 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
within 5.00 KM Lead.

1%

10.66 Qntl
656.92 /

10

Add Labour cess@

h)

400 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.00mtr =12.95 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
within 5.00 KM Lead.

1%

12.95 Qntl
798.04 /

450 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =15.63 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
within 5.00 KM Lead.

1%

15.63 Qntl
963.19

Add Labour cess@

Per Qntl
10

Add Labour cess@

h)

Per Qntl

Per Qntl
10

1%

i)

500 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =18.33 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
with 5.00 KM Lead.

18.33 Qntl
1129.58 /

Add Labour cess@

j)

600 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =24.43 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
with 5.00 KM Lead.

24.43 Qntl
1505.49 /

Add Labour cess@

j)

700 mm dia C.I. pipe


Data for 10 Mtr
Weight of C.I. pipe for 10.0mtr =31.50 qntl
Laying of C.I. pipe
cost for 10 mtr
Cost for 1 Mtr
Add carriage of C.I. pipe from store to work site
with 5.00 KM Lead.

31.5 Qntl
1941.18 /

Per Qntl
10

1%

Per Qntl
10

1%

Per Qntl
10

Add 1 % Labour Ces

Rate in Rs

Amount in
Rs.

190.00
170.00
150.00

32.30
28.90
199.50
260.70

Remarks
7

61.62 /Qntl

61.62

Say

61.62

Say

99.22
99.22
9.92
0.10
10.02 / Mtr
/ Mtr

126.33
126.33
12.63
6.67
19.30
0.19
19.49 / Mtr
19.50 / Mtr

260.70
32.59
2.61
20.86
316.75

61.62

205.21
205.21
20.52
10.91
31.43
0.31
31.74 / Mtr

61.62

299.50
299.50
29.95
17.14
47.09
0.47
47.56 / Mtr
47.60

Say

61.62

404.26
404.26
40.43
24.00
64.43
0.64
65.07 / Mtr

61.62

521.96
521.96
52.20

30.00
82.20
0.82
83.02 / Mtr

61.62

656.92
656.92
65.69
40.00
105.69
1.06
106.75 / Mtr

61.62

798.04
798.04
79.80
40.00
119.80
1.20
121.00 / Mtr

61.62

963.19
963.19
96.32
60.00
156.32
1.56
157.88 / Mtr

61.62

1129.58
1129.58
112.96
60.00
172.96
1.73
174.69 / Mtr

61.62

1505.49
1505.49
150.55
80.00
230.55
2.31
232.85 / Mtr

61.62

1941.18
1941.18
194.12

194.12
1.94
196.06 / Mtr
225.90 / Mtr

SL No. Description of items


1

Qnty

Unit

Supplying all labour,T&P and making the transportation


of following materials M.S. pipes, specials including
hoisting, loading and
stacking etc.from the
departmental store to work site, all complete as per the
direction of Engineer-in-charge.

TRANSPORTATION OF PVC PIPES FROM STORE TO WORK SITE MIN.5 KM

Conveyance of pipe including loading and unloading


( Bulky materials)
A)

A)

Within 5.00 Km
110mm O.D.PVC pipe
Rate for Mtr

1200.00 /
685.00 mtr /
1200.00 /

Rate for Mtr

325.00 mtr /
1200.00 /

160mm O.D.PVC pipe

Per Truck
Per Truck
685.00

Per Truck
325.00

Rate in Rs
5

Amount in
Rs.

Remarks

1.75 mtr

=
Say

3.69 mtr
3.70

SL No. Description of items


1

Qnty

Unit

Supplying all labour,T&P and making the transportation


of following materials M.S. pipes, specials including
hoisting, loading and
stacking etc.from the
departmental store to work site, all complete as per the
direction of Engineer-in-charge.

TRANSPORTATION OF C.I.PIPES FROM STORE TO WORK SITE MIN.5 KM


Conveyance of pipe including loading and unloading
( Bulky materials)
Within 5.00 Km

a)

b)

c)

d)

e)

f)

g)

h)

i)

1200.00

100mm dia C.I. (0.206 qntl/mtr)

Per Truck

Rate for Mtr

180.00 Mtr / Per Truck


1200.00 /
180.00

Rate for Mtr

110.00 Mtr / Per Truck


1200.00 /
110.00

150mm dia C.I. (0.338 qntl/mtr)

200mm dia C.I. (0.486 qntl/mtr)


Rate for Mtr

70.00 Mtr / Per Truck


1200.00 /

70.00

Rate for Mtr

50.00 Mtr / Per Truck


1200.00 /

50.00

Rate for Mtr

40.00 Mtr / Per Truck


1200.00 /

40.00

Rate for Mtr

30.00 Mtr / Per Truck


1200.00 /

30.00

Rate for Mtr

20.00 Mtr / Per Truck


1200.00 /

20.00

Rate for Mtr

20.00 Mtr / Per Truck


1200.00 /

20.00

Rate for Mtr

15.00 Mtr / Per Truck


1200.00 /

15.00

250mm dia C.I. (0.656 qntl/mtr)

300mm dia C.I. (0.847 qntl/mtr)

350mm dia C.I. (1.065 qntl/mtr)

450mm dia C.I. (1.563 qntl/mtr)

500mm dia C.I. (1.833 qntl/mtr)

600mm dia

TRANSPORTATION OF PVC PIPES FROM STORE TO WORK SITE MIN.5 KM

Conveyance of pipe including loading and unloading


( Bulky materials)
A)

A)

Within 5.00 Km
110mm O.D.PVC pipe
Rate for Mtr

1200.00 /
685.00 mtr /
1200.00 /

Rate for Mtr

325.00 mtr /
1200.00 /

160mm O.D.PVC pipe

Per Truck
Per Truck
685.00

Per Truck
325.00

Rate in Rs
5

Amount in
Rs.

Remarks

6.67 mtr

10.91 mtr

17.14 mtr

24.00 mtr

30.00 mtr

40.00 mtr

60.00 mtr

60.00 mtr

80.00 mtr

1.75 mtr

=
Say

3.69 mtr
3.70

Laying of UPVC (CLASS-II) pipe


SL No. Description of items
1
1

a)

a)
b)
c)
d)
e)

2
Supplying all materials,labour,T&P and laying in
trenches unplastised PVC pipes and specials
(class-II) of the following outer diameter
(4kg/cm2) including jointing with supply of
approved solvent cement by non-heat application
method including testing as per specification, all
complete (earth work in trenches, cost of PVC
pipe &
specials fittings to be measured
separately) as per the direction of Engineer-incharge.

75mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.

g)
h)
i)

Jointing materials
Cost of solvent cement =30 grammes or
kg.
Watering Charges
Sundries

0.03

Qnty

Unit

Rate in Rs
5

0.12 nos
0.24 nos

Each
Each

190.00
150.00

0.22 nos
0.83 nos
0.12 nos

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

12.50 %

0.03 kg
1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work
site within 5 km
Add Labour Cess

Add Cost of PVC Class-II pipe


Add Cost of Labour

321.54 /
10
1.00 mtr

Labour cost

1%

1 mtr
1 mtr

Add Labour cess

mtr
mtr

84.96

%
Say

a)

a)
b)
c)
d)
e)

g)
h)
i)

110mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)

Jointing materials
Cost of solvent cement =30 grammes or
kg.
Watering Charges
Sundries

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

0.056 kg

Add Labour Cess

c)
d)

0.31 nos
1.33 nos
0.18 nos

0.03

Add cost of Class-II pipe (110mm )


Add cost of labour

a)
b)

190.00
150.00

12.50 %

Add Labour Cess

160mm O.D.UPVC pipe


(DATA FOR 10 MTR)
Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter

Each
Each

O.H.C.

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work
site within 5 km

a)

0.18 nos
0.35 nos

1%
8%

495.62 /
1.00 mtr

10

1%

1.00 mtr Mtr


1.00 mtr Mtr

121.75

1%

0.25 nos
0.50 nos

Each
Each

190.00
150.00

0.46 nos
1.92 nos

Each
Each

190.00
170.00

e)

g)
h)
i)

Male worker (Unskilled)

0.25 nos

Jointing materials
Cost of solvent cement =30 grammes or
kg.
Watering Charges
Sundries

O.H.C.

12.50 %

0.03

0.133 kg

Each

150.00

Per kg

200.00

1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work
site within 5 km

723.77 /
1.00 mtr

Add Labour cess @

Add cost PVC (Class-II)


Add cost labour
Add Labour Cess

10

1%

1.00 mtr
1.00 mtr

257.42

1%
Say

Amount in
Rs.
6

Remarks
7

22.80
36.00
41.80
141.10
18.00
259.70
32.46
292.16

292.16

6.00
2.60
20.78
29.37

29.37
321.54

32.15
1.75
33.91
0.34
34.24 /mtr(Labour)
84.96
33.91
118.87
1.19
120.05
119.90 /mtr

34.20
52.50
58.90
226.10
27.00
398.70
49.84
448.54

448.54

11.20
3.99
31.90
47.08
49.56
1.75
51.31
0.51
51.83
121.75
51.31
173.06
1.73
174.79

47.50
75.00
87.40
326.40

47.08
495.62

37.50
573.80
71.73
645.53

645.53

26.60
5.74
45.90
78.24

78.24
723.77

72.38
3.69
76.07
0.76
76.83
257.42
76.07
333.49
3.33
336.82
336.50 / Mtr

76.50 /mtr
Labour Charge

Laying of UPVC (CLASS-III) pipe

SL No. Description of items


1
1

a)

a)
b)
c)
d)
e)

2
Supplying all labour,T&P and laying in trenches
unplastised PVC pipes and specials (class-III) of the
following outer diameter (6kg/cm2) including jointing
with supply of approved solvent cement by non-heat
application method including testing as per
specification, all complete (earth work in trenches,
cost of PVC pipe & specials fittings to be measured
separately) as per the direction of Engineer-in-charge.

Qnty

Unit

Rate in Rs
5

110mm O.D.UPVC pipe


(DATA FOR 10 MTR)

Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.

g)

Jointing materials
Cost of solvent cement =30 grammes or

h)
i)

Watering Charges
Sundries

0.03 kg.

0.18 nos
0.35 nos

Each
Each

190.00
150.00

0.31 nos
1.33 nos
0.18 nos

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

12.50 %

0.056 kg
1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work site
within 5 km

Add Labour Cess

495.62 /
10
1.00 mtr

1%

a)

a)
b)

160mm O.D.UPVC pipe


(DATA FOR 10 MTR)

Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)

0.25 nos
0.5 nos

Each
Each

190.00
150.00

c)
d)
e)

Labour for jointing & Testing


Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)

0.46 nos
1.92 nos
0.25 nos
O.H.C.

g)

Jointing materials
Cost of solvent cement =30 grammes or

h)
i)

Watering Charges
Sundries

0.03 kg.

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

12.50 %

0.133 kg
1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work site
within 5 km
Add Labour Cess

723.77 /
10
1.00 mtr

1%
Say

a)

a)
b)
c)
d)
e)

200mm O.D.UPVC pipe


(DATA FOR 10 MTR)

Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.

g)

Jointing materials
Cost of solvent cement =30 grammes or

h)
i)

Watering Charges
Sundries

0.03 kg.

0.32 nos
0.64 nos

Each
Each

190.00
150.00

0.74 nos
2.58 nos
0.32 nos

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

12.50 %

0.133 kg
1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work site within 5
km
Add Labour Cess

979.16 /
1.00 mtr

10

1%
Say

Amount in Rs. Remarks


6

34.20
52.50
58.90
226.10
27.00
398.70
49.84
448.54

448.54

11.20
3.99
31.90
47.08

47.08
495.62

49.56
1.75

51.31
0.51
51.83
270.76
2.71
273.47

51.80

47.50
75.00

87.40
326.40
37.50
573.80
71.73
645.53

645.53

26.60
5.74
45.90
78.24

78.24
723.77

72.38
3.70
76.08
0.76
76.84
76.80 / Mtr

60.80
96.00
140.60
438.60
48.00
784.00
98.00
882.00

882.00

26.60
7.84
62.72
97.16
97.92
0.00
97.92
0.98
98.90
84.80 / Mtr

97.16
979.16

Laying of UPVC (CLASS-III) pipe

SL No. Description of items


1
1

a)

a)
b)
c)
d)
e)

2
Supplying all labour,T&P and laying in trenches
unplastised PVC pipes and specials (class-III) of the
following outer diameter (6kg/cm2) including jointing
with supply of approved solvent cement by non-heat
application method including testing as per
specification, all complete (earth work in trenches,
cost of PVC pipe & specials fittings to be measured
separately) as per the direction of Engineer-in-charge.

Qnty

Unit

Rate in Rs
5

75mm O.D.UPVC pipe


(DATA FOR 10 MTR)

Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.

g)

Jointing materials
Cost of solvent cement =30 grammes or

h)
i)

Watering Charges
Sundries

0.03 kg.

0.12 nos
0.24 nos

Each
Each

190.00
150.00

0.22 nos
0.83 nos
0.12 nos

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

12.50 %

0.03 kg
1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Labour Cess

321.54 /
1%

10

Say

a)

a)
b)
c)
d)
e)

90mm O.D.UPVC pipe


(DATA FOR 10 MTR)

Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.

g)

Jointing materials
Cost of solvent cement =30 grammes or

h)
i)

Watering Charges
Sundries

0.03 kg.

0.14 nos
0.28 nos

Each
Each

190.00
150.00

0.29 nos
1.00 nos
0.14 nos

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

12.50 %

0.04 kg
1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work site within 5
km
Add Labour Cess

390.36 /
1.00 mtr

10

1%
Say

a)

a)
b)
c)
d)
e)

110mm O.D.UPVC pipe


(DATA FOR 10 MTR)

Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.

g)

Jointing materials
Cost of solvent cement =30 grammes or

h)
i)

Watering Charges
Sundries

0.03 kg.

0.18 nos
0.35 nos

Each
Each

190.00
150.00

0.31 nos
1.33 nos
0.18 nos

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

12.50 %

0.056 kg
1%
8%

Data for 10 Mtr


For 1.00 mtr

495.62 /

10

Add Carriage of PVC pipe from Store to Work site


within 5 km

Add Labour Cess

a)

a)
b)
c)
d)
e)

1.00 mtr

1%

160mm O.D.UPVC pipe


(DATA FOR 10 MTR)

Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.

g)

Jointing materials
Cost of solvent cement =30 grammes or

h)
i)

Watering Charges
Sundries

0.03 kg.

0.25 nos
0.5 nos

Each
Each

190.00
150.00

0.46 nos
1.92 nos
0.25 nos

Each
Each
Each

190.00
170.00
150.00

Per kg

200.00

12.50 %

0.133 kg
1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work site
within 5 km
160mm OD PVC (Class-III) pipes
Add Labour Cess

723.77 /
10
1.00 mtr

1.00 mtr
1%
Say

a)

a)
b)
c)
d)
e)

200mm O.D.UPVC pipe


(DATA FOR 10 MTR)

Labour of laying
Plumber (Fitter) (S)
Male worker (Unskilled)
Labour for jointing & Testing
Plumber (Fitter) (S)
Helper to plumber or fitter
Male worker (Unskilled)
O.H.C.

0.32 nos
0.64 nos

Each
Each

190.00
150.00

0.74 nos
2.58 nos
0.32 nos

Each
Each
Each

190.00
170.00
150.00

12.50 %

g)

Jointing materials
Cost of solvent cement =30 grammes or

h)
i)

Watering Charges
Sundries

0.03 kg.

0.133 kg

Per kg

200.00

1%
8%

Data for 10 Mtr


For 1.00 mtr
Add Carriage of PVC pipe from Store to Work site within 5
km
Add Labour Cess

979.16 /
1.00 mtr

10

1%
Say

Amount in Rs. Remarks


6

22.80
36.00
41.80
141.10
18.00
259.70
32.46
292.16

292.16

6.00
2.60
20.78
29.37
32.15
0.32
32.48
27.80 / Mtr

29.37
321.54

26.60
42.00
55.10
170.00
21.00
314.70
39.34
354.04

354.04

8.00
3.15
25.18
36.32

36.32
390.36

39.04
1.30
40.34
0.40
40.74
35.10 / Mtr

34.20
52.50
58.90
226.10
27.00
398.70
49.84
448.54

448.54

11.20
3.99
31.90
47.08
49.56

47.08
495.62

1.75

51.31
0.51
51.83

51.80

47.50
75.00
87.40
326.40
37.50
573.80
71.73
645.53

645.53

26.60
5.74
45.90
78.24
72.38
3.70
76.08
370.00
446.08
4.46
450.54
450.50 / Mtr

60.80
96.00
140.60
438.60
48.00
784.00
98.00

78.24
723.77

882.00

882.00

26.60
7.84
62.72
97.16
97.92
0.00
97.92
0.98
98.90
84.80 / Mtr

97.16
979.16

Tyton Rubber Joint

SL
No.
1

Description of items

Supplying all labour T & P and making tyton joints


using SBR rubber rings to spun Iron cast Iron pipes
and fittings of the following nominal diameter
including testing of the joints but excluding the cost
of rubber rings as per specification all complete as
per the direction of the Engineer in charge

(i)

100mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)

Unit

O.H. charge @
Watering charges @
Sundries @
For 1no joint
Add Labour Cess @

Add Tyton Rubber Ring


Add Labour cess

(ii)

Qnty

150mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)

5/ 6
2/ 3
1 2/

nos
nos

Each
Each

nos

Each

12.50

% on
1 % on
6 % on
For 10 nos Joints
623.39 / 10
1%

521.67
521.67
521.67

1 No

Each

1%

1 1/
2/

3
3

nos
nos

Each
Each

2 5/

12

nos

Each

O.H. charge @
Watering charges @
Sundries

12.50

729.17
729.17
729.17

Add Tyton Rubber Ring

1 no

Each

% on
1 % on
6 % on
For 10 nos joints
For 1no joint
871.35 / 10
Add Labour Cess @
1%

Add Labour cess

1%

(ii)

200mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)
O.H. charge @
Watering charges @
Sundries

1 1/

3
1

nos
nos

Each
Each

nos

Each

% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1043.63 / 10
Add Labour Cess @
1%

(ii)

250mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)
O.H. charge @
Watering charges @
Sundries

12.50

1 1/

3
1

nos
nos

Each
Each

nos

Each

% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1043.63 / 10

Add Labour Cess @

(ii)

300mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)
O.H. charge @
Watering charges @
Sundries

12.50

350mm dia C.I. pipe- data for 10 joints

873.33
873.33
873.33

1%

1 1/
3.33
12.50

3
1

nos
nos

Each
Each

nos

Each

% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1102.79 / 10
Add Labour Cess @
1%

(ii)

873.33
873.33
873.33

922.83
922.83
922.83

Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)

1 1/
4 1/

O.H. charge @
Watering charges @
Sundries

2
2
2

nos
nos
nos

% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1553.50 / 10
Add Labour Cess @
1%

(ii)

400mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)
O.H. charge @
Watering charges @
Sundries

12.50

1 1/
4 1/

2
2
2

nos
nos
nos

% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1553.50 / 10
Add Labour Cess @
1%

(ii)

12.50

450mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)
O.H. charge @
Watering charges @
Sundries

2
2
5

nos
nos
nos

% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1756.65 / 10
Add Labour Cess @
1%

(ii)

500mm dia C.I. pipe- data for 10 joints


Labour
Pl. Filter (S)
Helper to Plumber (F)
Male worker(Unskilled)

12.50

2
2
5

nos
nos
nos

Each
Each
Each
1300.00
1300.00
1300.00

Each
Each
Each
1300.00
1300.00
1300.00

Each
Each
Each
1470.00
1470.00
1470.00

Each
Each
Each

O.H. charge @
Watering charges @
Sundries

12.50

% on
1 % on
6 % on
For 10 nos joints
For 1no joint
1756.65 / 10
Add Labour Cess @
1%

1470.00
1470.00
1470.00

Rate in Rs Amount in Remarks


Rs.
5
6.00
7.00

Say

Say

190.00
170.00

158.33
113.33

150.00

250.00
521.67

45

62.34
0.62
62.96
63.00 Labour Ch
45.00
107.34
1.07
108.41
108.40

190.00
170.00

253.33
113.33

150.00

362.50
729.17

55

521.67
65.21
5.22
31.30
623.39

87.14
0.87
88.01
88.00 /Each
55.00
142.14
1.42

729.17
91.15
7.29
43.75
871.35

0.63
63.63

143.56

190.00
170.00

253.33
170.00

150.00

450.00
873.33

104.36
1.04
105.41

190.00
170.00

253.33
170.00

150.00

450.00
873.33

143.60

873.33
109.17
8.73
52.40
1043.63

105.40

873.33
109.17
8.73
52.40
1043.63

104.36
104.36
1.04
105.41

190.00
170.00

253.33
170.00

150.00

499.50
922.83

110.28
1.10
111.38

105.41

922.83
115.35
9.23
55.37
1102.79

111.38

63

190.00
170.00
150.00

285.00
340.00
675.00
1300.00

155.35
1.55
156.90

190.00
170.00
150.00

285.00
340.00
675.00
1300.00

155.35
1.55
156.90

190.00
170.00
150.00

190.00
170.00
150.00

380.00
340.00
750.00
1470.00

1300.00
162.50
13.00
78.00
1553.50

156.90

1300.00
162.50
13.00
78.00
1553.50

156.90

1470.00
183.75
14.70
88.20
1756.65

175.67
1.76
177.42

177.42

380.00
340.00
750.00
1470.00

1470.00

183.75
14.70
88.20
1756.65
175.67
1.76
177.42

177.42

Lead Joint
SL No. Description of items
1

1)

Supplying all labour , T&P and making the lead


caulked joint with molten lead to spun iron or cast
iron pipes and fittings of following nominal dia meter
including testing of joints but excluding the cost of
lead and gasket as per the following specification, all
complete as per the P.H.specification and direction of
Engineer-in-charge.

a)

100mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil

I)

ii)

Rate for 10 nos joints


Cost for each joint
Add cost Pig Lead
Gasket

ii)

0.28 qntl
0.38 ltrs

Qntl
Lits

1 nos
1 nos
2 nos

Each
Each
Each

12.5 %
1%
8%

on
on
on

929.50 /

2.20 kg
0.18 kg

Add Labour Cess @

I)

Unit

Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @

b)

Qnty

150mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @

10
kg
kg

1%

0.42 qntl
0.76 ltrs

Qntl
Lits

1.5 nos
1.5 nos
3 nos

Each
Each
Each

12.5 %
1%

on
on

Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket

I)

ii)

3.40 kg
0.23 kg

200mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil

Rate for 10 nos joints


Cost for each joint
Add cost Pig Lead
Gasket

I)

ii)

Qntl
Lits

2 nos
2 nos
4 nos

Each
Each
Each

12.5 %
1%
8%

on
on
on

10

5.00 kg
0.30 kg

250mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @

kg
kg

0.56 qntl
0.76 ltrs

1859.00 /

Add Labour Cess @

10

1%

Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @

d)

on

1399.95 /

Add Labour Cess @

c)

8%

kg
kg

1%

0.65 qntl
1.14 ltrs

Qntl
Lits

2.5 nos
2.5 nos
5 nos

Each
Each
Each

12.5 %
1%

on
on

Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket

2308.70 /

I)

ii)

300mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil

Rate for 10 nos joints


Cost for each joint
Add cost Pig Lead
Gasket

ii)

Qntl
Lits

3 nos
3 nos
6 nos

Each
Each
Each

Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)

12.5 %
1%
8%

on
on
on

10

7.20 kg
0.48 kg

350mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil

kg
kg

0.75 qntl
1.52 ltrs

2762.55 /

Add Labour Cess @

I)

10

1%

Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @

f)

on

6.10 kg
0.35 kg

Add Labour Cess @

e)

8%

kg
kg

1%

0.93 qntl
1.7 ltrs

Qntl
Lits

3 nos
3 nos
6 nos

Each
Each
Each

O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket

2842.65 /

I)

ii)

400mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil

10

Rate for 10 nos joints


Cost for each joint
Add cost Pig Lead
Gasket

1.12 qntl
1.7 ltrs

Qntl
Lits

4 nos
4 nos
8 nos

Each
Each
Each

12.5 %
1%
8%

3723.40 /

on
on
on

10

9.50 kg
0.75 kg

Add Labour Cess @

450mm dia C.I. (Data for 10 Joints)

kg
kg

1%

Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @

h)

on
on
on

8.40 kg
0.60 kg

Add Labour Cess @

g)

12.5 %
1%
8%

1%

kg
kg

I)

ii)

Material
Fire wood
Kerosene Oil
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket

I)

ii)

4.5 nos
4.5 nos
9 nos

Each
Each
Each

12.5 %
1%
8%

on
on
on

10

14.00 kg
0.95 kg

500mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket

Qntl
Lits

4178.80 /

Add Labour Cess @

i)

1.21 qntl
2.27 ltrs

kg
kg

1%

1.31 qntl
2.27 ltrs

Qntl
Lits

4.75 nos
4.75 nos
9.5 nos

Each
Each
Each

12.5 %
1%
8%

4420.78 /

on
on
on

10

15.00 kg
1.00 kg

kg
kg

Add Labour Cess @

J)
I)

ii)

600mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket

I)

ii)

700mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber

1.68 qntl
2.84 ltrs

Qntl
Lits

6.5 nos
6.5 nos
13 nos

Each
Each
Each

12.5 %
1%
8%

5994.75 /

Add Labour Cess @

K)

1%

on
on
on

10

kg
kg

kg
kg

1%

2.14 qntl
3.41 ltrs

Qntl
Lits

7.7 nos
7.7 nos

Each
Each

Male Worker (Unskilled)

15.4 nos
O.H. charge @
Watering charges @
Sundries @

Rate for 10 nos joints


Cost for each joint
Add cost Pig Lead
Gasket

7165.03 /

Add Labour Cess @

L)
I)

ii)

750mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil
Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket

800mm dia C.I. (Data for 10 Joints)


Material

on
on
on

10

kg
kg

kg
kg

1%

2.24 qntl
3.41 ltrs

Qntl
Lits

8.1 nos
8.1 nos
16.2 nos

Each
Each
Each

12.5 %
1%
8%

7527.29 /

Add Labour Cess @

L)

12.5 %
1%
8%

Each

1%

on
on
on

10

kg
kg

kg
kg

I)

Fire wood
Kerosene Oil

ii)

Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @
Rate for 10 nos joints
Cost for each joint
Add cost Pig Lead
Gasket

I)

ii)

Qntl
Lits

8.5 nos
8.5 nos
17 nos

Each
Each
Each

12.5 %
1%
8%

7885.40 /

Add Labour Cess @

L)

2.33 qntl
3.41 ltrs

900mm dia C.I. (Data for 10 Joints)


Material
Fire wood
Kerosene Oil

Rate for 10 nos joints


Cost for each joint
Add cost Pig Lead
Gasket

10

kg
kg

2.80 qntl
4.55 ltrs

Qntl
Lits

10 nos
10 nos
20 nos

Each
Each
Each

12.5 %
1%
8%

9317.50 /

Add Labour Cess @

kg
kg

1%

Labour Charge.
Plumber ( Fitter ) (S)
Helper to Plumber
Male Worker (Unskilled)
O.H. charge @
Watering charges @
Sundries @

on
on
on

1%

on
on
on

10

kg
kg

kg
kg

Rate in Rs
5

415.00
30.00

190.00
170.00
150.00
660.00
660.00
660.00

170.00
60.00

Say

415.00
30.00

190.00
170.00
150.00
990.00
990.00

Amount in
Rs.
6

Remarks

116.20
11.40
127.60

190.00
170.00
300.00
660.00
82.50
6.60
52.80
801.90

127.60

801.90
929.50

92.95
374.00
10.80
477.75
4.78
482.53
482.50 /Each

174.30
22.80
197.10

285.00
255.00
450.00
990.00
123.75
9.90

88

197.10

92.8295

93.8795

990.00

170.00
60.00

Say

415.00
30.00

190.00
170.00
150.00
1320.00
1320.00
1320.00

170.00
60.00

415.00
30.00

190.00
170.00
150.00
1650.00
1650.00

79.20
1202.85

1202.85
1399.95

140.00
578.00
13.80
731.80
7.32
739.11
739.10

232.40
22.80
255.20

380.00
340.00
600.00
1320.00
165.00
13.20
105.60
1603.80

255.20

1603.80
1859.00

185.90
850.00
18.00
1053.90
10.54
1064.44

269.75
34.20
303.95

475.00
425.00
750.00
1650.00
206.25
16.50

303.95

1650.00

170.00
60.00

Say

415.00
30.00

190.00
170.00
150.00
1980.00
1980.00
1980.00

170.00
60.00

415.00
30.00

190.00
170.00
150.00

132.00
2004.75

2004.75
2308.70

230.87
1037.00
21.00
1288.87
12.89
1301.76
1301.80

311.25
45.60
356.85

570.00
510.00
900.00
1980.00
247.50
19.80
158.40
2405.70

356.85

2405.70
2762.55

276.26
1224.00
28.80
1529.06
15.29
1544.35

385.95
51.00
436.95

570.00
510.00
900.00
1980.00

436.95

1980.00
1980.00
1980.00

170.00
60.00

415.00
30.00

190.00
170.00
150.00
2640.00
2640.00
2640.00

170.00
60.00

247.50
19.80
158.40
2405.70

2405.70
2842.65

284.27
1428.00
36.00
1748.27
17.48
1765.75

464.80
51.00
515.80

760.00
680.00
1200.00
2640.00
330.00
26.40
211.20
3207.60
372.34
1615.00
45.00
2032.34
20.32
2052.66

515.80

3207.60
3723.40

415.00
30.00

190.00
170.00
150.00
2970.00
2970.00
2970.00

170.00
60.00

Say

415.00
30.00

190.00
170.00
150.00
3135.00
3135.00
3135.00

170.00
60.00

502.15
68.10
570.25

855.00
765.00
1350.00
2970.00
371.25
29.70
237.60
3608.55

570.25

3608.55
4178.80

417.88
2380.00
57.00
2854.88
28.55
2883.43
2883.40

543.65
68.10
611.75

902.50
807.50
1425.00
3135.00
391.88
31.35
250.80
3809.03
442.08
2550.00
60.00

611.75

3809.03
4420.78
446.49828

3052.08
30.52
3082.60
3082.60

Say

415.00
30.00

190.00
170.00
150.00
4290.00
4290.00
4290.00

170.00
60.00

415.00
30.00

190.00
170.00

697.20
85.20
782.40

1235.00
1105.00
1950.00
4290.00
536.25
42.90
343.20
5212.35

782.40

5212.35
5994.75

599.48
0.00
0.00
599.48
5.99
605.47

888.10
102.30
990.40

1463.00
1309.00

990.40

150.00
5082.00
5082.00
5082.00

170.00
60.00

415.00
30.00

190.00
170.00
150.00
5346.00
5346.00
5346.00

170.00
60.00

2310.00
5082.00
635.25
50.82
406.56
6174.63

6174.63
7165.03

716.50
0.00
0.00
716.50
7.17
723.67

929.60
102.30
1031.90

1539.00
1377.00
2430.00
5346.00
668.25
53.46
427.68
6495.39
752.73
0.00
0.00
752.73
7.53
760.26

1031.90

6495.39
7527.29

415.00
30.00

190.00
170.00
150.00
5610.00
5610.00
5610.00

170.00
60.00

415.00
30.00

190.00
170.00
150.00
6600.00
6600.00
6600.00

170.00
60.00

966.95
102.30
1069.25

1615.00
1445.00
2550.00
5610.00
701.25
56.10
448.80
6816.15

1069.25

6816.15
7885.40

788.54
0.00
0.00
788.54
7.89
796.43

1162.00
136.50
1298.50

1900.00
1700.00
3000.00
6600.00
825.00
66.00
528.00
8019.00
931.75
0.00
0.00
931.75
9.32
941.07

1298.50

8019.00
9317.50

SL
No.
1

Description of items

Qnty

Supplying all materials, labour,T&P and cutting M.S. pipe &


welding two laying to inner& outer including packet cutting
& joint and testing the joint leak proof etc all complete as
per the direction of Engineer-in-charge.

Unit
3

(i)

(Data for 1 Joint)


Cutting of 450mm dia M.S.pipe 8mm thick

ii)

Welding Two Layers to 450mm dia M.S.pipe


Inside length
Outside length
Pocket welding

146.32 cm

Per cm

141.30 cm
146.32 cm
60.00 cm
347.62 cm
Add Labour Cess @

1%

Per cm

Rate in Rs Amount in Remarks


Rs.
5.00
6.00
7.00

7.00

1024.24

11.60

4032.39
5056.63

5056.63
50.57
5107.20

SL No. Description of items


1
1

a
b
c

2
Fixing Ferrule of the following nominal bore
including drilling the water main( cast iron pipes
or pipes with the metal strap) As per
specification complete
( excluding cost of ferrule)
10mm to 25mm bore
Labour for laying
Plumber ( fitter)
Helper to plumber or Helper
Male worker (U/S)-

d
e
f
g

Unit

0.25 nos
0.50 nos
0.50 nos

Add O.H.C.@
jointing materials etc @
Watering charges @
sundries @
ADD 15mm dia Brass Ferrule cock
Add Labour Cess

Qnty

12.5 %
17 %
1%
8%

Each
Each
Each

on
on
on

1 no

207.50
207.50
207.50
207.50
Each

1%

Making connection of galvanized mild steel


distribution branch with galvanized mild steel
main 25mm to 40mm nominal bore by providing
and fixing tee including cutting and threading
the pipes completes( cost of G.I. fitting to be
measured and paid Separately)

Detailed of cost laying of one


connection take 32mm dia
as an average size)

a)
b)
c)
d)
e)

Labour Charges
Plumber ( Fitter)
male worker (U/S)-

0.33 nos
0.33 nos
Add O.H.C. @
Watering charges @
sundries @
Add Labour Cess

12.50 %
1%
8%
1%

Each
Each
on
on
on

112.20
112.20
112.20

Making connection of galvanized mild steel


distribution branch with galvanized mild steel
main 50mm to 80mm nominal bore by providing
and fixing tee including cutting and threading
the Pipes completes( cost of G.I. fitting to be
measured and paid Separately)

Detailed of cost laying of one


connection take 65mm dia
as an average size)

a)
b)
c)
d)
e)

Labour Charges
Plumber ( Fitter)
male worker (U/S)-

0.45 nos
0.45 nos
Add O.H.C. @
Watering charges @
sundries @
Add Labour Cess

a)
b)
c)
d)
e)
(i)

12.50 %
1%
8%

Each
Each
on
on
on

153.00
153.00
153.00

1%

Supplying all labour, T&P and fixing metal or


PVC Fabricated Saddle Pieces using suitable
rubber O rings , bolts and nuts etc, to PVC
Pipes of suitable diameter 80mm to 315mm as
per specification complete.
80mm to 315mm dia
( DATA FOR ONE PIECE OF RUBBER O RING)
Labour Charges
Plumber/ fitter
Helper to plumber or fitter
Add O.H.C. @
Watering charges @
Sundries @
Add 110mm dia Service Saddle

0.25 nos
0.50 nos
12.50 %
1.00 %
7.00 %
1 set

Each
Each
on
on
on

132.50
132.50
132.50
Set

Add Labour Cess

(ii)

Cost of Labour Charges


Add cost 160mm dia Service saddle
Add Labour Cess

1%

1 no
1%

Each

Rate in Rs Amount in
Rs.
5
6

190.00
170.00
150.00

350.00

190.00
150.00

47.50
85.00
75.00
207.50
25.94
35.28
2.08
16.60
287.39
350.00

62.70
49.50
112.20
14.03
1.12
8.98
136.32
1.36
137.69

Remarks
7

287.39
350.00
637.39
6.37
643.76

190.00
150.00

85.50
67.50
153.00
19.13
1.53
12.24
185.90
1.86
187.75

190.00
170.00

47.50
85.00
132.50
16.56
1.33
9.28
159.66
94.40

94.40

159.66
94.40
254.06

2.54
256.60

179.30

159.66
179.30
338.96
3.39
342.35

Sluice Valves Fixing


SL No. Description of items
1
1

Qnty

Unit

Supplying all labour, T & P Fixing the cast Iron sluice


valve with double flanged ends for water works purposes
for the following rating and nominal diameters ( but
excluding the cost of cast Iron, sluice valves, bolts,
nuts, and rubber insertion )as per specification,
complete. as per the direction of the Engineer -in
charge.

(Data for 10 Joints)


100mm dia C.I.
Data for laying 7.40 QH C.I. specials vide A/R2.2.14
Labour
Pl. Fitter (S)
Helper to plumber
Male worker
Add O.H. charges. @
Watering @
Sundries @

0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%

Each
Each
Each
on
on
on

For 7.40 Qntl


Rate for 1 Qntl
794.73
/

654.10
654.10
654.10

7.40

Rate of laying of 100mm dia C.I.


a)

D/F sluice valve =10 nos


@ 0.443/each = 4.43 qntl

4.43 Qntl

Qntl

Data for flange jointing


vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S)
Helper to plumber
Male worker

0.25 nos
0.25 nos
1.00 nos

Each
Each
Each

Add O.H. charges. @


Watering @
Sundries @

12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
289.20 /

b)

240.00
240.00
240.00
10

Rate for 20 nos flanged joints

20 nos

Each

Add cost sluice valve (P.N.1.0)

10 nos

Each

Nut Bolt 16mm x 60mm long

46 kg

3mm thick Rubber Insertion =20nos = 0.05


sqm=1.00 Sqm @7.00kg/sqm
.
Rate for one no

7.00 kg
Kg
Rate for 10 nos Valves
5079.16

Add Labour Cess

Kg

10

1%

(Data for 10 Joints)


150mm dia C.I.
Data for laying 7.40 QH C.I. specials vide A/R2.2.14
Labour
Pl. Fitter (S)
Helper to plumber
Male worker
Add O.H. charges. @
Watering @
Sundries @

Rate for 1 Qntl

0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%

Each
Each
Each
on
on
on

For 7.40 Qntl


794.73
/

654.10
654.10
654.10

7.40

Rate of laying of 150mm dia C.I.


a)

D/F sluice valve =10 nos


= 7.13 qntl

7.13 Qntl

Qntl

Data for flange jointing


vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S)
Helper to plumber
Male worker

0.30 nos
0.30 nos
1.10 nos

Each
Each
Each

Add O.H. charges. @


Watering @
Sundries @

12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
328.97 /

b)

273.00
273.00
273.00
10

Rate for 20 nos flanged joints

20 nos

Each

Add cost sluice valve (P.N.1.0)


Nut Bolt 20mm x 65mm long

10 nos
74.28 kg

Each
Kg

11.20 kg

Kg

3mm thick Rubber Insertion =20nos = 0.08


sqm =1.60 sqm Sqm@7.00kg/sqm

Rate for 10 nos Valves


Rate for one no

7911.26

Add Labour Cess

10

1%
Say

(Data for 10 Joints)


200mm dia C.I.
Data for laying 7.40 QH C.I. specials vide A/R2.2.14
Labour
Pl. Fitter (S)
Helper to plumber
Male worker
Add O.H. charges. @
Watering @
Sundries @

0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%

Each
Each
Each
on
on
on

For 7.40 Qntl


Rate for 1 Qntl
794.73
/

654.10
654.10
654.10

7.40

Rate of laying of 200mm dia C.I.


a)

D/F sluice valve =10 nos


= 12.15 qntl
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S)
Helper to plumber
Male worker

12.15 Qntl

Qntl

0.30 nos
0.30 nos
1.10 nos

Each
Each
Each

Add O.H. charges. @


Watering @
Sundries @

12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
328.97 /

b)

Rate for 20 nos flanged joints

20 nos

273.00
273.00
273.00
10
Each

Add cost sluice valve (P.N.1.0)

10 nos

Each

Nut Bolt 20mm x 70mm long -160nos @


0.4750kg /Each =76.00 Kg

76.00 kg

Kg

3mm thick Rubber Insertion =20nos =0.116


sqm =2.32 sqm @7.00kg/sqm =

16.24 kg

Kg

Rate for 10 nos Valves


Rate for one no

9150.39

Add Labour Cess

10

1%

(Data for 10 Joints)


250mm dia C.I.
Data for laying 7.40 QH C.I. specials vide A/R2.2.14
Labour
Pl. Fitter (S)
Helper to plumber
Male worker
Add O.H. charges. @
Watering @
Sundries @

0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%

Each
Each
Each
on
on
on

For 7.40 Qntl


Rate for 1 Qntl
794.73
/

654.10
654.10
654.10

7.40

Rate of laying of 250mm dia C.I.


a)

D/F sluice valve =10 nos


= 17.69 qntl
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints

17.69 Qntl

Qntl

Labour
Pl. Fitter (S)
Helper to plumber
Male worker

0.40 nos
0.40 nos
1.30 nos

Each
Each
Each

Add O.H. charges. @


Watering @
Sundries @

12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
408.50 /

b)

Rate for 20 nos flanged joints

20 nos

Add cost sluice valve (P.N.1.0)

10 nos
kg

339.00
339.00
339.00
10
Each

Each
Kg
sqm
sqm
Rate for 10 nos Valves

Rate for one no

2716.83

Add Labour Cess

10

1%

(Data for 10 Joints)


300mm dia C.I.
Data for laying 7.40 QH C.I. specials vide A/R2.2.14
Labour
Pl. Fitter (S)
Helper to plumber
Male worker
Add O.H. charges. @
Watering @
Sundries @

0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%

Each
Each
Each
on
on
on

For 7.40 Qntl


Rate for 1 Qntl
794.73
/

654.10
654.10
654.10

7.40

a)

Rate of laying of 300mm dia C.I.


D/F sluice valve =10 nos
= 24.24 qntl
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S)
Helper to plumber
Male worker

24.24 Qntl

Qntl

0.40 nos
0.40 nos
1.30 nos

Each
Each
Each

Add O.H. charges. @


Watering @
Sundries @

12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
408.50 /

b)

Rate for 20 nos flanged joints

20 nos

Add cost sluice valve (P.N.1.0)

10 nos
kg

339.00
339.00
339.00
10
Each

Each
Kg
sqm
sqm
Rate for 10 nos Valves

Rate for one no

3420.27

Add Labour Cess

10

1%

(Data for 10 Joints)


350mm dia C.I.
Data for laying 7.40 QH C.I. specials vide A/R2.2.14
Labour
Pl. Fitter (S)
Helper to plumber

0.93 nos
0.62 nos

Each
Each

Male worker

2.48 nos
Add O.H. charges. @
Watering @
Sundries @

12.5 %
1%
8%

Each
on
on
on

For 7.40 Qntl


Rate for 1 Qntl
794.73
/

a)

Rate of laying of 350mm dia C.I.


D/F sluice valve =10 nos
= 32.58 qntl
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S)
Helper to plumber
Male worker

654.10
654.10
654.10

7.40

32.58 Qntl

Qntl

0.50 nos
0.50 nos
1.50 nos

Each
Each
Each

Add O.H. charges. @


Watering @
Sundries @

12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
488.03 /

b)

Rate for 20 nos flanged joints

20 nos

Add cost sluice valve (P.N.1.0)

10 nos
kg

405.00
405.00
405.00
10
Each

Each
Kg
sqm
sqm
Rate for 10 nos Valves

Rate for one no

4475.02

Add Labour Cess

1%

10

(Data for 10 Joints)


400mm dia C.I.
Data for laying 7.40 QH C.I. specials vide A/R2.2.14
Labour
Pl. Fitter (S)
Helper to plumber
Male worker
Add O.H. charges. @
Watering @
Sundries @

0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%

Each
Each
Each
on
on
on

For 7.40 Qntl


Rate for 1 Qntl
794.73
/

a)

Rate of laying of 400mm dia C.I.


D/F sluice valve =10 nos
= 42.12 qntl
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S)
Helper to plumber
Male worker

654.10
654.10
654.10

7.40

42.12 Qntl

Qntl

0.50 nos
0.50 nos
1.50 nos

Each
Each
Each

Add O.H. charges. @


Watering @
Sundries @

12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
488.03 /

b)

Rate for 20 nos flanged joints

20 nos

Add cost sluice valve (P.N.1.0)

10 nos
kg

405.00
405.00
405.00
10
Each

Each
Kg
sqm
sqm
Rate for 10 nos Valves

Rate for one no

5499.58

Add Labour Cess

1%

10

(Data for 10 Joints)


450mm dia C.I.
Data for laying 7.40 QH C.I. specials vide A/R2.2.14
Labour
Pl. Fitter (S)
Helper to plumber
Male worker
Add O.H. charges. @
Watering @
Sundries @

0.93 nos
0.62 nos
2.48 nos
12.5 %
1%
8%

Each
Each
Each
on
on
on

For 7.40 Qntl


Rate for 1 Qntl
794.73
/

a)

Rate of laying of 450mm dia C.I.


D/F sluice valve =10 nos
= 42.12 qntl
Data for flange jointing
vide A/R 0 2-2-30 For 10 joints
Labour
Pl. Fitter (S)
Helper to plumber
Male worker

Qntl

654.10
654.10
654.10

7.40

Qntl

0.50 nos
0.50 nos
1.50 nos

Each
Each
Each

Add O.H. charges. @


Watering @
Sundries @

12.5 %
on
1%
on
7%
on
Rate for 10 nos
Rate for One no
488.03 /

b)

Rate for 20 nos flanged joints

20 nos

Add cost sluice valve (P.N.1.0)

10 nos
kg

Rate for one no

405.00
405.00
405.00
10
Each

Each
Kg
sqm
sqm
Rate for 10 nos Valves
976.05

10

Add Labour Cess

1%

Rate in Rs
5

190.00
170.00
150.00

Amount in
Rs.
6

Remarks
7

176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40

107.40

475.76
475.76

190.00
170.00
150.00

47.50
42.50
150.00
240.00
30.00
2.40
16.80
289.20
28.92

28.92

578.40
0.00

475.76

578.40
1054.16

70.00

3220.00

115.00

805.00
4025.00

507.92
5.08
513.00 Say

190.00
170.00
150.00

4025.00
5079.16

513.00

176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40

107.40

765.73
765.73

190.00
170.00
150.00

57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97
32.90

32.90

657.93

0.00
70.00

0.00
5199.60

115.00

1288.00

765.73

120.8

657.93
1423.66
11.2

1.6

11.2

6487.60
791.13
7.91
799.04
799.00

190.00
170.00
150.00

6487.60
7911.26

241.22

176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40

107.40

1304.86
1304.86

190.00
170.00
150.00

57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97
32.90

32.90

657.93

1304.86

657.93
1962.79

746.83

0.00

0.00

70.00

5320.00

76

115.00

1867.60

2.32

7187.60

924.20

176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40

107.40

16.24
0.812

7187.60
9150.39

915.04
9.15
924.19 Say

190.00
170.00
150.00

74.68293

1899.84
1899.84

1899.84

313.87

190.00
170.00
150.00

76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50
40.85

40.85

816.99

0.00
0.00
0.00

0.00

0.00
0.00
0.00

1500.86
150.0864

0.00
2716.83

271.68
2.72
274.40

190.00
170.00
150.00

816.99
2716.83

-335.92

176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40

107.40

2603.28
2603.28

190.00
170.00
150.00

76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50
40.85

40.85

816.99

0.00
0.00
0.00

0.00

816.99
3420.27

0.00
0.00
0.00

2204.31
220.4309

0.00
3420.27

342.03
3.42
345.45

190.00
170.00

2603.28

-264.87

176.70
105.40

150.00

372.00
654.10
81.76
6.54
52.33
794.73
107.40

107.40

3498.97
3498.97

190.00
170.00
150.00

95.00
85.00
225.00
405.00
50.63
4.05
28.35
488.03
48.80

48.80

976.05

0.00
0.00
0.00

0.00
0.00

976.05
4475.02

0.00

0.00

447.50
4.48
451.98

3498.97

3259.05
325.9053

0.00
4475.02

-158.34

190.00
170.00
150.00

176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40

107.40

4523.53
4523.53

190.00
170.00
150.00

95.00
85.00
225.00
405.00
50.63
4.05
28.35
488.03
48.80

48.80

976.05

0.00
0.00
0.00

0.00

976.05
5499.58

0.00
0.00
0.00

549.96
5.50
555.46

4523.53

4283.61
428.3612

0.00
5499.58

-54.86

190.00
170.00
150.00

176.70
105.40
372.00
654.10
81.76
6.54
52.33
794.73
107.40

107.40

0.00
0.00

190.00
170.00
150.00

95.00
85.00
225.00
405.00
50.63
4.05
28.35
488.03
48.80

48.80

976.05

0.00
0.00
0.00

0.00
0.00

976.05
976.05

0.00

0.00

97.61

0.00

0.00
976.05

-239.91
-23.99139

0.98
98.58

-511.74

SL No. Description of items

Qnty

Providing flanged joints (Full-faced flanges) for


jointing PVC pipes and other conventional pipes and
fittings of the following nominal diameters including
testing of the joints & cost of nut bolt and rubber
insertion as per specification complete & direction of
Engineer-in-charge.

A)

80mm dia (Range-75mm to90mm)

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

0.15 nos
0.15 nos
0.80 nos

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg

Per each = 40nos = 11.50 Kg

100mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

on
on
on

2.80 Kg
11.50 Kg

For 1 joint
Add Labour cess

b)

12.50 %
1%
7%

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.05 sqm/e =0.50 sqm @ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg

For 10 nos joints


1290.67 /
1

0.25 nos
0.25 nos
1.00 nos
12.50 %
1%
7%

3.50 Kg

on
on
on

Per each = 80nos = 23.00 Kg

23.00 Kg

For 1 joint
Add Labour cess

c)

150mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

For 10 nos joints


2209.70 /
1

0.30 nos
0.30 nos
1.10 nos

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.08sqm /E =0.80 sqm@ 7.00 kg/sqm

12.50 %
1%
7%

on
on
on

5.60 Kg

20mm x 65mm long nut bolt @ 0.4643 kg

Per each = 80nos = 37.14 Kg

37.14 Kg

For 1 joint
Add Labour cess

d)

200mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.116 sqm/e =1.16 sqm @ 7.00 kg/sqm

For 10 nos joints


3424.21 /
1

0.30 nos
0.30 nos
1.10 nos
12.50 %
1%
7%

8.12 Kg

20mm x 70mm long nut bolt @ 0.4750 kg

Per each = 80nos = 38.00 Kg

38.00 Kg

on
on
on

For 1 joint
Add Labour cess

d)

250mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

For 10 nos joints


3770.77 /
1

0.40 nos
0.40 nos
1.30 nos

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.156 sqm/e =1.56 sqm @ 7.00 kg/sqm

12.50 %
1%
7%

on
on
on

10.92 Kg

20mm x75mm long nut bolt @ 0.4892 kg

Per each = 80nos = 38.00 Kg

39.14 Kg

For 1 joint
Add Labour cess

d)

300mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

For 10 nos joints


4247.54 /
1

0.40 nos
0.40 nos
1.30 nos
O.H.C @
Watering charges @

12.50 %
1%

on
on

Sundries including Tool & Plant @


Materials
Rubber Insertion 3mm thick x 10nos
0.20 sqm/e =2.00 sqm @ 7.00 kg/sqm

7%

on

14.00 Kg

20mm x 75mm long nut bolt @ 0.4892 kg

Per each = 120nos = 58.70 Kg

58.70 Kg

For 1 joint
Add Labour cess

Providing flanged joints (Stub flanges) for jointing


PVC pipes and other fittings of the following nominal
diameters including testing of the joints & cost of nut
bolt and rubber insertion & labour cess as per
specification complete & direction of Engineer-incharge.

A)

75mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg

Per each = 40nos = 11.50 Kg

For 10 nos joints


5892.70 /
1

0.15 nos
0.15 nos
0.80 nos
12.50 %
1%
7%

2.80 Kg
11.50 Kg

on
on
on

For 1 joint
Add Labour cess

b)

90mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

For 10 nos joints


1290.67 /
1

0.15 nos
0.15 nos
0.80 nos

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.040 sqm /E = 0.40 sqm@ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg

Per each = 40nos = 11.50 Kg

12.50 %
1%
7%

on
on
on

2.80 Kg
11.50 Kg

For 10 nos joints


For 1 joint
1290.67 /
Add Labour cess

C)

110mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.050 sqm /E = 0.50 sqm@ 7.00 kg/sqm
16mm x 60mm long nut bolt @ 0.2874 kg

Per each = 80nos = 23.00Kg

0.25 nos
0.25 nos
1.00 nos
12.50 %
1%
7%

3.50 Kg
23.00 Kg

on
on
on

For 1 joint
Add Labour cess

c)

160mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

For 10 nos joints


2209.70 /
1

0.30 nos
0.30 nos
1.10 nos

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
(0.08sqm /E =0.80 sqm@ 7.00 kg/sqm

12.50 %
1%
7%

on
on
on

5.60 Kg

20mm x 65mm long nut bolt @ 0.4643 kg

Per each = 80nos = 37.14 Kg

37.14 Kg
For 10 nos joints
For 1 joint
3424.21 /
Add Labour cess

d)

200mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

0.30 nos
0.30 nos
1.10 nos
O.H.C @
Watering charges @

12.50 %
1%

on
on

Sundries including Tool & Plant @


Materials
Rubber Insertion 3mm thick x 10nos
0.116 sqm/e =1.16 sqm @ 7.00 kg/sqm

7%

on

8.12 Kg

20mm x 70mm long nut bolt @ 0.4750 kg

Per each = 80nos = 38.00 Kg

38.00 Kg

For 1 joint
Add Labour cess

d)

250mm dia

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

For 10 nos joints


3770.77 /
1

0.40 nos
0.40 nos
1.30 nos

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.156 sqm/e =1.56 sqm @ 7.00 kg/sqm

12.50 %
1%
7%

on
on
on

10.92 Kg

20mm x 75mm long nut bolt @ 0.4892 kg

Per each = 80nos = 38.00 Kg

39.14 Kg

For 1 joint
Add Labour cess

d)

315mm dia

For 10 nos joints


4247.54 /
1

a)

(Data for 10 joints)


Labour charges
Plumber (Fitter)

b)
c)

Helper to Plumber or fitter


Male worker(un-skilled)

d)
e)

0.40 nos
0.40 nos
1.30 nos

O.H.C @
Watering charges @
Sundries including Tool & Plant @
Materials
Rubber Insertion 3mm thick x 10nos
0.20 sqm/e =2.00 sqm @ 7.00 kg/sqm

12.50 %
1%
7%

on
on
on

14.00 Kg

20mm x 75mm long nut bolt @ 0.4892 kg

Per each = 120nos = 58.70 Kg

58.70 Kg
For 10 nos joints
For 1 joint
5892.70 /
Add Labour cess

Unit

Rate in Rs Amount in Remarks


Rs.

Each
Each
Each

190.00
170.00
150.00

174.00
174.00
174.00

28.50
25.50
120.00
174.00
21.75
1.74
12.18
209.67

Kg

115.00

322.00

Kg

66.00

759.00
1081.00

0.4
2.8
1081.00
1290.67

10
%

129.07
1.29
130.36
130.40 /Each
Joint

Say

Each
Each
Each

190.00
170.00
150.00

240.00
240.00
240.00

Kg

209.67

115.00

47.50
42.50
150.00
240.00
30.00
2.40
16.80
289.20

402.50

289.20

0.5
3.5

Kg

66.00

Say

190.00
170.00
150.00

273.00
273.00
273.00

57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97

Kg

115.00

644.00

Kg

66.00

2451.24
3095.24

328.97

0.8
5.6
3095.24

3424.21
342.42
3.42
345.84
345.80 /Each
Joint

10
%
Say

Each
Each
Each

1920.50

2209.70
220.97
2.21
223.18
223.20 /Each
Joint

10
%

Each
Each
Each

1518.00
1920.50

190.00
170.00
150.00

273.00
273.00
273.00

57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97

Kg

115.00

933.80

Kg

66.00

2508.00
3441.80

328.97

1.16
8.12
3441.80

38

3770.77
377.08
3.77
380.85
380.80 /Each
Joint

10
%
Say

Each
Each
Each

190.00
170.00
150.00

339.00
339.00
339.00

76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50

Kg

115.00

1255.80

Kg

66.00

2583.24
3839.04

Say

339.00
339.00

1.16
10.92
3839.04

4247.54
424.75
4.25
429.00
429.00 /Each
Joint

10
%

Each
Each
Each

408.50

190.00
170.00
150.00

76.00
68.00
195.00
339.00
42.38
3.39

39.136

339.00

23.73
408.50

Kg

115.00

1610.00

Kg

66.00

3874.20
5484.20

1.16
14
5484.20

58.704

5892.70
589.27
5.89
595.16
595.20 /Each
Joint

10
%
Say

Each
Each
Each

408.50

190.00
170.00
150.00

174.00
174.00
174.00

28.50
25.50
120.00
174.00
21.75
1.74
12.18
209.67

Kg

115.00

322.00

Kg

66.00

759.00
1081.00

209.67

0.4
2.8
1081.00

1290.67
129.07
1.29
130.36
130.40 /Each
Joint

10
%
Say

Each
Each
Each

190.00
170.00
150.00

174.00
174.00
174.00

28.50
25.50
120.00
174.00
21.75
1.74
12.18
209.67

Kg

115.00

322.00

Kg

66.00

759.00
1081.00

209.67

0.4
2.8
1081.00
1290.67

10
%

129.07
1.29
130.36
130.40 /Each
Joint

Say

Each
Each
Each

190.00
170.00
150.00

240.00
240.00
240.00

47.50
42.50
150.00
240.00
30.00
2.40
16.80
289.20

Kg

115.00

402.50

Kg

66.00

1518.00
1920.50

289.20

0.4
2.8
1920.50

2209.70
220.97
2.21
223.18
223.20 /Each
Joint

10
%
Say

Each
Each
Each

190.00
170.00
150.00

273.00
273.00
273.00

57.00
51.00
165.00
273.00
34.13
2.73
19.11
328.97

Kg

115.00

644.00

Kg

66.00

2451.24
3095.24

328.97

0.8
5.6
3095.24
3424.21

10
%

342.42
3.42
345.84
345.80 /Each
Joint

Say

Each
Each
Each
273.00
273.00

190.00
170.00
150.00

57.00
51.00
165.00
273.00
34.13
2.73

273.00

19.11
328.97

Kg

115.00

933.80

Kg

66.00

2508.00
3441.80

Say

190.00
170.00
150.00

339.00
339.00
339.00

76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50

Kg

115.00

1255.80

Kg

66.00

2583.24
3839.04

10
%
Say

1.16
8.12
3441.80

38

3770.77
377.08
3.77
380.85
380.80 /Each
Joint

10
%

Each
Each
Each

328.97

408.50

1.16
10.92
3839.04

4247.54
424.75
4.25
429.00
429.00 /Each
Joint

39.136

Each
Each
Each

190.00
170.00
150.00

339.00
339.00
339.00

76.00
68.00
195.00
339.00
42.38
3.39
23.73
408.50

Kg

115.00

1610.00

Kg

66.00

3874.20
5484.20

408.50

1.16
14
5484.20
5892.70

10
%
Say

589.27
5.89
595.16
595.20 /Each
Joint

58.704

SL No. Description of items


1
1

2
Supplying all labour, T&P and fixing Single Air
valves for Water Works purposes for the following
dismeter,including drilling the water main (Cast
Iron or pipe with metal straps) But excluding cost
of Air Valve and metal straps as per specification
complete and direction of Engineer-in-charge.

Qnty

Unit

Ref:- A/R-1999 P-No.296 Sl No.2.6.4


(A)
(I)

SINGLE AIR VALVES


15mm to 25mm diameter.
Data for one Air Valve.
Labour for drilling and fixing the Air Valve.

(a)
(b)
c)

Plumber (Fitter) (S)


Helper to Plumber or Fitter
Male Worker(Unskilled)

0.25 nos
0.50 nos
0.50 nos

d)
e)
f)
g)

O.H. Charges @
Jointing materials etc @
Water Charges @
Sundries @

Supplying all labour, T&P and Fixing Double Air


Valve for Water Works Purposes of the following
diameter (But Excluding cost of Double Air
Valve,Rubber insertion,Bolts and nus) as per
specification ,complete and direction of Engineerin-charge.

(A)

DOUBLE AIR VALVES


Up to 80mm dia
Labour Charges for fixing
Labour
Pl. Fitter (S)
Helper to plumber
Male worker

a)

12.5 %
17 %
1%
8%
Cost of One No
Add Labour Cess
1%

Each
Each
Each
on
on
on
on

0.93 nos
0.62 nos
2.48 nos
Add O.H. charges. @
Watering @

12.5 %
1%

207.50
207.50
207.50
207.50

Each
Each
Each
on
on

654.10
654.10

Sundries @

8%
on
Rate for 7.40 Qntl
Rate for 1 Qntl
794.73 /
Rate of laying of C.I. D/F Air valve
=10 nos =0.713 qntl

Data for flange jointing vide A/R 0 2-2-30

0.713 Qntl

654.10
7.40

Qntl

Rate in Rs Amount in Remarks


Rs.
5.00

6.00

190.00
170.00
150.00

47.50
85.00
75.00
207.50
25.94
35.28
2.08
16.60
287.39
2.87
290.26

190.00
170.00
150.00

176.70
105.40
372.00
654.10
81.76
6.54

7.00

107.40

107.40

52.33
794.73

76.57